Encyclopedia

Result of completed design and survey works


Your opinion

Is this topic interesting to you?

Rating

The result of the completed design and survey works — design documentation and (or) a document containing the results of engineering surveys — is recognized as the result of the performed design and (or) survey works under such a contract, provided that there is a positive conclusion of the expert review of the design documentation and (or) the results of engineering surveys1.

  1. Federal Law No. 44-FZ of April 5, 2013 "On the Contract System in the Field of Procurement of Goods, Works and Services for State and Municipal Needs", as amended on January 8, 2020, Article 110.2, paragraph 3 // Official Gazette of the Russian Federation. 2013. No. 14. Item 1652. ↩

Your opinion

How useful was this material to you?

Choose a reaction, rate the material, and tell us what could be improved.

Your impression
Rating
Select a star to rate it