Costs of construction of power grid facilities
Costs for the construction of electric grid infrastructure - costs for the construction of electric grid infrastructure from existing electric grid infrastructure to connected energy receiving devices and (or) power generation facilities, not accounted for from 1 October 2015 to 31 December 2022 as part of the fee for technological connection of energy receiving devices with a maximum power not exceeding 150 kW1.
Costs for the construction of electric grid infrastructure - from existing electric grid infrastructure to connected energy receiving devices and (or) power generation facilities, not accounted for from 1 October 2015 as part of the fee for technological connection of energy receiving devices with a maximum power not exceeding 150 kW (ceased to be in force on 2019-01-01)2.
Federal Law No. 35-FZ of March 26, 2003 "On Electric Power", as amended on September 1, 2026, Art. 23.2, para. 2 // RSZ RF. 2003. No. 13. Art. 1177. ↩
Federal Law No. 35-FZ of March 26, 2003 "On Electric Power", as amended on December 27, 2018, Art. 23-2, para. 2, ceased to be in force from January 1, 2019 // RSZ RF. 2003. No. 13. Art. 1177. ↩