Encyclopedia

Pulp Deposition Front


Your opinion

Is this topic interesting to you?

Rating

Deposition front - total width of pulp flows discharged simultaneously through openings of the distribution pulp pipeline onto the beach of a hydraulic embankment. The design value of the deposition front is calculated depending on the type of stored soils, capacity of the earth suction unit or dredger, and duration of deposition at this section

Source: "VSN 291-72*. Departmental Construction Norms. Instruction for designing hydraulic embankments from clayey soils and forecasting their condition"

(approved by the Ministry of Mounting and Special Construction of the USSR on March 21, 1972)

Your opinion

How useful was this material to you?

Choose a reaction, rate the material, and tell us what could be improved.

Your impression
Rating
Select a star to rate it

Морфология

Род

Понятие «фронт намыва пульпы» мужского рода.

Склонение и число

Падеж Единственное число Множественное число
Р фронта намыва пульпы фронтов намыва пульпы
Д фронту намыва пульпы фронтам намыва пульпы
В фронт намыва пульпы фронты намыва пульпы
Т фронтом намыва пульпы фронтами намыва пульпы
П фронте намыва пульпы фронтах намыва пульпы