Legislation

Energy Act 2011

Date of adoption: October 19, 2011

Source: www.legislation.gov.uk

Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-1"><num>CHAPTER 1</num><heading>Green deal</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-introductory"><heading><i>Introductory</i></heading><section eId="section-1"><num>1</num><heading>Green deal plans</heading><subsection eId="section-1-1"><num>(1)</num><content><p>This section applies for the purposes of this Chapter.</p></content></subsection><subsection eId="section-1-2"><num>(2)</num><content><p>An energy plan is an arrangement made by the occupier or owner of a property for a person to make energy efficiency improvements to the property.</p></content></subsection><subsection eId="section-1-3"><num>(3)</num><intro><p>An energy plan is a green deal plan if—</p></intro><level class="para1" eId="section-1-3-a"><num>(a)</num><content><p>the energy efficiency improvements are to be paid for wholly or partly in instalments, and</p></content></level><level class="para1" eId="section-1-3-b"><num>(b)</num><content><p>all of the requirements listed in paragraphs (a) to (e) of subsection (4) are met in relation to the plan at the time when it is made.</p></content></level></subsection><subsection eId="section-1-4"><num>(4)</num><intro><p>The requirements are—</p></intro><level class="para1" eId="section-1-4-a"><num>(a)</num><content><p>the property is an eligible property,</p></content></level><level class="para1" eId="section-1-4-b"><num>(b)</num><content><p>the energy efficiency improvements fall within a description specified in an order made by the Secretary of State (“qualifying energy improvements”),</p></content></level><level class="para1" eId="section-1-4-c"><num>(c)</num><content><p>the conditions mentioned in section 4 as to assessment of the property and other matters have been met,</p></content></level><level class="para1" eId="section-1-4-d"><num>(d)</num><content><p>the conditions mentioned in section 5 as to the terms of the plan and other matters are met, and</p></content></level><level class="para1" eId="section-1-4-e"><num>(e)</num><content><p>a relevant energy supplier supplies, or is to supply, energy to the property.</p></content></level></subsection><subsection eId="section-1-5"><num>(5)</num><intro><p>Subsection (6) applies to a green deal plan from the time when—</p></intro><level class="para1" eId="section-1-5-a"><num>(a)</num><content><p>improvements have been installed in accordance with section 7,</p></content></level><level class="para1" eId="section-1-5-b"><num>(b)</num><content><p>the plan is confirmed in accordance with section 8, and</p></content></level><level class="para1" eId="section-1-5-c"><num>(c)</num><content><p>the requirements imposed by virtue of section 9 or 10 are met.</p></content></level></subsection><subsection eId="section-1-6"><num>(6)</num><intro><p>The payments in instalments agreed in the plan are to be—</p></intro><level class="para1" eId="section-1-6-a"><num>(a)</num><content><p>made by the person who is for the time being liable to pay the energy bills for the property,</p></content></level><level class="para1" eId="section-1-6-b"><num>(b)</num><content><p>made to the relevant energy supplier through the energy bills for the property,</p></content></level><level class="para1" eId="section-1-6-c"><num>(c)</num><content><p>recoverable as a debt by the relevant energy supplier from the person referred to in paragraph (a), and</p></content></level><level class="para1" eId="section-1-6-d"><num>(d)</num><content><p>recovered and held by the relevant energy supplier as agent and trustee for the person who made the improvements (unless the relevant energy supplier is also that person).</p></content></level></subsection><subsection eId="section-1-7"><num>(7)</num><content><p>Subsection (6) applies irrespective of whether the person referred to in paragraph (a) is the person who entered into the plan.</p></content></subsection><subsection eId="section-1-8"><num>(8)</num><intro><p>Subsection (6) is subject to—</p></intro><level class="para1" eId="section-1-8-a"><num>(a)</num><content><p>provision made in regulations under section 34;</p></content></level><level class="para1" eId="section-1-8-b"><num>(b)</num><content><p>any suspension or cancellation, by virtue of provision made in regulations under section 3(3)(h) or (i), 6(4), 16 or 35, of liability to make payments.</p></content></level></subsection><subsection eId="section-1-9"><num>(9)</num><content><p>For the purposes of subsection (4)(a) a property is an eligible property unless it falls within a description specified in an order made by the Secretary of State.</p></content></subsection></section><section eId="section-2"><num>2</num><heading>Green deal plans: supplementary</heading><subsection eId="section-2-1"><num>(1)</num><content><p>This section applies for the purposes of this Chapter.</p></content></subsection><subsection eId="section-2-2"><num>(2)</num><content><p>The occupier or owner who makes the arrangement referred to in section 1(2) is the “improver” and the person who makes the improvements is the “green deal provider”.</p></content></subsection><subsection eId="section-2-3"><num>(3)</num><content><p>The person referred to in section 1(6)(a) is the “bill payer”.</p></content></subsection><subsection eId="section-2-4"><num>(4)</num><intro><p>References to energy efficiency improvements, in relation to a property, are to—</p></intro><level class="para1" eId="section-2-4-a"><num>(a)</num><content><p>measures for improving efficiency in the use in the property of electricity, gas conveyed through pipes or any other source of energy which is specified in an order made by the Secretary of State, or</p></content></level><level class="para1" eId="section-2-4-b"><num>(b)</num><content><p>measures falling within subsection (5) or (6).</p></content></level></subsection><subsection eId="section-2-5"><num>(5)</num><intro><p>Measures fall within this subsection if—</p></intro><level class="para1" eId="section-2-5-a"><num>(a)</num><intro><p>they are any of the following—</p></intro><level class="para2" eId="section-2-5-a-i"><num>(i)</num><content><p>measures for increasing the amount of electricity generated, or heat produced, by microgeneration (within the meaning given by section 26(1) of the Climate Change and Sustainable Energy Act 2006);</p></content></level><level class="para2" eId="section-2-5-a-ii"><num>(ii)</num><content><p>any other measures for increasing the amount of electricity generated, or heat produced, using low-emissions sources or technologies;</p></content></level><level class="para2" eId="section-2-5-a-iii"><num>(iii)</num><content><p>measures for reducing the consumption of such energy as is mentioned in subsection (4), and</p></content></level></level><level class="para1" eId="section-2-5-b"><num>(b)</num><content><p>they are specified in an order made by the Secretary of State.</p></content></level></subsection><subsection eId="section-2-6"><num>(6)</num><intro><p>Measures fall within this subsection if—</p></intro><level class="para1" eId="section-2-6-a"><num>(a)</num><intro><p>they are installed at the property for the purpose of supplying to it any of the following types of energy—</p></intro><level class="para2" eId="section-2-6-a-i"><num>(i)</num><content><p>electricity generated by a generating station operated for the purposes of producing heat, or a cooling effect, in association with electricity;</p></content></level><level class="para2" eId="section-2-6-a-ii"><num>(ii)</num><content><p>heat produced in association with electricity or steam produced from (or air or water heated by) such heat;</p></content></level><level class="para2" eId="section-2-6-a-iii"><num>(iii)</num><content><p>any gas or liquid subjected to a cooling effect produced in association with electricity, and</p></content></level></level><level class="para1" eId="section-2-6-b"><num>(b)</num><content><p>they are specified in an order made by the Secretary of State.</p></content></level></subsection><subsection eId="section-2-7"><num>(7)</num><content><p>For the purposes of subsection (5)(a)(ii) electricity is generated, or heat is produced, using low-emissions sources or technologies if it is generated, or produced, by plant which relies wholly or mainly on a source of energy or a technology mentioned in section 26(2) of the Climate Change and Sustainable Energy Act 2006.</p></content></subsection><subsection eId="section-2-8"><num>(8)</num><content><p>For the purposes of subsection (6) “generating station” and “supplying” are to be read in accordance with section 64(1) of the Electricity Act 1989.</p></content></subsection><subsection eId="section-2-9"><num>(9)</num><content><p>“Energy” (except in this section), “energy bill”, “occupier”, “owner” and “relevant energy supplier” have the meaning given in regulations made by the Secretary of State.</p></content></subsection><subsection eId="section-2-10"><num>(10)</num><content><p>Regulations under subsection (9) may also make provision as to the circumstances in which a person who is not a bill payer for the purposes of this Chapter may be treated as a bill payer for those purposes.</p></content></subsection></section><section eId="section-3"><num>3</num><heading>Framework regulations</heading><subsection eId="section-3-1"><num>(1)</num><intro><p>The Secretary of State must by regulations establish a scheme making provision for the Secretary of State—</p></intro><level class="para1" eId="section-3-1-a"><num>(a)</num><content><p>to authorise persons to act as green deal assessors, green deal providers or green deal installers in connection with green deal plans (either individually or through membership of a body specified in, or authorised under, the scheme);</p></content></level><level class="para1" eId="section-3-1-b"><num>(b)</num><content><p>to regulate the conduct of those assessors, providers or installers (“green deal participants”).</p></content></level></subsection><subsection eId="section-3-2"><num>(2)</num><content><p>Regulations under subsection (1) are referred to in this Chapter as “<term refersTo="#term-the-framework-regulations" eId="term-the-framework-regulations">the framework regulations</term>”.</p></content></subsection><subsection eId="section-3-3"><num>(3)</num><intro><p>The scheme established by the framework regulations may, in particular, make provision—</p></intro><level class="para1" eId="section-3-3-a"><num>(a)</num><content><p>requiring the payment of a fee in connection with initial or continued authorisation under the scheme;</p></content></level><level class="para1" eId="section-3-3-b"><num>(b)</num><content><p>for the establishment and maintenance of a register of green deal participants and of persons from whom authorisation under the scheme has been withdrawn;</p></content></level><level class="para1" eId="section-3-3-c"><num>(c)</num><content><p>requiring green deal participants to provide the information required under the scheme;</p></content></level><level class="para1" eId="section-3-3-d"><num>(d)</num><content><p>for the issuing, revision or revocation of a code of practice;</p></content></level><level class="para1" eId="section-3-3-e"><num>(e)</num><content><p>requiring green deal participants to comply with the code of practice as a condition of their authorisation;</p></content></level><level class="para1" eId="section-3-3-f"><num>(f)</num><content><p>requiring green deal providers to enter into an agreement with the holder of a licence under section 7 or 7A of the Gas Act 1986 (gas transporter, shipper or supply licences) or section 6(1)(c) or (d) of the Electricity Act 1989 (electricity distributor and supply licences) and to comply with that agreement as a condition of their authorisation;</p></content></level><level class="para1" eId="section-3-3-g"><num>(g)</num><content><p>requiring that an agreement mentioned in paragraph (f) be approved by the Secretary of State before being entered into;</p></content></level><level class="para1" eId="section-3-3-h"><num>(h)</num><content><p>for securing compliance with any condition or any other requirement of the scheme, code or agreement;</p></content></level><level class="para1" eId="section-3-3-i"><num>(i)</num><content><p>as to the consequences of non-compliance with any such condition or requirement.</p></content></level></subsection><subsection eId="section-3-4"><num>(4)</num><intro><p>The code of practice issued for the purposes of the scheme may, in particular, make provision—</p></intro><level class="para1" eId="section-3-4-a"><num>(a)</num><content><p>as to the qualification and training of green deal participants;</p></content></level><level class="para1" eId="section-3-4-b"><num>(b)</num><content><p>as to their handling of queries or complaints;</p></content></level><level class="para1" eId="section-3-4-c"><num>(c)</num><content><p>requiring green deal participants to have such arrangements for insurance as are specified in the code;</p></content></level><level class="para1" eId="section-3-4-d"><num>(d)</num><content><p>as to the payment of green deal assessors by green deal providers or green deal installers and the payment of green deal installers by green deal providers;</p></content></level><level class="para1" eId="section-3-4-e"><num>(e)</num><content><p>as to the circumstances in which green deal assessors may charge customers for qualifying assessments of properties and as to the amount of any such charge;</p></content></level><level class="para1" eId="section-3-4-f"><num>(f)</num><content><p>requiring green deal assessors to act with impartiality;</p></content></level><level class="para1" eId="section-3-4-g"><num>(g)</num><content><p>as to the provision of information by green deal providers to improvers and bill payers and prospective improvers and bill payers;</p></content></level><level class="para1" eId="section-3-4-h"><num>(h)</num><content><p>as to marketing in connection with green deal plans.</p></content></level></subsection><subsection eId="section-3-5"><num>(5)</num><content><p>The code may include provision for regulating a body specified or authorised for the purposes of subsection (1)(a).</p></content></subsection><subsection eId="section-3-6"><num>(6)</num><content><p>The scheme and the code may make different provision for different circumstances or cases or for different purposes.</p></content></subsection><subsection eId="section-3-7"><num>(7)</num><content><p>The provision made by the scheme or code in relation to green deal participants may also extend to matters in connection with any energy plans which are not green deal plans.</p></content></subsection><subsection eId="section-3-8"><num>(8)</num><intro><p>The provision made for the purposes of subsection (3)(h) or (i) may, in particular, include provision enabling the Secretary of State to—</p></intro><level class="para1" eId="section-3-8-a"><num>(a)</num><content><p>cancel any liability to pay for a qualifying assessment of a property;</p></content></level><level class="para1" eId="section-3-8-b"><num>(b)</num><content><p>require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-3-8-c"><num>(c)</num><content><p>require a green deal participant to rectify a qualifying energy improvement or its installation;</p></content></level><level class="para1" eId="section-3-8-d"><num>(d)</num><content><p>require a green deal participant to pay compensation or a financial penalty;</p></content></level><level class="para1" eId="section-3-8-e"><num>(e)</num><content><p>withdraw, or require a body specified or authorised for the purposes of subsection (1)(a) to withdraw, an authorisation to act as a green deal participant;</p></content></level><level class="para1" eId="section-3-8-f"><num>(f)</num><content><p>withdraw authorisation from a body authorised for the purposes of subsection (1)(a) as a body whose members are authorised to act as green deal participants.</p></content></level></subsection><subsection eId="section-3-9"><num>(9)</num><content><p>For the purposes of this section references to a qualifying assessment are to an energy efficiency assessment which meets the requirements specified in the framework regulations and deals with such other matters as may be so specified.</p></content></subsection><subsection eId="section-3-10"><num>(10)</num><content><p>This section is without prejudice to the powers conferred on the Secretary of State by other provisions of this Chapter to make provision in or under the framework regulations.</p></content></subsection><subsection eId="section-3-11"><num>(11)</num><content><p>In this Chapter references to a code of practice include references to a code of practice which has been revised by virtue of subsection (3)(d).</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-green-deal-plan"><heading><i>Green deal plan</i></heading><section eId="section-4"><num>4</num><heading>Assessment of property <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-4-1"><num>(1)</num><intro><p>For the purposes of section 1(4)(c) the conditions as to assessment of the property and other matters are—</p></intro><level class="para1" eId="section-4-1-a"><num>(a)</num><content><p>the conditions set out in subsections (2) to (9), and</p></content></level><level class="para1" eId="section-4-1-b"><num>(b)</num><content><p>such other conditions (whether relating to the green deal assessor, the green deal provider, the improver or any other person) as are specified in the framework regulations.</p></content></level></subsection><subsection eId="section-4-2"><num>(2)</num><content><p>The first condition is that a qualifying assessment of the property has been carried out by a person authorised by virtue of the framework regulations to act as a green deal assessor.</p></content></subsection><subsection eId="section-4-3"><num>(3)</num><content><p>The second condition is that the green deal assessor has recommended the energy efficiency improvements.</p></content></subsection><subsection eId="section-4-4"><num>(4)</num><content><p>The third condition is that the green deal provider has given an estimate, on the basis specified in the framework regulations, of the savings likely to be made on the energy bills for the property if the improvements are carried out.</p></content></subsection><subsection eId="section-4-5"><num>(5)</num><content><p>The fourth condition is that the green deal provider has given an estimate, on the basis specified in the framework regulations, of the period over which the savings mentioned in subsection (4) are likely to be made.</p></content></subsection><subsection eId="section-4-6"><num>(6)</num><content><p>The fifth condition is that the green deal provider is authorised by virtue of the framework regulations to act as a green deal provider.</p></content></subsection><subsection eId="section-4-7"><num>(7)</num><content><p>The sixth condition is that the green deal provider has offered to carry out the improvements on the basis that the whole or part of the cost will be repaid in instalments over a period after the improvements have been made.</p></content></subsection><subsection eId="section-4-8"><num>(8)</num><intro><p>The seventh condition is that the green deal provider meets any requirement specified in the framework regulations as to the relationship between—</p></intro><level class="para1" eId="section-4-8-a"><num>(a)</num><content><p>the estimated total of the proposed instalments, and</p></content></level><level class="para1" eId="section-4-8-b"><num>(b)</num><content><p>the estimate mentioned in subsection (4).</p></content></level></subsection><subsection eId="section-4-9"><num>(9)</num><intro><p>The eighth condition is that the green deal provider meets any requirement specified in the framework regulations as to the relationship between—</p></intro><level class="para1" eId="section-4-9-a"><num>(a)</num><content><p>the period for which the instalments are proposed to be paid, and</p></content></level><level class="para1" eId="section-4-9-b"><num>(b)</num><content><p>the period estimated under subsection (5).</p></content></level></subsection><subsection eId="section-4-10"><num>(10)</num><content><p>In subsection (2) the reference to a qualifying assessment is to be read in accordance with section 3(9).</p></content></subsection></section><section eId="section-5"><num>5</num><heading>Terms of plan <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-5-1"><num>(1)</num><intro><p>For the purposes of section 1(4)(d), the conditions as to the terms of the plan and other matters are—</p></intro><level class="para1" eId="section-5-1-a"><num>(a)</num><content><p>the conditions set out in subsections (2) to (4), and</p></content></level><level class="para1" eId="section-5-1-b"><num>(b)</num><content><p>such other conditions as are specified in the framework regulations.</p></content></level></subsection><subsection eId="section-5-2"><num>(2)</num><intro><p>The first condition is that the plan includes the following terms—</p></intro><level class="para1" eId="section-5-2-a"><num>(a)</num><intro><p>a term in which the improver agrees to—</p></intro><level class="para2" eId="section-5-2-a-i"><num>(i)</num><content><p>the amounts of the payments in instalments and the intervals at which, and period for which, they are payable;</p></content></level><level class="para2" eId="section-5-2-a-ii"><num>(ii)</num><content><p>such other matters as are specified in the regulations;</p></content></level></level><level class="para1" eId="section-5-2-b"><num>(b)</num><content><p>a term in which the improver confirms that any necessary permissions or consents have been obtained in respect of the improvements;</p></content></level><level class="para1" eId="section-5-2-c"><num>(c)</num><content><p>a term providing that the green deal provider may not take a charge over any person's property by way of security for payments;</p></content></level><level class="para1" eId="section-5-2-d"><num>(d)</num><content><p>a term providing that the green deal plan does not prevent the bill payer from changing the intervals at which energy bills are to be paid.</p></content></level></subsection><subsection eId="section-5-3"><num>(3)</num><intro><p>The second condition is that the plan does not include any of the following terms—</p></intro><level class="para1" eId="section-5-3-a"><num>(a)</num><content><p>a term making a person liable to make any payments under the green deal plan otherwise than in respect of the period for which the person is the bill payer in relation to the property;</p></content></level><level class="para1" eId="section-5-3-b"><num>(b)</num><content><p>a term requiring the bill payer to make in any circumstances an early repayment of the whole or part of the amount outstanding under the green deal plan (except in accordance with the framework regulations or regulations under section 34, or provision made under them);</p></content></level><level class="para1" eId="section-5-3-c"><num>(c)</num><content><p>a term providing for money to be advanced to the improver (except in accordance with the framework regulations or provision made under them).</p></content></level></subsection><subsection eId="section-5-4"><num>(4)</num><content><p>The third condition is that the agreements mentioned in paragraph (a) of subsection (2) and the permissions and consents mentioned in paragraph (b) of that subsection have not been withdrawn before the end of the period of 14 days beginning with the last day on which they were given.</p></content></subsection><subsection eId="section-5-5"><num>(5)</num><intro><p>The conditions which may be specified in the framework regulations by virtue of subsection (1)(b) include, in particular—</p></intro><level class="para1" eId="section-5-5-a"><num>(a)</num><content><p>a condition that the plan includes a term so specified enabling the early repayment of the whole or part of the amount outstanding under the plan and making provision as to the calculation of the amount payable and any fee,</p></content></level><level class="para1" eId="section-5-5-b"><num>(b)</num><content><p>a condition that the plan includes a term so specified guaranteeing the improvements and making provision as to who is to benefit from the guarantee,</p></content></level><level class="para1" eId="section-5-5-c"><num>(c)</num><content><p>a condition that the plan includes a term so specified as to how any problems with the improvements installed, or arising in connection with the installation of them, are to be dealt with, and</p></content></level><level class="para1" eId="section-5-5-d"><num>(d)</num><content><p>a condition requiring the agreements mentioned in subsection (2)(a) to be in the form specified in the framework regulations.</p></content></level></subsection><subsection eId="section-5-6"><num>(6)</num><content><p>References in this section to the agreements mentioned in subsection (2)(a) include references to the consent required by virtue of section 6(2)(a).</p></content></subsection></section><section eId="section-6"><num>6</num><heading>Consents and redress <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-6-1"><num>(1)</num><intro><p>The framework regulations may make provision for dealing with cases where—</p></intro><level class="para1" eId="section-6-1-a"><num>(a)</num><content><p>at the time when a plan is entered into the improver and the bill payer are different persons;</p></content></level><level class="para1" eId="section-6-1-b"><num>(b)</num><content><p>the bill payer at the time when a plan is entered into is a different person from the bill payer at any subsequent time (a “subsequent bill payer”).</p></content></level></subsection><subsection eId="section-6-2"><num>(2)</num><intro><p>Provision which may be made by virtue of subsection (1) includes—</p></intro><level class="para1" eId="section-6-2-a"><num>(a)</num><content><p>provision requiring the term included in the plan by virtue of section 5(2)(a)(i) to be one to which the bill payer mentioned in subsection (1)(a) has consented, and</p></content></level><level class="para1" eId="section-6-2-b"><num>(b)</num><content><p>provision as to the terms of the plan which are to bind or benefit that bill payer or a subsequent bill payer.</p></content></level></subsection><subsection eId="section-6-3"><num>(3)</num><content><p>Subsection (1) is subject to section 1(6).</p></content></subsection><subsection eId="section-6-4"><num>(4)</num><content><p>The framework regulations may make provision for the purpose of providing redress in cases where a permission or consent mentioned in section 5(2)(b) was not obtained or was improperly obtained.</p></content></subsection><subsection eId="section-6-5"><num>(5)</num><intro><p>Provision included in framework regulations by virtue of subsection (4) may, in particular, enable the Secretary of State to—</p></intro><level class="para1" eId="section-6-5-a"><num>(a)</num><content><p>require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-6-5-b"><num>(b)</num><content><p>require a green deal provider to refund any such payments that have already been made;</p></content></level><level class="para1" eId="section-6-5-c"><num>(c)</num><content><p>require an improver to pay compensation to the green deal provider in respect of the suspension, cancellation or refund.</p></content></level></subsection></section><section eId="section-7"><num>7</num><heading>Installation of improvements</heading><subsection eId="section-7-1"><num>(1)</num><content><p>For the purposes of section 1(5)(a) improvements are installed in accordance with this section if the following three conditions are met.</p></content></subsection><subsection eId="section-7-2"><num>(2)</num><content><p>The first condition is that the person carrying out the installation of the improvements is authorised by virtue of the framework regulations to act as a green deal installer.</p></content></subsection><subsection eId="section-7-3"><num>(3)</num><intro><p>The second condition is that any product installed in making the improvements—</p></intro><level class="para1" eId="section-7-3-a"><num>(a)</num><content><p>meets the standard specified in the code of practice in relation to the product or description of product, or</p></content></level><level class="para1" eId="section-7-3-b"><num>(b)</num><intro><p>is listed in a document which—</p></intro><level class="para2" eId="section-7-3-b-i"><num>(i)</num><content><p>is issued by the Secretary of State or a person authorised by the Secretary of State in connection with the code, and</p></content></level><level class="para2" eId="section-7-3-b-ii"><num>(ii)</num><content><p>is referred to in the code as listing the products which are to be taken as meeting the required standard.</p></content></level></level></subsection><subsection eId="section-7-4"><num>(4)</num><content><p>In specifying the standard in relation to a product or description of product for the purposes of subsection (3)(a), the code of practice may make provision as to the testing and certification of the product or description of product.</p></content></subsection><subsection eId="section-7-5"><num>(5)</num><content><p>The third condition is that the carrying out of the installation meets the standard specified in the code of practice.</p></content></subsection><subsection eId="section-7-6"><num>(6)</num><content><p>In this section references to the code of practice are to the code of practice issued for the purposes of the scheme under the framework regulations.</p></content></subsection></section><section eId="section-8"><num>8</num><heading>Confirmation of plan</heading><subsection eId="section-8-1"><num>(1)</num><content><p>For the purposes of section 1(5)(b) an arrangement is confirmed in accordance with this section if the following two conditions are met.</p></content></subsection><subsection eId="section-8-2"><num>(2)</num><intro><p>The first condition is that the relevant energy supplier notifies the bill payer—</p></intro><level class="para1" eId="section-8-2-a"><num>(a)</num><content><p>that payments for the energy efficiency improvements to the property are to be included in the energy bills for the property from the date specified in the notification, and</p></content></level><level class="para1" eId="section-8-2-b"><num>(b)</num><content><p>of the amounts of those payments and the period for which they are to be made.</p></content></level></subsection><subsection eId="section-8-3"><num>(3)</num><content><p>The date mentioned in subsection (2)(a) must not fall earlier than the end of the period specified in the framework regulations.</p></content></subsection><subsection eId="section-8-4"><num>(4)</num><intro><p>The second condition is that, as soon as practicable after the improvements have been installed, the green deal provider takes one or more of the following actions as required by the framework regulations in the circumstances—</p></intro><level class="para1" eId="section-8-4-a"><num>(a)</num><content><p>producing a document containing such information in connection with the plan as is specified in the regulations in the form so specified,</p></content></level><level class="para1" eId="section-8-4-b"><num>(b)</num><content><p>securing that a document of a description specified in the regulations is produced, or</p></content></level><level class="para1" eId="section-8-4-c"><num>(c)</num><content><p>securing that a document of such a description is updated.</p></content></level></subsection><subsection eId="section-8-5"><num>(5)</num><content><p>The reference in this section to securing that a document is updated includes a reference to securing that a document is replaced by a document of the same description.</p></content></subsection><subsection eId="section-8-6"><num>(6)</num><content><p>Sections 9 and 10 make further provision in relation to the second condition.</p></content></subsection></section><section eId="section-9"><num>9</num><heading>Confirmation of plan: supplementary provision for England and Wales</heading><subsection eId="section-9-1"><num>(1)</num><content><p>Subsection (2) applies if, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2007 Regulations or the 2010 Regulations.</p></content></subsection><subsection eId="section-9-2"><num>(2)</num><content><p>The Secretary of State may by regulations make provision amending the 2007 Regulations or the 2010 Regulations or both (as the case may require) in connection with a document required to be produced or updated by virtue of section 8(4)(b) or (c).</p></content></subsection><subsection eId="section-9-3"><num>(3)</num><content><p>The amendments made by virtue of subsection (2) may, in particular, include amendments for the purpose of requiring a document to contain additional or updated information in connection with the plan or the improvements installed under the plan.</p></content></subsection><subsection eId="section-9-4"><num>(4)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-the-2007-regulations" eId="term-the-2007-regulations">the 2007 Regulations</term>” means the Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2007/991);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-2010-regulations" eId="term-the-2010-regulations">the 2010 Regulations</term>” means the Building Regulations 2010 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2010/2214).</p></content></hcontainer></subsection></section><section eId="section-10"><num>10</num><heading>Confirmation of plan: supplementary provision for Scotland</heading><subsection eId="section-10-1"><num>(1)</num><content><p>Subsection (2) applies if, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2008 Regulations.</p></content></subsection><subsection eId="section-10-2"><num>(2)</num><content><p>The Scottish Ministers may by regulations make provision amending the 2008 Regulations in connection with a document required to be produced or updated by virtue of section 8(4)(b) or (c).</p></content></subsection><subsection eId="section-10-3"><num>(3)</num><content><p>The amendments made by virtue of subsection (2) may, in particular, include amendments for the purpose of requiring a document to contain additional or updated information in connection with the plan or the improvements installed under the plan.</p></content></subsection><subsection eId="section-10-4"><num>(4)</num><content><p>In this section “<term refersTo="#term-the-2008-regulations" eId="term-the-2008-regulations">the 2008 Regulations</term>” means the Energy Performance of Buildings (Scotland) Regulations 2008 (<abbr class="acronym" title="Scottish Statutory Instrument">S.S.I.</abbr> 2008/309).</p></content></subsection></section><section eId="section-11"><num>11</num><heading>Updating information produced under section 8</heading><hcontainer name="wrapper2"><subsection eId="section-11-1"><num>(1)</num><content><p>The framework regulations may make provision as to the circumstances in which a document produced for the purposes of section 8(4)(a) is required to be updated in accordance with the regulations.</p></content></subsection><subsection eId="section-11-2"><num>(2)</num><content><p>Subsection (6) applies if one or more of the first, second or third conditions is met.</p></content></subsection><subsection eId="section-11-3"><num>(3)</num><intro><p>The first condition is that—</p></intro><level class="para1" eId="section-11-3-a"><num>(a)</num><content><p>by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2007 Regulations or the 2010 Regulations, and</p></content></level><level class="para1" eId="section-11-3-b"><num>(b)</num><content><p>provision is made in the 2007 Regulations or the 2010 Regulations or both by virtue of section 9(3) to require a document of that description to contain additional or updated information.</p></content></level></subsection><subsection eId="section-11-4"><num>(4)</num><intro><p>The second condition is that—</p></intro><level class="para1" eId="section-11-4-a"><num>(a)</num><content><p>by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2008 Regulations, and</p></content></level><level class="para1" eId="section-11-4-b"><num>(b)</num><content><p>provision is made in the 2008 Regulations by virtue of section 10(3) to require a document of that description to contain additional or updated information.</p></content></level></subsection><subsection eId="section-11-5"><num>(5)</num><content><p>The third condition is that, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description other than one falling within subsection (3) or (4).</p></content></subsection><subsection eId="section-11-6"><num>(6)</num><intro><p>The framework regulations may make provision as to the circumstances in which<ins class="substitution first" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3"><noteRef uk:name="commentary" href="#key-dfc5221cba708fe22339d7edef4760f3" class="commentary"/>—</ins></p></intro><level class="para1" eId="section-11-6-a"><num><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">(a)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">data from which a document of a description falling within subsection (3) or (4) may be produced, or</ins></p></content></level></subsection><level class="para1" eId="section-11-b"><num><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">(b)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">a document of a description falling within subsection (5),</ins></p></content></level></hcontainer><hcontainer name="wrapper2"><intro><p><ins class="substitution last" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">is</ins> required to be updated or further updated in accordance with provision made by the Secretary of State in the regulations.</p></intro><subsection eId="section-11-7"><num>(7)</num><content><p>In subsection (3) “<term refersTo="#term-the-2007-regulations" eId="term-the-2007-regulations">the 2007 Regulations</term>” and “<term refersTo="#term-the-2010-regulations" eId="term-the-2010-regulations">the 2010 Regulations</term>” have the same meaning as in section 9.</p></content></subsection><subsection eId="section-11-8"><num>(8)</num><content><p>In subsection (4) “<term refersTo="#term-the-2008-regulations" eId="term-the-2008-regulations">the 2008 Regulations</term>” has the same meaning as in section 10.</p></content></subsection><subsection eId="section-11-9"><num>(9)</num><content><p>In this section references to a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1491329299599" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> being required to be updated or further updated include references to a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1495547783705" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> being required to be replaced by a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1495547785898" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> of the same description.</p></content></subsection></hcontainer></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-disclosure-of-green-deal-plan-etc"><heading><i>Disclosure of green deal plan <abbr title="Et cetera" xml:lang="la">etc</abbr></i></heading><section eId="section-12"><num>12</num><heading>Disclosure of green deal plan <abbr title="Et cetera" xml:lang="la">etc</abbr> in connection with sale or letting out</heading><subsection eId="section-12-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-12-1-a"><num>(a)</num><content><p>a green deal property, or a lease of such a property, is to be sold, or</p></content></level><level class="para1" eId="section-12-1-b"><num>(b)</num><intro><p>a green deal property is to be let out—</p></intro><level class="para2" eId="section-12-1-b-i"><num>(i)</num><content><p>under a tenancy or licence agreement, and</p></content></level><level class="para2" eId="section-12-1-b-ii"><num>(ii)</num><content><p>on the basis that the prospective tenant or licensee is to be liable for paying the energy bills for the property.</p></content></level></level></subsection><subsection eId="section-12-2"><num>(2)</num><intro><p>The seller or prospective landlord or licensor must, in relation to the document, or each document, required to be produced or updated as mentioned in section 8(4)—</p></intro><level class="para1" eId="section-12-2-a"><num>(a)</num><content><p>obtain the document or, if the requirement to produce or update the document has not yet been complied with, produce a document containing the same information in connection with the green deal plan as that document would have contained, and</p></content></level><level class="para1" eId="section-12-2-b"><num>(b)</num><content><p>provide the document free of charge to any prospective buyer, tenant or licensee at the specified time.</p></content></level></subsection><subsection eId="section-12-3"><num>(3)</num><content><p>An obligation under subsection (2) may be discharged by an agent.</p></content></subsection><subsection eId="section-12-4"><num>(4)</num><intro><p>For the purposes of subsection (2) a person becomes a prospective buyer, tenant or licensee in relation to a property when the person—</p></intro><level class="para1" eId="section-12-4-a"><num>(a)</num><content><p>requests any information about the property from the seller, prospective landlord or licensor or an agent for the purpose of deciding whether to buy or let the property,</p></content></level><level class="para1" eId="section-12-4-b"><num>(b)</num><content><p>makes a request to view the property for the purpose mentioned in paragraph (a), or</p></content></level><level class="para1" eId="section-12-4-c"><num>(c)</num><content><p>makes an offer, whether oral or written, to buy or let the property.</p></content></level></subsection><subsection eId="section-12-5"><num>(5)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-12-5-a"><num>(a)</num><content><p>an agent is a person acting on behalf of a seller or prospective landlord or licensor in the sale or letting out of a property;</p></content></level><level class="para1" eId="section-12-5-b"><num>(b)</num><content><p>a property is a green deal property if there is a green deal plan in respect of the property and payments are still to be made under that plan;</p></content></level><level class="para1" eId="section-12-5-c"><num>(c)</num><content><p>specified, in relation to a time, means specified in regulations made by the Secretary of State.</p></content></level></subsection><subsection eId="section-12-6"><num>(6)</num><content><p>The Secretary of State may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection></section><section eId="section-13"><num>13</num><heading>Disclosure of green deal plan in connection with other transactions <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-13-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-13-1-a"><num>(a)</num><content><p>there is to be a transaction or other arrangement in respect of a green deal property (not falling within section 12(1)), and</p></content></level><level class="para1" eId="section-13-1-b"><num>(b)</num><content><p>the transaction or arrangement is of a description specified in regulations made by the Secretary of State.</p></content></level></subsection><subsection eId="section-13-2"><num>(2)</num><intro><p>The regulations may require a person of a description specified in the regulations to—</p></intro><level class="para1" eId="section-13-2-a"><num>(a)</num><content><p>obtain a document required to be produced or updated as mentioned in section 8(4) or, if the requirement to produce or update such a document has not yet been complied with, produce a document containing the same information in connection with the green deal plan as that document would have contained, and</p></content></level><level class="para1" eId="section-13-2-b"><num>(b)</num><content><p>provide the document free of charge to a person of a description specified in the regulations at the time so specified.</p></content></level></subsection><subsection eId="section-13-3"><num>(3)</num><content><p>The regulations may provide for an obligation imposed on a person by virtue of subsection (2) to be discharged by a person acting on the person's behalf.</p></content></subsection><subsection eId="section-13-4"><num>(4)</num><content><p>In this section the reference to a green deal property is to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-14"><num>14</num><heading>Acknowledgment of green deal plan on sale or letting out</heading><subsection eId="section-14-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-14-1-a"><num>(a)</num><content><p>a green deal property, or a lease of such a property, is to be sold, or</p></content></level><level class="para1" eId="section-14-1-b"><num>(b)</num><intro><p>a green deal property is to be let out—</p></intro><level class="para2" eId="section-14-1-b-i"><num>(i)</num><content><p>under a tenancy or licence agreement which is in writing, and</p></content></level><level class="para2" eId="section-14-1-b-ii"><num>(ii)</num><content><p>on the basis that the prospective tenant or licensee is to be liable for paying the energy bills for the property.</p></content></level></level></subsection><subsection eId="section-14-2"><num>(2)</num><content><p>The seller or prospective landlord or licensor must secure that the contract for sale or tenancy or licence agreement includes an acknowledgment by the buyer, tenant or licensee that the bill payer at the property is liable to make payments under the green deal plan and that certain terms of that plan are binding on the bill payer.</p></content></subsection><subsection eId="section-14-3"><num>(3)</num><content><p>Subsections (4) and (5) apply where the green deal property is in England or Wales.</p></content></subsection><subsection eId="section-14-4"><num>(4)</num><content><p>An acknowledgment required by subsection (2) must be in the form prescribed in regulations made by the Secretary of State.</p></content></subsection><subsection eId="section-14-5"><num>(5)</num><content><p>The Secretary of State may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection><subsection eId="section-14-6"><num>(6)</num><content><p>Subsections (7) and (8) apply where the green deal property is in Scotland.</p></content></subsection><subsection eId="section-14-7"><num>(7)</num><content><p>The acknowledgment required by subsection (2) must be in the form prescribed in regulations made by the Scottish Ministers.</p></content></subsection><subsection eId="section-14-8"><num>(8)</num><content><p>The Scottish Ministers may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection><subsection eId="section-14-9"><num>(9)</num><content><p>In this section references to a green deal property are to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-15"><num>15</num><heading>Acknowledgment of green deal plan in connection with other transactions <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-15-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-15-1-a"><num>(a)</num><content><p>there is to be a transaction or other arrangement in respect of a green deal property (not falling within section 14(1)), and</p></content></level><level class="para1" eId="section-15-1-b"><num>(b)</num><content><p>the transaction or arrangement is of a description specified in regulations made under this subsection by the Secretary of State.</p></content></level></subsection><subsection eId="section-15-2"><num>(2)</num><intro><p>Regulations under subsection (1) may require a person of a description specified in the regulations to secure, at a time and in a document so specified, that an acknowledgment is made by a person of a description so specified that—</p></intro><level class="para1" eId="section-15-2-a"><num>(a)</num><content><p>the bill payer at the property is liable to make payments under the green deal plan, and</p></content></level><level class="para1" eId="section-15-2-b"><num>(b)</num><content><p>certain terms of that plan are binding on the bill payer.</p></content></level></subsection><subsection eId="section-15-3"><num>(3)</num><content><p>Where the green deal property is in England or Wales, regulations made by the Secretary of State under this subsection may provide for any acknowledgment required by virtue of subsection (2) to be in the form prescribed in the regulations under this subsection.</p></content></subsection><subsection eId="section-15-4"><num>(4)</num><content><p>Where the green deal property is in Scotland, regulations made by the Scottish Ministers under this subsection may provide for any acknowledgment required by virtue of subsection (2) to be in the form prescribed in the regulations under this subsection.</p></content></subsection><subsection eId="section-15-5"><num>(5)</num><content><p>In this section references to a green deal property are to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-16"><num>16</num><heading>Sanctions for non-compliance with obligations under sections 12 to 15</heading><subsection eId="section-16-1"><num>(1)</num><intro><p>The Secretary of State may make regulations—</p></intro><level class="para1" eId="section-16-1-a"><num>(a)</num><content><p>for the purpose of securing compliance with the obligations set out in section 12 or 14 or imposed by virtue of regulations under section 13 or 15;</p></content></level><level class="para1" eId="section-16-1-b"><num>(b)</num><content><p>as to the consequences of non-compliance with the obligations.</p></content></level></subsection><subsection eId="section-16-2"><num>(2)</num><intro><p>The regulations may, in particular, include provision—</p></intro><level class="para1" eId="section-16-2-a"><num>(a)</num><content><p>as to sanctions for non-compliance with the obligations (including the imposition of a civil penalty);</p></content></level><level class="para1" eId="section-16-2-b"><num>(b)</num><content><p>enabling the Secretary of State to require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-16-2-c"><num>(c)</num><content><p>enabling the Secretary of State to require a green deal provider to refund any such payments that have already been made;</p></content></level><level class="para1" eId="section-16-2-d"><num>(d)</num><content><p>enabling the Secretary of State to require a seller, a prospective landlord or licensor or another person to pay compensation to a green deal provider in respect of any such suspension, cancellation or refund.</p></content></level></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-modifying-energy-licences"><heading><i>Modifying energy licences</i></heading><section eId="section-17"><num>17</num><heading>Power to modify energy licences in connection with green deal payments</heading><subsection eId="section-17-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-17-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7 or 7A of the Gas Act 1986 (gas transporter, shipper and supply licences);</p></content></level><level class="para1" eId="section-17-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-17-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(c) or (d) of the Electricity Act 1989 (electricity distribution and supply licences);</p></content></level><level class="para1" eId="section-17-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-17-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7 or 7A of the Gas Act 1986 or section 6(1)(c) or (d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-17-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised for the following purposes only—</p></intro><level class="para1" eId="section-17-2-a"><num>(a)</num><content><p>in so far as the power relates to a licence under section 7 of the Gas Act 1986 or section 6(1)(c) of the Electricity Act 1989, the purpose of preventing the holder of the licence from permanently disconnecting the supply of gas or electricity to a green deal property, and</p></content></level><level class="para1" eId="section-17-2-b"><num>(b)</num><content><p>in so far as the power relates to any licence, the purpose of requiring or enabling the holder of the licence to take, or not to take, specified action in connection with green deal payments.</p></content></level></subsection><subsection eId="section-17-3"><num>(3)</num><intro><p>The provision which may be made by virtue of subsection (2)(b) includes, in particular—</p></intro><level class="para1" eId="section-17-3-a"><num>(a)</num><content><p>if the holder of the licence is of a specified description, provision enabling the holder to opt into or opt out of any provision made by virtue of paragraphs (b) to (f),</p></content></level><level class="para1" eId="section-17-3-b"><num>(b)</num><content><p>provision requiring the holder of the licence to collect green deal payments through energy bills and remit them to a green deal provider,</p></content></level><level class="para1" eId="section-17-3-c"><num>(c)</num><content><p>provision as to the circumstances in which the holder of the licence is required to make payments to a green deal provider by reference to green deal payments which are due but which have not been made,</p></content></level><level class="para1" eId="section-17-3-d"><num>(d)</num><content><p>provision in connection with the cancellation or suspension of green deal payments,</p></content></level><level class="para1" eId="section-17-3-e"><num>(e)</num><content><p>provision requiring or enabling the holder of the licence to make specified arrangements for facilitating the collection of green deal payments, and</p></content></level><level class="para1" eId="section-17-3-f"><num>(f)</num><content><p>provision requiring or enabling payments to be made by or to the holder of the licence in respect of functions discharged in connection with green deal payments.</p></content></level></subsection><subsection eId="section-17-4"><num>(4)</num><content><p>Provision made by virtue of subsection (2)(b) which falls within subsection (3)(c) may include provision requiring the holder of the licence, where a bill payer has failed to pay a sum due under an energy bill, to remit a proportion of any payment received to a green deal provider.</p></content></subsection><subsection eId="section-17-5"><num>(5)</num><content><p>Conditions included in a licence under section 7 or 7A of the Gas Act 1986 by virtue of the power under subsection (1) may do any of the things authorised by section 7B(5)(a)(i) or (iii) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7B(4)(a)).</p></content></subsection><subsection eId="section-17-6"><num>(6)</num><content><p>Conditions included in a licence under section 6(1)(c) or (d) of the Electricity Act 1989 by virtue of the power under subsection (1) may do any of the things authorised by section 7(3)(a) or (c) or (4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection><subsection eId="section-17-7"><num>(7)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-17-7-a"><num>(a)</num><content><p>payments are green deal payments if they are made under a green deal plan,</p></content></level><level class="para1" eId="section-17-7-b"><num>(b)</num><content><p>a property is a green deal property if there is a green deal plan in respect of the property and payments are still to be made under that plan, and</p></content></level><level class="para1" eId="section-17-7-c"><num>(c)</num><content><p>references to a green deal provider include references to a person acting on behalf of a green deal provider or nominated by a green deal provider.</p></content></level></subsection></section><section eId="section-18"><num>18</num><heading>Power to modify energy supply licences to make provision as to default in green deal payments</heading><subsection eId="section-18-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-18-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-18-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-18-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-18-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-18-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-18-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised for the purpose only of making provision—</p></intro><level class="para1" eId="section-18-2-a"><num>(a)</num><content><p>as to the steps which are to be taken by the holder of a licence following a bill payer's default in making green deal payments to the holder of the licence,</p></content></level><level class="para1" eId="section-18-2-b"><num>(b)</num><content><p>as to the circumstances in which the holder of a licence may disconnect the supply to a green deal property following such a default, or</p></content></level><level class="para1" eId="section-18-2-c"><num>(c)</num><content><p>enabling, in specified circumstances, the holder of a licence to require from a bill payer a deposit by way of security for green deal payments to be made by the bill payer.</p></content></level></subsection><subsection eId="section-18-3"><num>(3)</num><content><p>For the purposes of this section “green deal payments” and “green deal property” are to be read in accordance with section 17(7).</p></content></subsection></section><section eId="section-19"><num>19</num><heading>Power to modify energy supply licences to require provision of information</heading><subsection eId="section-19-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-19-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-19-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-19-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-19-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-19-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-19-2"><num>(2)</num><content><p>The power under subsection (1) may be exercised for one or both of the following two purposes only.</p></content></subsection><subsection eId="section-19-3"><num>(3)</num><content><p>The first purpose is the purpose of requiring, at specified times, the holder of the licence to provide bill payers with specified information in connection with their green deal plans.</p></content></subsection><subsection eId="section-19-4"><num>(4)</num><content><p>The second purpose is the purpose of requiring the holder of the licence to disclose on request specified information about the payment of energy bills by a person who is, or is to be, the bill payer for a property in respect of which there is, or is proposed to be, a green deal plan.</p></content></subsection><subsection eId="section-19-5"><num>(5)</num><intro><p>The only persons to whom the licence holder may be required to disclose information by virtue of subsection (4) are—</p></intro><level class="para1" eId="section-19-5-a"><num>(a)</num><content><p>where there is a green deal plan, the green deal provider under the plan;</p></content></level><level class="para1" eId="section-19-5-b"><num>(b)</num><content><p>where there is proposed to be a green deal plan, a person who is authorised under the framework regulations to act as a green deal provider.</p></content></level></subsection><subsection eId="section-19-6"><num>(6)</num><intro><p>The licence holder may be required to disclose the information requested only where—</p></intro><level class="para1" eId="section-19-6-a"><num>(a)</num><content><p>the green deal provider or authorised person states that the request is made for purposes connected with the green deal plan or proposed green deal plan,</p></content></level><level class="para1" eId="section-19-6-b"><num>(b)</num><intro><p>the green deal provider or authorised person provides evidence that the bill payer has consented to—</p></intro><level class="para2" eId="section-19-6-b-i"><num>(i)</num><content><p>disclosure of the information to that provider or person for those purposes, and</p></content></level><level class="para2" eId="section-19-6-b-ii"><num>(ii)</num><content><p>onward disclosure of the disclosed information to and by other persons for those purposes,</p></content></level></level><level class="para1" eId="section-19-6-c"><num>(c)</num><content><p>the information relates to a time within the 5 years immediately preceding the request, and</p></content></level><level class="para1" eId="section-19-6-d"><num>(d)</num><content><p>the licence holder has the information.</p></content></level></subsection><subsection eId="section-19-7"><num>(7)</num><content><p>The power under subsection (1) may be exercised so as to require information to be provided in a specified manner or form, or subject to specified requirements or restrictions.</p></content></subsection><subsection eId="section-19-8"><num>(8)</num><content><p>Conditions included in a licence under section 7A(1) of the Gas Act 1986 by virtue of the power under subsection (1) and the purpose mentioned in subsection (4) may do any of the things authorised by section 7B(5)(a)(i) or (iii) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7B(4)(a)).</p></content></subsection><subsection eId="section-19-9"><num>(9)</num><content><p>Conditions included in a licence under section 6(1)(d) of the Electricity Act 1989 by virtue of the power under subsection (1) and the purpose mentioned in subsection (4) may do any of the things authorised by section 7(3)(a) or (c) or (4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection></section><section eId="section-20"><num>20</num><heading>Power to modify energy supply licences to make provision as to consumer protection</heading><subsection eId="section-20-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-20-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-20-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-20-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-20-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-20-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-20-2"><num>(2)</num><content><p>The power under subsection (1) may be exercised for the purpose only of making provision corresponding to that made by the disapplied consumer protection legislation.</p></content></subsection><subsection eId="section-20-3"><num>(3)</num><content><p>Conditions included in a licence under section 6(1)(d) of the Electricity Act 1989 by virtue of the power under subsection (1) may do any of the things authorised by section 7(4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection><subsection eId="section-20-4"><num>(4)</num><content><p>For the purposes of subsection (2) provision corresponds to that made by the disapplied consumer protection legislation if it is made for the same purpose as the purpose for which that provision was made.</p></content></subsection><subsection eId="section-20-5"><num><ins class="substitution first" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35"><noteRef uk:name="commentary" href="#key-3f8f93cba169f015282416aba5430e35" class="commentary"/>(5)</ins></num><intro><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">For the purpose of this section, references to the disapplied consumer protection legislation are to—</ins></p></intro><level class="para1" eId="section-20-5-a"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(a)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">the provisions of or made under the Consumer Credit Act 1974 or the Financial Services and Markets Act 2000 (“the 2000 Act”), and</ins></p></content></level><level class="para1" eId="section-20-5-b"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(b)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">any rules made under the 2000 Act,</ins></p></content></level><wrapUp><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">which would apply but for any exemption conferred by an order under section 22 of the 2000 Act (regulated activities) in relation to debts due under a green deal plan associated with the licensee.</ins></p></wrapUp></subsection><subsection eId="section-20-6"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(6)</ins></num><content><p><ins class="substitution last" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">A green deal plan is associated with a licensee if the payments under the plan are to be made to the licensee.</ins></p></content></subsection></section><section eId="section-21"><num>21</num><heading>Powers under sections 17 to 20: consultation</heading><intro><p>Before making a modification under any of sections 17 to 20, the Secretary of State must consult—</p></intro><level class="para1" eId="section-21-a"><num>(a)</num><content><p>the holder of any licence being modified,</p></content></level><level class="para1" eId="section-21-b"><num>(b)</num><content><p>the Gas and Electricity Markets Authority, and</p></content></level><level class="para1" eId="section-21-c"><num>(c)</num><content><p>such other persons as the Secretary of State considers appropriate.</p></content></level></section><section eId="section-22"><num>22</num><heading>Powers under sections 17 to 20: supplementary</heading><subsection eId="section-22-1"><num>(1)</num><content><p>Subsections (2) to (6) apply in relation to the powers under sections 17 to 20.</p></content></subsection><subsection eId="section-22-2"><num>(2)</num><intro><p>The powers—</p></intro><level class="para1" eId="section-22-2-a"><num>(a)</num><content><p>may be exercised generally, only in relation to specified cases or subject to exceptions (including provision for a case to be excepted only so long as specified conditions are satisfied);</p></content></level><level class="para1" eId="section-22-2-b"><num>(b)</num><content><p>may be exercised differently in different cases or circumstances;</p></content></level><level class="para1" eId="section-22-2-c"><num>(c)</num><content><p>include a power to make incidental, consequential or transitional modifications.</p></content></level></subsection><subsection eId="section-22-3"><num>(3)</num><intro><p>Provision included in a licence by virtue of any of the powers—</p></intro><level class="para1" eId="section-22-3-a"><num>(a)</num><content><p>need not relate to the activities authorised by the licence;</p></content></level><level class="para1" eId="section-22-3-b"><num>(b)</num><content><p>may make different provision for different cases.</p></content></level></subsection><subsection eId="section-22-4"><num>(4)</num><content><p>The Secretary of State must publish details of modifications under any of the powers as soon as reasonably practicable after the modifications are made.</p></content></subsection><subsection eId="section-22-5"><num>(5)</num><content><p>A modification under any of the powers of part of a standard condition of a licence does not prevent any other part of the condition from continuing to be regarded as a standard condition for the purposes of Part 1 of the Gas Act 1986 or Part 1 of the Electricity Act 1989.</p></content></subsection><subsection eId="section-22-6"><num>(6)</num><content><p>Where the Secretary of State makes modifications under any of the powers of the standard conditions of a licence of any type, the Gas and Electricity Markets Authority must make the same modification of those standard conditions for the purposes of their incorporation in licences of that type granted after that time.</p></content></subsection><subsection eId="section-22-7"><num>(7)</num><intro><p>In section 33(1) of the Utilities Act 2000 (standard conditions of electricity licences)—</p></intro><level class="para1" eId="section-22-7-a"><num>(a)</num><content><p>after paragraph (d) omit “or”;</p></content></level><level class="para1" eId="section-22-7-b"><num>(b)</num><content><p><mod>after paragraph (e) insert<quotedText startQuote="&#x201C;">or </quotedText><quotedStructure endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(f)</num><content><p>under Chapter 1 of Part 1 of the Energy Act 2011.</p></content></level></quotedStructure></mod></p></content></level></subsection><subsection eId="section-22-8"><num>(8)</num><intro><p>In section 81(2) of the Utilities Act 2000 (standard conditions of gas licences)—</p></intro><level class="para1" eId="section-22-8-a"><num>(a)</num><content><p><mod>for “2008 or” substitute <quotedText>“ 2008, ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-22-8-b"><num>(b)</num><content><p><mod>after “2010” insert <quotedText>“ or under Chapter 1 of Part 1 of the Energy Act 2011 ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-22-9"><num>(9)</num><content><p>Sections 4AA to 4B of the Gas Act 1986 (principal objective and general duties) apply in relation to the powers under sections 17 to 20 with respect to holders of licences under section 7 or 7A of that Act as they apply in relation to functions of the Secretary of State under Part 1 of that Act.</p></content></subsection><subsection eId="section-22-10"><num>(10)</num><content><p>Sections 3A to 3D of the Electricity Act 1989 (principal objective and general duties) apply in relation to the powers under sections 17 to 20 with respect to holders of licences under section 6(1)(c) or (d) of that Act as they apply in relation to functions of the Secretary of State under Part 1 of that Act.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-gas-and-electricity-codes"><heading><i>Gas and electricity codes</i></heading><section eId="section-23"><num>23</num><heading>Recovering green deal payments: gas suppliers</heading><subsection eId="section-23-1"><num>(1)</num><content><p>Schedule 2B to the Gas Act 1986 (the gas code) is amended as follows.</p></content></subsection><subsection eId="section-23-2"><num>(2)</num><content><p><mod>In paragraph 6A(1) for paragraph (a) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(a)</num><intro><p>the sum is owed to an authorised supplier—</p></intro><level class="para2"><num>(i)</num><content><p>in respect of the supply of gas to the premises on which the meter is installed,</p></content></level><level class="para2"><num>(ii)</num><content><p>in respect of the provision of the meter, or</p></content></level><level class="para2"><num>(iii)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises; or</p></content></level></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-23-3"><num>(3)</num><content><p><mod>In paragraph 7(1) for paragraphs (a) and (b) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>a demand in writing is made by a gas supplier for any of the relevant payments to be made by a consumer; and</p></content></level><level class="para1"><num>(b)</num><content><p>the consumer does not make those payments within 28 days after the making of the demand.</p></content></level></quotedStructure></mod></p></content></subsection><subsection eId="section-23-4"><num>(4)</num><content><p><mod>After paragraph 7(1) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><subsection><num>(1A)</num><intro><p>A payment is a relevant payment for the purposes of sub-paragraph (1) if it is due to the gas supplier from the consumer—</p></intro><level class="para1"><num>(a)</num><content><p>in respect of the supply of gas to any premises of the consumer (in this paragraph referred to as “<term refersTo="#term-the-premises">the premises</term>”); or</p></content></level><level class="para1"><num>(b)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-23-5"><num>(5)</num><content><p><mod>In each of paragraphs 7(4)(b) and (5) for “charges” substitute <quotedText>“ payments ”</quotedText>.</mod></p></content></subsection></section><section eId="section-24"><num>24</num><heading>Recovering green deal payments: electricity suppliers</heading><subsection eId="section-24-1"><num>(1)</num><content><p>The Electricity Act 1989 is amended as follows.</p></content></subsection><subsection eId="section-24-2"><num>(2)</num><content><p>Paragraph 2 of Schedule 6 to the Electricity Act 1989 (the electricity code) is amended as set out in subsections (3) to (5).</p></content></subsection><subsection eId="section-24-3"><num>(3)</num><content><p><mod>In sub-paragraph (1) for the words from “paid” to “electricity meter” substitute <quotedText>“ made all the relevant payments ”</quotedText>.</mod></p></content></subsection><subsection eId="section-24-4"><num>(4)</num><content><p><mod>After sub-paragraph (1) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><subsection><num>(1A)</num><intro><p>A payment is a relevant payment for the purposes of sub-paragraph (1) if it is due from the customer to an electricity supplier—</p></intro><level class="para1"><num>(a)</num><content><p>in respect of the supply of electricity to any premises or the provision of an electricity meter; or</p></content></level><level class="para1"><num>(b)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-24-5"><num>(5)</num><content><p><mod>In sub-paragraph (3) for “payment of the charges due” substitute <quotedText>“ the relevant payments to be made ”</quotedText>.</mod></p></content></subsection><subsection eId="section-24-6"><num>(6)</num><content><p><mod>In paragraph 12(2) of Schedule 7 (recovery through pre-payment meters) for paragraph (a) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="default"><level class="para1"><num>(a)</num><intro><p>the sum is owed to an authorised supplier—</p></intro><level class="para2"><num>(i)</num><content><p>in respect of the supply of electricity to the premises on which the meter is installed,</p></content></level><level class="para2"><num>(ii)</num><content><p>in respect of the provision of the meter, or</p></content></level><level class="para2"><num>(iii)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises; or</p></content></level></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-modifying-consumer-credit-legislation"><heading><i>Modifying consumer credit legislation</i></heading><section eId="section-25"><num><noteRef href="#key-f059ff6bc0f5be2cb9a9a920afef444e" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>25</num><heading>Exemption from Consumer Credit Act 1974 in relation to credit to business debtors</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-26"><num><noteRef href="#key-fe68fb8a74e286ff5688a659547d5b8a" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>26</num><heading>Energy suppliers not to be treated as carrying on ancillary credit business</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-27"><num>27</num><heading>Duties to give debtors information and statements</heading><subsection eId="section-27-1"><num>(1)</num><content><p>The Consumer Credit Act 1974 is amended as follows.</p></content></subsection><subsection eId="section-27-2"><num>(2)</num><content><p><mod>In section 77 (duty to give information to debtor under fixed-sum credit agreement) after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(2A)</num><content><p>Subsection (2B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(2B)</num><content><p>The duty imposed on the creditor by subsection (1) may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-27-3"><num>(3)</num><content><p><mod>In section 77A (statements to be provided in relation to fixed-sum credit agreement) after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(2A)</num><content><p>Subsection (2B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(2B)</num><content><p>Any duty imposed on the creditor by this section may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-27-4"><num>(4)</num><content><p><mod>In section 77B (statement of account to be provided on request in relation to fixed-sum credit agreement) after subsection (7) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(7A)</num><content><p>Subsection (7B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(7B)</num><content><p>The duty imposed on the creditor by this section may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection></section><section eId="section-28"><num>28</num><heading>Exemption from requirement to give notice of sums in arrears</heading><content><p><mod>In section 86B of the Consumer Credit Act 1974 (requirement to give notice of sums in arrears) for subsection (12) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(12)</num><content><p>In this section “<term refersTo="#term-applicable-agreement">applicable agreement</term>” means an agreement which falls within subsection (12A) or (12B).</p></content></subsection><subsection><num>(12A)</num><intro><p>An agreement falls within this subsection if—</p></intro><level class="para1"><num>(a)</num><content><p>it is a regulated agreement for fixed-sum credit; and</p></content></level><level class="para1"><num>(b)</num><intro><p>it is not—</p></intro><level class="para2"><num>(i)</num><content><p>a non-commercial agreement;</p></content></level><level class="para2"><num>(ii)</num><content><p>a small agreement; or</p></content></level><level class="para2"><num>(iii)</num><content><p>a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></level></level></subsection><subsection><num>(12B)</num><intro><p>An agreement falls within this subsection if—</p></intro><level class="para1"><num>(a)</num><content><p>it is a regulated consumer hire agreement; and</p></content></level><level class="para1"><num>(b)</num><content><p>it is neither a non-commercial agreement nor a small agreement.</p></content></level></subsection></quotedStructure></mod></p></content></section><section eId="section-29"><num>29</num><heading>Early repayment of green deal finance</heading><subsection eId="section-29-1"><num>(1)</num><content><p>The Consumer Credit Act 1974 is amended as follows.</p></content></subsection><subsection eId="section-29-2"><num>(2)</num><content><p><mod>After section 95A (compensatory amount to creditor in relation to early repayment) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><section><num>95B</num><heading>Compensatory amount: green deal finance</heading><subsection><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1"><num>(a)</num><content><p>a regulated consumer credit agreement provides for the rate of interest on the credit to be fixed for a period of time (“the fixed rate period”),</p></content></level><level class="para1"><num>(b)</num><content><p>the agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011) which is of a duration specified for the purposes of this section in regulations, and</p></content></level><level class="para1"><num>(c)</num><content><p>under section 94 the debtor discharges all or part of his indebtedness during the fixed rate period.</p></content></level></subsection><subsection><num>(2)</num><intro><p>The creditor may claim an amount equal to the cost which the creditor has incurred as a result only of the debtor's indebtedness being discharged during the fixed rate period if—</p></intro><level class="para1"><num>(a)</num><content><p>the amount of the payment under section 94 is not paid from the proceeds of a contract of payment protection insurance, and</p></content></level><level class="para1"><num>(b)</num><content><p>such other conditions as may be specified for the purposes of this section in regulations are satisfied.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The amount in subsection (2)—</p></intro><level class="para1"><num>(a)</num><content><p>must be fair,</p></content></level><level class="para1"><num>(b)</num><content><p>must be objectively justified,</p></content></level><level class="para1"><num>(c)</num><content><p>must be calculated by the creditor in accordance with provision made for the purposes of this section in regulations, and</p></content></level><level class="para1"><num>(d)</num><content><p>must not exceed the total amount of interest that would have been paid by the debtor under the agreement in the period from the date on which the debtor makes the payment under section 94 to the date fixed by the agreement for the discharge of the indebtedness of the debtor.</p></content></level></subsection><subsection><num>(4)</num><content><p>If a creditor could claim under either section 95A or this section, the creditor may choose under which section to claim.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-29-3"><num>(3)</num><intro><p>In section 94 (right to complete payments ahead of time)—</p></intro><level class="para1" eId="section-29-3-a"><num>(a)</num><content><p><mod>in subsection (1) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-29-3-b"><num>(b)</num><content><p><mod>in subsection (5) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-29-4"><num>(4)</num><content><p><mod>In subsection (2)(c) of section 97A (duty to give information on partial repayment) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>.</mod></p></content></subsection></section><section eId="section-30"><num>30</num><heading>Power to amend Consumer Credit Act 1974</heading><subsection eId="section-30-1"><num>(1)</num><content><p>The Secretary of State may by order make such amendments to the Consumer Credit Act 1974<ins class="first last" ukl:ChangeId="key-0bb8e82a9a9824c6fb5a3055017bc416-1491332806432" ukl:CommentaryRef="key-0bb8e82a9a9824c6fb5a3055017bc416"><noteRef uk:name="commentary" href="#key-0bb8e82a9a9824c6fb5a3055017bc416" class="commentary"/>, the Financial Services and Markets Act 2000 and any statutory instrument made under that Act</ins> as the Secretary of State considers appropriate in consequence of provision made by or under this Chapter.</p></content></subsection><subsection eId="section-30-2"><num>(2)</num><intro><p>Before exercising the power under subsection (1) the Secretary of State must consult—</p></intro><level class="para1" eId="section-30-2-a"><num>(a)</num><content><p>the <ins class="substitution first last" ukl:ChangeId="key-803fdd5956001662e37b430be0cc1a4d-1491332863193" ukl:CommentaryRef="key-803fdd5956001662e37b430be0cc1a4d"><noteRef uk:name="commentary" href="#key-803fdd5956001662e37b430be0cc1a4d" class="commentary"/>Financial Conduct Authority</ins>, and</p></content></level><level class="para1" eId="section-30-2-b"><num>(b)</num><content><p>such other persons as the Secretary of State considers appropriate.</p></content></level></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-delegation-and-exercise-of-functions"><heading><i>Delegation and exercise of functions</i></heading><section eId="section-31"><num>31</num><heading>Delegation and conferring of functions</heading><subsection eId="section-31-1"><num>(1)</num><intro><p>The Secretary of State may by order provide for the following functions conferred on the Secretary of State to be exercisable instead by a public body specified in the order—</p></intro><level class="para1" eId="section-31-1-a"><num>(a)</num><content><p>any function exercisable in connection with the scheme established by the framework regulations;</p></content></level><level class="para1" eId="section-31-1-b"><num>(b)</num><content><p>any function exercisable under the framework regulations by virtue of section 6(4);</p></content></level><level class="para1" eId="section-31-1-c"><num>(c)</num><content><p>any function under regulations made under section 16.</p></content></level></subsection><subsection eId="section-31-2"><num>(2)</num><content><p>If the function of issuing a code of practice for the purposes of the scheme is specified in an order by virtue of subsection (1)(a), a draft of the code must be approved by the Secretary of State before the Secretary of State lays the draft before Parliament under section 39(2).</p></content></subsection><subsection eId="section-31-3"><num>(3)</num><content><p>If the function of revoking a code of practice issued for the purposes of the scheme is specified in an order by virtue of subsection (1)(a), the code must not be revoked without the approval of the Secretary of State.</p></content></subsection><subsection eId="section-31-4"><num>(4)</num><intro><p>The Secretary of State may by order make provision conferring administration functions on—</p></intro><level class="para1" eId="section-31-4-a"><num>(a)</num><content><p>the Secretary of State;</p></content></level><level class="para1" eId="section-31-4-b"><num>(b)</num><content><p>a public body specified in the order.</p></content></level></subsection><subsection eId="section-31-5"><num>(5)</num><content><p>For the purposes of subsection (4) administration functions are functions in connection with the administration of any provision in licences under section 7 or 7A of the Gas Act 1986 or section 6(1)(c) or (d) of the Electricity Act 1989 made by virtue of section 17(3) of this Act.</p></content></subsection><subsection eId="section-31-6"><num>(6)</num><intro><p>An order made by virtue of subsection (1) or (4)(b) may provide for—</p></intro><level class="para1" eId="section-31-6-a"><num>(a)</num><content><p>different functions to be exercisable by different public bodies;</p></content></level><level class="para1" eId="section-31-6-b"><num>(b)</num><content><p>the same function to be exercisable by different public bodies in relation to different areas.</p></content></level></subsection><subsection eId="section-31-7"><num>(7)</num><content><p>The Secretary of State may make payments to any public body specified in an order made by virtue of subsection (1).</p></content></subsection></section><section eId="section-32"><num>32</num><heading>Exercise of scheme functions on behalf of the Secretary of State or a public body</heading><subsection eId="section-32-1"><num>(1)</num><content><p>This section applies to any function exercisable in connection with the scheme established by the framework regulations.</p></content></subsection><subsection eId="section-32-2"><num>(2)</num><content><p>The Secretary of State may arrange for such a function to be exercised by any body or person on behalf of the Secretary of State.</p></content></subsection><subsection eId="section-32-3"><num>(3)</num><content><p>A public body specified in relation to such a function in an order made by virtue of section 31(1)(a) may arrange for the function to be exercised by any other body or person on its behalf.</p></content></subsection><subsection eId="section-32-4"><num>(4)</num><intro><p>Arrangements under this section—</p></intro><level class="para1" eId="section-32-4-a"><num>(a)</num><content><p>do not affect the responsibility for the exercise of the function;</p></content></level><level class="para1" eId="section-32-4-b"><num>(b)</num><content><p>may include provision for payments to be made to the body or person exercising the function under the arrangements.</p></content></level></subsection></section><section eId="section-33"><num>33</num><heading>Duty to report</heading><subsection eId="section-33-1"><num>(1)</num><content><p>This section applies if the function under section 3(1)(a) is specified in an order made by virtue of section 31(1)(a).</p></content></subsection><subsection eId="section-33-2"><num>(2)</num><intro><p>The Secretary of State may make regulations requiring the body specified in relation to that function in the order to—</p></intro><level class="para1" eId="section-33-2-a"><num>(a)</num><content><p>collect information on the specified matters, and</p></content></level><level class="para1" eId="section-33-2-b"><num>(b)</num><content><p>provide the Secretary of State with a report on those matters at the specified times.</p></content></level></subsection><subsection eId="section-33-3"><num>(3)</num><content><p>In subsection (2) “<term refersTo="#term-specified" eId="term-specified">specified</term>” means specified in the regulations.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-general"><heading><i>General</i></heading><section eId="section-34"><num>34</num><heading>Power of Secretary of State to deal with special circumstances</heading><subsection eId="section-34-1"><num>(1)</num><intro><p>The Secretary of State may by regulations make provision as to—</p></intro><level class="para1" eId="section-34-1-a"><num>(a)</num><content><p>the circumstances in which a bill payer's liability to make green deal payments to the relevant energy supplier is suspended or cancelled;</p></content></level><level class="para1" eId="section-34-1-b"><num>(b)</num><content><p>the circumstances in which any suspension of liability ends;</p></content></level><level class="para1" eId="section-34-1-c"><num>(c)</num><content><p>the consequences of any suspension or cancellation;</p></content></level><level class="para1" eId="section-34-1-d"><num>(d)</num><content><p>the circumstances in which the green deal provider may require the early repayment of the whole or part of the total of the payments outstanding under a green deal plan.</p></content></level></subsection><subsection eId="section-34-2"><num>(2)</num><intro><p>The regulations may, in particular, include provision—</p></intro><level class="para1" eId="section-34-2-a"><num>(a)</num><content><p>as to the procedure to be followed for securing a suspension or cancellation (including the payment of an administration fee calculated in accordance with the regulations);</p></content></level><level class="para1" eId="section-34-2-b"><num>(b)</num><content><p>as to how any payments due under a green deal plan during a period of suspension are to be paid;</p></content></level><level class="para1" eId="section-34-2-c"><num>(c)</num><content><p>as to the making of payments due under a green deal plan after a period of suspension;</p></content></level><level class="para1" eId="section-34-2-d"><num>(d)</num><content><p>as to the calculation of the amount payable on early repayment (including a fee calculated in accordance with the regulations).</p></content></level></subsection><subsection eId="section-34-3"><num>(3)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-34-3-a"><num>(a)</num><content><p>“<term refersTo="#term-bill-payer" eId="term-bill-payer">bill payer</term>” includes the person who would be the bill payer if the supply from the relevant energy supplier were not temporarily disconnected or the liability to make green deal payments were not suspended, and</p></content></level><level class="para1" eId="section-34-3-b"><num>(b)</num><content><p>payments are green deal payments if they are made under a green deal plan.</p></content></level></subsection></section><section eId="section-35"><num>35</num><heading>Appeals</heading><subsection eId="section-35-1"><num>(1)</num><intro><p>This section applies if provision is included in a scheme or regulations by virtue of any of the following—</p></intro><level class="para1" eId="section-35-1-a"><num>(a)</num><content><p>section 3(3)(h) or (i);</p></content></level><level class="para1" eId="section-35-1-b"><num>(b)</num><content><p>section 6(4);</p></content></level><level class="para1" eId="section-35-1-c"><num>(c)</num><content><p>section 16.</p></content></level></subsection><subsection eId="section-35-2"><num>(2)</num><content><p>The Secretary of State must by regulations provide for a right of appeal to a court or tribunal against any sanction imposed, or other action taken, by the Secretary of State or a specified public body under the provision mentioned in subsection (1).</p></content></subsection><subsection eId="section-35-3"><num>(3)</num><intro><p>Regulations under subsection (2) may, in particular, include provision—</p></intro><level class="para1" eId="section-35-3-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-35-3-b"><num>(b)</num><content><p>as to the persons who may make an appeal;</p></content></level><level class="para1" eId="section-35-3-c"><num>(c)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-35-3-d"><num>(d)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-35-3-e"><num>(e)</num><content><p>suspending the effect of a sanction or other action being appealed against, pending determination of the appeal;</p></content></level><level class="para1" eId="section-35-3-f"><num>(f)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-35-3-g"><num>(g)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-35-4"><num>(4)</num><intro><p>The provision referred to in subsection (3)(f) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-35-4-a"><num>(a)</num><content><p>to confirm the sanction imposed or action taken;</p></content></level><level class="para1" eId="section-35-4-b"><num>(b)</num><content><p>to withdraw the sanction or action;</p></content></level><level class="para1" eId="section-35-4-c"><num>(c)</num><content><p>to impose a different sanction or take different action;</p></content></level><level class="para1" eId="section-35-4-d"><num>(d)</num><content><p>to remit the decision whether to confirm the sanction or other action, or any matter relating to that decision, to the person who imposed the sanction or took the action;</p></content></level><level class="para1" eId="section-35-4-e"><num>(e)</num><content><p>to award costs or, in Scotland, expenses.</p></content></level></subsection><subsection eId="section-35-5"><num>(5)</num><content><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within subsection (3)(a), (d), (f) or (g), regulations under subsection (2) may revoke or amend any subordinate legislation.</p></content></subsection><subsection eId="section-35-6"><num>(6)</num><content><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within subsection (3)(a), (d), (f) or (g), they may by regulations revoke or amend any subordinate legislation, or any provision included in an instrument made under an Act of the Scottish Parliament, if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></content></subsection><subsection eId="section-35-7"><num>(7)</num><intro><p>In this section—</p></intro><level class="para1" eId="section-35-7-a"><num>(a)</num><content><p>“<term refersTo="#term-specified-public-body" eId="term-specified-public-body">specified public body</term>” means a public body specified in an order made by virtue of section 31(1);</p></content></level><level class="para1" eId="section-35-7-b"><num>(b)</num><content><p>“<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></level></subsection></section><section eId="section-36"><num>36</num><heading>Funding for energy efficiency advice</heading><subsection eId="section-36-1"><num>(1)</num><content><p>The Secretary of State may incur expenditure in providing qualifying advice or information or in making payments to persons who provide qualifying advice or information.</p></content></subsection><subsection eId="section-36-2"><num>(2)</num><content><p>In this section “<term refersTo="#term-qualifying-advice-or-information" eId="term-qualifying-advice-or-information">qualifying advice or information</term>” means advice or information about green deal plans or energy efficiency generally which is given to individuals or organisations.</p></content></subsection></section><section eId="section-37"><num>37</num><heading>Preparatory expenditure: framework regulations</heading><content><p>The Secretary of State may, before the framework regulations are made, incur expenditure for the purpose of, or in connection with, preparing for a scheme of the kind provided for by section 3.</p></content></section><section eId="section-38"><num>38</num><heading>Green deal installation apprenticeships</heading><subsection eId="section-38-1"><num>(1)</num><content><p>Before making the first framework regulations the Secretary of State must lay before Parliament a report on what, if any, steps the Secretary of State has taken to encourage green deal installation apprenticeships.</p></content></subsection><subsection eId="section-38-2"><num>(2)</num><content><p>A “green deal installation apprenticeship” is an apprenticeship which provides training on how to install energy efficiency improvements at properties.</p></content></subsection></section><section eId="section-39"><num>39</num><heading>Parliamentary procedure in relation to code of practice</heading><subsection eId="section-39-1"><num>(1)</num><content><p>This section makes further provision in relation to the issuing of any code of practice for the purposes of the scheme established by the framework regulations.</p></content></subsection><subsection eId="section-39-2"><num>(2)</num><content><p>Before the code is issued the Secretary of State must lay a draft of the code before Parliament.</p></content></subsection><subsection eId="section-39-3"><num>(3)</num><content><p>If, within the 40-day period, either House of Parliament resolves not to approve the draft, the code may not be issued.</p></content></subsection><subsection eId="section-39-4"><num>(4)</num><content><p>If no such resolution is made within that period, the code may be issued.</p></content></subsection><subsection eId="section-39-5"><num>(5)</num><content><p>The “<term refersTo="#term-40-day-period" eId="term-40-day-period">40-day period</term>”, in relation to a draft of a code, means the period of 40 days beginning with the day on which the draft is laid before Parliament (or, if it is not laid before each House of Parliament on the same day, the later of the 2 days on which it is laid).</p></content></subsection><subsection eId="section-39-6"><num>(6)</num><intro><p>For the purposes of calculating the 40-day period, no account is to be taken of any period during which—</p></intro><level class="para1" eId="section-39-6-a"><num>(a)</num><content><p>Parliament is dissolved or prorogued, or</p></content></level><level class="para1" eId="section-39-6-b"><num>(b)</num><content><p>both Houses are adjourned for more than 4 days.</p></content></level></subsection></section><section eId="section-40"><num>40</num><heading>Regulations and orders</heading><subsection eId="section-40-1"><num>(1)</num><content><p>Regulations and orders under this Chapter may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-40-2"><num>(2)</num><content><p>Regulations and orders under this Chapter, other than those made by the Scottish Ministers, are to be made by statutory instrument.</p></content></subsection><subsection eId="section-40-3"><num>(3)</num><content><p>A statutory instrument containing regulations or an order under this Chapter is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-40-4"><num>(4)</num><intro><p>Subsection (3) does not apply to a statutory instrument containing—</p></intro><level class="para1" eId="section-40-4-a"><num>(a)</num><content><p>regulations under section 2 or the framework regulations,</p></content></level><level class="para1" eId="section-40-4-b"><num>(b)</num><content><p>regulations under section 13, 15(1), 16, 34 or 35(2), or</p></content></level><level class="para1" eId="section-40-4-c"><num>(c)</num><content><p>an order under section 1, 2 or 30.</p></content></level></subsection><subsection eId="section-40-5"><num>(5)</num><content><p>A statutory instrument containing regulations or an order falling within subsection (4) may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection eId="section-40-6"><num>(6)</num><content><p>Regulations under section 10(2), 14(7) or (8) or 15(4) (regulations made by the Scottish Ministers) are subject to the negative procedure.</p></content></subsection><subsection eId="section-40-7"><num>(7)</num><content><p>Regulations under section 35(6) (regulations made by the Scottish Ministers) are subject to the affirmative procedure.</p></content></subsection><subsection eId="section-40-8"><num>(8)</num><intro><p>Before making regulations or an order under this Chapter extending to Scotland, the Secretary of State must—</p></intro><level class="para1" eId="section-40-8-a"><num>(a)</num><content><p>if the regulations or order contain any provision which would be within the legislative competence of the Scottish Parliament if it were contained in an Act of that Parliament, obtain the consent of the Scottish Ministers;</p></content></level><level class="para1" eId="section-40-8-b"><num>(b)</num><content><p>in any other case, consult the Scottish Ministers.</p></content></level></subsection><subsection eId="section-40-9"><num>(9)</num><intro><p>The Secretary of State must obtain the consent of the Welsh Ministers before making provision under section 35 amending or revoking—</p></intro><level class="para1" eId="section-40-9-a"><num>(a)</num><content><p>provision included in an instrument made under a Measure or Act of the National Assembly for Wales;</p></content></level><level class="para1" eId="section-40-9-b"><num>(b)</num><content><p>any other subordinate legislation made by the Welsh Ministers (or the National Assembly for Wales established under the Government of Wales Act 1998).</p></content></level></subsection><subsection eId="section-40-10"><num>(10)</num><content><p>Before amending under section 9 a provision of the Building Regulations 2010 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2010/2214), the Secretary of State must, if and so far as the function under which the provision was made is exercisable by the Welsh Ministers, obtain their consent.</p></content></subsection><subsection eId="section-40-11"><num>(11)</num><content><p>Subsections (9) and (10) do not apply to the extent that the Secretary of State is making incidental or consequential provision.</p></content></subsection><subsection eId="section-40-12"><num>(12)</num><content><p>Before making regulations or an order under this Chapter applying to Wales, the Secretary of State must consult the Welsh Ministers.</p></content></subsection><subsection eId="section-40-13"><num>(13)</num><content><p>Subsection (12) does not apply to the extent that consent has been obtained under subsection (9) or (10).</p></content></subsection></section><section eId="section-41"><num>41</num><heading>Crown application: Chapter 1</heading><content><p>This Chapter binds the Crown.</p></content></section></hcontainer></chapter> — Introductory
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-1"><num>CHAPTER 1</num><heading>Green deal</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-introductory"><heading><i>Introductory</i></heading><section eId="section-1"><num>1</num><heading>Green deal plans</heading><subsection eId="section-1-1"><num>(1)</num><content><p>This section applies for the purposes of this Chapter.</p></content></subsection><subsection eId="section-1-2"><num>(2)</num><content><p>An energy plan is an arrangement made by the occupier or owner of a property for a person to make energy efficiency improvements to the property.</p></content></subsection><subsection eId="section-1-3"><num>(3)</num><intro><p>An energy plan is a green deal plan if—</p></intro><level class="para1" eId="section-1-3-a"><num>(a)</num><content><p>the energy efficiency improvements are to be paid for wholly or partly in instalments, and</p></content></level><level class="para1" eId="section-1-3-b"><num>(b)</num><content><p>all of the requirements listed in paragraphs (a) to (e) of subsection (4) are met in relation to the plan at the time when it is made.</p></content></level></subsection><subsection eId="section-1-4"><num>(4)</num><intro><p>The requirements are—</p></intro><level class="para1" eId="section-1-4-a"><num>(a)</num><content><p>the property is an eligible property,</p></content></level><level class="para1" eId="section-1-4-b"><num>(b)</num><content><p>the energy efficiency improvements fall within a description specified in an order made by the Secretary of State (“qualifying energy improvements”),</p></content></level><level class="para1" eId="section-1-4-c"><num>(c)</num><content><p>the conditions mentioned in section 4 as to assessment of the property and other matters have been met,</p></content></level><level class="para1" eId="section-1-4-d"><num>(d)</num><content><p>the conditions mentioned in section 5 as to the terms of the plan and other matters are met, and</p></content></level><level class="para1" eId="section-1-4-e"><num>(e)</num><content><p>a relevant energy supplier supplies, or is to supply, energy to the property.</p></content></level></subsection><subsection eId="section-1-5"><num>(5)</num><intro><p>Subsection (6) applies to a green deal plan from the time when—</p></intro><level class="para1" eId="section-1-5-a"><num>(a)</num><content><p>improvements have been installed in accordance with section 7,</p></content></level><level class="para1" eId="section-1-5-b"><num>(b)</num><content><p>the plan is confirmed in accordance with section 8, and</p></content></level><level class="para1" eId="section-1-5-c"><num>(c)</num><content><p>the requirements imposed by virtue of section 9 or 10 are met.</p></content></level></subsection><subsection eId="section-1-6"><num>(6)</num><intro><p>The payments in instalments agreed in the plan are to be—</p></intro><level class="para1" eId="section-1-6-a"><num>(a)</num><content><p>made by the person who is for the time being liable to pay the energy bills for the property,</p></content></level><level class="para1" eId="section-1-6-b"><num>(b)</num><content><p>made to the relevant energy supplier through the energy bills for the property,</p></content></level><level class="para1" eId="section-1-6-c"><num>(c)</num><content><p>recoverable as a debt by the relevant energy supplier from the person referred to in paragraph (a), and</p></content></level><level class="para1" eId="section-1-6-d"><num>(d)</num><content><p>recovered and held by the relevant energy supplier as agent and trustee for the person who made the improvements (unless the relevant energy supplier is also that person).</p></content></level></subsection><subsection eId="section-1-7"><num>(7)</num><content><p>Subsection (6) applies irrespective of whether the person referred to in paragraph (a) is the person who entered into the plan.</p></content></subsection><subsection eId="section-1-8"><num>(8)</num><intro><p>Subsection (6) is subject to—</p></intro><level class="para1" eId="section-1-8-a"><num>(a)</num><content><p>provision made in regulations under section 34;</p></content></level><level class="para1" eId="section-1-8-b"><num>(b)</num><content><p>any suspension or cancellation, by virtue of provision made in regulations under section 3(3)(h) or (i), 6(4), 16 or 35, of liability to make payments.</p></content></level></subsection><subsection eId="section-1-9"><num>(9)</num><content><p>For the purposes of subsection (4)(a) a property is an eligible property unless it falls within a description specified in an order made by the Secretary of State.</p></content></subsection></section><section eId="section-2"><num>2</num><heading>Green deal plans: supplementary</heading><subsection eId="section-2-1"><num>(1)</num><content><p>This section applies for the purposes of this Chapter.</p></content></subsection><subsection eId="section-2-2"><num>(2)</num><content><p>The occupier or owner who makes the arrangement referred to in section 1(2) is the “improver” and the person who makes the improvements is the “green deal provider”.</p></content></subsection><subsection eId="section-2-3"><num>(3)</num><content><p>The person referred to in section 1(6)(a) is the “bill payer”.</p></content></subsection><subsection eId="section-2-4"><num>(4)</num><intro><p>References to energy efficiency improvements, in relation to a property, are to—</p></intro><level class="para1" eId="section-2-4-a"><num>(a)</num><content><p>measures for improving efficiency in the use in the property of electricity, gas conveyed through pipes or any other source of energy which is specified in an order made by the Secretary of State, or</p></content></level><level class="para1" eId="section-2-4-b"><num>(b)</num><content><p>measures falling within subsection (5) or (6).</p></content></level></subsection><subsection eId="section-2-5"><num>(5)</num><intro><p>Measures fall within this subsection if—</p></intro><level class="para1" eId="section-2-5-a"><num>(a)</num><intro><p>they are any of the following—</p></intro><level class="para2" eId="section-2-5-a-i"><num>(i)</num><content><p>measures for increasing the amount of electricity generated, or heat produced, by microgeneration (within the meaning given by section 26(1) of the Climate Change and Sustainable Energy Act 2006);</p></content></level><level class="para2" eId="section-2-5-a-ii"><num>(ii)</num><content><p>any other measures for increasing the amount of electricity generated, or heat produced, using low-emissions sources or technologies;</p></content></level><level class="para2" eId="section-2-5-a-iii"><num>(iii)</num><content><p>measures for reducing the consumption of such energy as is mentioned in subsection (4), and</p></content></level></level><level class="para1" eId="section-2-5-b"><num>(b)</num><content><p>they are specified in an order made by the Secretary of State.</p></content></level></subsection><subsection eId="section-2-6"><num>(6)</num><intro><p>Measures fall within this subsection if—</p></intro><level class="para1" eId="section-2-6-a"><num>(a)</num><intro><p>they are installed at the property for the purpose of supplying to it any of the following types of energy—</p></intro><level class="para2" eId="section-2-6-a-i"><num>(i)</num><content><p>electricity generated by a generating station operated for the purposes of producing heat, or a cooling effect, in association with electricity;</p></content></level><level class="para2" eId="section-2-6-a-ii"><num>(ii)</num><content><p>heat produced in association with electricity or steam produced from (or air or water heated by) such heat;</p></content></level><level class="para2" eId="section-2-6-a-iii"><num>(iii)</num><content><p>any gas or liquid subjected to a cooling effect produced in association with electricity, and</p></content></level></level><level class="para1" eId="section-2-6-b"><num>(b)</num><content><p>they are specified in an order made by the Secretary of State.</p></content></level></subsection><subsection eId="section-2-7"><num>(7)</num><content><p>For the purposes of subsection (5)(a)(ii) electricity is generated, or heat is produced, using low-emissions sources or technologies if it is generated, or produced, by plant which relies wholly or mainly on a source of energy or a technology mentioned in section 26(2) of the Climate Change and Sustainable Energy Act 2006.</p></content></subsection><subsection eId="section-2-8"><num>(8)</num><content><p>For the purposes of subsection (6) “generating station” and “supplying” are to be read in accordance with section 64(1) of the Electricity Act 1989.</p></content></subsection><subsection eId="section-2-9"><num>(9)</num><content><p>“Energy” (except in this section), “energy bill”, “occupier”, “owner” and “relevant energy supplier” have the meaning given in regulations made by the Secretary of State.</p></content></subsection><subsection eId="section-2-10"><num>(10)</num><content><p>Regulations under subsection (9) may also make provision as to the circumstances in which a person who is not a bill payer for the purposes of this Chapter may be treated as a bill payer for those purposes.</p></content></subsection></section><section eId="section-3"><num>3</num><heading>Framework regulations</heading><subsection eId="section-3-1"><num>(1)</num><intro><p>The Secretary of State must by regulations establish a scheme making provision for the Secretary of State—</p></intro><level class="para1" eId="section-3-1-a"><num>(a)</num><content><p>to authorise persons to act as green deal assessors, green deal providers or green deal installers in connection with green deal plans (either individually or through membership of a body specified in, or authorised under, the scheme);</p></content></level><level class="para1" eId="section-3-1-b"><num>(b)</num><content><p>to regulate the conduct of those assessors, providers or installers (“green deal participants”).</p></content></level></subsection><subsection eId="section-3-2"><num>(2)</num><content><p>Regulations under subsection (1) are referred to in this Chapter as “<term refersTo="#term-the-framework-regulations" eId="term-the-framework-regulations">the framework regulations</term>”.</p></content></subsection><subsection eId="section-3-3"><num>(3)</num><intro><p>The scheme established by the framework regulations may, in particular, make provision—</p></intro><level class="para1" eId="section-3-3-a"><num>(a)</num><content><p>requiring the payment of a fee in connection with initial or continued authorisation under the scheme;</p></content></level><level class="para1" eId="section-3-3-b"><num>(b)</num><content><p>for the establishment and maintenance of a register of green deal participants and of persons from whom authorisation under the scheme has been withdrawn;</p></content></level><level class="para1" eId="section-3-3-c"><num>(c)</num><content><p>requiring green deal participants to provide the information required under the scheme;</p></content></level><level class="para1" eId="section-3-3-d"><num>(d)</num><content><p>for the issuing, revision or revocation of a code of practice;</p></content></level><level class="para1" eId="section-3-3-e"><num>(e)</num><content><p>requiring green deal participants to comply with the code of practice as a condition of their authorisation;</p></content></level><level class="para1" eId="section-3-3-f"><num>(f)</num><content><p>requiring green deal providers to enter into an agreement with the holder of a licence under section 7 or 7A of the Gas Act 1986 (gas transporter, shipper or supply licences) or section 6(1)(c) or (d) of the Electricity Act 1989 (electricity distributor and supply licences) and to comply with that agreement as a condition of their authorisation;</p></content></level><level class="para1" eId="section-3-3-g"><num>(g)</num><content><p>requiring that an agreement mentioned in paragraph (f) be approved by the Secretary of State before being entered into;</p></content></level><level class="para1" eId="section-3-3-h"><num>(h)</num><content><p>for securing compliance with any condition or any other requirement of the scheme, code or agreement;</p></content></level><level class="para1" eId="section-3-3-i"><num>(i)</num><content><p>as to the consequences of non-compliance with any such condition or requirement.</p></content></level></subsection><subsection eId="section-3-4"><num>(4)</num><intro><p>The code of practice issued for the purposes of the scheme may, in particular, make provision—</p></intro><level class="para1" eId="section-3-4-a"><num>(a)</num><content><p>as to the qualification and training of green deal participants;</p></content></level><level class="para1" eId="section-3-4-b"><num>(b)</num><content><p>as to their handling of queries or complaints;</p></content></level><level class="para1" eId="section-3-4-c"><num>(c)</num><content><p>requiring green deal participants to have such arrangements for insurance as are specified in the code;</p></content></level><level class="para1" eId="section-3-4-d"><num>(d)</num><content><p>as to the payment of green deal assessors by green deal providers or green deal installers and the payment of green deal installers by green deal providers;</p></content></level><level class="para1" eId="section-3-4-e"><num>(e)</num><content><p>as to the circumstances in which green deal assessors may charge customers for qualifying assessments of properties and as to the amount of any such charge;</p></content></level><level class="para1" eId="section-3-4-f"><num>(f)</num><content><p>requiring green deal assessors to act with impartiality;</p></content></level><level class="para1" eId="section-3-4-g"><num>(g)</num><content><p>as to the provision of information by green deal providers to improvers and bill payers and prospective improvers and bill payers;</p></content></level><level class="para1" eId="section-3-4-h"><num>(h)</num><content><p>as to marketing in connection with green deal plans.</p></content></level></subsection><subsection eId="section-3-5"><num>(5)</num><content><p>The code may include provision for regulating a body specified or authorised for the purposes of subsection (1)(a).</p></content></subsection><subsection eId="section-3-6"><num>(6)</num><content><p>The scheme and the code may make different provision for different circumstances or cases or for different purposes.</p></content></subsection><subsection eId="section-3-7"><num>(7)</num><content><p>The provision made by the scheme or code in relation to green deal participants may also extend to matters in connection with any energy plans which are not green deal plans.</p></content></subsection><subsection eId="section-3-8"><num>(8)</num><intro><p>The provision made for the purposes of subsection (3)(h) or (i) may, in particular, include provision enabling the Secretary of State to—</p></intro><level class="para1" eId="section-3-8-a"><num>(a)</num><content><p>cancel any liability to pay for a qualifying assessment of a property;</p></content></level><level class="para1" eId="section-3-8-b"><num>(b)</num><content><p>require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-3-8-c"><num>(c)</num><content><p>require a green deal participant to rectify a qualifying energy improvement or its installation;</p></content></level><level class="para1" eId="section-3-8-d"><num>(d)</num><content><p>require a green deal participant to pay compensation or a financial penalty;</p></content></level><level class="para1" eId="section-3-8-e"><num>(e)</num><content><p>withdraw, or require a body specified or authorised for the purposes of subsection (1)(a) to withdraw, an authorisation to act as a green deal participant;</p></content></level><level class="para1" eId="section-3-8-f"><num>(f)</num><content><p>withdraw authorisation from a body authorised for the purposes of subsection (1)(a) as a body whose members are authorised to act as green deal participants.</p></content></level></subsection><subsection eId="section-3-9"><num>(9)</num><content><p>For the purposes of this section references to a qualifying assessment are to an energy efficiency assessment which meets the requirements specified in the framework regulations and deals with such other matters as may be so specified.</p></content></subsection><subsection eId="section-3-10"><num>(10)</num><content><p>This section is without prejudice to the powers conferred on the Secretary of State by other provisions of this Chapter to make provision in or under the framework regulations.</p></content></subsection><subsection eId="section-3-11"><num>(11)</num><content><p>In this Chapter references to a code of practice include references to a code of practice which has been revised by virtue of subsection (3)(d).</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-green-deal-plan"><heading><i>Green deal plan</i></heading><section eId="section-4"><num>4</num><heading>Assessment of property <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-4-1"><num>(1)</num><intro><p>For the purposes of section 1(4)(c) the conditions as to assessment of the property and other matters are—</p></intro><level class="para1" eId="section-4-1-a"><num>(a)</num><content><p>the conditions set out in subsections (2) to (9), and</p></content></level><level class="para1" eId="section-4-1-b"><num>(b)</num><content><p>such other conditions (whether relating to the green deal assessor, the green deal provider, the improver or any other person) as are specified in the framework regulations.</p></content></level></subsection><subsection eId="section-4-2"><num>(2)</num><content><p>The first condition is that a qualifying assessment of the property has been carried out by a person authorised by virtue of the framework regulations to act as a green deal assessor.</p></content></subsection><subsection eId="section-4-3"><num>(3)</num><content><p>The second condition is that the green deal assessor has recommended the energy efficiency improvements.</p></content></subsection><subsection eId="section-4-4"><num>(4)</num><content><p>The third condition is that the green deal provider has given an estimate, on the basis specified in the framework regulations, of the savings likely to be made on the energy bills for the property if the improvements are carried out.</p></content></subsection><subsection eId="section-4-5"><num>(5)</num><content><p>The fourth condition is that the green deal provider has given an estimate, on the basis specified in the framework regulations, of the period over which the savings mentioned in subsection (4) are likely to be made.</p></content></subsection><subsection eId="section-4-6"><num>(6)</num><content><p>The fifth condition is that the green deal provider is authorised by virtue of the framework regulations to act as a green deal provider.</p></content></subsection><subsection eId="section-4-7"><num>(7)</num><content><p>The sixth condition is that the green deal provider has offered to carry out the improvements on the basis that the whole or part of the cost will be repaid in instalments over a period after the improvements have been made.</p></content></subsection><subsection eId="section-4-8"><num>(8)</num><intro><p>The seventh condition is that the green deal provider meets any requirement specified in the framework regulations as to the relationship between—</p></intro><level class="para1" eId="section-4-8-a"><num>(a)</num><content><p>the estimated total of the proposed instalments, and</p></content></level><level class="para1" eId="section-4-8-b"><num>(b)</num><content><p>the estimate mentioned in subsection (4).</p></content></level></subsection><subsection eId="section-4-9"><num>(9)</num><intro><p>The eighth condition is that the green deal provider meets any requirement specified in the framework regulations as to the relationship between—</p></intro><level class="para1" eId="section-4-9-a"><num>(a)</num><content><p>the period for which the instalments are proposed to be paid, and</p></content></level><level class="para1" eId="section-4-9-b"><num>(b)</num><content><p>the period estimated under subsection (5).</p></content></level></subsection><subsection eId="section-4-10"><num>(10)</num><content><p>In subsection (2) the reference to a qualifying assessment is to be read in accordance with section 3(9).</p></content></subsection></section><section eId="section-5"><num>5</num><heading>Terms of plan <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-5-1"><num>(1)</num><intro><p>For the purposes of section 1(4)(d), the conditions as to the terms of the plan and other matters are—</p></intro><level class="para1" eId="section-5-1-a"><num>(a)</num><content><p>the conditions set out in subsections (2) to (4), and</p></content></level><level class="para1" eId="section-5-1-b"><num>(b)</num><content><p>such other conditions as are specified in the framework regulations.</p></content></level></subsection><subsection eId="section-5-2"><num>(2)</num><intro><p>The first condition is that the plan includes the following terms—</p></intro><level class="para1" eId="section-5-2-a"><num>(a)</num><intro><p>a term in which the improver agrees to—</p></intro><level class="para2" eId="section-5-2-a-i"><num>(i)</num><content><p>the amounts of the payments in instalments and the intervals at which, and period for which, they are payable;</p></content></level><level class="para2" eId="section-5-2-a-ii"><num>(ii)</num><content><p>such other matters as are specified in the regulations;</p></content></level></level><level class="para1" eId="section-5-2-b"><num>(b)</num><content><p>a term in which the improver confirms that any necessary permissions or consents have been obtained in respect of the improvements;</p></content></level><level class="para1" eId="section-5-2-c"><num>(c)</num><content><p>a term providing that the green deal provider may not take a charge over any person's property by way of security for payments;</p></content></level><level class="para1" eId="section-5-2-d"><num>(d)</num><content><p>a term providing that the green deal plan does not prevent the bill payer from changing the intervals at which energy bills are to be paid.</p></content></level></subsection><subsection eId="section-5-3"><num>(3)</num><intro><p>The second condition is that the plan does not include any of the following terms—</p></intro><level class="para1" eId="section-5-3-a"><num>(a)</num><content><p>a term making a person liable to make any payments under the green deal plan otherwise than in respect of the period for which the person is the bill payer in relation to the property;</p></content></level><level class="para1" eId="section-5-3-b"><num>(b)</num><content><p>a term requiring the bill payer to make in any circumstances an early repayment of the whole or part of the amount outstanding under the green deal plan (except in accordance with the framework regulations or regulations under section 34, or provision made under them);</p></content></level><level class="para1" eId="section-5-3-c"><num>(c)</num><content><p>a term providing for money to be advanced to the improver (except in accordance with the framework regulations or provision made under them).</p></content></level></subsection><subsection eId="section-5-4"><num>(4)</num><content><p>The third condition is that the agreements mentioned in paragraph (a) of subsection (2) and the permissions and consents mentioned in paragraph (b) of that subsection have not been withdrawn before the end of the period of 14 days beginning with the last day on which they were given.</p></content></subsection><subsection eId="section-5-5"><num>(5)</num><intro><p>The conditions which may be specified in the framework regulations by virtue of subsection (1)(b) include, in particular—</p></intro><level class="para1" eId="section-5-5-a"><num>(a)</num><content><p>a condition that the plan includes a term so specified enabling the early repayment of the whole or part of the amount outstanding under the plan and making provision as to the calculation of the amount payable and any fee,</p></content></level><level class="para1" eId="section-5-5-b"><num>(b)</num><content><p>a condition that the plan includes a term so specified guaranteeing the improvements and making provision as to who is to benefit from the guarantee,</p></content></level><level class="para1" eId="section-5-5-c"><num>(c)</num><content><p>a condition that the plan includes a term so specified as to how any problems with the improvements installed, or arising in connection with the installation of them, are to be dealt with, and</p></content></level><level class="para1" eId="section-5-5-d"><num>(d)</num><content><p>a condition requiring the agreements mentioned in subsection (2)(a) to be in the form specified in the framework regulations.</p></content></level></subsection><subsection eId="section-5-6"><num>(6)</num><content><p>References in this section to the agreements mentioned in subsection (2)(a) include references to the consent required by virtue of section 6(2)(a).</p></content></subsection></section><section eId="section-6"><num>6</num><heading>Consents and redress <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-6-1"><num>(1)</num><intro><p>The framework regulations may make provision for dealing with cases where—</p></intro><level class="para1" eId="section-6-1-a"><num>(a)</num><content><p>at the time when a plan is entered into the improver and the bill payer are different persons;</p></content></level><level class="para1" eId="section-6-1-b"><num>(b)</num><content><p>the bill payer at the time when a plan is entered into is a different person from the bill payer at any subsequent time (a “subsequent bill payer”).</p></content></level></subsection><subsection eId="section-6-2"><num>(2)</num><intro><p>Provision which may be made by virtue of subsection (1) includes—</p></intro><level class="para1" eId="section-6-2-a"><num>(a)</num><content><p>provision requiring the term included in the plan by virtue of section 5(2)(a)(i) to be one to which the bill payer mentioned in subsection (1)(a) has consented, and</p></content></level><level class="para1" eId="section-6-2-b"><num>(b)</num><content><p>provision as to the terms of the plan which are to bind or benefit that bill payer or a subsequent bill payer.</p></content></level></subsection><subsection eId="section-6-3"><num>(3)</num><content><p>Subsection (1) is subject to section 1(6).</p></content></subsection><subsection eId="section-6-4"><num>(4)</num><content><p>The framework regulations may make provision for the purpose of providing redress in cases where a permission or consent mentioned in section 5(2)(b) was not obtained or was improperly obtained.</p></content></subsection><subsection eId="section-6-5"><num>(5)</num><intro><p>Provision included in framework regulations by virtue of subsection (4) may, in particular, enable the Secretary of State to—</p></intro><level class="para1" eId="section-6-5-a"><num>(a)</num><content><p>require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-6-5-b"><num>(b)</num><content><p>require a green deal provider to refund any such payments that have already been made;</p></content></level><level class="para1" eId="section-6-5-c"><num>(c)</num><content><p>require an improver to pay compensation to the green deal provider in respect of the suspension, cancellation or refund.</p></content></level></subsection></section><section eId="section-7"><num>7</num><heading>Installation of improvements</heading><subsection eId="section-7-1"><num>(1)</num><content><p>For the purposes of section 1(5)(a) improvements are installed in accordance with this section if the following three conditions are met.</p></content></subsection><subsection eId="section-7-2"><num>(2)</num><content><p>The first condition is that the person carrying out the installation of the improvements is authorised by virtue of the framework regulations to act as a green deal installer.</p></content></subsection><subsection eId="section-7-3"><num>(3)</num><intro><p>The second condition is that any product installed in making the improvements—</p></intro><level class="para1" eId="section-7-3-a"><num>(a)</num><content><p>meets the standard specified in the code of practice in relation to the product or description of product, or</p></content></level><level class="para1" eId="section-7-3-b"><num>(b)</num><intro><p>is listed in a document which—</p></intro><level class="para2" eId="section-7-3-b-i"><num>(i)</num><content><p>is issued by the Secretary of State or a person authorised by the Secretary of State in connection with the code, and</p></content></level><level class="para2" eId="section-7-3-b-ii"><num>(ii)</num><content><p>is referred to in the code as listing the products which are to be taken as meeting the required standard.</p></content></level></level></subsection><subsection eId="section-7-4"><num>(4)</num><content><p>In specifying the standard in relation to a product or description of product for the purposes of subsection (3)(a), the code of practice may make provision as to the testing and certification of the product or description of product.</p></content></subsection><subsection eId="section-7-5"><num>(5)</num><content><p>The third condition is that the carrying out of the installation meets the standard specified in the code of practice.</p></content></subsection><subsection eId="section-7-6"><num>(6)</num><content><p>In this section references to the code of practice are to the code of practice issued for the purposes of the scheme under the framework regulations.</p></content></subsection></section><section eId="section-8"><num>8</num><heading>Confirmation of plan</heading><subsection eId="section-8-1"><num>(1)</num><content><p>For the purposes of section 1(5)(b) an arrangement is confirmed in accordance with this section if the following two conditions are met.</p></content></subsection><subsection eId="section-8-2"><num>(2)</num><intro><p>The first condition is that the relevant energy supplier notifies the bill payer—</p></intro><level class="para1" eId="section-8-2-a"><num>(a)</num><content><p>that payments for the energy efficiency improvements to the property are to be included in the energy bills for the property from the date specified in the notification, and</p></content></level><level class="para1" eId="section-8-2-b"><num>(b)</num><content><p>of the amounts of those payments and the period for which they are to be made.</p></content></level></subsection><subsection eId="section-8-3"><num>(3)</num><content><p>The date mentioned in subsection (2)(a) must not fall earlier than the end of the period specified in the framework regulations.</p></content></subsection><subsection eId="section-8-4"><num>(4)</num><intro><p>The second condition is that, as soon as practicable after the improvements have been installed, the green deal provider takes one or more of the following actions as required by the framework regulations in the circumstances—</p></intro><level class="para1" eId="section-8-4-a"><num>(a)</num><content><p>producing a document containing such information in connection with the plan as is specified in the regulations in the form so specified,</p></content></level><level class="para1" eId="section-8-4-b"><num>(b)</num><content><p>securing that a document of a description specified in the regulations is produced, or</p></content></level><level class="para1" eId="section-8-4-c"><num>(c)</num><content><p>securing that a document of such a description is updated.</p></content></level></subsection><subsection eId="section-8-5"><num>(5)</num><content><p>The reference in this section to securing that a document is updated includes a reference to securing that a document is replaced by a document of the same description.</p></content></subsection><subsection eId="section-8-6"><num>(6)</num><content><p>Sections 9 and 10 make further provision in relation to the second condition.</p></content></subsection></section><section eId="section-9"><num>9</num><heading>Confirmation of plan: supplementary provision for England and Wales</heading><subsection eId="section-9-1"><num>(1)</num><content><p>Subsection (2) applies if, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2007 Regulations or the 2010 Regulations.</p></content></subsection><subsection eId="section-9-2"><num>(2)</num><content><p>The Secretary of State may by regulations make provision amending the 2007 Regulations or the 2010 Regulations or both (as the case may require) in connection with a document required to be produced or updated by virtue of section 8(4)(b) or (c).</p></content></subsection><subsection eId="section-9-3"><num>(3)</num><content><p>The amendments made by virtue of subsection (2) may, in particular, include amendments for the purpose of requiring a document to contain additional or updated information in connection with the plan or the improvements installed under the plan.</p></content></subsection><subsection eId="section-9-4"><num>(4)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-the-2007-regulations" eId="term-the-2007-regulations">the 2007 Regulations</term>” means the Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2007/991);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-2010-regulations" eId="term-the-2010-regulations">the 2010 Regulations</term>” means the Building Regulations 2010 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2010/2214).</p></content></hcontainer></subsection></section><section eId="section-10"><num>10</num><heading>Confirmation of plan: supplementary provision for Scotland</heading><subsection eId="section-10-1"><num>(1)</num><content><p>Subsection (2) applies if, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2008 Regulations.</p></content></subsection><subsection eId="section-10-2"><num>(2)</num><content><p>The Scottish Ministers may by regulations make provision amending the 2008 Regulations in connection with a document required to be produced or updated by virtue of section 8(4)(b) or (c).</p></content></subsection><subsection eId="section-10-3"><num>(3)</num><content><p>The amendments made by virtue of subsection (2) may, in particular, include amendments for the purpose of requiring a document to contain additional or updated information in connection with the plan or the improvements installed under the plan.</p></content></subsection><subsection eId="section-10-4"><num>(4)</num><content><p>In this section “<term refersTo="#term-the-2008-regulations" eId="term-the-2008-regulations">the 2008 Regulations</term>” means the Energy Performance of Buildings (Scotland) Regulations 2008 (<abbr class="acronym" title="Scottish Statutory Instrument">S.S.I.</abbr> 2008/309).</p></content></subsection></section><section eId="section-11"><num>11</num><heading>Updating information produced under section 8</heading><hcontainer name="wrapper2"><subsection eId="section-11-1"><num>(1)</num><content><p>The framework regulations may make provision as to the circumstances in which a document produced for the purposes of section 8(4)(a) is required to be updated in accordance with the regulations.</p></content></subsection><subsection eId="section-11-2"><num>(2)</num><content><p>Subsection (6) applies if one or more of the first, second or third conditions is met.</p></content></subsection><subsection eId="section-11-3"><num>(3)</num><intro><p>The first condition is that—</p></intro><level class="para1" eId="section-11-3-a"><num>(a)</num><content><p>by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2007 Regulations or the 2010 Regulations, and</p></content></level><level class="para1" eId="section-11-3-b"><num>(b)</num><content><p>provision is made in the 2007 Regulations or the 2010 Regulations or both by virtue of section 9(3) to require a document of that description to contain additional or updated information.</p></content></level></subsection><subsection eId="section-11-4"><num>(4)</num><intro><p>The second condition is that—</p></intro><level class="para1" eId="section-11-4-a"><num>(a)</num><content><p>by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2008 Regulations, and</p></content></level><level class="para1" eId="section-11-4-b"><num>(b)</num><content><p>provision is made in the 2008 Regulations by virtue of section 10(3) to require a document of that description to contain additional or updated information.</p></content></level></subsection><subsection eId="section-11-5"><num>(5)</num><content><p>The third condition is that, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description other than one falling within subsection (3) or (4).</p></content></subsection><subsection eId="section-11-6"><num>(6)</num><intro><p>The framework regulations may make provision as to the circumstances in which<ins class="substitution first" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3"><noteRef uk:name="commentary" href="#key-dfc5221cba708fe22339d7edef4760f3" class="commentary"/>—</ins></p></intro><level class="para1" eId="section-11-6-a"><num><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">(a)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">data from which a document of a description falling within subsection (3) or (4) may be produced, or</ins></p></content></level></subsection><level class="para1" eId="section-11-b"><num><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">(b)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">a document of a description falling within subsection (5),</ins></p></content></level></hcontainer><hcontainer name="wrapper2"><intro><p><ins class="substitution last" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">is</ins> required to be updated or further updated in accordance with provision made by the Secretary of State in the regulations.</p></intro><subsection eId="section-11-7"><num>(7)</num><content><p>In subsection (3) “<term refersTo="#term-the-2007-regulations" eId="term-the-2007-regulations">the 2007 Regulations</term>” and “<term refersTo="#term-the-2010-regulations" eId="term-the-2010-regulations">the 2010 Regulations</term>” have the same meaning as in section 9.</p></content></subsection><subsection eId="section-11-8"><num>(8)</num><content><p>In subsection (4) “<term refersTo="#term-the-2008-regulations" eId="term-the-2008-regulations">the 2008 Regulations</term>” has the same meaning as in section 10.</p></content></subsection><subsection eId="section-11-9"><num>(9)</num><content><p>In this section references to a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1491329299599" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> being required to be updated or further updated include references to a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1495547783705" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> being required to be replaced by a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1495547785898" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> of the same description.</p></content></subsection></hcontainer></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-disclosure-of-green-deal-plan-etc"><heading><i>Disclosure of green deal plan <abbr title="Et cetera" xml:lang="la">etc</abbr></i></heading><section eId="section-12"><num>12</num><heading>Disclosure of green deal plan <abbr title="Et cetera" xml:lang="la">etc</abbr> in connection with sale or letting out</heading><subsection eId="section-12-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-12-1-a"><num>(a)</num><content><p>a green deal property, or a lease of such a property, is to be sold, or</p></content></level><level class="para1" eId="section-12-1-b"><num>(b)</num><intro><p>a green deal property is to be let out—</p></intro><level class="para2" eId="section-12-1-b-i"><num>(i)</num><content><p>under a tenancy or licence agreement, and</p></content></level><level class="para2" eId="section-12-1-b-ii"><num>(ii)</num><content><p>on the basis that the prospective tenant or licensee is to be liable for paying the energy bills for the property.</p></content></level></level></subsection><subsection eId="section-12-2"><num>(2)</num><intro><p>The seller or prospective landlord or licensor must, in relation to the document, or each document, required to be produced or updated as mentioned in section 8(4)—</p></intro><level class="para1" eId="section-12-2-a"><num>(a)</num><content><p>obtain the document or, if the requirement to produce or update the document has not yet been complied with, produce a document containing the same information in connection with the green deal plan as that document would have contained, and</p></content></level><level class="para1" eId="section-12-2-b"><num>(b)</num><content><p>provide the document free of charge to any prospective buyer, tenant or licensee at the specified time.</p></content></level></subsection><subsection eId="section-12-3"><num>(3)</num><content><p>An obligation under subsection (2) may be discharged by an agent.</p></content></subsection><subsection eId="section-12-4"><num>(4)</num><intro><p>For the purposes of subsection (2) a person becomes a prospective buyer, tenant or licensee in relation to a property when the person—</p></intro><level class="para1" eId="section-12-4-a"><num>(a)</num><content><p>requests any information about the property from the seller, prospective landlord or licensor or an agent for the purpose of deciding whether to buy or let the property,</p></content></level><level class="para1" eId="section-12-4-b"><num>(b)</num><content><p>makes a request to view the property for the purpose mentioned in paragraph (a), or</p></content></level><level class="para1" eId="section-12-4-c"><num>(c)</num><content><p>makes an offer, whether oral or written, to buy or let the property.</p></content></level></subsection><subsection eId="section-12-5"><num>(5)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-12-5-a"><num>(a)</num><content><p>an agent is a person acting on behalf of a seller or prospective landlord or licensor in the sale or letting out of a property;</p></content></level><level class="para1" eId="section-12-5-b"><num>(b)</num><content><p>a property is a green deal property if there is a green deal plan in respect of the property and payments are still to be made under that plan;</p></content></level><level class="para1" eId="section-12-5-c"><num>(c)</num><content><p>specified, in relation to a time, means specified in regulations made by the Secretary of State.</p></content></level></subsection><subsection eId="section-12-6"><num>(6)</num><content><p>The Secretary of State may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection></section><section eId="section-13"><num>13</num><heading>Disclosure of green deal plan in connection with other transactions <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-13-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-13-1-a"><num>(a)</num><content><p>there is to be a transaction or other arrangement in respect of a green deal property (not falling within section 12(1)), and</p></content></level><level class="para1" eId="section-13-1-b"><num>(b)</num><content><p>the transaction or arrangement is of a description specified in regulations made by the Secretary of State.</p></content></level></subsection><subsection eId="section-13-2"><num>(2)</num><intro><p>The regulations may require a person of a description specified in the regulations to—</p></intro><level class="para1" eId="section-13-2-a"><num>(a)</num><content><p>obtain a document required to be produced or updated as mentioned in section 8(4) or, if the requirement to produce or update such a document has not yet been complied with, produce a document containing the same information in connection with the green deal plan as that document would have contained, and</p></content></level><level class="para1" eId="section-13-2-b"><num>(b)</num><content><p>provide the document free of charge to a person of a description specified in the regulations at the time so specified.</p></content></level></subsection><subsection eId="section-13-3"><num>(3)</num><content><p>The regulations may provide for an obligation imposed on a person by virtue of subsection (2) to be discharged by a person acting on the person's behalf.</p></content></subsection><subsection eId="section-13-4"><num>(4)</num><content><p>In this section the reference to a green deal property is to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-14"><num>14</num><heading>Acknowledgment of green deal plan on sale or letting out</heading><subsection eId="section-14-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-14-1-a"><num>(a)</num><content><p>a green deal property, or a lease of such a property, is to be sold, or</p></content></level><level class="para1" eId="section-14-1-b"><num>(b)</num><intro><p>a green deal property is to be let out—</p></intro><level class="para2" eId="section-14-1-b-i"><num>(i)</num><content><p>under a tenancy or licence agreement which is in writing, and</p></content></level><level class="para2" eId="section-14-1-b-ii"><num>(ii)</num><content><p>on the basis that the prospective tenant or licensee is to be liable for paying the energy bills for the property.</p></content></level></level></subsection><subsection eId="section-14-2"><num>(2)</num><content><p>The seller or prospective landlord or licensor must secure that the contract for sale or tenancy or licence agreement includes an acknowledgment by the buyer, tenant or licensee that the bill payer at the property is liable to make payments under the green deal plan and that certain terms of that plan are binding on the bill payer.</p></content></subsection><subsection eId="section-14-3"><num>(3)</num><content><p>Subsections (4) and (5) apply where the green deal property is in England or Wales.</p></content></subsection><subsection eId="section-14-4"><num>(4)</num><content><p>An acknowledgment required by subsection (2) must be in the form prescribed in regulations made by the Secretary of State.</p></content></subsection><subsection eId="section-14-5"><num>(5)</num><content><p>The Secretary of State may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection><subsection eId="section-14-6"><num>(6)</num><content><p>Subsections (7) and (8) apply where the green deal property is in Scotland.</p></content></subsection><subsection eId="section-14-7"><num>(7)</num><content><p>The acknowledgment required by subsection (2) must be in the form prescribed in regulations made by the Scottish Ministers.</p></content></subsection><subsection eId="section-14-8"><num>(8)</num><content><p>The Scottish Ministers may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection><subsection eId="section-14-9"><num>(9)</num><content><p>In this section references to a green deal property are to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-15"><num>15</num><heading>Acknowledgment of green deal plan in connection with other transactions <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-15-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-15-1-a"><num>(a)</num><content><p>there is to be a transaction or other arrangement in respect of a green deal property (not falling within section 14(1)), and</p></content></level><level class="para1" eId="section-15-1-b"><num>(b)</num><content><p>the transaction or arrangement is of a description specified in regulations made under this subsection by the Secretary of State.</p></content></level></subsection><subsection eId="section-15-2"><num>(2)</num><intro><p>Regulations under subsection (1) may require a person of a description specified in the regulations to secure, at a time and in a document so specified, that an acknowledgment is made by a person of a description so specified that—</p></intro><level class="para1" eId="section-15-2-a"><num>(a)</num><content><p>the bill payer at the property is liable to make payments under the green deal plan, and</p></content></level><level class="para1" eId="section-15-2-b"><num>(b)</num><content><p>certain terms of that plan are binding on the bill payer.</p></content></level></subsection><subsection eId="section-15-3"><num>(3)</num><content><p>Where the green deal property is in England or Wales, regulations made by the Secretary of State under this subsection may provide for any acknowledgment required by virtue of subsection (2) to be in the form prescribed in the regulations under this subsection.</p></content></subsection><subsection eId="section-15-4"><num>(4)</num><content><p>Where the green deal property is in Scotland, regulations made by the Scottish Ministers under this subsection may provide for any acknowledgment required by virtue of subsection (2) to be in the form prescribed in the regulations under this subsection.</p></content></subsection><subsection eId="section-15-5"><num>(5)</num><content><p>In this section references to a green deal property are to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-16"><num>16</num><heading>Sanctions for non-compliance with obligations under sections 12 to 15</heading><subsection eId="section-16-1"><num>(1)</num><intro><p>The Secretary of State may make regulations—</p></intro><level class="para1" eId="section-16-1-a"><num>(a)</num><content><p>for the purpose of securing compliance with the obligations set out in section 12 or 14 or imposed by virtue of regulations under section 13 or 15;</p></content></level><level class="para1" eId="section-16-1-b"><num>(b)</num><content><p>as to the consequences of non-compliance with the obligations.</p></content></level></subsection><subsection eId="section-16-2"><num>(2)</num><intro><p>The regulations may, in particular, include provision—</p></intro><level class="para1" eId="section-16-2-a"><num>(a)</num><content><p>as to sanctions for non-compliance with the obligations (including the imposition of a civil penalty);</p></content></level><level class="para1" eId="section-16-2-b"><num>(b)</num><content><p>enabling the Secretary of State to require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-16-2-c"><num>(c)</num><content><p>enabling the Secretary of State to require a green deal provider to refund any such payments that have already been made;</p></content></level><level class="para1" eId="section-16-2-d"><num>(d)</num><content><p>enabling the Secretary of State to require a seller, a prospective landlord or licensor or another person to pay compensation to a green deal provider in respect of any such suspension, cancellation or refund.</p></content></level></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-modifying-energy-licences"><heading><i>Modifying energy licences</i></heading><section eId="section-17"><num>17</num><heading>Power to modify energy licences in connection with green deal payments</heading><subsection eId="section-17-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-17-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7 or 7A of the Gas Act 1986 (gas transporter, shipper and supply licences);</p></content></level><level class="para1" eId="section-17-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-17-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(c) or (d) of the Electricity Act 1989 (electricity distribution and supply licences);</p></content></level><level class="para1" eId="section-17-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-17-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7 or 7A of the Gas Act 1986 or section 6(1)(c) or (d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-17-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised for the following purposes only—</p></intro><level class="para1" eId="section-17-2-a"><num>(a)</num><content><p>in so far as the power relates to a licence under section 7 of the Gas Act 1986 or section 6(1)(c) of the Electricity Act 1989, the purpose of preventing the holder of the licence from permanently disconnecting the supply of gas or electricity to a green deal property, and</p></content></level><level class="para1" eId="section-17-2-b"><num>(b)</num><content><p>in so far as the power relates to any licence, the purpose of requiring or enabling the holder of the licence to take, or not to take, specified action in connection with green deal payments.</p></content></level></subsection><subsection eId="section-17-3"><num>(3)</num><intro><p>The provision which may be made by virtue of subsection (2)(b) includes, in particular—</p></intro><level class="para1" eId="section-17-3-a"><num>(a)</num><content><p>if the holder of the licence is of a specified description, provision enabling the holder to opt into or opt out of any provision made by virtue of paragraphs (b) to (f),</p></content></level><level class="para1" eId="section-17-3-b"><num>(b)</num><content><p>provision requiring the holder of the licence to collect green deal payments through energy bills and remit them to a green deal provider,</p></content></level><level class="para1" eId="section-17-3-c"><num>(c)</num><content><p>provision as to the circumstances in which the holder of the licence is required to make payments to a green deal provider by reference to green deal payments which are due but which have not been made,</p></content></level><level class="para1" eId="section-17-3-d"><num>(d)</num><content><p>provision in connection with the cancellation or suspension of green deal payments,</p></content></level><level class="para1" eId="section-17-3-e"><num>(e)</num><content><p>provision requiring or enabling the holder of the licence to make specified arrangements for facilitating the collection of green deal payments, and</p></content></level><level class="para1" eId="section-17-3-f"><num>(f)</num><content><p>provision requiring or enabling payments to be made by or to the holder of the licence in respect of functions discharged in connection with green deal payments.</p></content></level></subsection><subsection eId="section-17-4"><num>(4)</num><content><p>Provision made by virtue of subsection (2)(b) which falls within subsection (3)(c) may include provision requiring the holder of the licence, where a bill payer has failed to pay a sum due under an energy bill, to remit a proportion of any payment received to a green deal provider.</p></content></subsection><subsection eId="section-17-5"><num>(5)</num><content><p>Conditions included in a licence under section 7 or 7A of the Gas Act 1986 by virtue of the power under subsection (1) may do any of the things authorised by section 7B(5)(a)(i) or (iii) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7B(4)(a)).</p></content></subsection><subsection eId="section-17-6"><num>(6)</num><content><p>Conditions included in a licence under section 6(1)(c) or (d) of the Electricity Act 1989 by virtue of the power under subsection (1) may do any of the things authorised by section 7(3)(a) or (c) or (4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection><subsection eId="section-17-7"><num>(7)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-17-7-a"><num>(a)</num><content><p>payments are green deal payments if they are made under a green deal plan,</p></content></level><level class="para1" eId="section-17-7-b"><num>(b)</num><content><p>a property is a green deal property if there is a green deal plan in respect of the property and payments are still to be made under that plan, and</p></content></level><level class="para1" eId="section-17-7-c"><num>(c)</num><content><p>references to a green deal provider include references to a person acting on behalf of a green deal provider or nominated by a green deal provider.</p></content></level></subsection></section><section eId="section-18"><num>18</num><heading>Power to modify energy supply licences to make provision as to default in green deal payments</heading><subsection eId="section-18-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-18-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-18-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-18-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-18-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-18-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-18-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised for the purpose only of making provision—</p></intro><level class="para1" eId="section-18-2-a"><num>(a)</num><content><p>as to the steps which are to be taken by the holder of a licence following a bill payer's default in making green deal payments to the holder of the licence,</p></content></level><level class="para1" eId="section-18-2-b"><num>(b)</num><content><p>as to the circumstances in which the holder of a licence may disconnect the supply to a green deal property following such a default, or</p></content></level><level class="para1" eId="section-18-2-c"><num>(c)</num><content><p>enabling, in specified circumstances, the holder of a licence to require from a bill payer a deposit by way of security for green deal payments to be made by the bill payer.</p></content></level></subsection><subsection eId="section-18-3"><num>(3)</num><content><p>For the purposes of this section “green deal payments” and “green deal property” are to be read in accordance with section 17(7).</p></content></subsection></section><section eId="section-19"><num>19</num><heading>Power to modify energy supply licences to require provision of information</heading><subsection eId="section-19-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-19-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-19-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-19-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-19-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-19-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-19-2"><num>(2)</num><content><p>The power under subsection (1) may be exercised for one or both of the following two purposes only.</p></content></subsection><subsection eId="section-19-3"><num>(3)</num><content><p>The first purpose is the purpose of requiring, at specified times, the holder of the licence to provide bill payers with specified information in connection with their green deal plans.</p></content></subsection><subsection eId="section-19-4"><num>(4)</num><content><p>The second purpose is the purpose of requiring the holder of the licence to disclose on request specified information about the payment of energy bills by a person who is, or is to be, the bill payer for a property in respect of which there is, or is proposed to be, a green deal plan.</p></content></subsection><subsection eId="section-19-5"><num>(5)</num><intro><p>The only persons to whom the licence holder may be required to disclose information by virtue of subsection (4) are—</p></intro><level class="para1" eId="section-19-5-a"><num>(a)</num><content><p>where there is a green deal plan, the green deal provider under the plan;</p></content></level><level class="para1" eId="section-19-5-b"><num>(b)</num><content><p>where there is proposed to be a green deal plan, a person who is authorised under the framework regulations to act as a green deal provider.</p></content></level></subsection><subsection eId="section-19-6"><num>(6)</num><intro><p>The licence holder may be required to disclose the information requested only where—</p></intro><level class="para1" eId="section-19-6-a"><num>(a)</num><content><p>the green deal provider or authorised person states that the request is made for purposes connected with the green deal plan or proposed green deal plan,</p></content></level><level class="para1" eId="section-19-6-b"><num>(b)</num><intro><p>the green deal provider or authorised person provides evidence that the bill payer has consented to—</p></intro><level class="para2" eId="section-19-6-b-i"><num>(i)</num><content><p>disclosure of the information to that provider or person for those purposes, and</p></content></level><level class="para2" eId="section-19-6-b-ii"><num>(ii)</num><content><p>onward disclosure of the disclosed information to and by other persons for those purposes,</p></content></level></level><level class="para1" eId="section-19-6-c"><num>(c)</num><content><p>the information relates to a time within the 5 years immediately preceding the request, and</p></content></level><level class="para1" eId="section-19-6-d"><num>(d)</num><content><p>the licence holder has the information.</p></content></level></subsection><subsection eId="section-19-7"><num>(7)</num><content><p>The power under subsection (1) may be exercised so as to require information to be provided in a specified manner or form, or subject to specified requirements or restrictions.</p></content></subsection><subsection eId="section-19-8"><num>(8)</num><content><p>Conditions included in a licence under section 7A(1) of the Gas Act 1986 by virtue of the power under subsection (1) and the purpose mentioned in subsection (4) may do any of the things authorised by section 7B(5)(a)(i) or (iii) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7B(4)(a)).</p></content></subsection><subsection eId="section-19-9"><num>(9)</num><content><p>Conditions included in a licence under section 6(1)(d) of the Electricity Act 1989 by virtue of the power under subsection (1) and the purpose mentioned in subsection (4) may do any of the things authorised by section 7(3)(a) or (c) or (4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection></section><section eId="section-20"><num>20</num><heading>Power to modify energy supply licences to make provision as to consumer protection</heading><subsection eId="section-20-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-20-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-20-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-20-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-20-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-20-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-20-2"><num>(2)</num><content><p>The power under subsection (1) may be exercised for the purpose only of making provision corresponding to that made by the disapplied consumer protection legislation.</p></content></subsection><subsection eId="section-20-3"><num>(3)</num><content><p>Conditions included in a licence under section 6(1)(d) of the Electricity Act 1989 by virtue of the power under subsection (1) may do any of the things authorised by section 7(4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection><subsection eId="section-20-4"><num>(4)</num><content><p>For the purposes of subsection (2) provision corresponds to that made by the disapplied consumer protection legislation if it is made for the same purpose as the purpose for which that provision was made.</p></content></subsection><subsection eId="section-20-5"><num><ins class="substitution first" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35"><noteRef uk:name="commentary" href="#key-3f8f93cba169f015282416aba5430e35" class="commentary"/>(5)</ins></num><intro><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">For the purpose of this section, references to the disapplied consumer protection legislation are to—</ins></p></intro><level class="para1" eId="section-20-5-a"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(a)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">the provisions of or made under the Consumer Credit Act 1974 or the Financial Services and Markets Act 2000 (“the 2000 Act”), and</ins></p></content></level><level class="para1" eId="section-20-5-b"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(b)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">any rules made under the 2000 Act,</ins></p></content></level><wrapUp><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">which would apply but for any exemption conferred by an order under section 22 of the 2000 Act (regulated activities) in relation to debts due under a green deal plan associated with the licensee.</ins></p></wrapUp></subsection><subsection eId="section-20-6"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(6)</ins></num><content><p><ins class="substitution last" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">A green deal plan is associated with a licensee if the payments under the plan are to be made to the licensee.</ins></p></content></subsection></section><section eId="section-21"><num>21</num><heading>Powers under sections 17 to 20: consultation</heading><intro><p>Before making a modification under any of sections 17 to 20, the Secretary of State must consult—</p></intro><level class="para1" eId="section-21-a"><num>(a)</num><content><p>the holder of any licence being modified,</p></content></level><level class="para1" eId="section-21-b"><num>(b)</num><content><p>the Gas and Electricity Markets Authority, and</p></content></level><level class="para1" eId="section-21-c"><num>(c)</num><content><p>such other persons as the Secretary of State considers appropriate.</p></content></level></section><section eId="section-22"><num>22</num><heading>Powers under sections 17 to 20: supplementary</heading><subsection eId="section-22-1"><num>(1)</num><content><p>Subsections (2) to (6) apply in relation to the powers under sections 17 to 20.</p></content></subsection><subsection eId="section-22-2"><num>(2)</num><intro><p>The powers—</p></intro><level class="para1" eId="section-22-2-a"><num>(a)</num><content><p>may be exercised generally, only in relation to specified cases or subject to exceptions (including provision for a case to be excepted only so long as specified conditions are satisfied);</p></content></level><level class="para1" eId="section-22-2-b"><num>(b)</num><content><p>may be exercised differently in different cases or circumstances;</p></content></level><level class="para1" eId="section-22-2-c"><num>(c)</num><content><p>include a power to make incidental, consequential or transitional modifications.</p></content></level></subsection><subsection eId="section-22-3"><num>(3)</num><intro><p>Provision included in a licence by virtue of any of the powers—</p></intro><level class="para1" eId="section-22-3-a"><num>(a)</num><content><p>need not relate to the activities authorised by the licence;</p></content></level><level class="para1" eId="section-22-3-b"><num>(b)</num><content><p>may make different provision for different cases.</p></content></level></subsection><subsection eId="section-22-4"><num>(4)</num><content><p>The Secretary of State must publish details of modifications under any of the powers as soon as reasonably practicable after the modifications are made.</p></content></subsection><subsection eId="section-22-5"><num>(5)</num><content><p>A modification under any of the powers of part of a standard condition of a licence does not prevent any other part of the condition from continuing to be regarded as a standard condition for the purposes of Part 1 of the Gas Act 1986 or Part 1 of the Electricity Act 1989.</p></content></subsection><subsection eId="section-22-6"><num>(6)</num><content><p>Where the Secretary of State makes modifications under any of the powers of the standard conditions of a licence of any type, the Gas and Electricity Markets Authority must make the same modification of those standard conditions for the purposes of their incorporation in licences of that type granted after that time.</p></content></subsection><subsection eId="section-22-7"><num>(7)</num><intro><p>In section 33(1) of the Utilities Act 2000 (standard conditions of electricity licences)—</p></intro><level class="para1" eId="section-22-7-a"><num>(a)</num><content><p>after paragraph (d) omit “or”;</p></content></level><level class="para1" eId="section-22-7-b"><num>(b)</num><content><p><mod>after paragraph (e) insert<quotedText startQuote="&#x201C;">or </quotedText><quotedStructure endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(f)</num><content><p>under Chapter 1 of Part 1 of the Energy Act 2011.</p></content></level></quotedStructure></mod></p></content></level></subsection><subsection eId="section-22-8"><num>(8)</num><intro><p>In section 81(2) of the Utilities Act 2000 (standard conditions of gas licences)—</p></intro><level class="para1" eId="section-22-8-a"><num>(a)</num><content><p><mod>for “2008 or” substitute <quotedText>“ 2008, ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-22-8-b"><num>(b)</num><content><p><mod>after “2010” insert <quotedText>“ or under Chapter 1 of Part 1 of the Energy Act 2011 ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-22-9"><num>(9)</num><content><p>Sections 4AA to 4B of the Gas Act 1986 (principal objective and general duties) apply in relation to the powers under sections 17 to 20 with respect to holders of licences under section 7 or 7A of that Act as they apply in relation to functions of the Secretary of State under Part 1 of that Act.</p></content></subsection><subsection eId="section-22-10"><num>(10)</num><content><p>Sections 3A to 3D of the Electricity Act 1989 (principal objective and general duties) apply in relation to the powers under sections 17 to 20 with respect to holders of licences under section 6(1)(c) or (d) of that Act as they apply in relation to functions of the Secretary of State under Part 1 of that Act.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-gas-and-electricity-codes"><heading><i>Gas and electricity codes</i></heading><section eId="section-23"><num>23</num><heading>Recovering green deal payments: gas suppliers</heading><subsection eId="section-23-1"><num>(1)</num><content><p>Schedule 2B to the Gas Act 1986 (the gas code) is amended as follows.</p></content></subsection><subsection eId="section-23-2"><num>(2)</num><content><p><mod>In paragraph 6A(1) for paragraph (a) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(a)</num><intro><p>the sum is owed to an authorised supplier—</p></intro><level class="para2"><num>(i)</num><content><p>in respect of the supply of gas to the premises on which the meter is installed,</p></content></level><level class="para2"><num>(ii)</num><content><p>in respect of the provision of the meter, or</p></content></level><level class="para2"><num>(iii)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises; or</p></content></level></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-23-3"><num>(3)</num><content><p><mod>In paragraph 7(1) for paragraphs (a) and (b) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>a demand in writing is made by a gas supplier for any of the relevant payments to be made by a consumer; and</p></content></level><level class="para1"><num>(b)</num><content><p>the consumer does not make those payments within 28 days after the making of the demand.</p></content></level></quotedStructure></mod></p></content></subsection><subsection eId="section-23-4"><num>(4)</num><content><p><mod>After paragraph 7(1) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><subsection><num>(1A)</num><intro><p>A payment is a relevant payment for the purposes of sub-paragraph (1) if it is due to the gas supplier from the consumer—</p></intro><level class="para1"><num>(a)</num><content><p>in respect of the supply of gas to any premises of the consumer (in this paragraph referred to as “<term refersTo="#term-the-premises">the premises</term>”); or</p></content></level><level class="para1"><num>(b)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-23-5"><num>(5)</num><content><p><mod>In each of paragraphs 7(4)(b) and (5) for “charges” substitute <quotedText>“ payments ”</quotedText>.</mod></p></content></subsection></section><section eId="section-24"><num>24</num><heading>Recovering green deal payments: electricity suppliers</heading><subsection eId="section-24-1"><num>(1)</num><content><p>The Electricity Act 1989 is amended as follows.</p></content></subsection><subsection eId="section-24-2"><num>(2)</num><content><p>Paragraph 2 of Schedule 6 to the Electricity Act 1989 (the electricity code) is amended as set out in subsections (3) to (5).</p></content></subsection><subsection eId="section-24-3"><num>(3)</num><content><p><mod>In sub-paragraph (1) for the words from “paid” to “electricity meter” substitute <quotedText>“ made all the relevant payments ”</quotedText>.</mod></p></content></subsection><subsection eId="section-24-4"><num>(4)</num><content><p><mod>After sub-paragraph (1) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><subsection><num>(1A)</num><intro><p>A payment is a relevant payment for the purposes of sub-paragraph (1) if it is due from the customer to an electricity supplier—</p></intro><level class="para1"><num>(a)</num><content><p>in respect of the supply of electricity to any premises or the provision of an electricity meter; or</p></content></level><level class="para1"><num>(b)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-24-5"><num>(5)</num><content><p><mod>In sub-paragraph (3) for “payment of the charges due” substitute <quotedText>“ the relevant payments to be made ”</quotedText>.</mod></p></content></subsection><subsection eId="section-24-6"><num>(6)</num><content><p><mod>In paragraph 12(2) of Schedule 7 (recovery through pre-payment meters) for paragraph (a) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="default"><level class="para1"><num>(a)</num><intro><p>the sum is owed to an authorised supplier—</p></intro><level class="para2"><num>(i)</num><content><p>in respect of the supply of electricity to the premises on which the meter is installed,</p></content></level><level class="para2"><num>(ii)</num><content><p>in respect of the provision of the meter, or</p></content></level><level class="para2"><num>(iii)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises; or</p></content></level></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-modifying-consumer-credit-legislation"><heading><i>Modifying consumer credit legislation</i></heading><section eId="section-25"><num><noteRef href="#key-f059ff6bc0f5be2cb9a9a920afef444e" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>25</num><heading>Exemption from Consumer Credit Act 1974 in relation to credit to business debtors</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-26"><num><noteRef href="#key-fe68fb8a74e286ff5688a659547d5b8a" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>26</num><heading>Energy suppliers not to be treated as carrying on ancillary credit business</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-27"><num>27</num><heading>Duties to give debtors information and statements</heading><subsection eId="section-27-1"><num>(1)</num><content><p>The Consumer Credit Act 1974 is amended as follows.</p></content></subsection><subsection eId="section-27-2"><num>(2)</num><content><p><mod>In section 77 (duty to give information to debtor under fixed-sum credit agreement) after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(2A)</num><content><p>Subsection (2B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(2B)</num><content><p>The duty imposed on the creditor by subsection (1) may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-27-3"><num>(3)</num><content><p><mod>In section 77A (statements to be provided in relation to fixed-sum credit agreement) after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(2A)</num><content><p>Subsection (2B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(2B)</num><content><p>Any duty imposed on the creditor by this section may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-27-4"><num>(4)</num><content><p><mod>In section 77B (statement of account to be provided on request in relation to fixed-sum credit agreement) after subsection (7) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(7A)</num><content><p>Subsection (7B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(7B)</num><content><p>The duty imposed on the creditor by this section may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection></section><section eId="section-28"><num>28</num><heading>Exemption from requirement to give notice of sums in arrears</heading><content><p><mod>In section 86B of the Consumer Credit Act 1974 (requirement to give notice of sums in arrears) for subsection (12) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(12)</num><content><p>In this section “<term refersTo="#term-applicable-agreement">applicable agreement</term>” means an agreement which falls within subsection (12A) or (12B).</p></content></subsection><subsection><num>(12A)</num><intro><p>An agreement falls within this subsection if—</p></intro><level class="para1"><num>(a)</num><content><p>it is a regulated agreement for fixed-sum credit; and</p></content></level><level class="para1"><num>(b)</num><intro><p>it is not—</p></intro><level class="para2"><num>(i)</num><content><p>a non-commercial agreement;</p></content></level><level class="para2"><num>(ii)</num><content><p>a small agreement; or</p></content></level><level class="para2"><num>(iii)</num><content><p>a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></level></level></subsection><subsection><num>(12B)</num><intro><p>An agreement falls within this subsection if—</p></intro><level class="para1"><num>(a)</num><content><p>it is a regulated consumer hire agreement; and</p></content></level><level class="para1"><num>(b)</num><content><p>it is neither a non-commercial agreement nor a small agreement.</p></content></level></subsection></quotedStructure></mod></p></content></section><section eId="section-29"><num>29</num><heading>Early repayment of green deal finance</heading><subsection eId="section-29-1"><num>(1)</num><content><p>The Consumer Credit Act 1974 is amended as follows.</p></content></subsection><subsection eId="section-29-2"><num>(2)</num><content><p><mod>After section 95A (compensatory amount to creditor in relation to early repayment) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><section><num>95B</num><heading>Compensatory amount: green deal finance</heading><subsection><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1"><num>(a)</num><content><p>a regulated consumer credit agreement provides for the rate of interest on the credit to be fixed for a period of time (“the fixed rate period”),</p></content></level><level class="para1"><num>(b)</num><content><p>the agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011) which is of a duration specified for the purposes of this section in regulations, and</p></content></level><level class="para1"><num>(c)</num><content><p>under section 94 the debtor discharges all or part of his indebtedness during the fixed rate period.</p></content></level></subsection><subsection><num>(2)</num><intro><p>The creditor may claim an amount equal to the cost which the creditor has incurred as a result only of the debtor's indebtedness being discharged during the fixed rate period if—</p></intro><level class="para1"><num>(a)</num><content><p>the amount of the payment under section 94 is not paid from the proceeds of a contract of payment protection insurance, and</p></content></level><level class="para1"><num>(b)</num><content><p>such other conditions as may be specified for the purposes of this section in regulations are satisfied.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The amount in subsection (2)—</p></intro><level class="para1"><num>(a)</num><content><p>must be fair,</p></content></level><level class="para1"><num>(b)</num><content><p>must be objectively justified,</p></content></level><level class="para1"><num>(c)</num><content><p>must be calculated by the creditor in accordance with provision made for the purposes of this section in regulations, and</p></content></level><level class="para1"><num>(d)</num><content><p>must not exceed the total amount of interest that would have been paid by the debtor under the agreement in the period from the date on which the debtor makes the payment under section 94 to the date fixed by the agreement for the discharge of the indebtedness of the debtor.</p></content></level></subsection><subsection><num>(4)</num><content><p>If a creditor could claim under either section 95A or this section, the creditor may choose under which section to claim.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-29-3"><num>(3)</num><intro><p>In section 94 (right to complete payments ahead of time)—</p></intro><level class="para1" eId="section-29-3-a"><num>(a)</num><content><p><mod>in subsection (1) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-29-3-b"><num>(b)</num><content><p><mod>in subsection (5) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-29-4"><num>(4)</num><content><p><mod>In subsection (2)(c) of section 97A (duty to give information on partial repayment) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>.</mod></p></content></subsection></section><section eId="section-30"><num>30</num><heading>Power to amend Consumer Credit Act 1974</heading><subsection eId="section-30-1"><num>(1)</num><content><p>The Secretary of State may by order make such amendments to the Consumer Credit Act 1974<ins class="first last" ukl:ChangeId="key-0bb8e82a9a9824c6fb5a3055017bc416-1491332806432" ukl:CommentaryRef="key-0bb8e82a9a9824c6fb5a3055017bc416"><noteRef uk:name="commentary" href="#key-0bb8e82a9a9824c6fb5a3055017bc416" class="commentary"/>, the Financial Services and Markets Act 2000 and any statutory instrument made under that Act</ins> as the Secretary of State considers appropriate in consequence of provision made by or under this Chapter.</p></content></subsection><subsection eId="section-30-2"><num>(2)</num><intro><p>Before exercising the power under subsection (1) the Secretary of State must consult—</p></intro><level class="para1" eId="section-30-2-a"><num>(a)</num><content><p>the <ins class="substitution first last" ukl:ChangeId="key-803fdd5956001662e37b430be0cc1a4d-1491332863193" ukl:CommentaryRef="key-803fdd5956001662e37b430be0cc1a4d"><noteRef uk:name="commentary" href="#key-803fdd5956001662e37b430be0cc1a4d" class="commentary"/>Financial Conduct Authority</ins>, and</p></content></level><level class="para1" eId="section-30-2-b"><num>(b)</num><content><p>such other persons as the Secretary of State considers appropriate.</p></content></level></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-delegation-and-exercise-of-functions"><heading><i>Delegation and exercise of functions</i></heading><section eId="section-31"><num>31</num><heading>Delegation and conferring of functions</heading><subsection eId="section-31-1"><num>(1)</num><intro><p>The Secretary of State may by order provide for the following functions conferred on the Secretary of State to be exercisable instead by a public body specified in the order—</p></intro><level class="para1" eId="section-31-1-a"><num>(a)</num><content><p>any function exercisable in connection with the scheme established by the framework regulations;</p></content></level><level class="para1" eId="section-31-1-b"><num>(b)</num><content><p>any function exercisable under the framework regulations by virtue of section 6(4);</p></content></level><level class="para1" eId="section-31-1-c"><num>(c)</num><content><p>any function under regulations made under section 16.</p></content></level></subsection><subsection eId="section-31-2"><num>(2)</num><content><p>If the function of issuing a code of practice for the purposes of the scheme is specified in an order by virtue of subsection (1)(a), a draft of the code must be approved by the Secretary of State before the Secretary of State lays the draft before Parliament under section 39(2).</p></content></subsection><subsection eId="section-31-3"><num>(3)</num><content><p>If the function of revoking a code of practice issued for the purposes of the scheme is specified in an order by virtue of subsection (1)(a), the code must not be revoked without the approval of the Secretary of State.</p></content></subsection><subsection eId="section-31-4"><num>(4)</num><intro><p>The Secretary of State may by order make provision conferring administration functions on—</p></intro><level class="para1" eId="section-31-4-a"><num>(a)</num><content><p>the Secretary of State;</p></content></level><level class="para1" eId="section-31-4-b"><num>(b)</num><content><p>a public body specified in the order.</p></content></level></subsection><subsection eId="section-31-5"><num>(5)</num><content><p>For the purposes of subsection (4) administration functions are functions in connection with the administration of any provision in licences under section 7 or 7A of the Gas Act 1986 or section 6(1)(c) or (d) of the Electricity Act 1989 made by virtue of section 17(3) of this Act.</p></content></subsection><subsection eId="section-31-6"><num>(6)</num><intro><p>An order made by virtue of subsection (1) or (4)(b) may provide for—</p></intro><level class="para1" eId="section-31-6-a"><num>(a)</num><content><p>different functions to be exercisable by different public bodies;</p></content></level><level class="para1" eId="section-31-6-b"><num>(b)</num><content><p>the same function to be exercisable by different public bodies in relation to different areas.</p></content></level></subsection><subsection eId="section-31-7"><num>(7)</num><content><p>The Secretary of State may make payments to any public body specified in an order made by virtue of subsection (1).</p></content></subsection></section><section eId="section-32"><num>32</num><heading>Exercise of scheme functions on behalf of the Secretary of State or a public body</heading><subsection eId="section-32-1"><num>(1)</num><content><p>This section applies to any function exercisable in connection with the scheme established by the framework regulations.</p></content></subsection><subsection eId="section-32-2"><num>(2)</num><content><p>The Secretary of State may arrange for such a function to be exercised by any body or person on behalf of the Secretary of State.</p></content></subsection><subsection eId="section-32-3"><num>(3)</num><content><p>A public body specified in relation to such a function in an order made by virtue of section 31(1)(a) may arrange for the function to be exercised by any other body or person on its behalf.</p></content></subsection><subsection eId="section-32-4"><num>(4)</num><intro><p>Arrangements under this section—</p></intro><level class="para1" eId="section-32-4-a"><num>(a)</num><content><p>do not affect the responsibility for the exercise of the function;</p></content></level><level class="para1" eId="section-32-4-b"><num>(b)</num><content><p>may include provision for payments to be made to the body or person exercising the function under the arrangements.</p></content></level></subsection></section><section eId="section-33"><num>33</num><heading>Duty to report</heading><subsection eId="section-33-1"><num>(1)</num><content><p>This section applies if the function under section 3(1)(a) is specified in an order made by virtue of section 31(1)(a).</p></content></subsection><subsection eId="section-33-2"><num>(2)</num><intro><p>The Secretary of State may make regulations requiring the body specified in relation to that function in the order to—</p></intro><level class="para1" eId="section-33-2-a"><num>(a)</num><content><p>collect information on the specified matters, and</p></content></level><level class="para1" eId="section-33-2-b"><num>(b)</num><content><p>provide the Secretary of State with a report on those matters at the specified times.</p></content></level></subsection><subsection eId="section-33-3"><num>(3)</num><content><p>In subsection (2) “<term refersTo="#term-specified" eId="term-specified">specified</term>” means specified in the regulations.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-general"><heading><i>General</i></heading><section eId="section-34"><num>34</num><heading>Power of Secretary of State to deal with special circumstances</heading><subsection eId="section-34-1"><num>(1)</num><intro><p>The Secretary of State may by regulations make provision as to—</p></intro><level class="para1" eId="section-34-1-a"><num>(a)</num><content><p>the circumstances in which a bill payer's liability to make green deal payments to the relevant energy supplier is suspended or cancelled;</p></content></level><level class="para1" eId="section-34-1-b"><num>(b)</num><content><p>the circumstances in which any suspension of liability ends;</p></content></level><level class="para1" eId="section-34-1-c"><num>(c)</num><content><p>the consequences of any suspension or cancellation;</p></content></level><level class="para1" eId="section-34-1-d"><num>(d)</num><content><p>the circumstances in which the green deal provider may require the early repayment of the whole or part of the total of the payments outstanding under a green deal plan.</p></content></level></subsection><subsection eId="section-34-2"><num>(2)</num><intro><p>The regulations may, in particular, include provision—</p></intro><level class="para1" eId="section-34-2-a"><num>(a)</num><content><p>as to the procedure to be followed for securing a suspension or cancellation (including the payment of an administration fee calculated in accordance with the regulations);</p></content></level><level class="para1" eId="section-34-2-b"><num>(b)</num><content><p>as to how any payments due under a green deal plan during a period of suspension are to be paid;</p></content></level><level class="para1" eId="section-34-2-c"><num>(c)</num><content><p>as to the making of payments due under a green deal plan after a period of suspension;</p></content></level><level class="para1" eId="section-34-2-d"><num>(d)</num><content><p>as to the calculation of the amount payable on early repayment (including a fee calculated in accordance with the regulations).</p></content></level></subsection><subsection eId="section-34-3"><num>(3)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-34-3-a"><num>(a)</num><content><p>“<term refersTo="#term-bill-payer" eId="term-bill-payer">bill payer</term>” includes the person who would be the bill payer if the supply from the relevant energy supplier were not temporarily disconnected or the liability to make green deal payments were not suspended, and</p></content></level><level class="para1" eId="section-34-3-b"><num>(b)</num><content><p>payments are green deal payments if they are made under a green deal plan.</p></content></level></subsection></section><section eId="section-35"><num>35</num><heading>Appeals</heading><subsection eId="section-35-1"><num>(1)</num><intro><p>This section applies if provision is included in a scheme or regulations by virtue of any of the following—</p></intro><level class="para1" eId="section-35-1-a"><num>(a)</num><content><p>section 3(3)(h) or (i);</p></content></level><level class="para1" eId="section-35-1-b"><num>(b)</num><content><p>section 6(4);</p></content></level><level class="para1" eId="section-35-1-c"><num>(c)</num><content><p>section 16.</p></content></level></subsection><subsection eId="section-35-2"><num>(2)</num><content><p>The Secretary of State must by regulations provide for a right of appeal to a court or tribunal against any sanction imposed, or other action taken, by the Secretary of State or a specified public body under the provision mentioned in subsection (1).</p></content></subsection><subsection eId="section-35-3"><num>(3)</num><intro><p>Regulations under subsection (2) may, in particular, include provision—</p></intro><level class="para1" eId="section-35-3-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-35-3-b"><num>(b)</num><content><p>as to the persons who may make an appeal;</p></content></level><level class="para1" eId="section-35-3-c"><num>(c)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-35-3-d"><num>(d)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-35-3-e"><num>(e)</num><content><p>suspending the effect of a sanction or other action being appealed against, pending determination of the appeal;</p></content></level><level class="para1" eId="section-35-3-f"><num>(f)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-35-3-g"><num>(g)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-35-4"><num>(4)</num><intro><p>The provision referred to in subsection (3)(f) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-35-4-a"><num>(a)</num><content><p>to confirm the sanction imposed or action taken;</p></content></level><level class="para1" eId="section-35-4-b"><num>(b)</num><content><p>to withdraw the sanction or action;</p></content></level><level class="para1" eId="section-35-4-c"><num>(c)</num><content><p>to impose a different sanction or take different action;</p></content></level><level class="para1" eId="section-35-4-d"><num>(d)</num><content><p>to remit the decision whether to confirm the sanction or other action, or any matter relating to that decision, to the person who imposed the sanction or took the action;</p></content></level><level class="para1" eId="section-35-4-e"><num>(e)</num><content><p>to award costs or, in Scotland, expenses.</p></content></level></subsection><subsection eId="section-35-5"><num>(5)</num><content><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within subsection (3)(a), (d), (f) or (g), regulations under subsection (2) may revoke or amend any subordinate legislation.</p></content></subsection><subsection eId="section-35-6"><num>(6)</num><content><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within subsection (3)(a), (d), (f) or (g), they may by regulations revoke or amend any subordinate legislation, or any provision included in an instrument made under an Act of the Scottish Parliament, if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></content></subsection><subsection eId="section-35-7"><num>(7)</num><intro><p>In this section—</p></intro><level class="para1" eId="section-35-7-a"><num>(a)</num><content><p>“<term refersTo="#term-specified-public-body" eId="term-specified-public-body">specified public body</term>” means a public body specified in an order made by virtue of section 31(1);</p></content></level><level class="para1" eId="section-35-7-b"><num>(b)</num><content><p>“<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></level></subsection></section><section eId="section-36"><num>36</num><heading>Funding for energy efficiency advice</heading><subsection eId="section-36-1"><num>(1)</num><content><p>The Secretary of State may incur expenditure in providing qualifying advice or information or in making payments to persons who provide qualifying advice or information.</p></content></subsection><subsection eId="section-36-2"><num>(2)</num><content><p>In this section “<term refersTo="#term-qualifying-advice-or-information" eId="term-qualifying-advice-or-information">qualifying advice or information</term>” means advice or information about green deal plans or energy efficiency generally which is given to individuals or organisations.</p></content></subsection></section><section eId="section-37"><num>37</num><heading>Preparatory expenditure: framework regulations</heading><content><p>The Secretary of State may, before the framework regulations are made, incur expenditure for the purpose of, or in connection with, preparing for a scheme of the kind provided for by section 3.</p></content></section><section eId="section-38"><num>38</num><heading>Green deal installation apprenticeships</heading><subsection eId="section-38-1"><num>(1)</num><content><p>Before making the first framework regulations the Secretary of State must lay before Parliament a report on what, if any, steps the Secretary of State has taken to encourage green deal installation apprenticeships.</p></content></subsection><subsection eId="section-38-2"><num>(2)</num><content><p>A “green deal installation apprenticeship” is an apprenticeship which provides training on how to install energy efficiency improvements at properties.</p></content></subsection></section><section eId="section-39"><num>39</num><heading>Parliamentary procedure in relation to code of practice</heading><subsection eId="section-39-1"><num>(1)</num><content><p>This section makes further provision in relation to the issuing of any code of practice for the purposes of the scheme established by the framework regulations.</p></content></subsection><subsection eId="section-39-2"><num>(2)</num><content><p>Before the code is issued the Secretary of State must lay a draft of the code before Parliament.</p></content></subsection><subsection eId="section-39-3"><num>(3)</num><content><p>If, within the 40-day period, either House of Parliament resolves not to approve the draft, the code may not be issued.</p></content></subsection><subsection eId="section-39-4"><num>(4)</num><content><p>If no such resolution is made within that period, the code may be issued.</p></content></subsection><subsection eId="section-39-5"><num>(5)</num><content><p>The “<term refersTo="#term-40-day-period" eId="term-40-day-period">40-day period</term>”, in relation to a draft of a code, means the period of 40 days beginning with the day on which the draft is laid before Parliament (or, if it is not laid before each House of Parliament on the same day, the later of the 2 days on which it is laid).</p></content></subsection><subsection eId="section-39-6"><num>(6)</num><intro><p>For the purposes of calculating the 40-day period, no account is to be taken of any period during which—</p></intro><level class="para1" eId="section-39-6-a"><num>(a)</num><content><p>Parliament is dissolved or prorogued, or</p></content></level><level class="para1" eId="section-39-6-b"><num>(b)</num><content><p>both Houses are adjourned for more than 4 days.</p></content></level></subsection></section><section eId="section-40"><num>40</num><heading>Regulations and orders</heading><subsection eId="section-40-1"><num>(1)</num><content><p>Regulations and orders under this Chapter may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-40-2"><num>(2)</num><content><p>Regulations and orders under this Chapter, other than those made by the Scottish Ministers, are to be made by statutory instrument.</p></content></subsection><subsection eId="section-40-3"><num>(3)</num><content><p>A statutory instrument containing regulations or an order under this Chapter is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-40-4"><num>(4)</num><intro><p>Subsection (3) does not apply to a statutory instrument containing—</p></intro><level class="para1" eId="section-40-4-a"><num>(a)</num><content><p>regulations under section 2 or the framework regulations,</p></content></level><level class="para1" eId="section-40-4-b"><num>(b)</num><content><p>regulations under section 13, 15(1), 16, 34 or 35(2), or</p></content></level><level class="para1" eId="section-40-4-c"><num>(c)</num><content><p>an order under section 1, 2 or 30.</p></content></level></subsection><subsection eId="section-40-5"><num>(5)</num><content><p>A statutory instrument containing regulations or an order falling within subsection (4) may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection eId="section-40-6"><num>(6)</num><content><p>Regulations under section 10(2), 14(7) or (8) or 15(4) (regulations made by the Scottish Ministers) are subject to the negative procedure.</p></content></subsection><subsection eId="section-40-7"><num>(7)</num><content><p>Regulations under section 35(6) (regulations made by the Scottish Ministers) are subject to the affirmative procedure.</p></content></subsection><subsection eId="section-40-8"><num>(8)</num><intro><p>Before making regulations or an order under this Chapter extending to Scotland, the Secretary of State must—</p></intro><level class="para1" eId="section-40-8-a"><num>(a)</num><content><p>if the regulations or order contain any provision which would be within the legislative competence of the Scottish Parliament if it were contained in an Act of that Parliament, obtain the consent of the Scottish Ministers;</p></content></level><level class="para1" eId="section-40-8-b"><num>(b)</num><content><p>in any other case, consult the Scottish Ministers.</p></content></level></subsection><subsection eId="section-40-9"><num>(9)</num><intro><p>The Secretary of State must obtain the consent of the Welsh Ministers before making provision under section 35 amending or revoking—</p></intro><level class="para1" eId="section-40-9-a"><num>(a)</num><content><p>provision included in an instrument made under a Measure or Act of the National Assembly for Wales;</p></content></level><level class="para1" eId="section-40-9-b"><num>(b)</num><content><p>any other subordinate legislation made by the Welsh Ministers (or the National Assembly for Wales established under the Government of Wales Act 1998).</p></content></level></subsection><subsection eId="section-40-10"><num>(10)</num><content><p>Before amending under section 9 a provision of the Building Regulations 2010 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2010/2214), the Secretary of State must, if and so far as the function under which the provision was made is exercisable by the Welsh Ministers, obtain their consent.</p></content></subsection><subsection eId="section-40-11"><num>(11)</num><content><p>Subsections (9) and (10) do not apply to the extent that the Secretary of State is making incidental or consequential provision.</p></content></subsection><subsection eId="section-40-12"><num>(12)</num><content><p>Before making regulations or an order under this Chapter applying to Wales, the Secretary of State must consult the Welsh Ministers.</p></content></subsection><subsection eId="section-40-13"><num>(13)</num><content><p>Subsection (12) does not apply to the extent that consent has been obtained under subsection (9) or (10).</p></content></subsection></section><section eId="section-41"><num>41</num><heading>Crown application: Chapter 1</heading><content><p>This Chapter binds the Crown.</p></content></section></hcontainer></chapter> — Green deal plan
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-1"><num>CHAPTER 1</num><heading>Green deal</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-introductory"><heading><i>Introductory</i></heading><section eId="section-1"><num>1</num><heading>Green deal plans</heading><subsection eId="section-1-1"><num>(1)</num><content><p>This section applies for the purposes of this Chapter.</p></content></subsection><subsection eId="section-1-2"><num>(2)</num><content><p>An energy plan is an arrangement made by the occupier or owner of a property for a person to make energy efficiency improvements to the property.</p></content></subsection><subsection eId="section-1-3"><num>(3)</num><intro><p>An energy plan is a green deal plan if—</p></intro><level class="para1" eId="section-1-3-a"><num>(a)</num><content><p>the energy efficiency improvements are to be paid for wholly or partly in instalments, and</p></content></level><level class="para1" eId="section-1-3-b"><num>(b)</num><content><p>all of the requirements listed in paragraphs (a) to (e) of subsection (4) are met in relation to the plan at the time when it is made.</p></content></level></subsection><subsection eId="section-1-4"><num>(4)</num><intro><p>The requirements are—</p></intro><level class="para1" eId="section-1-4-a"><num>(a)</num><content><p>the property is an eligible property,</p></content></level><level class="para1" eId="section-1-4-b"><num>(b)</num><content><p>the energy efficiency improvements fall within a description specified in an order made by the Secretary of State (“qualifying energy improvements”),</p></content></level><level class="para1" eId="section-1-4-c"><num>(c)</num><content><p>the conditions mentioned in section 4 as to assessment of the property and other matters have been met,</p></content></level><level class="para1" eId="section-1-4-d"><num>(d)</num><content><p>the conditions mentioned in section 5 as to the terms of the plan and other matters are met, and</p></content></level><level class="para1" eId="section-1-4-e"><num>(e)</num><content><p>a relevant energy supplier supplies, or is to supply, energy to the property.</p></content></level></subsection><subsection eId="section-1-5"><num>(5)</num><intro><p>Subsection (6) applies to a green deal plan from the time when—</p></intro><level class="para1" eId="section-1-5-a"><num>(a)</num><content><p>improvements have been installed in accordance with section 7,</p></content></level><level class="para1" eId="section-1-5-b"><num>(b)</num><content><p>the plan is confirmed in accordance with section 8, and</p></content></level><level class="para1" eId="section-1-5-c"><num>(c)</num><content><p>the requirements imposed by virtue of section 9 or 10 are met.</p></content></level></subsection><subsection eId="section-1-6"><num>(6)</num><intro><p>The payments in instalments agreed in the plan are to be—</p></intro><level class="para1" eId="section-1-6-a"><num>(a)</num><content><p>made by the person who is for the time being liable to pay the energy bills for the property,</p></content></level><level class="para1" eId="section-1-6-b"><num>(b)</num><content><p>made to the relevant energy supplier through the energy bills for the property,</p></content></level><level class="para1" eId="section-1-6-c"><num>(c)</num><content><p>recoverable as a debt by the relevant energy supplier from the person referred to in paragraph (a), and</p></content></level><level class="para1" eId="section-1-6-d"><num>(d)</num><content><p>recovered and held by the relevant energy supplier as agent and trustee for the person who made the improvements (unless the relevant energy supplier is also that person).</p></content></level></subsection><subsection eId="section-1-7"><num>(7)</num><content><p>Subsection (6) applies irrespective of whether the person referred to in paragraph (a) is the person who entered into the plan.</p></content></subsection><subsection eId="section-1-8"><num>(8)</num><intro><p>Subsection (6) is subject to—</p></intro><level class="para1" eId="section-1-8-a"><num>(a)</num><content><p>provision made in regulations under section 34;</p></content></level><level class="para1" eId="section-1-8-b"><num>(b)</num><content><p>any suspension or cancellation, by virtue of provision made in regulations under section 3(3)(h) or (i), 6(4), 16 or 35, of liability to make payments.</p></content></level></subsection><subsection eId="section-1-9"><num>(9)</num><content><p>For the purposes of subsection (4)(a) a property is an eligible property unless it falls within a description specified in an order made by the Secretary of State.</p></content></subsection></section><section eId="section-2"><num>2</num><heading>Green deal plans: supplementary</heading><subsection eId="section-2-1"><num>(1)</num><content><p>This section applies for the purposes of this Chapter.</p></content></subsection><subsection eId="section-2-2"><num>(2)</num><content><p>The occupier or owner who makes the arrangement referred to in section 1(2) is the “improver” and the person who makes the improvements is the “green deal provider”.</p></content></subsection><subsection eId="section-2-3"><num>(3)</num><content><p>The person referred to in section 1(6)(a) is the “bill payer”.</p></content></subsection><subsection eId="section-2-4"><num>(4)</num><intro><p>References to energy efficiency improvements, in relation to a property, are to—</p></intro><level class="para1" eId="section-2-4-a"><num>(a)</num><content><p>measures for improving efficiency in the use in the property of electricity, gas conveyed through pipes or any other source of energy which is specified in an order made by the Secretary of State, or</p></content></level><level class="para1" eId="section-2-4-b"><num>(b)</num><content><p>measures falling within subsection (5) or (6).</p></content></level></subsection><subsection eId="section-2-5"><num>(5)</num><intro><p>Measures fall within this subsection if—</p></intro><level class="para1" eId="section-2-5-a"><num>(a)</num><intro><p>they are any of the following—</p></intro><level class="para2" eId="section-2-5-a-i"><num>(i)</num><content><p>measures for increasing the amount of electricity generated, or heat produced, by microgeneration (within the meaning given by section 26(1) of the Climate Change and Sustainable Energy Act 2006);</p></content></level><level class="para2" eId="section-2-5-a-ii"><num>(ii)</num><content><p>any other measures for increasing the amount of electricity generated, or heat produced, using low-emissions sources or technologies;</p></content></level><level class="para2" eId="section-2-5-a-iii"><num>(iii)</num><content><p>measures for reducing the consumption of such energy as is mentioned in subsection (4), and</p></content></level></level><level class="para1" eId="section-2-5-b"><num>(b)</num><content><p>they are specified in an order made by the Secretary of State.</p></content></level></subsection><subsection eId="section-2-6"><num>(6)</num><intro><p>Measures fall within this subsection if—</p></intro><level class="para1" eId="section-2-6-a"><num>(a)</num><intro><p>they are installed at the property for the purpose of supplying to it any of the following types of energy—</p></intro><level class="para2" eId="section-2-6-a-i"><num>(i)</num><content><p>electricity generated by a generating station operated for the purposes of producing heat, or a cooling effect, in association with electricity;</p></content></level><level class="para2" eId="section-2-6-a-ii"><num>(ii)</num><content><p>heat produced in association with electricity or steam produced from (or air or water heated by) such heat;</p></content></level><level class="para2" eId="section-2-6-a-iii"><num>(iii)</num><content><p>any gas or liquid subjected to a cooling effect produced in association with electricity, and</p></content></level></level><level class="para1" eId="section-2-6-b"><num>(b)</num><content><p>they are specified in an order made by the Secretary of State.</p></content></level></subsection><subsection eId="section-2-7"><num>(7)</num><content><p>For the purposes of subsection (5)(a)(ii) electricity is generated, or heat is produced, using low-emissions sources or technologies if it is generated, or produced, by plant which relies wholly or mainly on a source of energy or a technology mentioned in section 26(2) of the Climate Change and Sustainable Energy Act 2006.</p></content></subsection><subsection eId="section-2-8"><num>(8)</num><content><p>For the purposes of subsection (6) “generating station” and “supplying” are to be read in accordance with section 64(1) of the Electricity Act 1989.</p></content></subsection><subsection eId="section-2-9"><num>(9)</num><content><p>“Energy” (except in this section), “energy bill”, “occupier”, “owner” and “relevant energy supplier” have the meaning given in regulations made by the Secretary of State.</p></content></subsection><subsection eId="section-2-10"><num>(10)</num><content><p>Regulations under subsection (9) may also make provision as to the circumstances in which a person who is not a bill payer for the purposes of this Chapter may be treated as a bill payer for those purposes.</p></content></subsection></section><section eId="section-3"><num>3</num><heading>Framework regulations</heading><subsection eId="section-3-1"><num>(1)</num><intro><p>The Secretary of State must by regulations establish a scheme making provision for the Secretary of State—</p></intro><level class="para1" eId="section-3-1-a"><num>(a)</num><content><p>to authorise persons to act as green deal assessors, green deal providers or green deal installers in connection with green deal plans (either individually or through membership of a body specified in, or authorised under, the scheme);</p></content></level><level class="para1" eId="section-3-1-b"><num>(b)</num><content><p>to regulate the conduct of those assessors, providers or installers (“green deal participants”).</p></content></level></subsection><subsection eId="section-3-2"><num>(2)</num><content><p>Regulations under subsection (1) are referred to in this Chapter as “<term refersTo="#term-the-framework-regulations" eId="term-the-framework-regulations">the framework regulations</term>”.</p></content></subsection><subsection eId="section-3-3"><num>(3)</num><intro><p>The scheme established by the framework regulations may, in particular, make provision—</p></intro><level class="para1" eId="section-3-3-a"><num>(a)</num><content><p>requiring the payment of a fee in connection with initial or continued authorisation under the scheme;</p></content></level><level class="para1" eId="section-3-3-b"><num>(b)</num><content><p>for the establishment and maintenance of a register of green deal participants and of persons from whom authorisation under the scheme has been withdrawn;</p></content></level><level class="para1" eId="section-3-3-c"><num>(c)</num><content><p>requiring green deal participants to provide the information required under the scheme;</p></content></level><level class="para1" eId="section-3-3-d"><num>(d)</num><content><p>for the issuing, revision or revocation of a code of practice;</p></content></level><level class="para1" eId="section-3-3-e"><num>(e)</num><content><p>requiring green deal participants to comply with the code of practice as a condition of their authorisation;</p></content></level><level class="para1" eId="section-3-3-f"><num>(f)</num><content><p>requiring green deal providers to enter into an agreement with the holder of a licence under section 7 or 7A of the Gas Act 1986 (gas transporter, shipper or supply licences) or section 6(1)(c) or (d) of the Electricity Act 1989 (electricity distributor and supply licences) and to comply with that agreement as a condition of their authorisation;</p></content></level><level class="para1" eId="section-3-3-g"><num>(g)</num><content><p>requiring that an agreement mentioned in paragraph (f) be approved by the Secretary of State before being entered into;</p></content></level><level class="para1" eId="section-3-3-h"><num>(h)</num><content><p>for securing compliance with any condition or any other requirement of the scheme, code or agreement;</p></content></level><level class="para1" eId="section-3-3-i"><num>(i)</num><content><p>as to the consequences of non-compliance with any such condition or requirement.</p></content></level></subsection><subsection eId="section-3-4"><num>(4)</num><intro><p>The code of practice issued for the purposes of the scheme may, in particular, make provision—</p></intro><level class="para1" eId="section-3-4-a"><num>(a)</num><content><p>as to the qualification and training of green deal participants;</p></content></level><level class="para1" eId="section-3-4-b"><num>(b)</num><content><p>as to their handling of queries or complaints;</p></content></level><level class="para1" eId="section-3-4-c"><num>(c)</num><content><p>requiring green deal participants to have such arrangements for insurance as are specified in the code;</p></content></level><level class="para1" eId="section-3-4-d"><num>(d)</num><content><p>as to the payment of green deal assessors by green deal providers or green deal installers and the payment of green deal installers by green deal providers;</p></content></level><level class="para1" eId="section-3-4-e"><num>(e)</num><content><p>as to the circumstances in which green deal assessors may charge customers for qualifying assessments of properties and as to the amount of any such charge;</p></content></level><level class="para1" eId="section-3-4-f"><num>(f)</num><content><p>requiring green deal assessors to act with impartiality;</p></content></level><level class="para1" eId="section-3-4-g"><num>(g)</num><content><p>as to the provision of information by green deal providers to improvers and bill payers and prospective improvers and bill payers;</p></content></level><level class="para1" eId="section-3-4-h"><num>(h)</num><content><p>as to marketing in connection with green deal plans.</p></content></level></subsection><subsection eId="section-3-5"><num>(5)</num><content><p>The code may include provision for regulating a body specified or authorised for the purposes of subsection (1)(a).</p></content></subsection><subsection eId="section-3-6"><num>(6)</num><content><p>The scheme and the code may make different provision for different circumstances or cases or for different purposes.</p></content></subsection><subsection eId="section-3-7"><num>(7)</num><content><p>The provision made by the scheme or code in relation to green deal participants may also extend to matters in connection with any energy plans which are not green deal plans.</p></content></subsection><subsection eId="section-3-8"><num>(8)</num><intro><p>The provision made for the purposes of subsection (3)(h) or (i) may, in particular, include provision enabling the Secretary of State to—</p></intro><level class="para1" eId="section-3-8-a"><num>(a)</num><content><p>cancel any liability to pay for a qualifying assessment of a property;</p></content></level><level class="para1" eId="section-3-8-b"><num>(b)</num><content><p>require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-3-8-c"><num>(c)</num><content><p>require a green deal participant to rectify a qualifying energy improvement or its installation;</p></content></level><level class="para1" eId="section-3-8-d"><num>(d)</num><content><p>require a green deal participant to pay compensation or a financial penalty;</p></content></level><level class="para1" eId="section-3-8-e"><num>(e)</num><content><p>withdraw, or require a body specified or authorised for the purposes of subsection (1)(a) to withdraw, an authorisation to act as a green deal participant;</p></content></level><level class="para1" eId="section-3-8-f"><num>(f)</num><content><p>withdraw authorisation from a body authorised for the purposes of subsection (1)(a) as a body whose members are authorised to act as green deal participants.</p></content></level></subsection><subsection eId="section-3-9"><num>(9)</num><content><p>For the purposes of this section references to a qualifying assessment are to an energy efficiency assessment which meets the requirements specified in the framework regulations and deals with such other matters as may be so specified.</p></content></subsection><subsection eId="section-3-10"><num>(10)</num><content><p>This section is without prejudice to the powers conferred on the Secretary of State by other provisions of this Chapter to make provision in or under the framework regulations.</p></content></subsection><subsection eId="section-3-11"><num>(11)</num><content><p>In this Chapter references to a code of practice include references to a code of practice which has been revised by virtue of subsection (3)(d).</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-green-deal-plan"><heading><i>Green deal plan</i></heading><section eId="section-4"><num>4</num><heading>Assessment of property <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-4-1"><num>(1)</num><intro><p>For the purposes of section 1(4)(c) the conditions as to assessment of the property and other matters are—</p></intro><level class="para1" eId="section-4-1-a"><num>(a)</num><content><p>the conditions set out in subsections (2) to (9), and</p></content></level><level class="para1" eId="section-4-1-b"><num>(b)</num><content><p>such other conditions (whether relating to the green deal assessor, the green deal provider, the improver or any other person) as are specified in the framework regulations.</p></content></level></subsection><subsection eId="section-4-2"><num>(2)</num><content><p>The first condition is that a qualifying assessment of the property has been carried out by a person authorised by virtue of the framework regulations to act as a green deal assessor.</p></content></subsection><subsection eId="section-4-3"><num>(3)</num><content><p>The second condition is that the green deal assessor has recommended the energy efficiency improvements.</p></content></subsection><subsection eId="section-4-4"><num>(4)</num><content><p>The third condition is that the green deal provider has given an estimate, on the basis specified in the framework regulations, of the savings likely to be made on the energy bills for the property if the improvements are carried out.</p></content></subsection><subsection eId="section-4-5"><num>(5)</num><content><p>The fourth condition is that the green deal provider has given an estimate, on the basis specified in the framework regulations, of the period over which the savings mentioned in subsection (4) are likely to be made.</p></content></subsection><subsection eId="section-4-6"><num>(6)</num><content><p>The fifth condition is that the green deal provider is authorised by virtue of the framework regulations to act as a green deal provider.</p></content></subsection><subsection eId="section-4-7"><num>(7)</num><content><p>The sixth condition is that the green deal provider has offered to carry out the improvements on the basis that the whole or part of the cost will be repaid in instalments over a period after the improvements have been made.</p></content></subsection><subsection eId="section-4-8"><num>(8)</num><intro><p>The seventh condition is that the green deal provider meets any requirement specified in the framework regulations as to the relationship between—</p></intro><level class="para1" eId="section-4-8-a"><num>(a)</num><content><p>the estimated total of the proposed instalments, and</p></content></level><level class="para1" eId="section-4-8-b"><num>(b)</num><content><p>the estimate mentioned in subsection (4).</p></content></level></subsection><subsection eId="section-4-9"><num>(9)</num><intro><p>The eighth condition is that the green deal provider meets any requirement specified in the framework regulations as to the relationship between—</p></intro><level class="para1" eId="section-4-9-a"><num>(a)</num><content><p>the period for which the instalments are proposed to be paid, and</p></content></level><level class="para1" eId="section-4-9-b"><num>(b)</num><content><p>the period estimated under subsection (5).</p></content></level></subsection><subsection eId="section-4-10"><num>(10)</num><content><p>In subsection (2) the reference to a qualifying assessment is to be read in accordance with section 3(9).</p></content></subsection></section><section eId="section-5"><num>5</num><heading>Terms of plan <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-5-1"><num>(1)</num><intro><p>For the purposes of section 1(4)(d), the conditions as to the terms of the plan and other matters are—</p></intro><level class="para1" eId="section-5-1-a"><num>(a)</num><content><p>the conditions set out in subsections (2) to (4), and</p></content></level><level class="para1" eId="section-5-1-b"><num>(b)</num><content><p>such other conditions as are specified in the framework regulations.</p></content></level></subsection><subsection eId="section-5-2"><num>(2)</num><intro><p>The first condition is that the plan includes the following terms—</p></intro><level class="para1" eId="section-5-2-a"><num>(a)</num><intro><p>a term in which the improver agrees to—</p></intro><level class="para2" eId="section-5-2-a-i"><num>(i)</num><content><p>the amounts of the payments in instalments and the intervals at which, and period for which, they are payable;</p></content></level><level class="para2" eId="section-5-2-a-ii"><num>(ii)</num><content><p>such other matters as are specified in the regulations;</p></content></level></level><level class="para1" eId="section-5-2-b"><num>(b)</num><content><p>a term in which the improver confirms that any necessary permissions or consents have been obtained in respect of the improvements;</p></content></level><level class="para1" eId="section-5-2-c"><num>(c)</num><content><p>a term providing that the green deal provider may not take a charge over any person's property by way of security for payments;</p></content></level><level class="para1" eId="section-5-2-d"><num>(d)</num><content><p>a term providing that the green deal plan does not prevent the bill payer from changing the intervals at which energy bills are to be paid.</p></content></level></subsection><subsection eId="section-5-3"><num>(3)</num><intro><p>The second condition is that the plan does not include any of the following terms—</p></intro><level class="para1" eId="section-5-3-a"><num>(a)</num><content><p>a term making a person liable to make any payments under the green deal plan otherwise than in respect of the period for which the person is the bill payer in relation to the property;</p></content></level><level class="para1" eId="section-5-3-b"><num>(b)</num><content><p>a term requiring the bill payer to make in any circumstances an early repayment of the whole or part of the amount outstanding under the green deal plan (except in accordance with the framework regulations or regulations under section 34, or provision made under them);</p></content></level><level class="para1" eId="section-5-3-c"><num>(c)</num><content><p>a term providing for money to be advanced to the improver (except in accordance with the framework regulations or provision made under them).</p></content></level></subsection><subsection eId="section-5-4"><num>(4)</num><content><p>The third condition is that the agreements mentioned in paragraph (a) of subsection (2) and the permissions and consents mentioned in paragraph (b) of that subsection have not been withdrawn before the end of the period of 14 days beginning with the last day on which they were given.</p></content></subsection><subsection eId="section-5-5"><num>(5)</num><intro><p>The conditions which may be specified in the framework regulations by virtue of subsection (1)(b) include, in particular—</p></intro><level class="para1" eId="section-5-5-a"><num>(a)</num><content><p>a condition that the plan includes a term so specified enabling the early repayment of the whole or part of the amount outstanding under the plan and making provision as to the calculation of the amount payable and any fee,</p></content></level><level class="para1" eId="section-5-5-b"><num>(b)</num><content><p>a condition that the plan includes a term so specified guaranteeing the improvements and making provision as to who is to benefit from the guarantee,</p></content></level><level class="para1" eId="section-5-5-c"><num>(c)</num><content><p>a condition that the plan includes a term so specified as to how any problems with the improvements installed, or arising in connection with the installation of them, are to be dealt with, and</p></content></level><level class="para1" eId="section-5-5-d"><num>(d)</num><content><p>a condition requiring the agreements mentioned in subsection (2)(a) to be in the form specified in the framework regulations.</p></content></level></subsection><subsection eId="section-5-6"><num>(6)</num><content><p>References in this section to the agreements mentioned in subsection (2)(a) include references to the consent required by virtue of section 6(2)(a).</p></content></subsection></section><section eId="section-6"><num>6</num><heading>Consents and redress <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-6-1"><num>(1)</num><intro><p>The framework regulations may make provision for dealing with cases where—</p></intro><level class="para1" eId="section-6-1-a"><num>(a)</num><content><p>at the time when a plan is entered into the improver and the bill payer are different persons;</p></content></level><level class="para1" eId="section-6-1-b"><num>(b)</num><content><p>the bill payer at the time when a plan is entered into is a different person from the bill payer at any subsequent time (a “subsequent bill payer”).</p></content></level></subsection><subsection eId="section-6-2"><num>(2)</num><intro><p>Provision which may be made by virtue of subsection (1) includes—</p></intro><level class="para1" eId="section-6-2-a"><num>(a)</num><content><p>provision requiring the term included in the plan by virtue of section 5(2)(a)(i) to be one to which the bill payer mentioned in subsection (1)(a) has consented, and</p></content></level><level class="para1" eId="section-6-2-b"><num>(b)</num><content><p>provision as to the terms of the plan which are to bind or benefit that bill payer or a subsequent bill payer.</p></content></level></subsection><subsection eId="section-6-3"><num>(3)</num><content><p>Subsection (1) is subject to section 1(6).</p></content></subsection><subsection eId="section-6-4"><num>(4)</num><content><p>The framework regulations may make provision for the purpose of providing redress in cases where a permission or consent mentioned in section 5(2)(b) was not obtained or was improperly obtained.</p></content></subsection><subsection eId="section-6-5"><num>(5)</num><intro><p>Provision included in framework regulations by virtue of subsection (4) may, in particular, enable the Secretary of State to—</p></intro><level class="para1" eId="section-6-5-a"><num>(a)</num><content><p>require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-6-5-b"><num>(b)</num><content><p>require a green deal provider to refund any such payments that have already been made;</p></content></level><level class="para1" eId="section-6-5-c"><num>(c)</num><content><p>require an improver to pay compensation to the green deal provider in respect of the suspension, cancellation or refund.</p></content></level></subsection></section><section eId="section-7"><num>7</num><heading>Installation of improvements</heading><subsection eId="section-7-1"><num>(1)</num><content><p>For the purposes of section 1(5)(a) improvements are installed in accordance with this section if the following three conditions are met.</p></content></subsection><subsection eId="section-7-2"><num>(2)</num><content><p>The first condition is that the person carrying out the installation of the improvements is authorised by virtue of the framework regulations to act as a green deal installer.</p></content></subsection><subsection eId="section-7-3"><num>(3)</num><intro><p>The second condition is that any product installed in making the improvements—</p></intro><level class="para1" eId="section-7-3-a"><num>(a)</num><content><p>meets the standard specified in the code of practice in relation to the product or description of product, or</p></content></level><level class="para1" eId="section-7-3-b"><num>(b)</num><intro><p>is listed in a document which—</p></intro><level class="para2" eId="section-7-3-b-i"><num>(i)</num><content><p>is issued by the Secretary of State or a person authorised by the Secretary of State in connection with the code, and</p></content></level><level class="para2" eId="section-7-3-b-ii"><num>(ii)</num><content><p>is referred to in the code as listing the products which are to be taken as meeting the required standard.</p></content></level></level></subsection><subsection eId="section-7-4"><num>(4)</num><content><p>In specifying the standard in relation to a product or description of product for the purposes of subsection (3)(a), the code of practice may make provision as to the testing and certification of the product or description of product.</p></content></subsection><subsection eId="section-7-5"><num>(5)</num><content><p>The third condition is that the carrying out of the installation meets the standard specified in the code of practice.</p></content></subsection><subsection eId="section-7-6"><num>(6)</num><content><p>In this section references to the code of practice are to the code of practice issued for the purposes of the scheme under the framework regulations.</p></content></subsection></section><section eId="section-8"><num>8</num><heading>Confirmation of plan</heading><subsection eId="section-8-1"><num>(1)</num><content><p>For the purposes of section 1(5)(b) an arrangement is confirmed in accordance with this section if the following two conditions are met.</p></content></subsection><subsection eId="section-8-2"><num>(2)</num><intro><p>The first condition is that the relevant energy supplier notifies the bill payer—</p></intro><level class="para1" eId="section-8-2-a"><num>(a)</num><content><p>that payments for the energy efficiency improvements to the property are to be included in the energy bills for the property from the date specified in the notification, and</p></content></level><level class="para1" eId="section-8-2-b"><num>(b)</num><content><p>of the amounts of those payments and the period for which they are to be made.</p></content></level></subsection><subsection eId="section-8-3"><num>(3)</num><content><p>The date mentioned in subsection (2)(a) must not fall earlier than the end of the period specified in the framework regulations.</p></content></subsection><subsection eId="section-8-4"><num>(4)</num><intro><p>The second condition is that, as soon as practicable after the improvements have been installed, the green deal provider takes one or more of the following actions as required by the framework regulations in the circumstances—</p></intro><level class="para1" eId="section-8-4-a"><num>(a)</num><content><p>producing a document containing such information in connection with the plan as is specified in the regulations in the form so specified,</p></content></level><level class="para1" eId="section-8-4-b"><num>(b)</num><content><p>securing that a document of a description specified in the regulations is produced, or</p></content></level><level class="para1" eId="section-8-4-c"><num>(c)</num><content><p>securing that a document of such a description is updated.</p></content></level></subsection><subsection eId="section-8-5"><num>(5)</num><content><p>The reference in this section to securing that a document is updated includes a reference to securing that a document is replaced by a document of the same description.</p></content></subsection><subsection eId="section-8-6"><num>(6)</num><content><p>Sections 9 and 10 make further provision in relation to the second condition.</p></content></subsection></section><section eId="section-9"><num>9</num><heading>Confirmation of plan: supplementary provision for England and Wales</heading><subsection eId="section-9-1"><num>(1)</num><content><p>Subsection (2) applies if, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2007 Regulations or the 2010 Regulations.</p></content></subsection><subsection eId="section-9-2"><num>(2)</num><content><p>The Secretary of State may by regulations make provision amending the 2007 Regulations or the 2010 Regulations or both (as the case may require) in connection with a document required to be produced or updated by virtue of section 8(4)(b) or (c).</p></content></subsection><subsection eId="section-9-3"><num>(3)</num><content><p>The amendments made by virtue of subsection (2) may, in particular, include amendments for the purpose of requiring a document to contain additional or updated information in connection with the plan or the improvements installed under the plan.</p></content></subsection><subsection eId="section-9-4"><num>(4)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-the-2007-regulations" eId="term-the-2007-regulations">the 2007 Regulations</term>” means the Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2007/991);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-2010-regulations" eId="term-the-2010-regulations">the 2010 Regulations</term>” means the Building Regulations 2010 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2010/2214).</p></content></hcontainer></subsection></section><section eId="section-10"><num>10</num><heading>Confirmation of plan: supplementary provision for Scotland</heading><subsection eId="section-10-1"><num>(1)</num><content><p>Subsection (2) applies if, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2008 Regulations.</p></content></subsection><subsection eId="section-10-2"><num>(2)</num><content><p>The Scottish Ministers may by regulations make provision amending the 2008 Regulations in connection with a document required to be produced or updated by virtue of section 8(4)(b) or (c).</p></content></subsection><subsection eId="section-10-3"><num>(3)</num><content><p>The amendments made by virtue of subsection (2) may, in particular, include amendments for the purpose of requiring a document to contain additional or updated information in connection with the plan or the improvements installed under the plan.</p></content></subsection><subsection eId="section-10-4"><num>(4)</num><content><p>In this section “<term refersTo="#term-the-2008-regulations" eId="term-the-2008-regulations">the 2008 Regulations</term>” means the Energy Performance of Buildings (Scotland) Regulations 2008 (<abbr class="acronym" title="Scottish Statutory Instrument">S.S.I.</abbr> 2008/309).</p></content></subsection></section><section eId="section-11"><num>11</num><heading>Updating information produced under section 8</heading><hcontainer name="wrapper2"><subsection eId="section-11-1"><num>(1)</num><content><p>The framework regulations may make provision as to the circumstances in which a document produced for the purposes of section 8(4)(a) is required to be updated in accordance with the regulations.</p></content></subsection><subsection eId="section-11-2"><num>(2)</num><content><p>Subsection (6) applies if one or more of the first, second or third conditions is met.</p></content></subsection><subsection eId="section-11-3"><num>(3)</num><intro><p>The first condition is that—</p></intro><level class="para1" eId="section-11-3-a"><num>(a)</num><content><p>by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2007 Regulations or the 2010 Regulations, and</p></content></level><level class="para1" eId="section-11-3-b"><num>(b)</num><content><p>provision is made in the 2007 Regulations or the 2010 Regulations or both by virtue of section 9(3) to require a document of that description to contain additional or updated information.</p></content></level></subsection><subsection eId="section-11-4"><num>(4)</num><intro><p>The second condition is that—</p></intro><level class="para1" eId="section-11-4-a"><num>(a)</num><content><p>by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2008 Regulations, and</p></content></level><level class="para1" eId="section-11-4-b"><num>(b)</num><content><p>provision is made in the 2008 Regulations by virtue of section 10(3) to require a document of that description to contain additional or updated information.</p></content></level></subsection><subsection eId="section-11-5"><num>(5)</num><content><p>The third condition is that, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description other than one falling within subsection (3) or (4).</p></content></subsection><subsection eId="section-11-6"><num>(6)</num><intro><p>The framework regulations may make provision as to the circumstances in which<ins class="substitution first" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3"><noteRef uk:name="commentary" href="#key-dfc5221cba708fe22339d7edef4760f3" class="commentary"/>—</ins></p></intro><level class="para1" eId="section-11-6-a"><num><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">(a)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">data from which a document of a description falling within subsection (3) or (4) may be produced, or</ins></p></content></level></subsection><level class="para1" eId="section-11-b"><num><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">(b)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">a document of a description falling within subsection (5),</ins></p></content></level></hcontainer><hcontainer name="wrapper2"><intro><p><ins class="substitution last" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">is</ins> required to be updated or further updated in accordance with provision made by the Secretary of State in the regulations.</p></intro><subsection eId="section-11-7"><num>(7)</num><content><p>In subsection (3) “<term refersTo="#term-the-2007-regulations" eId="term-the-2007-regulations">the 2007 Regulations</term>” and “<term refersTo="#term-the-2010-regulations" eId="term-the-2010-regulations">the 2010 Regulations</term>” have the same meaning as in section 9.</p></content></subsection><subsection eId="section-11-8"><num>(8)</num><content><p>In subsection (4) “<term refersTo="#term-the-2008-regulations" eId="term-the-2008-regulations">the 2008 Regulations</term>” has the same meaning as in section 10.</p></content></subsection><subsection eId="section-11-9"><num>(9)</num><content><p>In this section references to a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1491329299599" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> being required to be updated or further updated include references to a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1495547783705" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> being required to be replaced by a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1495547785898" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> of the same description.</p></content></subsection></hcontainer></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-disclosure-of-green-deal-plan-etc"><heading><i>Disclosure of green deal plan <abbr title="Et cetera" xml:lang="la">etc</abbr></i></heading><section eId="section-12"><num>12</num><heading>Disclosure of green deal plan <abbr title="Et cetera" xml:lang="la">etc</abbr> in connection with sale or letting out</heading><subsection eId="section-12-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-12-1-a"><num>(a)</num><content><p>a green deal property, or a lease of such a property, is to be sold, or</p></content></level><level class="para1" eId="section-12-1-b"><num>(b)</num><intro><p>a green deal property is to be let out—</p></intro><level class="para2" eId="section-12-1-b-i"><num>(i)</num><content><p>under a tenancy or licence agreement, and</p></content></level><level class="para2" eId="section-12-1-b-ii"><num>(ii)</num><content><p>on the basis that the prospective tenant or licensee is to be liable for paying the energy bills for the property.</p></content></level></level></subsection><subsection eId="section-12-2"><num>(2)</num><intro><p>The seller or prospective landlord or licensor must, in relation to the document, or each document, required to be produced or updated as mentioned in section 8(4)—</p></intro><level class="para1" eId="section-12-2-a"><num>(a)</num><content><p>obtain the document or, if the requirement to produce or update the document has not yet been complied with, produce a document containing the same information in connection with the green deal plan as that document would have contained, and</p></content></level><level class="para1" eId="section-12-2-b"><num>(b)</num><content><p>provide the document free of charge to any prospective buyer, tenant or licensee at the specified time.</p></content></level></subsection><subsection eId="section-12-3"><num>(3)</num><content><p>An obligation under subsection (2) may be discharged by an agent.</p></content></subsection><subsection eId="section-12-4"><num>(4)</num><intro><p>For the purposes of subsection (2) a person becomes a prospective buyer, tenant or licensee in relation to a property when the person—</p></intro><level class="para1" eId="section-12-4-a"><num>(a)</num><content><p>requests any information about the property from the seller, prospective landlord or licensor or an agent for the purpose of deciding whether to buy or let the property,</p></content></level><level class="para1" eId="section-12-4-b"><num>(b)</num><content><p>makes a request to view the property for the purpose mentioned in paragraph (a), or</p></content></level><level class="para1" eId="section-12-4-c"><num>(c)</num><content><p>makes an offer, whether oral or written, to buy or let the property.</p></content></level></subsection><subsection eId="section-12-5"><num>(5)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-12-5-a"><num>(a)</num><content><p>an agent is a person acting on behalf of a seller or prospective landlord or licensor in the sale or letting out of a property;</p></content></level><level class="para1" eId="section-12-5-b"><num>(b)</num><content><p>a property is a green deal property if there is a green deal plan in respect of the property and payments are still to be made under that plan;</p></content></level><level class="para1" eId="section-12-5-c"><num>(c)</num><content><p>specified, in relation to a time, means specified in regulations made by the Secretary of State.</p></content></level></subsection><subsection eId="section-12-6"><num>(6)</num><content><p>The Secretary of State may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection></section><section eId="section-13"><num>13</num><heading>Disclosure of green deal plan in connection with other transactions <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-13-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-13-1-a"><num>(a)</num><content><p>there is to be a transaction or other arrangement in respect of a green deal property (not falling within section 12(1)), and</p></content></level><level class="para1" eId="section-13-1-b"><num>(b)</num><content><p>the transaction or arrangement is of a description specified in regulations made by the Secretary of State.</p></content></level></subsection><subsection eId="section-13-2"><num>(2)</num><intro><p>The regulations may require a person of a description specified in the regulations to—</p></intro><level class="para1" eId="section-13-2-a"><num>(a)</num><content><p>obtain a document required to be produced or updated as mentioned in section 8(4) or, if the requirement to produce or update such a document has not yet been complied with, produce a document containing the same information in connection with the green deal plan as that document would have contained, and</p></content></level><level class="para1" eId="section-13-2-b"><num>(b)</num><content><p>provide the document free of charge to a person of a description specified in the regulations at the time so specified.</p></content></level></subsection><subsection eId="section-13-3"><num>(3)</num><content><p>The regulations may provide for an obligation imposed on a person by virtue of subsection (2) to be discharged by a person acting on the person's behalf.</p></content></subsection><subsection eId="section-13-4"><num>(4)</num><content><p>In this section the reference to a green deal property is to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-14"><num>14</num><heading>Acknowledgment of green deal plan on sale or letting out</heading><subsection eId="section-14-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-14-1-a"><num>(a)</num><content><p>a green deal property, or a lease of such a property, is to be sold, or</p></content></level><level class="para1" eId="section-14-1-b"><num>(b)</num><intro><p>a green deal property is to be let out—</p></intro><level class="para2" eId="section-14-1-b-i"><num>(i)</num><content><p>under a tenancy or licence agreement which is in writing, and</p></content></level><level class="para2" eId="section-14-1-b-ii"><num>(ii)</num><content><p>on the basis that the prospective tenant or licensee is to be liable for paying the energy bills for the property.</p></content></level></level></subsection><subsection eId="section-14-2"><num>(2)</num><content><p>The seller or prospective landlord or licensor must secure that the contract for sale or tenancy or licence agreement includes an acknowledgment by the buyer, tenant or licensee that the bill payer at the property is liable to make payments under the green deal plan and that certain terms of that plan are binding on the bill payer.</p></content></subsection><subsection eId="section-14-3"><num>(3)</num><content><p>Subsections (4) and (5) apply where the green deal property is in England or Wales.</p></content></subsection><subsection eId="section-14-4"><num>(4)</num><content><p>An acknowledgment required by subsection (2) must be in the form prescribed in regulations made by the Secretary of State.</p></content></subsection><subsection eId="section-14-5"><num>(5)</num><content><p>The Secretary of State may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection><subsection eId="section-14-6"><num>(6)</num><content><p>Subsections (7) and (8) apply where the green deal property is in Scotland.</p></content></subsection><subsection eId="section-14-7"><num>(7)</num><content><p>The acknowledgment required by subsection (2) must be in the form prescribed in regulations made by the Scottish Ministers.</p></content></subsection><subsection eId="section-14-8"><num>(8)</num><content><p>The Scottish Ministers may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection><subsection eId="section-14-9"><num>(9)</num><content><p>In this section references to a green deal property are to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-15"><num>15</num><heading>Acknowledgment of green deal plan in connection with other transactions <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-15-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-15-1-a"><num>(a)</num><content><p>there is to be a transaction or other arrangement in respect of a green deal property (not falling within section 14(1)), and</p></content></level><level class="para1" eId="section-15-1-b"><num>(b)</num><content><p>the transaction or arrangement is of a description specified in regulations made under this subsection by the Secretary of State.</p></content></level></subsection><subsection eId="section-15-2"><num>(2)</num><intro><p>Regulations under subsection (1) may require a person of a description specified in the regulations to secure, at a time and in a document so specified, that an acknowledgment is made by a person of a description so specified that—</p></intro><level class="para1" eId="section-15-2-a"><num>(a)</num><content><p>the bill payer at the property is liable to make payments under the green deal plan, and</p></content></level><level class="para1" eId="section-15-2-b"><num>(b)</num><content><p>certain terms of that plan are binding on the bill payer.</p></content></level></subsection><subsection eId="section-15-3"><num>(3)</num><content><p>Where the green deal property is in England or Wales, regulations made by the Secretary of State under this subsection may provide for any acknowledgment required by virtue of subsection (2) to be in the form prescribed in the regulations under this subsection.</p></content></subsection><subsection eId="section-15-4"><num>(4)</num><content><p>Where the green deal property is in Scotland, regulations made by the Scottish Ministers under this subsection may provide for any acknowledgment required by virtue of subsection (2) to be in the form prescribed in the regulations under this subsection.</p></content></subsection><subsection eId="section-15-5"><num>(5)</num><content><p>In this section references to a green deal property are to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-16"><num>16</num><heading>Sanctions for non-compliance with obligations under sections 12 to 15</heading><subsection eId="section-16-1"><num>(1)</num><intro><p>The Secretary of State may make regulations—</p></intro><level class="para1" eId="section-16-1-a"><num>(a)</num><content><p>for the purpose of securing compliance with the obligations set out in section 12 or 14 or imposed by virtue of regulations under section 13 or 15;</p></content></level><level class="para1" eId="section-16-1-b"><num>(b)</num><content><p>as to the consequences of non-compliance with the obligations.</p></content></level></subsection><subsection eId="section-16-2"><num>(2)</num><intro><p>The regulations may, in particular, include provision—</p></intro><level class="para1" eId="section-16-2-a"><num>(a)</num><content><p>as to sanctions for non-compliance with the obligations (including the imposition of a civil penalty);</p></content></level><level class="para1" eId="section-16-2-b"><num>(b)</num><content><p>enabling the Secretary of State to require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-16-2-c"><num>(c)</num><content><p>enabling the Secretary of State to require a green deal provider to refund any such payments that have already been made;</p></content></level><level class="para1" eId="section-16-2-d"><num>(d)</num><content><p>enabling the Secretary of State to require a seller, a prospective landlord or licensor or another person to pay compensation to a green deal provider in respect of any such suspension, cancellation or refund.</p></content></level></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-modifying-energy-licences"><heading><i>Modifying energy licences</i></heading><section eId="section-17"><num>17</num><heading>Power to modify energy licences in connection with green deal payments</heading><subsection eId="section-17-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-17-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7 or 7A of the Gas Act 1986 (gas transporter, shipper and supply licences);</p></content></level><level class="para1" eId="section-17-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-17-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(c) or (d) of the Electricity Act 1989 (electricity distribution and supply licences);</p></content></level><level class="para1" eId="section-17-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-17-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7 or 7A of the Gas Act 1986 or section 6(1)(c) or (d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-17-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised for the following purposes only—</p></intro><level class="para1" eId="section-17-2-a"><num>(a)</num><content><p>in so far as the power relates to a licence under section 7 of the Gas Act 1986 or section 6(1)(c) of the Electricity Act 1989, the purpose of preventing the holder of the licence from permanently disconnecting the supply of gas or electricity to a green deal property, and</p></content></level><level class="para1" eId="section-17-2-b"><num>(b)</num><content><p>in so far as the power relates to any licence, the purpose of requiring or enabling the holder of the licence to take, or not to take, specified action in connection with green deal payments.</p></content></level></subsection><subsection eId="section-17-3"><num>(3)</num><intro><p>The provision which may be made by virtue of subsection (2)(b) includes, in particular—</p></intro><level class="para1" eId="section-17-3-a"><num>(a)</num><content><p>if the holder of the licence is of a specified description, provision enabling the holder to opt into or opt out of any provision made by virtue of paragraphs (b) to (f),</p></content></level><level class="para1" eId="section-17-3-b"><num>(b)</num><content><p>provision requiring the holder of the licence to collect green deal payments through energy bills and remit them to a green deal provider,</p></content></level><level class="para1" eId="section-17-3-c"><num>(c)</num><content><p>provision as to the circumstances in which the holder of the licence is required to make payments to a green deal provider by reference to green deal payments which are due but which have not been made,</p></content></level><level class="para1" eId="section-17-3-d"><num>(d)</num><content><p>provision in connection with the cancellation or suspension of green deal payments,</p></content></level><level class="para1" eId="section-17-3-e"><num>(e)</num><content><p>provision requiring or enabling the holder of the licence to make specified arrangements for facilitating the collection of green deal payments, and</p></content></level><level class="para1" eId="section-17-3-f"><num>(f)</num><content><p>provision requiring or enabling payments to be made by or to the holder of the licence in respect of functions discharged in connection with green deal payments.</p></content></level></subsection><subsection eId="section-17-4"><num>(4)</num><content><p>Provision made by virtue of subsection (2)(b) which falls within subsection (3)(c) may include provision requiring the holder of the licence, where a bill payer has failed to pay a sum due under an energy bill, to remit a proportion of any payment received to a green deal provider.</p></content></subsection><subsection eId="section-17-5"><num>(5)</num><content><p>Conditions included in a licence under section 7 or 7A of the Gas Act 1986 by virtue of the power under subsection (1) may do any of the things authorised by section 7B(5)(a)(i) or (iii) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7B(4)(a)).</p></content></subsection><subsection eId="section-17-6"><num>(6)</num><content><p>Conditions included in a licence under section 6(1)(c) or (d) of the Electricity Act 1989 by virtue of the power under subsection (1) may do any of the things authorised by section 7(3)(a) or (c) or (4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection><subsection eId="section-17-7"><num>(7)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-17-7-a"><num>(a)</num><content><p>payments are green deal payments if they are made under a green deal plan,</p></content></level><level class="para1" eId="section-17-7-b"><num>(b)</num><content><p>a property is a green deal property if there is a green deal plan in respect of the property and payments are still to be made under that plan, and</p></content></level><level class="para1" eId="section-17-7-c"><num>(c)</num><content><p>references to a green deal provider include references to a person acting on behalf of a green deal provider or nominated by a green deal provider.</p></content></level></subsection></section><section eId="section-18"><num>18</num><heading>Power to modify energy supply licences to make provision as to default in green deal payments</heading><subsection eId="section-18-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-18-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-18-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-18-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-18-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-18-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-18-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised for the purpose only of making provision—</p></intro><level class="para1" eId="section-18-2-a"><num>(a)</num><content><p>as to the steps which are to be taken by the holder of a licence following a bill payer's default in making green deal payments to the holder of the licence,</p></content></level><level class="para1" eId="section-18-2-b"><num>(b)</num><content><p>as to the circumstances in which the holder of a licence may disconnect the supply to a green deal property following such a default, or</p></content></level><level class="para1" eId="section-18-2-c"><num>(c)</num><content><p>enabling, in specified circumstances, the holder of a licence to require from a bill payer a deposit by way of security for green deal payments to be made by the bill payer.</p></content></level></subsection><subsection eId="section-18-3"><num>(3)</num><content><p>For the purposes of this section “green deal payments” and “green deal property” are to be read in accordance with section 17(7).</p></content></subsection></section><section eId="section-19"><num>19</num><heading>Power to modify energy supply licences to require provision of information</heading><subsection eId="section-19-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-19-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-19-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-19-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-19-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-19-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-19-2"><num>(2)</num><content><p>The power under subsection (1) may be exercised for one or both of the following two purposes only.</p></content></subsection><subsection eId="section-19-3"><num>(3)</num><content><p>The first purpose is the purpose of requiring, at specified times, the holder of the licence to provide bill payers with specified information in connection with their green deal plans.</p></content></subsection><subsection eId="section-19-4"><num>(4)</num><content><p>The second purpose is the purpose of requiring the holder of the licence to disclose on request specified information about the payment of energy bills by a person who is, or is to be, the bill payer for a property in respect of which there is, or is proposed to be, a green deal plan.</p></content></subsection><subsection eId="section-19-5"><num>(5)</num><intro><p>The only persons to whom the licence holder may be required to disclose information by virtue of subsection (4) are—</p></intro><level class="para1" eId="section-19-5-a"><num>(a)</num><content><p>where there is a green deal plan, the green deal provider under the plan;</p></content></level><level class="para1" eId="section-19-5-b"><num>(b)</num><content><p>where there is proposed to be a green deal plan, a person who is authorised under the framework regulations to act as a green deal provider.</p></content></level></subsection><subsection eId="section-19-6"><num>(6)</num><intro><p>The licence holder may be required to disclose the information requested only where—</p></intro><level class="para1" eId="section-19-6-a"><num>(a)</num><content><p>the green deal provider or authorised person states that the request is made for purposes connected with the green deal plan or proposed green deal plan,</p></content></level><level class="para1" eId="section-19-6-b"><num>(b)</num><intro><p>the green deal provider or authorised person provides evidence that the bill payer has consented to—</p></intro><level class="para2" eId="section-19-6-b-i"><num>(i)</num><content><p>disclosure of the information to that provider or person for those purposes, and</p></content></level><level class="para2" eId="section-19-6-b-ii"><num>(ii)</num><content><p>onward disclosure of the disclosed information to and by other persons for those purposes,</p></content></level></level><level class="para1" eId="section-19-6-c"><num>(c)</num><content><p>the information relates to a time within the 5 years immediately preceding the request, and</p></content></level><level class="para1" eId="section-19-6-d"><num>(d)</num><content><p>the licence holder has the information.</p></content></level></subsection><subsection eId="section-19-7"><num>(7)</num><content><p>The power under subsection (1) may be exercised so as to require information to be provided in a specified manner or form, or subject to specified requirements or restrictions.</p></content></subsection><subsection eId="section-19-8"><num>(8)</num><content><p>Conditions included in a licence under section 7A(1) of the Gas Act 1986 by virtue of the power under subsection (1) and the purpose mentioned in subsection (4) may do any of the things authorised by section 7B(5)(a)(i) or (iii) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7B(4)(a)).</p></content></subsection><subsection eId="section-19-9"><num>(9)</num><content><p>Conditions included in a licence under section 6(1)(d) of the Electricity Act 1989 by virtue of the power under subsection (1) and the purpose mentioned in subsection (4) may do any of the things authorised by section 7(3)(a) or (c) or (4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection></section><section eId="section-20"><num>20</num><heading>Power to modify energy supply licences to make provision as to consumer protection</heading><subsection eId="section-20-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-20-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-20-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-20-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-20-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-20-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-20-2"><num>(2)</num><content><p>The power under subsection (1) may be exercised for the purpose only of making provision corresponding to that made by the disapplied consumer protection legislation.</p></content></subsection><subsection eId="section-20-3"><num>(3)</num><content><p>Conditions included in a licence under section 6(1)(d) of the Electricity Act 1989 by virtue of the power under subsection (1) may do any of the things authorised by section 7(4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection><subsection eId="section-20-4"><num>(4)</num><content><p>For the purposes of subsection (2) provision corresponds to that made by the disapplied consumer protection legislation if it is made for the same purpose as the purpose for which that provision was made.</p></content></subsection><subsection eId="section-20-5"><num><ins class="substitution first" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35"><noteRef uk:name="commentary" href="#key-3f8f93cba169f015282416aba5430e35" class="commentary"/>(5)</ins></num><intro><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">For the purpose of this section, references to the disapplied consumer protection legislation are to—</ins></p></intro><level class="para1" eId="section-20-5-a"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(a)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">the provisions of or made under the Consumer Credit Act 1974 or the Financial Services and Markets Act 2000 (“the 2000 Act”), and</ins></p></content></level><level class="para1" eId="section-20-5-b"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(b)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">any rules made under the 2000 Act,</ins></p></content></level><wrapUp><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">which would apply but for any exemption conferred by an order under section 22 of the 2000 Act (regulated activities) in relation to debts due under a green deal plan associated with the licensee.</ins></p></wrapUp></subsection><subsection eId="section-20-6"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(6)</ins></num><content><p><ins class="substitution last" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">A green deal plan is associated with a licensee if the payments under the plan are to be made to the licensee.</ins></p></content></subsection></section><section eId="section-21"><num>21</num><heading>Powers under sections 17 to 20: consultation</heading><intro><p>Before making a modification under any of sections 17 to 20, the Secretary of State must consult—</p></intro><level class="para1" eId="section-21-a"><num>(a)</num><content><p>the holder of any licence being modified,</p></content></level><level class="para1" eId="section-21-b"><num>(b)</num><content><p>the Gas and Electricity Markets Authority, and</p></content></level><level class="para1" eId="section-21-c"><num>(c)</num><content><p>such other persons as the Secretary of State considers appropriate.</p></content></level></section><section eId="section-22"><num>22</num><heading>Powers under sections 17 to 20: supplementary</heading><subsection eId="section-22-1"><num>(1)</num><content><p>Subsections (2) to (6) apply in relation to the powers under sections 17 to 20.</p></content></subsection><subsection eId="section-22-2"><num>(2)</num><intro><p>The powers—</p></intro><level class="para1" eId="section-22-2-a"><num>(a)</num><content><p>may be exercised generally, only in relation to specified cases or subject to exceptions (including provision for a case to be excepted only so long as specified conditions are satisfied);</p></content></level><level class="para1" eId="section-22-2-b"><num>(b)</num><content><p>may be exercised differently in different cases or circumstances;</p></content></level><level class="para1" eId="section-22-2-c"><num>(c)</num><content><p>include a power to make incidental, consequential or transitional modifications.</p></content></level></subsection><subsection eId="section-22-3"><num>(3)</num><intro><p>Provision included in a licence by virtue of any of the powers—</p></intro><level class="para1" eId="section-22-3-a"><num>(a)</num><content><p>need not relate to the activities authorised by the licence;</p></content></level><level class="para1" eId="section-22-3-b"><num>(b)</num><content><p>may make different provision for different cases.</p></content></level></subsection><subsection eId="section-22-4"><num>(4)</num><content><p>The Secretary of State must publish details of modifications under any of the powers as soon as reasonably practicable after the modifications are made.</p></content></subsection><subsection eId="section-22-5"><num>(5)</num><content><p>A modification under any of the powers of part of a standard condition of a licence does not prevent any other part of the condition from continuing to be regarded as a standard condition for the purposes of Part 1 of the Gas Act 1986 or Part 1 of the Electricity Act 1989.</p></content></subsection><subsection eId="section-22-6"><num>(6)</num><content><p>Where the Secretary of State makes modifications under any of the powers of the standard conditions of a licence of any type, the Gas and Electricity Markets Authority must make the same modification of those standard conditions for the purposes of their incorporation in licences of that type granted after that time.</p></content></subsection><subsection eId="section-22-7"><num>(7)</num><intro><p>In section 33(1) of the Utilities Act 2000 (standard conditions of electricity licences)—</p></intro><level class="para1" eId="section-22-7-a"><num>(a)</num><content><p>after paragraph (d) omit “or”;</p></content></level><level class="para1" eId="section-22-7-b"><num>(b)</num><content><p><mod>after paragraph (e) insert<quotedText startQuote="&#x201C;">or </quotedText><quotedStructure endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(f)</num><content><p>under Chapter 1 of Part 1 of the Energy Act 2011.</p></content></level></quotedStructure></mod></p></content></level></subsection><subsection eId="section-22-8"><num>(8)</num><intro><p>In section 81(2) of the Utilities Act 2000 (standard conditions of gas licences)—</p></intro><level class="para1" eId="section-22-8-a"><num>(a)</num><content><p><mod>for “2008 or” substitute <quotedText>“ 2008, ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-22-8-b"><num>(b)</num><content><p><mod>after “2010” insert <quotedText>“ or under Chapter 1 of Part 1 of the Energy Act 2011 ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-22-9"><num>(9)</num><content><p>Sections 4AA to 4B of the Gas Act 1986 (principal objective and general duties) apply in relation to the powers under sections 17 to 20 with respect to holders of licences under section 7 or 7A of that Act as they apply in relation to functions of the Secretary of State under Part 1 of that Act.</p></content></subsection><subsection eId="section-22-10"><num>(10)</num><content><p>Sections 3A to 3D of the Electricity Act 1989 (principal objective and general duties) apply in relation to the powers under sections 17 to 20 with respect to holders of licences under section 6(1)(c) or (d) of that Act as they apply in relation to functions of the Secretary of State under Part 1 of that Act.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-gas-and-electricity-codes"><heading><i>Gas and electricity codes</i></heading><section eId="section-23"><num>23</num><heading>Recovering green deal payments: gas suppliers</heading><subsection eId="section-23-1"><num>(1)</num><content><p>Schedule 2B to the Gas Act 1986 (the gas code) is amended as follows.</p></content></subsection><subsection eId="section-23-2"><num>(2)</num><content><p><mod>In paragraph 6A(1) for paragraph (a) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(a)</num><intro><p>the sum is owed to an authorised supplier—</p></intro><level class="para2"><num>(i)</num><content><p>in respect of the supply of gas to the premises on which the meter is installed,</p></content></level><level class="para2"><num>(ii)</num><content><p>in respect of the provision of the meter, or</p></content></level><level class="para2"><num>(iii)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises; or</p></content></level></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-23-3"><num>(3)</num><content><p><mod>In paragraph 7(1) for paragraphs (a) and (b) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>a demand in writing is made by a gas supplier for any of the relevant payments to be made by a consumer; and</p></content></level><level class="para1"><num>(b)</num><content><p>the consumer does not make those payments within 28 days after the making of the demand.</p></content></level></quotedStructure></mod></p></content></subsection><subsection eId="section-23-4"><num>(4)</num><content><p><mod>After paragraph 7(1) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><subsection><num>(1A)</num><intro><p>A payment is a relevant payment for the purposes of sub-paragraph (1) if it is due to the gas supplier from the consumer—</p></intro><level class="para1"><num>(a)</num><content><p>in respect of the supply of gas to any premises of the consumer (in this paragraph referred to as “<term refersTo="#term-the-premises">the premises</term>”); or</p></content></level><level class="para1"><num>(b)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-23-5"><num>(5)</num><content><p><mod>In each of paragraphs 7(4)(b) and (5) for “charges” substitute <quotedText>“ payments ”</quotedText>.</mod></p></content></subsection></section><section eId="section-24"><num>24</num><heading>Recovering green deal payments: electricity suppliers</heading><subsection eId="section-24-1"><num>(1)</num><content><p>The Electricity Act 1989 is amended as follows.</p></content></subsection><subsection eId="section-24-2"><num>(2)</num><content><p>Paragraph 2 of Schedule 6 to the Electricity Act 1989 (the electricity code) is amended as set out in subsections (3) to (5).</p></content></subsection><subsection eId="section-24-3"><num>(3)</num><content><p><mod>In sub-paragraph (1) for the words from “paid” to “electricity meter” substitute <quotedText>“ made all the relevant payments ”</quotedText>.</mod></p></content></subsection><subsection eId="section-24-4"><num>(4)</num><content><p><mod>After sub-paragraph (1) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><subsection><num>(1A)</num><intro><p>A payment is a relevant payment for the purposes of sub-paragraph (1) if it is due from the customer to an electricity supplier—</p></intro><level class="para1"><num>(a)</num><content><p>in respect of the supply of electricity to any premises or the provision of an electricity meter; or</p></content></level><level class="para1"><num>(b)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-24-5"><num>(5)</num><content><p><mod>In sub-paragraph (3) for “payment of the charges due” substitute <quotedText>“ the relevant payments to be made ”</quotedText>.</mod></p></content></subsection><subsection eId="section-24-6"><num>(6)</num><content><p><mod>In paragraph 12(2) of Schedule 7 (recovery through pre-payment meters) for paragraph (a) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="default"><level class="para1"><num>(a)</num><intro><p>the sum is owed to an authorised supplier—</p></intro><level class="para2"><num>(i)</num><content><p>in respect of the supply of electricity to the premises on which the meter is installed,</p></content></level><level class="para2"><num>(ii)</num><content><p>in respect of the provision of the meter, or</p></content></level><level class="para2"><num>(iii)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises; or</p></content></level></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-modifying-consumer-credit-legislation"><heading><i>Modifying consumer credit legislation</i></heading><section eId="section-25"><num><noteRef href="#key-f059ff6bc0f5be2cb9a9a920afef444e" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>25</num><heading>Exemption from Consumer Credit Act 1974 in relation to credit to business debtors</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-26"><num><noteRef href="#key-fe68fb8a74e286ff5688a659547d5b8a" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>26</num><heading>Energy suppliers not to be treated as carrying on ancillary credit business</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-27"><num>27</num><heading>Duties to give debtors information and statements</heading><subsection eId="section-27-1"><num>(1)</num><content><p>The Consumer Credit Act 1974 is amended as follows.</p></content></subsection><subsection eId="section-27-2"><num>(2)</num><content><p><mod>In section 77 (duty to give information to debtor under fixed-sum credit agreement) after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(2A)</num><content><p>Subsection (2B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(2B)</num><content><p>The duty imposed on the creditor by subsection (1) may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-27-3"><num>(3)</num><content><p><mod>In section 77A (statements to be provided in relation to fixed-sum credit agreement) after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(2A)</num><content><p>Subsection (2B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(2B)</num><content><p>Any duty imposed on the creditor by this section may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-27-4"><num>(4)</num><content><p><mod>In section 77B (statement of account to be provided on request in relation to fixed-sum credit agreement) after subsection (7) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(7A)</num><content><p>Subsection (7B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(7B)</num><content><p>The duty imposed on the creditor by this section may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection></section><section eId="section-28"><num>28</num><heading>Exemption from requirement to give notice of sums in arrears</heading><content><p><mod>In section 86B of the Consumer Credit Act 1974 (requirement to give notice of sums in arrears) for subsection (12) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(12)</num><content><p>In this section “<term refersTo="#term-applicable-agreement">applicable agreement</term>” means an agreement which falls within subsection (12A) or (12B).</p></content></subsection><subsection><num>(12A)</num><intro><p>An agreement falls within this subsection if—</p></intro><level class="para1"><num>(a)</num><content><p>it is a regulated agreement for fixed-sum credit; and</p></content></level><level class="para1"><num>(b)</num><intro><p>it is not—</p></intro><level class="para2"><num>(i)</num><content><p>a non-commercial agreement;</p></content></level><level class="para2"><num>(ii)</num><content><p>a small agreement; or</p></content></level><level class="para2"><num>(iii)</num><content><p>a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></level></level></subsection><subsection><num>(12B)</num><intro><p>An agreement falls within this subsection if—</p></intro><level class="para1"><num>(a)</num><content><p>it is a regulated consumer hire agreement; and</p></content></level><level class="para1"><num>(b)</num><content><p>it is neither a non-commercial agreement nor a small agreement.</p></content></level></subsection></quotedStructure></mod></p></content></section><section eId="section-29"><num>29</num><heading>Early repayment of green deal finance</heading><subsection eId="section-29-1"><num>(1)</num><content><p>The Consumer Credit Act 1974 is amended as follows.</p></content></subsection><subsection eId="section-29-2"><num>(2)</num><content><p><mod>After section 95A (compensatory amount to creditor in relation to early repayment) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><section><num>95B</num><heading>Compensatory amount: green deal finance</heading><subsection><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1"><num>(a)</num><content><p>a regulated consumer credit agreement provides for the rate of interest on the credit to be fixed for a period of time (“the fixed rate period”),</p></content></level><level class="para1"><num>(b)</num><content><p>the agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011) which is of a duration specified for the purposes of this section in regulations, and</p></content></level><level class="para1"><num>(c)</num><content><p>under section 94 the debtor discharges all or part of his indebtedness during the fixed rate period.</p></content></level></subsection><subsection><num>(2)</num><intro><p>The creditor may claim an amount equal to the cost which the creditor has incurred as a result only of the debtor's indebtedness being discharged during the fixed rate period if—</p></intro><level class="para1"><num>(a)</num><content><p>the amount of the payment under section 94 is not paid from the proceeds of a contract of payment protection insurance, and</p></content></level><level class="para1"><num>(b)</num><content><p>such other conditions as may be specified for the purposes of this section in regulations are satisfied.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The amount in subsection (2)—</p></intro><level class="para1"><num>(a)</num><content><p>must be fair,</p></content></level><level class="para1"><num>(b)</num><content><p>must be objectively justified,</p></content></level><level class="para1"><num>(c)</num><content><p>must be calculated by the creditor in accordance with provision made for the purposes of this section in regulations, and</p></content></level><level class="para1"><num>(d)</num><content><p>must not exceed the total amount of interest that would have been paid by the debtor under the agreement in the period from the date on which the debtor makes the payment under section 94 to the date fixed by the agreement for the discharge of the indebtedness of the debtor.</p></content></level></subsection><subsection><num>(4)</num><content><p>If a creditor could claim under either section 95A or this section, the creditor may choose under which section to claim.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-29-3"><num>(3)</num><intro><p>In section 94 (right to complete payments ahead of time)—</p></intro><level class="para1" eId="section-29-3-a"><num>(a)</num><content><p><mod>in subsection (1) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-29-3-b"><num>(b)</num><content><p><mod>in subsection (5) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-29-4"><num>(4)</num><content><p><mod>In subsection (2)(c) of section 97A (duty to give information on partial repayment) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>.</mod></p></content></subsection></section><section eId="section-30"><num>30</num><heading>Power to amend Consumer Credit Act 1974</heading><subsection eId="section-30-1"><num>(1)</num><content><p>The Secretary of State may by order make such amendments to the Consumer Credit Act 1974<ins class="first last" ukl:ChangeId="key-0bb8e82a9a9824c6fb5a3055017bc416-1491332806432" ukl:CommentaryRef="key-0bb8e82a9a9824c6fb5a3055017bc416"><noteRef uk:name="commentary" href="#key-0bb8e82a9a9824c6fb5a3055017bc416" class="commentary"/>, the Financial Services and Markets Act 2000 and any statutory instrument made under that Act</ins> as the Secretary of State considers appropriate in consequence of provision made by or under this Chapter.</p></content></subsection><subsection eId="section-30-2"><num>(2)</num><intro><p>Before exercising the power under subsection (1) the Secretary of State must consult—</p></intro><level class="para1" eId="section-30-2-a"><num>(a)</num><content><p>the <ins class="substitution first last" ukl:ChangeId="key-803fdd5956001662e37b430be0cc1a4d-1491332863193" ukl:CommentaryRef="key-803fdd5956001662e37b430be0cc1a4d"><noteRef uk:name="commentary" href="#key-803fdd5956001662e37b430be0cc1a4d" class="commentary"/>Financial Conduct Authority</ins>, and</p></content></level><level class="para1" eId="section-30-2-b"><num>(b)</num><content><p>such other persons as the Secretary of State considers appropriate.</p></content></level></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-delegation-and-exercise-of-functions"><heading><i>Delegation and exercise of functions</i></heading><section eId="section-31"><num>31</num><heading>Delegation and conferring of functions</heading><subsection eId="section-31-1"><num>(1)</num><intro><p>The Secretary of State may by order provide for the following functions conferred on the Secretary of State to be exercisable instead by a public body specified in the order—</p></intro><level class="para1" eId="section-31-1-a"><num>(a)</num><content><p>any function exercisable in connection with the scheme established by the framework regulations;</p></content></level><level class="para1" eId="section-31-1-b"><num>(b)</num><content><p>any function exercisable under the framework regulations by virtue of section 6(4);</p></content></level><level class="para1" eId="section-31-1-c"><num>(c)</num><content><p>any function under regulations made under section 16.</p></content></level></subsection><subsection eId="section-31-2"><num>(2)</num><content><p>If the function of issuing a code of practice for the purposes of the scheme is specified in an order by virtue of subsection (1)(a), a draft of the code must be approved by the Secretary of State before the Secretary of State lays the draft before Parliament under section 39(2).</p></content></subsection><subsection eId="section-31-3"><num>(3)</num><content><p>If the function of revoking a code of practice issued for the purposes of the scheme is specified in an order by virtue of subsection (1)(a), the code must not be revoked without the approval of the Secretary of State.</p></content></subsection><subsection eId="section-31-4"><num>(4)</num><intro><p>The Secretary of State may by order make provision conferring administration functions on—</p></intro><level class="para1" eId="section-31-4-a"><num>(a)</num><content><p>the Secretary of State;</p></content></level><level class="para1" eId="section-31-4-b"><num>(b)</num><content><p>a public body specified in the order.</p></content></level></subsection><subsection eId="section-31-5"><num>(5)</num><content><p>For the purposes of subsection (4) administration functions are functions in connection with the administration of any provision in licences under section 7 or 7A of the Gas Act 1986 or section 6(1)(c) or (d) of the Electricity Act 1989 made by virtue of section 17(3) of this Act.</p></content></subsection><subsection eId="section-31-6"><num>(6)</num><intro><p>An order made by virtue of subsection (1) or (4)(b) may provide for—</p></intro><level class="para1" eId="section-31-6-a"><num>(a)</num><content><p>different functions to be exercisable by different public bodies;</p></content></level><level class="para1" eId="section-31-6-b"><num>(b)</num><content><p>the same function to be exercisable by different public bodies in relation to different areas.</p></content></level></subsection><subsection eId="section-31-7"><num>(7)</num><content><p>The Secretary of State may make payments to any public body specified in an order made by virtue of subsection (1).</p></content></subsection></section><section eId="section-32"><num>32</num><heading>Exercise of scheme functions on behalf of the Secretary of State or a public body</heading><subsection eId="section-32-1"><num>(1)</num><content><p>This section applies to any function exercisable in connection with the scheme established by the framework regulations.</p></content></subsection><subsection eId="section-32-2"><num>(2)</num><content><p>The Secretary of State may arrange for such a function to be exercised by any body or person on behalf of the Secretary of State.</p></content></subsection><subsection eId="section-32-3"><num>(3)</num><content><p>A public body specified in relation to such a function in an order made by virtue of section 31(1)(a) may arrange for the function to be exercised by any other body or person on its behalf.</p></content></subsection><subsection eId="section-32-4"><num>(4)</num><intro><p>Arrangements under this section—</p></intro><level class="para1" eId="section-32-4-a"><num>(a)</num><content><p>do not affect the responsibility for the exercise of the function;</p></content></level><level class="para1" eId="section-32-4-b"><num>(b)</num><content><p>may include provision for payments to be made to the body or person exercising the function under the arrangements.</p></content></level></subsection></section><section eId="section-33"><num>33</num><heading>Duty to report</heading><subsection eId="section-33-1"><num>(1)</num><content><p>This section applies if the function under section 3(1)(a) is specified in an order made by virtue of section 31(1)(a).</p></content></subsection><subsection eId="section-33-2"><num>(2)</num><intro><p>The Secretary of State may make regulations requiring the body specified in relation to that function in the order to—</p></intro><level class="para1" eId="section-33-2-a"><num>(a)</num><content><p>collect information on the specified matters, and</p></content></level><level class="para1" eId="section-33-2-b"><num>(b)</num><content><p>provide the Secretary of State with a report on those matters at the specified times.</p></content></level></subsection><subsection eId="section-33-3"><num>(3)</num><content><p>In subsection (2) “<term refersTo="#term-specified" eId="term-specified">specified</term>” means specified in the regulations.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-general"><heading><i>General</i></heading><section eId="section-34"><num>34</num><heading>Power of Secretary of State to deal with special circumstances</heading><subsection eId="section-34-1"><num>(1)</num><intro><p>The Secretary of State may by regulations make provision as to—</p></intro><level class="para1" eId="section-34-1-a"><num>(a)</num><content><p>the circumstances in which a bill payer's liability to make green deal payments to the relevant energy supplier is suspended or cancelled;</p></content></level><level class="para1" eId="section-34-1-b"><num>(b)</num><content><p>the circumstances in which any suspension of liability ends;</p></content></level><level class="para1" eId="section-34-1-c"><num>(c)</num><content><p>the consequences of any suspension or cancellation;</p></content></level><level class="para1" eId="section-34-1-d"><num>(d)</num><content><p>the circumstances in which the green deal provider may require the early repayment of the whole or part of the total of the payments outstanding under a green deal plan.</p></content></level></subsection><subsection eId="section-34-2"><num>(2)</num><intro><p>The regulations may, in particular, include provision—</p></intro><level class="para1" eId="section-34-2-a"><num>(a)</num><content><p>as to the procedure to be followed for securing a suspension or cancellation (including the payment of an administration fee calculated in accordance with the regulations);</p></content></level><level class="para1" eId="section-34-2-b"><num>(b)</num><content><p>as to how any payments due under a green deal plan during a period of suspension are to be paid;</p></content></level><level class="para1" eId="section-34-2-c"><num>(c)</num><content><p>as to the making of payments due under a green deal plan after a period of suspension;</p></content></level><level class="para1" eId="section-34-2-d"><num>(d)</num><content><p>as to the calculation of the amount payable on early repayment (including a fee calculated in accordance with the regulations).</p></content></level></subsection><subsection eId="section-34-3"><num>(3)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-34-3-a"><num>(a)</num><content><p>“<term refersTo="#term-bill-payer" eId="term-bill-payer">bill payer</term>” includes the person who would be the bill payer if the supply from the relevant energy supplier were not temporarily disconnected or the liability to make green deal payments were not suspended, and</p></content></level><level class="para1" eId="section-34-3-b"><num>(b)</num><content><p>payments are green deal payments if they are made under a green deal plan.</p></content></level></subsection></section><section eId="section-35"><num>35</num><heading>Appeals</heading><subsection eId="section-35-1"><num>(1)</num><intro><p>This section applies if provision is included in a scheme or regulations by virtue of any of the following—</p></intro><level class="para1" eId="section-35-1-a"><num>(a)</num><content><p>section 3(3)(h) or (i);</p></content></level><level class="para1" eId="section-35-1-b"><num>(b)</num><content><p>section 6(4);</p></content></level><level class="para1" eId="section-35-1-c"><num>(c)</num><content><p>section 16.</p></content></level></subsection><subsection eId="section-35-2"><num>(2)</num><content><p>The Secretary of State must by regulations provide for a right of appeal to a court or tribunal against any sanction imposed, or other action taken, by the Secretary of State or a specified public body under the provision mentioned in subsection (1).</p></content></subsection><subsection eId="section-35-3"><num>(3)</num><intro><p>Regulations under subsection (2) may, in particular, include provision—</p></intro><level class="para1" eId="section-35-3-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-35-3-b"><num>(b)</num><content><p>as to the persons who may make an appeal;</p></content></level><level class="para1" eId="section-35-3-c"><num>(c)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-35-3-d"><num>(d)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-35-3-e"><num>(e)</num><content><p>suspending the effect of a sanction or other action being appealed against, pending determination of the appeal;</p></content></level><level class="para1" eId="section-35-3-f"><num>(f)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-35-3-g"><num>(g)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-35-4"><num>(4)</num><intro><p>The provision referred to in subsection (3)(f) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-35-4-a"><num>(a)</num><content><p>to confirm the sanction imposed or action taken;</p></content></level><level class="para1" eId="section-35-4-b"><num>(b)</num><content><p>to withdraw the sanction or action;</p></content></level><level class="para1" eId="section-35-4-c"><num>(c)</num><content><p>to impose a different sanction or take different action;</p></content></level><level class="para1" eId="section-35-4-d"><num>(d)</num><content><p>to remit the decision whether to confirm the sanction or other action, or any matter relating to that decision, to the person who imposed the sanction or took the action;</p></content></level><level class="para1" eId="section-35-4-e"><num>(e)</num><content><p>to award costs or, in Scotland, expenses.</p></content></level></subsection><subsection eId="section-35-5"><num>(5)</num><content><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within subsection (3)(a), (d), (f) or (g), regulations under subsection (2) may revoke or amend any subordinate legislation.</p></content></subsection><subsection eId="section-35-6"><num>(6)</num><content><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within subsection (3)(a), (d), (f) or (g), they may by regulations revoke or amend any subordinate legislation, or any provision included in an instrument made under an Act of the Scottish Parliament, if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></content></subsection><subsection eId="section-35-7"><num>(7)</num><intro><p>In this section—</p></intro><level class="para1" eId="section-35-7-a"><num>(a)</num><content><p>“<term refersTo="#term-specified-public-body" eId="term-specified-public-body">specified public body</term>” means a public body specified in an order made by virtue of section 31(1);</p></content></level><level class="para1" eId="section-35-7-b"><num>(b)</num><content><p>“<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></level></subsection></section><section eId="section-36"><num>36</num><heading>Funding for energy efficiency advice</heading><subsection eId="section-36-1"><num>(1)</num><content><p>The Secretary of State may incur expenditure in providing qualifying advice or information or in making payments to persons who provide qualifying advice or information.</p></content></subsection><subsection eId="section-36-2"><num>(2)</num><content><p>In this section “<term refersTo="#term-qualifying-advice-or-information" eId="term-qualifying-advice-or-information">qualifying advice or information</term>” means advice or information about green deal plans or energy efficiency generally which is given to individuals or organisations.</p></content></subsection></section><section eId="section-37"><num>37</num><heading>Preparatory expenditure: framework regulations</heading><content><p>The Secretary of State may, before the framework regulations are made, incur expenditure for the purpose of, or in connection with, preparing for a scheme of the kind provided for by section 3.</p></content></section><section eId="section-38"><num>38</num><heading>Green deal installation apprenticeships</heading><subsection eId="section-38-1"><num>(1)</num><content><p>Before making the first framework regulations the Secretary of State must lay before Parliament a report on what, if any, steps the Secretary of State has taken to encourage green deal installation apprenticeships.</p></content></subsection><subsection eId="section-38-2"><num>(2)</num><content><p>A “green deal installation apprenticeship” is an apprenticeship which provides training on how to install energy efficiency improvements at properties.</p></content></subsection></section><section eId="section-39"><num>39</num><heading>Parliamentary procedure in relation to code of practice</heading><subsection eId="section-39-1"><num>(1)</num><content><p>This section makes further provision in relation to the issuing of any code of practice for the purposes of the scheme established by the framework regulations.</p></content></subsection><subsection eId="section-39-2"><num>(2)</num><content><p>Before the code is issued the Secretary of State must lay a draft of the code before Parliament.</p></content></subsection><subsection eId="section-39-3"><num>(3)</num><content><p>If, within the 40-day period, either House of Parliament resolves not to approve the draft, the code may not be issued.</p></content></subsection><subsection eId="section-39-4"><num>(4)</num><content><p>If no such resolution is made within that period, the code may be issued.</p></content></subsection><subsection eId="section-39-5"><num>(5)</num><content><p>The “<term refersTo="#term-40-day-period" eId="term-40-day-period">40-day period</term>”, in relation to a draft of a code, means the period of 40 days beginning with the day on which the draft is laid before Parliament (or, if it is not laid before each House of Parliament on the same day, the later of the 2 days on which it is laid).</p></content></subsection><subsection eId="section-39-6"><num>(6)</num><intro><p>For the purposes of calculating the 40-day period, no account is to be taken of any period during which—</p></intro><level class="para1" eId="section-39-6-a"><num>(a)</num><content><p>Parliament is dissolved or prorogued, or</p></content></level><level class="para1" eId="section-39-6-b"><num>(b)</num><content><p>both Houses are adjourned for more than 4 days.</p></content></level></subsection></section><section eId="section-40"><num>40</num><heading>Regulations and orders</heading><subsection eId="section-40-1"><num>(1)</num><content><p>Regulations and orders under this Chapter may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-40-2"><num>(2)</num><content><p>Regulations and orders under this Chapter, other than those made by the Scottish Ministers, are to be made by statutory instrument.</p></content></subsection><subsection eId="section-40-3"><num>(3)</num><content><p>A statutory instrument containing regulations or an order under this Chapter is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-40-4"><num>(4)</num><intro><p>Subsection (3) does not apply to a statutory instrument containing—</p></intro><level class="para1" eId="section-40-4-a"><num>(a)</num><content><p>regulations under section 2 or the framework regulations,</p></content></level><level class="para1" eId="section-40-4-b"><num>(b)</num><content><p>regulations under section 13, 15(1), 16, 34 or 35(2), or</p></content></level><level class="para1" eId="section-40-4-c"><num>(c)</num><content><p>an order under section 1, 2 or 30.</p></content></level></subsection><subsection eId="section-40-5"><num>(5)</num><content><p>A statutory instrument containing regulations or an order falling within subsection (4) may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection eId="section-40-6"><num>(6)</num><content><p>Regulations under section 10(2), 14(7) or (8) or 15(4) (regulations made by the Scottish Ministers) are subject to the negative procedure.</p></content></subsection><subsection eId="section-40-7"><num>(7)</num><content><p>Regulations under section 35(6) (regulations made by the Scottish Ministers) are subject to the affirmative procedure.</p></content></subsection><subsection eId="section-40-8"><num>(8)</num><intro><p>Before making regulations or an order under this Chapter extending to Scotland, the Secretary of State must—</p></intro><level class="para1" eId="section-40-8-a"><num>(a)</num><content><p>if the regulations or order contain any provision which would be within the legislative competence of the Scottish Parliament if it were contained in an Act of that Parliament, obtain the consent of the Scottish Ministers;</p></content></level><level class="para1" eId="section-40-8-b"><num>(b)</num><content><p>in any other case, consult the Scottish Ministers.</p></content></level></subsection><subsection eId="section-40-9"><num>(9)</num><intro><p>The Secretary of State must obtain the consent of the Welsh Ministers before making provision under section 35 amending or revoking—</p></intro><level class="para1" eId="section-40-9-a"><num>(a)</num><content><p>provision included in an instrument made under a Measure or Act of the National Assembly for Wales;</p></content></level><level class="para1" eId="section-40-9-b"><num>(b)</num><content><p>any other subordinate legislation made by the Welsh Ministers (or the National Assembly for Wales established under the Government of Wales Act 1998).</p></content></level></subsection><subsection eId="section-40-10"><num>(10)</num><content><p>Before amending under section 9 a provision of the Building Regulations 2010 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2010/2214), the Secretary of State must, if and so far as the function under which the provision was made is exercisable by the Welsh Ministers, obtain their consent.</p></content></subsection><subsection eId="section-40-11"><num>(11)</num><content><p>Subsections (9) and (10) do not apply to the extent that the Secretary of State is making incidental or consequential provision.</p></content></subsection><subsection eId="section-40-12"><num>(12)</num><content><p>Before making regulations or an order under this Chapter applying to Wales, the Secretary of State must consult the Welsh Ministers.</p></content></subsection><subsection eId="section-40-13"><num>(13)</num><content><p>Subsection (12) does not apply to the extent that consent has been obtained under subsection (9) or (10).</p></content></subsection></section><section eId="section-41"><num>41</num><heading>Crown application: Chapter 1</heading><content><p>This Chapter binds the Crown.</p></content></section></hcontainer></chapter> — Disclosure of green deal plan etc
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-1"><num>CHAPTER 1</num><heading>Green deal</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-introductory"><heading><i>Introductory</i></heading><section eId="section-1"><num>1</num><heading>Green deal plans</heading><subsection eId="section-1-1"><num>(1)</num><content><p>This section applies for the purposes of this Chapter.</p></content></subsection><subsection eId="section-1-2"><num>(2)</num><content><p>An energy plan is an arrangement made by the occupier or owner of a property for a person to make energy efficiency improvements to the property.</p></content></subsection><subsection eId="section-1-3"><num>(3)</num><intro><p>An energy plan is a green deal plan if—</p></intro><level class="para1" eId="section-1-3-a"><num>(a)</num><content><p>the energy efficiency improvements are to be paid for wholly or partly in instalments, and</p></content></level><level class="para1" eId="section-1-3-b"><num>(b)</num><content><p>all of the requirements listed in paragraphs (a) to (e) of subsection (4) are met in relation to the plan at the time when it is made.</p></content></level></subsection><subsection eId="section-1-4"><num>(4)</num><intro><p>The requirements are—</p></intro><level class="para1" eId="section-1-4-a"><num>(a)</num><content><p>the property is an eligible property,</p></content></level><level class="para1" eId="section-1-4-b"><num>(b)</num><content><p>the energy efficiency improvements fall within a description specified in an order made by the Secretary of State (“qualifying energy improvements”),</p></content></level><level class="para1" eId="section-1-4-c"><num>(c)</num><content><p>the conditions mentioned in section 4 as to assessment of the property and other matters have been met,</p></content></level><level class="para1" eId="section-1-4-d"><num>(d)</num><content><p>the conditions mentioned in section 5 as to the terms of the plan and other matters are met, and</p></content></level><level class="para1" eId="section-1-4-e"><num>(e)</num><content><p>a relevant energy supplier supplies, or is to supply, energy to the property.</p></content></level></subsection><subsection eId="section-1-5"><num>(5)</num><intro><p>Subsection (6) applies to a green deal plan from the time when—</p></intro><level class="para1" eId="section-1-5-a"><num>(a)</num><content><p>improvements have been installed in accordance with section 7,</p></content></level><level class="para1" eId="section-1-5-b"><num>(b)</num><content><p>the plan is confirmed in accordance with section 8, and</p></content></level><level class="para1" eId="section-1-5-c"><num>(c)</num><content><p>the requirements imposed by virtue of section 9 or 10 are met.</p></content></level></subsection><subsection eId="section-1-6"><num>(6)</num><intro><p>The payments in instalments agreed in the plan are to be—</p></intro><level class="para1" eId="section-1-6-a"><num>(a)</num><content><p>made by the person who is for the time being liable to pay the energy bills for the property,</p></content></level><level class="para1" eId="section-1-6-b"><num>(b)</num><content><p>made to the relevant energy supplier through the energy bills for the property,</p></content></level><level class="para1" eId="section-1-6-c"><num>(c)</num><content><p>recoverable as a debt by the relevant energy supplier from the person referred to in paragraph (a), and</p></content></level><level class="para1" eId="section-1-6-d"><num>(d)</num><content><p>recovered and held by the relevant energy supplier as agent and trustee for the person who made the improvements (unless the relevant energy supplier is also that person).</p></content></level></subsection><subsection eId="section-1-7"><num>(7)</num><content><p>Subsection (6) applies irrespective of whether the person referred to in paragraph (a) is the person who entered into the plan.</p></content></subsection><subsection eId="section-1-8"><num>(8)</num><intro><p>Subsection (6) is subject to—</p></intro><level class="para1" eId="section-1-8-a"><num>(a)</num><content><p>provision made in regulations under section 34;</p></content></level><level class="para1" eId="section-1-8-b"><num>(b)</num><content><p>any suspension or cancellation, by virtue of provision made in regulations under section 3(3)(h) or (i), 6(4), 16 or 35, of liability to make payments.</p></content></level></subsection><subsection eId="section-1-9"><num>(9)</num><content><p>For the purposes of subsection (4)(a) a property is an eligible property unless it falls within a description specified in an order made by the Secretary of State.</p></content></subsection></section><section eId="section-2"><num>2</num><heading>Green deal plans: supplementary</heading><subsection eId="section-2-1"><num>(1)</num><content><p>This section applies for the purposes of this Chapter.</p></content></subsection><subsection eId="section-2-2"><num>(2)</num><content><p>The occupier or owner who makes the arrangement referred to in section 1(2) is the “improver” and the person who makes the improvements is the “green deal provider”.</p></content></subsection><subsection eId="section-2-3"><num>(3)</num><content><p>The person referred to in section 1(6)(a) is the “bill payer”.</p></content></subsection><subsection eId="section-2-4"><num>(4)</num><intro><p>References to energy efficiency improvements, in relation to a property, are to—</p></intro><level class="para1" eId="section-2-4-a"><num>(a)</num><content><p>measures for improving efficiency in the use in the property of electricity, gas conveyed through pipes or any other source of energy which is specified in an order made by the Secretary of State, or</p></content></level><level class="para1" eId="section-2-4-b"><num>(b)</num><content><p>measures falling within subsection (5) or (6).</p></content></level></subsection><subsection eId="section-2-5"><num>(5)</num><intro><p>Measures fall within this subsection if—</p></intro><level class="para1" eId="section-2-5-a"><num>(a)</num><intro><p>they are any of the following—</p></intro><level class="para2" eId="section-2-5-a-i"><num>(i)</num><content><p>measures for increasing the amount of electricity generated, or heat produced, by microgeneration (within the meaning given by section 26(1) of the Climate Change and Sustainable Energy Act 2006);</p></content></level><level class="para2" eId="section-2-5-a-ii"><num>(ii)</num><content><p>any other measures for increasing the amount of electricity generated, or heat produced, using low-emissions sources or technologies;</p></content></level><level class="para2" eId="section-2-5-a-iii"><num>(iii)</num><content><p>measures for reducing the consumption of such energy as is mentioned in subsection (4), and</p></content></level></level><level class="para1" eId="section-2-5-b"><num>(b)</num><content><p>they are specified in an order made by the Secretary of State.</p></content></level></subsection><subsection eId="section-2-6"><num>(6)</num><intro><p>Measures fall within this subsection if—</p></intro><level class="para1" eId="section-2-6-a"><num>(a)</num><intro><p>they are installed at the property for the purpose of supplying to it any of the following types of energy—</p></intro><level class="para2" eId="section-2-6-a-i"><num>(i)</num><content><p>electricity generated by a generating station operated for the purposes of producing heat, or a cooling effect, in association with electricity;</p></content></level><level class="para2" eId="section-2-6-a-ii"><num>(ii)</num><content><p>heat produced in association with electricity or steam produced from (or air or water heated by) such heat;</p></content></level><level class="para2" eId="section-2-6-a-iii"><num>(iii)</num><content><p>any gas or liquid subjected to a cooling effect produced in association with electricity, and</p></content></level></level><level class="para1" eId="section-2-6-b"><num>(b)</num><content><p>they are specified in an order made by the Secretary of State.</p></content></level></subsection><subsection eId="section-2-7"><num>(7)</num><content><p>For the purposes of subsection (5)(a)(ii) electricity is generated, or heat is produced, using low-emissions sources or technologies if it is generated, or produced, by plant which relies wholly or mainly on a source of energy or a technology mentioned in section 26(2) of the Climate Change and Sustainable Energy Act 2006.</p></content></subsection><subsection eId="section-2-8"><num>(8)</num><content><p>For the purposes of subsection (6) “generating station” and “supplying” are to be read in accordance with section 64(1) of the Electricity Act 1989.</p></content></subsection><subsection eId="section-2-9"><num>(9)</num><content><p>“Energy” (except in this section), “energy bill”, “occupier”, “owner” and “relevant energy supplier” have the meaning given in regulations made by the Secretary of State.</p></content></subsection><subsection eId="section-2-10"><num>(10)</num><content><p>Regulations under subsection (9) may also make provision as to the circumstances in which a person who is not a bill payer for the purposes of this Chapter may be treated as a bill payer for those purposes.</p></content></subsection></section><section eId="section-3"><num>3</num><heading>Framework regulations</heading><subsection eId="section-3-1"><num>(1)</num><intro><p>The Secretary of State must by regulations establish a scheme making provision for the Secretary of State—</p></intro><level class="para1" eId="section-3-1-a"><num>(a)</num><content><p>to authorise persons to act as green deal assessors, green deal providers or green deal installers in connection with green deal plans (either individually or through membership of a body specified in, or authorised under, the scheme);</p></content></level><level class="para1" eId="section-3-1-b"><num>(b)</num><content><p>to regulate the conduct of those assessors, providers or installers (“green deal participants”).</p></content></level></subsection><subsection eId="section-3-2"><num>(2)</num><content><p>Regulations under subsection (1) are referred to in this Chapter as “<term refersTo="#term-the-framework-regulations" eId="term-the-framework-regulations">the framework regulations</term>”.</p></content></subsection><subsection eId="section-3-3"><num>(3)</num><intro><p>The scheme established by the framework regulations may, in particular, make provision—</p></intro><level class="para1" eId="section-3-3-a"><num>(a)</num><content><p>requiring the payment of a fee in connection with initial or continued authorisation under the scheme;</p></content></level><level class="para1" eId="section-3-3-b"><num>(b)</num><content><p>for the establishment and maintenance of a register of green deal participants and of persons from whom authorisation under the scheme has been withdrawn;</p></content></level><level class="para1" eId="section-3-3-c"><num>(c)</num><content><p>requiring green deal participants to provide the information required under the scheme;</p></content></level><level class="para1" eId="section-3-3-d"><num>(d)</num><content><p>for the issuing, revision or revocation of a code of practice;</p></content></level><level class="para1" eId="section-3-3-e"><num>(e)</num><content><p>requiring green deal participants to comply with the code of practice as a condition of their authorisation;</p></content></level><level class="para1" eId="section-3-3-f"><num>(f)</num><content><p>requiring green deal providers to enter into an agreement with the holder of a licence under section 7 or 7A of the Gas Act 1986 (gas transporter, shipper or supply licences) or section 6(1)(c) or (d) of the Electricity Act 1989 (electricity distributor and supply licences) and to comply with that agreement as a condition of their authorisation;</p></content></level><level class="para1" eId="section-3-3-g"><num>(g)</num><content><p>requiring that an agreement mentioned in paragraph (f) be approved by the Secretary of State before being entered into;</p></content></level><level class="para1" eId="section-3-3-h"><num>(h)</num><content><p>for securing compliance with any condition or any other requirement of the scheme, code or agreement;</p></content></level><level class="para1" eId="section-3-3-i"><num>(i)</num><content><p>as to the consequences of non-compliance with any such condition or requirement.</p></content></level></subsection><subsection eId="section-3-4"><num>(4)</num><intro><p>The code of practice issued for the purposes of the scheme may, in particular, make provision—</p></intro><level class="para1" eId="section-3-4-a"><num>(a)</num><content><p>as to the qualification and training of green deal participants;</p></content></level><level class="para1" eId="section-3-4-b"><num>(b)</num><content><p>as to their handling of queries or complaints;</p></content></level><level class="para1" eId="section-3-4-c"><num>(c)</num><content><p>requiring green deal participants to have such arrangements for insurance as are specified in the code;</p></content></level><level class="para1" eId="section-3-4-d"><num>(d)</num><content><p>as to the payment of green deal assessors by green deal providers or green deal installers and the payment of green deal installers by green deal providers;</p></content></level><level class="para1" eId="section-3-4-e"><num>(e)</num><content><p>as to the circumstances in which green deal assessors may charge customers for qualifying assessments of properties and as to the amount of any such charge;</p></content></level><level class="para1" eId="section-3-4-f"><num>(f)</num><content><p>requiring green deal assessors to act with impartiality;</p></content></level><level class="para1" eId="section-3-4-g"><num>(g)</num><content><p>as to the provision of information by green deal providers to improvers and bill payers and prospective improvers and bill payers;</p></content></level><level class="para1" eId="section-3-4-h"><num>(h)</num><content><p>as to marketing in connection with green deal plans.</p></content></level></subsection><subsection eId="section-3-5"><num>(5)</num><content><p>The code may include provision for regulating a body specified or authorised for the purposes of subsection (1)(a).</p></content></subsection><subsection eId="section-3-6"><num>(6)</num><content><p>The scheme and the code may make different provision for different circumstances or cases or for different purposes.</p></content></subsection><subsection eId="section-3-7"><num>(7)</num><content><p>The provision made by the scheme or code in relation to green deal participants may also extend to matters in connection with any energy plans which are not green deal plans.</p></content></subsection><subsection eId="section-3-8"><num>(8)</num><intro><p>The provision made for the purposes of subsection (3)(h) or (i) may, in particular, include provision enabling the Secretary of State to—</p></intro><level class="para1" eId="section-3-8-a"><num>(a)</num><content><p>cancel any liability to pay for a qualifying assessment of a property;</p></content></level><level class="para1" eId="section-3-8-b"><num>(b)</num><content><p>require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-3-8-c"><num>(c)</num><content><p>require a green deal participant to rectify a qualifying energy improvement or its installation;</p></content></level><level class="para1" eId="section-3-8-d"><num>(d)</num><content><p>require a green deal participant to pay compensation or a financial penalty;</p></content></level><level class="para1" eId="section-3-8-e"><num>(e)</num><content><p>withdraw, or require a body specified or authorised for the purposes of subsection (1)(a) to withdraw, an authorisation to act as a green deal participant;</p></content></level><level class="para1" eId="section-3-8-f"><num>(f)</num><content><p>withdraw authorisation from a body authorised for the purposes of subsection (1)(a) as a body whose members are authorised to act as green deal participants.</p></content></level></subsection><subsection eId="section-3-9"><num>(9)</num><content><p>For the purposes of this section references to a qualifying assessment are to an energy efficiency assessment which meets the requirements specified in the framework regulations and deals with such other matters as may be so specified.</p></content></subsection><subsection eId="section-3-10"><num>(10)</num><content><p>This section is without prejudice to the powers conferred on the Secretary of State by other provisions of this Chapter to make provision in or under the framework regulations.</p></content></subsection><subsection eId="section-3-11"><num>(11)</num><content><p>In this Chapter references to a code of practice include references to a code of practice which has been revised by virtue of subsection (3)(d).</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-green-deal-plan"><heading><i>Green deal plan</i></heading><section eId="section-4"><num>4</num><heading>Assessment of property <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-4-1"><num>(1)</num><intro><p>For the purposes of section 1(4)(c) the conditions as to assessment of the property and other matters are—</p></intro><level class="para1" eId="section-4-1-a"><num>(a)</num><content><p>the conditions set out in subsections (2) to (9), and</p></content></level><level class="para1" eId="section-4-1-b"><num>(b)</num><content><p>such other conditions (whether relating to the green deal assessor, the green deal provider, the improver or any other person) as are specified in the framework regulations.</p></content></level></subsection><subsection eId="section-4-2"><num>(2)</num><content><p>The first condition is that a qualifying assessment of the property has been carried out by a person authorised by virtue of the framework regulations to act as a green deal assessor.</p></content></subsection><subsection eId="section-4-3"><num>(3)</num><content><p>The second condition is that the green deal assessor has recommended the energy efficiency improvements.</p></content></subsection><subsection eId="section-4-4"><num>(4)</num><content><p>The third condition is that the green deal provider has given an estimate, on the basis specified in the framework regulations, of the savings likely to be made on the energy bills for the property if the improvements are carried out.</p></content></subsection><subsection eId="section-4-5"><num>(5)</num><content><p>The fourth condition is that the green deal provider has given an estimate, on the basis specified in the framework regulations, of the period over which the savings mentioned in subsection (4) are likely to be made.</p></content></subsection><subsection eId="section-4-6"><num>(6)</num><content><p>The fifth condition is that the green deal provider is authorised by virtue of the framework regulations to act as a green deal provider.</p></content></subsection><subsection eId="section-4-7"><num>(7)</num><content><p>The sixth condition is that the green deal provider has offered to carry out the improvements on the basis that the whole or part of the cost will be repaid in instalments over a period after the improvements have been made.</p></content></subsection><subsection eId="section-4-8"><num>(8)</num><intro><p>The seventh condition is that the green deal provider meets any requirement specified in the framework regulations as to the relationship between—</p></intro><level class="para1" eId="section-4-8-a"><num>(a)</num><content><p>the estimated total of the proposed instalments, and</p></content></level><level class="para1" eId="section-4-8-b"><num>(b)</num><content><p>the estimate mentioned in subsection (4).</p></content></level></subsection><subsection eId="section-4-9"><num>(9)</num><intro><p>The eighth condition is that the green deal provider meets any requirement specified in the framework regulations as to the relationship between—</p></intro><level class="para1" eId="section-4-9-a"><num>(a)</num><content><p>the period for which the instalments are proposed to be paid, and</p></content></level><level class="para1" eId="section-4-9-b"><num>(b)</num><content><p>the period estimated under subsection (5).</p></content></level></subsection><subsection eId="section-4-10"><num>(10)</num><content><p>In subsection (2) the reference to a qualifying assessment is to be read in accordance with section 3(9).</p></content></subsection></section><section eId="section-5"><num>5</num><heading>Terms of plan <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-5-1"><num>(1)</num><intro><p>For the purposes of section 1(4)(d), the conditions as to the terms of the plan and other matters are—</p></intro><level class="para1" eId="section-5-1-a"><num>(a)</num><content><p>the conditions set out in subsections (2) to (4), and</p></content></level><level class="para1" eId="section-5-1-b"><num>(b)</num><content><p>such other conditions as are specified in the framework regulations.</p></content></level></subsection><subsection eId="section-5-2"><num>(2)</num><intro><p>The first condition is that the plan includes the following terms—</p></intro><level class="para1" eId="section-5-2-a"><num>(a)</num><intro><p>a term in which the improver agrees to—</p></intro><level class="para2" eId="section-5-2-a-i"><num>(i)</num><content><p>the amounts of the payments in instalments and the intervals at which, and period for which, they are payable;</p></content></level><level class="para2" eId="section-5-2-a-ii"><num>(ii)</num><content><p>such other matters as are specified in the regulations;</p></content></level></level><level class="para1" eId="section-5-2-b"><num>(b)</num><content><p>a term in which the improver confirms that any necessary permissions or consents have been obtained in respect of the improvements;</p></content></level><level class="para1" eId="section-5-2-c"><num>(c)</num><content><p>a term providing that the green deal provider may not take a charge over any person's property by way of security for payments;</p></content></level><level class="para1" eId="section-5-2-d"><num>(d)</num><content><p>a term providing that the green deal plan does not prevent the bill payer from changing the intervals at which energy bills are to be paid.</p></content></level></subsection><subsection eId="section-5-3"><num>(3)</num><intro><p>The second condition is that the plan does not include any of the following terms—</p></intro><level class="para1" eId="section-5-3-a"><num>(a)</num><content><p>a term making a person liable to make any payments under the green deal plan otherwise than in respect of the period for which the person is the bill payer in relation to the property;</p></content></level><level class="para1" eId="section-5-3-b"><num>(b)</num><content><p>a term requiring the bill payer to make in any circumstances an early repayment of the whole or part of the amount outstanding under the green deal plan (except in accordance with the framework regulations or regulations under section 34, or provision made under them);</p></content></level><level class="para1" eId="section-5-3-c"><num>(c)</num><content><p>a term providing for money to be advanced to the improver (except in accordance with the framework regulations or provision made under them).</p></content></level></subsection><subsection eId="section-5-4"><num>(4)</num><content><p>The third condition is that the agreements mentioned in paragraph (a) of subsection (2) and the permissions and consents mentioned in paragraph (b) of that subsection have not been withdrawn before the end of the period of 14 days beginning with the last day on which they were given.</p></content></subsection><subsection eId="section-5-5"><num>(5)</num><intro><p>The conditions which may be specified in the framework regulations by virtue of subsection (1)(b) include, in particular—</p></intro><level class="para1" eId="section-5-5-a"><num>(a)</num><content><p>a condition that the plan includes a term so specified enabling the early repayment of the whole or part of the amount outstanding under the plan and making provision as to the calculation of the amount payable and any fee,</p></content></level><level class="para1" eId="section-5-5-b"><num>(b)</num><content><p>a condition that the plan includes a term so specified guaranteeing the improvements and making provision as to who is to benefit from the guarantee,</p></content></level><level class="para1" eId="section-5-5-c"><num>(c)</num><content><p>a condition that the plan includes a term so specified as to how any problems with the improvements installed, or arising in connection with the installation of them, are to be dealt with, and</p></content></level><level class="para1" eId="section-5-5-d"><num>(d)</num><content><p>a condition requiring the agreements mentioned in subsection (2)(a) to be in the form specified in the framework regulations.</p></content></level></subsection><subsection eId="section-5-6"><num>(6)</num><content><p>References in this section to the agreements mentioned in subsection (2)(a) include references to the consent required by virtue of section 6(2)(a).</p></content></subsection></section><section eId="section-6"><num>6</num><heading>Consents and redress <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-6-1"><num>(1)</num><intro><p>The framework regulations may make provision for dealing with cases where—</p></intro><level class="para1" eId="section-6-1-a"><num>(a)</num><content><p>at the time when a plan is entered into the improver and the bill payer are different persons;</p></content></level><level class="para1" eId="section-6-1-b"><num>(b)</num><content><p>the bill payer at the time when a plan is entered into is a different person from the bill payer at any subsequent time (a “subsequent bill payer”).</p></content></level></subsection><subsection eId="section-6-2"><num>(2)</num><intro><p>Provision which may be made by virtue of subsection (1) includes—</p></intro><level class="para1" eId="section-6-2-a"><num>(a)</num><content><p>provision requiring the term included in the plan by virtue of section 5(2)(a)(i) to be one to which the bill payer mentioned in subsection (1)(a) has consented, and</p></content></level><level class="para1" eId="section-6-2-b"><num>(b)</num><content><p>provision as to the terms of the plan which are to bind or benefit that bill payer or a subsequent bill payer.</p></content></level></subsection><subsection eId="section-6-3"><num>(3)</num><content><p>Subsection (1) is subject to section 1(6).</p></content></subsection><subsection eId="section-6-4"><num>(4)</num><content><p>The framework regulations may make provision for the purpose of providing redress in cases where a permission or consent mentioned in section 5(2)(b) was not obtained or was improperly obtained.</p></content></subsection><subsection eId="section-6-5"><num>(5)</num><intro><p>Provision included in framework regulations by virtue of subsection (4) may, in particular, enable the Secretary of State to—</p></intro><level class="para1" eId="section-6-5-a"><num>(a)</num><content><p>require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-6-5-b"><num>(b)</num><content><p>require a green deal provider to refund any such payments that have already been made;</p></content></level><level class="para1" eId="section-6-5-c"><num>(c)</num><content><p>require an improver to pay compensation to the green deal provider in respect of the suspension, cancellation or refund.</p></content></level></subsection></section><section eId="section-7"><num>7</num><heading>Installation of improvements</heading><subsection eId="section-7-1"><num>(1)</num><content><p>For the purposes of section 1(5)(a) improvements are installed in accordance with this section if the following three conditions are met.</p></content></subsection><subsection eId="section-7-2"><num>(2)</num><content><p>The first condition is that the person carrying out the installation of the improvements is authorised by virtue of the framework regulations to act as a green deal installer.</p></content></subsection><subsection eId="section-7-3"><num>(3)</num><intro><p>The second condition is that any product installed in making the improvements—</p></intro><level class="para1" eId="section-7-3-a"><num>(a)</num><content><p>meets the standard specified in the code of practice in relation to the product or description of product, or</p></content></level><level class="para1" eId="section-7-3-b"><num>(b)</num><intro><p>is listed in a document which—</p></intro><level class="para2" eId="section-7-3-b-i"><num>(i)</num><content><p>is issued by the Secretary of State or a person authorised by the Secretary of State in connection with the code, and</p></content></level><level class="para2" eId="section-7-3-b-ii"><num>(ii)</num><content><p>is referred to in the code as listing the products which are to be taken as meeting the required standard.</p></content></level></level></subsection><subsection eId="section-7-4"><num>(4)</num><content><p>In specifying the standard in relation to a product or description of product for the purposes of subsection (3)(a), the code of practice may make provision as to the testing and certification of the product or description of product.</p></content></subsection><subsection eId="section-7-5"><num>(5)</num><content><p>The third condition is that the carrying out of the installation meets the standard specified in the code of practice.</p></content></subsection><subsection eId="section-7-6"><num>(6)</num><content><p>In this section references to the code of practice are to the code of practice issued for the purposes of the scheme under the framework regulations.</p></content></subsection></section><section eId="section-8"><num>8</num><heading>Confirmation of plan</heading><subsection eId="section-8-1"><num>(1)</num><content><p>For the purposes of section 1(5)(b) an arrangement is confirmed in accordance with this section if the following two conditions are met.</p></content></subsection><subsection eId="section-8-2"><num>(2)</num><intro><p>The first condition is that the relevant energy supplier notifies the bill payer—</p></intro><level class="para1" eId="section-8-2-a"><num>(a)</num><content><p>that payments for the energy efficiency improvements to the property are to be included in the energy bills for the property from the date specified in the notification, and</p></content></level><level class="para1" eId="section-8-2-b"><num>(b)</num><content><p>of the amounts of those payments and the period for which they are to be made.</p></content></level></subsection><subsection eId="section-8-3"><num>(3)</num><content><p>The date mentioned in subsection (2)(a) must not fall earlier than the end of the period specified in the framework regulations.</p></content></subsection><subsection eId="section-8-4"><num>(4)</num><intro><p>The second condition is that, as soon as practicable after the improvements have been installed, the green deal provider takes one or more of the following actions as required by the framework regulations in the circumstances—</p></intro><level class="para1" eId="section-8-4-a"><num>(a)</num><content><p>producing a document containing such information in connection with the plan as is specified in the regulations in the form so specified,</p></content></level><level class="para1" eId="section-8-4-b"><num>(b)</num><content><p>securing that a document of a description specified in the regulations is produced, or</p></content></level><level class="para1" eId="section-8-4-c"><num>(c)</num><content><p>securing that a document of such a description is updated.</p></content></level></subsection><subsection eId="section-8-5"><num>(5)</num><content><p>The reference in this section to securing that a document is updated includes a reference to securing that a document is replaced by a document of the same description.</p></content></subsection><subsection eId="section-8-6"><num>(6)</num><content><p>Sections 9 and 10 make further provision in relation to the second condition.</p></content></subsection></section><section eId="section-9"><num>9</num><heading>Confirmation of plan: supplementary provision for England and Wales</heading><subsection eId="section-9-1"><num>(1)</num><content><p>Subsection (2) applies if, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2007 Regulations or the 2010 Regulations.</p></content></subsection><subsection eId="section-9-2"><num>(2)</num><content><p>The Secretary of State may by regulations make provision amending the 2007 Regulations or the 2010 Regulations or both (as the case may require) in connection with a document required to be produced or updated by virtue of section 8(4)(b) or (c).</p></content></subsection><subsection eId="section-9-3"><num>(3)</num><content><p>The amendments made by virtue of subsection (2) may, in particular, include amendments for the purpose of requiring a document to contain additional or updated information in connection with the plan or the improvements installed under the plan.</p></content></subsection><subsection eId="section-9-4"><num>(4)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-the-2007-regulations" eId="term-the-2007-regulations">the 2007 Regulations</term>” means the Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2007/991);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-2010-regulations" eId="term-the-2010-regulations">the 2010 Regulations</term>” means the Building Regulations 2010 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2010/2214).</p></content></hcontainer></subsection></section><section eId="section-10"><num>10</num><heading>Confirmation of plan: supplementary provision for Scotland</heading><subsection eId="section-10-1"><num>(1)</num><content><p>Subsection (2) applies if, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2008 Regulations.</p></content></subsection><subsection eId="section-10-2"><num>(2)</num><content><p>The Scottish Ministers may by regulations make provision amending the 2008 Regulations in connection with a document required to be produced or updated by virtue of section 8(4)(b) or (c).</p></content></subsection><subsection eId="section-10-3"><num>(3)</num><content><p>The amendments made by virtue of subsection (2) may, in particular, include amendments for the purpose of requiring a document to contain additional or updated information in connection with the plan or the improvements installed under the plan.</p></content></subsection><subsection eId="section-10-4"><num>(4)</num><content><p>In this section “<term refersTo="#term-the-2008-regulations" eId="term-the-2008-regulations">the 2008 Regulations</term>” means the Energy Performance of Buildings (Scotland) Regulations 2008 (<abbr class="acronym" title="Scottish Statutory Instrument">S.S.I.</abbr> 2008/309).</p></content></subsection></section><section eId="section-11"><num>11</num><heading>Updating information produced under section 8</heading><hcontainer name="wrapper2"><subsection eId="section-11-1"><num>(1)</num><content><p>The framework regulations may make provision as to the circumstances in which a document produced for the purposes of section 8(4)(a) is required to be updated in accordance with the regulations.</p></content></subsection><subsection eId="section-11-2"><num>(2)</num><content><p>Subsection (6) applies if one or more of the first, second or third conditions is met.</p></content></subsection><subsection eId="section-11-3"><num>(3)</num><intro><p>The first condition is that—</p></intro><level class="para1" eId="section-11-3-a"><num>(a)</num><content><p>by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2007 Regulations or the 2010 Regulations, and</p></content></level><level class="para1" eId="section-11-3-b"><num>(b)</num><content><p>provision is made in the 2007 Regulations or the 2010 Regulations or both by virtue of section 9(3) to require a document of that description to contain additional or updated information.</p></content></level></subsection><subsection eId="section-11-4"><num>(4)</num><intro><p>The second condition is that—</p></intro><level class="para1" eId="section-11-4-a"><num>(a)</num><content><p>by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2008 Regulations, and</p></content></level><level class="para1" eId="section-11-4-b"><num>(b)</num><content><p>provision is made in the 2008 Regulations by virtue of section 10(3) to require a document of that description to contain additional or updated information.</p></content></level></subsection><subsection eId="section-11-5"><num>(5)</num><content><p>The third condition is that, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description other than one falling within subsection (3) or (4).</p></content></subsection><subsection eId="section-11-6"><num>(6)</num><intro><p>The framework regulations may make provision as to the circumstances in which<ins class="substitution first" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3"><noteRef uk:name="commentary" href="#key-dfc5221cba708fe22339d7edef4760f3" class="commentary"/>—</ins></p></intro><level class="para1" eId="section-11-6-a"><num><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">(a)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">data from which a document of a description falling within subsection (3) or (4) may be produced, or</ins></p></content></level></subsection><level class="para1" eId="section-11-b"><num><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">(b)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">a document of a description falling within subsection (5),</ins></p></content></level></hcontainer><hcontainer name="wrapper2"><intro><p><ins class="substitution last" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">is</ins> required to be updated or further updated in accordance with provision made by the Secretary of State in the regulations.</p></intro><subsection eId="section-11-7"><num>(7)</num><content><p>In subsection (3) “<term refersTo="#term-the-2007-regulations" eId="term-the-2007-regulations">the 2007 Regulations</term>” and “<term refersTo="#term-the-2010-regulations" eId="term-the-2010-regulations">the 2010 Regulations</term>” have the same meaning as in section 9.</p></content></subsection><subsection eId="section-11-8"><num>(8)</num><content><p>In subsection (4) “<term refersTo="#term-the-2008-regulations" eId="term-the-2008-regulations">the 2008 Regulations</term>” has the same meaning as in section 10.</p></content></subsection><subsection eId="section-11-9"><num>(9)</num><content><p>In this section references to a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1491329299599" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> being required to be updated or further updated include references to a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1495547783705" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> being required to be replaced by a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1495547785898" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> of the same description.</p></content></subsection></hcontainer></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-disclosure-of-green-deal-plan-etc"><heading><i>Disclosure of green deal plan <abbr title="Et cetera" xml:lang="la">etc</abbr></i></heading><section eId="section-12"><num>12</num><heading>Disclosure of green deal plan <abbr title="Et cetera" xml:lang="la">etc</abbr> in connection with sale or letting out</heading><subsection eId="section-12-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-12-1-a"><num>(a)</num><content><p>a green deal property, or a lease of such a property, is to be sold, or</p></content></level><level class="para1" eId="section-12-1-b"><num>(b)</num><intro><p>a green deal property is to be let out—</p></intro><level class="para2" eId="section-12-1-b-i"><num>(i)</num><content><p>under a tenancy or licence agreement, and</p></content></level><level class="para2" eId="section-12-1-b-ii"><num>(ii)</num><content><p>on the basis that the prospective tenant or licensee is to be liable for paying the energy bills for the property.</p></content></level></level></subsection><subsection eId="section-12-2"><num>(2)</num><intro><p>The seller or prospective landlord or licensor must, in relation to the document, or each document, required to be produced or updated as mentioned in section 8(4)—</p></intro><level class="para1" eId="section-12-2-a"><num>(a)</num><content><p>obtain the document or, if the requirement to produce or update the document has not yet been complied with, produce a document containing the same information in connection with the green deal plan as that document would have contained, and</p></content></level><level class="para1" eId="section-12-2-b"><num>(b)</num><content><p>provide the document free of charge to any prospective buyer, tenant or licensee at the specified time.</p></content></level></subsection><subsection eId="section-12-3"><num>(3)</num><content><p>An obligation under subsection (2) may be discharged by an agent.</p></content></subsection><subsection eId="section-12-4"><num>(4)</num><intro><p>For the purposes of subsection (2) a person becomes a prospective buyer, tenant or licensee in relation to a property when the person—</p></intro><level class="para1" eId="section-12-4-a"><num>(a)</num><content><p>requests any information about the property from the seller, prospective landlord or licensor or an agent for the purpose of deciding whether to buy or let the property,</p></content></level><level class="para1" eId="section-12-4-b"><num>(b)</num><content><p>makes a request to view the property for the purpose mentioned in paragraph (a), or</p></content></level><level class="para1" eId="section-12-4-c"><num>(c)</num><content><p>makes an offer, whether oral or written, to buy or let the property.</p></content></level></subsection><subsection eId="section-12-5"><num>(5)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-12-5-a"><num>(a)</num><content><p>an agent is a person acting on behalf of a seller or prospective landlord or licensor in the sale or letting out of a property;</p></content></level><level class="para1" eId="section-12-5-b"><num>(b)</num><content><p>a property is a green deal property if there is a green deal plan in respect of the property and payments are still to be made under that plan;</p></content></level><level class="para1" eId="section-12-5-c"><num>(c)</num><content><p>specified, in relation to a time, means specified in regulations made by the Secretary of State.</p></content></level></subsection><subsection eId="section-12-6"><num>(6)</num><content><p>The Secretary of State may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection></section><section eId="section-13"><num>13</num><heading>Disclosure of green deal plan in connection with other transactions <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-13-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-13-1-a"><num>(a)</num><content><p>there is to be a transaction or other arrangement in respect of a green deal property (not falling within section 12(1)), and</p></content></level><level class="para1" eId="section-13-1-b"><num>(b)</num><content><p>the transaction or arrangement is of a description specified in regulations made by the Secretary of State.</p></content></level></subsection><subsection eId="section-13-2"><num>(2)</num><intro><p>The regulations may require a person of a description specified in the regulations to—</p></intro><level class="para1" eId="section-13-2-a"><num>(a)</num><content><p>obtain a document required to be produced or updated as mentioned in section 8(4) or, if the requirement to produce or update such a document has not yet been complied with, produce a document containing the same information in connection with the green deal plan as that document would have contained, and</p></content></level><level class="para1" eId="section-13-2-b"><num>(b)</num><content><p>provide the document free of charge to a person of a description specified in the regulations at the time so specified.</p></content></level></subsection><subsection eId="section-13-3"><num>(3)</num><content><p>The regulations may provide for an obligation imposed on a person by virtue of subsection (2) to be discharged by a person acting on the person's behalf.</p></content></subsection><subsection eId="section-13-4"><num>(4)</num><content><p>In this section the reference to a green deal property is to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-14"><num>14</num><heading>Acknowledgment of green deal plan on sale or letting out</heading><subsection eId="section-14-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-14-1-a"><num>(a)</num><content><p>a green deal property, or a lease of such a property, is to be sold, or</p></content></level><level class="para1" eId="section-14-1-b"><num>(b)</num><intro><p>a green deal property is to be let out—</p></intro><level class="para2" eId="section-14-1-b-i"><num>(i)</num><content><p>under a tenancy or licence agreement which is in writing, and</p></content></level><level class="para2" eId="section-14-1-b-ii"><num>(ii)</num><content><p>on the basis that the prospective tenant or licensee is to be liable for paying the energy bills for the property.</p></content></level></level></subsection><subsection eId="section-14-2"><num>(2)</num><content><p>The seller or prospective landlord or licensor must secure that the contract for sale or tenancy or licence agreement includes an acknowledgment by the buyer, tenant or licensee that the bill payer at the property is liable to make payments under the green deal plan and that certain terms of that plan are binding on the bill payer.</p></content></subsection><subsection eId="section-14-3"><num>(3)</num><content><p>Subsections (4) and (5) apply where the green deal property is in England or Wales.</p></content></subsection><subsection eId="section-14-4"><num>(4)</num><content><p>An acknowledgment required by subsection (2) must be in the form prescribed in regulations made by the Secretary of State.</p></content></subsection><subsection eId="section-14-5"><num>(5)</num><content><p>The Secretary of State may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection><subsection eId="section-14-6"><num>(6)</num><content><p>Subsections (7) and (8) apply where the green deal property is in Scotland.</p></content></subsection><subsection eId="section-14-7"><num>(7)</num><content><p>The acknowledgment required by subsection (2) must be in the form prescribed in regulations made by the Scottish Ministers.</p></content></subsection><subsection eId="section-14-8"><num>(8)</num><content><p>The Scottish Ministers may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection><subsection eId="section-14-9"><num>(9)</num><content><p>In this section references to a green deal property are to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-15"><num>15</num><heading>Acknowledgment of green deal plan in connection with other transactions <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-15-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-15-1-a"><num>(a)</num><content><p>there is to be a transaction or other arrangement in respect of a green deal property (not falling within section 14(1)), and</p></content></level><level class="para1" eId="section-15-1-b"><num>(b)</num><content><p>the transaction or arrangement is of a description specified in regulations made under this subsection by the Secretary of State.</p></content></level></subsection><subsection eId="section-15-2"><num>(2)</num><intro><p>Regulations under subsection (1) may require a person of a description specified in the regulations to secure, at a time and in a document so specified, that an acknowledgment is made by a person of a description so specified that—</p></intro><level class="para1" eId="section-15-2-a"><num>(a)</num><content><p>the bill payer at the property is liable to make payments under the green deal plan, and</p></content></level><level class="para1" eId="section-15-2-b"><num>(b)</num><content><p>certain terms of that plan are binding on the bill payer.</p></content></level></subsection><subsection eId="section-15-3"><num>(3)</num><content><p>Where the green deal property is in England or Wales, regulations made by the Secretary of State under this subsection may provide for any acknowledgment required by virtue of subsection (2) to be in the form prescribed in the regulations under this subsection.</p></content></subsection><subsection eId="section-15-4"><num>(4)</num><content><p>Where the green deal property is in Scotland, regulations made by the Scottish Ministers under this subsection may provide for any acknowledgment required by virtue of subsection (2) to be in the form prescribed in the regulations under this subsection.</p></content></subsection><subsection eId="section-15-5"><num>(5)</num><content><p>In this section references to a green deal property are to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-16"><num>16</num><heading>Sanctions for non-compliance with obligations under sections 12 to 15</heading><subsection eId="section-16-1"><num>(1)</num><intro><p>The Secretary of State may make regulations—</p></intro><level class="para1" eId="section-16-1-a"><num>(a)</num><content><p>for the purpose of securing compliance with the obligations set out in section 12 or 14 or imposed by virtue of regulations under section 13 or 15;</p></content></level><level class="para1" eId="section-16-1-b"><num>(b)</num><content><p>as to the consequences of non-compliance with the obligations.</p></content></level></subsection><subsection eId="section-16-2"><num>(2)</num><intro><p>The regulations may, in particular, include provision—</p></intro><level class="para1" eId="section-16-2-a"><num>(a)</num><content><p>as to sanctions for non-compliance with the obligations (including the imposition of a civil penalty);</p></content></level><level class="para1" eId="section-16-2-b"><num>(b)</num><content><p>enabling the Secretary of State to require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-16-2-c"><num>(c)</num><content><p>enabling the Secretary of State to require a green deal provider to refund any such payments that have already been made;</p></content></level><level class="para1" eId="section-16-2-d"><num>(d)</num><content><p>enabling the Secretary of State to require a seller, a prospective landlord or licensor or another person to pay compensation to a green deal provider in respect of any such suspension, cancellation or refund.</p></content></level></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-modifying-energy-licences"><heading><i>Modifying energy licences</i></heading><section eId="section-17"><num>17</num><heading>Power to modify energy licences in connection with green deal payments</heading><subsection eId="section-17-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-17-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7 or 7A of the Gas Act 1986 (gas transporter, shipper and supply licences);</p></content></level><level class="para1" eId="section-17-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-17-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(c) or (d) of the Electricity Act 1989 (electricity distribution and supply licences);</p></content></level><level class="para1" eId="section-17-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-17-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7 or 7A of the Gas Act 1986 or section 6(1)(c) or (d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-17-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised for the following purposes only—</p></intro><level class="para1" eId="section-17-2-a"><num>(a)</num><content><p>in so far as the power relates to a licence under section 7 of the Gas Act 1986 or section 6(1)(c) of the Electricity Act 1989, the purpose of preventing the holder of the licence from permanently disconnecting the supply of gas or electricity to a green deal property, and</p></content></level><level class="para1" eId="section-17-2-b"><num>(b)</num><content><p>in so far as the power relates to any licence, the purpose of requiring or enabling the holder of the licence to take, or not to take, specified action in connection with green deal payments.</p></content></level></subsection><subsection eId="section-17-3"><num>(3)</num><intro><p>The provision which may be made by virtue of subsection (2)(b) includes, in particular—</p></intro><level class="para1" eId="section-17-3-a"><num>(a)</num><content><p>if the holder of the licence is of a specified description, provision enabling the holder to opt into or opt out of any provision made by virtue of paragraphs (b) to (f),</p></content></level><level class="para1" eId="section-17-3-b"><num>(b)</num><content><p>provision requiring the holder of the licence to collect green deal payments through energy bills and remit them to a green deal provider,</p></content></level><level class="para1" eId="section-17-3-c"><num>(c)</num><content><p>provision as to the circumstances in which the holder of the licence is required to make payments to a green deal provider by reference to green deal payments which are due but which have not been made,</p></content></level><level class="para1" eId="section-17-3-d"><num>(d)</num><content><p>provision in connection with the cancellation or suspension of green deal payments,</p></content></level><level class="para1" eId="section-17-3-e"><num>(e)</num><content><p>provision requiring or enabling the holder of the licence to make specified arrangements for facilitating the collection of green deal payments, and</p></content></level><level class="para1" eId="section-17-3-f"><num>(f)</num><content><p>provision requiring or enabling payments to be made by or to the holder of the licence in respect of functions discharged in connection with green deal payments.</p></content></level></subsection><subsection eId="section-17-4"><num>(4)</num><content><p>Provision made by virtue of subsection (2)(b) which falls within subsection (3)(c) may include provision requiring the holder of the licence, where a bill payer has failed to pay a sum due under an energy bill, to remit a proportion of any payment received to a green deal provider.</p></content></subsection><subsection eId="section-17-5"><num>(5)</num><content><p>Conditions included in a licence under section 7 or 7A of the Gas Act 1986 by virtue of the power under subsection (1) may do any of the things authorised by section 7B(5)(a)(i) or (iii) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7B(4)(a)).</p></content></subsection><subsection eId="section-17-6"><num>(6)</num><content><p>Conditions included in a licence under section 6(1)(c) or (d) of the Electricity Act 1989 by virtue of the power under subsection (1) may do any of the things authorised by section 7(3)(a) or (c) or (4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection><subsection eId="section-17-7"><num>(7)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-17-7-a"><num>(a)</num><content><p>payments are green deal payments if they are made under a green deal plan,</p></content></level><level class="para1" eId="section-17-7-b"><num>(b)</num><content><p>a property is a green deal property if there is a green deal plan in respect of the property and payments are still to be made under that plan, and</p></content></level><level class="para1" eId="section-17-7-c"><num>(c)</num><content><p>references to a green deal provider include references to a person acting on behalf of a green deal provider or nominated by a green deal provider.</p></content></level></subsection></section><section eId="section-18"><num>18</num><heading>Power to modify energy supply licences to make provision as to default in green deal payments</heading><subsection eId="section-18-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-18-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-18-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-18-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-18-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-18-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-18-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised for the purpose only of making provision—</p></intro><level class="para1" eId="section-18-2-a"><num>(a)</num><content><p>as to the steps which are to be taken by the holder of a licence following a bill payer's default in making green deal payments to the holder of the licence,</p></content></level><level class="para1" eId="section-18-2-b"><num>(b)</num><content><p>as to the circumstances in which the holder of a licence may disconnect the supply to a green deal property following such a default, or</p></content></level><level class="para1" eId="section-18-2-c"><num>(c)</num><content><p>enabling, in specified circumstances, the holder of a licence to require from a bill payer a deposit by way of security for green deal payments to be made by the bill payer.</p></content></level></subsection><subsection eId="section-18-3"><num>(3)</num><content><p>For the purposes of this section “green deal payments” and “green deal property” are to be read in accordance with section 17(7).</p></content></subsection></section><section eId="section-19"><num>19</num><heading>Power to modify energy supply licences to require provision of information</heading><subsection eId="section-19-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-19-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-19-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-19-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-19-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-19-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-19-2"><num>(2)</num><content><p>The power under subsection (1) may be exercised for one or both of the following two purposes only.</p></content></subsection><subsection eId="section-19-3"><num>(3)</num><content><p>The first purpose is the purpose of requiring, at specified times, the holder of the licence to provide bill payers with specified information in connection with their green deal plans.</p></content></subsection><subsection eId="section-19-4"><num>(4)</num><content><p>The second purpose is the purpose of requiring the holder of the licence to disclose on request specified information about the payment of energy bills by a person who is, or is to be, the bill payer for a property in respect of which there is, or is proposed to be, a green deal plan.</p></content></subsection><subsection eId="section-19-5"><num>(5)</num><intro><p>The only persons to whom the licence holder may be required to disclose information by virtue of subsection (4) are—</p></intro><level class="para1" eId="section-19-5-a"><num>(a)</num><content><p>where there is a green deal plan, the green deal provider under the plan;</p></content></level><level class="para1" eId="section-19-5-b"><num>(b)</num><content><p>where there is proposed to be a green deal plan, a person who is authorised under the framework regulations to act as a green deal provider.</p></content></level></subsection><subsection eId="section-19-6"><num>(6)</num><intro><p>The licence holder may be required to disclose the information requested only where—</p></intro><level class="para1" eId="section-19-6-a"><num>(a)</num><content><p>the green deal provider or authorised person states that the request is made for purposes connected with the green deal plan or proposed green deal plan,</p></content></level><level class="para1" eId="section-19-6-b"><num>(b)</num><intro><p>the green deal provider or authorised person provides evidence that the bill payer has consented to—</p></intro><level class="para2" eId="section-19-6-b-i"><num>(i)</num><content><p>disclosure of the information to that provider or person for those purposes, and</p></content></level><level class="para2" eId="section-19-6-b-ii"><num>(ii)</num><content><p>onward disclosure of the disclosed information to and by other persons for those purposes,</p></content></level></level><level class="para1" eId="section-19-6-c"><num>(c)</num><content><p>the information relates to a time within the 5 years immediately preceding the request, and</p></content></level><level class="para1" eId="section-19-6-d"><num>(d)</num><content><p>the licence holder has the information.</p></content></level></subsection><subsection eId="section-19-7"><num>(7)</num><content><p>The power under subsection (1) may be exercised so as to require information to be provided in a specified manner or form, or subject to specified requirements or restrictions.</p></content></subsection><subsection eId="section-19-8"><num>(8)</num><content><p>Conditions included in a licence under section 7A(1) of the Gas Act 1986 by virtue of the power under subsection (1) and the purpose mentioned in subsection (4) may do any of the things authorised by section 7B(5)(a)(i) or (iii) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7B(4)(a)).</p></content></subsection><subsection eId="section-19-9"><num>(9)</num><content><p>Conditions included in a licence under section 6(1)(d) of the Electricity Act 1989 by virtue of the power under subsection (1) and the purpose mentioned in subsection (4) may do any of the things authorised by section 7(3)(a) or (c) or (4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection></section><section eId="section-20"><num>20</num><heading>Power to modify energy supply licences to make provision as to consumer protection</heading><subsection eId="section-20-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-20-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-20-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-20-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-20-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-20-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-20-2"><num>(2)</num><content><p>The power under subsection (1) may be exercised for the purpose only of making provision corresponding to that made by the disapplied consumer protection legislation.</p></content></subsection><subsection eId="section-20-3"><num>(3)</num><content><p>Conditions included in a licence under section 6(1)(d) of the Electricity Act 1989 by virtue of the power under subsection (1) may do any of the things authorised by section 7(4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection><subsection eId="section-20-4"><num>(4)</num><content><p>For the purposes of subsection (2) provision corresponds to that made by the disapplied consumer protection legislation if it is made for the same purpose as the purpose for which that provision was made.</p></content></subsection><subsection eId="section-20-5"><num><ins class="substitution first" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35"><noteRef uk:name="commentary" href="#key-3f8f93cba169f015282416aba5430e35" class="commentary"/>(5)</ins></num><intro><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">For the purpose of this section, references to the disapplied consumer protection legislation are to—</ins></p></intro><level class="para1" eId="section-20-5-a"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(a)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">the provisions of or made under the Consumer Credit Act 1974 or the Financial Services and Markets Act 2000 (“the 2000 Act”), and</ins></p></content></level><level class="para1" eId="section-20-5-b"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(b)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">any rules made under the 2000 Act,</ins></p></content></level><wrapUp><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">which would apply but for any exemption conferred by an order under section 22 of the 2000 Act (regulated activities) in relation to debts due under a green deal plan associated with the licensee.</ins></p></wrapUp></subsection><subsection eId="section-20-6"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(6)</ins></num><content><p><ins class="substitution last" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">A green deal plan is associated with a licensee if the payments under the plan are to be made to the licensee.</ins></p></content></subsection></section><section eId="section-21"><num>21</num><heading>Powers under sections 17 to 20: consultation</heading><intro><p>Before making a modification under any of sections 17 to 20, the Secretary of State must consult—</p></intro><level class="para1" eId="section-21-a"><num>(a)</num><content><p>the holder of any licence being modified,</p></content></level><level class="para1" eId="section-21-b"><num>(b)</num><content><p>the Gas and Electricity Markets Authority, and</p></content></level><level class="para1" eId="section-21-c"><num>(c)</num><content><p>such other persons as the Secretary of State considers appropriate.</p></content></level></section><section eId="section-22"><num>22</num><heading>Powers under sections 17 to 20: supplementary</heading><subsection eId="section-22-1"><num>(1)</num><content><p>Subsections (2) to (6) apply in relation to the powers under sections 17 to 20.</p></content></subsection><subsection eId="section-22-2"><num>(2)</num><intro><p>The powers—</p></intro><level class="para1" eId="section-22-2-a"><num>(a)</num><content><p>may be exercised generally, only in relation to specified cases or subject to exceptions (including provision for a case to be excepted only so long as specified conditions are satisfied);</p></content></level><level class="para1" eId="section-22-2-b"><num>(b)</num><content><p>may be exercised differently in different cases or circumstances;</p></content></level><level class="para1" eId="section-22-2-c"><num>(c)</num><content><p>include a power to make incidental, consequential or transitional modifications.</p></content></level></subsection><subsection eId="section-22-3"><num>(3)</num><intro><p>Provision included in a licence by virtue of any of the powers—</p></intro><level class="para1" eId="section-22-3-a"><num>(a)</num><content><p>need not relate to the activities authorised by the licence;</p></content></level><level class="para1" eId="section-22-3-b"><num>(b)</num><content><p>may make different provision for different cases.</p></content></level></subsection><subsection eId="section-22-4"><num>(4)</num><content><p>The Secretary of State must publish details of modifications under any of the powers as soon as reasonably practicable after the modifications are made.</p></content></subsection><subsection eId="section-22-5"><num>(5)</num><content><p>A modification under any of the powers of part of a standard condition of a licence does not prevent any other part of the condition from continuing to be regarded as a standard condition for the purposes of Part 1 of the Gas Act 1986 or Part 1 of the Electricity Act 1989.</p></content></subsection><subsection eId="section-22-6"><num>(6)</num><content><p>Where the Secretary of State makes modifications under any of the powers of the standard conditions of a licence of any type, the Gas and Electricity Markets Authority must make the same modification of those standard conditions for the purposes of their incorporation in licences of that type granted after that time.</p></content></subsection><subsection eId="section-22-7"><num>(7)</num><intro><p>In section 33(1) of the Utilities Act 2000 (standard conditions of electricity licences)—</p></intro><level class="para1" eId="section-22-7-a"><num>(a)</num><content><p>after paragraph (d) omit “or”;</p></content></level><level class="para1" eId="section-22-7-b"><num>(b)</num><content><p><mod>after paragraph (e) insert<quotedText startQuote="&#x201C;">or </quotedText><quotedStructure endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(f)</num><content><p>under Chapter 1 of Part 1 of the Energy Act 2011.</p></content></level></quotedStructure></mod></p></content></level></subsection><subsection eId="section-22-8"><num>(8)</num><intro><p>In section 81(2) of the Utilities Act 2000 (standard conditions of gas licences)—</p></intro><level class="para1" eId="section-22-8-a"><num>(a)</num><content><p><mod>for “2008 or” substitute <quotedText>“ 2008, ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-22-8-b"><num>(b)</num><content><p><mod>after “2010” insert <quotedText>“ or under Chapter 1 of Part 1 of the Energy Act 2011 ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-22-9"><num>(9)</num><content><p>Sections 4AA to 4B of the Gas Act 1986 (principal objective and general duties) apply in relation to the powers under sections 17 to 20 with respect to holders of licences under section 7 or 7A of that Act as they apply in relation to functions of the Secretary of State under Part 1 of that Act.</p></content></subsection><subsection eId="section-22-10"><num>(10)</num><content><p>Sections 3A to 3D of the Electricity Act 1989 (principal objective and general duties) apply in relation to the powers under sections 17 to 20 with respect to holders of licences under section 6(1)(c) or (d) of that Act as they apply in relation to functions of the Secretary of State under Part 1 of that Act.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-gas-and-electricity-codes"><heading><i>Gas and electricity codes</i></heading><section eId="section-23"><num>23</num><heading>Recovering green deal payments: gas suppliers</heading><subsection eId="section-23-1"><num>(1)</num><content><p>Schedule 2B to the Gas Act 1986 (the gas code) is amended as follows.</p></content></subsection><subsection eId="section-23-2"><num>(2)</num><content><p><mod>In paragraph 6A(1) for paragraph (a) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(a)</num><intro><p>the sum is owed to an authorised supplier—</p></intro><level class="para2"><num>(i)</num><content><p>in respect of the supply of gas to the premises on which the meter is installed,</p></content></level><level class="para2"><num>(ii)</num><content><p>in respect of the provision of the meter, or</p></content></level><level class="para2"><num>(iii)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises; or</p></content></level></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-23-3"><num>(3)</num><content><p><mod>In paragraph 7(1) for paragraphs (a) and (b) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>a demand in writing is made by a gas supplier for any of the relevant payments to be made by a consumer; and</p></content></level><level class="para1"><num>(b)</num><content><p>the consumer does not make those payments within 28 days after the making of the demand.</p></content></level></quotedStructure></mod></p></content></subsection><subsection eId="section-23-4"><num>(4)</num><content><p><mod>After paragraph 7(1) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><subsection><num>(1A)</num><intro><p>A payment is a relevant payment for the purposes of sub-paragraph (1) if it is due to the gas supplier from the consumer—</p></intro><level class="para1"><num>(a)</num><content><p>in respect of the supply of gas to any premises of the consumer (in this paragraph referred to as “<term refersTo="#term-the-premises">the premises</term>”); or</p></content></level><level class="para1"><num>(b)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-23-5"><num>(5)</num><content><p><mod>In each of paragraphs 7(4)(b) and (5) for “charges” substitute <quotedText>“ payments ”</quotedText>.</mod></p></content></subsection></section><section eId="section-24"><num>24</num><heading>Recovering green deal payments: electricity suppliers</heading><subsection eId="section-24-1"><num>(1)</num><content><p>The Electricity Act 1989 is amended as follows.</p></content></subsection><subsection eId="section-24-2"><num>(2)</num><content><p>Paragraph 2 of Schedule 6 to the Electricity Act 1989 (the electricity code) is amended as set out in subsections (3) to (5).</p></content></subsection><subsection eId="section-24-3"><num>(3)</num><content><p><mod>In sub-paragraph (1) for the words from “paid” to “electricity meter” substitute <quotedText>“ made all the relevant payments ”</quotedText>.</mod></p></content></subsection><subsection eId="section-24-4"><num>(4)</num><content><p><mod>After sub-paragraph (1) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><subsection><num>(1A)</num><intro><p>A payment is a relevant payment for the purposes of sub-paragraph (1) if it is due from the customer to an electricity supplier—</p></intro><level class="para1"><num>(a)</num><content><p>in respect of the supply of electricity to any premises or the provision of an electricity meter; or</p></content></level><level class="para1"><num>(b)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-24-5"><num>(5)</num><content><p><mod>In sub-paragraph (3) for “payment of the charges due” substitute <quotedText>“ the relevant payments to be made ”</quotedText>.</mod></p></content></subsection><subsection eId="section-24-6"><num>(6)</num><content><p><mod>In paragraph 12(2) of Schedule 7 (recovery through pre-payment meters) for paragraph (a) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="default"><level class="para1"><num>(a)</num><intro><p>the sum is owed to an authorised supplier—</p></intro><level class="para2"><num>(i)</num><content><p>in respect of the supply of electricity to the premises on which the meter is installed,</p></content></level><level class="para2"><num>(ii)</num><content><p>in respect of the provision of the meter, or</p></content></level><level class="para2"><num>(iii)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises; or</p></content></level></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-modifying-consumer-credit-legislation"><heading><i>Modifying consumer credit legislation</i></heading><section eId="section-25"><num><noteRef href="#key-f059ff6bc0f5be2cb9a9a920afef444e" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>25</num><heading>Exemption from Consumer Credit Act 1974 in relation to credit to business debtors</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-26"><num><noteRef href="#key-fe68fb8a74e286ff5688a659547d5b8a" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>26</num><heading>Energy suppliers not to be treated as carrying on ancillary credit business</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-27"><num>27</num><heading>Duties to give debtors information and statements</heading><subsection eId="section-27-1"><num>(1)</num><content><p>The Consumer Credit Act 1974 is amended as follows.</p></content></subsection><subsection eId="section-27-2"><num>(2)</num><content><p><mod>In section 77 (duty to give information to debtor under fixed-sum credit agreement) after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(2A)</num><content><p>Subsection (2B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(2B)</num><content><p>The duty imposed on the creditor by subsection (1) may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-27-3"><num>(3)</num><content><p><mod>In section 77A (statements to be provided in relation to fixed-sum credit agreement) after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(2A)</num><content><p>Subsection (2B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(2B)</num><content><p>Any duty imposed on the creditor by this section may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-27-4"><num>(4)</num><content><p><mod>In section 77B (statement of account to be provided on request in relation to fixed-sum credit agreement) after subsection (7) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(7A)</num><content><p>Subsection (7B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(7B)</num><content><p>The duty imposed on the creditor by this section may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection></section><section eId="section-28"><num>28</num><heading>Exemption from requirement to give notice of sums in arrears</heading><content><p><mod>In section 86B of the Consumer Credit Act 1974 (requirement to give notice of sums in arrears) for subsection (12) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(12)</num><content><p>In this section “<term refersTo="#term-applicable-agreement">applicable agreement</term>” means an agreement which falls within subsection (12A) or (12B).</p></content></subsection><subsection><num>(12A)</num><intro><p>An agreement falls within this subsection if—</p></intro><level class="para1"><num>(a)</num><content><p>it is a regulated agreement for fixed-sum credit; and</p></content></level><level class="para1"><num>(b)</num><intro><p>it is not—</p></intro><level class="para2"><num>(i)</num><content><p>a non-commercial agreement;</p></content></level><level class="para2"><num>(ii)</num><content><p>a small agreement; or</p></content></level><level class="para2"><num>(iii)</num><content><p>a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></level></level></subsection><subsection><num>(12B)</num><intro><p>An agreement falls within this subsection if—</p></intro><level class="para1"><num>(a)</num><content><p>it is a regulated consumer hire agreement; and</p></content></level><level class="para1"><num>(b)</num><content><p>it is neither a non-commercial agreement nor a small agreement.</p></content></level></subsection></quotedStructure></mod></p></content></section><section eId="section-29"><num>29</num><heading>Early repayment of green deal finance</heading><subsection eId="section-29-1"><num>(1)</num><content><p>The Consumer Credit Act 1974 is amended as follows.</p></content></subsection><subsection eId="section-29-2"><num>(2)</num><content><p><mod>After section 95A (compensatory amount to creditor in relation to early repayment) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><section><num>95B</num><heading>Compensatory amount: green deal finance</heading><subsection><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1"><num>(a)</num><content><p>a regulated consumer credit agreement provides for the rate of interest on the credit to be fixed for a period of time (“the fixed rate period”),</p></content></level><level class="para1"><num>(b)</num><content><p>the agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011) which is of a duration specified for the purposes of this section in regulations, and</p></content></level><level class="para1"><num>(c)</num><content><p>under section 94 the debtor discharges all or part of his indebtedness during the fixed rate period.</p></content></level></subsection><subsection><num>(2)</num><intro><p>The creditor may claim an amount equal to the cost which the creditor has incurred as a result only of the debtor's indebtedness being discharged during the fixed rate period if—</p></intro><level class="para1"><num>(a)</num><content><p>the amount of the payment under section 94 is not paid from the proceeds of a contract of payment protection insurance, and</p></content></level><level class="para1"><num>(b)</num><content><p>such other conditions as may be specified for the purposes of this section in regulations are satisfied.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The amount in subsection (2)—</p></intro><level class="para1"><num>(a)</num><content><p>must be fair,</p></content></level><level class="para1"><num>(b)</num><content><p>must be objectively justified,</p></content></level><level class="para1"><num>(c)</num><content><p>must be calculated by the creditor in accordance with provision made for the purposes of this section in regulations, and</p></content></level><level class="para1"><num>(d)</num><content><p>must not exceed the total amount of interest that would have been paid by the debtor under the agreement in the period from the date on which the debtor makes the payment under section 94 to the date fixed by the agreement for the discharge of the indebtedness of the debtor.</p></content></level></subsection><subsection><num>(4)</num><content><p>If a creditor could claim under either section 95A or this section, the creditor may choose under which section to claim.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-29-3"><num>(3)</num><intro><p>In section 94 (right to complete payments ahead of time)—</p></intro><level class="para1" eId="section-29-3-a"><num>(a)</num><content><p><mod>in subsection (1) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-29-3-b"><num>(b)</num><content><p><mod>in subsection (5) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-29-4"><num>(4)</num><content><p><mod>In subsection (2)(c) of section 97A (duty to give information on partial repayment) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>.</mod></p></content></subsection></section><section eId="section-30"><num>30</num><heading>Power to amend Consumer Credit Act 1974</heading><subsection eId="section-30-1"><num>(1)</num><content><p>The Secretary of State may by order make such amendments to the Consumer Credit Act 1974<ins class="first last" ukl:ChangeId="key-0bb8e82a9a9824c6fb5a3055017bc416-1491332806432" ukl:CommentaryRef="key-0bb8e82a9a9824c6fb5a3055017bc416"><noteRef uk:name="commentary" href="#key-0bb8e82a9a9824c6fb5a3055017bc416" class="commentary"/>, the Financial Services and Markets Act 2000 and any statutory instrument made under that Act</ins> as the Secretary of State considers appropriate in consequence of provision made by or under this Chapter.</p></content></subsection><subsection eId="section-30-2"><num>(2)</num><intro><p>Before exercising the power under subsection (1) the Secretary of State must consult—</p></intro><level class="para1" eId="section-30-2-a"><num>(a)</num><content><p>the <ins class="substitution first last" ukl:ChangeId="key-803fdd5956001662e37b430be0cc1a4d-1491332863193" ukl:CommentaryRef="key-803fdd5956001662e37b430be0cc1a4d"><noteRef uk:name="commentary" href="#key-803fdd5956001662e37b430be0cc1a4d" class="commentary"/>Financial Conduct Authority</ins>, and</p></content></level><level class="para1" eId="section-30-2-b"><num>(b)</num><content><p>such other persons as the Secretary of State considers appropriate.</p></content></level></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-delegation-and-exercise-of-functions"><heading><i>Delegation and exercise of functions</i></heading><section eId="section-31"><num>31</num><heading>Delegation and conferring of functions</heading><subsection eId="section-31-1"><num>(1)</num><intro><p>The Secretary of State may by order provide for the following functions conferred on the Secretary of State to be exercisable instead by a public body specified in the order—</p></intro><level class="para1" eId="section-31-1-a"><num>(a)</num><content><p>any function exercisable in connection with the scheme established by the framework regulations;</p></content></level><level class="para1" eId="section-31-1-b"><num>(b)</num><content><p>any function exercisable under the framework regulations by virtue of section 6(4);</p></content></level><level class="para1" eId="section-31-1-c"><num>(c)</num><content><p>any function under regulations made under section 16.</p></content></level></subsection><subsection eId="section-31-2"><num>(2)</num><content><p>If the function of issuing a code of practice for the purposes of the scheme is specified in an order by virtue of subsection (1)(a), a draft of the code must be approved by the Secretary of State before the Secretary of State lays the draft before Parliament under section 39(2).</p></content></subsection><subsection eId="section-31-3"><num>(3)</num><content><p>If the function of revoking a code of practice issued for the purposes of the scheme is specified in an order by virtue of subsection (1)(a), the code must not be revoked without the approval of the Secretary of State.</p></content></subsection><subsection eId="section-31-4"><num>(4)</num><intro><p>The Secretary of State may by order make provision conferring administration functions on—</p></intro><level class="para1" eId="section-31-4-a"><num>(a)</num><content><p>the Secretary of State;</p></content></level><level class="para1" eId="section-31-4-b"><num>(b)</num><content><p>a public body specified in the order.</p></content></level></subsection><subsection eId="section-31-5"><num>(5)</num><content><p>For the purposes of subsection (4) administration functions are functions in connection with the administration of any provision in licences under section 7 or 7A of the Gas Act 1986 or section 6(1)(c) or (d) of the Electricity Act 1989 made by virtue of section 17(3) of this Act.</p></content></subsection><subsection eId="section-31-6"><num>(6)</num><intro><p>An order made by virtue of subsection (1) or (4)(b) may provide for—</p></intro><level class="para1" eId="section-31-6-a"><num>(a)</num><content><p>different functions to be exercisable by different public bodies;</p></content></level><level class="para1" eId="section-31-6-b"><num>(b)</num><content><p>the same function to be exercisable by different public bodies in relation to different areas.</p></content></level></subsection><subsection eId="section-31-7"><num>(7)</num><content><p>The Secretary of State may make payments to any public body specified in an order made by virtue of subsection (1).</p></content></subsection></section><section eId="section-32"><num>32</num><heading>Exercise of scheme functions on behalf of the Secretary of State or a public body</heading><subsection eId="section-32-1"><num>(1)</num><content><p>This section applies to any function exercisable in connection with the scheme established by the framework regulations.</p></content></subsection><subsection eId="section-32-2"><num>(2)</num><content><p>The Secretary of State may arrange for such a function to be exercised by any body or person on behalf of the Secretary of State.</p></content></subsection><subsection eId="section-32-3"><num>(3)</num><content><p>A public body specified in relation to such a function in an order made by virtue of section 31(1)(a) may arrange for the function to be exercised by any other body or person on its behalf.</p></content></subsection><subsection eId="section-32-4"><num>(4)</num><intro><p>Arrangements under this section—</p></intro><level class="para1" eId="section-32-4-a"><num>(a)</num><content><p>do not affect the responsibility for the exercise of the function;</p></content></level><level class="para1" eId="section-32-4-b"><num>(b)</num><content><p>may include provision for payments to be made to the body or person exercising the function under the arrangements.</p></content></level></subsection></section><section eId="section-33"><num>33</num><heading>Duty to report</heading><subsection eId="section-33-1"><num>(1)</num><content><p>This section applies if the function under section 3(1)(a) is specified in an order made by virtue of section 31(1)(a).</p></content></subsection><subsection eId="section-33-2"><num>(2)</num><intro><p>The Secretary of State may make regulations requiring the body specified in relation to that function in the order to—</p></intro><level class="para1" eId="section-33-2-a"><num>(a)</num><content><p>collect information on the specified matters, and</p></content></level><level class="para1" eId="section-33-2-b"><num>(b)</num><content><p>provide the Secretary of State with a report on those matters at the specified times.</p></content></level></subsection><subsection eId="section-33-3"><num>(3)</num><content><p>In subsection (2) “<term refersTo="#term-specified" eId="term-specified">specified</term>” means specified in the regulations.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-general"><heading><i>General</i></heading><section eId="section-34"><num>34</num><heading>Power of Secretary of State to deal with special circumstances</heading><subsection eId="section-34-1"><num>(1)</num><intro><p>The Secretary of State may by regulations make provision as to—</p></intro><level class="para1" eId="section-34-1-a"><num>(a)</num><content><p>the circumstances in which a bill payer's liability to make green deal payments to the relevant energy supplier is suspended or cancelled;</p></content></level><level class="para1" eId="section-34-1-b"><num>(b)</num><content><p>the circumstances in which any suspension of liability ends;</p></content></level><level class="para1" eId="section-34-1-c"><num>(c)</num><content><p>the consequences of any suspension or cancellation;</p></content></level><level class="para1" eId="section-34-1-d"><num>(d)</num><content><p>the circumstances in which the green deal provider may require the early repayment of the whole or part of the total of the payments outstanding under a green deal plan.</p></content></level></subsection><subsection eId="section-34-2"><num>(2)</num><intro><p>The regulations may, in particular, include provision—</p></intro><level class="para1" eId="section-34-2-a"><num>(a)</num><content><p>as to the procedure to be followed for securing a suspension or cancellation (including the payment of an administration fee calculated in accordance with the regulations);</p></content></level><level class="para1" eId="section-34-2-b"><num>(b)</num><content><p>as to how any payments due under a green deal plan during a period of suspension are to be paid;</p></content></level><level class="para1" eId="section-34-2-c"><num>(c)</num><content><p>as to the making of payments due under a green deal plan after a period of suspension;</p></content></level><level class="para1" eId="section-34-2-d"><num>(d)</num><content><p>as to the calculation of the amount payable on early repayment (including a fee calculated in accordance with the regulations).</p></content></level></subsection><subsection eId="section-34-3"><num>(3)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-34-3-a"><num>(a)</num><content><p>“<term refersTo="#term-bill-payer" eId="term-bill-payer">bill payer</term>” includes the person who would be the bill payer if the supply from the relevant energy supplier were not temporarily disconnected or the liability to make green deal payments were not suspended, and</p></content></level><level class="para1" eId="section-34-3-b"><num>(b)</num><content><p>payments are green deal payments if they are made under a green deal plan.</p></content></level></subsection></section><section eId="section-35"><num>35</num><heading>Appeals</heading><subsection eId="section-35-1"><num>(1)</num><intro><p>This section applies if provision is included in a scheme or regulations by virtue of any of the following—</p></intro><level class="para1" eId="section-35-1-a"><num>(a)</num><content><p>section 3(3)(h) or (i);</p></content></level><level class="para1" eId="section-35-1-b"><num>(b)</num><content><p>section 6(4);</p></content></level><level class="para1" eId="section-35-1-c"><num>(c)</num><content><p>section 16.</p></content></level></subsection><subsection eId="section-35-2"><num>(2)</num><content><p>The Secretary of State must by regulations provide for a right of appeal to a court or tribunal against any sanction imposed, or other action taken, by the Secretary of State or a specified public body under the provision mentioned in subsection (1).</p></content></subsection><subsection eId="section-35-3"><num>(3)</num><intro><p>Regulations under subsection (2) may, in particular, include provision—</p></intro><level class="para1" eId="section-35-3-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-35-3-b"><num>(b)</num><content><p>as to the persons who may make an appeal;</p></content></level><level class="para1" eId="section-35-3-c"><num>(c)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-35-3-d"><num>(d)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-35-3-e"><num>(e)</num><content><p>suspending the effect of a sanction or other action being appealed against, pending determination of the appeal;</p></content></level><level class="para1" eId="section-35-3-f"><num>(f)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-35-3-g"><num>(g)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-35-4"><num>(4)</num><intro><p>The provision referred to in subsection (3)(f) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-35-4-a"><num>(a)</num><content><p>to confirm the sanction imposed or action taken;</p></content></level><level class="para1" eId="section-35-4-b"><num>(b)</num><content><p>to withdraw the sanction or action;</p></content></level><level class="para1" eId="section-35-4-c"><num>(c)</num><content><p>to impose a different sanction or take different action;</p></content></level><level class="para1" eId="section-35-4-d"><num>(d)</num><content><p>to remit the decision whether to confirm the sanction or other action, or any matter relating to that decision, to the person who imposed the sanction or took the action;</p></content></level><level class="para1" eId="section-35-4-e"><num>(e)</num><content><p>to award costs or, in Scotland, expenses.</p></content></level></subsection><subsection eId="section-35-5"><num>(5)</num><content><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within subsection (3)(a), (d), (f) or (g), regulations under subsection (2) may revoke or amend any subordinate legislation.</p></content></subsection><subsection eId="section-35-6"><num>(6)</num><content><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within subsection (3)(a), (d), (f) or (g), they may by regulations revoke or amend any subordinate legislation, or any provision included in an instrument made under an Act of the Scottish Parliament, if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></content></subsection><subsection eId="section-35-7"><num>(7)</num><intro><p>In this section—</p></intro><level class="para1" eId="section-35-7-a"><num>(a)</num><content><p>“<term refersTo="#term-specified-public-body" eId="term-specified-public-body">specified public body</term>” means a public body specified in an order made by virtue of section 31(1);</p></content></level><level class="para1" eId="section-35-7-b"><num>(b)</num><content><p>“<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></level></subsection></section><section eId="section-36"><num>36</num><heading>Funding for energy efficiency advice</heading><subsection eId="section-36-1"><num>(1)</num><content><p>The Secretary of State may incur expenditure in providing qualifying advice or information or in making payments to persons who provide qualifying advice or information.</p></content></subsection><subsection eId="section-36-2"><num>(2)</num><content><p>In this section “<term refersTo="#term-qualifying-advice-or-information" eId="term-qualifying-advice-or-information">qualifying advice or information</term>” means advice or information about green deal plans or energy efficiency generally which is given to individuals or organisations.</p></content></subsection></section><section eId="section-37"><num>37</num><heading>Preparatory expenditure: framework regulations</heading><content><p>The Secretary of State may, before the framework regulations are made, incur expenditure for the purpose of, or in connection with, preparing for a scheme of the kind provided for by section 3.</p></content></section><section eId="section-38"><num>38</num><heading>Green deal installation apprenticeships</heading><subsection eId="section-38-1"><num>(1)</num><content><p>Before making the first framework regulations the Secretary of State must lay before Parliament a report on what, if any, steps the Secretary of State has taken to encourage green deal installation apprenticeships.</p></content></subsection><subsection eId="section-38-2"><num>(2)</num><content><p>A “green deal installation apprenticeship” is an apprenticeship which provides training on how to install energy efficiency improvements at properties.</p></content></subsection></section><section eId="section-39"><num>39</num><heading>Parliamentary procedure in relation to code of practice</heading><subsection eId="section-39-1"><num>(1)</num><content><p>This section makes further provision in relation to the issuing of any code of practice for the purposes of the scheme established by the framework regulations.</p></content></subsection><subsection eId="section-39-2"><num>(2)</num><content><p>Before the code is issued the Secretary of State must lay a draft of the code before Parliament.</p></content></subsection><subsection eId="section-39-3"><num>(3)</num><content><p>If, within the 40-day period, either House of Parliament resolves not to approve the draft, the code may not be issued.</p></content></subsection><subsection eId="section-39-4"><num>(4)</num><content><p>If no such resolution is made within that period, the code may be issued.</p></content></subsection><subsection eId="section-39-5"><num>(5)</num><content><p>The “<term refersTo="#term-40-day-period" eId="term-40-day-period">40-day period</term>”, in relation to a draft of a code, means the period of 40 days beginning with the day on which the draft is laid before Parliament (or, if it is not laid before each House of Parliament on the same day, the later of the 2 days on which it is laid).</p></content></subsection><subsection eId="section-39-6"><num>(6)</num><intro><p>For the purposes of calculating the 40-day period, no account is to be taken of any period during which—</p></intro><level class="para1" eId="section-39-6-a"><num>(a)</num><content><p>Parliament is dissolved or prorogued, or</p></content></level><level class="para1" eId="section-39-6-b"><num>(b)</num><content><p>both Houses are adjourned for more than 4 days.</p></content></level></subsection></section><section eId="section-40"><num>40</num><heading>Regulations and orders</heading><subsection eId="section-40-1"><num>(1)</num><content><p>Regulations and orders under this Chapter may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-40-2"><num>(2)</num><content><p>Regulations and orders under this Chapter, other than those made by the Scottish Ministers, are to be made by statutory instrument.</p></content></subsection><subsection eId="section-40-3"><num>(3)</num><content><p>A statutory instrument containing regulations or an order under this Chapter is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-40-4"><num>(4)</num><intro><p>Subsection (3) does not apply to a statutory instrument containing—</p></intro><level class="para1" eId="section-40-4-a"><num>(a)</num><content><p>regulations under section 2 or the framework regulations,</p></content></level><level class="para1" eId="section-40-4-b"><num>(b)</num><content><p>regulations under section 13, 15(1), 16, 34 or 35(2), or</p></content></level><level class="para1" eId="section-40-4-c"><num>(c)</num><content><p>an order under section 1, 2 or 30.</p></content></level></subsection><subsection eId="section-40-5"><num>(5)</num><content><p>A statutory instrument containing regulations or an order falling within subsection (4) may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection eId="section-40-6"><num>(6)</num><content><p>Regulations under section 10(2), 14(7) or (8) or 15(4) (regulations made by the Scottish Ministers) are subject to the negative procedure.</p></content></subsection><subsection eId="section-40-7"><num>(7)</num><content><p>Regulations under section 35(6) (regulations made by the Scottish Ministers) are subject to the affirmative procedure.</p></content></subsection><subsection eId="section-40-8"><num>(8)</num><intro><p>Before making regulations or an order under this Chapter extending to Scotland, the Secretary of State must—</p></intro><level class="para1" eId="section-40-8-a"><num>(a)</num><content><p>if the regulations or order contain any provision which would be within the legislative competence of the Scottish Parliament if it were contained in an Act of that Parliament, obtain the consent of the Scottish Ministers;</p></content></level><level class="para1" eId="section-40-8-b"><num>(b)</num><content><p>in any other case, consult the Scottish Ministers.</p></content></level></subsection><subsection eId="section-40-9"><num>(9)</num><intro><p>The Secretary of State must obtain the consent of the Welsh Ministers before making provision under section 35 amending or revoking—</p></intro><level class="para1" eId="section-40-9-a"><num>(a)</num><content><p>provision included in an instrument made under a Measure or Act of the National Assembly for Wales;</p></content></level><level class="para1" eId="section-40-9-b"><num>(b)</num><content><p>any other subordinate legislation made by the Welsh Ministers (or the National Assembly for Wales established under the Government of Wales Act 1998).</p></content></level></subsection><subsection eId="section-40-10"><num>(10)</num><content><p>Before amending under section 9 a provision of the Building Regulations 2010 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2010/2214), the Secretary of State must, if and so far as the function under which the provision was made is exercisable by the Welsh Ministers, obtain their consent.</p></content></subsection><subsection eId="section-40-11"><num>(11)</num><content><p>Subsections (9) and (10) do not apply to the extent that the Secretary of State is making incidental or consequential provision.</p></content></subsection><subsection eId="section-40-12"><num>(12)</num><content><p>Before making regulations or an order under this Chapter applying to Wales, the Secretary of State must consult the Welsh Ministers.</p></content></subsection><subsection eId="section-40-13"><num>(13)</num><content><p>Subsection (12) does not apply to the extent that consent has been obtained under subsection (9) or (10).</p></content></subsection></section><section eId="section-41"><num>41</num><heading>Crown application: Chapter 1</heading><content><p>This Chapter binds the Crown.</p></content></section></hcontainer></chapter> — Modifying energy licences
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-1"><num>CHAPTER 1</num><heading>Green deal</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-introductory"><heading><i>Introductory</i></heading><section eId="section-1"><num>1</num><heading>Green deal plans</heading><subsection eId="section-1-1"><num>(1)</num><content><p>This section applies for the purposes of this Chapter.</p></content></subsection><subsection eId="section-1-2"><num>(2)</num><content><p>An energy plan is an arrangement made by the occupier or owner of a property for a person to make energy efficiency improvements to the property.</p></content></subsection><subsection eId="section-1-3"><num>(3)</num><intro><p>An energy plan is a green deal plan if—</p></intro><level class="para1" eId="section-1-3-a"><num>(a)</num><content><p>the energy efficiency improvements are to be paid for wholly or partly in instalments, and</p></content></level><level class="para1" eId="section-1-3-b"><num>(b)</num><content><p>all of the requirements listed in paragraphs (a) to (e) of subsection (4) are met in relation to the plan at the time when it is made.</p></content></level></subsection><subsection eId="section-1-4"><num>(4)</num><intro><p>The requirements are—</p></intro><level class="para1" eId="section-1-4-a"><num>(a)</num><content><p>the property is an eligible property,</p></content></level><level class="para1" eId="section-1-4-b"><num>(b)</num><content><p>the energy efficiency improvements fall within a description specified in an order made by the Secretary of State (“qualifying energy improvements”),</p></content></level><level class="para1" eId="section-1-4-c"><num>(c)</num><content><p>the conditions mentioned in section 4 as to assessment of the property and other matters have been met,</p></content></level><level class="para1" eId="section-1-4-d"><num>(d)</num><content><p>the conditions mentioned in section 5 as to the terms of the plan and other matters are met, and</p></content></level><level class="para1" eId="section-1-4-e"><num>(e)</num><content><p>a relevant energy supplier supplies, or is to supply, energy to the property.</p></content></level></subsection><subsection eId="section-1-5"><num>(5)</num><intro><p>Subsection (6) applies to a green deal plan from the time when—</p></intro><level class="para1" eId="section-1-5-a"><num>(a)</num><content><p>improvements have been installed in accordance with section 7,</p></content></level><level class="para1" eId="section-1-5-b"><num>(b)</num><content><p>the plan is confirmed in accordance with section 8, and</p></content></level><level class="para1" eId="section-1-5-c"><num>(c)</num><content><p>the requirements imposed by virtue of section 9 or 10 are met.</p></content></level></subsection><subsection eId="section-1-6"><num>(6)</num><intro><p>The payments in instalments agreed in the plan are to be—</p></intro><level class="para1" eId="section-1-6-a"><num>(a)</num><content><p>made by the person who is for the time being liable to pay the energy bills for the property,</p></content></level><level class="para1" eId="section-1-6-b"><num>(b)</num><content><p>made to the relevant energy supplier through the energy bills for the property,</p></content></level><level class="para1" eId="section-1-6-c"><num>(c)</num><content><p>recoverable as a debt by the relevant energy supplier from the person referred to in paragraph (a), and</p></content></level><level class="para1" eId="section-1-6-d"><num>(d)</num><content><p>recovered and held by the relevant energy supplier as agent and trustee for the person who made the improvements (unless the relevant energy supplier is also that person).</p></content></level></subsection><subsection eId="section-1-7"><num>(7)</num><content><p>Subsection (6) applies irrespective of whether the person referred to in paragraph (a) is the person who entered into the plan.</p></content></subsection><subsection eId="section-1-8"><num>(8)</num><intro><p>Subsection (6) is subject to—</p></intro><level class="para1" eId="section-1-8-a"><num>(a)</num><content><p>provision made in regulations under section 34;</p></content></level><level class="para1" eId="section-1-8-b"><num>(b)</num><content><p>any suspension or cancellation, by virtue of provision made in regulations under section 3(3)(h) or (i), 6(4), 16 or 35, of liability to make payments.</p></content></level></subsection><subsection eId="section-1-9"><num>(9)</num><content><p>For the purposes of subsection (4)(a) a property is an eligible property unless it falls within a description specified in an order made by the Secretary of State.</p></content></subsection></section><section eId="section-2"><num>2</num><heading>Green deal plans: supplementary</heading><subsection eId="section-2-1"><num>(1)</num><content><p>This section applies for the purposes of this Chapter.</p></content></subsection><subsection eId="section-2-2"><num>(2)</num><content><p>The occupier or owner who makes the arrangement referred to in section 1(2) is the “improver” and the person who makes the improvements is the “green deal provider”.</p></content></subsection><subsection eId="section-2-3"><num>(3)</num><content><p>The person referred to in section 1(6)(a) is the “bill payer”.</p></content></subsection><subsection eId="section-2-4"><num>(4)</num><intro><p>References to energy efficiency improvements, in relation to a property, are to—</p></intro><level class="para1" eId="section-2-4-a"><num>(a)</num><content><p>measures for improving efficiency in the use in the property of electricity, gas conveyed through pipes or any other source of energy which is specified in an order made by the Secretary of State, or</p></content></level><level class="para1" eId="section-2-4-b"><num>(b)</num><content><p>measures falling within subsection (5) or (6).</p></content></level></subsection><subsection eId="section-2-5"><num>(5)</num><intro><p>Measures fall within this subsection if—</p></intro><level class="para1" eId="section-2-5-a"><num>(a)</num><intro><p>they are any of the following—</p></intro><level class="para2" eId="section-2-5-a-i"><num>(i)</num><content><p>measures for increasing the amount of electricity generated, or heat produced, by microgeneration (within the meaning given by section 26(1) of the Climate Change and Sustainable Energy Act 2006);</p></content></level><level class="para2" eId="section-2-5-a-ii"><num>(ii)</num><content><p>any other measures for increasing the amount of electricity generated, or heat produced, using low-emissions sources or technologies;</p></content></level><level class="para2" eId="section-2-5-a-iii"><num>(iii)</num><content><p>measures for reducing the consumption of such energy as is mentioned in subsection (4), and</p></content></level></level><level class="para1" eId="section-2-5-b"><num>(b)</num><content><p>they are specified in an order made by the Secretary of State.</p></content></level></subsection><subsection eId="section-2-6"><num>(6)</num><intro><p>Measures fall within this subsection if—</p></intro><level class="para1" eId="section-2-6-a"><num>(a)</num><intro><p>they are installed at the property for the purpose of supplying to it any of the following types of energy—</p></intro><level class="para2" eId="section-2-6-a-i"><num>(i)</num><content><p>electricity generated by a generating station operated for the purposes of producing heat, or a cooling effect, in association with electricity;</p></content></level><level class="para2" eId="section-2-6-a-ii"><num>(ii)</num><content><p>heat produced in association with electricity or steam produced from (or air or water heated by) such heat;</p></content></level><level class="para2" eId="section-2-6-a-iii"><num>(iii)</num><content><p>any gas or liquid subjected to a cooling effect produced in association with electricity, and</p></content></level></level><level class="para1" eId="section-2-6-b"><num>(b)</num><content><p>they are specified in an order made by the Secretary of State.</p></content></level></subsection><subsection eId="section-2-7"><num>(7)</num><content><p>For the purposes of subsection (5)(a)(ii) electricity is generated, or heat is produced, using low-emissions sources or technologies if it is generated, or produced, by plant which relies wholly or mainly on a source of energy or a technology mentioned in section 26(2) of the Climate Change and Sustainable Energy Act 2006.</p></content></subsection><subsection eId="section-2-8"><num>(8)</num><content><p>For the purposes of subsection (6) “generating station” and “supplying” are to be read in accordance with section 64(1) of the Electricity Act 1989.</p></content></subsection><subsection eId="section-2-9"><num>(9)</num><content><p>“Energy” (except in this section), “energy bill”, “occupier”, “owner” and “relevant energy supplier” have the meaning given in regulations made by the Secretary of State.</p></content></subsection><subsection eId="section-2-10"><num>(10)</num><content><p>Regulations under subsection (9) may also make provision as to the circumstances in which a person who is not a bill payer for the purposes of this Chapter may be treated as a bill payer for those purposes.</p></content></subsection></section><section eId="section-3"><num>3</num><heading>Framework regulations</heading><subsection eId="section-3-1"><num>(1)</num><intro><p>The Secretary of State must by regulations establish a scheme making provision for the Secretary of State—</p></intro><level class="para1" eId="section-3-1-a"><num>(a)</num><content><p>to authorise persons to act as green deal assessors, green deal providers or green deal installers in connection with green deal plans (either individually or through membership of a body specified in, or authorised under, the scheme);</p></content></level><level class="para1" eId="section-3-1-b"><num>(b)</num><content><p>to regulate the conduct of those assessors, providers or installers (“green deal participants”).</p></content></level></subsection><subsection eId="section-3-2"><num>(2)</num><content><p>Regulations under subsection (1) are referred to in this Chapter as “<term refersTo="#term-the-framework-regulations" eId="term-the-framework-regulations">the framework regulations</term>”.</p></content></subsection><subsection eId="section-3-3"><num>(3)</num><intro><p>The scheme established by the framework regulations may, in particular, make provision—</p></intro><level class="para1" eId="section-3-3-a"><num>(a)</num><content><p>requiring the payment of a fee in connection with initial or continued authorisation under the scheme;</p></content></level><level class="para1" eId="section-3-3-b"><num>(b)</num><content><p>for the establishment and maintenance of a register of green deal participants and of persons from whom authorisation under the scheme has been withdrawn;</p></content></level><level class="para1" eId="section-3-3-c"><num>(c)</num><content><p>requiring green deal participants to provide the information required under the scheme;</p></content></level><level class="para1" eId="section-3-3-d"><num>(d)</num><content><p>for the issuing, revision or revocation of a code of practice;</p></content></level><level class="para1" eId="section-3-3-e"><num>(e)</num><content><p>requiring green deal participants to comply with the code of practice as a condition of their authorisation;</p></content></level><level class="para1" eId="section-3-3-f"><num>(f)</num><content><p>requiring green deal providers to enter into an agreement with the holder of a licence under section 7 or 7A of the Gas Act 1986 (gas transporter, shipper or supply licences) or section 6(1)(c) or (d) of the Electricity Act 1989 (electricity distributor and supply licences) and to comply with that agreement as a condition of their authorisation;</p></content></level><level class="para1" eId="section-3-3-g"><num>(g)</num><content><p>requiring that an agreement mentioned in paragraph (f) be approved by the Secretary of State before being entered into;</p></content></level><level class="para1" eId="section-3-3-h"><num>(h)</num><content><p>for securing compliance with any condition or any other requirement of the scheme, code or agreement;</p></content></level><level class="para1" eId="section-3-3-i"><num>(i)</num><content><p>as to the consequences of non-compliance with any such condition or requirement.</p></content></level></subsection><subsection eId="section-3-4"><num>(4)</num><intro><p>The code of practice issued for the purposes of the scheme may, in particular, make provision—</p></intro><level class="para1" eId="section-3-4-a"><num>(a)</num><content><p>as to the qualification and training of green deal participants;</p></content></level><level class="para1" eId="section-3-4-b"><num>(b)</num><content><p>as to their handling of queries or complaints;</p></content></level><level class="para1" eId="section-3-4-c"><num>(c)</num><content><p>requiring green deal participants to have such arrangements for insurance as are specified in the code;</p></content></level><level class="para1" eId="section-3-4-d"><num>(d)</num><content><p>as to the payment of green deal assessors by green deal providers or green deal installers and the payment of green deal installers by green deal providers;</p></content></level><level class="para1" eId="section-3-4-e"><num>(e)</num><content><p>as to the circumstances in which green deal assessors may charge customers for qualifying assessments of properties and as to the amount of any such charge;</p></content></level><level class="para1" eId="section-3-4-f"><num>(f)</num><content><p>requiring green deal assessors to act with impartiality;</p></content></level><level class="para1" eId="section-3-4-g"><num>(g)</num><content><p>as to the provision of information by green deal providers to improvers and bill payers and prospective improvers and bill payers;</p></content></level><level class="para1" eId="section-3-4-h"><num>(h)</num><content><p>as to marketing in connection with green deal plans.</p></content></level></subsection><subsection eId="section-3-5"><num>(5)</num><content><p>The code may include provision for regulating a body specified or authorised for the purposes of subsection (1)(a).</p></content></subsection><subsection eId="section-3-6"><num>(6)</num><content><p>The scheme and the code may make different provision for different circumstances or cases or for different purposes.</p></content></subsection><subsection eId="section-3-7"><num>(7)</num><content><p>The provision made by the scheme or code in relation to green deal participants may also extend to matters in connection with any energy plans which are not green deal plans.</p></content></subsection><subsection eId="section-3-8"><num>(8)</num><intro><p>The provision made for the purposes of subsection (3)(h) or (i) may, in particular, include provision enabling the Secretary of State to—</p></intro><level class="para1" eId="section-3-8-a"><num>(a)</num><content><p>cancel any liability to pay for a qualifying assessment of a property;</p></content></level><level class="para1" eId="section-3-8-b"><num>(b)</num><content><p>require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-3-8-c"><num>(c)</num><content><p>require a green deal participant to rectify a qualifying energy improvement or its installation;</p></content></level><level class="para1" eId="section-3-8-d"><num>(d)</num><content><p>require a green deal participant to pay compensation or a financial penalty;</p></content></level><level class="para1" eId="section-3-8-e"><num>(e)</num><content><p>withdraw, or require a body specified or authorised for the purposes of subsection (1)(a) to withdraw, an authorisation to act as a green deal participant;</p></content></level><level class="para1" eId="section-3-8-f"><num>(f)</num><content><p>withdraw authorisation from a body authorised for the purposes of subsection (1)(a) as a body whose members are authorised to act as green deal participants.</p></content></level></subsection><subsection eId="section-3-9"><num>(9)</num><content><p>For the purposes of this section references to a qualifying assessment are to an energy efficiency assessment which meets the requirements specified in the framework regulations and deals with such other matters as may be so specified.</p></content></subsection><subsection eId="section-3-10"><num>(10)</num><content><p>This section is without prejudice to the powers conferred on the Secretary of State by other provisions of this Chapter to make provision in or under the framework regulations.</p></content></subsection><subsection eId="section-3-11"><num>(11)</num><content><p>In this Chapter references to a code of practice include references to a code of practice which has been revised by virtue of subsection (3)(d).</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-green-deal-plan"><heading><i>Green deal plan</i></heading><section eId="section-4"><num>4</num><heading>Assessment of property <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-4-1"><num>(1)</num><intro><p>For the purposes of section 1(4)(c) the conditions as to assessment of the property and other matters are—</p></intro><level class="para1" eId="section-4-1-a"><num>(a)</num><content><p>the conditions set out in subsections (2) to (9), and</p></content></level><level class="para1" eId="section-4-1-b"><num>(b)</num><content><p>such other conditions (whether relating to the green deal assessor, the green deal provider, the improver or any other person) as are specified in the framework regulations.</p></content></level></subsection><subsection eId="section-4-2"><num>(2)</num><content><p>The first condition is that a qualifying assessment of the property has been carried out by a person authorised by virtue of the framework regulations to act as a green deal assessor.</p></content></subsection><subsection eId="section-4-3"><num>(3)</num><content><p>The second condition is that the green deal assessor has recommended the energy efficiency improvements.</p></content></subsection><subsection eId="section-4-4"><num>(4)</num><content><p>The third condition is that the green deal provider has given an estimate, on the basis specified in the framework regulations, of the savings likely to be made on the energy bills for the property if the improvements are carried out.</p></content></subsection><subsection eId="section-4-5"><num>(5)</num><content><p>The fourth condition is that the green deal provider has given an estimate, on the basis specified in the framework regulations, of the period over which the savings mentioned in subsection (4) are likely to be made.</p></content></subsection><subsection eId="section-4-6"><num>(6)</num><content><p>The fifth condition is that the green deal provider is authorised by virtue of the framework regulations to act as a green deal provider.</p></content></subsection><subsection eId="section-4-7"><num>(7)</num><content><p>The sixth condition is that the green deal provider has offered to carry out the improvements on the basis that the whole or part of the cost will be repaid in instalments over a period after the improvements have been made.</p></content></subsection><subsection eId="section-4-8"><num>(8)</num><intro><p>The seventh condition is that the green deal provider meets any requirement specified in the framework regulations as to the relationship between—</p></intro><level class="para1" eId="section-4-8-a"><num>(a)</num><content><p>the estimated total of the proposed instalments, and</p></content></level><level class="para1" eId="section-4-8-b"><num>(b)</num><content><p>the estimate mentioned in subsection (4).</p></content></level></subsection><subsection eId="section-4-9"><num>(9)</num><intro><p>The eighth condition is that the green deal provider meets any requirement specified in the framework regulations as to the relationship between—</p></intro><level class="para1" eId="section-4-9-a"><num>(a)</num><content><p>the period for which the instalments are proposed to be paid, and</p></content></level><level class="para1" eId="section-4-9-b"><num>(b)</num><content><p>the period estimated under subsection (5).</p></content></level></subsection><subsection eId="section-4-10"><num>(10)</num><content><p>In subsection (2) the reference to a qualifying assessment is to be read in accordance with section 3(9).</p></content></subsection></section><section eId="section-5"><num>5</num><heading>Terms of plan <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-5-1"><num>(1)</num><intro><p>For the purposes of section 1(4)(d), the conditions as to the terms of the plan and other matters are—</p></intro><level class="para1" eId="section-5-1-a"><num>(a)</num><content><p>the conditions set out in subsections (2) to (4), and</p></content></level><level class="para1" eId="section-5-1-b"><num>(b)</num><content><p>such other conditions as are specified in the framework regulations.</p></content></level></subsection><subsection eId="section-5-2"><num>(2)</num><intro><p>The first condition is that the plan includes the following terms—</p></intro><level class="para1" eId="section-5-2-a"><num>(a)</num><intro><p>a term in which the improver agrees to—</p></intro><level class="para2" eId="section-5-2-a-i"><num>(i)</num><content><p>the amounts of the payments in instalments and the intervals at which, and period for which, they are payable;</p></content></level><level class="para2" eId="section-5-2-a-ii"><num>(ii)</num><content><p>such other matters as are specified in the regulations;</p></content></level></level><level class="para1" eId="section-5-2-b"><num>(b)</num><content><p>a term in which the improver confirms that any necessary permissions or consents have been obtained in respect of the improvements;</p></content></level><level class="para1" eId="section-5-2-c"><num>(c)</num><content><p>a term providing that the green deal provider may not take a charge over any person's property by way of security for payments;</p></content></level><level class="para1" eId="section-5-2-d"><num>(d)</num><content><p>a term providing that the green deal plan does not prevent the bill payer from changing the intervals at which energy bills are to be paid.</p></content></level></subsection><subsection eId="section-5-3"><num>(3)</num><intro><p>The second condition is that the plan does not include any of the following terms—</p></intro><level class="para1" eId="section-5-3-a"><num>(a)</num><content><p>a term making a person liable to make any payments under the green deal plan otherwise than in respect of the period for which the person is the bill payer in relation to the property;</p></content></level><level class="para1" eId="section-5-3-b"><num>(b)</num><content><p>a term requiring the bill payer to make in any circumstances an early repayment of the whole or part of the amount outstanding under the green deal plan (except in accordance with the framework regulations or regulations under section 34, or provision made under them);</p></content></level><level class="para1" eId="section-5-3-c"><num>(c)</num><content><p>a term providing for money to be advanced to the improver (except in accordance with the framework regulations or provision made under them).</p></content></level></subsection><subsection eId="section-5-4"><num>(4)</num><content><p>The third condition is that the agreements mentioned in paragraph (a) of subsection (2) and the permissions and consents mentioned in paragraph (b) of that subsection have not been withdrawn before the end of the period of 14 days beginning with the last day on which they were given.</p></content></subsection><subsection eId="section-5-5"><num>(5)</num><intro><p>The conditions which may be specified in the framework regulations by virtue of subsection (1)(b) include, in particular—</p></intro><level class="para1" eId="section-5-5-a"><num>(a)</num><content><p>a condition that the plan includes a term so specified enabling the early repayment of the whole or part of the amount outstanding under the plan and making provision as to the calculation of the amount payable and any fee,</p></content></level><level class="para1" eId="section-5-5-b"><num>(b)</num><content><p>a condition that the plan includes a term so specified guaranteeing the improvements and making provision as to who is to benefit from the guarantee,</p></content></level><level class="para1" eId="section-5-5-c"><num>(c)</num><content><p>a condition that the plan includes a term so specified as to how any problems with the improvements installed, or arising in connection with the installation of them, are to be dealt with, and</p></content></level><level class="para1" eId="section-5-5-d"><num>(d)</num><content><p>a condition requiring the agreements mentioned in subsection (2)(a) to be in the form specified in the framework regulations.</p></content></level></subsection><subsection eId="section-5-6"><num>(6)</num><content><p>References in this section to the agreements mentioned in subsection (2)(a) include references to the consent required by virtue of section 6(2)(a).</p></content></subsection></section><section eId="section-6"><num>6</num><heading>Consents and redress <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-6-1"><num>(1)</num><intro><p>The framework regulations may make provision for dealing with cases where—</p></intro><level class="para1" eId="section-6-1-a"><num>(a)</num><content><p>at the time when a plan is entered into the improver and the bill payer are different persons;</p></content></level><level class="para1" eId="section-6-1-b"><num>(b)</num><content><p>the bill payer at the time when a plan is entered into is a different person from the bill payer at any subsequent time (a “subsequent bill payer”).</p></content></level></subsection><subsection eId="section-6-2"><num>(2)</num><intro><p>Provision which may be made by virtue of subsection (1) includes—</p></intro><level class="para1" eId="section-6-2-a"><num>(a)</num><content><p>provision requiring the term included in the plan by virtue of section 5(2)(a)(i) to be one to which the bill payer mentioned in subsection (1)(a) has consented, and</p></content></level><level class="para1" eId="section-6-2-b"><num>(b)</num><content><p>provision as to the terms of the plan which are to bind or benefit that bill payer or a subsequent bill payer.</p></content></level></subsection><subsection eId="section-6-3"><num>(3)</num><content><p>Subsection (1) is subject to section 1(6).</p></content></subsection><subsection eId="section-6-4"><num>(4)</num><content><p>The framework regulations may make provision for the purpose of providing redress in cases where a permission or consent mentioned in section 5(2)(b) was not obtained or was improperly obtained.</p></content></subsection><subsection eId="section-6-5"><num>(5)</num><intro><p>Provision included in framework regulations by virtue of subsection (4) may, in particular, enable the Secretary of State to—</p></intro><level class="para1" eId="section-6-5-a"><num>(a)</num><content><p>require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-6-5-b"><num>(b)</num><content><p>require a green deal provider to refund any such payments that have already been made;</p></content></level><level class="para1" eId="section-6-5-c"><num>(c)</num><content><p>require an improver to pay compensation to the green deal provider in respect of the suspension, cancellation or refund.</p></content></level></subsection></section><section eId="section-7"><num>7</num><heading>Installation of improvements</heading><subsection eId="section-7-1"><num>(1)</num><content><p>For the purposes of section 1(5)(a) improvements are installed in accordance with this section if the following three conditions are met.</p></content></subsection><subsection eId="section-7-2"><num>(2)</num><content><p>The first condition is that the person carrying out the installation of the improvements is authorised by virtue of the framework regulations to act as a green deal installer.</p></content></subsection><subsection eId="section-7-3"><num>(3)</num><intro><p>The second condition is that any product installed in making the improvements—</p></intro><level class="para1" eId="section-7-3-a"><num>(a)</num><content><p>meets the standard specified in the code of practice in relation to the product or description of product, or</p></content></level><level class="para1" eId="section-7-3-b"><num>(b)</num><intro><p>is listed in a document which—</p></intro><level class="para2" eId="section-7-3-b-i"><num>(i)</num><content><p>is issued by the Secretary of State or a person authorised by the Secretary of State in connection with the code, and</p></content></level><level class="para2" eId="section-7-3-b-ii"><num>(ii)</num><content><p>is referred to in the code as listing the products which are to be taken as meeting the required standard.</p></content></level></level></subsection><subsection eId="section-7-4"><num>(4)</num><content><p>In specifying the standard in relation to a product or description of product for the purposes of subsection (3)(a), the code of practice may make provision as to the testing and certification of the product or description of product.</p></content></subsection><subsection eId="section-7-5"><num>(5)</num><content><p>The third condition is that the carrying out of the installation meets the standard specified in the code of practice.</p></content></subsection><subsection eId="section-7-6"><num>(6)</num><content><p>In this section references to the code of practice are to the code of practice issued for the purposes of the scheme under the framework regulations.</p></content></subsection></section><section eId="section-8"><num>8</num><heading>Confirmation of plan</heading><subsection eId="section-8-1"><num>(1)</num><content><p>For the purposes of section 1(5)(b) an arrangement is confirmed in accordance with this section if the following two conditions are met.</p></content></subsection><subsection eId="section-8-2"><num>(2)</num><intro><p>The first condition is that the relevant energy supplier notifies the bill payer—</p></intro><level class="para1" eId="section-8-2-a"><num>(a)</num><content><p>that payments for the energy efficiency improvements to the property are to be included in the energy bills for the property from the date specified in the notification, and</p></content></level><level class="para1" eId="section-8-2-b"><num>(b)</num><content><p>of the amounts of those payments and the period for which they are to be made.</p></content></level></subsection><subsection eId="section-8-3"><num>(3)</num><content><p>The date mentioned in subsection (2)(a) must not fall earlier than the end of the period specified in the framework regulations.</p></content></subsection><subsection eId="section-8-4"><num>(4)</num><intro><p>The second condition is that, as soon as practicable after the improvements have been installed, the green deal provider takes one or more of the following actions as required by the framework regulations in the circumstances—</p></intro><level class="para1" eId="section-8-4-a"><num>(a)</num><content><p>producing a document containing such information in connection with the plan as is specified in the regulations in the form so specified,</p></content></level><level class="para1" eId="section-8-4-b"><num>(b)</num><content><p>securing that a document of a description specified in the regulations is produced, or</p></content></level><level class="para1" eId="section-8-4-c"><num>(c)</num><content><p>securing that a document of such a description is updated.</p></content></level></subsection><subsection eId="section-8-5"><num>(5)</num><content><p>The reference in this section to securing that a document is updated includes a reference to securing that a document is replaced by a document of the same description.</p></content></subsection><subsection eId="section-8-6"><num>(6)</num><content><p>Sections 9 and 10 make further provision in relation to the second condition.</p></content></subsection></section><section eId="section-9"><num>9</num><heading>Confirmation of plan: supplementary provision for England and Wales</heading><subsection eId="section-9-1"><num>(1)</num><content><p>Subsection (2) applies if, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2007 Regulations or the 2010 Regulations.</p></content></subsection><subsection eId="section-9-2"><num>(2)</num><content><p>The Secretary of State may by regulations make provision amending the 2007 Regulations or the 2010 Regulations or both (as the case may require) in connection with a document required to be produced or updated by virtue of section 8(4)(b) or (c).</p></content></subsection><subsection eId="section-9-3"><num>(3)</num><content><p>The amendments made by virtue of subsection (2) may, in particular, include amendments for the purpose of requiring a document to contain additional or updated information in connection with the plan or the improvements installed under the plan.</p></content></subsection><subsection eId="section-9-4"><num>(4)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-the-2007-regulations" eId="term-the-2007-regulations">the 2007 Regulations</term>” means the Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2007/991);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-2010-regulations" eId="term-the-2010-regulations">the 2010 Regulations</term>” means the Building Regulations 2010 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2010/2214).</p></content></hcontainer></subsection></section><section eId="section-10"><num>10</num><heading>Confirmation of plan: supplementary provision for Scotland</heading><subsection eId="section-10-1"><num>(1)</num><content><p>Subsection (2) applies if, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2008 Regulations.</p></content></subsection><subsection eId="section-10-2"><num>(2)</num><content><p>The Scottish Ministers may by regulations make provision amending the 2008 Regulations in connection with a document required to be produced or updated by virtue of section 8(4)(b) or (c).</p></content></subsection><subsection eId="section-10-3"><num>(3)</num><content><p>The amendments made by virtue of subsection (2) may, in particular, include amendments for the purpose of requiring a document to contain additional or updated information in connection with the plan or the improvements installed under the plan.</p></content></subsection><subsection eId="section-10-4"><num>(4)</num><content><p>In this section “<term refersTo="#term-the-2008-regulations" eId="term-the-2008-regulations">the 2008 Regulations</term>” means the Energy Performance of Buildings (Scotland) Regulations 2008 (<abbr class="acronym" title="Scottish Statutory Instrument">S.S.I.</abbr> 2008/309).</p></content></subsection></section><section eId="section-11"><num>11</num><heading>Updating information produced under section 8</heading><hcontainer name="wrapper2"><subsection eId="section-11-1"><num>(1)</num><content><p>The framework regulations may make provision as to the circumstances in which a document produced for the purposes of section 8(4)(a) is required to be updated in accordance with the regulations.</p></content></subsection><subsection eId="section-11-2"><num>(2)</num><content><p>Subsection (6) applies if one or more of the first, second or third conditions is met.</p></content></subsection><subsection eId="section-11-3"><num>(3)</num><intro><p>The first condition is that—</p></intro><level class="para1" eId="section-11-3-a"><num>(a)</num><content><p>by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2007 Regulations or the 2010 Regulations, and</p></content></level><level class="para1" eId="section-11-3-b"><num>(b)</num><content><p>provision is made in the 2007 Regulations or the 2010 Regulations or both by virtue of section 9(3) to require a document of that description to contain additional or updated information.</p></content></level></subsection><subsection eId="section-11-4"><num>(4)</num><intro><p>The second condition is that—</p></intro><level class="para1" eId="section-11-4-a"><num>(a)</num><content><p>by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2008 Regulations, and</p></content></level><level class="para1" eId="section-11-4-b"><num>(b)</num><content><p>provision is made in the 2008 Regulations by virtue of section 10(3) to require a document of that description to contain additional or updated information.</p></content></level></subsection><subsection eId="section-11-5"><num>(5)</num><content><p>The third condition is that, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description other than one falling within subsection (3) or (4).</p></content></subsection><subsection eId="section-11-6"><num>(6)</num><intro><p>The framework regulations may make provision as to the circumstances in which<ins class="substitution first" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3"><noteRef uk:name="commentary" href="#key-dfc5221cba708fe22339d7edef4760f3" class="commentary"/>—</ins></p></intro><level class="para1" eId="section-11-6-a"><num><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">(a)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">data from which a document of a description falling within subsection (3) or (4) may be produced, or</ins></p></content></level></subsection><level class="para1" eId="section-11-b"><num><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">(b)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">a document of a description falling within subsection (5),</ins></p></content></level></hcontainer><hcontainer name="wrapper2"><intro><p><ins class="substitution last" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">is</ins> required to be updated or further updated in accordance with provision made by the Secretary of State in the regulations.</p></intro><subsection eId="section-11-7"><num>(7)</num><content><p>In subsection (3) “<term refersTo="#term-the-2007-regulations" eId="term-the-2007-regulations">the 2007 Regulations</term>” and “<term refersTo="#term-the-2010-regulations" eId="term-the-2010-regulations">the 2010 Regulations</term>” have the same meaning as in section 9.</p></content></subsection><subsection eId="section-11-8"><num>(8)</num><content><p>In subsection (4) “<term refersTo="#term-the-2008-regulations" eId="term-the-2008-regulations">the 2008 Regulations</term>” has the same meaning as in section 10.</p></content></subsection><subsection eId="section-11-9"><num>(9)</num><content><p>In this section references to a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1491329299599" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> being required to be updated or further updated include references to a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1495547783705" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> being required to be replaced by a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1495547785898" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> of the same description.</p></content></subsection></hcontainer></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-disclosure-of-green-deal-plan-etc"><heading><i>Disclosure of green deal plan <abbr title="Et cetera" xml:lang="la">etc</abbr></i></heading><section eId="section-12"><num>12</num><heading>Disclosure of green deal plan <abbr title="Et cetera" xml:lang="la">etc</abbr> in connection with sale or letting out</heading><subsection eId="section-12-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-12-1-a"><num>(a)</num><content><p>a green deal property, or a lease of such a property, is to be sold, or</p></content></level><level class="para1" eId="section-12-1-b"><num>(b)</num><intro><p>a green deal property is to be let out—</p></intro><level class="para2" eId="section-12-1-b-i"><num>(i)</num><content><p>under a tenancy or licence agreement, and</p></content></level><level class="para2" eId="section-12-1-b-ii"><num>(ii)</num><content><p>on the basis that the prospective tenant or licensee is to be liable for paying the energy bills for the property.</p></content></level></level></subsection><subsection eId="section-12-2"><num>(2)</num><intro><p>The seller or prospective landlord or licensor must, in relation to the document, or each document, required to be produced or updated as mentioned in section 8(4)—</p></intro><level class="para1" eId="section-12-2-a"><num>(a)</num><content><p>obtain the document or, if the requirement to produce or update the document has not yet been complied with, produce a document containing the same information in connection with the green deal plan as that document would have contained, and</p></content></level><level class="para1" eId="section-12-2-b"><num>(b)</num><content><p>provide the document free of charge to any prospective buyer, tenant or licensee at the specified time.</p></content></level></subsection><subsection eId="section-12-3"><num>(3)</num><content><p>An obligation under subsection (2) may be discharged by an agent.</p></content></subsection><subsection eId="section-12-4"><num>(4)</num><intro><p>For the purposes of subsection (2) a person becomes a prospective buyer, tenant or licensee in relation to a property when the person—</p></intro><level class="para1" eId="section-12-4-a"><num>(a)</num><content><p>requests any information about the property from the seller, prospective landlord or licensor or an agent for the purpose of deciding whether to buy or let the property,</p></content></level><level class="para1" eId="section-12-4-b"><num>(b)</num><content><p>makes a request to view the property for the purpose mentioned in paragraph (a), or</p></content></level><level class="para1" eId="section-12-4-c"><num>(c)</num><content><p>makes an offer, whether oral or written, to buy or let the property.</p></content></level></subsection><subsection eId="section-12-5"><num>(5)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-12-5-a"><num>(a)</num><content><p>an agent is a person acting on behalf of a seller or prospective landlord or licensor in the sale or letting out of a property;</p></content></level><level class="para1" eId="section-12-5-b"><num>(b)</num><content><p>a property is a green deal property if there is a green deal plan in respect of the property and payments are still to be made under that plan;</p></content></level><level class="para1" eId="section-12-5-c"><num>(c)</num><content><p>specified, in relation to a time, means specified in regulations made by the Secretary of State.</p></content></level></subsection><subsection eId="section-12-6"><num>(6)</num><content><p>The Secretary of State may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection></section><section eId="section-13"><num>13</num><heading>Disclosure of green deal plan in connection with other transactions <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-13-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-13-1-a"><num>(a)</num><content><p>there is to be a transaction or other arrangement in respect of a green deal property (not falling within section 12(1)), and</p></content></level><level class="para1" eId="section-13-1-b"><num>(b)</num><content><p>the transaction or arrangement is of a description specified in regulations made by the Secretary of State.</p></content></level></subsection><subsection eId="section-13-2"><num>(2)</num><intro><p>The regulations may require a person of a description specified in the regulations to—</p></intro><level class="para1" eId="section-13-2-a"><num>(a)</num><content><p>obtain a document required to be produced or updated as mentioned in section 8(4) or, if the requirement to produce or update such a document has not yet been complied with, produce a document containing the same information in connection with the green deal plan as that document would have contained, and</p></content></level><level class="para1" eId="section-13-2-b"><num>(b)</num><content><p>provide the document free of charge to a person of a description specified in the regulations at the time so specified.</p></content></level></subsection><subsection eId="section-13-3"><num>(3)</num><content><p>The regulations may provide for an obligation imposed on a person by virtue of subsection (2) to be discharged by a person acting on the person's behalf.</p></content></subsection><subsection eId="section-13-4"><num>(4)</num><content><p>In this section the reference to a green deal property is to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-14"><num>14</num><heading>Acknowledgment of green deal plan on sale or letting out</heading><subsection eId="section-14-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-14-1-a"><num>(a)</num><content><p>a green deal property, or a lease of such a property, is to be sold, or</p></content></level><level class="para1" eId="section-14-1-b"><num>(b)</num><intro><p>a green deal property is to be let out—</p></intro><level class="para2" eId="section-14-1-b-i"><num>(i)</num><content><p>under a tenancy or licence agreement which is in writing, and</p></content></level><level class="para2" eId="section-14-1-b-ii"><num>(ii)</num><content><p>on the basis that the prospective tenant or licensee is to be liable for paying the energy bills for the property.</p></content></level></level></subsection><subsection eId="section-14-2"><num>(2)</num><content><p>The seller or prospective landlord or licensor must secure that the contract for sale or tenancy or licence agreement includes an acknowledgment by the buyer, tenant or licensee that the bill payer at the property is liable to make payments under the green deal plan and that certain terms of that plan are binding on the bill payer.</p></content></subsection><subsection eId="section-14-3"><num>(3)</num><content><p>Subsections (4) and (5) apply where the green deal property is in England or Wales.</p></content></subsection><subsection eId="section-14-4"><num>(4)</num><content><p>An acknowledgment required by subsection (2) must be in the form prescribed in regulations made by the Secretary of State.</p></content></subsection><subsection eId="section-14-5"><num>(5)</num><content><p>The Secretary of State may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection><subsection eId="section-14-6"><num>(6)</num><content><p>Subsections (7) and (8) apply where the green deal property is in Scotland.</p></content></subsection><subsection eId="section-14-7"><num>(7)</num><content><p>The acknowledgment required by subsection (2) must be in the form prescribed in regulations made by the Scottish Ministers.</p></content></subsection><subsection eId="section-14-8"><num>(8)</num><content><p>The Scottish Ministers may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection><subsection eId="section-14-9"><num>(9)</num><content><p>In this section references to a green deal property are to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-15"><num>15</num><heading>Acknowledgment of green deal plan in connection with other transactions <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-15-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-15-1-a"><num>(a)</num><content><p>there is to be a transaction or other arrangement in respect of a green deal property (not falling within section 14(1)), and</p></content></level><level class="para1" eId="section-15-1-b"><num>(b)</num><content><p>the transaction or arrangement is of a description specified in regulations made under this subsection by the Secretary of State.</p></content></level></subsection><subsection eId="section-15-2"><num>(2)</num><intro><p>Regulations under subsection (1) may require a person of a description specified in the regulations to secure, at a time and in a document so specified, that an acknowledgment is made by a person of a description so specified that—</p></intro><level class="para1" eId="section-15-2-a"><num>(a)</num><content><p>the bill payer at the property is liable to make payments under the green deal plan, and</p></content></level><level class="para1" eId="section-15-2-b"><num>(b)</num><content><p>certain terms of that plan are binding on the bill payer.</p></content></level></subsection><subsection eId="section-15-3"><num>(3)</num><content><p>Where the green deal property is in England or Wales, regulations made by the Secretary of State under this subsection may provide for any acknowledgment required by virtue of subsection (2) to be in the form prescribed in the regulations under this subsection.</p></content></subsection><subsection eId="section-15-4"><num>(4)</num><content><p>Where the green deal property is in Scotland, regulations made by the Scottish Ministers under this subsection may provide for any acknowledgment required by virtue of subsection (2) to be in the form prescribed in the regulations under this subsection.</p></content></subsection><subsection eId="section-15-5"><num>(5)</num><content><p>In this section references to a green deal property are to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-16"><num>16</num><heading>Sanctions for non-compliance with obligations under sections 12 to 15</heading><subsection eId="section-16-1"><num>(1)</num><intro><p>The Secretary of State may make regulations—</p></intro><level class="para1" eId="section-16-1-a"><num>(a)</num><content><p>for the purpose of securing compliance with the obligations set out in section 12 or 14 or imposed by virtue of regulations under section 13 or 15;</p></content></level><level class="para1" eId="section-16-1-b"><num>(b)</num><content><p>as to the consequences of non-compliance with the obligations.</p></content></level></subsection><subsection eId="section-16-2"><num>(2)</num><intro><p>The regulations may, in particular, include provision—</p></intro><level class="para1" eId="section-16-2-a"><num>(a)</num><content><p>as to sanctions for non-compliance with the obligations (including the imposition of a civil penalty);</p></content></level><level class="para1" eId="section-16-2-b"><num>(b)</num><content><p>enabling the Secretary of State to require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-16-2-c"><num>(c)</num><content><p>enabling the Secretary of State to require a green deal provider to refund any such payments that have already been made;</p></content></level><level class="para1" eId="section-16-2-d"><num>(d)</num><content><p>enabling the Secretary of State to require a seller, a prospective landlord or licensor or another person to pay compensation to a green deal provider in respect of any such suspension, cancellation or refund.</p></content></level></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-modifying-energy-licences"><heading><i>Modifying energy licences</i></heading><section eId="section-17"><num>17</num><heading>Power to modify energy licences in connection with green deal payments</heading><subsection eId="section-17-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-17-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7 or 7A of the Gas Act 1986 (gas transporter, shipper and supply licences);</p></content></level><level class="para1" eId="section-17-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-17-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(c) or (d) of the Electricity Act 1989 (electricity distribution and supply licences);</p></content></level><level class="para1" eId="section-17-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-17-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7 or 7A of the Gas Act 1986 or section 6(1)(c) or (d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-17-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised for the following purposes only—</p></intro><level class="para1" eId="section-17-2-a"><num>(a)</num><content><p>in so far as the power relates to a licence under section 7 of the Gas Act 1986 or section 6(1)(c) of the Electricity Act 1989, the purpose of preventing the holder of the licence from permanently disconnecting the supply of gas or electricity to a green deal property, and</p></content></level><level class="para1" eId="section-17-2-b"><num>(b)</num><content><p>in so far as the power relates to any licence, the purpose of requiring or enabling the holder of the licence to take, or not to take, specified action in connection with green deal payments.</p></content></level></subsection><subsection eId="section-17-3"><num>(3)</num><intro><p>The provision which may be made by virtue of subsection (2)(b) includes, in particular—</p></intro><level class="para1" eId="section-17-3-a"><num>(a)</num><content><p>if the holder of the licence is of a specified description, provision enabling the holder to opt into or opt out of any provision made by virtue of paragraphs (b) to (f),</p></content></level><level class="para1" eId="section-17-3-b"><num>(b)</num><content><p>provision requiring the holder of the licence to collect green deal payments through energy bills and remit them to a green deal provider,</p></content></level><level class="para1" eId="section-17-3-c"><num>(c)</num><content><p>provision as to the circumstances in which the holder of the licence is required to make payments to a green deal provider by reference to green deal payments which are due but which have not been made,</p></content></level><level class="para1" eId="section-17-3-d"><num>(d)</num><content><p>provision in connection with the cancellation or suspension of green deal payments,</p></content></level><level class="para1" eId="section-17-3-e"><num>(e)</num><content><p>provision requiring or enabling the holder of the licence to make specified arrangements for facilitating the collection of green deal payments, and</p></content></level><level class="para1" eId="section-17-3-f"><num>(f)</num><content><p>provision requiring or enabling payments to be made by or to the holder of the licence in respect of functions discharged in connection with green deal payments.</p></content></level></subsection><subsection eId="section-17-4"><num>(4)</num><content><p>Provision made by virtue of subsection (2)(b) which falls within subsection (3)(c) may include provision requiring the holder of the licence, where a bill payer has failed to pay a sum due under an energy bill, to remit a proportion of any payment received to a green deal provider.</p></content></subsection><subsection eId="section-17-5"><num>(5)</num><content><p>Conditions included in a licence under section 7 or 7A of the Gas Act 1986 by virtue of the power under subsection (1) may do any of the things authorised by section 7B(5)(a)(i) or (iii) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7B(4)(a)).</p></content></subsection><subsection eId="section-17-6"><num>(6)</num><content><p>Conditions included in a licence under section 6(1)(c) or (d) of the Electricity Act 1989 by virtue of the power under subsection (1) may do any of the things authorised by section 7(3)(a) or (c) or (4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection><subsection eId="section-17-7"><num>(7)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-17-7-a"><num>(a)</num><content><p>payments are green deal payments if they are made under a green deal plan,</p></content></level><level class="para1" eId="section-17-7-b"><num>(b)</num><content><p>a property is a green deal property if there is a green deal plan in respect of the property and payments are still to be made under that plan, and</p></content></level><level class="para1" eId="section-17-7-c"><num>(c)</num><content><p>references to a green deal provider include references to a person acting on behalf of a green deal provider or nominated by a green deal provider.</p></content></level></subsection></section><section eId="section-18"><num>18</num><heading>Power to modify energy supply licences to make provision as to default in green deal payments</heading><subsection eId="section-18-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-18-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-18-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-18-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-18-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-18-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-18-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised for the purpose only of making provision—</p></intro><level class="para1" eId="section-18-2-a"><num>(a)</num><content><p>as to the steps which are to be taken by the holder of a licence following a bill payer's default in making green deal payments to the holder of the licence,</p></content></level><level class="para1" eId="section-18-2-b"><num>(b)</num><content><p>as to the circumstances in which the holder of a licence may disconnect the supply to a green deal property following such a default, or</p></content></level><level class="para1" eId="section-18-2-c"><num>(c)</num><content><p>enabling, in specified circumstances, the holder of a licence to require from a bill payer a deposit by way of security for green deal payments to be made by the bill payer.</p></content></level></subsection><subsection eId="section-18-3"><num>(3)</num><content><p>For the purposes of this section “green deal payments” and “green deal property” are to be read in accordance with section 17(7).</p></content></subsection></section><section eId="section-19"><num>19</num><heading>Power to modify energy supply licences to require provision of information</heading><subsection eId="section-19-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-19-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-19-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-19-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-19-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-19-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-19-2"><num>(2)</num><content><p>The power under subsection (1) may be exercised for one or both of the following two purposes only.</p></content></subsection><subsection eId="section-19-3"><num>(3)</num><content><p>The first purpose is the purpose of requiring, at specified times, the holder of the licence to provide bill payers with specified information in connection with their green deal plans.</p></content></subsection><subsection eId="section-19-4"><num>(4)</num><content><p>The second purpose is the purpose of requiring the holder of the licence to disclose on request specified information about the payment of energy bills by a person who is, or is to be, the bill payer for a property in respect of which there is, or is proposed to be, a green deal plan.</p></content></subsection><subsection eId="section-19-5"><num>(5)</num><intro><p>The only persons to whom the licence holder may be required to disclose information by virtue of subsection (4) are—</p></intro><level class="para1" eId="section-19-5-a"><num>(a)</num><content><p>where there is a green deal plan, the green deal provider under the plan;</p></content></level><level class="para1" eId="section-19-5-b"><num>(b)</num><content><p>where there is proposed to be a green deal plan, a person who is authorised under the framework regulations to act as a green deal provider.</p></content></level></subsection><subsection eId="section-19-6"><num>(6)</num><intro><p>The licence holder may be required to disclose the information requested only where—</p></intro><level class="para1" eId="section-19-6-a"><num>(a)</num><content><p>the green deal provider or authorised person states that the request is made for purposes connected with the green deal plan or proposed green deal plan,</p></content></level><level class="para1" eId="section-19-6-b"><num>(b)</num><intro><p>the green deal provider or authorised person provides evidence that the bill payer has consented to—</p></intro><level class="para2" eId="section-19-6-b-i"><num>(i)</num><content><p>disclosure of the information to that provider or person for those purposes, and</p></content></level><level class="para2" eId="section-19-6-b-ii"><num>(ii)</num><content><p>onward disclosure of the disclosed information to and by other persons for those purposes,</p></content></level></level><level class="para1" eId="section-19-6-c"><num>(c)</num><content><p>the information relates to a time within the 5 years immediately preceding the request, and</p></content></level><level class="para1" eId="section-19-6-d"><num>(d)</num><content><p>the licence holder has the information.</p></content></level></subsection><subsection eId="section-19-7"><num>(7)</num><content><p>The power under subsection (1) may be exercised so as to require information to be provided in a specified manner or form, or subject to specified requirements or restrictions.</p></content></subsection><subsection eId="section-19-8"><num>(8)</num><content><p>Conditions included in a licence under section 7A(1) of the Gas Act 1986 by virtue of the power under subsection (1) and the purpose mentioned in subsection (4) may do any of the things authorised by section 7B(5)(a)(i) or (iii) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7B(4)(a)).</p></content></subsection><subsection eId="section-19-9"><num>(9)</num><content><p>Conditions included in a licence under section 6(1)(d) of the Electricity Act 1989 by virtue of the power under subsection (1) and the purpose mentioned in subsection (4) may do any of the things authorised by section 7(3)(a) or (c) or (4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection></section><section eId="section-20"><num>20</num><heading>Power to modify energy supply licences to make provision as to consumer protection</heading><subsection eId="section-20-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-20-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-20-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-20-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-20-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-20-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-20-2"><num>(2)</num><content><p>The power under subsection (1) may be exercised for the purpose only of making provision corresponding to that made by the disapplied consumer protection legislation.</p></content></subsection><subsection eId="section-20-3"><num>(3)</num><content><p>Conditions included in a licence under section 6(1)(d) of the Electricity Act 1989 by virtue of the power under subsection (1) may do any of the things authorised by section 7(4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection><subsection eId="section-20-4"><num>(4)</num><content><p>For the purposes of subsection (2) provision corresponds to that made by the disapplied consumer protection legislation if it is made for the same purpose as the purpose for which that provision was made.</p></content></subsection><subsection eId="section-20-5"><num><ins class="substitution first" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35"><noteRef uk:name="commentary" href="#key-3f8f93cba169f015282416aba5430e35" class="commentary"/>(5)</ins></num><intro><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">For the purpose of this section, references to the disapplied consumer protection legislation are to—</ins></p></intro><level class="para1" eId="section-20-5-a"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(a)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">the provisions of or made under the Consumer Credit Act 1974 or the Financial Services and Markets Act 2000 (“the 2000 Act”), and</ins></p></content></level><level class="para1" eId="section-20-5-b"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(b)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">any rules made under the 2000 Act,</ins></p></content></level><wrapUp><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">which would apply but for any exemption conferred by an order under section 22 of the 2000 Act (regulated activities) in relation to debts due under a green deal plan associated with the licensee.</ins></p></wrapUp></subsection><subsection eId="section-20-6"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(6)</ins></num><content><p><ins class="substitution last" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">A green deal plan is associated with a licensee if the payments under the plan are to be made to the licensee.</ins></p></content></subsection></section><section eId="section-21"><num>21</num><heading>Powers under sections 17 to 20: consultation</heading><intro><p>Before making a modification under any of sections 17 to 20, the Secretary of State must consult—</p></intro><level class="para1" eId="section-21-a"><num>(a)</num><content><p>the holder of any licence being modified,</p></content></level><level class="para1" eId="section-21-b"><num>(b)</num><content><p>the Gas and Electricity Markets Authority, and</p></content></level><level class="para1" eId="section-21-c"><num>(c)</num><content><p>such other persons as the Secretary of State considers appropriate.</p></content></level></section><section eId="section-22"><num>22</num><heading>Powers under sections 17 to 20: supplementary</heading><subsection eId="section-22-1"><num>(1)</num><content><p>Subsections (2) to (6) apply in relation to the powers under sections 17 to 20.</p></content></subsection><subsection eId="section-22-2"><num>(2)</num><intro><p>The powers—</p></intro><level class="para1" eId="section-22-2-a"><num>(a)</num><content><p>may be exercised generally, only in relation to specified cases or subject to exceptions (including provision for a case to be excepted only so long as specified conditions are satisfied);</p></content></level><level class="para1" eId="section-22-2-b"><num>(b)</num><content><p>may be exercised differently in different cases or circumstances;</p></content></level><level class="para1" eId="section-22-2-c"><num>(c)</num><content><p>include a power to make incidental, consequential or transitional modifications.</p></content></level></subsection><subsection eId="section-22-3"><num>(3)</num><intro><p>Provision included in a licence by virtue of any of the powers—</p></intro><level class="para1" eId="section-22-3-a"><num>(a)</num><content><p>need not relate to the activities authorised by the licence;</p></content></level><level class="para1" eId="section-22-3-b"><num>(b)</num><content><p>may make different provision for different cases.</p></content></level></subsection><subsection eId="section-22-4"><num>(4)</num><content><p>The Secretary of State must publish details of modifications under any of the powers as soon as reasonably practicable after the modifications are made.</p></content></subsection><subsection eId="section-22-5"><num>(5)</num><content><p>A modification under any of the powers of part of a standard condition of a licence does not prevent any other part of the condition from continuing to be regarded as a standard condition for the purposes of Part 1 of the Gas Act 1986 or Part 1 of the Electricity Act 1989.</p></content></subsection><subsection eId="section-22-6"><num>(6)</num><content><p>Where the Secretary of State makes modifications under any of the powers of the standard conditions of a licence of any type, the Gas and Electricity Markets Authority must make the same modification of those standard conditions for the purposes of their incorporation in licences of that type granted after that time.</p></content></subsection><subsection eId="section-22-7"><num>(7)</num><intro><p>In section 33(1) of the Utilities Act 2000 (standard conditions of electricity licences)—</p></intro><level class="para1" eId="section-22-7-a"><num>(a)</num><content><p>after paragraph (d) omit “or”;</p></content></level><level class="para1" eId="section-22-7-b"><num>(b)</num><content><p><mod>after paragraph (e) insert<quotedText startQuote="&#x201C;">or </quotedText><quotedStructure endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(f)</num><content><p>under Chapter 1 of Part 1 of the Energy Act 2011.</p></content></level></quotedStructure></mod></p></content></level></subsection><subsection eId="section-22-8"><num>(8)</num><intro><p>In section 81(2) of the Utilities Act 2000 (standard conditions of gas licences)—</p></intro><level class="para1" eId="section-22-8-a"><num>(a)</num><content><p><mod>for “2008 or” substitute <quotedText>“ 2008, ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-22-8-b"><num>(b)</num><content><p><mod>after “2010” insert <quotedText>“ or under Chapter 1 of Part 1 of the Energy Act 2011 ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-22-9"><num>(9)</num><content><p>Sections 4AA to 4B of the Gas Act 1986 (principal objective and general duties) apply in relation to the powers under sections 17 to 20 with respect to holders of licences under section 7 or 7A of that Act as they apply in relation to functions of the Secretary of State under Part 1 of that Act.</p></content></subsection><subsection eId="section-22-10"><num>(10)</num><content><p>Sections 3A to 3D of the Electricity Act 1989 (principal objective and general duties) apply in relation to the powers under sections 17 to 20 with respect to holders of licences under section 6(1)(c) or (d) of that Act as they apply in relation to functions of the Secretary of State under Part 1 of that Act.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-gas-and-electricity-codes"><heading><i>Gas and electricity codes</i></heading><section eId="section-23"><num>23</num><heading>Recovering green deal payments: gas suppliers</heading><subsection eId="section-23-1"><num>(1)</num><content><p>Schedule 2B to the Gas Act 1986 (the gas code) is amended as follows.</p></content></subsection><subsection eId="section-23-2"><num>(2)</num><content><p><mod>In paragraph 6A(1) for paragraph (a) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(a)</num><intro><p>the sum is owed to an authorised supplier—</p></intro><level class="para2"><num>(i)</num><content><p>in respect of the supply of gas to the premises on which the meter is installed,</p></content></level><level class="para2"><num>(ii)</num><content><p>in respect of the provision of the meter, or</p></content></level><level class="para2"><num>(iii)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises; or</p></content></level></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-23-3"><num>(3)</num><content><p><mod>In paragraph 7(1) for paragraphs (a) and (b) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>a demand in writing is made by a gas supplier for any of the relevant payments to be made by a consumer; and</p></content></level><level class="para1"><num>(b)</num><content><p>the consumer does not make those payments within 28 days after the making of the demand.</p></content></level></quotedStructure></mod></p></content></subsection><subsection eId="section-23-4"><num>(4)</num><content><p><mod>After paragraph 7(1) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><subsection><num>(1A)</num><intro><p>A payment is a relevant payment for the purposes of sub-paragraph (1) if it is due to the gas supplier from the consumer—</p></intro><level class="para1"><num>(a)</num><content><p>in respect of the supply of gas to any premises of the consumer (in this paragraph referred to as “<term refersTo="#term-the-premises">the premises</term>”); or</p></content></level><level class="para1"><num>(b)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-23-5"><num>(5)</num><content><p><mod>In each of paragraphs 7(4)(b) and (5) for “charges” substitute <quotedText>“ payments ”</quotedText>.</mod></p></content></subsection></section><section eId="section-24"><num>24</num><heading>Recovering green deal payments: electricity suppliers</heading><subsection eId="section-24-1"><num>(1)</num><content><p>The Electricity Act 1989 is amended as follows.</p></content></subsection><subsection eId="section-24-2"><num>(2)</num><content><p>Paragraph 2 of Schedule 6 to the Electricity Act 1989 (the electricity code) is amended as set out in subsections (3) to (5).</p></content></subsection><subsection eId="section-24-3"><num>(3)</num><content><p><mod>In sub-paragraph (1) for the words from “paid” to “electricity meter” substitute <quotedText>“ made all the relevant payments ”</quotedText>.</mod></p></content></subsection><subsection eId="section-24-4"><num>(4)</num><content><p><mod>After sub-paragraph (1) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><subsection><num>(1A)</num><intro><p>A payment is a relevant payment for the purposes of sub-paragraph (1) if it is due from the customer to an electricity supplier—</p></intro><level class="para1"><num>(a)</num><content><p>in respect of the supply of electricity to any premises or the provision of an electricity meter; or</p></content></level><level class="para1"><num>(b)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-24-5"><num>(5)</num><content><p><mod>In sub-paragraph (3) for “payment of the charges due” substitute <quotedText>“ the relevant payments to be made ”</quotedText>.</mod></p></content></subsection><subsection eId="section-24-6"><num>(6)</num><content><p><mod>In paragraph 12(2) of Schedule 7 (recovery through pre-payment meters) for paragraph (a) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="default"><level class="para1"><num>(a)</num><intro><p>the sum is owed to an authorised supplier—</p></intro><level class="para2"><num>(i)</num><content><p>in respect of the supply of electricity to the premises on which the meter is installed,</p></content></level><level class="para2"><num>(ii)</num><content><p>in respect of the provision of the meter, or</p></content></level><level class="para2"><num>(iii)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises; or</p></content></level></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-modifying-consumer-credit-legislation"><heading><i>Modifying consumer credit legislation</i></heading><section eId="section-25"><num><noteRef href="#key-f059ff6bc0f5be2cb9a9a920afef444e" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>25</num><heading>Exemption from Consumer Credit Act 1974 in relation to credit to business debtors</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-26"><num><noteRef href="#key-fe68fb8a74e286ff5688a659547d5b8a" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>26</num><heading>Energy suppliers not to be treated as carrying on ancillary credit business</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-27"><num>27</num><heading>Duties to give debtors information and statements</heading><subsection eId="section-27-1"><num>(1)</num><content><p>The Consumer Credit Act 1974 is amended as follows.</p></content></subsection><subsection eId="section-27-2"><num>(2)</num><content><p><mod>In section 77 (duty to give information to debtor under fixed-sum credit agreement) after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(2A)</num><content><p>Subsection (2B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(2B)</num><content><p>The duty imposed on the creditor by subsection (1) may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-27-3"><num>(3)</num><content><p><mod>In section 77A (statements to be provided in relation to fixed-sum credit agreement) after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(2A)</num><content><p>Subsection (2B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(2B)</num><content><p>Any duty imposed on the creditor by this section may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-27-4"><num>(4)</num><content><p><mod>In section 77B (statement of account to be provided on request in relation to fixed-sum credit agreement) after subsection (7) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(7A)</num><content><p>Subsection (7B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(7B)</num><content><p>The duty imposed on the creditor by this section may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection></section><section eId="section-28"><num>28</num><heading>Exemption from requirement to give notice of sums in arrears</heading><content><p><mod>In section 86B of the Consumer Credit Act 1974 (requirement to give notice of sums in arrears) for subsection (12) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(12)</num><content><p>In this section “<term refersTo="#term-applicable-agreement">applicable agreement</term>” means an agreement which falls within subsection (12A) or (12B).</p></content></subsection><subsection><num>(12A)</num><intro><p>An agreement falls within this subsection if—</p></intro><level class="para1"><num>(a)</num><content><p>it is a regulated agreement for fixed-sum credit; and</p></content></level><level class="para1"><num>(b)</num><intro><p>it is not—</p></intro><level class="para2"><num>(i)</num><content><p>a non-commercial agreement;</p></content></level><level class="para2"><num>(ii)</num><content><p>a small agreement; or</p></content></level><level class="para2"><num>(iii)</num><content><p>a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></level></level></subsection><subsection><num>(12B)</num><intro><p>An agreement falls within this subsection if—</p></intro><level class="para1"><num>(a)</num><content><p>it is a regulated consumer hire agreement; and</p></content></level><level class="para1"><num>(b)</num><content><p>it is neither a non-commercial agreement nor a small agreement.</p></content></level></subsection></quotedStructure></mod></p></content></section><section eId="section-29"><num>29</num><heading>Early repayment of green deal finance</heading><subsection eId="section-29-1"><num>(1)</num><content><p>The Consumer Credit Act 1974 is amended as follows.</p></content></subsection><subsection eId="section-29-2"><num>(2)</num><content><p><mod>After section 95A (compensatory amount to creditor in relation to early repayment) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><section><num>95B</num><heading>Compensatory amount: green deal finance</heading><subsection><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1"><num>(a)</num><content><p>a regulated consumer credit agreement provides for the rate of interest on the credit to be fixed for a period of time (“the fixed rate period”),</p></content></level><level class="para1"><num>(b)</num><content><p>the agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011) which is of a duration specified for the purposes of this section in regulations, and</p></content></level><level class="para1"><num>(c)</num><content><p>under section 94 the debtor discharges all or part of his indebtedness during the fixed rate period.</p></content></level></subsection><subsection><num>(2)</num><intro><p>The creditor may claim an amount equal to the cost which the creditor has incurred as a result only of the debtor's indebtedness being discharged during the fixed rate period if—</p></intro><level class="para1"><num>(a)</num><content><p>the amount of the payment under section 94 is not paid from the proceeds of a contract of payment protection insurance, and</p></content></level><level class="para1"><num>(b)</num><content><p>such other conditions as may be specified for the purposes of this section in regulations are satisfied.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The amount in subsection (2)—</p></intro><level class="para1"><num>(a)</num><content><p>must be fair,</p></content></level><level class="para1"><num>(b)</num><content><p>must be objectively justified,</p></content></level><level class="para1"><num>(c)</num><content><p>must be calculated by the creditor in accordance with provision made for the purposes of this section in regulations, and</p></content></level><level class="para1"><num>(d)</num><content><p>must not exceed the total amount of interest that would have been paid by the debtor under the agreement in the period from the date on which the debtor makes the payment under section 94 to the date fixed by the agreement for the discharge of the indebtedness of the debtor.</p></content></level></subsection><subsection><num>(4)</num><content><p>If a creditor could claim under either section 95A or this section, the creditor may choose under which section to claim.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-29-3"><num>(3)</num><intro><p>In section 94 (right to complete payments ahead of time)—</p></intro><level class="para1" eId="section-29-3-a"><num>(a)</num><content><p><mod>in subsection (1) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-29-3-b"><num>(b)</num><content><p><mod>in subsection (5) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-29-4"><num>(4)</num><content><p><mod>In subsection (2)(c) of section 97A (duty to give information on partial repayment) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>.</mod></p></content></subsection></section><section eId="section-30"><num>30</num><heading>Power to amend Consumer Credit Act 1974</heading><subsection eId="section-30-1"><num>(1)</num><content><p>The Secretary of State may by order make such amendments to the Consumer Credit Act 1974<ins class="first last" ukl:ChangeId="key-0bb8e82a9a9824c6fb5a3055017bc416-1491332806432" ukl:CommentaryRef="key-0bb8e82a9a9824c6fb5a3055017bc416"><noteRef uk:name="commentary" href="#key-0bb8e82a9a9824c6fb5a3055017bc416" class="commentary"/>, the Financial Services and Markets Act 2000 and any statutory instrument made under that Act</ins> as the Secretary of State considers appropriate in consequence of provision made by or under this Chapter.</p></content></subsection><subsection eId="section-30-2"><num>(2)</num><intro><p>Before exercising the power under subsection (1) the Secretary of State must consult—</p></intro><level class="para1" eId="section-30-2-a"><num>(a)</num><content><p>the <ins class="substitution first last" ukl:ChangeId="key-803fdd5956001662e37b430be0cc1a4d-1491332863193" ukl:CommentaryRef="key-803fdd5956001662e37b430be0cc1a4d"><noteRef uk:name="commentary" href="#key-803fdd5956001662e37b430be0cc1a4d" class="commentary"/>Financial Conduct Authority</ins>, and</p></content></level><level class="para1" eId="section-30-2-b"><num>(b)</num><content><p>such other persons as the Secretary of State considers appropriate.</p></content></level></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-delegation-and-exercise-of-functions"><heading><i>Delegation and exercise of functions</i></heading><section eId="section-31"><num>31</num><heading>Delegation and conferring of functions</heading><subsection eId="section-31-1"><num>(1)</num><intro><p>The Secretary of State may by order provide for the following functions conferred on the Secretary of State to be exercisable instead by a public body specified in the order—</p></intro><level class="para1" eId="section-31-1-a"><num>(a)</num><content><p>any function exercisable in connection with the scheme established by the framework regulations;</p></content></level><level class="para1" eId="section-31-1-b"><num>(b)</num><content><p>any function exercisable under the framework regulations by virtue of section 6(4);</p></content></level><level class="para1" eId="section-31-1-c"><num>(c)</num><content><p>any function under regulations made under section 16.</p></content></level></subsection><subsection eId="section-31-2"><num>(2)</num><content><p>If the function of issuing a code of practice for the purposes of the scheme is specified in an order by virtue of subsection (1)(a), a draft of the code must be approved by the Secretary of State before the Secretary of State lays the draft before Parliament under section 39(2).</p></content></subsection><subsection eId="section-31-3"><num>(3)</num><content><p>If the function of revoking a code of practice issued for the purposes of the scheme is specified in an order by virtue of subsection (1)(a), the code must not be revoked without the approval of the Secretary of State.</p></content></subsection><subsection eId="section-31-4"><num>(4)</num><intro><p>The Secretary of State may by order make provision conferring administration functions on—</p></intro><level class="para1" eId="section-31-4-a"><num>(a)</num><content><p>the Secretary of State;</p></content></level><level class="para1" eId="section-31-4-b"><num>(b)</num><content><p>a public body specified in the order.</p></content></level></subsection><subsection eId="section-31-5"><num>(5)</num><content><p>For the purposes of subsection (4) administration functions are functions in connection with the administration of any provision in licences under section 7 or 7A of the Gas Act 1986 or section 6(1)(c) or (d) of the Electricity Act 1989 made by virtue of section 17(3) of this Act.</p></content></subsection><subsection eId="section-31-6"><num>(6)</num><intro><p>An order made by virtue of subsection (1) or (4)(b) may provide for—</p></intro><level class="para1" eId="section-31-6-a"><num>(a)</num><content><p>different functions to be exercisable by different public bodies;</p></content></level><level class="para1" eId="section-31-6-b"><num>(b)</num><content><p>the same function to be exercisable by different public bodies in relation to different areas.</p></content></level></subsection><subsection eId="section-31-7"><num>(7)</num><content><p>The Secretary of State may make payments to any public body specified in an order made by virtue of subsection (1).</p></content></subsection></section><section eId="section-32"><num>32</num><heading>Exercise of scheme functions on behalf of the Secretary of State or a public body</heading><subsection eId="section-32-1"><num>(1)</num><content><p>This section applies to any function exercisable in connection with the scheme established by the framework regulations.</p></content></subsection><subsection eId="section-32-2"><num>(2)</num><content><p>The Secretary of State may arrange for such a function to be exercised by any body or person on behalf of the Secretary of State.</p></content></subsection><subsection eId="section-32-3"><num>(3)</num><content><p>A public body specified in relation to such a function in an order made by virtue of section 31(1)(a) may arrange for the function to be exercised by any other body or person on its behalf.</p></content></subsection><subsection eId="section-32-4"><num>(4)</num><intro><p>Arrangements under this section—</p></intro><level class="para1" eId="section-32-4-a"><num>(a)</num><content><p>do not affect the responsibility for the exercise of the function;</p></content></level><level class="para1" eId="section-32-4-b"><num>(b)</num><content><p>may include provision for payments to be made to the body or person exercising the function under the arrangements.</p></content></level></subsection></section><section eId="section-33"><num>33</num><heading>Duty to report</heading><subsection eId="section-33-1"><num>(1)</num><content><p>This section applies if the function under section 3(1)(a) is specified in an order made by virtue of section 31(1)(a).</p></content></subsection><subsection eId="section-33-2"><num>(2)</num><intro><p>The Secretary of State may make regulations requiring the body specified in relation to that function in the order to—</p></intro><level class="para1" eId="section-33-2-a"><num>(a)</num><content><p>collect information on the specified matters, and</p></content></level><level class="para1" eId="section-33-2-b"><num>(b)</num><content><p>provide the Secretary of State with a report on those matters at the specified times.</p></content></level></subsection><subsection eId="section-33-3"><num>(3)</num><content><p>In subsection (2) “<term refersTo="#term-specified" eId="term-specified">specified</term>” means specified in the regulations.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-general"><heading><i>General</i></heading><section eId="section-34"><num>34</num><heading>Power of Secretary of State to deal with special circumstances</heading><subsection eId="section-34-1"><num>(1)</num><intro><p>The Secretary of State may by regulations make provision as to—</p></intro><level class="para1" eId="section-34-1-a"><num>(a)</num><content><p>the circumstances in which a bill payer's liability to make green deal payments to the relevant energy supplier is suspended or cancelled;</p></content></level><level class="para1" eId="section-34-1-b"><num>(b)</num><content><p>the circumstances in which any suspension of liability ends;</p></content></level><level class="para1" eId="section-34-1-c"><num>(c)</num><content><p>the consequences of any suspension or cancellation;</p></content></level><level class="para1" eId="section-34-1-d"><num>(d)</num><content><p>the circumstances in which the green deal provider may require the early repayment of the whole or part of the total of the payments outstanding under a green deal plan.</p></content></level></subsection><subsection eId="section-34-2"><num>(2)</num><intro><p>The regulations may, in particular, include provision—</p></intro><level class="para1" eId="section-34-2-a"><num>(a)</num><content><p>as to the procedure to be followed for securing a suspension or cancellation (including the payment of an administration fee calculated in accordance with the regulations);</p></content></level><level class="para1" eId="section-34-2-b"><num>(b)</num><content><p>as to how any payments due under a green deal plan during a period of suspension are to be paid;</p></content></level><level class="para1" eId="section-34-2-c"><num>(c)</num><content><p>as to the making of payments due under a green deal plan after a period of suspension;</p></content></level><level class="para1" eId="section-34-2-d"><num>(d)</num><content><p>as to the calculation of the amount payable on early repayment (including a fee calculated in accordance with the regulations).</p></content></level></subsection><subsection eId="section-34-3"><num>(3)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-34-3-a"><num>(a)</num><content><p>“<term refersTo="#term-bill-payer" eId="term-bill-payer">bill payer</term>” includes the person who would be the bill payer if the supply from the relevant energy supplier were not temporarily disconnected or the liability to make green deal payments were not suspended, and</p></content></level><level class="para1" eId="section-34-3-b"><num>(b)</num><content><p>payments are green deal payments if they are made under a green deal plan.</p></content></level></subsection></section><section eId="section-35"><num>35</num><heading>Appeals</heading><subsection eId="section-35-1"><num>(1)</num><intro><p>This section applies if provision is included in a scheme or regulations by virtue of any of the following—</p></intro><level class="para1" eId="section-35-1-a"><num>(a)</num><content><p>section 3(3)(h) or (i);</p></content></level><level class="para1" eId="section-35-1-b"><num>(b)</num><content><p>section 6(4);</p></content></level><level class="para1" eId="section-35-1-c"><num>(c)</num><content><p>section 16.</p></content></level></subsection><subsection eId="section-35-2"><num>(2)</num><content><p>The Secretary of State must by regulations provide for a right of appeal to a court or tribunal against any sanction imposed, or other action taken, by the Secretary of State or a specified public body under the provision mentioned in subsection (1).</p></content></subsection><subsection eId="section-35-3"><num>(3)</num><intro><p>Regulations under subsection (2) may, in particular, include provision—</p></intro><level class="para1" eId="section-35-3-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-35-3-b"><num>(b)</num><content><p>as to the persons who may make an appeal;</p></content></level><level class="para1" eId="section-35-3-c"><num>(c)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-35-3-d"><num>(d)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-35-3-e"><num>(e)</num><content><p>suspending the effect of a sanction or other action being appealed against, pending determination of the appeal;</p></content></level><level class="para1" eId="section-35-3-f"><num>(f)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-35-3-g"><num>(g)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-35-4"><num>(4)</num><intro><p>The provision referred to in subsection (3)(f) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-35-4-a"><num>(a)</num><content><p>to confirm the sanction imposed or action taken;</p></content></level><level class="para1" eId="section-35-4-b"><num>(b)</num><content><p>to withdraw the sanction or action;</p></content></level><level class="para1" eId="section-35-4-c"><num>(c)</num><content><p>to impose a different sanction or take different action;</p></content></level><level class="para1" eId="section-35-4-d"><num>(d)</num><content><p>to remit the decision whether to confirm the sanction or other action, or any matter relating to that decision, to the person who imposed the sanction or took the action;</p></content></level><level class="para1" eId="section-35-4-e"><num>(e)</num><content><p>to award costs or, in Scotland, expenses.</p></content></level></subsection><subsection eId="section-35-5"><num>(5)</num><content><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within subsection (3)(a), (d), (f) or (g), regulations under subsection (2) may revoke or amend any subordinate legislation.</p></content></subsection><subsection eId="section-35-6"><num>(6)</num><content><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within subsection (3)(a), (d), (f) or (g), they may by regulations revoke or amend any subordinate legislation, or any provision included in an instrument made under an Act of the Scottish Parliament, if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></content></subsection><subsection eId="section-35-7"><num>(7)</num><intro><p>In this section—</p></intro><level class="para1" eId="section-35-7-a"><num>(a)</num><content><p>“<term refersTo="#term-specified-public-body" eId="term-specified-public-body">specified public body</term>” means a public body specified in an order made by virtue of section 31(1);</p></content></level><level class="para1" eId="section-35-7-b"><num>(b)</num><content><p>“<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></level></subsection></section><section eId="section-36"><num>36</num><heading>Funding for energy efficiency advice</heading><subsection eId="section-36-1"><num>(1)</num><content><p>The Secretary of State may incur expenditure in providing qualifying advice or information or in making payments to persons who provide qualifying advice or information.</p></content></subsection><subsection eId="section-36-2"><num>(2)</num><content><p>In this section “<term refersTo="#term-qualifying-advice-or-information" eId="term-qualifying-advice-or-information">qualifying advice or information</term>” means advice or information about green deal plans or energy efficiency generally which is given to individuals or organisations.</p></content></subsection></section><section eId="section-37"><num>37</num><heading>Preparatory expenditure: framework regulations</heading><content><p>The Secretary of State may, before the framework regulations are made, incur expenditure for the purpose of, or in connection with, preparing for a scheme of the kind provided for by section 3.</p></content></section><section eId="section-38"><num>38</num><heading>Green deal installation apprenticeships</heading><subsection eId="section-38-1"><num>(1)</num><content><p>Before making the first framework regulations the Secretary of State must lay before Parliament a report on what, if any, steps the Secretary of State has taken to encourage green deal installation apprenticeships.</p></content></subsection><subsection eId="section-38-2"><num>(2)</num><content><p>A “green deal installation apprenticeship” is an apprenticeship which provides training on how to install energy efficiency improvements at properties.</p></content></subsection></section><section eId="section-39"><num>39</num><heading>Parliamentary procedure in relation to code of practice</heading><subsection eId="section-39-1"><num>(1)</num><content><p>This section makes further provision in relation to the issuing of any code of practice for the purposes of the scheme established by the framework regulations.</p></content></subsection><subsection eId="section-39-2"><num>(2)</num><content><p>Before the code is issued the Secretary of State must lay a draft of the code before Parliament.</p></content></subsection><subsection eId="section-39-3"><num>(3)</num><content><p>If, within the 40-day period, either House of Parliament resolves not to approve the draft, the code may not be issued.</p></content></subsection><subsection eId="section-39-4"><num>(4)</num><content><p>If no such resolution is made within that period, the code may be issued.</p></content></subsection><subsection eId="section-39-5"><num>(5)</num><content><p>The “<term refersTo="#term-40-day-period" eId="term-40-day-period">40-day period</term>”, in relation to a draft of a code, means the period of 40 days beginning with the day on which the draft is laid before Parliament (or, if it is not laid before each House of Parliament on the same day, the later of the 2 days on which it is laid).</p></content></subsection><subsection eId="section-39-6"><num>(6)</num><intro><p>For the purposes of calculating the 40-day period, no account is to be taken of any period during which—</p></intro><level class="para1" eId="section-39-6-a"><num>(a)</num><content><p>Parliament is dissolved or prorogued, or</p></content></level><level class="para1" eId="section-39-6-b"><num>(b)</num><content><p>both Houses are adjourned for more than 4 days.</p></content></level></subsection></section><section eId="section-40"><num>40</num><heading>Regulations and orders</heading><subsection eId="section-40-1"><num>(1)</num><content><p>Regulations and orders under this Chapter may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-40-2"><num>(2)</num><content><p>Regulations and orders under this Chapter, other than those made by the Scottish Ministers, are to be made by statutory instrument.</p></content></subsection><subsection eId="section-40-3"><num>(3)</num><content><p>A statutory instrument containing regulations or an order under this Chapter is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-40-4"><num>(4)</num><intro><p>Subsection (3) does not apply to a statutory instrument containing—</p></intro><level class="para1" eId="section-40-4-a"><num>(a)</num><content><p>regulations under section 2 or the framework regulations,</p></content></level><level class="para1" eId="section-40-4-b"><num>(b)</num><content><p>regulations under section 13, 15(1), 16, 34 or 35(2), or</p></content></level><level class="para1" eId="section-40-4-c"><num>(c)</num><content><p>an order under section 1, 2 or 30.</p></content></level></subsection><subsection eId="section-40-5"><num>(5)</num><content><p>A statutory instrument containing regulations or an order falling within subsection (4) may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection eId="section-40-6"><num>(6)</num><content><p>Regulations under section 10(2), 14(7) or (8) or 15(4) (regulations made by the Scottish Ministers) are subject to the negative procedure.</p></content></subsection><subsection eId="section-40-7"><num>(7)</num><content><p>Regulations under section 35(6) (regulations made by the Scottish Ministers) are subject to the affirmative procedure.</p></content></subsection><subsection eId="section-40-8"><num>(8)</num><intro><p>Before making regulations or an order under this Chapter extending to Scotland, the Secretary of State must—</p></intro><level class="para1" eId="section-40-8-a"><num>(a)</num><content><p>if the regulations or order contain any provision which would be within the legislative competence of the Scottish Parliament if it were contained in an Act of that Parliament, obtain the consent of the Scottish Ministers;</p></content></level><level class="para1" eId="section-40-8-b"><num>(b)</num><content><p>in any other case, consult the Scottish Ministers.</p></content></level></subsection><subsection eId="section-40-9"><num>(9)</num><intro><p>The Secretary of State must obtain the consent of the Welsh Ministers before making provision under section 35 amending or revoking—</p></intro><level class="para1" eId="section-40-9-a"><num>(a)</num><content><p>provision included in an instrument made under a Measure or Act of the National Assembly for Wales;</p></content></level><level class="para1" eId="section-40-9-b"><num>(b)</num><content><p>any other subordinate legislation made by the Welsh Ministers (or the National Assembly for Wales established under the Government of Wales Act 1998).</p></content></level></subsection><subsection eId="section-40-10"><num>(10)</num><content><p>Before amending under section 9 a provision of the Building Regulations 2010 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2010/2214), the Secretary of State must, if and so far as the function under which the provision was made is exercisable by the Welsh Ministers, obtain their consent.</p></content></subsection><subsection eId="section-40-11"><num>(11)</num><content><p>Subsections (9) and (10) do not apply to the extent that the Secretary of State is making incidental or consequential provision.</p></content></subsection><subsection eId="section-40-12"><num>(12)</num><content><p>Before making regulations or an order under this Chapter applying to Wales, the Secretary of State must consult the Welsh Ministers.</p></content></subsection><subsection eId="section-40-13"><num>(13)</num><content><p>Subsection (12) does not apply to the extent that consent has been obtained under subsection (9) or (10).</p></content></subsection></section><section eId="section-41"><num>41</num><heading>Crown application: Chapter 1</heading><content><p>This Chapter binds the Crown.</p></content></section></hcontainer></chapter> — Gas and electricity codes
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-1"><num>CHAPTER 1</num><heading>Green deal</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-introductory"><heading><i>Introductory</i></heading><section eId="section-1"><num>1</num><heading>Green deal plans</heading><subsection eId="section-1-1"><num>(1)</num><content><p>This section applies for the purposes of this Chapter.</p></content></subsection><subsection eId="section-1-2"><num>(2)</num><content><p>An energy plan is an arrangement made by the occupier or owner of a property for a person to make energy efficiency improvements to the property.</p></content></subsection><subsection eId="section-1-3"><num>(3)</num><intro><p>An energy plan is a green deal plan if—</p></intro><level class="para1" eId="section-1-3-a"><num>(a)</num><content><p>the energy efficiency improvements are to be paid for wholly or partly in instalments, and</p></content></level><level class="para1" eId="section-1-3-b"><num>(b)</num><content><p>all of the requirements listed in paragraphs (a) to (e) of subsection (4) are met in relation to the plan at the time when it is made.</p></content></level></subsection><subsection eId="section-1-4"><num>(4)</num><intro><p>The requirements are—</p></intro><level class="para1" eId="section-1-4-a"><num>(a)</num><content><p>the property is an eligible property,</p></content></level><level class="para1" eId="section-1-4-b"><num>(b)</num><content><p>the energy efficiency improvements fall within a description specified in an order made by the Secretary of State (“qualifying energy improvements”),</p></content></level><level class="para1" eId="section-1-4-c"><num>(c)</num><content><p>the conditions mentioned in section 4 as to assessment of the property and other matters have been met,</p></content></level><level class="para1" eId="section-1-4-d"><num>(d)</num><content><p>the conditions mentioned in section 5 as to the terms of the plan and other matters are met, and</p></content></level><level class="para1" eId="section-1-4-e"><num>(e)</num><content><p>a relevant energy supplier supplies, or is to supply, energy to the property.</p></content></level></subsection><subsection eId="section-1-5"><num>(5)</num><intro><p>Subsection (6) applies to a green deal plan from the time when—</p></intro><level class="para1" eId="section-1-5-a"><num>(a)</num><content><p>improvements have been installed in accordance with section 7,</p></content></level><level class="para1" eId="section-1-5-b"><num>(b)</num><content><p>the plan is confirmed in accordance with section 8, and</p></content></level><level class="para1" eId="section-1-5-c"><num>(c)</num><content><p>the requirements imposed by virtue of section 9 or 10 are met.</p></content></level></subsection><subsection eId="section-1-6"><num>(6)</num><intro><p>The payments in instalments agreed in the plan are to be—</p></intro><level class="para1" eId="section-1-6-a"><num>(a)</num><content><p>made by the person who is for the time being liable to pay the energy bills for the property,</p></content></level><level class="para1" eId="section-1-6-b"><num>(b)</num><content><p>made to the relevant energy supplier through the energy bills for the property,</p></content></level><level class="para1" eId="section-1-6-c"><num>(c)</num><content><p>recoverable as a debt by the relevant energy supplier from the person referred to in paragraph (a), and</p></content></level><level class="para1" eId="section-1-6-d"><num>(d)</num><content><p>recovered and held by the relevant energy supplier as agent and trustee for the person who made the improvements (unless the relevant energy supplier is also that person).</p></content></level></subsection><subsection eId="section-1-7"><num>(7)</num><content><p>Subsection (6) applies irrespective of whether the person referred to in paragraph (a) is the person who entered into the plan.</p></content></subsection><subsection eId="section-1-8"><num>(8)</num><intro><p>Subsection (6) is subject to—</p></intro><level class="para1" eId="section-1-8-a"><num>(a)</num><content><p>provision made in regulations under section 34;</p></content></level><level class="para1" eId="section-1-8-b"><num>(b)</num><content><p>any suspension or cancellation, by virtue of provision made in regulations under section 3(3)(h) or (i), 6(4), 16 or 35, of liability to make payments.</p></content></level></subsection><subsection eId="section-1-9"><num>(9)</num><content><p>For the purposes of subsection (4)(a) a property is an eligible property unless it falls within a description specified in an order made by the Secretary of State.</p></content></subsection></section><section eId="section-2"><num>2</num><heading>Green deal plans: supplementary</heading><subsection eId="section-2-1"><num>(1)</num><content><p>This section applies for the purposes of this Chapter.</p></content></subsection><subsection eId="section-2-2"><num>(2)</num><content><p>The occupier or owner who makes the arrangement referred to in section 1(2) is the “improver” and the person who makes the improvements is the “green deal provider”.</p></content></subsection><subsection eId="section-2-3"><num>(3)</num><content><p>The person referred to in section 1(6)(a) is the “bill payer”.</p></content></subsection><subsection eId="section-2-4"><num>(4)</num><intro><p>References to energy efficiency improvements, in relation to a property, are to—</p></intro><level class="para1" eId="section-2-4-a"><num>(a)</num><content><p>measures for improving efficiency in the use in the property of electricity, gas conveyed through pipes or any other source of energy which is specified in an order made by the Secretary of State, or</p></content></level><level class="para1" eId="section-2-4-b"><num>(b)</num><content><p>measures falling within subsection (5) or (6).</p></content></level></subsection><subsection eId="section-2-5"><num>(5)</num><intro><p>Measures fall within this subsection if—</p></intro><level class="para1" eId="section-2-5-a"><num>(a)</num><intro><p>they are any of the following—</p></intro><level class="para2" eId="section-2-5-a-i"><num>(i)</num><content><p>measures for increasing the amount of electricity generated, or heat produced, by microgeneration (within the meaning given by section 26(1) of the Climate Change and Sustainable Energy Act 2006);</p></content></level><level class="para2" eId="section-2-5-a-ii"><num>(ii)</num><content><p>any other measures for increasing the amount of electricity generated, or heat produced, using low-emissions sources or technologies;</p></content></level><level class="para2" eId="section-2-5-a-iii"><num>(iii)</num><content><p>measures for reducing the consumption of such energy as is mentioned in subsection (4), and</p></content></level></level><level class="para1" eId="section-2-5-b"><num>(b)</num><content><p>they are specified in an order made by the Secretary of State.</p></content></level></subsection><subsection eId="section-2-6"><num>(6)</num><intro><p>Measures fall within this subsection if—</p></intro><level class="para1" eId="section-2-6-a"><num>(a)</num><intro><p>they are installed at the property for the purpose of supplying to it any of the following types of energy—</p></intro><level class="para2" eId="section-2-6-a-i"><num>(i)</num><content><p>electricity generated by a generating station operated for the purposes of producing heat, or a cooling effect, in association with electricity;</p></content></level><level class="para2" eId="section-2-6-a-ii"><num>(ii)</num><content><p>heat produced in association with electricity or steam produced from (or air or water heated by) such heat;</p></content></level><level class="para2" eId="section-2-6-a-iii"><num>(iii)</num><content><p>any gas or liquid subjected to a cooling effect produced in association with electricity, and</p></content></level></level><level class="para1" eId="section-2-6-b"><num>(b)</num><content><p>they are specified in an order made by the Secretary of State.</p></content></level></subsection><subsection eId="section-2-7"><num>(7)</num><content><p>For the purposes of subsection (5)(a)(ii) electricity is generated, or heat is produced, using low-emissions sources or technologies if it is generated, or produced, by plant which relies wholly or mainly on a source of energy or a technology mentioned in section 26(2) of the Climate Change and Sustainable Energy Act 2006.</p></content></subsection><subsection eId="section-2-8"><num>(8)</num><content><p>For the purposes of subsection (6) “generating station” and “supplying” are to be read in accordance with section 64(1) of the Electricity Act 1989.</p></content></subsection><subsection eId="section-2-9"><num>(9)</num><content><p>“Energy” (except in this section), “energy bill”, “occupier”, “owner” and “relevant energy supplier” have the meaning given in regulations made by the Secretary of State.</p></content></subsection><subsection eId="section-2-10"><num>(10)</num><content><p>Regulations under subsection (9) may also make provision as to the circumstances in which a person who is not a bill payer for the purposes of this Chapter may be treated as a bill payer for those purposes.</p></content></subsection></section><section eId="section-3"><num>3</num><heading>Framework regulations</heading><subsection eId="section-3-1"><num>(1)</num><intro><p>The Secretary of State must by regulations establish a scheme making provision for the Secretary of State—</p></intro><level class="para1" eId="section-3-1-a"><num>(a)</num><content><p>to authorise persons to act as green deal assessors, green deal providers or green deal installers in connection with green deal plans (either individually or through membership of a body specified in, or authorised under, the scheme);</p></content></level><level class="para1" eId="section-3-1-b"><num>(b)</num><content><p>to regulate the conduct of those assessors, providers or installers (“green deal participants”).</p></content></level></subsection><subsection eId="section-3-2"><num>(2)</num><content><p>Regulations under subsection (1) are referred to in this Chapter as “<term refersTo="#term-the-framework-regulations" eId="term-the-framework-regulations">the framework regulations</term>”.</p></content></subsection><subsection eId="section-3-3"><num>(3)</num><intro><p>The scheme established by the framework regulations may, in particular, make provision—</p></intro><level class="para1" eId="section-3-3-a"><num>(a)</num><content><p>requiring the payment of a fee in connection with initial or continued authorisation under the scheme;</p></content></level><level class="para1" eId="section-3-3-b"><num>(b)</num><content><p>for the establishment and maintenance of a register of green deal participants and of persons from whom authorisation under the scheme has been withdrawn;</p></content></level><level class="para1" eId="section-3-3-c"><num>(c)</num><content><p>requiring green deal participants to provide the information required under the scheme;</p></content></level><level class="para1" eId="section-3-3-d"><num>(d)</num><content><p>for the issuing, revision or revocation of a code of practice;</p></content></level><level class="para1" eId="section-3-3-e"><num>(e)</num><content><p>requiring green deal participants to comply with the code of practice as a condition of their authorisation;</p></content></level><level class="para1" eId="section-3-3-f"><num>(f)</num><content><p>requiring green deal providers to enter into an agreement with the holder of a licence under section 7 or 7A of the Gas Act 1986 (gas transporter, shipper or supply licences) or section 6(1)(c) or (d) of the Electricity Act 1989 (electricity distributor and supply licences) and to comply with that agreement as a condition of their authorisation;</p></content></level><level class="para1" eId="section-3-3-g"><num>(g)</num><content><p>requiring that an agreement mentioned in paragraph (f) be approved by the Secretary of State before being entered into;</p></content></level><level class="para1" eId="section-3-3-h"><num>(h)</num><content><p>for securing compliance with any condition or any other requirement of the scheme, code or agreement;</p></content></level><level class="para1" eId="section-3-3-i"><num>(i)</num><content><p>as to the consequences of non-compliance with any such condition or requirement.</p></content></level></subsection><subsection eId="section-3-4"><num>(4)</num><intro><p>The code of practice issued for the purposes of the scheme may, in particular, make provision—</p></intro><level class="para1" eId="section-3-4-a"><num>(a)</num><content><p>as to the qualification and training of green deal participants;</p></content></level><level class="para1" eId="section-3-4-b"><num>(b)</num><content><p>as to their handling of queries or complaints;</p></content></level><level class="para1" eId="section-3-4-c"><num>(c)</num><content><p>requiring green deal participants to have such arrangements for insurance as are specified in the code;</p></content></level><level class="para1" eId="section-3-4-d"><num>(d)</num><content><p>as to the payment of green deal assessors by green deal providers or green deal installers and the payment of green deal installers by green deal providers;</p></content></level><level class="para1" eId="section-3-4-e"><num>(e)</num><content><p>as to the circumstances in which green deal assessors may charge customers for qualifying assessments of properties and as to the amount of any such charge;</p></content></level><level class="para1" eId="section-3-4-f"><num>(f)</num><content><p>requiring green deal assessors to act with impartiality;</p></content></level><level class="para1" eId="section-3-4-g"><num>(g)</num><content><p>as to the provision of information by green deal providers to improvers and bill payers and prospective improvers and bill payers;</p></content></level><level class="para1" eId="section-3-4-h"><num>(h)</num><content><p>as to marketing in connection with green deal plans.</p></content></level></subsection><subsection eId="section-3-5"><num>(5)</num><content><p>The code may include provision for regulating a body specified or authorised for the purposes of subsection (1)(a).</p></content></subsection><subsection eId="section-3-6"><num>(6)</num><content><p>The scheme and the code may make different provision for different circumstances or cases or for different purposes.</p></content></subsection><subsection eId="section-3-7"><num>(7)</num><content><p>The provision made by the scheme or code in relation to green deal participants may also extend to matters in connection with any energy plans which are not green deal plans.</p></content></subsection><subsection eId="section-3-8"><num>(8)</num><intro><p>The provision made for the purposes of subsection (3)(h) or (i) may, in particular, include provision enabling the Secretary of State to—</p></intro><level class="para1" eId="section-3-8-a"><num>(a)</num><content><p>cancel any liability to pay for a qualifying assessment of a property;</p></content></level><level class="para1" eId="section-3-8-b"><num>(b)</num><content><p>require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-3-8-c"><num>(c)</num><content><p>require a green deal participant to rectify a qualifying energy improvement or its installation;</p></content></level><level class="para1" eId="section-3-8-d"><num>(d)</num><content><p>require a green deal participant to pay compensation or a financial penalty;</p></content></level><level class="para1" eId="section-3-8-e"><num>(e)</num><content><p>withdraw, or require a body specified or authorised for the purposes of subsection (1)(a) to withdraw, an authorisation to act as a green deal participant;</p></content></level><level class="para1" eId="section-3-8-f"><num>(f)</num><content><p>withdraw authorisation from a body authorised for the purposes of subsection (1)(a) as a body whose members are authorised to act as green deal participants.</p></content></level></subsection><subsection eId="section-3-9"><num>(9)</num><content><p>For the purposes of this section references to a qualifying assessment are to an energy efficiency assessment which meets the requirements specified in the framework regulations and deals with such other matters as may be so specified.</p></content></subsection><subsection eId="section-3-10"><num>(10)</num><content><p>This section is without prejudice to the powers conferred on the Secretary of State by other provisions of this Chapter to make provision in or under the framework regulations.</p></content></subsection><subsection eId="section-3-11"><num>(11)</num><content><p>In this Chapter references to a code of practice include references to a code of practice which has been revised by virtue of subsection (3)(d).</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-green-deal-plan"><heading><i>Green deal plan</i></heading><section eId="section-4"><num>4</num><heading>Assessment of property <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-4-1"><num>(1)</num><intro><p>For the purposes of section 1(4)(c) the conditions as to assessment of the property and other matters are—</p></intro><level class="para1" eId="section-4-1-a"><num>(a)</num><content><p>the conditions set out in subsections (2) to (9), and</p></content></level><level class="para1" eId="section-4-1-b"><num>(b)</num><content><p>such other conditions (whether relating to the green deal assessor, the green deal provider, the improver or any other person) as are specified in the framework regulations.</p></content></level></subsection><subsection eId="section-4-2"><num>(2)</num><content><p>The first condition is that a qualifying assessment of the property has been carried out by a person authorised by virtue of the framework regulations to act as a green deal assessor.</p></content></subsection><subsection eId="section-4-3"><num>(3)</num><content><p>The second condition is that the green deal assessor has recommended the energy efficiency improvements.</p></content></subsection><subsection eId="section-4-4"><num>(4)</num><content><p>The third condition is that the green deal provider has given an estimate, on the basis specified in the framework regulations, of the savings likely to be made on the energy bills for the property if the improvements are carried out.</p></content></subsection><subsection eId="section-4-5"><num>(5)</num><content><p>The fourth condition is that the green deal provider has given an estimate, on the basis specified in the framework regulations, of the period over which the savings mentioned in subsection (4) are likely to be made.</p></content></subsection><subsection eId="section-4-6"><num>(6)</num><content><p>The fifth condition is that the green deal provider is authorised by virtue of the framework regulations to act as a green deal provider.</p></content></subsection><subsection eId="section-4-7"><num>(7)</num><content><p>The sixth condition is that the green deal provider has offered to carry out the improvements on the basis that the whole or part of the cost will be repaid in instalments over a period after the improvements have been made.</p></content></subsection><subsection eId="section-4-8"><num>(8)</num><intro><p>The seventh condition is that the green deal provider meets any requirement specified in the framework regulations as to the relationship between—</p></intro><level class="para1" eId="section-4-8-a"><num>(a)</num><content><p>the estimated total of the proposed instalments, and</p></content></level><level class="para1" eId="section-4-8-b"><num>(b)</num><content><p>the estimate mentioned in subsection (4).</p></content></level></subsection><subsection eId="section-4-9"><num>(9)</num><intro><p>The eighth condition is that the green deal provider meets any requirement specified in the framework regulations as to the relationship between—</p></intro><level class="para1" eId="section-4-9-a"><num>(a)</num><content><p>the period for which the instalments are proposed to be paid, and</p></content></level><level class="para1" eId="section-4-9-b"><num>(b)</num><content><p>the period estimated under subsection (5).</p></content></level></subsection><subsection eId="section-4-10"><num>(10)</num><content><p>In subsection (2) the reference to a qualifying assessment is to be read in accordance with section 3(9).</p></content></subsection></section><section eId="section-5"><num>5</num><heading>Terms of plan <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-5-1"><num>(1)</num><intro><p>For the purposes of section 1(4)(d), the conditions as to the terms of the plan and other matters are—</p></intro><level class="para1" eId="section-5-1-a"><num>(a)</num><content><p>the conditions set out in subsections (2) to (4), and</p></content></level><level class="para1" eId="section-5-1-b"><num>(b)</num><content><p>such other conditions as are specified in the framework regulations.</p></content></level></subsection><subsection eId="section-5-2"><num>(2)</num><intro><p>The first condition is that the plan includes the following terms—</p></intro><level class="para1" eId="section-5-2-a"><num>(a)</num><intro><p>a term in which the improver agrees to—</p></intro><level class="para2" eId="section-5-2-a-i"><num>(i)</num><content><p>the amounts of the payments in instalments and the intervals at which, and period for which, they are payable;</p></content></level><level class="para2" eId="section-5-2-a-ii"><num>(ii)</num><content><p>such other matters as are specified in the regulations;</p></content></level></level><level class="para1" eId="section-5-2-b"><num>(b)</num><content><p>a term in which the improver confirms that any necessary permissions or consents have been obtained in respect of the improvements;</p></content></level><level class="para1" eId="section-5-2-c"><num>(c)</num><content><p>a term providing that the green deal provider may not take a charge over any person's property by way of security for payments;</p></content></level><level class="para1" eId="section-5-2-d"><num>(d)</num><content><p>a term providing that the green deal plan does not prevent the bill payer from changing the intervals at which energy bills are to be paid.</p></content></level></subsection><subsection eId="section-5-3"><num>(3)</num><intro><p>The second condition is that the plan does not include any of the following terms—</p></intro><level class="para1" eId="section-5-3-a"><num>(a)</num><content><p>a term making a person liable to make any payments under the green deal plan otherwise than in respect of the period for which the person is the bill payer in relation to the property;</p></content></level><level class="para1" eId="section-5-3-b"><num>(b)</num><content><p>a term requiring the bill payer to make in any circumstances an early repayment of the whole or part of the amount outstanding under the green deal plan (except in accordance with the framework regulations or regulations under section 34, or provision made under them);</p></content></level><level class="para1" eId="section-5-3-c"><num>(c)</num><content><p>a term providing for money to be advanced to the improver (except in accordance with the framework regulations or provision made under them).</p></content></level></subsection><subsection eId="section-5-4"><num>(4)</num><content><p>The third condition is that the agreements mentioned in paragraph (a) of subsection (2) and the permissions and consents mentioned in paragraph (b) of that subsection have not been withdrawn before the end of the period of 14 days beginning with the last day on which they were given.</p></content></subsection><subsection eId="section-5-5"><num>(5)</num><intro><p>The conditions which may be specified in the framework regulations by virtue of subsection (1)(b) include, in particular—</p></intro><level class="para1" eId="section-5-5-a"><num>(a)</num><content><p>a condition that the plan includes a term so specified enabling the early repayment of the whole or part of the amount outstanding under the plan and making provision as to the calculation of the amount payable and any fee,</p></content></level><level class="para1" eId="section-5-5-b"><num>(b)</num><content><p>a condition that the plan includes a term so specified guaranteeing the improvements and making provision as to who is to benefit from the guarantee,</p></content></level><level class="para1" eId="section-5-5-c"><num>(c)</num><content><p>a condition that the plan includes a term so specified as to how any problems with the improvements installed, or arising in connection with the installation of them, are to be dealt with, and</p></content></level><level class="para1" eId="section-5-5-d"><num>(d)</num><content><p>a condition requiring the agreements mentioned in subsection (2)(a) to be in the form specified in the framework regulations.</p></content></level></subsection><subsection eId="section-5-6"><num>(6)</num><content><p>References in this section to the agreements mentioned in subsection (2)(a) include references to the consent required by virtue of section 6(2)(a).</p></content></subsection></section><section eId="section-6"><num>6</num><heading>Consents and redress <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-6-1"><num>(1)</num><intro><p>The framework regulations may make provision for dealing with cases where—</p></intro><level class="para1" eId="section-6-1-a"><num>(a)</num><content><p>at the time when a plan is entered into the improver and the bill payer are different persons;</p></content></level><level class="para1" eId="section-6-1-b"><num>(b)</num><content><p>the bill payer at the time when a plan is entered into is a different person from the bill payer at any subsequent time (a “subsequent bill payer”).</p></content></level></subsection><subsection eId="section-6-2"><num>(2)</num><intro><p>Provision which may be made by virtue of subsection (1) includes—</p></intro><level class="para1" eId="section-6-2-a"><num>(a)</num><content><p>provision requiring the term included in the plan by virtue of section 5(2)(a)(i) to be one to which the bill payer mentioned in subsection (1)(a) has consented, and</p></content></level><level class="para1" eId="section-6-2-b"><num>(b)</num><content><p>provision as to the terms of the plan which are to bind or benefit that bill payer or a subsequent bill payer.</p></content></level></subsection><subsection eId="section-6-3"><num>(3)</num><content><p>Subsection (1) is subject to section 1(6).</p></content></subsection><subsection eId="section-6-4"><num>(4)</num><content><p>The framework regulations may make provision for the purpose of providing redress in cases where a permission or consent mentioned in section 5(2)(b) was not obtained or was improperly obtained.</p></content></subsection><subsection eId="section-6-5"><num>(5)</num><intro><p>Provision included in framework regulations by virtue of subsection (4) may, in particular, enable the Secretary of State to—</p></intro><level class="para1" eId="section-6-5-a"><num>(a)</num><content><p>require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-6-5-b"><num>(b)</num><content><p>require a green deal provider to refund any such payments that have already been made;</p></content></level><level class="para1" eId="section-6-5-c"><num>(c)</num><content><p>require an improver to pay compensation to the green deal provider in respect of the suspension, cancellation or refund.</p></content></level></subsection></section><section eId="section-7"><num>7</num><heading>Installation of improvements</heading><subsection eId="section-7-1"><num>(1)</num><content><p>For the purposes of section 1(5)(a) improvements are installed in accordance with this section if the following three conditions are met.</p></content></subsection><subsection eId="section-7-2"><num>(2)</num><content><p>The first condition is that the person carrying out the installation of the improvements is authorised by virtue of the framework regulations to act as a green deal installer.</p></content></subsection><subsection eId="section-7-3"><num>(3)</num><intro><p>The second condition is that any product installed in making the improvements—</p></intro><level class="para1" eId="section-7-3-a"><num>(a)</num><content><p>meets the standard specified in the code of practice in relation to the product or description of product, or</p></content></level><level class="para1" eId="section-7-3-b"><num>(b)</num><intro><p>is listed in a document which—</p></intro><level class="para2" eId="section-7-3-b-i"><num>(i)</num><content><p>is issued by the Secretary of State or a person authorised by the Secretary of State in connection with the code, and</p></content></level><level class="para2" eId="section-7-3-b-ii"><num>(ii)</num><content><p>is referred to in the code as listing the products which are to be taken as meeting the required standard.</p></content></level></level></subsection><subsection eId="section-7-4"><num>(4)</num><content><p>In specifying the standard in relation to a product or description of product for the purposes of subsection (3)(a), the code of practice may make provision as to the testing and certification of the product or description of product.</p></content></subsection><subsection eId="section-7-5"><num>(5)</num><content><p>The third condition is that the carrying out of the installation meets the standard specified in the code of practice.</p></content></subsection><subsection eId="section-7-6"><num>(6)</num><content><p>In this section references to the code of practice are to the code of practice issued for the purposes of the scheme under the framework regulations.</p></content></subsection></section><section eId="section-8"><num>8</num><heading>Confirmation of plan</heading><subsection eId="section-8-1"><num>(1)</num><content><p>For the purposes of section 1(5)(b) an arrangement is confirmed in accordance with this section if the following two conditions are met.</p></content></subsection><subsection eId="section-8-2"><num>(2)</num><intro><p>The first condition is that the relevant energy supplier notifies the bill payer—</p></intro><level class="para1" eId="section-8-2-a"><num>(a)</num><content><p>that payments for the energy efficiency improvements to the property are to be included in the energy bills for the property from the date specified in the notification, and</p></content></level><level class="para1" eId="section-8-2-b"><num>(b)</num><content><p>of the amounts of those payments and the period for which they are to be made.</p></content></level></subsection><subsection eId="section-8-3"><num>(3)</num><content><p>The date mentioned in subsection (2)(a) must not fall earlier than the end of the period specified in the framework regulations.</p></content></subsection><subsection eId="section-8-4"><num>(4)</num><intro><p>The second condition is that, as soon as practicable after the improvements have been installed, the green deal provider takes one or more of the following actions as required by the framework regulations in the circumstances—</p></intro><level class="para1" eId="section-8-4-a"><num>(a)</num><content><p>producing a document containing such information in connection with the plan as is specified in the regulations in the form so specified,</p></content></level><level class="para1" eId="section-8-4-b"><num>(b)</num><content><p>securing that a document of a description specified in the regulations is produced, or</p></content></level><level class="para1" eId="section-8-4-c"><num>(c)</num><content><p>securing that a document of such a description is updated.</p></content></level></subsection><subsection eId="section-8-5"><num>(5)</num><content><p>The reference in this section to securing that a document is updated includes a reference to securing that a document is replaced by a document of the same description.</p></content></subsection><subsection eId="section-8-6"><num>(6)</num><content><p>Sections 9 and 10 make further provision in relation to the second condition.</p></content></subsection></section><section eId="section-9"><num>9</num><heading>Confirmation of plan: supplementary provision for England and Wales</heading><subsection eId="section-9-1"><num>(1)</num><content><p>Subsection (2) applies if, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2007 Regulations or the 2010 Regulations.</p></content></subsection><subsection eId="section-9-2"><num>(2)</num><content><p>The Secretary of State may by regulations make provision amending the 2007 Regulations or the 2010 Regulations or both (as the case may require) in connection with a document required to be produced or updated by virtue of section 8(4)(b) or (c).</p></content></subsection><subsection eId="section-9-3"><num>(3)</num><content><p>The amendments made by virtue of subsection (2) may, in particular, include amendments for the purpose of requiring a document to contain additional or updated information in connection with the plan or the improvements installed under the plan.</p></content></subsection><subsection eId="section-9-4"><num>(4)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-the-2007-regulations" eId="term-the-2007-regulations">the 2007 Regulations</term>” means the Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2007/991);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-2010-regulations" eId="term-the-2010-regulations">the 2010 Regulations</term>” means the Building Regulations 2010 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2010/2214).</p></content></hcontainer></subsection></section><section eId="section-10"><num>10</num><heading>Confirmation of plan: supplementary provision for Scotland</heading><subsection eId="section-10-1"><num>(1)</num><content><p>Subsection (2) applies if, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2008 Regulations.</p></content></subsection><subsection eId="section-10-2"><num>(2)</num><content><p>The Scottish Ministers may by regulations make provision amending the 2008 Regulations in connection with a document required to be produced or updated by virtue of section 8(4)(b) or (c).</p></content></subsection><subsection eId="section-10-3"><num>(3)</num><content><p>The amendments made by virtue of subsection (2) may, in particular, include amendments for the purpose of requiring a document to contain additional or updated information in connection with the plan or the improvements installed under the plan.</p></content></subsection><subsection eId="section-10-4"><num>(4)</num><content><p>In this section “<term refersTo="#term-the-2008-regulations" eId="term-the-2008-regulations">the 2008 Regulations</term>” means the Energy Performance of Buildings (Scotland) Regulations 2008 (<abbr class="acronym" title="Scottish Statutory Instrument">S.S.I.</abbr> 2008/309).</p></content></subsection></section><section eId="section-11"><num>11</num><heading>Updating information produced under section 8</heading><hcontainer name="wrapper2"><subsection eId="section-11-1"><num>(1)</num><content><p>The framework regulations may make provision as to the circumstances in which a document produced for the purposes of section 8(4)(a) is required to be updated in accordance with the regulations.</p></content></subsection><subsection eId="section-11-2"><num>(2)</num><content><p>Subsection (6) applies if one or more of the first, second or third conditions is met.</p></content></subsection><subsection eId="section-11-3"><num>(3)</num><intro><p>The first condition is that—</p></intro><level class="para1" eId="section-11-3-a"><num>(a)</num><content><p>by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2007 Regulations or the 2010 Regulations, and</p></content></level><level class="para1" eId="section-11-3-b"><num>(b)</num><content><p>provision is made in the 2007 Regulations or the 2010 Regulations or both by virtue of section 9(3) to require a document of that description to contain additional or updated information.</p></content></level></subsection><subsection eId="section-11-4"><num>(4)</num><intro><p>The second condition is that—</p></intro><level class="para1" eId="section-11-4-a"><num>(a)</num><content><p>by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2008 Regulations, and</p></content></level><level class="para1" eId="section-11-4-b"><num>(b)</num><content><p>provision is made in the 2008 Regulations by virtue of section 10(3) to require a document of that description to contain additional or updated information.</p></content></level></subsection><subsection eId="section-11-5"><num>(5)</num><content><p>The third condition is that, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description other than one falling within subsection (3) or (4).</p></content></subsection><subsection eId="section-11-6"><num>(6)</num><intro><p>The framework regulations may make provision as to the circumstances in which<ins class="substitution first" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3"><noteRef uk:name="commentary" href="#key-dfc5221cba708fe22339d7edef4760f3" class="commentary"/>—</ins></p></intro><level class="para1" eId="section-11-6-a"><num><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">(a)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">data from which a document of a description falling within subsection (3) or (4) may be produced, or</ins></p></content></level></subsection><level class="para1" eId="section-11-b"><num><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">(b)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">a document of a description falling within subsection (5),</ins></p></content></level></hcontainer><hcontainer name="wrapper2"><intro><p><ins class="substitution last" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">is</ins> required to be updated or further updated in accordance with provision made by the Secretary of State in the regulations.</p></intro><subsection eId="section-11-7"><num>(7)</num><content><p>In subsection (3) “<term refersTo="#term-the-2007-regulations" eId="term-the-2007-regulations">the 2007 Regulations</term>” and “<term refersTo="#term-the-2010-regulations" eId="term-the-2010-regulations">the 2010 Regulations</term>” have the same meaning as in section 9.</p></content></subsection><subsection eId="section-11-8"><num>(8)</num><content><p>In subsection (4) “<term refersTo="#term-the-2008-regulations" eId="term-the-2008-regulations">the 2008 Regulations</term>” has the same meaning as in section 10.</p></content></subsection><subsection eId="section-11-9"><num>(9)</num><content><p>In this section references to a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1491329299599" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> being required to be updated or further updated include references to a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1495547783705" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> being required to be replaced by a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1495547785898" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> of the same description.</p></content></subsection></hcontainer></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-disclosure-of-green-deal-plan-etc"><heading><i>Disclosure of green deal plan <abbr title="Et cetera" xml:lang="la">etc</abbr></i></heading><section eId="section-12"><num>12</num><heading>Disclosure of green deal plan <abbr title="Et cetera" xml:lang="la">etc</abbr> in connection with sale or letting out</heading><subsection eId="section-12-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-12-1-a"><num>(a)</num><content><p>a green deal property, or a lease of such a property, is to be sold, or</p></content></level><level class="para1" eId="section-12-1-b"><num>(b)</num><intro><p>a green deal property is to be let out—</p></intro><level class="para2" eId="section-12-1-b-i"><num>(i)</num><content><p>under a tenancy or licence agreement, and</p></content></level><level class="para2" eId="section-12-1-b-ii"><num>(ii)</num><content><p>on the basis that the prospective tenant or licensee is to be liable for paying the energy bills for the property.</p></content></level></level></subsection><subsection eId="section-12-2"><num>(2)</num><intro><p>The seller or prospective landlord or licensor must, in relation to the document, or each document, required to be produced or updated as mentioned in section 8(4)—</p></intro><level class="para1" eId="section-12-2-a"><num>(a)</num><content><p>obtain the document or, if the requirement to produce or update the document has not yet been complied with, produce a document containing the same information in connection with the green deal plan as that document would have contained, and</p></content></level><level class="para1" eId="section-12-2-b"><num>(b)</num><content><p>provide the document free of charge to any prospective buyer, tenant or licensee at the specified time.</p></content></level></subsection><subsection eId="section-12-3"><num>(3)</num><content><p>An obligation under subsection (2) may be discharged by an agent.</p></content></subsection><subsection eId="section-12-4"><num>(4)</num><intro><p>For the purposes of subsection (2) a person becomes a prospective buyer, tenant or licensee in relation to a property when the person—</p></intro><level class="para1" eId="section-12-4-a"><num>(a)</num><content><p>requests any information about the property from the seller, prospective landlord or licensor or an agent for the purpose of deciding whether to buy or let the property,</p></content></level><level class="para1" eId="section-12-4-b"><num>(b)</num><content><p>makes a request to view the property for the purpose mentioned in paragraph (a), or</p></content></level><level class="para1" eId="section-12-4-c"><num>(c)</num><content><p>makes an offer, whether oral or written, to buy or let the property.</p></content></level></subsection><subsection eId="section-12-5"><num>(5)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-12-5-a"><num>(a)</num><content><p>an agent is a person acting on behalf of a seller or prospective landlord or licensor in the sale or letting out of a property;</p></content></level><level class="para1" eId="section-12-5-b"><num>(b)</num><content><p>a property is a green deal property if there is a green deal plan in respect of the property and payments are still to be made under that plan;</p></content></level><level class="para1" eId="section-12-5-c"><num>(c)</num><content><p>specified, in relation to a time, means specified in regulations made by the Secretary of State.</p></content></level></subsection><subsection eId="section-12-6"><num>(6)</num><content><p>The Secretary of State may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection></section><section eId="section-13"><num>13</num><heading>Disclosure of green deal plan in connection with other transactions <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-13-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-13-1-a"><num>(a)</num><content><p>there is to be a transaction or other arrangement in respect of a green deal property (not falling within section 12(1)), and</p></content></level><level class="para1" eId="section-13-1-b"><num>(b)</num><content><p>the transaction or arrangement is of a description specified in regulations made by the Secretary of State.</p></content></level></subsection><subsection eId="section-13-2"><num>(2)</num><intro><p>The regulations may require a person of a description specified in the regulations to—</p></intro><level class="para1" eId="section-13-2-a"><num>(a)</num><content><p>obtain a document required to be produced or updated as mentioned in section 8(4) or, if the requirement to produce or update such a document has not yet been complied with, produce a document containing the same information in connection with the green deal plan as that document would have contained, and</p></content></level><level class="para1" eId="section-13-2-b"><num>(b)</num><content><p>provide the document free of charge to a person of a description specified in the regulations at the time so specified.</p></content></level></subsection><subsection eId="section-13-3"><num>(3)</num><content><p>The regulations may provide for an obligation imposed on a person by virtue of subsection (2) to be discharged by a person acting on the person's behalf.</p></content></subsection><subsection eId="section-13-4"><num>(4)</num><content><p>In this section the reference to a green deal property is to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-14"><num>14</num><heading>Acknowledgment of green deal plan on sale or letting out</heading><subsection eId="section-14-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-14-1-a"><num>(a)</num><content><p>a green deal property, or a lease of such a property, is to be sold, or</p></content></level><level class="para1" eId="section-14-1-b"><num>(b)</num><intro><p>a green deal property is to be let out—</p></intro><level class="para2" eId="section-14-1-b-i"><num>(i)</num><content><p>under a tenancy or licence agreement which is in writing, and</p></content></level><level class="para2" eId="section-14-1-b-ii"><num>(ii)</num><content><p>on the basis that the prospective tenant or licensee is to be liable for paying the energy bills for the property.</p></content></level></level></subsection><subsection eId="section-14-2"><num>(2)</num><content><p>The seller or prospective landlord or licensor must secure that the contract for sale or tenancy or licence agreement includes an acknowledgment by the buyer, tenant or licensee that the bill payer at the property is liable to make payments under the green deal plan and that certain terms of that plan are binding on the bill payer.</p></content></subsection><subsection eId="section-14-3"><num>(3)</num><content><p>Subsections (4) and (5) apply where the green deal property is in England or Wales.</p></content></subsection><subsection eId="section-14-4"><num>(4)</num><content><p>An acknowledgment required by subsection (2) must be in the form prescribed in regulations made by the Secretary of State.</p></content></subsection><subsection eId="section-14-5"><num>(5)</num><content><p>The Secretary of State may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection><subsection eId="section-14-6"><num>(6)</num><content><p>Subsections (7) and (8) apply where the green deal property is in Scotland.</p></content></subsection><subsection eId="section-14-7"><num>(7)</num><content><p>The acknowledgment required by subsection (2) must be in the form prescribed in regulations made by the Scottish Ministers.</p></content></subsection><subsection eId="section-14-8"><num>(8)</num><content><p>The Scottish Ministers may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection><subsection eId="section-14-9"><num>(9)</num><content><p>In this section references to a green deal property are to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-15"><num>15</num><heading>Acknowledgment of green deal plan in connection with other transactions <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-15-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-15-1-a"><num>(a)</num><content><p>there is to be a transaction or other arrangement in respect of a green deal property (not falling within section 14(1)), and</p></content></level><level class="para1" eId="section-15-1-b"><num>(b)</num><content><p>the transaction or arrangement is of a description specified in regulations made under this subsection by the Secretary of State.</p></content></level></subsection><subsection eId="section-15-2"><num>(2)</num><intro><p>Regulations under subsection (1) may require a person of a description specified in the regulations to secure, at a time and in a document so specified, that an acknowledgment is made by a person of a description so specified that—</p></intro><level class="para1" eId="section-15-2-a"><num>(a)</num><content><p>the bill payer at the property is liable to make payments under the green deal plan, and</p></content></level><level class="para1" eId="section-15-2-b"><num>(b)</num><content><p>certain terms of that plan are binding on the bill payer.</p></content></level></subsection><subsection eId="section-15-3"><num>(3)</num><content><p>Where the green deal property is in England or Wales, regulations made by the Secretary of State under this subsection may provide for any acknowledgment required by virtue of subsection (2) to be in the form prescribed in the regulations under this subsection.</p></content></subsection><subsection eId="section-15-4"><num>(4)</num><content><p>Where the green deal property is in Scotland, regulations made by the Scottish Ministers under this subsection may provide for any acknowledgment required by virtue of subsection (2) to be in the form prescribed in the regulations under this subsection.</p></content></subsection><subsection eId="section-15-5"><num>(5)</num><content><p>In this section references to a green deal property are to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-16"><num>16</num><heading>Sanctions for non-compliance with obligations under sections 12 to 15</heading><subsection eId="section-16-1"><num>(1)</num><intro><p>The Secretary of State may make regulations—</p></intro><level class="para1" eId="section-16-1-a"><num>(a)</num><content><p>for the purpose of securing compliance with the obligations set out in section 12 or 14 or imposed by virtue of regulations under section 13 or 15;</p></content></level><level class="para1" eId="section-16-1-b"><num>(b)</num><content><p>as to the consequences of non-compliance with the obligations.</p></content></level></subsection><subsection eId="section-16-2"><num>(2)</num><intro><p>The regulations may, in particular, include provision—</p></intro><level class="para1" eId="section-16-2-a"><num>(a)</num><content><p>as to sanctions for non-compliance with the obligations (including the imposition of a civil penalty);</p></content></level><level class="para1" eId="section-16-2-b"><num>(b)</num><content><p>enabling the Secretary of State to require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-16-2-c"><num>(c)</num><content><p>enabling the Secretary of State to require a green deal provider to refund any such payments that have already been made;</p></content></level><level class="para1" eId="section-16-2-d"><num>(d)</num><content><p>enabling the Secretary of State to require a seller, a prospective landlord or licensor or another person to pay compensation to a green deal provider in respect of any such suspension, cancellation or refund.</p></content></level></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-modifying-energy-licences"><heading><i>Modifying energy licences</i></heading><section eId="section-17"><num>17</num><heading>Power to modify energy licences in connection with green deal payments</heading><subsection eId="section-17-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-17-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7 or 7A of the Gas Act 1986 (gas transporter, shipper and supply licences);</p></content></level><level class="para1" eId="section-17-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-17-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(c) or (d) of the Electricity Act 1989 (electricity distribution and supply licences);</p></content></level><level class="para1" eId="section-17-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-17-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7 or 7A of the Gas Act 1986 or section 6(1)(c) or (d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-17-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised for the following purposes only—</p></intro><level class="para1" eId="section-17-2-a"><num>(a)</num><content><p>in so far as the power relates to a licence under section 7 of the Gas Act 1986 or section 6(1)(c) of the Electricity Act 1989, the purpose of preventing the holder of the licence from permanently disconnecting the supply of gas or electricity to a green deal property, and</p></content></level><level class="para1" eId="section-17-2-b"><num>(b)</num><content><p>in so far as the power relates to any licence, the purpose of requiring or enabling the holder of the licence to take, or not to take, specified action in connection with green deal payments.</p></content></level></subsection><subsection eId="section-17-3"><num>(3)</num><intro><p>The provision which may be made by virtue of subsection (2)(b) includes, in particular—</p></intro><level class="para1" eId="section-17-3-a"><num>(a)</num><content><p>if the holder of the licence is of a specified description, provision enabling the holder to opt into or opt out of any provision made by virtue of paragraphs (b) to (f),</p></content></level><level class="para1" eId="section-17-3-b"><num>(b)</num><content><p>provision requiring the holder of the licence to collect green deal payments through energy bills and remit them to a green deal provider,</p></content></level><level class="para1" eId="section-17-3-c"><num>(c)</num><content><p>provision as to the circumstances in which the holder of the licence is required to make payments to a green deal provider by reference to green deal payments which are due but which have not been made,</p></content></level><level class="para1" eId="section-17-3-d"><num>(d)</num><content><p>provision in connection with the cancellation or suspension of green deal payments,</p></content></level><level class="para1" eId="section-17-3-e"><num>(e)</num><content><p>provision requiring or enabling the holder of the licence to make specified arrangements for facilitating the collection of green deal payments, and</p></content></level><level class="para1" eId="section-17-3-f"><num>(f)</num><content><p>provision requiring or enabling payments to be made by or to the holder of the licence in respect of functions discharged in connection with green deal payments.</p></content></level></subsection><subsection eId="section-17-4"><num>(4)</num><content><p>Provision made by virtue of subsection (2)(b) which falls within subsection (3)(c) may include provision requiring the holder of the licence, where a bill payer has failed to pay a sum due under an energy bill, to remit a proportion of any payment received to a green deal provider.</p></content></subsection><subsection eId="section-17-5"><num>(5)</num><content><p>Conditions included in a licence under section 7 or 7A of the Gas Act 1986 by virtue of the power under subsection (1) may do any of the things authorised by section 7B(5)(a)(i) or (iii) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7B(4)(a)).</p></content></subsection><subsection eId="section-17-6"><num>(6)</num><content><p>Conditions included in a licence under section 6(1)(c) or (d) of the Electricity Act 1989 by virtue of the power under subsection (1) may do any of the things authorised by section 7(3)(a) or (c) or (4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection><subsection eId="section-17-7"><num>(7)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-17-7-a"><num>(a)</num><content><p>payments are green deal payments if they are made under a green deal plan,</p></content></level><level class="para1" eId="section-17-7-b"><num>(b)</num><content><p>a property is a green deal property if there is a green deal plan in respect of the property and payments are still to be made under that plan, and</p></content></level><level class="para1" eId="section-17-7-c"><num>(c)</num><content><p>references to a green deal provider include references to a person acting on behalf of a green deal provider or nominated by a green deal provider.</p></content></level></subsection></section><section eId="section-18"><num>18</num><heading>Power to modify energy supply licences to make provision as to default in green deal payments</heading><subsection eId="section-18-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-18-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-18-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-18-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-18-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-18-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-18-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised for the purpose only of making provision—</p></intro><level class="para1" eId="section-18-2-a"><num>(a)</num><content><p>as to the steps which are to be taken by the holder of a licence following a bill payer's default in making green deal payments to the holder of the licence,</p></content></level><level class="para1" eId="section-18-2-b"><num>(b)</num><content><p>as to the circumstances in which the holder of a licence may disconnect the supply to a green deal property following such a default, or</p></content></level><level class="para1" eId="section-18-2-c"><num>(c)</num><content><p>enabling, in specified circumstances, the holder of a licence to require from a bill payer a deposit by way of security for green deal payments to be made by the bill payer.</p></content></level></subsection><subsection eId="section-18-3"><num>(3)</num><content><p>For the purposes of this section “green deal payments” and “green deal property” are to be read in accordance with section 17(7).</p></content></subsection></section><section eId="section-19"><num>19</num><heading>Power to modify energy supply licences to require provision of information</heading><subsection eId="section-19-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-19-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-19-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-19-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-19-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-19-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-19-2"><num>(2)</num><content><p>The power under subsection (1) may be exercised for one or both of the following two purposes only.</p></content></subsection><subsection eId="section-19-3"><num>(3)</num><content><p>The first purpose is the purpose of requiring, at specified times, the holder of the licence to provide bill payers with specified information in connection with their green deal plans.</p></content></subsection><subsection eId="section-19-4"><num>(4)</num><content><p>The second purpose is the purpose of requiring the holder of the licence to disclose on request specified information about the payment of energy bills by a person who is, or is to be, the bill payer for a property in respect of which there is, or is proposed to be, a green deal plan.</p></content></subsection><subsection eId="section-19-5"><num>(5)</num><intro><p>The only persons to whom the licence holder may be required to disclose information by virtue of subsection (4) are—</p></intro><level class="para1" eId="section-19-5-a"><num>(a)</num><content><p>where there is a green deal plan, the green deal provider under the plan;</p></content></level><level class="para1" eId="section-19-5-b"><num>(b)</num><content><p>where there is proposed to be a green deal plan, a person who is authorised under the framework regulations to act as a green deal provider.</p></content></level></subsection><subsection eId="section-19-6"><num>(6)</num><intro><p>The licence holder may be required to disclose the information requested only where—</p></intro><level class="para1" eId="section-19-6-a"><num>(a)</num><content><p>the green deal provider or authorised person states that the request is made for purposes connected with the green deal plan or proposed green deal plan,</p></content></level><level class="para1" eId="section-19-6-b"><num>(b)</num><intro><p>the green deal provider or authorised person provides evidence that the bill payer has consented to—</p></intro><level class="para2" eId="section-19-6-b-i"><num>(i)</num><content><p>disclosure of the information to that provider or person for those purposes, and</p></content></level><level class="para2" eId="section-19-6-b-ii"><num>(ii)</num><content><p>onward disclosure of the disclosed information to and by other persons for those purposes,</p></content></level></level><level class="para1" eId="section-19-6-c"><num>(c)</num><content><p>the information relates to a time within the 5 years immediately preceding the request, and</p></content></level><level class="para1" eId="section-19-6-d"><num>(d)</num><content><p>the licence holder has the information.</p></content></level></subsection><subsection eId="section-19-7"><num>(7)</num><content><p>The power under subsection (1) may be exercised so as to require information to be provided in a specified manner or form, or subject to specified requirements or restrictions.</p></content></subsection><subsection eId="section-19-8"><num>(8)</num><content><p>Conditions included in a licence under section 7A(1) of the Gas Act 1986 by virtue of the power under subsection (1) and the purpose mentioned in subsection (4) may do any of the things authorised by section 7B(5)(a)(i) or (iii) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7B(4)(a)).</p></content></subsection><subsection eId="section-19-9"><num>(9)</num><content><p>Conditions included in a licence under section 6(1)(d) of the Electricity Act 1989 by virtue of the power under subsection (1) and the purpose mentioned in subsection (4) may do any of the things authorised by section 7(3)(a) or (c) or (4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection></section><section eId="section-20"><num>20</num><heading>Power to modify energy supply licences to make provision as to consumer protection</heading><subsection eId="section-20-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-20-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-20-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-20-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-20-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-20-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-20-2"><num>(2)</num><content><p>The power under subsection (1) may be exercised for the purpose only of making provision corresponding to that made by the disapplied consumer protection legislation.</p></content></subsection><subsection eId="section-20-3"><num>(3)</num><content><p>Conditions included in a licence under section 6(1)(d) of the Electricity Act 1989 by virtue of the power under subsection (1) may do any of the things authorised by section 7(4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection><subsection eId="section-20-4"><num>(4)</num><content><p>For the purposes of subsection (2) provision corresponds to that made by the disapplied consumer protection legislation if it is made for the same purpose as the purpose for which that provision was made.</p></content></subsection><subsection eId="section-20-5"><num><ins class="substitution first" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35"><noteRef uk:name="commentary" href="#key-3f8f93cba169f015282416aba5430e35" class="commentary"/>(5)</ins></num><intro><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">For the purpose of this section, references to the disapplied consumer protection legislation are to—</ins></p></intro><level class="para1" eId="section-20-5-a"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(a)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">the provisions of or made under the Consumer Credit Act 1974 or the Financial Services and Markets Act 2000 (“the 2000 Act”), and</ins></p></content></level><level class="para1" eId="section-20-5-b"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(b)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">any rules made under the 2000 Act,</ins></p></content></level><wrapUp><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">which would apply but for any exemption conferred by an order under section 22 of the 2000 Act (regulated activities) in relation to debts due under a green deal plan associated with the licensee.</ins></p></wrapUp></subsection><subsection eId="section-20-6"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(6)</ins></num><content><p><ins class="substitution last" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">A green deal plan is associated with a licensee if the payments under the plan are to be made to the licensee.</ins></p></content></subsection></section><section eId="section-21"><num>21</num><heading>Powers under sections 17 to 20: consultation</heading><intro><p>Before making a modification under any of sections 17 to 20, the Secretary of State must consult—</p></intro><level class="para1" eId="section-21-a"><num>(a)</num><content><p>the holder of any licence being modified,</p></content></level><level class="para1" eId="section-21-b"><num>(b)</num><content><p>the Gas and Electricity Markets Authority, and</p></content></level><level class="para1" eId="section-21-c"><num>(c)</num><content><p>such other persons as the Secretary of State considers appropriate.</p></content></level></section><section eId="section-22"><num>22</num><heading>Powers under sections 17 to 20: supplementary</heading><subsection eId="section-22-1"><num>(1)</num><content><p>Subsections (2) to (6) apply in relation to the powers under sections 17 to 20.</p></content></subsection><subsection eId="section-22-2"><num>(2)</num><intro><p>The powers—</p></intro><level class="para1" eId="section-22-2-a"><num>(a)</num><content><p>may be exercised generally, only in relation to specified cases or subject to exceptions (including provision for a case to be excepted only so long as specified conditions are satisfied);</p></content></level><level class="para1" eId="section-22-2-b"><num>(b)</num><content><p>may be exercised differently in different cases or circumstances;</p></content></level><level class="para1" eId="section-22-2-c"><num>(c)</num><content><p>include a power to make incidental, consequential or transitional modifications.</p></content></level></subsection><subsection eId="section-22-3"><num>(3)</num><intro><p>Provision included in a licence by virtue of any of the powers—</p></intro><level class="para1" eId="section-22-3-a"><num>(a)</num><content><p>need not relate to the activities authorised by the licence;</p></content></level><level class="para1" eId="section-22-3-b"><num>(b)</num><content><p>may make different provision for different cases.</p></content></level></subsection><subsection eId="section-22-4"><num>(4)</num><content><p>The Secretary of State must publish details of modifications under any of the powers as soon as reasonably practicable after the modifications are made.</p></content></subsection><subsection eId="section-22-5"><num>(5)</num><content><p>A modification under any of the powers of part of a standard condition of a licence does not prevent any other part of the condition from continuing to be regarded as a standard condition for the purposes of Part 1 of the Gas Act 1986 or Part 1 of the Electricity Act 1989.</p></content></subsection><subsection eId="section-22-6"><num>(6)</num><content><p>Where the Secretary of State makes modifications under any of the powers of the standard conditions of a licence of any type, the Gas and Electricity Markets Authority must make the same modification of those standard conditions for the purposes of their incorporation in licences of that type granted after that time.</p></content></subsection><subsection eId="section-22-7"><num>(7)</num><intro><p>In section 33(1) of the Utilities Act 2000 (standard conditions of electricity licences)—</p></intro><level class="para1" eId="section-22-7-a"><num>(a)</num><content><p>after paragraph (d) omit “or”;</p></content></level><level class="para1" eId="section-22-7-b"><num>(b)</num><content><p><mod>after paragraph (e) insert<quotedText startQuote="&#x201C;">or </quotedText><quotedStructure endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(f)</num><content><p>under Chapter 1 of Part 1 of the Energy Act 2011.</p></content></level></quotedStructure></mod></p></content></level></subsection><subsection eId="section-22-8"><num>(8)</num><intro><p>In section 81(2) of the Utilities Act 2000 (standard conditions of gas licences)—</p></intro><level class="para1" eId="section-22-8-a"><num>(a)</num><content><p><mod>for “2008 or” substitute <quotedText>“ 2008, ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-22-8-b"><num>(b)</num><content><p><mod>after “2010” insert <quotedText>“ or under Chapter 1 of Part 1 of the Energy Act 2011 ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-22-9"><num>(9)</num><content><p>Sections 4AA to 4B of the Gas Act 1986 (principal objective and general duties) apply in relation to the powers under sections 17 to 20 with respect to holders of licences under section 7 or 7A of that Act as they apply in relation to functions of the Secretary of State under Part 1 of that Act.</p></content></subsection><subsection eId="section-22-10"><num>(10)</num><content><p>Sections 3A to 3D of the Electricity Act 1989 (principal objective and general duties) apply in relation to the powers under sections 17 to 20 with respect to holders of licences under section 6(1)(c) or (d) of that Act as they apply in relation to functions of the Secretary of State under Part 1 of that Act.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-gas-and-electricity-codes"><heading><i>Gas and electricity codes</i></heading><section eId="section-23"><num>23</num><heading>Recovering green deal payments: gas suppliers</heading><subsection eId="section-23-1"><num>(1)</num><content><p>Schedule 2B to the Gas Act 1986 (the gas code) is amended as follows.</p></content></subsection><subsection eId="section-23-2"><num>(2)</num><content><p><mod>In paragraph 6A(1) for paragraph (a) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(a)</num><intro><p>the sum is owed to an authorised supplier—</p></intro><level class="para2"><num>(i)</num><content><p>in respect of the supply of gas to the premises on which the meter is installed,</p></content></level><level class="para2"><num>(ii)</num><content><p>in respect of the provision of the meter, or</p></content></level><level class="para2"><num>(iii)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises; or</p></content></level></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-23-3"><num>(3)</num><content><p><mod>In paragraph 7(1) for paragraphs (a) and (b) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>a demand in writing is made by a gas supplier for any of the relevant payments to be made by a consumer; and</p></content></level><level class="para1"><num>(b)</num><content><p>the consumer does not make those payments within 28 days after the making of the demand.</p></content></level></quotedStructure></mod></p></content></subsection><subsection eId="section-23-4"><num>(4)</num><content><p><mod>After paragraph 7(1) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><subsection><num>(1A)</num><intro><p>A payment is a relevant payment for the purposes of sub-paragraph (1) if it is due to the gas supplier from the consumer—</p></intro><level class="para1"><num>(a)</num><content><p>in respect of the supply of gas to any premises of the consumer (in this paragraph referred to as “<term refersTo="#term-the-premises">the premises</term>”); or</p></content></level><level class="para1"><num>(b)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-23-5"><num>(5)</num><content><p><mod>In each of paragraphs 7(4)(b) and (5) for “charges” substitute <quotedText>“ payments ”</quotedText>.</mod></p></content></subsection></section><section eId="section-24"><num>24</num><heading>Recovering green deal payments: electricity suppliers</heading><subsection eId="section-24-1"><num>(1)</num><content><p>The Electricity Act 1989 is amended as follows.</p></content></subsection><subsection eId="section-24-2"><num>(2)</num><content><p>Paragraph 2 of Schedule 6 to the Electricity Act 1989 (the electricity code) is amended as set out in subsections (3) to (5).</p></content></subsection><subsection eId="section-24-3"><num>(3)</num><content><p><mod>In sub-paragraph (1) for the words from “paid” to “electricity meter” substitute <quotedText>“ made all the relevant payments ”</quotedText>.</mod></p></content></subsection><subsection eId="section-24-4"><num>(4)</num><content><p><mod>After sub-paragraph (1) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><subsection><num>(1A)</num><intro><p>A payment is a relevant payment for the purposes of sub-paragraph (1) if it is due from the customer to an electricity supplier—</p></intro><level class="para1"><num>(a)</num><content><p>in respect of the supply of electricity to any premises or the provision of an electricity meter; or</p></content></level><level class="para1"><num>(b)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-24-5"><num>(5)</num><content><p><mod>In sub-paragraph (3) for “payment of the charges due” substitute <quotedText>“ the relevant payments to be made ”</quotedText>.</mod></p></content></subsection><subsection eId="section-24-6"><num>(6)</num><content><p><mod>In paragraph 12(2) of Schedule 7 (recovery through pre-payment meters) for paragraph (a) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="default"><level class="para1"><num>(a)</num><intro><p>the sum is owed to an authorised supplier—</p></intro><level class="para2"><num>(i)</num><content><p>in respect of the supply of electricity to the premises on which the meter is installed,</p></content></level><level class="para2"><num>(ii)</num><content><p>in respect of the provision of the meter, or</p></content></level><level class="para2"><num>(iii)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises; or</p></content></level></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-modifying-consumer-credit-legislation"><heading><i>Modifying consumer credit legislation</i></heading><section eId="section-25"><num><noteRef href="#key-f059ff6bc0f5be2cb9a9a920afef444e" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>25</num><heading>Exemption from Consumer Credit Act 1974 in relation to credit to business debtors</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-26"><num><noteRef href="#key-fe68fb8a74e286ff5688a659547d5b8a" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>26</num><heading>Energy suppliers not to be treated as carrying on ancillary credit business</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-27"><num>27</num><heading>Duties to give debtors information and statements</heading><subsection eId="section-27-1"><num>(1)</num><content><p>The Consumer Credit Act 1974 is amended as follows.</p></content></subsection><subsection eId="section-27-2"><num>(2)</num><content><p><mod>In section 77 (duty to give information to debtor under fixed-sum credit agreement) after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(2A)</num><content><p>Subsection (2B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(2B)</num><content><p>The duty imposed on the creditor by subsection (1) may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-27-3"><num>(3)</num><content><p><mod>In section 77A (statements to be provided in relation to fixed-sum credit agreement) after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(2A)</num><content><p>Subsection (2B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(2B)</num><content><p>Any duty imposed on the creditor by this section may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-27-4"><num>(4)</num><content><p><mod>In section 77B (statement of account to be provided on request in relation to fixed-sum credit agreement) after subsection (7) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(7A)</num><content><p>Subsection (7B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(7B)</num><content><p>The duty imposed on the creditor by this section may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection></section><section eId="section-28"><num>28</num><heading>Exemption from requirement to give notice of sums in arrears</heading><content><p><mod>In section 86B of the Consumer Credit Act 1974 (requirement to give notice of sums in arrears) for subsection (12) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(12)</num><content><p>In this section “<term refersTo="#term-applicable-agreement">applicable agreement</term>” means an agreement which falls within subsection (12A) or (12B).</p></content></subsection><subsection><num>(12A)</num><intro><p>An agreement falls within this subsection if—</p></intro><level class="para1"><num>(a)</num><content><p>it is a regulated agreement for fixed-sum credit; and</p></content></level><level class="para1"><num>(b)</num><intro><p>it is not—</p></intro><level class="para2"><num>(i)</num><content><p>a non-commercial agreement;</p></content></level><level class="para2"><num>(ii)</num><content><p>a small agreement; or</p></content></level><level class="para2"><num>(iii)</num><content><p>a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></level></level></subsection><subsection><num>(12B)</num><intro><p>An agreement falls within this subsection if—</p></intro><level class="para1"><num>(a)</num><content><p>it is a regulated consumer hire agreement; and</p></content></level><level class="para1"><num>(b)</num><content><p>it is neither a non-commercial agreement nor a small agreement.</p></content></level></subsection></quotedStructure></mod></p></content></section><section eId="section-29"><num>29</num><heading>Early repayment of green deal finance</heading><subsection eId="section-29-1"><num>(1)</num><content><p>The Consumer Credit Act 1974 is amended as follows.</p></content></subsection><subsection eId="section-29-2"><num>(2)</num><content><p><mod>After section 95A (compensatory amount to creditor in relation to early repayment) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><section><num>95B</num><heading>Compensatory amount: green deal finance</heading><subsection><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1"><num>(a)</num><content><p>a regulated consumer credit agreement provides for the rate of interest on the credit to be fixed for a period of time (“the fixed rate period”),</p></content></level><level class="para1"><num>(b)</num><content><p>the agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011) which is of a duration specified for the purposes of this section in regulations, and</p></content></level><level class="para1"><num>(c)</num><content><p>under section 94 the debtor discharges all or part of his indebtedness during the fixed rate period.</p></content></level></subsection><subsection><num>(2)</num><intro><p>The creditor may claim an amount equal to the cost which the creditor has incurred as a result only of the debtor's indebtedness being discharged during the fixed rate period if—</p></intro><level class="para1"><num>(a)</num><content><p>the amount of the payment under section 94 is not paid from the proceeds of a contract of payment protection insurance, and</p></content></level><level class="para1"><num>(b)</num><content><p>such other conditions as may be specified for the purposes of this section in regulations are satisfied.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The amount in subsection (2)—</p></intro><level class="para1"><num>(a)</num><content><p>must be fair,</p></content></level><level class="para1"><num>(b)</num><content><p>must be objectively justified,</p></content></level><level class="para1"><num>(c)</num><content><p>must be calculated by the creditor in accordance with provision made for the purposes of this section in regulations, and</p></content></level><level class="para1"><num>(d)</num><content><p>must not exceed the total amount of interest that would have been paid by the debtor under the agreement in the period from the date on which the debtor makes the payment under section 94 to the date fixed by the agreement for the discharge of the indebtedness of the debtor.</p></content></level></subsection><subsection><num>(4)</num><content><p>If a creditor could claim under either section 95A or this section, the creditor may choose under which section to claim.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-29-3"><num>(3)</num><intro><p>In section 94 (right to complete payments ahead of time)—</p></intro><level class="para1" eId="section-29-3-a"><num>(a)</num><content><p><mod>in subsection (1) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-29-3-b"><num>(b)</num><content><p><mod>in subsection (5) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-29-4"><num>(4)</num><content><p><mod>In subsection (2)(c) of section 97A (duty to give information on partial repayment) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>.</mod></p></content></subsection></section><section eId="section-30"><num>30</num><heading>Power to amend Consumer Credit Act 1974</heading><subsection eId="section-30-1"><num>(1)</num><content><p>The Secretary of State may by order make such amendments to the Consumer Credit Act 1974<ins class="first last" ukl:ChangeId="key-0bb8e82a9a9824c6fb5a3055017bc416-1491332806432" ukl:CommentaryRef="key-0bb8e82a9a9824c6fb5a3055017bc416"><noteRef uk:name="commentary" href="#key-0bb8e82a9a9824c6fb5a3055017bc416" class="commentary"/>, the Financial Services and Markets Act 2000 and any statutory instrument made under that Act</ins> as the Secretary of State considers appropriate in consequence of provision made by or under this Chapter.</p></content></subsection><subsection eId="section-30-2"><num>(2)</num><intro><p>Before exercising the power under subsection (1) the Secretary of State must consult—</p></intro><level class="para1" eId="section-30-2-a"><num>(a)</num><content><p>the <ins class="substitution first last" ukl:ChangeId="key-803fdd5956001662e37b430be0cc1a4d-1491332863193" ukl:CommentaryRef="key-803fdd5956001662e37b430be0cc1a4d"><noteRef uk:name="commentary" href="#key-803fdd5956001662e37b430be0cc1a4d" class="commentary"/>Financial Conduct Authority</ins>, and</p></content></level><level class="para1" eId="section-30-2-b"><num>(b)</num><content><p>such other persons as the Secretary of State considers appropriate.</p></content></level></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-delegation-and-exercise-of-functions"><heading><i>Delegation and exercise of functions</i></heading><section eId="section-31"><num>31</num><heading>Delegation and conferring of functions</heading><subsection eId="section-31-1"><num>(1)</num><intro><p>The Secretary of State may by order provide for the following functions conferred on the Secretary of State to be exercisable instead by a public body specified in the order—</p></intro><level class="para1" eId="section-31-1-a"><num>(a)</num><content><p>any function exercisable in connection with the scheme established by the framework regulations;</p></content></level><level class="para1" eId="section-31-1-b"><num>(b)</num><content><p>any function exercisable under the framework regulations by virtue of section 6(4);</p></content></level><level class="para1" eId="section-31-1-c"><num>(c)</num><content><p>any function under regulations made under section 16.</p></content></level></subsection><subsection eId="section-31-2"><num>(2)</num><content><p>If the function of issuing a code of practice for the purposes of the scheme is specified in an order by virtue of subsection (1)(a), a draft of the code must be approved by the Secretary of State before the Secretary of State lays the draft before Parliament under section 39(2).</p></content></subsection><subsection eId="section-31-3"><num>(3)</num><content><p>If the function of revoking a code of practice issued for the purposes of the scheme is specified in an order by virtue of subsection (1)(a), the code must not be revoked without the approval of the Secretary of State.</p></content></subsection><subsection eId="section-31-4"><num>(4)</num><intro><p>The Secretary of State may by order make provision conferring administration functions on—</p></intro><level class="para1" eId="section-31-4-a"><num>(a)</num><content><p>the Secretary of State;</p></content></level><level class="para1" eId="section-31-4-b"><num>(b)</num><content><p>a public body specified in the order.</p></content></level></subsection><subsection eId="section-31-5"><num>(5)</num><content><p>For the purposes of subsection (4) administration functions are functions in connection with the administration of any provision in licences under section 7 or 7A of the Gas Act 1986 or section 6(1)(c) or (d) of the Electricity Act 1989 made by virtue of section 17(3) of this Act.</p></content></subsection><subsection eId="section-31-6"><num>(6)</num><intro><p>An order made by virtue of subsection (1) or (4)(b) may provide for—</p></intro><level class="para1" eId="section-31-6-a"><num>(a)</num><content><p>different functions to be exercisable by different public bodies;</p></content></level><level class="para1" eId="section-31-6-b"><num>(b)</num><content><p>the same function to be exercisable by different public bodies in relation to different areas.</p></content></level></subsection><subsection eId="section-31-7"><num>(7)</num><content><p>The Secretary of State may make payments to any public body specified in an order made by virtue of subsection (1).</p></content></subsection></section><section eId="section-32"><num>32</num><heading>Exercise of scheme functions on behalf of the Secretary of State or a public body</heading><subsection eId="section-32-1"><num>(1)</num><content><p>This section applies to any function exercisable in connection with the scheme established by the framework regulations.</p></content></subsection><subsection eId="section-32-2"><num>(2)</num><content><p>The Secretary of State may arrange for such a function to be exercised by any body or person on behalf of the Secretary of State.</p></content></subsection><subsection eId="section-32-3"><num>(3)</num><content><p>A public body specified in relation to such a function in an order made by virtue of section 31(1)(a) may arrange for the function to be exercised by any other body or person on its behalf.</p></content></subsection><subsection eId="section-32-4"><num>(4)</num><intro><p>Arrangements under this section—</p></intro><level class="para1" eId="section-32-4-a"><num>(a)</num><content><p>do not affect the responsibility for the exercise of the function;</p></content></level><level class="para1" eId="section-32-4-b"><num>(b)</num><content><p>may include provision for payments to be made to the body or person exercising the function under the arrangements.</p></content></level></subsection></section><section eId="section-33"><num>33</num><heading>Duty to report</heading><subsection eId="section-33-1"><num>(1)</num><content><p>This section applies if the function under section 3(1)(a) is specified in an order made by virtue of section 31(1)(a).</p></content></subsection><subsection eId="section-33-2"><num>(2)</num><intro><p>The Secretary of State may make regulations requiring the body specified in relation to that function in the order to—</p></intro><level class="para1" eId="section-33-2-a"><num>(a)</num><content><p>collect information on the specified matters, and</p></content></level><level class="para1" eId="section-33-2-b"><num>(b)</num><content><p>provide the Secretary of State with a report on those matters at the specified times.</p></content></level></subsection><subsection eId="section-33-3"><num>(3)</num><content><p>In subsection (2) “<term refersTo="#term-specified" eId="term-specified">specified</term>” means specified in the regulations.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-general"><heading><i>General</i></heading><section eId="section-34"><num>34</num><heading>Power of Secretary of State to deal with special circumstances</heading><subsection eId="section-34-1"><num>(1)</num><intro><p>The Secretary of State may by regulations make provision as to—</p></intro><level class="para1" eId="section-34-1-a"><num>(a)</num><content><p>the circumstances in which a bill payer's liability to make green deal payments to the relevant energy supplier is suspended or cancelled;</p></content></level><level class="para1" eId="section-34-1-b"><num>(b)</num><content><p>the circumstances in which any suspension of liability ends;</p></content></level><level class="para1" eId="section-34-1-c"><num>(c)</num><content><p>the consequences of any suspension or cancellation;</p></content></level><level class="para1" eId="section-34-1-d"><num>(d)</num><content><p>the circumstances in which the green deal provider may require the early repayment of the whole or part of the total of the payments outstanding under a green deal plan.</p></content></level></subsection><subsection eId="section-34-2"><num>(2)</num><intro><p>The regulations may, in particular, include provision—</p></intro><level class="para1" eId="section-34-2-a"><num>(a)</num><content><p>as to the procedure to be followed for securing a suspension or cancellation (including the payment of an administration fee calculated in accordance with the regulations);</p></content></level><level class="para1" eId="section-34-2-b"><num>(b)</num><content><p>as to how any payments due under a green deal plan during a period of suspension are to be paid;</p></content></level><level class="para1" eId="section-34-2-c"><num>(c)</num><content><p>as to the making of payments due under a green deal plan after a period of suspension;</p></content></level><level class="para1" eId="section-34-2-d"><num>(d)</num><content><p>as to the calculation of the amount payable on early repayment (including a fee calculated in accordance with the regulations).</p></content></level></subsection><subsection eId="section-34-3"><num>(3)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-34-3-a"><num>(a)</num><content><p>“<term refersTo="#term-bill-payer" eId="term-bill-payer">bill payer</term>” includes the person who would be the bill payer if the supply from the relevant energy supplier were not temporarily disconnected or the liability to make green deal payments were not suspended, and</p></content></level><level class="para1" eId="section-34-3-b"><num>(b)</num><content><p>payments are green deal payments if they are made under a green deal plan.</p></content></level></subsection></section><section eId="section-35"><num>35</num><heading>Appeals</heading><subsection eId="section-35-1"><num>(1)</num><intro><p>This section applies if provision is included in a scheme or regulations by virtue of any of the following—</p></intro><level class="para1" eId="section-35-1-a"><num>(a)</num><content><p>section 3(3)(h) or (i);</p></content></level><level class="para1" eId="section-35-1-b"><num>(b)</num><content><p>section 6(4);</p></content></level><level class="para1" eId="section-35-1-c"><num>(c)</num><content><p>section 16.</p></content></level></subsection><subsection eId="section-35-2"><num>(2)</num><content><p>The Secretary of State must by regulations provide for a right of appeal to a court or tribunal against any sanction imposed, or other action taken, by the Secretary of State or a specified public body under the provision mentioned in subsection (1).</p></content></subsection><subsection eId="section-35-3"><num>(3)</num><intro><p>Regulations under subsection (2) may, in particular, include provision—</p></intro><level class="para1" eId="section-35-3-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-35-3-b"><num>(b)</num><content><p>as to the persons who may make an appeal;</p></content></level><level class="para1" eId="section-35-3-c"><num>(c)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-35-3-d"><num>(d)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-35-3-e"><num>(e)</num><content><p>suspending the effect of a sanction or other action being appealed against, pending determination of the appeal;</p></content></level><level class="para1" eId="section-35-3-f"><num>(f)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-35-3-g"><num>(g)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-35-4"><num>(4)</num><intro><p>The provision referred to in subsection (3)(f) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-35-4-a"><num>(a)</num><content><p>to confirm the sanction imposed or action taken;</p></content></level><level class="para1" eId="section-35-4-b"><num>(b)</num><content><p>to withdraw the sanction or action;</p></content></level><level class="para1" eId="section-35-4-c"><num>(c)</num><content><p>to impose a different sanction or take different action;</p></content></level><level class="para1" eId="section-35-4-d"><num>(d)</num><content><p>to remit the decision whether to confirm the sanction or other action, or any matter relating to that decision, to the person who imposed the sanction or took the action;</p></content></level><level class="para1" eId="section-35-4-e"><num>(e)</num><content><p>to award costs or, in Scotland, expenses.</p></content></level></subsection><subsection eId="section-35-5"><num>(5)</num><content><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within subsection (3)(a), (d), (f) or (g), regulations under subsection (2) may revoke or amend any subordinate legislation.</p></content></subsection><subsection eId="section-35-6"><num>(6)</num><content><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within subsection (3)(a), (d), (f) or (g), they may by regulations revoke or amend any subordinate legislation, or any provision included in an instrument made under an Act of the Scottish Parliament, if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></content></subsection><subsection eId="section-35-7"><num>(7)</num><intro><p>In this section—</p></intro><level class="para1" eId="section-35-7-a"><num>(a)</num><content><p>“<term refersTo="#term-specified-public-body" eId="term-specified-public-body">specified public body</term>” means a public body specified in an order made by virtue of section 31(1);</p></content></level><level class="para1" eId="section-35-7-b"><num>(b)</num><content><p>“<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></level></subsection></section><section eId="section-36"><num>36</num><heading>Funding for energy efficiency advice</heading><subsection eId="section-36-1"><num>(1)</num><content><p>The Secretary of State may incur expenditure in providing qualifying advice or information or in making payments to persons who provide qualifying advice or information.</p></content></subsection><subsection eId="section-36-2"><num>(2)</num><content><p>In this section “<term refersTo="#term-qualifying-advice-or-information" eId="term-qualifying-advice-or-information">qualifying advice or information</term>” means advice or information about green deal plans or energy efficiency generally which is given to individuals or organisations.</p></content></subsection></section><section eId="section-37"><num>37</num><heading>Preparatory expenditure: framework regulations</heading><content><p>The Secretary of State may, before the framework regulations are made, incur expenditure for the purpose of, or in connection with, preparing for a scheme of the kind provided for by section 3.</p></content></section><section eId="section-38"><num>38</num><heading>Green deal installation apprenticeships</heading><subsection eId="section-38-1"><num>(1)</num><content><p>Before making the first framework regulations the Secretary of State must lay before Parliament a report on what, if any, steps the Secretary of State has taken to encourage green deal installation apprenticeships.</p></content></subsection><subsection eId="section-38-2"><num>(2)</num><content><p>A “green deal installation apprenticeship” is an apprenticeship which provides training on how to install energy efficiency improvements at properties.</p></content></subsection></section><section eId="section-39"><num>39</num><heading>Parliamentary procedure in relation to code of practice</heading><subsection eId="section-39-1"><num>(1)</num><content><p>This section makes further provision in relation to the issuing of any code of practice for the purposes of the scheme established by the framework regulations.</p></content></subsection><subsection eId="section-39-2"><num>(2)</num><content><p>Before the code is issued the Secretary of State must lay a draft of the code before Parliament.</p></content></subsection><subsection eId="section-39-3"><num>(3)</num><content><p>If, within the 40-day period, either House of Parliament resolves not to approve the draft, the code may not be issued.</p></content></subsection><subsection eId="section-39-4"><num>(4)</num><content><p>If no such resolution is made within that period, the code may be issued.</p></content></subsection><subsection eId="section-39-5"><num>(5)</num><content><p>The “<term refersTo="#term-40-day-period" eId="term-40-day-period">40-day period</term>”, in relation to a draft of a code, means the period of 40 days beginning with the day on which the draft is laid before Parliament (or, if it is not laid before each House of Parliament on the same day, the later of the 2 days on which it is laid).</p></content></subsection><subsection eId="section-39-6"><num>(6)</num><intro><p>For the purposes of calculating the 40-day period, no account is to be taken of any period during which—</p></intro><level class="para1" eId="section-39-6-a"><num>(a)</num><content><p>Parliament is dissolved or prorogued, or</p></content></level><level class="para1" eId="section-39-6-b"><num>(b)</num><content><p>both Houses are adjourned for more than 4 days.</p></content></level></subsection></section><section eId="section-40"><num>40</num><heading>Regulations and orders</heading><subsection eId="section-40-1"><num>(1)</num><content><p>Regulations and orders under this Chapter may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-40-2"><num>(2)</num><content><p>Regulations and orders under this Chapter, other than those made by the Scottish Ministers, are to be made by statutory instrument.</p></content></subsection><subsection eId="section-40-3"><num>(3)</num><content><p>A statutory instrument containing regulations or an order under this Chapter is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-40-4"><num>(4)</num><intro><p>Subsection (3) does not apply to a statutory instrument containing—</p></intro><level class="para1" eId="section-40-4-a"><num>(a)</num><content><p>regulations under section 2 or the framework regulations,</p></content></level><level class="para1" eId="section-40-4-b"><num>(b)</num><content><p>regulations under section 13, 15(1), 16, 34 or 35(2), or</p></content></level><level class="para1" eId="section-40-4-c"><num>(c)</num><content><p>an order under section 1, 2 or 30.</p></content></level></subsection><subsection eId="section-40-5"><num>(5)</num><content><p>A statutory instrument containing regulations or an order falling within subsection (4) may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection eId="section-40-6"><num>(6)</num><content><p>Regulations under section 10(2), 14(7) or (8) or 15(4) (regulations made by the Scottish Ministers) are subject to the negative procedure.</p></content></subsection><subsection eId="section-40-7"><num>(7)</num><content><p>Regulations under section 35(6) (regulations made by the Scottish Ministers) are subject to the affirmative procedure.</p></content></subsection><subsection eId="section-40-8"><num>(8)</num><intro><p>Before making regulations or an order under this Chapter extending to Scotland, the Secretary of State must—</p></intro><level class="para1" eId="section-40-8-a"><num>(a)</num><content><p>if the regulations or order contain any provision which would be within the legislative competence of the Scottish Parliament if it were contained in an Act of that Parliament, obtain the consent of the Scottish Ministers;</p></content></level><level class="para1" eId="section-40-8-b"><num>(b)</num><content><p>in any other case, consult the Scottish Ministers.</p></content></level></subsection><subsection eId="section-40-9"><num>(9)</num><intro><p>The Secretary of State must obtain the consent of the Welsh Ministers before making provision under section 35 amending or revoking—</p></intro><level class="para1" eId="section-40-9-a"><num>(a)</num><content><p>provision included in an instrument made under a Measure or Act of the National Assembly for Wales;</p></content></level><level class="para1" eId="section-40-9-b"><num>(b)</num><content><p>any other subordinate legislation made by the Welsh Ministers (or the National Assembly for Wales established under the Government of Wales Act 1998).</p></content></level></subsection><subsection eId="section-40-10"><num>(10)</num><content><p>Before amending under section 9 a provision of the Building Regulations 2010 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2010/2214), the Secretary of State must, if and so far as the function under which the provision was made is exercisable by the Welsh Ministers, obtain their consent.</p></content></subsection><subsection eId="section-40-11"><num>(11)</num><content><p>Subsections (9) and (10) do not apply to the extent that the Secretary of State is making incidental or consequential provision.</p></content></subsection><subsection eId="section-40-12"><num>(12)</num><content><p>Before making regulations or an order under this Chapter applying to Wales, the Secretary of State must consult the Welsh Ministers.</p></content></subsection><subsection eId="section-40-13"><num>(13)</num><content><p>Subsection (12) does not apply to the extent that consent has been obtained under subsection (9) or (10).</p></content></subsection></section><section eId="section-41"><num>41</num><heading>Crown application: Chapter 1</heading><content><p>This Chapter binds the Crown.</p></content></section></hcontainer></chapter> — Modifying consumer credit legislation
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-1"><num>CHAPTER 1</num><heading>Green deal</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-introductory"><heading><i>Introductory</i></heading><section eId="section-1"><num>1</num><heading>Green deal plans</heading><subsection eId="section-1-1"><num>(1)</num><content><p>This section applies for the purposes of this Chapter.</p></content></subsection><subsection eId="section-1-2"><num>(2)</num><content><p>An energy plan is an arrangement made by the occupier or owner of a property for a person to make energy efficiency improvements to the property.</p></content></subsection><subsection eId="section-1-3"><num>(3)</num><intro><p>An energy plan is a green deal plan if—</p></intro><level class="para1" eId="section-1-3-a"><num>(a)</num><content><p>the energy efficiency improvements are to be paid for wholly or partly in instalments, and</p></content></level><level class="para1" eId="section-1-3-b"><num>(b)</num><content><p>all of the requirements listed in paragraphs (a) to (e) of subsection (4) are met in relation to the plan at the time when it is made.</p></content></level></subsection><subsection eId="section-1-4"><num>(4)</num><intro><p>The requirements are—</p></intro><level class="para1" eId="section-1-4-a"><num>(a)</num><content><p>the property is an eligible property,</p></content></level><level class="para1" eId="section-1-4-b"><num>(b)</num><content><p>the energy efficiency improvements fall within a description specified in an order made by the Secretary of State (“qualifying energy improvements”),</p></content></level><level class="para1" eId="section-1-4-c"><num>(c)</num><content><p>the conditions mentioned in section 4 as to assessment of the property and other matters have been met,</p></content></level><level class="para1" eId="section-1-4-d"><num>(d)</num><content><p>the conditions mentioned in section 5 as to the terms of the plan and other matters are met, and</p></content></level><level class="para1" eId="section-1-4-e"><num>(e)</num><content><p>a relevant energy supplier supplies, or is to supply, energy to the property.</p></content></level></subsection><subsection eId="section-1-5"><num>(5)</num><intro><p>Subsection (6) applies to a green deal plan from the time when—</p></intro><level class="para1" eId="section-1-5-a"><num>(a)</num><content><p>improvements have been installed in accordance with section 7,</p></content></level><level class="para1" eId="section-1-5-b"><num>(b)</num><content><p>the plan is confirmed in accordance with section 8, and</p></content></level><level class="para1" eId="section-1-5-c"><num>(c)</num><content><p>the requirements imposed by virtue of section 9 or 10 are met.</p></content></level></subsection><subsection eId="section-1-6"><num>(6)</num><intro><p>The payments in instalments agreed in the plan are to be—</p></intro><level class="para1" eId="section-1-6-a"><num>(a)</num><content><p>made by the person who is for the time being liable to pay the energy bills for the property,</p></content></level><level class="para1" eId="section-1-6-b"><num>(b)</num><content><p>made to the relevant energy supplier through the energy bills for the property,</p></content></level><level class="para1" eId="section-1-6-c"><num>(c)</num><content><p>recoverable as a debt by the relevant energy supplier from the person referred to in paragraph (a), and</p></content></level><level class="para1" eId="section-1-6-d"><num>(d)</num><content><p>recovered and held by the relevant energy supplier as agent and trustee for the person who made the improvements (unless the relevant energy supplier is also that person).</p></content></level></subsection><subsection eId="section-1-7"><num>(7)</num><content><p>Subsection (6) applies irrespective of whether the person referred to in paragraph (a) is the person who entered into the plan.</p></content></subsection><subsection eId="section-1-8"><num>(8)</num><intro><p>Subsection (6) is subject to—</p></intro><level class="para1" eId="section-1-8-a"><num>(a)</num><content><p>provision made in regulations under section 34;</p></content></level><level class="para1" eId="section-1-8-b"><num>(b)</num><content><p>any suspension or cancellation, by virtue of provision made in regulations under section 3(3)(h) or (i), 6(4), 16 or 35, of liability to make payments.</p></content></level></subsection><subsection eId="section-1-9"><num>(9)</num><content><p>For the purposes of subsection (4)(a) a property is an eligible property unless it falls within a description specified in an order made by the Secretary of State.</p></content></subsection></section><section eId="section-2"><num>2</num><heading>Green deal plans: supplementary</heading><subsection eId="section-2-1"><num>(1)</num><content><p>This section applies for the purposes of this Chapter.</p></content></subsection><subsection eId="section-2-2"><num>(2)</num><content><p>The occupier or owner who makes the arrangement referred to in section 1(2) is the “improver” and the person who makes the improvements is the “green deal provider”.</p></content></subsection><subsection eId="section-2-3"><num>(3)</num><content><p>The person referred to in section 1(6)(a) is the “bill payer”.</p></content></subsection><subsection eId="section-2-4"><num>(4)</num><intro><p>References to energy efficiency improvements, in relation to a property, are to—</p></intro><level class="para1" eId="section-2-4-a"><num>(a)</num><content><p>measures for improving efficiency in the use in the property of electricity, gas conveyed through pipes or any other source of energy which is specified in an order made by the Secretary of State, or</p></content></level><level class="para1" eId="section-2-4-b"><num>(b)</num><content><p>measures falling within subsection (5) or (6).</p></content></level></subsection><subsection eId="section-2-5"><num>(5)</num><intro><p>Measures fall within this subsection if—</p></intro><level class="para1" eId="section-2-5-a"><num>(a)</num><intro><p>they are any of the following—</p></intro><level class="para2" eId="section-2-5-a-i"><num>(i)</num><content><p>measures for increasing the amount of electricity generated, or heat produced, by microgeneration (within the meaning given by section 26(1) of the Climate Change and Sustainable Energy Act 2006);</p></content></level><level class="para2" eId="section-2-5-a-ii"><num>(ii)</num><content><p>any other measures for increasing the amount of electricity generated, or heat produced, using low-emissions sources or technologies;</p></content></level><level class="para2" eId="section-2-5-a-iii"><num>(iii)</num><content><p>measures for reducing the consumption of such energy as is mentioned in subsection (4), and</p></content></level></level><level class="para1" eId="section-2-5-b"><num>(b)</num><content><p>they are specified in an order made by the Secretary of State.</p></content></level></subsection><subsection eId="section-2-6"><num>(6)</num><intro><p>Measures fall within this subsection if—</p></intro><level class="para1" eId="section-2-6-a"><num>(a)</num><intro><p>they are installed at the property for the purpose of supplying to it any of the following types of energy—</p></intro><level class="para2" eId="section-2-6-a-i"><num>(i)</num><content><p>electricity generated by a generating station operated for the purposes of producing heat, or a cooling effect, in association with electricity;</p></content></level><level class="para2" eId="section-2-6-a-ii"><num>(ii)</num><content><p>heat produced in association with electricity or steam produced from (or air or water heated by) such heat;</p></content></level><level class="para2" eId="section-2-6-a-iii"><num>(iii)</num><content><p>any gas or liquid subjected to a cooling effect produced in association with electricity, and</p></content></level></level><level class="para1" eId="section-2-6-b"><num>(b)</num><content><p>they are specified in an order made by the Secretary of State.</p></content></level></subsection><subsection eId="section-2-7"><num>(7)</num><content><p>For the purposes of subsection (5)(a)(ii) electricity is generated, or heat is produced, using low-emissions sources or technologies if it is generated, or produced, by plant which relies wholly or mainly on a source of energy or a technology mentioned in section 26(2) of the Climate Change and Sustainable Energy Act 2006.</p></content></subsection><subsection eId="section-2-8"><num>(8)</num><content><p>For the purposes of subsection (6) “generating station” and “supplying” are to be read in accordance with section 64(1) of the Electricity Act 1989.</p></content></subsection><subsection eId="section-2-9"><num>(9)</num><content><p>“Energy” (except in this section), “energy bill”, “occupier”, “owner” and “relevant energy supplier” have the meaning given in regulations made by the Secretary of State.</p></content></subsection><subsection eId="section-2-10"><num>(10)</num><content><p>Regulations under subsection (9) may also make provision as to the circumstances in which a person who is not a bill payer for the purposes of this Chapter may be treated as a bill payer for those purposes.</p></content></subsection></section><section eId="section-3"><num>3</num><heading>Framework regulations</heading><subsection eId="section-3-1"><num>(1)</num><intro><p>The Secretary of State must by regulations establish a scheme making provision for the Secretary of State—</p></intro><level class="para1" eId="section-3-1-a"><num>(a)</num><content><p>to authorise persons to act as green deal assessors, green deal providers or green deal installers in connection with green deal plans (either individually or through membership of a body specified in, or authorised under, the scheme);</p></content></level><level class="para1" eId="section-3-1-b"><num>(b)</num><content><p>to regulate the conduct of those assessors, providers or installers (“green deal participants”).</p></content></level></subsection><subsection eId="section-3-2"><num>(2)</num><content><p>Regulations under subsection (1) are referred to in this Chapter as “<term refersTo="#term-the-framework-regulations" eId="term-the-framework-regulations">the framework regulations</term>”.</p></content></subsection><subsection eId="section-3-3"><num>(3)</num><intro><p>The scheme established by the framework regulations may, in particular, make provision—</p></intro><level class="para1" eId="section-3-3-a"><num>(a)</num><content><p>requiring the payment of a fee in connection with initial or continued authorisation under the scheme;</p></content></level><level class="para1" eId="section-3-3-b"><num>(b)</num><content><p>for the establishment and maintenance of a register of green deal participants and of persons from whom authorisation under the scheme has been withdrawn;</p></content></level><level class="para1" eId="section-3-3-c"><num>(c)</num><content><p>requiring green deal participants to provide the information required under the scheme;</p></content></level><level class="para1" eId="section-3-3-d"><num>(d)</num><content><p>for the issuing, revision or revocation of a code of practice;</p></content></level><level class="para1" eId="section-3-3-e"><num>(e)</num><content><p>requiring green deal participants to comply with the code of practice as a condition of their authorisation;</p></content></level><level class="para1" eId="section-3-3-f"><num>(f)</num><content><p>requiring green deal providers to enter into an agreement with the holder of a licence under section 7 or 7A of the Gas Act 1986 (gas transporter, shipper or supply licences) or section 6(1)(c) or (d) of the Electricity Act 1989 (electricity distributor and supply licences) and to comply with that agreement as a condition of their authorisation;</p></content></level><level class="para1" eId="section-3-3-g"><num>(g)</num><content><p>requiring that an agreement mentioned in paragraph (f) be approved by the Secretary of State before being entered into;</p></content></level><level class="para1" eId="section-3-3-h"><num>(h)</num><content><p>for securing compliance with any condition or any other requirement of the scheme, code or agreement;</p></content></level><level class="para1" eId="section-3-3-i"><num>(i)</num><content><p>as to the consequences of non-compliance with any such condition or requirement.</p></content></level></subsection><subsection eId="section-3-4"><num>(4)</num><intro><p>The code of practice issued for the purposes of the scheme may, in particular, make provision—</p></intro><level class="para1" eId="section-3-4-a"><num>(a)</num><content><p>as to the qualification and training of green deal participants;</p></content></level><level class="para1" eId="section-3-4-b"><num>(b)</num><content><p>as to their handling of queries or complaints;</p></content></level><level class="para1" eId="section-3-4-c"><num>(c)</num><content><p>requiring green deal participants to have such arrangements for insurance as are specified in the code;</p></content></level><level class="para1" eId="section-3-4-d"><num>(d)</num><content><p>as to the payment of green deal assessors by green deal providers or green deal installers and the payment of green deal installers by green deal providers;</p></content></level><level class="para1" eId="section-3-4-e"><num>(e)</num><content><p>as to the circumstances in which green deal assessors may charge customers for qualifying assessments of properties and as to the amount of any such charge;</p></content></level><level class="para1" eId="section-3-4-f"><num>(f)</num><content><p>requiring green deal assessors to act with impartiality;</p></content></level><level class="para1" eId="section-3-4-g"><num>(g)</num><content><p>as to the provision of information by green deal providers to improvers and bill payers and prospective improvers and bill payers;</p></content></level><level class="para1" eId="section-3-4-h"><num>(h)</num><content><p>as to marketing in connection with green deal plans.</p></content></level></subsection><subsection eId="section-3-5"><num>(5)</num><content><p>The code may include provision for regulating a body specified or authorised for the purposes of subsection (1)(a).</p></content></subsection><subsection eId="section-3-6"><num>(6)</num><content><p>The scheme and the code may make different provision for different circumstances or cases or for different purposes.</p></content></subsection><subsection eId="section-3-7"><num>(7)</num><content><p>The provision made by the scheme or code in relation to green deal participants may also extend to matters in connection with any energy plans which are not green deal plans.</p></content></subsection><subsection eId="section-3-8"><num>(8)</num><intro><p>The provision made for the purposes of subsection (3)(h) or (i) may, in particular, include provision enabling the Secretary of State to—</p></intro><level class="para1" eId="section-3-8-a"><num>(a)</num><content><p>cancel any liability to pay for a qualifying assessment of a property;</p></content></level><level class="para1" eId="section-3-8-b"><num>(b)</num><content><p>require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-3-8-c"><num>(c)</num><content><p>require a green deal participant to rectify a qualifying energy improvement or its installation;</p></content></level><level class="para1" eId="section-3-8-d"><num>(d)</num><content><p>require a green deal participant to pay compensation or a financial penalty;</p></content></level><level class="para1" eId="section-3-8-e"><num>(e)</num><content><p>withdraw, or require a body specified or authorised for the purposes of subsection (1)(a) to withdraw, an authorisation to act as a green deal participant;</p></content></level><level class="para1" eId="section-3-8-f"><num>(f)</num><content><p>withdraw authorisation from a body authorised for the purposes of subsection (1)(a) as a body whose members are authorised to act as green deal participants.</p></content></level></subsection><subsection eId="section-3-9"><num>(9)</num><content><p>For the purposes of this section references to a qualifying assessment are to an energy efficiency assessment which meets the requirements specified in the framework regulations and deals with such other matters as may be so specified.</p></content></subsection><subsection eId="section-3-10"><num>(10)</num><content><p>This section is without prejudice to the powers conferred on the Secretary of State by other provisions of this Chapter to make provision in or under the framework regulations.</p></content></subsection><subsection eId="section-3-11"><num>(11)</num><content><p>In this Chapter references to a code of practice include references to a code of practice which has been revised by virtue of subsection (3)(d).</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-green-deal-plan"><heading><i>Green deal plan</i></heading><section eId="section-4"><num>4</num><heading>Assessment of property <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-4-1"><num>(1)</num><intro><p>For the purposes of section 1(4)(c) the conditions as to assessment of the property and other matters are—</p></intro><level class="para1" eId="section-4-1-a"><num>(a)</num><content><p>the conditions set out in subsections (2) to (9), and</p></content></level><level class="para1" eId="section-4-1-b"><num>(b)</num><content><p>such other conditions (whether relating to the green deal assessor, the green deal provider, the improver or any other person) as are specified in the framework regulations.</p></content></level></subsection><subsection eId="section-4-2"><num>(2)</num><content><p>The first condition is that a qualifying assessment of the property has been carried out by a person authorised by virtue of the framework regulations to act as a green deal assessor.</p></content></subsection><subsection eId="section-4-3"><num>(3)</num><content><p>The second condition is that the green deal assessor has recommended the energy efficiency improvements.</p></content></subsection><subsection eId="section-4-4"><num>(4)</num><content><p>The third condition is that the green deal provider has given an estimate, on the basis specified in the framework regulations, of the savings likely to be made on the energy bills for the property if the improvements are carried out.</p></content></subsection><subsection eId="section-4-5"><num>(5)</num><content><p>The fourth condition is that the green deal provider has given an estimate, on the basis specified in the framework regulations, of the period over which the savings mentioned in subsection (4) are likely to be made.</p></content></subsection><subsection eId="section-4-6"><num>(6)</num><content><p>The fifth condition is that the green deal provider is authorised by virtue of the framework regulations to act as a green deal provider.</p></content></subsection><subsection eId="section-4-7"><num>(7)</num><content><p>The sixth condition is that the green deal provider has offered to carry out the improvements on the basis that the whole or part of the cost will be repaid in instalments over a period after the improvements have been made.</p></content></subsection><subsection eId="section-4-8"><num>(8)</num><intro><p>The seventh condition is that the green deal provider meets any requirement specified in the framework regulations as to the relationship between—</p></intro><level class="para1" eId="section-4-8-a"><num>(a)</num><content><p>the estimated total of the proposed instalments, and</p></content></level><level class="para1" eId="section-4-8-b"><num>(b)</num><content><p>the estimate mentioned in subsection (4).</p></content></level></subsection><subsection eId="section-4-9"><num>(9)</num><intro><p>The eighth condition is that the green deal provider meets any requirement specified in the framework regulations as to the relationship between—</p></intro><level class="para1" eId="section-4-9-a"><num>(a)</num><content><p>the period for which the instalments are proposed to be paid, and</p></content></level><level class="para1" eId="section-4-9-b"><num>(b)</num><content><p>the period estimated under subsection (5).</p></content></level></subsection><subsection eId="section-4-10"><num>(10)</num><content><p>In subsection (2) the reference to a qualifying assessment is to be read in accordance with section 3(9).</p></content></subsection></section><section eId="section-5"><num>5</num><heading>Terms of plan <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-5-1"><num>(1)</num><intro><p>For the purposes of section 1(4)(d), the conditions as to the terms of the plan and other matters are—</p></intro><level class="para1" eId="section-5-1-a"><num>(a)</num><content><p>the conditions set out in subsections (2) to (4), and</p></content></level><level class="para1" eId="section-5-1-b"><num>(b)</num><content><p>such other conditions as are specified in the framework regulations.</p></content></level></subsection><subsection eId="section-5-2"><num>(2)</num><intro><p>The first condition is that the plan includes the following terms—</p></intro><level class="para1" eId="section-5-2-a"><num>(a)</num><intro><p>a term in which the improver agrees to—</p></intro><level class="para2" eId="section-5-2-a-i"><num>(i)</num><content><p>the amounts of the payments in instalments and the intervals at which, and period for which, they are payable;</p></content></level><level class="para2" eId="section-5-2-a-ii"><num>(ii)</num><content><p>such other matters as are specified in the regulations;</p></content></level></level><level class="para1" eId="section-5-2-b"><num>(b)</num><content><p>a term in which the improver confirms that any necessary permissions or consents have been obtained in respect of the improvements;</p></content></level><level class="para1" eId="section-5-2-c"><num>(c)</num><content><p>a term providing that the green deal provider may not take a charge over any person's property by way of security for payments;</p></content></level><level class="para1" eId="section-5-2-d"><num>(d)</num><content><p>a term providing that the green deal plan does not prevent the bill payer from changing the intervals at which energy bills are to be paid.</p></content></level></subsection><subsection eId="section-5-3"><num>(3)</num><intro><p>The second condition is that the plan does not include any of the following terms—</p></intro><level class="para1" eId="section-5-3-a"><num>(a)</num><content><p>a term making a person liable to make any payments under the green deal plan otherwise than in respect of the period for which the person is the bill payer in relation to the property;</p></content></level><level class="para1" eId="section-5-3-b"><num>(b)</num><content><p>a term requiring the bill payer to make in any circumstances an early repayment of the whole or part of the amount outstanding under the green deal plan (except in accordance with the framework regulations or regulations under section 34, or provision made under them);</p></content></level><level class="para1" eId="section-5-3-c"><num>(c)</num><content><p>a term providing for money to be advanced to the improver (except in accordance with the framework regulations or provision made under them).</p></content></level></subsection><subsection eId="section-5-4"><num>(4)</num><content><p>The third condition is that the agreements mentioned in paragraph (a) of subsection (2) and the permissions and consents mentioned in paragraph (b) of that subsection have not been withdrawn before the end of the period of 14 days beginning with the last day on which they were given.</p></content></subsection><subsection eId="section-5-5"><num>(5)</num><intro><p>The conditions which may be specified in the framework regulations by virtue of subsection (1)(b) include, in particular—</p></intro><level class="para1" eId="section-5-5-a"><num>(a)</num><content><p>a condition that the plan includes a term so specified enabling the early repayment of the whole or part of the amount outstanding under the plan and making provision as to the calculation of the amount payable and any fee,</p></content></level><level class="para1" eId="section-5-5-b"><num>(b)</num><content><p>a condition that the plan includes a term so specified guaranteeing the improvements and making provision as to who is to benefit from the guarantee,</p></content></level><level class="para1" eId="section-5-5-c"><num>(c)</num><content><p>a condition that the plan includes a term so specified as to how any problems with the improvements installed, or arising in connection with the installation of them, are to be dealt with, and</p></content></level><level class="para1" eId="section-5-5-d"><num>(d)</num><content><p>a condition requiring the agreements mentioned in subsection (2)(a) to be in the form specified in the framework regulations.</p></content></level></subsection><subsection eId="section-5-6"><num>(6)</num><content><p>References in this section to the agreements mentioned in subsection (2)(a) include references to the consent required by virtue of section 6(2)(a).</p></content></subsection></section><section eId="section-6"><num>6</num><heading>Consents and redress <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-6-1"><num>(1)</num><intro><p>The framework regulations may make provision for dealing with cases where—</p></intro><level class="para1" eId="section-6-1-a"><num>(a)</num><content><p>at the time when a plan is entered into the improver and the bill payer are different persons;</p></content></level><level class="para1" eId="section-6-1-b"><num>(b)</num><content><p>the bill payer at the time when a plan is entered into is a different person from the bill payer at any subsequent time (a “subsequent bill payer”).</p></content></level></subsection><subsection eId="section-6-2"><num>(2)</num><intro><p>Provision which may be made by virtue of subsection (1) includes—</p></intro><level class="para1" eId="section-6-2-a"><num>(a)</num><content><p>provision requiring the term included in the plan by virtue of section 5(2)(a)(i) to be one to which the bill payer mentioned in subsection (1)(a) has consented, and</p></content></level><level class="para1" eId="section-6-2-b"><num>(b)</num><content><p>provision as to the terms of the plan which are to bind or benefit that bill payer or a subsequent bill payer.</p></content></level></subsection><subsection eId="section-6-3"><num>(3)</num><content><p>Subsection (1) is subject to section 1(6).</p></content></subsection><subsection eId="section-6-4"><num>(4)</num><content><p>The framework regulations may make provision for the purpose of providing redress in cases where a permission or consent mentioned in section 5(2)(b) was not obtained or was improperly obtained.</p></content></subsection><subsection eId="section-6-5"><num>(5)</num><intro><p>Provision included in framework regulations by virtue of subsection (4) may, in particular, enable the Secretary of State to—</p></intro><level class="para1" eId="section-6-5-a"><num>(a)</num><content><p>require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-6-5-b"><num>(b)</num><content><p>require a green deal provider to refund any such payments that have already been made;</p></content></level><level class="para1" eId="section-6-5-c"><num>(c)</num><content><p>require an improver to pay compensation to the green deal provider in respect of the suspension, cancellation or refund.</p></content></level></subsection></section><section eId="section-7"><num>7</num><heading>Installation of improvements</heading><subsection eId="section-7-1"><num>(1)</num><content><p>For the purposes of section 1(5)(a) improvements are installed in accordance with this section if the following three conditions are met.</p></content></subsection><subsection eId="section-7-2"><num>(2)</num><content><p>The first condition is that the person carrying out the installation of the improvements is authorised by virtue of the framework regulations to act as a green deal installer.</p></content></subsection><subsection eId="section-7-3"><num>(3)</num><intro><p>The second condition is that any product installed in making the improvements—</p></intro><level class="para1" eId="section-7-3-a"><num>(a)</num><content><p>meets the standard specified in the code of practice in relation to the product or description of product, or</p></content></level><level class="para1" eId="section-7-3-b"><num>(b)</num><intro><p>is listed in a document which—</p></intro><level class="para2" eId="section-7-3-b-i"><num>(i)</num><content><p>is issued by the Secretary of State or a person authorised by the Secretary of State in connection with the code, and</p></content></level><level class="para2" eId="section-7-3-b-ii"><num>(ii)</num><content><p>is referred to in the code as listing the products which are to be taken as meeting the required standard.</p></content></level></level></subsection><subsection eId="section-7-4"><num>(4)</num><content><p>In specifying the standard in relation to a product or description of product for the purposes of subsection (3)(a), the code of practice may make provision as to the testing and certification of the product or description of product.</p></content></subsection><subsection eId="section-7-5"><num>(5)</num><content><p>The third condition is that the carrying out of the installation meets the standard specified in the code of practice.</p></content></subsection><subsection eId="section-7-6"><num>(6)</num><content><p>In this section references to the code of practice are to the code of practice issued for the purposes of the scheme under the framework regulations.</p></content></subsection></section><section eId="section-8"><num>8</num><heading>Confirmation of plan</heading><subsection eId="section-8-1"><num>(1)</num><content><p>For the purposes of section 1(5)(b) an arrangement is confirmed in accordance with this section if the following two conditions are met.</p></content></subsection><subsection eId="section-8-2"><num>(2)</num><intro><p>The first condition is that the relevant energy supplier notifies the bill payer—</p></intro><level class="para1" eId="section-8-2-a"><num>(a)</num><content><p>that payments for the energy efficiency improvements to the property are to be included in the energy bills for the property from the date specified in the notification, and</p></content></level><level class="para1" eId="section-8-2-b"><num>(b)</num><content><p>of the amounts of those payments and the period for which they are to be made.</p></content></level></subsection><subsection eId="section-8-3"><num>(3)</num><content><p>The date mentioned in subsection (2)(a) must not fall earlier than the end of the period specified in the framework regulations.</p></content></subsection><subsection eId="section-8-4"><num>(4)</num><intro><p>The second condition is that, as soon as practicable after the improvements have been installed, the green deal provider takes one or more of the following actions as required by the framework regulations in the circumstances—</p></intro><level class="para1" eId="section-8-4-a"><num>(a)</num><content><p>producing a document containing such information in connection with the plan as is specified in the regulations in the form so specified,</p></content></level><level class="para1" eId="section-8-4-b"><num>(b)</num><content><p>securing that a document of a description specified in the regulations is produced, or</p></content></level><level class="para1" eId="section-8-4-c"><num>(c)</num><content><p>securing that a document of such a description is updated.</p></content></level></subsection><subsection eId="section-8-5"><num>(5)</num><content><p>The reference in this section to securing that a document is updated includes a reference to securing that a document is replaced by a document of the same description.</p></content></subsection><subsection eId="section-8-6"><num>(6)</num><content><p>Sections 9 and 10 make further provision in relation to the second condition.</p></content></subsection></section><section eId="section-9"><num>9</num><heading>Confirmation of plan: supplementary provision for England and Wales</heading><subsection eId="section-9-1"><num>(1)</num><content><p>Subsection (2) applies if, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2007 Regulations or the 2010 Regulations.</p></content></subsection><subsection eId="section-9-2"><num>(2)</num><content><p>The Secretary of State may by regulations make provision amending the 2007 Regulations or the 2010 Regulations or both (as the case may require) in connection with a document required to be produced or updated by virtue of section 8(4)(b) or (c).</p></content></subsection><subsection eId="section-9-3"><num>(3)</num><content><p>The amendments made by virtue of subsection (2) may, in particular, include amendments for the purpose of requiring a document to contain additional or updated information in connection with the plan or the improvements installed under the plan.</p></content></subsection><subsection eId="section-9-4"><num>(4)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-the-2007-regulations" eId="term-the-2007-regulations">the 2007 Regulations</term>” means the Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2007/991);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-2010-regulations" eId="term-the-2010-regulations">the 2010 Regulations</term>” means the Building Regulations 2010 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2010/2214).</p></content></hcontainer></subsection></section><section eId="section-10"><num>10</num><heading>Confirmation of plan: supplementary provision for Scotland</heading><subsection eId="section-10-1"><num>(1)</num><content><p>Subsection (2) applies if, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2008 Regulations.</p></content></subsection><subsection eId="section-10-2"><num>(2)</num><content><p>The Scottish Ministers may by regulations make provision amending the 2008 Regulations in connection with a document required to be produced or updated by virtue of section 8(4)(b) or (c).</p></content></subsection><subsection eId="section-10-3"><num>(3)</num><content><p>The amendments made by virtue of subsection (2) may, in particular, include amendments for the purpose of requiring a document to contain additional or updated information in connection with the plan or the improvements installed under the plan.</p></content></subsection><subsection eId="section-10-4"><num>(4)</num><content><p>In this section “<term refersTo="#term-the-2008-regulations" eId="term-the-2008-regulations">the 2008 Regulations</term>” means the Energy Performance of Buildings (Scotland) Regulations 2008 (<abbr class="acronym" title="Scottish Statutory Instrument">S.S.I.</abbr> 2008/309).</p></content></subsection></section><section eId="section-11"><num>11</num><heading>Updating information produced under section 8</heading><hcontainer name="wrapper2"><subsection eId="section-11-1"><num>(1)</num><content><p>The framework regulations may make provision as to the circumstances in which a document produced for the purposes of section 8(4)(a) is required to be updated in accordance with the regulations.</p></content></subsection><subsection eId="section-11-2"><num>(2)</num><content><p>Subsection (6) applies if one or more of the first, second or third conditions is met.</p></content></subsection><subsection eId="section-11-3"><num>(3)</num><intro><p>The first condition is that—</p></intro><level class="para1" eId="section-11-3-a"><num>(a)</num><content><p>by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2007 Regulations or the 2010 Regulations, and</p></content></level><level class="para1" eId="section-11-3-b"><num>(b)</num><content><p>provision is made in the 2007 Regulations or the 2010 Regulations or both by virtue of section 9(3) to require a document of that description to contain additional or updated information.</p></content></level></subsection><subsection eId="section-11-4"><num>(4)</num><intro><p>The second condition is that—</p></intro><level class="para1" eId="section-11-4-a"><num>(a)</num><content><p>by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2008 Regulations, and</p></content></level><level class="para1" eId="section-11-4-b"><num>(b)</num><content><p>provision is made in the 2008 Regulations by virtue of section 10(3) to require a document of that description to contain additional or updated information.</p></content></level></subsection><subsection eId="section-11-5"><num>(5)</num><content><p>The third condition is that, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description other than one falling within subsection (3) or (4).</p></content></subsection><subsection eId="section-11-6"><num>(6)</num><intro><p>The framework regulations may make provision as to the circumstances in which<ins class="substitution first" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3"><noteRef uk:name="commentary" href="#key-dfc5221cba708fe22339d7edef4760f3" class="commentary"/>—</ins></p></intro><level class="para1" eId="section-11-6-a"><num><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">(a)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">data from which a document of a description falling within subsection (3) or (4) may be produced, or</ins></p></content></level></subsection><level class="para1" eId="section-11-b"><num><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">(b)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">a document of a description falling within subsection (5),</ins></p></content></level></hcontainer><hcontainer name="wrapper2"><intro><p><ins class="substitution last" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">is</ins> required to be updated or further updated in accordance with provision made by the Secretary of State in the regulations.</p></intro><subsection eId="section-11-7"><num>(7)</num><content><p>In subsection (3) “<term refersTo="#term-the-2007-regulations" eId="term-the-2007-regulations">the 2007 Regulations</term>” and “<term refersTo="#term-the-2010-regulations" eId="term-the-2010-regulations">the 2010 Regulations</term>” have the same meaning as in section 9.</p></content></subsection><subsection eId="section-11-8"><num>(8)</num><content><p>In subsection (4) “<term refersTo="#term-the-2008-regulations" eId="term-the-2008-regulations">the 2008 Regulations</term>” has the same meaning as in section 10.</p></content></subsection><subsection eId="section-11-9"><num>(9)</num><content><p>In this section references to a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1491329299599" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> being required to be updated or further updated include references to a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1495547783705" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> being required to be replaced by a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1495547785898" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> of the same description.</p></content></subsection></hcontainer></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-disclosure-of-green-deal-plan-etc"><heading><i>Disclosure of green deal plan <abbr title="Et cetera" xml:lang="la">etc</abbr></i></heading><section eId="section-12"><num>12</num><heading>Disclosure of green deal plan <abbr title="Et cetera" xml:lang="la">etc</abbr> in connection with sale or letting out</heading><subsection eId="section-12-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-12-1-a"><num>(a)</num><content><p>a green deal property, or a lease of such a property, is to be sold, or</p></content></level><level class="para1" eId="section-12-1-b"><num>(b)</num><intro><p>a green deal property is to be let out—</p></intro><level class="para2" eId="section-12-1-b-i"><num>(i)</num><content><p>under a tenancy or licence agreement, and</p></content></level><level class="para2" eId="section-12-1-b-ii"><num>(ii)</num><content><p>on the basis that the prospective tenant or licensee is to be liable for paying the energy bills for the property.</p></content></level></level></subsection><subsection eId="section-12-2"><num>(2)</num><intro><p>The seller or prospective landlord or licensor must, in relation to the document, or each document, required to be produced or updated as mentioned in section 8(4)—</p></intro><level class="para1" eId="section-12-2-a"><num>(a)</num><content><p>obtain the document or, if the requirement to produce or update the document has not yet been complied with, produce a document containing the same information in connection with the green deal plan as that document would have contained, and</p></content></level><level class="para1" eId="section-12-2-b"><num>(b)</num><content><p>provide the document free of charge to any prospective buyer, tenant or licensee at the specified time.</p></content></level></subsection><subsection eId="section-12-3"><num>(3)</num><content><p>An obligation under subsection (2) may be discharged by an agent.</p></content></subsection><subsection eId="section-12-4"><num>(4)</num><intro><p>For the purposes of subsection (2) a person becomes a prospective buyer, tenant or licensee in relation to a property when the person—</p></intro><level class="para1" eId="section-12-4-a"><num>(a)</num><content><p>requests any information about the property from the seller, prospective landlord or licensor or an agent for the purpose of deciding whether to buy or let the property,</p></content></level><level class="para1" eId="section-12-4-b"><num>(b)</num><content><p>makes a request to view the property for the purpose mentioned in paragraph (a), or</p></content></level><level class="para1" eId="section-12-4-c"><num>(c)</num><content><p>makes an offer, whether oral or written, to buy or let the property.</p></content></level></subsection><subsection eId="section-12-5"><num>(5)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-12-5-a"><num>(a)</num><content><p>an agent is a person acting on behalf of a seller or prospective landlord or licensor in the sale or letting out of a property;</p></content></level><level class="para1" eId="section-12-5-b"><num>(b)</num><content><p>a property is a green deal property if there is a green deal plan in respect of the property and payments are still to be made under that plan;</p></content></level><level class="para1" eId="section-12-5-c"><num>(c)</num><content><p>specified, in relation to a time, means specified in regulations made by the Secretary of State.</p></content></level></subsection><subsection eId="section-12-6"><num>(6)</num><content><p>The Secretary of State may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection></section><section eId="section-13"><num>13</num><heading>Disclosure of green deal plan in connection with other transactions <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-13-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-13-1-a"><num>(a)</num><content><p>there is to be a transaction or other arrangement in respect of a green deal property (not falling within section 12(1)), and</p></content></level><level class="para1" eId="section-13-1-b"><num>(b)</num><content><p>the transaction or arrangement is of a description specified in regulations made by the Secretary of State.</p></content></level></subsection><subsection eId="section-13-2"><num>(2)</num><intro><p>The regulations may require a person of a description specified in the regulations to—</p></intro><level class="para1" eId="section-13-2-a"><num>(a)</num><content><p>obtain a document required to be produced or updated as mentioned in section 8(4) or, if the requirement to produce or update such a document has not yet been complied with, produce a document containing the same information in connection with the green deal plan as that document would have contained, and</p></content></level><level class="para1" eId="section-13-2-b"><num>(b)</num><content><p>provide the document free of charge to a person of a description specified in the regulations at the time so specified.</p></content></level></subsection><subsection eId="section-13-3"><num>(3)</num><content><p>The regulations may provide for an obligation imposed on a person by virtue of subsection (2) to be discharged by a person acting on the person's behalf.</p></content></subsection><subsection eId="section-13-4"><num>(4)</num><content><p>In this section the reference to a green deal property is to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-14"><num>14</num><heading>Acknowledgment of green deal plan on sale or letting out</heading><subsection eId="section-14-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-14-1-a"><num>(a)</num><content><p>a green deal property, or a lease of such a property, is to be sold, or</p></content></level><level class="para1" eId="section-14-1-b"><num>(b)</num><intro><p>a green deal property is to be let out—</p></intro><level class="para2" eId="section-14-1-b-i"><num>(i)</num><content><p>under a tenancy or licence agreement which is in writing, and</p></content></level><level class="para2" eId="section-14-1-b-ii"><num>(ii)</num><content><p>on the basis that the prospective tenant or licensee is to be liable for paying the energy bills for the property.</p></content></level></level></subsection><subsection eId="section-14-2"><num>(2)</num><content><p>The seller or prospective landlord or licensor must secure that the contract for sale or tenancy or licence agreement includes an acknowledgment by the buyer, tenant or licensee that the bill payer at the property is liable to make payments under the green deal plan and that certain terms of that plan are binding on the bill payer.</p></content></subsection><subsection eId="section-14-3"><num>(3)</num><content><p>Subsections (4) and (5) apply where the green deal property is in England or Wales.</p></content></subsection><subsection eId="section-14-4"><num>(4)</num><content><p>An acknowledgment required by subsection (2) must be in the form prescribed in regulations made by the Secretary of State.</p></content></subsection><subsection eId="section-14-5"><num>(5)</num><content><p>The Secretary of State may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection><subsection eId="section-14-6"><num>(6)</num><content><p>Subsections (7) and (8) apply where the green deal property is in Scotland.</p></content></subsection><subsection eId="section-14-7"><num>(7)</num><content><p>The acknowledgment required by subsection (2) must be in the form prescribed in regulations made by the Scottish Ministers.</p></content></subsection><subsection eId="section-14-8"><num>(8)</num><content><p>The Scottish Ministers may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection><subsection eId="section-14-9"><num>(9)</num><content><p>In this section references to a green deal property are to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-15"><num>15</num><heading>Acknowledgment of green deal plan in connection with other transactions <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-15-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-15-1-a"><num>(a)</num><content><p>there is to be a transaction or other arrangement in respect of a green deal property (not falling within section 14(1)), and</p></content></level><level class="para1" eId="section-15-1-b"><num>(b)</num><content><p>the transaction or arrangement is of a description specified in regulations made under this subsection by the Secretary of State.</p></content></level></subsection><subsection eId="section-15-2"><num>(2)</num><intro><p>Regulations under subsection (1) may require a person of a description specified in the regulations to secure, at a time and in a document so specified, that an acknowledgment is made by a person of a description so specified that—</p></intro><level class="para1" eId="section-15-2-a"><num>(a)</num><content><p>the bill payer at the property is liable to make payments under the green deal plan, and</p></content></level><level class="para1" eId="section-15-2-b"><num>(b)</num><content><p>certain terms of that plan are binding on the bill payer.</p></content></level></subsection><subsection eId="section-15-3"><num>(3)</num><content><p>Where the green deal property is in England or Wales, regulations made by the Secretary of State under this subsection may provide for any acknowledgment required by virtue of subsection (2) to be in the form prescribed in the regulations under this subsection.</p></content></subsection><subsection eId="section-15-4"><num>(4)</num><content><p>Where the green deal property is in Scotland, regulations made by the Scottish Ministers under this subsection may provide for any acknowledgment required by virtue of subsection (2) to be in the form prescribed in the regulations under this subsection.</p></content></subsection><subsection eId="section-15-5"><num>(5)</num><content><p>In this section references to a green deal property are to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-16"><num>16</num><heading>Sanctions for non-compliance with obligations under sections 12 to 15</heading><subsection eId="section-16-1"><num>(1)</num><intro><p>The Secretary of State may make regulations—</p></intro><level class="para1" eId="section-16-1-a"><num>(a)</num><content><p>for the purpose of securing compliance with the obligations set out in section 12 or 14 or imposed by virtue of regulations under section 13 or 15;</p></content></level><level class="para1" eId="section-16-1-b"><num>(b)</num><content><p>as to the consequences of non-compliance with the obligations.</p></content></level></subsection><subsection eId="section-16-2"><num>(2)</num><intro><p>The regulations may, in particular, include provision—</p></intro><level class="para1" eId="section-16-2-a"><num>(a)</num><content><p>as to sanctions for non-compliance with the obligations (including the imposition of a civil penalty);</p></content></level><level class="para1" eId="section-16-2-b"><num>(b)</num><content><p>enabling the Secretary of State to require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-16-2-c"><num>(c)</num><content><p>enabling the Secretary of State to require a green deal provider to refund any such payments that have already been made;</p></content></level><level class="para1" eId="section-16-2-d"><num>(d)</num><content><p>enabling the Secretary of State to require a seller, a prospective landlord or licensor or another person to pay compensation to a green deal provider in respect of any such suspension, cancellation or refund.</p></content></level></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-modifying-energy-licences"><heading><i>Modifying energy licences</i></heading><section eId="section-17"><num>17</num><heading>Power to modify energy licences in connection with green deal payments</heading><subsection eId="section-17-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-17-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7 or 7A of the Gas Act 1986 (gas transporter, shipper and supply licences);</p></content></level><level class="para1" eId="section-17-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-17-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(c) or (d) of the Electricity Act 1989 (electricity distribution and supply licences);</p></content></level><level class="para1" eId="section-17-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-17-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7 or 7A of the Gas Act 1986 or section 6(1)(c) or (d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-17-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised for the following purposes only—</p></intro><level class="para1" eId="section-17-2-a"><num>(a)</num><content><p>in so far as the power relates to a licence under section 7 of the Gas Act 1986 or section 6(1)(c) of the Electricity Act 1989, the purpose of preventing the holder of the licence from permanently disconnecting the supply of gas or electricity to a green deal property, and</p></content></level><level class="para1" eId="section-17-2-b"><num>(b)</num><content><p>in so far as the power relates to any licence, the purpose of requiring or enabling the holder of the licence to take, or not to take, specified action in connection with green deal payments.</p></content></level></subsection><subsection eId="section-17-3"><num>(3)</num><intro><p>The provision which may be made by virtue of subsection (2)(b) includes, in particular—</p></intro><level class="para1" eId="section-17-3-a"><num>(a)</num><content><p>if the holder of the licence is of a specified description, provision enabling the holder to opt into or opt out of any provision made by virtue of paragraphs (b) to (f),</p></content></level><level class="para1" eId="section-17-3-b"><num>(b)</num><content><p>provision requiring the holder of the licence to collect green deal payments through energy bills and remit them to a green deal provider,</p></content></level><level class="para1" eId="section-17-3-c"><num>(c)</num><content><p>provision as to the circumstances in which the holder of the licence is required to make payments to a green deal provider by reference to green deal payments which are due but which have not been made,</p></content></level><level class="para1" eId="section-17-3-d"><num>(d)</num><content><p>provision in connection with the cancellation or suspension of green deal payments,</p></content></level><level class="para1" eId="section-17-3-e"><num>(e)</num><content><p>provision requiring or enabling the holder of the licence to make specified arrangements for facilitating the collection of green deal payments, and</p></content></level><level class="para1" eId="section-17-3-f"><num>(f)</num><content><p>provision requiring or enabling payments to be made by or to the holder of the licence in respect of functions discharged in connection with green deal payments.</p></content></level></subsection><subsection eId="section-17-4"><num>(4)</num><content><p>Provision made by virtue of subsection (2)(b) which falls within subsection (3)(c) may include provision requiring the holder of the licence, where a bill payer has failed to pay a sum due under an energy bill, to remit a proportion of any payment received to a green deal provider.</p></content></subsection><subsection eId="section-17-5"><num>(5)</num><content><p>Conditions included in a licence under section 7 or 7A of the Gas Act 1986 by virtue of the power under subsection (1) may do any of the things authorised by section 7B(5)(a)(i) or (iii) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7B(4)(a)).</p></content></subsection><subsection eId="section-17-6"><num>(6)</num><content><p>Conditions included in a licence under section 6(1)(c) or (d) of the Electricity Act 1989 by virtue of the power under subsection (1) may do any of the things authorised by section 7(3)(a) or (c) or (4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection><subsection eId="section-17-7"><num>(7)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-17-7-a"><num>(a)</num><content><p>payments are green deal payments if they are made under a green deal plan,</p></content></level><level class="para1" eId="section-17-7-b"><num>(b)</num><content><p>a property is a green deal property if there is a green deal plan in respect of the property and payments are still to be made under that plan, and</p></content></level><level class="para1" eId="section-17-7-c"><num>(c)</num><content><p>references to a green deal provider include references to a person acting on behalf of a green deal provider or nominated by a green deal provider.</p></content></level></subsection></section><section eId="section-18"><num>18</num><heading>Power to modify energy supply licences to make provision as to default in green deal payments</heading><subsection eId="section-18-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-18-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-18-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-18-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-18-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-18-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-18-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised for the purpose only of making provision—</p></intro><level class="para1" eId="section-18-2-a"><num>(a)</num><content><p>as to the steps which are to be taken by the holder of a licence following a bill payer's default in making green deal payments to the holder of the licence,</p></content></level><level class="para1" eId="section-18-2-b"><num>(b)</num><content><p>as to the circumstances in which the holder of a licence may disconnect the supply to a green deal property following such a default, or</p></content></level><level class="para1" eId="section-18-2-c"><num>(c)</num><content><p>enabling, in specified circumstances, the holder of a licence to require from a bill payer a deposit by way of security for green deal payments to be made by the bill payer.</p></content></level></subsection><subsection eId="section-18-3"><num>(3)</num><content><p>For the purposes of this section “green deal payments” and “green deal property” are to be read in accordance with section 17(7).</p></content></subsection></section><section eId="section-19"><num>19</num><heading>Power to modify energy supply licences to require provision of information</heading><subsection eId="section-19-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-19-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-19-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-19-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-19-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-19-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-19-2"><num>(2)</num><content><p>The power under subsection (1) may be exercised for one or both of the following two purposes only.</p></content></subsection><subsection eId="section-19-3"><num>(3)</num><content><p>The first purpose is the purpose of requiring, at specified times, the holder of the licence to provide bill payers with specified information in connection with their green deal plans.</p></content></subsection><subsection eId="section-19-4"><num>(4)</num><content><p>The second purpose is the purpose of requiring the holder of the licence to disclose on request specified information about the payment of energy bills by a person who is, or is to be, the bill payer for a property in respect of which there is, or is proposed to be, a green deal plan.</p></content></subsection><subsection eId="section-19-5"><num>(5)</num><intro><p>The only persons to whom the licence holder may be required to disclose information by virtue of subsection (4) are—</p></intro><level class="para1" eId="section-19-5-a"><num>(a)</num><content><p>where there is a green deal plan, the green deal provider under the plan;</p></content></level><level class="para1" eId="section-19-5-b"><num>(b)</num><content><p>where there is proposed to be a green deal plan, a person who is authorised under the framework regulations to act as a green deal provider.</p></content></level></subsection><subsection eId="section-19-6"><num>(6)</num><intro><p>The licence holder may be required to disclose the information requested only where—</p></intro><level class="para1" eId="section-19-6-a"><num>(a)</num><content><p>the green deal provider or authorised person states that the request is made for purposes connected with the green deal plan or proposed green deal plan,</p></content></level><level class="para1" eId="section-19-6-b"><num>(b)</num><intro><p>the green deal provider or authorised person provides evidence that the bill payer has consented to—</p></intro><level class="para2" eId="section-19-6-b-i"><num>(i)</num><content><p>disclosure of the information to that provider or person for those purposes, and</p></content></level><level class="para2" eId="section-19-6-b-ii"><num>(ii)</num><content><p>onward disclosure of the disclosed information to and by other persons for those purposes,</p></content></level></level><level class="para1" eId="section-19-6-c"><num>(c)</num><content><p>the information relates to a time within the 5 years immediately preceding the request, and</p></content></level><level class="para1" eId="section-19-6-d"><num>(d)</num><content><p>the licence holder has the information.</p></content></level></subsection><subsection eId="section-19-7"><num>(7)</num><content><p>The power under subsection (1) may be exercised so as to require information to be provided in a specified manner or form, or subject to specified requirements or restrictions.</p></content></subsection><subsection eId="section-19-8"><num>(8)</num><content><p>Conditions included in a licence under section 7A(1) of the Gas Act 1986 by virtue of the power under subsection (1) and the purpose mentioned in subsection (4) may do any of the things authorised by section 7B(5)(a)(i) or (iii) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7B(4)(a)).</p></content></subsection><subsection eId="section-19-9"><num>(9)</num><content><p>Conditions included in a licence under section 6(1)(d) of the Electricity Act 1989 by virtue of the power under subsection (1) and the purpose mentioned in subsection (4) may do any of the things authorised by section 7(3)(a) or (c) or (4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection></section><section eId="section-20"><num>20</num><heading>Power to modify energy supply licences to make provision as to consumer protection</heading><subsection eId="section-20-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-20-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-20-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-20-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-20-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-20-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-20-2"><num>(2)</num><content><p>The power under subsection (1) may be exercised for the purpose only of making provision corresponding to that made by the disapplied consumer protection legislation.</p></content></subsection><subsection eId="section-20-3"><num>(3)</num><content><p>Conditions included in a licence under section 6(1)(d) of the Electricity Act 1989 by virtue of the power under subsection (1) may do any of the things authorised by section 7(4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection><subsection eId="section-20-4"><num>(4)</num><content><p>For the purposes of subsection (2) provision corresponds to that made by the disapplied consumer protection legislation if it is made for the same purpose as the purpose for which that provision was made.</p></content></subsection><subsection eId="section-20-5"><num><ins class="substitution first" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35"><noteRef uk:name="commentary" href="#key-3f8f93cba169f015282416aba5430e35" class="commentary"/>(5)</ins></num><intro><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">For the purpose of this section, references to the disapplied consumer protection legislation are to—</ins></p></intro><level class="para1" eId="section-20-5-a"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(a)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">the provisions of or made under the Consumer Credit Act 1974 or the Financial Services and Markets Act 2000 (“the 2000 Act”), and</ins></p></content></level><level class="para1" eId="section-20-5-b"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(b)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">any rules made under the 2000 Act,</ins></p></content></level><wrapUp><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">which would apply but for any exemption conferred by an order under section 22 of the 2000 Act (regulated activities) in relation to debts due under a green deal plan associated with the licensee.</ins></p></wrapUp></subsection><subsection eId="section-20-6"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(6)</ins></num><content><p><ins class="substitution last" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">A green deal plan is associated with a licensee if the payments under the plan are to be made to the licensee.</ins></p></content></subsection></section><section eId="section-21"><num>21</num><heading>Powers under sections 17 to 20: consultation</heading><intro><p>Before making a modification under any of sections 17 to 20, the Secretary of State must consult—</p></intro><level class="para1" eId="section-21-a"><num>(a)</num><content><p>the holder of any licence being modified,</p></content></level><level class="para1" eId="section-21-b"><num>(b)</num><content><p>the Gas and Electricity Markets Authority, and</p></content></level><level class="para1" eId="section-21-c"><num>(c)</num><content><p>such other persons as the Secretary of State considers appropriate.</p></content></level></section><section eId="section-22"><num>22</num><heading>Powers under sections 17 to 20: supplementary</heading><subsection eId="section-22-1"><num>(1)</num><content><p>Subsections (2) to (6) apply in relation to the powers under sections 17 to 20.</p></content></subsection><subsection eId="section-22-2"><num>(2)</num><intro><p>The powers—</p></intro><level class="para1" eId="section-22-2-a"><num>(a)</num><content><p>may be exercised generally, only in relation to specified cases or subject to exceptions (including provision for a case to be excepted only so long as specified conditions are satisfied);</p></content></level><level class="para1" eId="section-22-2-b"><num>(b)</num><content><p>may be exercised differently in different cases or circumstances;</p></content></level><level class="para1" eId="section-22-2-c"><num>(c)</num><content><p>include a power to make incidental, consequential or transitional modifications.</p></content></level></subsection><subsection eId="section-22-3"><num>(3)</num><intro><p>Provision included in a licence by virtue of any of the powers—</p></intro><level class="para1" eId="section-22-3-a"><num>(a)</num><content><p>need not relate to the activities authorised by the licence;</p></content></level><level class="para1" eId="section-22-3-b"><num>(b)</num><content><p>may make different provision for different cases.</p></content></level></subsection><subsection eId="section-22-4"><num>(4)</num><content><p>The Secretary of State must publish details of modifications under any of the powers as soon as reasonably practicable after the modifications are made.</p></content></subsection><subsection eId="section-22-5"><num>(5)</num><content><p>A modification under any of the powers of part of a standard condition of a licence does not prevent any other part of the condition from continuing to be regarded as a standard condition for the purposes of Part 1 of the Gas Act 1986 or Part 1 of the Electricity Act 1989.</p></content></subsection><subsection eId="section-22-6"><num>(6)</num><content><p>Where the Secretary of State makes modifications under any of the powers of the standard conditions of a licence of any type, the Gas and Electricity Markets Authority must make the same modification of those standard conditions for the purposes of their incorporation in licences of that type granted after that time.</p></content></subsection><subsection eId="section-22-7"><num>(7)</num><intro><p>In section 33(1) of the Utilities Act 2000 (standard conditions of electricity licences)—</p></intro><level class="para1" eId="section-22-7-a"><num>(a)</num><content><p>after paragraph (d) omit “or”;</p></content></level><level class="para1" eId="section-22-7-b"><num>(b)</num><content><p><mod>after paragraph (e) insert<quotedText startQuote="&#x201C;">or </quotedText><quotedStructure endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(f)</num><content><p>under Chapter 1 of Part 1 of the Energy Act 2011.</p></content></level></quotedStructure></mod></p></content></level></subsection><subsection eId="section-22-8"><num>(8)</num><intro><p>In section 81(2) of the Utilities Act 2000 (standard conditions of gas licences)—</p></intro><level class="para1" eId="section-22-8-a"><num>(a)</num><content><p><mod>for “2008 or” substitute <quotedText>“ 2008, ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-22-8-b"><num>(b)</num><content><p><mod>after “2010” insert <quotedText>“ or under Chapter 1 of Part 1 of the Energy Act 2011 ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-22-9"><num>(9)</num><content><p>Sections 4AA to 4B of the Gas Act 1986 (principal objective and general duties) apply in relation to the powers under sections 17 to 20 with respect to holders of licences under section 7 or 7A of that Act as they apply in relation to functions of the Secretary of State under Part 1 of that Act.</p></content></subsection><subsection eId="section-22-10"><num>(10)</num><content><p>Sections 3A to 3D of the Electricity Act 1989 (principal objective and general duties) apply in relation to the powers under sections 17 to 20 with respect to holders of licences under section 6(1)(c) or (d) of that Act as they apply in relation to functions of the Secretary of State under Part 1 of that Act.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-gas-and-electricity-codes"><heading><i>Gas and electricity codes</i></heading><section eId="section-23"><num>23</num><heading>Recovering green deal payments: gas suppliers</heading><subsection eId="section-23-1"><num>(1)</num><content><p>Schedule 2B to the Gas Act 1986 (the gas code) is amended as follows.</p></content></subsection><subsection eId="section-23-2"><num>(2)</num><content><p><mod>In paragraph 6A(1) for paragraph (a) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(a)</num><intro><p>the sum is owed to an authorised supplier—</p></intro><level class="para2"><num>(i)</num><content><p>in respect of the supply of gas to the premises on which the meter is installed,</p></content></level><level class="para2"><num>(ii)</num><content><p>in respect of the provision of the meter, or</p></content></level><level class="para2"><num>(iii)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises; or</p></content></level></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-23-3"><num>(3)</num><content><p><mod>In paragraph 7(1) for paragraphs (a) and (b) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>a demand in writing is made by a gas supplier for any of the relevant payments to be made by a consumer; and</p></content></level><level class="para1"><num>(b)</num><content><p>the consumer does not make those payments within 28 days after the making of the demand.</p></content></level></quotedStructure></mod></p></content></subsection><subsection eId="section-23-4"><num>(4)</num><content><p><mod>After paragraph 7(1) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><subsection><num>(1A)</num><intro><p>A payment is a relevant payment for the purposes of sub-paragraph (1) if it is due to the gas supplier from the consumer—</p></intro><level class="para1"><num>(a)</num><content><p>in respect of the supply of gas to any premises of the consumer (in this paragraph referred to as “<term refersTo="#term-the-premises">the premises</term>”); or</p></content></level><level class="para1"><num>(b)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-23-5"><num>(5)</num><content><p><mod>In each of paragraphs 7(4)(b) and (5) for “charges” substitute <quotedText>“ payments ”</quotedText>.</mod></p></content></subsection></section><section eId="section-24"><num>24</num><heading>Recovering green deal payments: electricity suppliers</heading><subsection eId="section-24-1"><num>(1)</num><content><p>The Electricity Act 1989 is amended as follows.</p></content></subsection><subsection eId="section-24-2"><num>(2)</num><content><p>Paragraph 2 of Schedule 6 to the Electricity Act 1989 (the electricity code) is amended as set out in subsections (3) to (5).</p></content></subsection><subsection eId="section-24-3"><num>(3)</num><content><p><mod>In sub-paragraph (1) for the words from “paid” to “electricity meter” substitute <quotedText>“ made all the relevant payments ”</quotedText>.</mod></p></content></subsection><subsection eId="section-24-4"><num>(4)</num><content><p><mod>After sub-paragraph (1) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><subsection><num>(1A)</num><intro><p>A payment is a relevant payment for the purposes of sub-paragraph (1) if it is due from the customer to an electricity supplier—</p></intro><level class="para1"><num>(a)</num><content><p>in respect of the supply of electricity to any premises or the provision of an electricity meter; or</p></content></level><level class="para1"><num>(b)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-24-5"><num>(5)</num><content><p><mod>In sub-paragraph (3) for “payment of the charges due” substitute <quotedText>“ the relevant payments to be made ”</quotedText>.</mod></p></content></subsection><subsection eId="section-24-6"><num>(6)</num><content><p><mod>In paragraph 12(2) of Schedule 7 (recovery through pre-payment meters) for paragraph (a) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="default"><level class="para1"><num>(a)</num><intro><p>the sum is owed to an authorised supplier—</p></intro><level class="para2"><num>(i)</num><content><p>in respect of the supply of electricity to the premises on which the meter is installed,</p></content></level><level class="para2"><num>(ii)</num><content><p>in respect of the provision of the meter, or</p></content></level><level class="para2"><num>(iii)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises; or</p></content></level></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-modifying-consumer-credit-legislation"><heading><i>Modifying consumer credit legislation</i></heading><section eId="section-25"><num><noteRef href="#key-f059ff6bc0f5be2cb9a9a920afef444e" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>25</num><heading>Exemption from Consumer Credit Act 1974 in relation to credit to business debtors</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-26"><num><noteRef href="#key-fe68fb8a74e286ff5688a659547d5b8a" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>26</num><heading>Energy suppliers not to be treated as carrying on ancillary credit business</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-27"><num>27</num><heading>Duties to give debtors information and statements</heading><subsection eId="section-27-1"><num>(1)</num><content><p>The Consumer Credit Act 1974 is amended as follows.</p></content></subsection><subsection eId="section-27-2"><num>(2)</num><content><p><mod>In section 77 (duty to give information to debtor under fixed-sum credit agreement) after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(2A)</num><content><p>Subsection (2B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(2B)</num><content><p>The duty imposed on the creditor by subsection (1) may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-27-3"><num>(3)</num><content><p><mod>In section 77A (statements to be provided in relation to fixed-sum credit agreement) after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(2A)</num><content><p>Subsection (2B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(2B)</num><content><p>Any duty imposed on the creditor by this section may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-27-4"><num>(4)</num><content><p><mod>In section 77B (statement of account to be provided on request in relation to fixed-sum credit agreement) after subsection (7) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(7A)</num><content><p>Subsection (7B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(7B)</num><content><p>The duty imposed on the creditor by this section may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection></section><section eId="section-28"><num>28</num><heading>Exemption from requirement to give notice of sums in arrears</heading><content><p><mod>In section 86B of the Consumer Credit Act 1974 (requirement to give notice of sums in arrears) for subsection (12) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(12)</num><content><p>In this section “<term refersTo="#term-applicable-agreement">applicable agreement</term>” means an agreement which falls within subsection (12A) or (12B).</p></content></subsection><subsection><num>(12A)</num><intro><p>An agreement falls within this subsection if—</p></intro><level class="para1"><num>(a)</num><content><p>it is a regulated agreement for fixed-sum credit; and</p></content></level><level class="para1"><num>(b)</num><intro><p>it is not—</p></intro><level class="para2"><num>(i)</num><content><p>a non-commercial agreement;</p></content></level><level class="para2"><num>(ii)</num><content><p>a small agreement; or</p></content></level><level class="para2"><num>(iii)</num><content><p>a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></level></level></subsection><subsection><num>(12B)</num><intro><p>An agreement falls within this subsection if—</p></intro><level class="para1"><num>(a)</num><content><p>it is a regulated consumer hire agreement; and</p></content></level><level class="para1"><num>(b)</num><content><p>it is neither a non-commercial agreement nor a small agreement.</p></content></level></subsection></quotedStructure></mod></p></content></section><section eId="section-29"><num>29</num><heading>Early repayment of green deal finance</heading><subsection eId="section-29-1"><num>(1)</num><content><p>The Consumer Credit Act 1974 is amended as follows.</p></content></subsection><subsection eId="section-29-2"><num>(2)</num><content><p><mod>After section 95A (compensatory amount to creditor in relation to early repayment) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><section><num>95B</num><heading>Compensatory amount: green deal finance</heading><subsection><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1"><num>(a)</num><content><p>a regulated consumer credit agreement provides for the rate of interest on the credit to be fixed for a period of time (“the fixed rate period”),</p></content></level><level class="para1"><num>(b)</num><content><p>the agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011) which is of a duration specified for the purposes of this section in regulations, and</p></content></level><level class="para1"><num>(c)</num><content><p>under section 94 the debtor discharges all or part of his indebtedness during the fixed rate period.</p></content></level></subsection><subsection><num>(2)</num><intro><p>The creditor may claim an amount equal to the cost which the creditor has incurred as a result only of the debtor's indebtedness being discharged during the fixed rate period if—</p></intro><level class="para1"><num>(a)</num><content><p>the amount of the payment under section 94 is not paid from the proceeds of a contract of payment protection insurance, and</p></content></level><level class="para1"><num>(b)</num><content><p>such other conditions as may be specified for the purposes of this section in regulations are satisfied.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The amount in subsection (2)—</p></intro><level class="para1"><num>(a)</num><content><p>must be fair,</p></content></level><level class="para1"><num>(b)</num><content><p>must be objectively justified,</p></content></level><level class="para1"><num>(c)</num><content><p>must be calculated by the creditor in accordance with provision made for the purposes of this section in regulations, and</p></content></level><level class="para1"><num>(d)</num><content><p>must not exceed the total amount of interest that would have been paid by the debtor under the agreement in the period from the date on which the debtor makes the payment under section 94 to the date fixed by the agreement for the discharge of the indebtedness of the debtor.</p></content></level></subsection><subsection><num>(4)</num><content><p>If a creditor could claim under either section 95A or this section, the creditor may choose under which section to claim.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-29-3"><num>(3)</num><intro><p>In section 94 (right to complete payments ahead of time)—</p></intro><level class="para1" eId="section-29-3-a"><num>(a)</num><content><p><mod>in subsection (1) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-29-3-b"><num>(b)</num><content><p><mod>in subsection (5) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-29-4"><num>(4)</num><content><p><mod>In subsection (2)(c) of section 97A (duty to give information on partial repayment) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>.</mod></p></content></subsection></section><section eId="section-30"><num>30</num><heading>Power to amend Consumer Credit Act 1974</heading><subsection eId="section-30-1"><num>(1)</num><content><p>The Secretary of State may by order make such amendments to the Consumer Credit Act 1974<ins class="first last" ukl:ChangeId="key-0bb8e82a9a9824c6fb5a3055017bc416-1491332806432" ukl:CommentaryRef="key-0bb8e82a9a9824c6fb5a3055017bc416"><noteRef uk:name="commentary" href="#key-0bb8e82a9a9824c6fb5a3055017bc416" class="commentary"/>, the Financial Services and Markets Act 2000 and any statutory instrument made under that Act</ins> as the Secretary of State considers appropriate in consequence of provision made by or under this Chapter.</p></content></subsection><subsection eId="section-30-2"><num>(2)</num><intro><p>Before exercising the power under subsection (1) the Secretary of State must consult—</p></intro><level class="para1" eId="section-30-2-a"><num>(a)</num><content><p>the <ins class="substitution first last" ukl:ChangeId="key-803fdd5956001662e37b430be0cc1a4d-1491332863193" ukl:CommentaryRef="key-803fdd5956001662e37b430be0cc1a4d"><noteRef uk:name="commentary" href="#key-803fdd5956001662e37b430be0cc1a4d" class="commentary"/>Financial Conduct Authority</ins>, and</p></content></level><level class="para1" eId="section-30-2-b"><num>(b)</num><content><p>such other persons as the Secretary of State considers appropriate.</p></content></level></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-delegation-and-exercise-of-functions"><heading><i>Delegation and exercise of functions</i></heading><section eId="section-31"><num>31</num><heading>Delegation and conferring of functions</heading><subsection eId="section-31-1"><num>(1)</num><intro><p>The Secretary of State may by order provide for the following functions conferred on the Secretary of State to be exercisable instead by a public body specified in the order—</p></intro><level class="para1" eId="section-31-1-a"><num>(a)</num><content><p>any function exercisable in connection with the scheme established by the framework regulations;</p></content></level><level class="para1" eId="section-31-1-b"><num>(b)</num><content><p>any function exercisable under the framework regulations by virtue of section 6(4);</p></content></level><level class="para1" eId="section-31-1-c"><num>(c)</num><content><p>any function under regulations made under section 16.</p></content></level></subsection><subsection eId="section-31-2"><num>(2)</num><content><p>If the function of issuing a code of practice for the purposes of the scheme is specified in an order by virtue of subsection (1)(a), a draft of the code must be approved by the Secretary of State before the Secretary of State lays the draft before Parliament under section 39(2).</p></content></subsection><subsection eId="section-31-3"><num>(3)</num><content><p>If the function of revoking a code of practice issued for the purposes of the scheme is specified in an order by virtue of subsection (1)(a), the code must not be revoked without the approval of the Secretary of State.</p></content></subsection><subsection eId="section-31-4"><num>(4)</num><intro><p>The Secretary of State may by order make provision conferring administration functions on—</p></intro><level class="para1" eId="section-31-4-a"><num>(a)</num><content><p>the Secretary of State;</p></content></level><level class="para1" eId="section-31-4-b"><num>(b)</num><content><p>a public body specified in the order.</p></content></level></subsection><subsection eId="section-31-5"><num>(5)</num><content><p>For the purposes of subsection (4) administration functions are functions in connection with the administration of any provision in licences under section 7 or 7A of the Gas Act 1986 or section 6(1)(c) or (d) of the Electricity Act 1989 made by virtue of section 17(3) of this Act.</p></content></subsection><subsection eId="section-31-6"><num>(6)</num><intro><p>An order made by virtue of subsection (1) or (4)(b) may provide for—</p></intro><level class="para1" eId="section-31-6-a"><num>(a)</num><content><p>different functions to be exercisable by different public bodies;</p></content></level><level class="para1" eId="section-31-6-b"><num>(b)</num><content><p>the same function to be exercisable by different public bodies in relation to different areas.</p></content></level></subsection><subsection eId="section-31-7"><num>(7)</num><content><p>The Secretary of State may make payments to any public body specified in an order made by virtue of subsection (1).</p></content></subsection></section><section eId="section-32"><num>32</num><heading>Exercise of scheme functions on behalf of the Secretary of State or a public body</heading><subsection eId="section-32-1"><num>(1)</num><content><p>This section applies to any function exercisable in connection with the scheme established by the framework regulations.</p></content></subsection><subsection eId="section-32-2"><num>(2)</num><content><p>The Secretary of State may arrange for such a function to be exercised by any body or person on behalf of the Secretary of State.</p></content></subsection><subsection eId="section-32-3"><num>(3)</num><content><p>A public body specified in relation to such a function in an order made by virtue of section 31(1)(a) may arrange for the function to be exercised by any other body or person on its behalf.</p></content></subsection><subsection eId="section-32-4"><num>(4)</num><intro><p>Arrangements under this section—</p></intro><level class="para1" eId="section-32-4-a"><num>(a)</num><content><p>do not affect the responsibility for the exercise of the function;</p></content></level><level class="para1" eId="section-32-4-b"><num>(b)</num><content><p>may include provision for payments to be made to the body or person exercising the function under the arrangements.</p></content></level></subsection></section><section eId="section-33"><num>33</num><heading>Duty to report</heading><subsection eId="section-33-1"><num>(1)</num><content><p>This section applies if the function under section 3(1)(a) is specified in an order made by virtue of section 31(1)(a).</p></content></subsection><subsection eId="section-33-2"><num>(2)</num><intro><p>The Secretary of State may make regulations requiring the body specified in relation to that function in the order to—</p></intro><level class="para1" eId="section-33-2-a"><num>(a)</num><content><p>collect information on the specified matters, and</p></content></level><level class="para1" eId="section-33-2-b"><num>(b)</num><content><p>provide the Secretary of State with a report on those matters at the specified times.</p></content></level></subsection><subsection eId="section-33-3"><num>(3)</num><content><p>In subsection (2) “<term refersTo="#term-specified" eId="term-specified">specified</term>” means specified in the regulations.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-general"><heading><i>General</i></heading><section eId="section-34"><num>34</num><heading>Power of Secretary of State to deal with special circumstances</heading><subsection eId="section-34-1"><num>(1)</num><intro><p>The Secretary of State may by regulations make provision as to—</p></intro><level class="para1" eId="section-34-1-a"><num>(a)</num><content><p>the circumstances in which a bill payer's liability to make green deal payments to the relevant energy supplier is suspended or cancelled;</p></content></level><level class="para1" eId="section-34-1-b"><num>(b)</num><content><p>the circumstances in which any suspension of liability ends;</p></content></level><level class="para1" eId="section-34-1-c"><num>(c)</num><content><p>the consequences of any suspension or cancellation;</p></content></level><level class="para1" eId="section-34-1-d"><num>(d)</num><content><p>the circumstances in which the green deal provider may require the early repayment of the whole or part of the total of the payments outstanding under a green deal plan.</p></content></level></subsection><subsection eId="section-34-2"><num>(2)</num><intro><p>The regulations may, in particular, include provision—</p></intro><level class="para1" eId="section-34-2-a"><num>(a)</num><content><p>as to the procedure to be followed for securing a suspension or cancellation (including the payment of an administration fee calculated in accordance with the regulations);</p></content></level><level class="para1" eId="section-34-2-b"><num>(b)</num><content><p>as to how any payments due under a green deal plan during a period of suspension are to be paid;</p></content></level><level class="para1" eId="section-34-2-c"><num>(c)</num><content><p>as to the making of payments due under a green deal plan after a period of suspension;</p></content></level><level class="para1" eId="section-34-2-d"><num>(d)</num><content><p>as to the calculation of the amount payable on early repayment (including a fee calculated in accordance with the regulations).</p></content></level></subsection><subsection eId="section-34-3"><num>(3)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-34-3-a"><num>(a)</num><content><p>“<term refersTo="#term-bill-payer" eId="term-bill-payer">bill payer</term>” includes the person who would be the bill payer if the supply from the relevant energy supplier were not temporarily disconnected or the liability to make green deal payments were not suspended, and</p></content></level><level class="para1" eId="section-34-3-b"><num>(b)</num><content><p>payments are green deal payments if they are made under a green deal plan.</p></content></level></subsection></section><section eId="section-35"><num>35</num><heading>Appeals</heading><subsection eId="section-35-1"><num>(1)</num><intro><p>This section applies if provision is included in a scheme or regulations by virtue of any of the following—</p></intro><level class="para1" eId="section-35-1-a"><num>(a)</num><content><p>section 3(3)(h) or (i);</p></content></level><level class="para1" eId="section-35-1-b"><num>(b)</num><content><p>section 6(4);</p></content></level><level class="para1" eId="section-35-1-c"><num>(c)</num><content><p>section 16.</p></content></level></subsection><subsection eId="section-35-2"><num>(2)</num><content><p>The Secretary of State must by regulations provide for a right of appeal to a court or tribunal against any sanction imposed, or other action taken, by the Secretary of State or a specified public body under the provision mentioned in subsection (1).</p></content></subsection><subsection eId="section-35-3"><num>(3)</num><intro><p>Regulations under subsection (2) may, in particular, include provision—</p></intro><level class="para1" eId="section-35-3-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-35-3-b"><num>(b)</num><content><p>as to the persons who may make an appeal;</p></content></level><level class="para1" eId="section-35-3-c"><num>(c)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-35-3-d"><num>(d)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-35-3-e"><num>(e)</num><content><p>suspending the effect of a sanction or other action being appealed against, pending determination of the appeal;</p></content></level><level class="para1" eId="section-35-3-f"><num>(f)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-35-3-g"><num>(g)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-35-4"><num>(4)</num><intro><p>The provision referred to in subsection (3)(f) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-35-4-a"><num>(a)</num><content><p>to confirm the sanction imposed or action taken;</p></content></level><level class="para1" eId="section-35-4-b"><num>(b)</num><content><p>to withdraw the sanction or action;</p></content></level><level class="para1" eId="section-35-4-c"><num>(c)</num><content><p>to impose a different sanction or take different action;</p></content></level><level class="para1" eId="section-35-4-d"><num>(d)</num><content><p>to remit the decision whether to confirm the sanction or other action, or any matter relating to that decision, to the person who imposed the sanction or took the action;</p></content></level><level class="para1" eId="section-35-4-e"><num>(e)</num><content><p>to award costs or, in Scotland, expenses.</p></content></level></subsection><subsection eId="section-35-5"><num>(5)</num><content><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within subsection (3)(a), (d), (f) or (g), regulations under subsection (2) may revoke or amend any subordinate legislation.</p></content></subsection><subsection eId="section-35-6"><num>(6)</num><content><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within subsection (3)(a), (d), (f) or (g), they may by regulations revoke or amend any subordinate legislation, or any provision included in an instrument made under an Act of the Scottish Parliament, if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></content></subsection><subsection eId="section-35-7"><num>(7)</num><intro><p>In this section—</p></intro><level class="para1" eId="section-35-7-a"><num>(a)</num><content><p>“<term refersTo="#term-specified-public-body" eId="term-specified-public-body">specified public body</term>” means a public body specified in an order made by virtue of section 31(1);</p></content></level><level class="para1" eId="section-35-7-b"><num>(b)</num><content><p>“<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></level></subsection></section><section eId="section-36"><num>36</num><heading>Funding for energy efficiency advice</heading><subsection eId="section-36-1"><num>(1)</num><content><p>The Secretary of State may incur expenditure in providing qualifying advice or information or in making payments to persons who provide qualifying advice or information.</p></content></subsection><subsection eId="section-36-2"><num>(2)</num><content><p>In this section “<term refersTo="#term-qualifying-advice-or-information" eId="term-qualifying-advice-or-information">qualifying advice or information</term>” means advice or information about green deal plans or energy efficiency generally which is given to individuals or organisations.</p></content></subsection></section><section eId="section-37"><num>37</num><heading>Preparatory expenditure: framework regulations</heading><content><p>The Secretary of State may, before the framework regulations are made, incur expenditure for the purpose of, or in connection with, preparing for a scheme of the kind provided for by section 3.</p></content></section><section eId="section-38"><num>38</num><heading>Green deal installation apprenticeships</heading><subsection eId="section-38-1"><num>(1)</num><content><p>Before making the first framework regulations the Secretary of State must lay before Parliament a report on what, if any, steps the Secretary of State has taken to encourage green deal installation apprenticeships.</p></content></subsection><subsection eId="section-38-2"><num>(2)</num><content><p>A “green deal installation apprenticeship” is an apprenticeship which provides training on how to install energy efficiency improvements at properties.</p></content></subsection></section><section eId="section-39"><num>39</num><heading>Parliamentary procedure in relation to code of practice</heading><subsection eId="section-39-1"><num>(1)</num><content><p>This section makes further provision in relation to the issuing of any code of practice for the purposes of the scheme established by the framework regulations.</p></content></subsection><subsection eId="section-39-2"><num>(2)</num><content><p>Before the code is issued the Secretary of State must lay a draft of the code before Parliament.</p></content></subsection><subsection eId="section-39-3"><num>(3)</num><content><p>If, within the 40-day period, either House of Parliament resolves not to approve the draft, the code may not be issued.</p></content></subsection><subsection eId="section-39-4"><num>(4)</num><content><p>If no such resolution is made within that period, the code may be issued.</p></content></subsection><subsection eId="section-39-5"><num>(5)</num><content><p>The “<term refersTo="#term-40-day-period" eId="term-40-day-period">40-day period</term>”, in relation to a draft of a code, means the period of 40 days beginning with the day on which the draft is laid before Parliament (or, if it is not laid before each House of Parliament on the same day, the later of the 2 days on which it is laid).</p></content></subsection><subsection eId="section-39-6"><num>(6)</num><intro><p>For the purposes of calculating the 40-day period, no account is to be taken of any period during which—</p></intro><level class="para1" eId="section-39-6-a"><num>(a)</num><content><p>Parliament is dissolved or prorogued, or</p></content></level><level class="para1" eId="section-39-6-b"><num>(b)</num><content><p>both Houses are adjourned for more than 4 days.</p></content></level></subsection></section><section eId="section-40"><num>40</num><heading>Regulations and orders</heading><subsection eId="section-40-1"><num>(1)</num><content><p>Regulations and orders under this Chapter may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-40-2"><num>(2)</num><content><p>Regulations and orders under this Chapter, other than those made by the Scottish Ministers, are to be made by statutory instrument.</p></content></subsection><subsection eId="section-40-3"><num>(3)</num><content><p>A statutory instrument containing regulations or an order under this Chapter is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-40-4"><num>(4)</num><intro><p>Subsection (3) does not apply to a statutory instrument containing—</p></intro><level class="para1" eId="section-40-4-a"><num>(a)</num><content><p>regulations under section 2 or the framework regulations,</p></content></level><level class="para1" eId="section-40-4-b"><num>(b)</num><content><p>regulations under section 13, 15(1), 16, 34 or 35(2), or</p></content></level><level class="para1" eId="section-40-4-c"><num>(c)</num><content><p>an order under section 1, 2 or 30.</p></content></level></subsection><subsection eId="section-40-5"><num>(5)</num><content><p>A statutory instrument containing regulations or an order falling within subsection (4) may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection eId="section-40-6"><num>(6)</num><content><p>Regulations under section 10(2), 14(7) or (8) or 15(4) (regulations made by the Scottish Ministers) are subject to the negative procedure.</p></content></subsection><subsection eId="section-40-7"><num>(7)</num><content><p>Regulations under section 35(6) (regulations made by the Scottish Ministers) are subject to the affirmative procedure.</p></content></subsection><subsection eId="section-40-8"><num>(8)</num><intro><p>Before making regulations or an order under this Chapter extending to Scotland, the Secretary of State must—</p></intro><level class="para1" eId="section-40-8-a"><num>(a)</num><content><p>if the regulations or order contain any provision which would be within the legislative competence of the Scottish Parliament if it were contained in an Act of that Parliament, obtain the consent of the Scottish Ministers;</p></content></level><level class="para1" eId="section-40-8-b"><num>(b)</num><content><p>in any other case, consult the Scottish Ministers.</p></content></level></subsection><subsection eId="section-40-9"><num>(9)</num><intro><p>The Secretary of State must obtain the consent of the Welsh Ministers before making provision under section 35 amending or revoking—</p></intro><level class="para1" eId="section-40-9-a"><num>(a)</num><content><p>provision included in an instrument made under a Measure or Act of the National Assembly for Wales;</p></content></level><level class="para1" eId="section-40-9-b"><num>(b)</num><content><p>any other subordinate legislation made by the Welsh Ministers (or the National Assembly for Wales established under the Government of Wales Act 1998).</p></content></level></subsection><subsection eId="section-40-10"><num>(10)</num><content><p>Before amending under section 9 a provision of the Building Regulations 2010 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2010/2214), the Secretary of State must, if and so far as the function under which the provision was made is exercisable by the Welsh Ministers, obtain their consent.</p></content></subsection><subsection eId="section-40-11"><num>(11)</num><content><p>Subsections (9) and (10) do not apply to the extent that the Secretary of State is making incidental or consequential provision.</p></content></subsection><subsection eId="section-40-12"><num>(12)</num><content><p>Before making regulations or an order under this Chapter applying to Wales, the Secretary of State must consult the Welsh Ministers.</p></content></subsection><subsection eId="section-40-13"><num>(13)</num><content><p>Subsection (12) does not apply to the extent that consent has been obtained under subsection (9) or (10).</p></content></subsection></section><section eId="section-41"><num>41</num><heading>Crown application: Chapter 1</heading><content><p>This Chapter binds the Crown.</p></content></section></hcontainer></chapter> — Delegation and exercise of functions
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-1"><num>CHAPTER 1</num><heading>Green deal</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-introductory"><heading><i>Introductory</i></heading><section eId="section-1"><num>1</num><heading>Green deal plans</heading><subsection eId="section-1-1"><num>(1)</num><content><p>This section applies for the purposes of this Chapter.</p></content></subsection><subsection eId="section-1-2"><num>(2)</num><content><p>An energy plan is an arrangement made by the occupier or owner of a property for a person to make energy efficiency improvements to the property.</p></content></subsection><subsection eId="section-1-3"><num>(3)</num><intro><p>An energy plan is a green deal plan if—</p></intro><level class="para1" eId="section-1-3-a"><num>(a)</num><content><p>the energy efficiency improvements are to be paid for wholly or partly in instalments, and</p></content></level><level class="para1" eId="section-1-3-b"><num>(b)</num><content><p>all of the requirements listed in paragraphs (a) to (e) of subsection (4) are met in relation to the plan at the time when it is made.</p></content></level></subsection><subsection eId="section-1-4"><num>(4)</num><intro><p>The requirements are—</p></intro><level class="para1" eId="section-1-4-a"><num>(a)</num><content><p>the property is an eligible property,</p></content></level><level class="para1" eId="section-1-4-b"><num>(b)</num><content><p>the energy efficiency improvements fall within a description specified in an order made by the Secretary of State (“qualifying energy improvements”),</p></content></level><level class="para1" eId="section-1-4-c"><num>(c)</num><content><p>the conditions mentioned in section 4 as to assessment of the property and other matters have been met,</p></content></level><level class="para1" eId="section-1-4-d"><num>(d)</num><content><p>the conditions mentioned in section 5 as to the terms of the plan and other matters are met, and</p></content></level><level class="para1" eId="section-1-4-e"><num>(e)</num><content><p>a relevant energy supplier supplies, or is to supply, energy to the property.</p></content></level></subsection><subsection eId="section-1-5"><num>(5)</num><intro><p>Subsection (6) applies to a green deal plan from the time when—</p></intro><level class="para1" eId="section-1-5-a"><num>(a)</num><content><p>improvements have been installed in accordance with section 7,</p></content></level><level class="para1" eId="section-1-5-b"><num>(b)</num><content><p>the plan is confirmed in accordance with section 8, and</p></content></level><level class="para1" eId="section-1-5-c"><num>(c)</num><content><p>the requirements imposed by virtue of section 9 or 10 are met.</p></content></level></subsection><subsection eId="section-1-6"><num>(6)</num><intro><p>The payments in instalments agreed in the plan are to be—</p></intro><level class="para1" eId="section-1-6-a"><num>(a)</num><content><p>made by the person who is for the time being liable to pay the energy bills for the property,</p></content></level><level class="para1" eId="section-1-6-b"><num>(b)</num><content><p>made to the relevant energy supplier through the energy bills for the property,</p></content></level><level class="para1" eId="section-1-6-c"><num>(c)</num><content><p>recoverable as a debt by the relevant energy supplier from the person referred to in paragraph (a), and</p></content></level><level class="para1" eId="section-1-6-d"><num>(d)</num><content><p>recovered and held by the relevant energy supplier as agent and trustee for the person who made the improvements (unless the relevant energy supplier is also that person).</p></content></level></subsection><subsection eId="section-1-7"><num>(7)</num><content><p>Subsection (6) applies irrespective of whether the person referred to in paragraph (a) is the person who entered into the plan.</p></content></subsection><subsection eId="section-1-8"><num>(8)</num><intro><p>Subsection (6) is subject to—</p></intro><level class="para1" eId="section-1-8-a"><num>(a)</num><content><p>provision made in regulations under section 34;</p></content></level><level class="para1" eId="section-1-8-b"><num>(b)</num><content><p>any suspension or cancellation, by virtue of provision made in regulations under section 3(3)(h) or (i), 6(4), 16 or 35, of liability to make payments.</p></content></level></subsection><subsection eId="section-1-9"><num>(9)</num><content><p>For the purposes of subsection (4)(a) a property is an eligible property unless it falls within a description specified in an order made by the Secretary of State.</p></content></subsection></section><section eId="section-2"><num>2</num><heading>Green deal plans: supplementary</heading><subsection eId="section-2-1"><num>(1)</num><content><p>This section applies for the purposes of this Chapter.</p></content></subsection><subsection eId="section-2-2"><num>(2)</num><content><p>The occupier or owner who makes the arrangement referred to in section 1(2) is the “improver” and the person who makes the improvements is the “green deal provider”.</p></content></subsection><subsection eId="section-2-3"><num>(3)</num><content><p>The person referred to in section 1(6)(a) is the “bill payer”.</p></content></subsection><subsection eId="section-2-4"><num>(4)</num><intro><p>References to energy efficiency improvements, in relation to a property, are to—</p></intro><level class="para1" eId="section-2-4-a"><num>(a)</num><content><p>measures for improving efficiency in the use in the property of electricity, gas conveyed through pipes or any other source of energy which is specified in an order made by the Secretary of State, or</p></content></level><level class="para1" eId="section-2-4-b"><num>(b)</num><content><p>measures falling within subsection (5) or (6).</p></content></level></subsection><subsection eId="section-2-5"><num>(5)</num><intro><p>Measures fall within this subsection if—</p></intro><level class="para1" eId="section-2-5-a"><num>(a)</num><intro><p>they are any of the following—</p></intro><level class="para2" eId="section-2-5-a-i"><num>(i)</num><content><p>measures for increasing the amount of electricity generated, or heat produced, by microgeneration (within the meaning given by section 26(1) of the Climate Change and Sustainable Energy Act 2006);</p></content></level><level class="para2" eId="section-2-5-a-ii"><num>(ii)</num><content><p>any other measures for increasing the amount of electricity generated, or heat produced, using low-emissions sources or technologies;</p></content></level><level class="para2" eId="section-2-5-a-iii"><num>(iii)</num><content><p>measures for reducing the consumption of such energy as is mentioned in subsection (4), and</p></content></level></level><level class="para1" eId="section-2-5-b"><num>(b)</num><content><p>they are specified in an order made by the Secretary of State.</p></content></level></subsection><subsection eId="section-2-6"><num>(6)</num><intro><p>Measures fall within this subsection if—</p></intro><level class="para1" eId="section-2-6-a"><num>(a)</num><intro><p>they are installed at the property for the purpose of supplying to it any of the following types of energy—</p></intro><level class="para2" eId="section-2-6-a-i"><num>(i)</num><content><p>electricity generated by a generating station operated for the purposes of producing heat, or a cooling effect, in association with electricity;</p></content></level><level class="para2" eId="section-2-6-a-ii"><num>(ii)</num><content><p>heat produced in association with electricity or steam produced from (or air or water heated by) such heat;</p></content></level><level class="para2" eId="section-2-6-a-iii"><num>(iii)</num><content><p>any gas or liquid subjected to a cooling effect produced in association with electricity, and</p></content></level></level><level class="para1" eId="section-2-6-b"><num>(b)</num><content><p>they are specified in an order made by the Secretary of State.</p></content></level></subsection><subsection eId="section-2-7"><num>(7)</num><content><p>For the purposes of subsection (5)(a)(ii) electricity is generated, or heat is produced, using low-emissions sources or technologies if it is generated, or produced, by plant which relies wholly or mainly on a source of energy or a technology mentioned in section 26(2) of the Climate Change and Sustainable Energy Act 2006.</p></content></subsection><subsection eId="section-2-8"><num>(8)</num><content><p>For the purposes of subsection (6) “generating station” and “supplying” are to be read in accordance with section 64(1) of the Electricity Act 1989.</p></content></subsection><subsection eId="section-2-9"><num>(9)</num><content><p>“Energy” (except in this section), “energy bill”, “occupier”, “owner” and “relevant energy supplier” have the meaning given in regulations made by the Secretary of State.</p></content></subsection><subsection eId="section-2-10"><num>(10)</num><content><p>Regulations under subsection (9) may also make provision as to the circumstances in which a person who is not a bill payer for the purposes of this Chapter may be treated as a bill payer for those purposes.</p></content></subsection></section><section eId="section-3"><num>3</num><heading>Framework regulations</heading><subsection eId="section-3-1"><num>(1)</num><intro><p>The Secretary of State must by regulations establish a scheme making provision for the Secretary of State—</p></intro><level class="para1" eId="section-3-1-a"><num>(a)</num><content><p>to authorise persons to act as green deal assessors, green deal providers or green deal installers in connection with green deal plans (either individually or through membership of a body specified in, or authorised under, the scheme);</p></content></level><level class="para1" eId="section-3-1-b"><num>(b)</num><content><p>to regulate the conduct of those assessors, providers or installers (“green deal participants”).</p></content></level></subsection><subsection eId="section-3-2"><num>(2)</num><content><p>Regulations under subsection (1) are referred to in this Chapter as “<term refersTo="#term-the-framework-regulations" eId="term-the-framework-regulations">the framework regulations</term>”.</p></content></subsection><subsection eId="section-3-3"><num>(3)</num><intro><p>The scheme established by the framework regulations may, in particular, make provision—</p></intro><level class="para1" eId="section-3-3-a"><num>(a)</num><content><p>requiring the payment of a fee in connection with initial or continued authorisation under the scheme;</p></content></level><level class="para1" eId="section-3-3-b"><num>(b)</num><content><p>for the establishment and maintenance of a register of green deal participants and of persons from whom authorisation under the scheme has been withdrawn;</p></content></level><level class="para1" eId="section-3-3-c"><num>(c)</num><content><p>requiring green deal participants to provide the information required under the scheme;</p></content></level><level class="para1" eId="section-3-3-d"><num>(d)</num><content><p>for the issuing, revision or revocation of a code of practice;</p></content></level><level class="para1" eId="section-3-3-e"><num>(e)</num><content><p>requiring green deal participants to comply with the code of practice as a condition of their authorisation;</p></content></level><level class="para1" eId="section-3-3-f"><num>(f)</num><content><p>requiring green deal providers to enter into an agreement with the holder of a licence under section 7 or 7A of the Gas Act 1986 (gas transporter, shipper or supply licences) or section 6(1)(c) or (d) of the Electricity Act 1989 (electricity distributor and supply licences) and to comply with that agreement as a condition of their authorisation;</p></content></level><level class="para1" eId="section-3-3-g"><num>(g)</num><content><p>requiring that an agreement mentioned in paragraph (f) be approved by the Secretary of State before being entered into;</p></content></level><level class="para1" eId="section-3-3-h"><num>(h)</num><content><p>for securing compliance with any condition or any other requirement of the scheme, code or agreement;</p></content></level><level class="para1" eId="section-3-3-i"><num>(i)</num><content><p>as to the consequences of non-compliance with any such condition or requirement.</p></content></level></subsection><subsection eId="section-3-4"><num>(4)</num><intro><p>The code of practice issued for the purposes of the scheme may, in particular, make provision—</p></intro><level class="para1" eId="section-3-4-a"><num>(a)</num><content><p>as to the qualification and training of green deal participants;</p></content></level><level class="para1" eId="section-3-4-b"><num>(b)</num><content><p>as to their handling of queries or complaints;</p></content></level><level class="para1" eId="section-3-4-c"><num>(c)</num><content><p>requiring green deal participants to have such arrangements for insurance as are specified in the code;</p></content></level><level class="para1" eId="section-3-4-d"><num>(d)</num><content><p>as to the payment of green deal assessors by green deal providers or green deal installers and the payment of green deal installers by green deal providers;</p></content></level><level class="para1" eId="section-3-4-e"><num>(e)</num><content><p>as to the circumstances in which green deal assessors may charge customers for qualifying assessments of properties and as to the amount of any such charge;</p></content></level><level class="para1" eId="section-3-4-f"><num>(f)</num><content><p>requiring green deal assessors to act with impartiality;</p></content></level><level class="para1" eId="section-3-4-g"><num>(g)</num><content><p>as to the provision of information by green deal providers to improvers and bill payers and prospective improvers and bill payers;</p></content></level><level class="para1" eId="section-3-4-h"><num>(h)</num><content><p>as to marketing in connection with green deal plans.</p></content></level></subsection><subsection eId="section-3-5"><num>(5)</num><content><p>The code may include provision for regulating a body specified or authorised for the purposes of subsection (1)(a).</p></content></subsection><subsection eId="section-3-6"><num>(6)</num><content><p>The scheme and the code may make different provision for different circumstances or cases or for different purposes.</p></content></subsection><subsection eId="section-3-7"><num>(7)</num><content><p>The provision made by the scheme or code in relation to green deal participants may also extend to matters in connection with any energy plans which are not green deal plans.</p></content></subsection><subsection eId="section-3-8"><num>(8)</num><intro><p>The provision made for the purposes of subsection (3)(h) or (i) may, in particular, include provision enabling the Secretary of State to—</p></intro><level class="para1" eId="section-3-8-a"><num>(a)</num><content><p>cancel any liability to pay for a qualifying assessment of a property;</p></content></level><level class="para1" eId="section-3-8-b"><num>(b)</num><content><p>require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-3-8-c"><num>(c)</num><content><p>require a green deal participant to rectify a qualifying energy improvement or its installation;</p></content></level><level class="para1" eId="section-3-8-d"><num>(d)</num><content><p>require a green deal participant to pay compensation or a financial penalty;</p></content></level><level class="para1" eId="section-3-8-e"><num>(e)</num><content><p>withdraw, or require a body specified or authorised for the purposes of subsection (1)(a) to withdraw, an authorisation to act as a green deal participant;</p></content></level><level class="para1" eId="section-3-8-f"><num>(f)</num><content><p>withdraw authorisation from a body authorised for the purposes of subsection (1)(a) as a body whose members are authorised to act as green deal participants.</p></content></level></subsection><subsection eId="section-3-9"><num>(9)</num><content><p>For the purposes of this section references to a qualifying assessment are to an energy efficiency assessment which meets the requirements specified in the framework regulations and deals with such other matters as may be so specified.</p></content></subsection><subsection eId="section-3-10"><num>(10)</num><content><p>This section is without prejudice to the powers conferred on the Secretary of State by other provisions of this Chapter to make provision in or under the framework regulations.</p></content></subsection><subsection eId="section-3-11"><num>(11)</num><content><p>In this Chapter references to a code of practice include references to a code of practice which has been revised by virtue of subsection (3)(d).</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-green-deal-plan"><heading><i>Green deal plan</i></heading><section eId="section-4"><num>4</num><heading>Assessment of property <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-4-1"><num>(1)</num><intro><p>For the purposes of section 1(4)(c) the conditions as to assessment of the property and other matters are—</p></intro><level class="para1" eId="section-4-1-a"><num>(a)</num><content><p>the conditions set out in subsections (2) to (9), and</p></content></level><level class="para1" eId="section-4-1-b"><num>(b)</num><content><p>such other conditions (whether relating to the green deal assessor, the green deal provider, the improver or any other person) as are specified in the framework regulations.</p></content></level></subsection><subsection eId="section-4-2"><num>(2)</num><content><p>The first condition is that a qualifying assessment of the property has been carried out by a person authorised by virtue of the framework regulations to act as a green deal assessor.</p></content></subsection><subsection eId="section-4-3"><num>(3)</num><content><p>The second condition is that the green deal assessor has recommended the energy efficiency improvements.</p></content></subsection><subsection eId="section-4-4"><num>(4)</num><content><p>The third condition is that the green deal provider has given an estimate, on the basis specified in the framework regulations, of the savings likely to be made on the energy bills for the property if the improvements are carried out.</p></content></subsection><subsection eId="section-4-5"><num>(5)</num><content><p>The fourth condition is that the green deal provider has given an estimate, on the basis specified in the framework regulations, of the period over which the savings mentioned in subsection (4) are likely to be made.</p></content></subsection><subsection eId="section-4-6"><num>(6)</num><content><p>The fifth condition is that the green deal provider is authorised by virtue of the framework regulations to act as a green deal provider.</p></content></subsection><subsection eId="section-4-7"><num>(7)</num><content><p>The sixth condition is that the green deal provider has offered to carry out the improvements on the basis that the whole or part of the cost will be repaid in instalments over a period after the improvements have been made.</p></content></subsection><subsection eId="section-4-8"><num>(8)</num><intro><p>The seventh condition is that the green deal provider meets any requirement specified in the framework regulations as to the relationship between—</p></intro><level class="para1" eId="section-4-8-a"><num>(a)</num><content><p>the estimated total of the proposed instalments, and</p></content></level><level class="para1" eId="section-4-8-b"><num>(b)</num><content><p>the estimate mentioned in subsection (4).</p></content></level></subsection><subsection eId="section-4-9"><num>(9)</num><intro><p>The eighth condition is that the green deal provider meets any requirement specified in the framework regulations as to the relationship between—</p></intro><level class="para1" eId="section-4-9-a"><num>(a)</num><content><p>the period for which the instalments are proposed to be paid, and</p></content></level><level class="para1" eId="section-4-9-b"><num>(b)</num><content><p>the period estimated under subsection (5).</p></content></level></subsection><subsection eId="section-4-10"><num>(10)</num><content><p>In subsection (2) the reference to a qualifying assessment is to be read in accordance with section 3(9).</p></content></subsection></section><section eId="section-5"><num>5</num><heading>Terms of plan <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-5-1"><num>(1)</num><intro><p>For the purposes of section 1(4)(d), the conditions as to the terms of the plan and other matters are—</p></intro><level class="para1" eId="section-5-1-a"><num>(a)</num><content><p>the conditions set out in subsections (2) to (4), and</p></content></level><level class="para1" eId="section-5-1-b"><num>(b)</num><content><p>such other conditions as are specified in the framework regulations.</p></content></level></subsection><subsection eId="section-5-2"><num>(2)</num><intro><p>The first condition is that the plan includes the following terms—</p></intro><level class="para1" eId="section-5-2-a"><num>(a)</num><intro><p>a term in which the improver agrees to—</p></intro><level class="para2" eId="section-5-2-a-i"><num>(i)</num><content><p>the amounts of the payments in instalments and the intervals at which, and period for which, they are payable;</p></content></level><level class="para2" eId="section-5-2-a-ii"><num>(ii)</num><content><p>such other matters as are specified in the regulations;</p></content></level></level><level class="para1" eId="section-5-2-b"><num>(b)</num><content><p>a term in which the improver confirms that any necessary permissions or consents have been obtained in respect of the improvements;</p></content></level><level class="para1" eId="section-5-2-c"><num>(c)</num><content><p>a term providing that the green deal provider may not take a charge over any person's property by way of security for payments;</p></content></level><level class="para1" eId="section-5-2-d"><num>(d)</num><content><p>a term providing that the green deal plan does not prevent the bill payer from changing the intervals at which energy bills are to be paid.</p></content></level></subsection><subsection eId="section-5-3"><num>(3)</num><intro><p>The second condition is that the plan does not include any of the following terms—</p></intro><level class="para1" eId="section-5-3-a"><num>(a)</num><content><p>a term making a person liable to make any payments under the green deal plan otherwise than in respect of the period for which the person is the bill payer in relation to the property;</p></content></level><level class="para1" eId="section-5-3-b"><num>(b)</num><content><p>a term requiring the bill payer to make in any circumstances an early repayment of the whole or part of the amount outstanding under the green deal plan (except in accordance with the framework regulations or regulations under section 34, or provision made under them);</p></content></level><level class="para1" eId="section-5-3-c"><num>(c)</num><content><p>a term providing for money to be advanced to the improver (except in accordance with the framework regulations or provision made under them).</p></content></level></subsection><subsection eId="section-5-4"><num>(4)</num><content><p>The third condition is that the agreements mentioned in paragraph (a) of subsection (2) and the permissions and consents mentioned in paragraph (b) of that subsection have not been withdrawn before the end of the period of 14 days beginning with the last day on which they were given.</p></content></subsection><subsection eId="section-5-5"><num>(5)</num><intro><p>The conditions which may be specified in the framework regulations by virtue of subsection (1)(b) include, in particular—</p></intro><level class="para1" eId="section-5-5-a"><num>(a)</num><content><p>a condition that the plan includes a term so specified enabling the early repayment of the whole or part of the amount outstanding under the plan and making provision as to the calculation of the amount payable and any fee,</p></content></level><level class="para1" eId="section-5-5-b"><num>(b)</num><content><p>a condition that the plan includes a term so specified guaranteeing the improvements and making provision as to who is to benefit from the guarantee,</p></content></level><level class="para1" eId="section-5-5-c"><num>(c)</num><content><p>a condition that the plan includes a term so specified as to how any problems with the improvements installed, or arising in connection with the installation of them, are to be dealt with, and</p></content></level><level class="para1" eId="section-5-5-d"><num>(d)</num><content><p>a condition requiring the agreements mentioned in subsection (2)(a) to be in the form specified in the framework regulations.</p></content></level></subsection><subsection eId="section-5-6"><num>(6)</num><content><p>References in this section to the agreements mentioned in subsection (2)(a) include references to the consent required by virtue of section 6(2)(a).</p></content></subsection></section><section eId="section-6"><num>6</num><heading>Consents and redress <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-6-1"><num>(1)</num><intro><p>The framework regulations may make provision for dealing with cases where—</p></intro><level class="para1" eId="section-6-1-a"><num>(a)</num><content><p>at the time when a plan is entered into the improver and the bill payer are different persons;</p></content></level><level class="para1" eId="section-6-1-b"><num>(b)</num><content><p>the bill payer at the time when a plan is entered into is a different person from the bill payer at any subsequent time (a “subsequent bill payer”).</p></content></level></subsection><subsection eId="section-6-2"><num>(2)</num><intro><p>Provision which may be made by virtue of subsection (1) includes—</p></intro><level class="para1" eId="section-6-2-a"><num>(a)</num><content><p>provision requiring the term included in the plan by virtue of section 5(2)(a)(i) to be one to which the bill payer mentioned in subsection (1)(a) has consented, and</p></content></level><level class="para1" eId="section-6-2-b"><num>(b)</num><content><p>provision as to the terms of the plan which are to bind or benefit that bill payer or a subsequent bill payer.</p></content></level></subsection><subsection eId="section-6-3"><num>(3)</num><content><p>Subsection (1) is subject to section 1(6).</p></content></subsection><subsection eId="section-6-4"><num>(4)</num><content><p>The framework regulations may make provision for the purpose of providing redress in cases where a permission or consent mentioned in section 5(2)(b) was not obtained or was improperly obtained.</p></content></subsection><subsection eId="section-6-5"><num>(5)</num><intro><p>Provision included in framework regulations by virtue of subsection (4) may, in particular, enable the Secretary of State to—</p></intro><level class="para1" eId="section-6-5-a"><num>(a)</num><content><p>require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-6-5-b"><num>(b)</num><content><p>require a green deal provider to refund any such payments that have already been made;</p></content></level><level class="para1" eId="section-6-5-c"><num>(c)</num><content><p>require an improver to pay compensation to the green deal provider in respect of the suspension, cancellation or refund.</p></content></level></subsection></section><section eId="section-7"><num>7</num><heading>Installation of improvements</heading><subsection eId="section-7-1"><num>(1)</num><content><p>For the purposes of section 1(5)(a) improvements are installed in accordance with this section if the following three conditions are met.</p></content></subsection><subsection eId="section-7-2"><num>(2)</num><content><p>The first condition is that the person carrying out the installation of the improvements is authorised by virtue of the framework regulations to act as a green deal installer.</p></content></subsection><subsection eId="section-7-3"><num>(3)</num><intro><p>The second condition is that any product installed in making the improvements—</p></intro><level class="para1" eId="section-7-3-a"><num>(a)</num><content><p>meets the standard specified in the code of practice in relation to the product or description of product, or</p></content></level><level class="para1" eId="section-7-3-b"><num>(b)</num><intro><p>is listed in a document which—</p></intro><level class="para2" eId="section-7-3-b-i"><num>(i)</num><content><p>is issued by the Secretary of State or a person authorised by the Secretary of State in connection with the code, and</p></content></level><level class="para2" eId="section-7-3-b-ii"><num>(ii)</num><content><p>is referred to in the code as listing the products which are to be taken as meeting the required standard.</p></content></level></level></subsection><subsection eId="section-7-4"><num>(4)</num><content><p>In specifying the standard in relation to a product or description of product for the purposes of subsection (3)(a), the code of practice may make provision as to the testing and certification of the product or description of product.</p></content></subsection><subsection eId="section-7-5"><num>(5)</num><content><p>The third condition is that the carrying out of the installation meets the standard specified in the code of practice.</p></content></subsection><subsection eId="section-7-6"><num>(6)</num><content><p>In this section references to the code of practice are to the code of practice issued for the purposes of the scheme under the framework regulations.</p></content></subsection></section><section eId="section-8"><num>8</num><heading>Confirmation of plan</heading><subsection eId="section-8-1"><num>(1)</num><content><p>For the purposes of section 1(5)(b) an arrangement is confirmed in accordance with this section if the following two conditions are met.</p></content></subsection><subsection eId="section-8-2"><num>(2)</num><intro><p>The first condition is that the relevant energy supplier notifies the bill payer—</p></intro><level class="para1" eId="section-8-2-a"><num>(a)</num><content><p>that payments for the energy efficiency improvements to the property are to be included in the energy bills for the property from the date specified in the notification, and</p></content></level><level class="para1" eId="section-8-2-b"><num>(b)</num><content><p>of the amounts of those payments and the period for which they are to be made.</p></content></level></subsection><subsection eId="section-8-3"><num>(3)</num><content><p>The date mentioned in subsection (2)(a) must not fall earlier than the end of the period specified in the framework regulations.</p></content></subsection><subsection eId="section-8-4"><num>(4)</num><intro><p>The second condition is that, as soon as practicable after the improvements have been installed, the green deal provider takes one or more of the following actions as required by the framework regulations in the circumstances—</p></intro><level class="para1" eId="section-8-4-a"><num>(a)</num><content><p>producing a document containing such information in connection with the plan as is specified in the regulations in the form so specified,</p></content></level><level class="para1" eId="section-8-4-b"><num>(b)</num><content><p>securing that a document of a description specified in the regulations is produced, or</p></content></level><level class="para1" eId="section-8-4-c"><num>(c)</num><content><p>securing that a document of such a description is updated.</p></content></level></subsection><subsection eId="section-8-5"><num>(5)</num><content><p>The reference in this section to securing that a document is updated includes a reference to securing that a document is replaced by a document of the same description.</p></content></subsection><subsection eId="section-8-6"><num>(6)</num><content><p>Sections 9 and 10 make further provision in relation to the second condition.</p></content></subsection></section><section eId="section-9"><num>9</num><heading>Confirmation of plan: supplementary provision for England and Wales</heading><subsection eId="section-9-1"><num>(1)</num><content><p>Subsection (2) applies if, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2007 Regulations or the 2010 Regulations.</p></content></subsection><subsection eId="section-9-2"><num>(2)</num><content><p>The Secretary of State may by regulations make provision amending the 2007 Regulations or the 2010 Regulations or both (as the case may require) in connection with a document required to be produced or updated by virtue of section 8(4)(b) or (c).</p></content></subsection><subsection eId="section-9-3"><num>(3)</num><content><p>The amendments made by virtue of subsection (2) may, in particular, include amendments for the purpose of requiring a document to contain additional or updated information in connection with the plan or the improvements installed under the plan.</p></content></subsection><subsection eId="section-9-4"><num>(4)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-the-2007-regulations" eId="term-the-2007-regulations">the 2007 Regulations</term>” means the Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2007/991);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-2010-regulations" eId="term-the-2010-regulations">the 2010 Regulations</term>” means the Building Regulations 2010 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2010/2214).</p></content></hcontainer></subsection></section><section eId="section-10"><num>10</num><heading>Confirmation of plan: supplementary provision for Scotland</heading><subsection eId="section-10-1"><num>(1)</num><content><p>Subsection (2) applies if, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2008 Regulations.</p></content></subsection><subsection eId="section-10-2"><num>(2)</num><content><p>The Scottish Ministers may by regulations make provision amending the 2008 Regulations in connection with a document required to be produced or updated by virtue of section 8(4)(b) or (c).</p></content></subsection><subsection eId="section-10-3"><num>(3)</num><content><p>The amendments made by virtue of subsection (2) may, in particular, include amendments for the purpose of requiring a document to contain additional or updated information in connection with the plan or the improvements installed under the plan.</p></content></subsection><subsection eId="section-10-4"><num>(4)</num><content><p>In this section “<term refersTo="#term-the-2008-regulations" eId="term-the-2008-regulations">the 2008 Regulations</term>” means the Energy Performance of Buildings (Scotland) Regulations 2008 (<abbr class="acronym" title="Scottish Statutory Instrument">S.S.I.</abbr> 2008/309).</p></content></subsection></section><section eId="section-11"><num>11</num><heading>Updating information produced under section 8</heading><hcontainer name="wrapper2"><subsection eId="section-11-1"><num>(1)</num><content><p>The framework regulations may make provision as to the circumstances in which a document produced for the purposes of section 8(4)(a) is required to be updated in accordance with the regulations.</p></content></subsection><subsection eId="section-11-2"><num>(2)</num><content><p>Subsection (6) applies if one or more of the first, second or third conditions is met.</p></content></subsection><subsection eId="section-11-3"><num>(3)</num><intro><p>The first condition is that—</p></intro><level class="para1" eId="section-11-3-a"><num>(a)</num><content><p>by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2007 Regulations or the 2010 Regulations, and</p></content></level><level class="para1" eId="section-11-3-b"><num>(b)</num><content><p>provision is made in the 2007 Regulations or the 2010 Regulations or both by virtue of section 9(3) to require a document of that description to contain additional or updated information.</p></content></level></subsection><subsection eId="section-11-4"><num>(4)</num><intro><p>The second condition is that—</p></intro><level class="para1" eId="section-11-4-a"><num>(a)</num><content><p>by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description which is required to be produced under the 2008 Regulations, and</p></content></level><level class="para1" eId="section-11-4-b"><num>(b)</num><content><p>provision is made in the 2008 Regulations by virtue of section 10(3) to require a document of that description to contain additional or updated information.</p></content></level></subsection><subsection eId="section-11-5"><num>(5)</num><content><p>The third condition is that, by virtue of section 8(4)(b) or (c), the framework regulations specify a document of a description other than one falling within subsection (3) or (4).</p></content></subsection><subsection eId="section-11-6"><num>(6)</num><intro><p>The framework regulations may make provision as to the circumstances in which<ins class="substitution first" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3"><noteRef uk:name="commentary" href="#key-dfc5221cba708fe22339d7edef4760f3" class="commentary"/>—</ins></p></intro><level class="para1" eId="section-11-6-a"><num><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">(a)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">data from which a document of a description falling within subsection (3) or (4) may be produced, or</ins></p></content></level></subsection><level class="para1" eId="section-11-b"><num><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">(b)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">a document of a description falling within subsection (5),</ins></p></content></level></hcontainer><hcontainer name="wrapper2"><intro><p><ins class="substitution last" ukl:ChangeId="key-dfc5221cba708fe22339d7edef4760f3-1491329037223" ukl:CommentaryRef="key-dfc5221cba708fe22339d7edef4760f3">is</ins> required to be updated or further updated in accordance with provision made by the Secretary of State in the regulations.</p></intro><subsection eId="section-11-7"><num>(7)</num><content><p>In subsection (3) “<term refersTo="#term-the-2007-regulations" eId="term-the-2007-regulations">the 2007 Regulations</term>” and “<term refersTo="#term-the-2010-regulations" eId="term-the-2010-regulations">the 2010 Regulations</term>” have the same meaning as in section 9.</p></content></subsection><subsection eId="section-11-8"><num>(8)</num><content><p>In subsection (4) “<term refersTo="#term-the-2008-regulations" eId="term-the-2008-regulations">the 2008 Regulations</term>” has the same meaning as in section 10.</p></content></subsection><subsection eId="section-11-9"><num>(9)</num><content><p>In this section references to a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1491329299599" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> being required to be updated or further updated include references to a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1495547783705" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> being required to be replaced by a document <ins class="first last" ukl:ChangeId="key-18ae55d097c805fa1b2c9be973b90fce-1495547785898" ukl:CommentaryRef="key-18ae55d097c805fa1b2c9be973b90fce"><noteRef uk:name="commentary" href="#key-18ae55d097c805fa1b2c9be973b90fce" class="commentary"/>or data</ins> of the same description.</p></content></subsection></hcontainer></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-disclosure-of-green-deal-plan-etc"><heading><i>Disclosure of green deal plan <abbr title="Et cetera" xml:lang="la">etc</abbr></i></heading><section eId="section-12"><num>12</num><heading>Disclosure of green deal plan <abbr title="Et cetera" xml:lang="la">etc</abbr> in connection with sale or letting out</heading><subsection eId="section-12-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-12-1-a"><num>(a)</num><content><p>a green deal property, or a lease of such a property, is to be sold, or</p></content></level><level class="para1" eId="section-12-1-b"><num>(b)</num><intro><p>a green deal property is to be let out—</p></intro><level class="para2" eId="section-12-1-b-i"><num>(i)</num><content><p>under a tenancy or licence agreement, and</p></content></level><level class="para2" eId="section-12-1-b-ii"><num>(ii)</num><content><p>on the basis that the prospective tenant or licensee is to be liable for paying the energy bills for the property.</p></content></level></level></subsection><subsection eId="section-12-2"><num>(2)</num><intro><p>The seller or prospective landlord or licensor must, in relation to the document, or each document, required to be produced or updated as mentioned in section 8(4)—</p></intro><level class="para1" eId="section-12-2-a"><num>(a)</num><content><p>obtain the document or, if the requirement to produce or update the document has not yet been complied with, produce a document containing the same information in connection with the green deal plan as that document would have contained, and</p></content></level><level class="para1" eId="section-12-2-b"><num>(b)</num><content><p>provide the document free of charge to any prospective buyer, tenant or licensee at the specified time.</p></content></level></subsection><subsection eId="section-12-3"><num>(3)</num><content><p>An obligation under subsection (2) may be discharged by an agent.</p></content></subsection><subsection eId="section-12-4"><num>(4)</num><intro><p>For the purposes of subsection (2) a person becomes a prospective buyer, tenant or licensee in relation to a property when the person—</p></intro><level class="para1" eId="section-12-4-a"><num>(a)</num><content><p>requests any information about the property from the seller, prospective landlord or licensor or an agent for the purpose of deciding whether to buy or let the property,</p></content></level><level class="para1" eId="section-12-4-b"><num>(b)</num><content><p>makes a request to view the property for the purpose mentioned in paragraph (a), or</p></content></level><level class="para1" eId="section-12-4-c"><num>(c)</num><content><p>makes an offer, whether oral or written, to buy or let the property.</p></content></level></subsection><subsection eId="section-12-5"><num>(5)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-12-5-a"><num>(a)</num><content><p>an agent is a person acting on behalf of a seller or prospective landlord or licensor in the sale or letting out of a property;</p></content></level><level class="para1" eId="section-12-5-b"><num>(b)</num><content><p>a property is a green deal property if there is a green deal plan in respect of the property and payments are still to be made under that plan;</p></content></level><level class="para1" eId="section-12-5-c"><num>(c)</num><content><p>specified, in relation to a time, means specified in regulations made by the Secretary of State.</p></content></level></subsection><subsection eId="section-12-6"><num>(6)</num><content><p>The Secretary of State may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection></section><section eId="section-13"><num>13</num><heading>Disclosure of green deal plan in connection with other transactions <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-13-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-13-1-a"><num>(a)</num><content><p>there is to be a transaction or other arrangement in respect of a green deal property (not falling within section 12(1)), and</p></content></level><level class="para1" eId="section-13-1-b"><num>(b)</num><content><p>the transaction or arrangement is of a description specified in regulations made by the Secretary of State.</p></content></level></subsection><subsection eId="section-13-2"><num>(2)</num><intro><p>The regulations may require a person of a description specified in the regulations to—</p></intro><level class="para1" eId="section-13-2-a"><num>(a)</num><content><p>obtain a document required to be produced or updated as mentioned in section 8(4) or, if the requirement to produce or update such a document has not yet been complied with, produce a document containing the same information in connection with the green deal plan as that document would have contained, and</p></content></level><level class="para1" eId="section-13-2-b"><num>(b)</num><content><p>provide the document free of charge to a person of a description specified in the regulations at the time so specified.</p></content></level></subsection><subsection eId="section-13-3"><num>(3)</num><content><p>The regulations may provide for an obligation imposed on a person by virtue of subsection (2) to be discharged by a person acting on the person's behalf.</p></content></subsection><subsection eId="section-13-4"><num>(4)</num><content><p>In this section the reference to a green deal property is to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-14"><num>14</num><heading>Acknowledgment of green deal plan on sale or letting out</heading><subsection eId="section-14-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-14-1-a"><num>(a)</num><content><p>a green deal property, or a lease of such a property, is to be sold, or</p></content></level><level class="para1" eId="section-14-1-b"><num>(b)</num><intro><p>a green deal property is to be let out—</p></intro><level class="para2" eId="section-14-1-b-i"><num>(i)</num><content><p>under a tenancy or licence agreement which is in writing, and</p></content></level><level class="para2" eId="section-14-1-b-ii"><num>(ii)</num><content><p>on the basis that the prospective tenant or licensee is to be liable for paying the energy bills for the property.</p></content></level></level></subsection><subsection eId="section-14-2"><num>(2)</num><content><p>The seller or prospective landlord or licensor must secure that the contract for sale or tenancy or licence agreement includes an acknowledgment by the buyer, tenant or licensee that the bill payer at the property is liable to make payments under the green deal plan and that certain terms of that plan are binding on the bill payer.</p></content></subsection><subsection eId="section-14-3"><num>(3)</num><content><p>Subsections (4) and (5) apply where the green deal property is in England or Wales.</p></content></subsection><subsection eId="section-14-4"><num>(4)</num><content><p>An acknowledgment required by subsection (2) must be in the form prescribed in regulations made by the Secretary of State.</p></content></subsection><subsection eId="section-14-5"><num>(5)</num><content><p>The Secretary of State may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection><subsection eId="section-14-6"><num>(6)</num><content><p>Subsections (7) and (8) apply where the green deal property is in Scotland.</p></content></subsection><subsection eId="section-14-7"><num>(7)</num><content><p>The acknowledgment required by subsection (2) must be in the form prescribed in regulations made by the Scottish Ministers.</p></content></subsection><subsection eId="section-14-8"><num>(8)</num><content><p>The Scottish Ministers may make regulations specifying cases or circumstances in which subsection (2) does not apply.</p></content></subsection><subsection eId="section-14-9"><num>(9)</num><content><p>In this section references to a green deal property are to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-15"><num>15</num><heading>Acknowledgment of green deal plan in connection with other transactions <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><subsection eId="section-15-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-15-1-a"><num>(a)</num><content><p>there is to be a transaction or other arrangement in respect of a green deal property (not falling within section 14(1)), and</p></content></level><level class="para1" eId="section-15-1-b"><num>(b)</num><content><p>the transaction or arrangement is of a description specified in regulations made under this subsection by the Secretary of State.</p></content></level></subsection><subsection eId="section-15-2"><num>(2)</num><intro><p>Regulations under subsection (1) may require a person of a description specified in the regulations to secure, at a time and in a document so specified, that an acknowledgment is made by a person of a description so specified that—</p></intro><level class="para1" eId="section-15-2-a"><num>(a)</num><content><p>the bill payer at the property is liable to make payments under the green deal plan, and</p></content></level><level class="para1" eId="section-15-2-b"><num>(b)</num><content><p>certain terms of that plan are binding on the bill payer.</p></content></level></subsection><subsection eId="section-15-3"><num>(3)</num><content><p>Where the green deal property is in England or Wales, regulations made by the Secretary of State under this subsection may provide for any acknowledgment required by virtue of subsection (2) to be in the form prescribed in the regulations under this subsection.</p></content></subsection><subsection eId="section-15-4"><num>(4)</num><content><p>Where the green deal property is in Scotland, regulations made by the Scottish Ministers under this subsection may provide for any acknowledgment required by virtue of subsection (2) to be in the form prescribed in the regulations under this subsection.</p></content></subsection><subsection eId="section-15-5"><num>(5)</num><content><p>In this section references to a green deal property are to be read in accordance with section 12(5)(b).</p></content></subsection></section><section eId="section-16"><num>16</num><heading>Sanctions for non-compliance with obligations under sections 12 to 15</heading><subsection eId="section-16-1"><num>(1)</num><intro><p>The Secretary of State may make regulations—</p></intro><level class="para1" eId="section-16-1-a"><num>(a)</num><content><p>for the purpose of securing compliance with the obligations set out in section 12 or 14 or imposed by virtue of regulations under section 13 or 15;</p></content></level><level class="para1" eId="section-16-1-b"><num>(b)</num><content><p>as to the consequences of non-compliance with the obligations.</p></content></level></subsection><subsection eId="section-16-2"><num>(2)</num><intro><p>The regulations may, in particular, include provision—</p></intro><level class="para1" eId="section-16-2-a"><num>(a)</num><content><p>as to sanctions for non-compliance with the obligations (including the imposition of a civil penalty);</p></content></level><level class="para1" eId="section-16-2-b"><num>(b)</num><content><p>enabling the Secretary of State to require a green deal provider to suspend or cancel the liability of a bill payer to make payments under a green deal plan;</p></content></level><level class="para1" eId="section-16-2-c"><num>(c)</num><content><p>enabling the Secretary of State to require a green deal provider to refund any such payments that have already been made;</p></content></level><level class="para1" eId="section-16-2-d"><num>(d)</num><content><p>enabling the Secretary of State to require a seller, a prospective landlord or licensor or another person to pay compensation to a green deal provider in respect of any such suspension, cancellation or refund.</p></content></level></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-modifying-energy-licences"><heading><i>Modifying energy licences</i></heading><section eId="section-17"><num>17</num><heading>Power to modify energy licences in connection with green deal payments</heading><subsection eId="section-17-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-17-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7 or 7A of the Gas Act 1986 (gas transporter, shipper and supply licences);</p></content></level><level class="para1" eId="section-17-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-17-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(c) or (d) of the Electricity Act 1989 (electricity distribution and supply licences);</p></content></level><level class="para1" eId="section-17-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-17-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7 or 7A of the Gas Act 1986 or section 6(1)(c) or (d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-17-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised for the following purposes only—</p></intro><level class="para1" eId="section-17-2-a"><num>(a)</num><content><p>in so far as the power relates to a licence under section 7 of the Gas Act 1986 or section 6(1)(c) of the Electricity Act 1989, the purpose of preventing the holder of the licence from permanently disconnecting the supply of gas or electricity to a green deal property, and</p></content></level><level class="para1" eId="section-17-2-b"><num>(b)</num><content><p>in so far as the power relates to any licence, the purpose of requiring or enabling the holder of the licence to take, or not to take, specified action in connection with green deal payments.</p></content></level></subsection><subsection eId="section-17-3"><num>(3)</num><intro><p>The provision which may be made by virtue of subsection (2)(b) includes, in particular—</p></intro><level class="para1" eId="section-17-3-a"><num>(a)</num><content><p>if the holder of the licence is of a specified description, provision enabling the holder to opt into or opt out of any provision made by virtue of paragraphs (b) to (f),</p></content></level><level class="para1" eId="section-17-3-b"><num>(b)</num><content><p>provision requiring the holder of the licence to collect green deal payments through energy bills and remit them to a green deal provider,</p></content></level><level class="para1" eId="section-17-3-c"><num>(c)</num><content><p>provision as to the circumstances in which the holder of the licence is required to make payments to a green deal provider by reference to green deal payments which are due but which have not been made,</p></content></level><level class="para1" eId="section-17-3-d"><num>(d)</num><content><p>provision in connection with the cancellation or suspension of green deal payments,</p></content></level><level class="para1" eId="section-17-3-e"><num>(e)</num><content><p>provision requiring or enabling the holder of the licence to make specified arrangements for facilitating the collection of green deal payments, and</p></content></level><level class="para1" eId="section-17-3-f"><num>(f)</num><content><p>provision requiring or enabling payments to be made by or to the holder of the licence in respect of functions discharged in connection with green deal payments.</p></content></level></subsection><subsection eId="section-17-4"><num>(4)</num><content><p>Provision made by virtue of subsection (2)(b) which falls within subsection (3)(c) may include provision requiring the holder of the licence, where a bill payer has failed to pay a sum due under an energy bill, to remit a proportion of any payment received to a green deal provider.</p></content></subsection><subsection eId="section-17-5"><num>(5)</num><content><p>Conditions included in a licence under section 7 or 7A of the Gas Act 1986 by virtue of the power under subsection (1) may do any of the things authorised by section 7B(5)(a)(i) or (iii) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7B(4)(a)).</p></content></subsection><subsection eId="section-17-6"><num>(6)</num><content><p>Conditions included in a licence under section 6(1)(c) or (d) of the Electricity Act 1989 by virtue of the power under subsection (1) may do any of the things authorised by section 7(3)(a) or (c) or (4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection><subsection eId="section-17-7"><num>(7)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-17-7-a"><num>(a)</num><content><p>payments are green deal payments if they are made under a green deal plan,</p></content></level><level class="para1" eId="section-17-7-b"><num>(b)</num><content><p>a property is a green deal property if there is a green deal plan in respect of the property and payments are still to be made under that plan, and</p></content></level><level class="para1" eId="section-17-7-c"><num>(c)</num><content><p>references to a green deal provider include references to a person acting on behalf of a green deal provider or nominated by a green deal provider.</p></content></level></subsection></section><section eId="section-18"><num>18</num><heading>Power to modify energy supply licences to make provision as to default in green deal payments</heading><subsection eId="section-18-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-18-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-18-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-18-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-18-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-18-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-18-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised for the purpose only of making provision—</p></intro><level class="para1" eId="section-18-2-a"><num>(a)</num><content><p>as to the steps which are to be taken by the holder of a licence following a bill payer's default in making green deal payments to the holder of the licence,</p></content></level><level class="para1" eId="section-18-2-b"><num>(b)</num><content><p>as to the circumstances in which the holder of a licence may disconnect the supply to a green deal property following such a default, or</p></content></level><level class="para1" eId="section-18-2-c"><num>(c)</num><content><p>enabling, in specified circumstances, the holder of a licence to require from a bill payer a deposit by way of security for green deal payments to be made by the bill payer.</p></content></level></subsection><subsection eId="section-18-3"><num>(3)</num><content><p>For the purposes of this section “green deal payments” and “green deal property” are to be read in accordance with section 17(7).</p></content></subsection></section><section eId="section-19"><num>19</num><heading>Power to modify energy supply licences to require provision of information</heading><subsection eId="section-19-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-19-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-19-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-19-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-19-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-19-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-19-2"><num>(2)</num><content><p>The power under subsection (1) may be exercised for one or both of the following two purposes only.</p></content></subsection><subsection eId="section-19-3"><num>(3)</num><content><p>The first purpose is the purpose of requiring, at specified times, the holder of the licence to provide bill payers with specified information in connection with their green deal plans.</p></content></subsection><subsection eId="section-19-4"><num>(4)</num><content><p>The second purpose is the purpose of requiring the holder of the licence to disclose on request specified information about the payment of energy bills by a person who is, or is to be, the bill payer for a property in respect of which there is, or is proposed to be, a green deal plan.</p></content></subsection><subsection eId="section-19-5"><num>(5)</num><intro><p>The only persons to whom the licence holder may be required to disclose information by virtue of subsection (4) are—</p></intro><level class="para1" eId="section-19-5-a"><num>(a)</num><content><p>where there is a green deal plan, the green deal provider under the plan;</p></content></level><level class="para1" eId="section-19-5-b"><num>(b)</num><content><p>where there is proposed to be a green deal plan, a person who is authorised under the framework regulations to act as a green deal provider.</p></content></level></subsection><subsection eId="section-19-6"><num>(6)</num><intro><p>The licence holder may be required to disclose the information requested only where—</p></intro><level class="para1" eId="section-19-6-a"><num>(a)</num><content><p>the green deal provider or authorised person states that the request is made for purposes connected with the green deal plan or proposed green deal plan,</p></content></level><level class="para1" eId="section-19-6-b"><num>(b)</num><intro><p>the green deal provider or authorised person provides evidence that the bill payer has consented to—</p></intro><level class="para2" eId="section-19-6-b-i"><num>(i)</num><content><p>disclosure of the information to that provider or person for those purposes, and</p></content></level><level class="para2" eId="section-19-6-b-ii"><num>(ii)</num><content><p>onward disclosure of the disclosed information to and by other persons for those purposes,</p></content></level></level><level class="para1" eId="section-19-6-c"><num>(c)</num><content><p>the information relates to a time within the 5 years immediately preceding the request, and</p></content></level><level class="para1" eId="section-19-6-d"><num>(d)</num><content><p>the licence holder has the information.</p></content></level></subsection><subsection eId="section-19-7"><num>(7)</num><content><p>The power under subsection (1) may be exercised so as to require information to be provided in a specified manner or form, or subject to specified requirements or restrictions.</p></content></subsection><subsection eId="section-19-8"><num>(8)</num><content><p>Conditions included in a licence under section 7A(1) of the Gas Act 1986 by virtue of the power under subsection (1) and the purpose mentioned in subsection (4) may do any of the things authorised by section 7B(5)(a)(i) or (iii) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7B(4)(a)).</p></content></subsection><subsection eId="section-19-9"><num>(9)</num><content><p>Conditions included in a licence under section 6(1)(d) of the Electricity Act 1989 by virtue of the power under subsection (1) and the purpose mentioned in subsection (4) may do any of the things authorised by section 7(3)(a) or (c) or (4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection></section><section eId="section-20"><num>20</num><heading>Power to modify energy supply licences to make provision as to consumer protection</heading><subsection eId="section-20-1"><num>(1)</num><intro><p>The Secretary of State may modify—</p></intro><level class="para1" eId="section-20-1-a"><num>(a)</num><content><p>a condition of a particular licence under section 7A(1) of the Gas Act 1986 (gas supply licences);</p></content></level><level class="para1" eId="section-20-1-b"><num>(b)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8 of that Act;</p></content></level><level class="para1" eId="section-20-1-c"><num>(c)</num><content><p>a condition of a particular licence under section 6(1)(d) of the Electricity Act 1989 (electricity supply licences);</p></content></level><level class="para1" eId="section-20-1-d"><num>(d)</num><content><p>the standard conditions incorporated in licences under that provision by virtue of section 8A of that Act;</p></content></level><level class="para1" eId="section-20-1-e"><num>(e)</num><content><p>a document maintained in accordance with the conditions of licences under section 7A(1) of the Gas Act 1986 or section 6(1)(d) of the Electricity Act 1989 or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="section-20-2"><num>(2)</num><content><p>The power under subsection (1) may be exercised for the purpose only of making provision corresponding to that made by the disapplied consumer protection legislation.</p></content></subsection><subsection eId="section-20-3"><num>(3)</num><content><p>Conditions included in a licence under section 6(1)(d) of the Electricity Act 1989 by virtue of the power under subsection (1) may do any of the things authorised by section 7(4) of that Act (which applies to the power of the Gas and Electricity Markets Authority with respect to licence conditions under section 7(1)(a)).</p></content></subsection><subsection eId="section-20-4"><num>(4)</num><content><p>For the purposes of subsection (2) provision corresponds to that made by the disapplied consumer protection legislation if it is made for the same purpose as the purpose for which that provision was made.</p></content></subsection><subsection eId="section-20-5"><num><ins class="substitution first" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35"><noteRef uk:name="commentary" href="#key-3f8f93cba169f015282416aba5430e35" class="commentary"/>(5)</ins></num><intro><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">For the purpose of this section, references to the disapplied consumer protection legislation are to—</ins></p></intro><level class="para1" eId="section-20-5-a"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(a)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">the provisions of or made under the Consumer Credit Act 1974 or the Financial Services and Markets Act 2000 (“the 2000 Act”), and</ins></p></content></level><level class="para1" eId="section-20-5-b"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(b)</ins></num><content><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">any rules made under the 2000 Act,</ins></p></content></level><wrapUp><p><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">which would apply but for any exemption conferred by an order under section 22 of the 2000 Act (regulated activities) in relation to debts due under a green deal plan associated with the licensee.</ins></p></wrapUp></subsection><subsection eId="section-20-6"><num><ins class="substitution" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">(6)</ins></num><content><p><ins class="substitution last" ukl:ChangeId="key-3f8f93cba169f015282416aba5430e35-1491332517204" ukl:CommentaryRef="key-3f8f93cba169f015282416aba5430e35">A green deal plan is associated with a licensee if the payments under the plan are to be made to the licensee.</ins></p></content></subsection></section><section eId="section-21"><num>21</num><heading>Powers under sections 17 to 20: consultation</heading><intro><p>Before making a modification under any of sections 17 to 20, the Secretary of State must consult—</p></intro><level class="para1" eId="section-21-a"><num>(a)</num><content><p>the holder of any licence being modified,</p></content></level><level class="para1" eId="section-21-b"><num>(b)</num><content><p>the Gas and Electricity Markets Authority, and</p></content></level><level class="para1" eId="section-21-c"><num>(c)</num><content><p>such other persons as the Secretary of State considers appropriate.</p></content></level></section><section eId="section-22"><num>22</num><heading>Powers under sections 17 to 20: supplementary</heading><subsection eId="section-22-1"><num>(1)</num><content><p>Subsections (2) to (6) apply in relation to the powers under sections 17 to 20.</p></content></subsection><subsection eId="section-22-2"><num>(2)</num><intro><p>The powers—</p></intro><level class="para1" eId="section-22-2-a"><num>(a)</num><content><p>may be exercised generally, only in relation to specified cases or subject to exceptions (including provision for a case to be excepted only so long as specified conditions are satisfied);</p></content></level><level class="para1" eId="section-22-2-b"><num>(b)</num><content><p>may be exercised differently in different cases or circumstances;</p></content></level><level class="para1" eId="section-22-2-c"><num>(c)</num><content><p>include a power to make incidental, consequential or transitional modifications.</p></content></level></subsection><subsection eId="section-22-3"><num>(3)</num><intro><p>Provision included in a licence by virtue of any of the powers—</p></intro><level class="para1" eId="section-22-3-a"><num>(a)</num><content><p>need not relate to the activities authorised by the licence;</p></content></level><level class="para1" eId="section-22-3-b"><num>(b)</num><content><p>may make different provision for different cases.</p></content></level></subsection><subsection eId="section-22-4"><num>(4)</num><content><p>The Secretary of State must publish details of modifications under any of the powers as soon as reasonably practicable after the modifications are made.</p></content></subsection><subsection eId="section-22-5"><num>(5)</num><content><p>A modification under any of the powers of part of a standard condition of a licence does not prevent any other part of the condition from continuing to be regarded as a standard condition for the purposes of Part 1 of the Gas Act 1986 or Part 1 of the Electricity Act 1989.</p></content></subsection><subsection eId="section-22-6"><num>(6)</num><content><p>Where the Secretary of State makes modifications under any of the powers of the standard conditions of a licence of any type, the Gas and Electricity Markets Authority must make the same modification of those standard conditions for the purposes of their incorporation in licences of that type granted after that time.</p></content></subsection><subsection eId="section-22-7"><num>(7)</num><intro><p>In section 33(1) of the Utilities Act 2000 (standard conditions of electricity licences)—</p></intro><level class="para1" eId="section-22-7-a"><num>(a)</num><content><p>after paragraph (d) omit “or”;</p></content></level><level class="para1" eId="section-22-7-b"><num>(b)</num><content><p><mod>after paragraph (e) insert<quotedText startQuote="&#x201C;">or </quotedText><quotedStructure endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(f)</num><content><p>under Chapter 1 of Part 1 of the Energy Act 2011.</p></content></level></quotedStructure></mod></p></content></level></subsection><subsection eId="section-22-8"><num>(8)</num><intro><p>In section 81(2) of the Utilities Act 2000 (standard conditions of gas licences)—</p></intro><level class="para1" eId="section-22-8-a"><num>(a)</num><content><p><mod>for “2008 or” substitute <quotedText>“ 2008, ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-22-8-b"><num>(b)</num><content><p><mod>after “2010” insert <quotedText>“ or under Chapter 1 of Part 1 of the Energy Act 2011 ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-22-9"><num>(9)</num><content><p>Sections 4AA to 4B of the Gas Act 1986 (principal objective and general duties) apply in relation to the powers under sections 17 to 20 with respect to holders of licences under section 7 or 7A of that Act as they apply in relation to functions of the Secretary of State under Part 1 of that Act.</p></content></subsection><subsection eId="section-22-10"><num>(10)</num><content><p>Sections 3A to 3D of the Electricity Act 1989 (principal objective and general duties) apply in relation to the powers under sections 17 to 20 with respect to holders of licences under section 6(1)(c) or (d) of that Act as they apply in relation to functions of the Secretary of State under Part 1 of that Act.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-gas-and-electricity-codes"><heading><i>Gas and electricity codes</i></heading><section eId="section-23"><num>23</num><heading>Recovering green deal payments: gas suppliers</heading><subsection eId="section-23-1"><num>(1)</num><content><p>Schedule 2B to the Gas Act 1986 (the gas code) is amended as follows.</p></content></subsection><subsection eId="section-23-2"><num>(2)</num><content><p><mod>In paragraph 6A(1) for paragraph (a) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(a)</num><intro><p>the sum is owed to an authorised supplier—</p></intro><level class="para2"><num>(i)</num><content><p>in respect of the supply of gas to the premises on which the meter is installed,</p></content></level><level class="para2"><num>(ii)</num><content><p>in respect of the provision of the meter, or</p></content></level><level class="para2"><num>(iii)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises; or</p></content></level></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-23-3"><num>(3)</num><content><p><mod>In paragraph 7(1) for paragraphs (a) and (b) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>a demand in writing is made by a gas supplier for any of the relevant payments to be made by a consumer; and</p></content></level><level class="para1"><num>(b)</num><content><p>the consumer does not make those payments within 28 days after the making of the demand.</p></content></level></quotedStructure></mod></p></content></subsection><subsection eId="section-23-4"><num>(4)</num><content><p><mod>After paragraph 7(1) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><subsection><num>(1A)</num><intro><p>A payment is a relevant payment for the purposes of sub-paragraph (1) if it is due to the gas supplier from the consumer—</p></intro><level class="para1"><num>(a)</num><content><p>in respect of the supply of gas to any premises of the consumer (in this paragraph referred to as “<term refersTo="#term-the-premises">the premises</term>”); or</p></content></level><level class="para1"><num>(b)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-23-5"><num>(5)</num><content><p><mod>In each of paragraphs 7(4)(b) and (5) for “charges” substitute <quotedText>“ payments ”</quotedText>.</mod></p></content></subsection></section><section eId="section-24"><num>24</num><heading>Recovering green deal payments: electricity suppliers</heading><subsection eId="section-24-1"><num>(1)</num><content><p>The Electricity Act 1989 is amended as follows.</p></content></subsection><subsection eId="section-24-2"><num>(2)</num><content><p>Paragraph 2 of Schedule 6 to the Electricity Act 1989 (the electricity code) is amended as set out in subsections (3) to (5).</p></content></subsection><subsection eId="section-24-3"><num>(3)</num><content><p><mod>In sub-paragraph (1) for the words from “paid” to “electricity meter” substitute <quotedText>“ made all the relevant payments ”</quotedText>.</mod></p></content></subsection><subsection eId="section-24-4"><num>(4)</num><content><p><mod>After sub-paragraph (1) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><subsection><num>(1A)</num><intro><p>A payment is a relevant payment for the purposes of sub-paragraph (1) if it is due from the customer to an electricity supplier—</p></intro><level class="para1"><num>(a)</num><content><p>in respect of the supply of electricity to any premises or the provision of an electricity meter; or</p></content></level><level class="para1"><num>(b)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-24-5"><num>(5)</num><content><p><mod>In sub-paragraph (3) for “payment of the charges due” substitute <quotedText>“ the relevant payments to be made ”</quotedText>.</mod></p></content></subsection><subsection eId="section-24-6"><num>(6)</num><content><p><mod>In paragraph 12(2) of Schedule 7 (recovery through pre-payment meters) for paragraph (a) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="default"><level class="para1"><num>(a)</num><intro><p>the sum is owed to an authorised supplier—</p></intro><level class="para2"><num>(i)</num><content><p>in respect of the supply of electricity to the premises on which the meter is installed,</p></content></level><level class="para2"><num>(ii)</num><content><p>in respect of the provision of the meter, or</p></content></level><level class="para2"><num>(iii)</num><content><p>under a green deal plan (within the meaning of section 1 of the Energy Act 2011) in respect of the premises; or</p></content></level></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-modifying-consumer-credit-legislation"><heading><i>Modifying consumer credit legislation</i></heading><section eId="section-25"><num><noteRef href="#key-f059ff6bc0f5be2cb9a9a920afef444e" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>25</num><heading>Exemption from Consumer Credit Act 1974 in relation to credit to business debtors</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-26"><num><noteRef href="#key-fe68fb8a74e286ff5688a659547d5b8a" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>26</num><heading>Energy suppliers not to be treated as carrying on ancillary credit business</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-27"><num>27</num><heading>Duties to give debtors information and statements</heading><subsection eId="section-27-1"><num>(1)</num><content><p>The Consumer Credit Act 1974 is amended as follows.</p></content></subsection><subsection eId="section-27-2"><num>(2)</num><content><p><mod>In section 77 (duty to give information to debtor under fixed-sum credit agreement) after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(2A)</num><content><p>Subsection (2B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(2B)</num><content><p>The duty imposed on the creditor by subsection (1) may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-27-3"><num>(3)</num><content><p><mod>In section 77A (statements to be provided in relation to fixed-sum credit agreement) after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(2A)</num><content><p>Subsection (2B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(2B)</num><content><p>Any duty imposed on the creditor by this section may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-27-4"><num>(4)</num><content><p><mod>In section 77B (statement of account to be provided on request in relation to fixed-sum credit agreement) after subsection (7) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(7A)</num><content><p>Subsection (7B) applies if the regulated agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></subsection><subsection><num>(7B)</num><content><p>The duty imposed on the creditor by this section may be discharged by another person acting on the creditor's behalf.</p></content></subsection></quotedStructure></mod></p></content></subsection></section><section eId="section-28"><num>28</num><heading>Exemption from requirement to give notice of sums in arrears</heading><content><p><mod>In section 86B of the Consumer Credit Act 1974 (requirement to give notice of sums in arrears) for subsection (12) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(12)</num><content><p>In this section “<term refersTo="#term-applicable-agreement">applicable agreement</term>” means an agreement which falls within subsection (12A) or (12B).</p></content></subsection><subsection><num>(12A)</num><intro><p>An agreement falls within this subsection if—</p></intro><level class="para1"><num>(a)</num><content><p>it is a regulated agreement for fixed-sum credit; and</p></content></level><level class="para1"><num>(b)</num><intro><p>it is not—</p></intro><level class="para2"><num>(i)</num><content><p>a non-commercial agreement;</p></content></level><level class="para2"><num>(ii)</num><content><p>a small agreement; or</p></content></level><level class="para2"><num>(iii)</num><content><p>a green deal plan (within the meaning of section 1 of the Energy Act 2011).</p></content></level></level></subsection><subsection><num>(12B)</num><intro><p>An agreement falls within this subsection if—</p></intro><level class="para1"><num>(a)</num><content><p>it is a regulated consumer hire agreement; and</p></content></level><level class="para1"><num>(b)</num><content><p>it is neither a non-commercial agreement nor a small agreement.</p></content></level></subsection></quotedStructure></mod></p></content></section><section eId="section-29"><num>29</num><heading>Early repayment of green deal finance</heading><subsection eId="section-29-1"><num>(1)</num><content><p>The Consumer Credit Act 1974 is amended as follows.</p></content></subsection><subsection eId="section-29-2"><num>(2)</num><content><p><mod>After section 95A (compensatory amount to creditor in relation to early repayment) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><section><num>95B</num><heading>Compensatory amount: green deal finance</heading><subsection><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1"><num>(a)</num><content><p>a regulated consumer credit agreement provides for the rate of interest on the credit to be fixed for a period of time (“the fixed rate period”),</p></content></level><level class="para1"><num>(b)</num><content><p>the agreement is a green deal plan (within the meaning of section 1 of the Energy Act 2011) which is of a duration specified for the purposes of this section in regulations, and</p></content></level><level class="para1"><num>(c)</num><content><p>under section 94 the debtor discharges all or part of his indebtedness during the fixed rate period.</p></content></level></subsection><subsection><num>(2)</num><intro><p>The creditor may claim an amount equal to the cost which the creditor has incurred as a result only of the debtor's indebtedness being discharged during the fixed rate period if—</p></intro><level class="para1"><num>(a)</num><content><p>the amount of the payment under section 94 is not paid from the proceeds of a contract of payment protection insurance, and</p></content></level><level class="para1"><num>(b)</num><content><p>such other conditions as may be specified for the purposes of this section in regulations are satisfied.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The amount in subsection (2)—</p></intro><level class="para1"><num>(a)</num><content><p>must be fair,</p></content></level><level class="para1"><num>(b)</num><content><p>must be objectively justified,</p></content></level><level class="para1"><num>(c)</num><content><p>must be calculated by the creditor in accordance with provision made for the purposes of this section in regulations, and</p></content></level><level class="para1"><num>(d)</num><content><p>must not exceed the total amount of interest that would have been paid by the debtor under the agreement in the period from the date on which the debtor makes the payment under section 94 to the date fixed by the agreement for the discharge of the indebtedness of the debtor.</p></content></level></subsection><subsection><num>(4)</num><content><p>If a creditor could claim under either section 95A or this section, the creditor may choose under which section to claim.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-29-3"><num>(3)</num><intro><p>In section 94 (right to complete payments ahead of time)—</p></intro><level class="para1" eId="section-29-3-a"><num>(a)</num><content><p><mod>in subsection (1) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-29-3-b"><num>(b)</num><content><p><mod>in subsection (5) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-29-4"><num>(4)</num><content><p><mod>In subsection (2)(c) of section 97A (duty to give information on partial repayment) after “section 95A(2)” insert <quotedText>“ or section 95B(2) ”</quotedText>.</mod></p></content></subsection></section><section eId="section-30"><num>30</num><heading>Power to amend Consumer Credit Act 1974</heading><subsection eId="section-30-1"><num>(1)</num><content><p>The Secretary of State may by order make such amendments to the Consumer Credit Act 1974<ins class="first last" ukl:ChangeId="key-0bb8e82a9a9824c6fb5a3055017bc416-1491332806432" ukl:CommentaryRef="key-0bb8e82a9a9824c6fb5a3055017bc416"><noteRef uk:name="commentary" href="#key-0bb8e82a9a9824c6fb5a3055017bc416" class="commentary"/>, the Financial Services and Markets Act 2000 and any statutory instrument made under that Act</ins> as the Secretary of State considers appropriate in consequence of provision made by or under this Chapter.</p></content></subsection><subsection eId="section-30-2"><num>(2)</num><intro><p>Before exercising the power under subsection (1) the Secretary of State must consult—</p></intro><level class="para1" eId="section-30-2-a"><num>(a)</num><content><p>the <ins class="substitution first last" ukl:ChangeId="key-803fdd5956001662e37b430be0cc1a4d-1491332863193" ukl:CommentaryRef="key-803fdd5956001662e37b430be0cc1a4d"><noteRef uk:name="commentary" href="#key-803fdd5956001662e37b430be0cc1a4d" class="commentary"/>Financial Conduct Authority</ins>, and</p></content></level><level class="para1" eId="section-30-2-b"><num>(b)</num><content><p>such other persons as the Secretary of State considers appropriate.</p></content></level></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-delegation-and-exercise-of-functions"><heading><i>Delegation and exercise of functions</i></heading><section eId="section-31"><num>31</num><heading>Delegation and conferring of functions</heading><subsection eId="section-31-1"><num>(1)</num><intro><p>The Secretary of State may by order provide for the following functions conferred on the Secretary of State to be exercisable instead by a public body specified in the order—</p></intro><level class="para1" eId="section-31-1-a"><num>(a)</num><content><p>any function exercisable in connection with the scheme established by the framework regulations;</p></content></level><level class="para1" eId="section-31-1-b"><num>(b)</num><content><p>any function exercisable under the framework regulations by virtue of section 6(4);</p></content></level><level class="para1" eId="section-31-1-c"><num>(c)</num><content><p>any function under regulations made under section 16.</p></content></level></subsection><subsection eId="section-31-2"><num>(2)</num><content><p>If the function of issuing a code of practice for the purposes of the scheme is specified in an order by virtue of subsection (1)(a), a draft of the code must be approved by the Secretary of State before the Secretary of State lays the draft before Parliament under section 39(2).</p></content></subsection><subsection eId="section-31-3"><num>(3)</num><content><p>If the function of revoking a code of practice issued for the purposes of the scheme is specified in an order by virtue of subsection (1)(a), the code must not be revoked without the approval of the Secretary of State.</p></content></subsection><subsection eId="section-31-4"><num>(4)</num><intro><p>The Secretary of State may by order make provision conferring administration functions on—</p></intro><level class="para1" eId="section-31-4-a"><num>(a)</num><content><p>the Secretary of State;</p></content></level><level class="para1" eId="section-31-4-b"><num>(b)</num><content><p>a public body specified in the order.</p></content></level></subsection><subsection eId="section-31-5"><num>(5)</num><content><p>For the purposes of subsection (4) administration functions are functions in connection with the administration of any provision in licences under section 7 or 7A of the Gas Act 1986 or section 6(1)(c) or (d) of the Electricity Act 1989 made by virtue of section 17(3) of this Act.</p></content></subsection><subsection eId="section-31-6"><num>(6)</num><intro><p>An order made by virtue of subsection (1) or (4)(b) may provide for—</p></intro><level class="para1" eId="section-31-6-a"><num>(a)</num><content><p>different functions to be exercisable by different public bodies;</p></content></level><level class="para1" eId="section-31-6-b"><num>(b)</num><content><p>the same function to be exercisable by different public bodies in relation to different areas.</p></content></level></subsection><subsection eId="section-31-7"><num>(7)</num><content><p>The Secretary of State may make payments to any public body specified in an order made by virtue of subsection (1).</p></content></subsection></section><section eId="section-32"><num>32</num><heading>Exercise of scheme functions on behalf of the Secretary of State or a public body</heading><subsection eId="section-32-1"><num>(1)</num><content><p>This section applies to any function exercisable in connection with the scheme established by the framework regulations.</p></content></subsection><subsection eId="section-32-2"><num>(2)</num><content><p>The Secretary of State may arrange for such a function to be exercised by any body or person on behalf of the Secretary of State.</p></content></subsection><subsection eId="section-32-3"><num>(3)</num><content><p>A public body specified in relation to such a function in an order made by virtue of section 31(1)(a) may arrange for the function to be exercised by any other body or person on its behalf.</p></content></subsection><subsection eId="section-32-4"><num>(4)</num><intro><p>Arrangements under this section—</p></intro><level class="para1" eId="section-32-4-a"><num>(a)</num><content><p>do not affect the responsibility for the exercise of the function;</p></content></level><level class="para1" eId="section-32-4-b"><num>(b)</num><content><p>may include provision for payments to be made to the body or person exercising the function under the arrangements.</p></content></level></subsection></section><section eId="section-33"><num>33</num><heading>Duty to report</heading><subsection eId="section-33-1"><num>(1)</num><content><p>This section applies if the function under section 3(1)(a) is specified in an order made by virtue of section 31(1)(a).</p></content></subsection><subsection eId="section-33-2"><num>(2)</num><intro><p>The Secretary of State may make regulations requiring the body specified in relation to that function in the order to—</p></intro><level class="para1" eId="section-33-2-a"><num>(a)</num><content><p>collect information on the specified matters, and</p></content></level><level class="para1" eId="section-33-2-b"><num>(b)</num><content><p>provide the Secretary of State with a report on those matters at the specified times.</p></content></level></subsection><subsection eId="section-33-3"><num>(3)</num><content><p>In subsection (2) “<term refersTo="#term-specified" eId="term-specified">specified</term>” means specified in the regulations.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-1-crossheading-general"><heading><i>General</i></heading><section eId="section-34"><num>34</num><heading>Power of Secretary of State to deal with special circumstances</heading><subsection eId="section-34-1"><num>(1)</num><intro><p>The Secretary of State may by regulations make provision as to—</p></intro><level class="para1" eId="section-34-1-a"><num>(a)</num><content><p>the circumstances in which a bill payer's liability to make green deal payments to the relevant energy supplier is suspended or cancelled;</p></content></level><level class="para1" eId="section-34-1-b"><num>(b)</num><content><p>the circumstances in which any suspension of liability ends;</p></content></level><level class="para1" eId="section-34-1-c"><num>(c)</num><content><p>the consequences of any suspension or cancellation;</p></content></level><level class="para1" eId="section-34-1-d"><num>(d)</num><content><p>the circumstances in which the green deal provider may require the early repayment of the whole or part of the total of the payments outstanding under a green deal plan.</p></content></level></subsection><subsection eId="section-34-2"><num>(2)</num><intro><p>The regulations may, in particular, include provision—</p></intro><level class="para1" eId="section-34-2-a"><num>(a)</num><content><p>as to the procedure to be followed for securing a suspension or cancellation (including the payment of an administration fee calculated in accordance with the regulations);</p></content></level><level class="para1" eId="section-34-2-b"><num>(b)</num><content><p>as to how any payments due under a green deal plan during a period of suspension are to be paid;</p></content></level><level class="para1" eId="section-34-2-c"><num>(c)</num><content><p>as to the making of payments due under a green deal plan after a period of suspension;</p></content></level><level class="para1" eId="section-34-2-d"><num>(d)</num><content><p>as to the calculation of the amount payable on early repayment (including a fee calculated in accordance with the regulations).</p></content></level></subsection><subsection eId="section-34-3"><num>(3)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-34-3-a"><num>(a)</num><content><p>“<term refersTo="#term-bill-payer" eId="term-bill-payer">bill payer</term>” includes the person who would be the bill payer if the supply from the relevant energy supplier were not temporarily disconnected or the liability to make green deal payments were not suspended, and</p></content></level><level class="para1" eId="section-34-3-b"><num>(b)</num><content><p>payments are green deal payments if they are made under a green deal plan.</p></content></level></subsection></section><section eId="section-35"><num>35</num><heading>Appeals</heading><subsection eId="section-35-1"><num>(1)</num><intro><p>This section applies if provision is included in a scheme or regulations by virtue of any of the following—</p></intro><level class="para1" eId="section-35-1-a"><num>(a)</num><content><p>section 3(3)(h) or (i);</p></content></level><level class="para1" eId="section-35-1-b"><num>(b)</num><content><p>section 6(4);</p></content></level><level class="para1" eId="section-35-1-c"><num>(c)</num><content><p>section 16.</p></content></level></subsection><subsection eId="section-35-2"><num>(2)</num><content><p>The Secretary of State must by regulations provide for a right of appeal to a court or tribunal against any sanction imposed, or other action taken, by the Secretary of State or a specified public body under the provision mentioned in subsection (1).</p></content></subsection><subsection eId="section-35-3"><num>(3)</num><intro><p>Regulations under subsection (2) may, in particular, include provision—</p></intro><level class="para1" eId="section-35-3-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-35-3-b"><num>(b)</num><content><p>as to the persons who may make an appeal;</p></content></level><level class="para1" eId="section-35-3-c"><num>(c)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-35-3-d"><num>(d)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-35-3-e"><num>(e)</num><content><p>suspending the effect of a sanction or other action being appealed against, pending determination of the appeal;</p></content></level><level class="para1" eId="section-35-3-f"><num>(f)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-35-3-g"><num>(g)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-35-4"><num>(4)</num><intro><p>The provision referred to in subsection (3)(f) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-35-4-a"><num>(a)</num><content><p>to confirm the sanction imposed or action taken;</p></content></level><level class="para1" eId="section-35-4-b"><num>(b)</num><content><p>to withdraw the sanction or action;</p></content></level><level class="para1" eId="section-35-4-c"><num>(c)</num><content><p>to impose a different sanction or take different action;</p></content></level><level class="para1" eId="section-35-4-d"><num>(d)</num><content><p>to remit the decision whether to confirm the sanction or other action, or any matter relating to that decision, to the person who imposed the sanction or took the action;</p></content></level><level class="para1" eId="section-35-4-e"><num>(e)</num><content><p>to award costs or, in Scotland, expenses.</p></content></level></subsection><subsection eId="section-35-5"><num>(5)</num><content><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within subsection (3)(a), (d), (f) or (g), regulations under subsection (2) may revoke or amend any subordinate legislation.</p></content></subsection><subsection eId="section-35-6"><num>(6)</num><content><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within subsection (3)(a), (d), (f) or (g), they may by regulations revoke or amend any subordinate legislation, or any provision included in an instrument made under an Act of the Scottish Parliament, if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></content></subsection><subsection eId="section-35-7"><num>(7)</num><intro><p>In this section—</p></intro><level class="para1" eId="section-35-7-a"><num>(a)</num><content><p>“<term refersTo="#term-specified-public-body" eId="term-specified-public-body">specified public body</term>” means a public body specified in an order made by virtue of section 31(1);</p></content></level><level class="para1" eId="section-35-7-b"><num>(b)</num><content><p>“<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></level></subsection></section><section eId="section-36"><num>36</num><heading>Funding for energy efficiency advice</heading><subsection eId="section-36-1"><num>(1)</num><content><p>The Secretary of State may incur expenditure in providing qualifying advice or information or in making payments to persons who provide qualifying advice or information.</p></content></subsection><subsection eId="section-36-2"><num>(2)</num><content><p>In this section “<term refersTo="#term-qualifying-advice-or-information" eId="term-qualifying-advice-or-information">qualifying advice or information</term>” means advice or information about green deal plans or energy efficiency generally which is given to individuals or organisations.</p></content></subsection></section><section eId="section-37"><num>37</num><heading>Preparatory expenditure: framework regulations</heading><content><p>The Secretary of State may, before the framework regulations are made, incur expenditure for the purpose of, or in connection with, preparing for a scheme of the kind provided for by section 3.</p></content></section><section eId="section-38"><num>38</num><heading>Green deal installation apprenticeships</heading><subsection eId="section-38-1"><num>(1)</num><content><p>Before making the first framework regulations the Secretary of State must lay before Parliament a report on what, if any, steps the Secretary of State has taken to encourage green deal installation apprenticeships.</p></content></subsection><subsection eId="section-38-2"><num>(2)</num><content><p>A “green deal installation apprenticeship” is an apprenticeship which provides training on how to install energy efficiency improvements at properties.</p></content></subsection></section><section eId="section-39"><num>39</num><heading>Parliamentary procedure in relation to code of practice</heading><subsection eId="section-39-1"><num>(1)</num><content><p>This section makes further provision in relation to the issuing of any code of practice for the purposes of the scheme established by the framework regulations.</p></content></subsection><subsection eId="section-39-2"><num>(2)</num><content><p>Before the code is issued the Secretary of State must lay a draft of the code before Parliament.</p></content></subsection><subsection eId="section-39-3"><num>(3)</num><content><p>If, within the 40-day period, either House of Parliament resolves not to approve the draft, the code may not be issued.</p></content></subsection><subsection eId="section-39-4"><num>(4)</num><content><p>If no such resolution is made within that period, the code may be issued.</p></content></subsection><subsection eId="section-39-5"><num>(5)</num><content><p>The “<term refersTo="#term-40-day-period" eId="term-40-day-period">40-day period</term>”, in relation to a draft of a code, means the period of 40 days beginning with the day on which the draft is laid before Parliament (or, if it is not laid before each House of Parliament on the same day, the later of the 2 days on which it is laid).</p></content></subsection><subsection eId="section-39-6"><num>(6)</num><intro><p>For the purposes of calculating the 40-day period, no account is to be taken of any period during which—</p></intro><level class="para1" eId="section-39-6-a"><num>(a)</num><content><p>Parliament is dissolved or prorogued, or</p></content></level><level class="para1" eId="section-39-6-b"><num>(b)</num><content><p>both Houses are adjourned for more than 4 days.</p></content></level></subsection></section><section eId="section-40"><num>40</num><heading>Regulations and orders</heading><subsection eId="section-40-1"><num>(1)</num><content><p>Regulations and orders under this Chapter may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-40-2"><num>(2)</num><content><p>Regulations and orders under this Chapter, other than those made by the Scottish Ministers, are to be made by statutory instrument.</p></content></subsection><subsection eId="section-40-3"><num>(3)</num><content><p>A statutory instrument containing regulations or an order under this Chapter is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-40-4"><num>(4)</num><intro><p>Subsection (3) does not apply to a statutory instrument containing—</p></intro><level class="para1" eId="section-40-4-a"><num>(a)</num><content><p>regulations under section 2 or the framework regulations,</p></content></level><level class="para1" eId="section-40-4-b"><num>(b)</num><content><p>regulations under section 13, 15(1), 16, 34 or 35(2), or</p></content></level><level class="para1" eId="section-40-4-c"><num>(c)</num><content><p>an order under section 1, 2 or 30.</p></content></level></subsection><subsection eId="section-40-5"><num>(5)</num><content><p>A statutory instrument containing regulations or an order falling within subsection (4) may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection eId="section-40-6"><num>(6)</num><content><p>Regulations under section 10(2), 14(7) or (8) or 15(4) (regulations made by the Scottish Ministers) are subject to the negative procedure.</p></content></subsection><subsection eId="section-40-7"><num>(7)</num><content><p>Regulations under section 35(6) (regulations made by the Scottish Ministers) are subject to the affirmative procedure.</p></content></subsection><subsection eId="section-40-8"><num>(8)</num><intro><p>Before making regulations or an order under this Chapter extending to Scotland, the Secretary of State must—</p></intro><level class="para1" eId="section-40-8-a"><num>(a)</num><content><p>if the regulations or order contain any provision which would be within the legislative competence of the Scottish Parliament if it were contained in an Act of that Parliament, obtain the consent of the Scottish Ministers;</p></content></level><level class="para1" eId="section-40-8-b"><num>(b)</num><content><p>in any other case, consult the Scottish Ministers.</p></content></level></subsection><subsection eId="section-40-9"><num>(9)</num><intro><p>The Secretary of State must obtain the consent of the Welsh Ministers before making provision under section 35 amending or revoking—</p></intro><level class="para1" eId="section-40-9-a"><num>(a)</num><content><p>provision included in an instrument made under a Measure or Act of the National Assembly for Wales;</p></content></level><level class="para1" eId="section-40-9-b"><num>(b)</num><content><p>any other subordinate legislation made by the Welsh Ministers (or the National Assembly for Wales established under the Government of Wales Act 1998).</p></content></level></subsection><subsection eId="section-40-10"><num>(10)</num><content><p>Before amending under section 9 a provision of the Building Regulations 2010 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2010/2214), the Secretary of State must, if and so far as the function under which the provision was made is exercisable by the Welsh Ministers, obtain their consent.</p></content></subsection><subsection eId="section-40-11"><num>(11)</num><content><p>Subsections (9) and (10) do not apply to the extent that the Secretary of State is making incidental or consequential provision.</p></content></subsection><subsection eId="section-40-12"><num>(12)</num><content><p>Before making regulations or an order under this Chapter applying to Wales, the Secretary of State must consult the Welsh Ministers.</p></content></subsection><subsection eId="section-40-13"><num>(13)</num><content><p>Subsection (12) does not apply to the extent that consent has been obtained under subsection (9) or (10).</p></content></subsection></section><section eId="section-41"><num>41</num><heading>Crown application: Chapter 1</heading><content><p>This Chapter binds the Crown.</p></content></section></hcontainer></chapter> — General
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-2"><num>CHAPTER 2</num><heading>Private rented sector: England and Wales</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-introductory"><heading><i>Introductory</i></heading><section eId="section-42"><num>42</num><heading>Meaning of “domestic PR property” and “non-domestic PR property”: England and Wales</heading><subsection eId="section-42-1"><num>(1)</num><intro><p>For the purposes of this Chapter—</p></intro><level class="para1" eId="section-42-1-a"><num>(a)</num><intro><p>a property is a “domestic private rented property” if, subject to subsection (2), it is let—</p></intro><level class="para2" eId="section-42-1-a-i"><num>(i)</num><content><p>under a tenancy which is an assured tenancy for the purposes of the Housing Act 1988,</p></content></level><level class="para2" eId="section-42-1-a-ii"><num>(ii)</num><content><p>under a tenancy which is a regulated tenancy for the purposes of the Rent Act 1977, <noteRef href="#key-5bda5789f355ab8bfc771857883af72f" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>...</p></content></level><level class="para2" eId="section-42-1-a-iia"><num><ins class="first" ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2"><noteRef uk:name="commentary" href="#key-712528cdb686e5424cc37b7da37109d2" class="commentary"/>(iia)</ins></num><intro><p><ins ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">under a tenancy which is a standard contract (within the meaning given by section 8 of the Renting Homes (Wales) Act 2016 (anaw 1)) except where—</ins></p></intro><level class="para3" eId="section-42-1-a-iia-i"><num><ins ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">(i)</ins></num><content><p><ins ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">the standard contract is a supported standard contract (within the meaning given by section 143 of the Renting Homes (Wales) Act 2016), or</ins></p></content></level><level class="para3" eId="section-42-1-a-iia-ii"><num><ins ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">(ii)</ins></num><content><p><ins class="last" ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">the interest of the landlord belongs to His Majesty in right of the Crown or to a government department or is held in trust for Her Majesty for the purposes of a government department, or</ins></p></content></level></level><level class="para2" eId="section-42-1-a-iii"><num>(iii)</num><content><p>under a tenancy which is specified for the purposes of this subsection in an order made by the Secretary of State;</p></content></level></level><level class="para1" eId="section-42-1-b"><num>(b)</num><intro><p>a property is a “non-domestic private rented property” if it—</p></intro><level class="para2" eId="section-42-1-b-i"><num>(i)</num><content><p>is situated in England and Wales,</p></content></level><level class="para2" eId="section-42-1-b-ii"><num>(ii)</num><content><p>is let under a tenancy, and</p></content></level><level class="para2" eId="section-42-1-b-iii"><num>(iii)</num><content><p>is not a dwelling.</p></content></level></level></subsection><subsection eId="section-42-2"><num>(2)</num><intro><p>But a property is not a domestic private rented property if—</p></intro><level class="para1" eId="section-42-2-a"><num>(a)</num><content><p>it is low cost rental accommodation within the meaning of section 69 of the Housing and Regeneration Act 2008 and the landlord is a private registered provider of social housing,</p></content></level><level class="para1" eId="section-42-2-b"><num>(b)</num><content><p>it is low cost home ownership accommodation within the meaning of section 70 of that Act, <noteRef href="#key-7423073fec0132527809fa9e071da1e7" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>...</p></content></level><level class="para1" eId="section-42-2-c"><num>(c)</num><content><p>the landlord is a body registered as a social landlord under Chapter 1 of Part 1 of the Housing Act 1996 <ins class="substitution first last" ukl:ChangeId="key-44101252701c4756b8e847f5b0baa8a4-1671190181312" ukl:CommentaryRef="key-44101252701c4756b8e847f5b0baa8a4"><noteRef uk:name="commentary" href="#key-44101252701c4756b8e847f5b0baa8a4" class="commentary"/>, or</ins> </p></content></level><level class="para1" eId="section-42-2-d"><num><ins class="first" ukl:ChangeId="key-47b91ba2d378dc6c88b8045eb4d460ad-1671190201964" ukl:CommentaryRef="key-47b91ba2d378dc6c88b8045eb4d460ad"><noteRef uk:name="commentary" href="#key-47b91ba2d378dc6c88b8045eb4d460ad" class="commentary"/>(d)</ins></num><content><p><ins class="last" ukl:ChangeId="key-47b91ba2d378dc6c88b8045eb4d460ad-1671190201964" ukl:CommentaryRef="key-47b91ba2d378dc6c88b8045eb4d460ad">if the landlord is a community landlord (within the meaning of section 9 of the Renting Homes (Wales) Act 2016.</ins></p></content></level></subsection><subsection eId="section-42-3"><num>(3)</num><content><p>In subsection (1)(b) “<term refersTo="#term-dwelling" eId="term-dwelling">dwelling</term>” has the meaning given by the Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2007/991) (“<term refersTo="#term-the-energy-performance-regulations" eId="term-the-energy-performance-regulations">the Energy Performance Regulations</term>”).</p></content></subsection><subsection eId="section-42-4"><num>(4)</num><content><p>A domestic private rented property is referred to in this Chapter as a “domestic PR property”.</p></content></subsection><subsection eId="section-42-5"><num>(5)</num><content><p>A non-domestic private rented property is referred to in this Chapter as a “non-domestic PR property”.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-domestic-energy-efficiency-regulations"><heading><i>Domestic energy efficiency regulations</i></heading><section eId="section-43"><num>43</num><heading>Domestic energy efficiency regulations</heading><subsection eId="section-43-1"><num>(1)</num><intro><p>The Secretary of State must make regulations for the purpose of securing that a landlord of a domestic PR property—</p></intro><level class="para1" eId="section-43-1-a"><num>(a)</num><content><p>which is of such description of domestic PR property as is provided for by the regulations,</p></content></level><level class="para1" eId="section-43-1-b"><num>(b)</num><content><p>in relation to which there is an energy performance certificate, and</p></content></level><level class="para1" eId="section-43-1-c"><num>(c)</num><content><p>which falls below such level of energy efficiency (as demonstrated by the energy performance certificate) as is provided for by the regulations,</p></content></level><wrapUp><p>may not let the property until the landlord has complied with the obligation mentioned in subsection (2).</p></wrapUp></subsection><subsection eId="section-43-2"><num>(2)</num><content><p>The obligation is to make to the property such relevant energy efficiency improvements as are provided for by the regulations.</p></content></subsection><subsection eId="section-43-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “<term refersTo="#term-domestic-energy-efficiency-regulations" eId="term-domestic-energy-efficiency-regulations">domestic energy efficiency regulations</term>”.</p></content></subsection><subsection eId="section-43-4"><num>(4)</num><intro><p>For the purposes of domestic energy efficiency regulations—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-performance-certificate" eId="term-energy-performance-certificate">energy performance certificate</term>” has the meaning given by the Energy Performance Regulations;</p></content></hcontainer><hcontainer name="definition"><content><p>“landlord” and “let the property” have the meaning given by the regulations (and “let the property” may be defined to include “continue to let the property”);</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p></intro><level class="para1"><num>(a)</num><content><p>are of such description as the regulations provide, and</p></content></level><level class="para1"><num>(b)</num><content><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part,</p></item><item><num>(ii)</num><p>provided free of charge pursuant to an obligation imposed by an order made under section 33BC or 33BD of the Gas Act 1986 or section 41A or 41B of the Electricity Act 1989,</p></item><item><num>(iii)</num><p>wholly financed pursuant to a combination of such a plan and such an obligation, or</p></item><item><num>(iv)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></content></level></hcontainer></subsection><subsection eId="section-43-5"><num>(5)</num><content><p>The Secretary of State may by order amend the definition of “energy performance certificate” in subsection (4).</p></content></subsection><subsection eId="section-43-6"><num>(6)</num><content><p>The first domestic energy efficiency regulations must come into force no later than 1 April 2018.</p></content></subsection></section><section eId="section-44"><num>44</num><heading>Further provision about domestic energy efficiency regulations</heading><subsection eId="section-44-1"><num>(1)</num><intro><p>Domestic energy efficiency regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-44-1-a"><num>(a)</num><content><p>the period within which improvements required by the regulations must be started or completed;</p></content></level><level class="para1" eId="section-44-1-b"><num>(b)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-44-1-c"><num>(c)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-44-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(b) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-44-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-44-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of complying with a requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-44-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-44-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-44-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-44-3-c"><num>(c)</num><content><p>that the improvements required by or under the regulations are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-45"><num>45</num><heading>Sanctions for the purposes of domestic energy efficiency regulations</heading><subsection eId="section-45-1"><num>(1)</num><content><p>Domestic energy efficiency regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-45-2"><num>(2)</num><intro><p>Provision falling within subsection (1) includes, in particular, provision—</p></intro><level class="para1" eId="section-45-2-a"><num>(a)</num><content><p>for a local authority to enforce any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-45-2-b"><num>(b)</num><content><p>about the sanctions for non-compliance with a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-45-2-c"><num>(c)</num><content><p>about the sanctions for the provision of false information in connection with such a requirement;</p></content></level><wrapUp><p>including, in cases falling within paragraph (b) or (c), the imposition of a civil penalty by a local authority.</p></wrapUp></subsection><subsection eId="section-45-3"><num>(3)</num><content><p>The amount of any civil penalty provided for by domestic energy efficiency regulations must not exceed £5,000.</p></content></subsection><subsection eId="section-45-4"><num>(4)</num><content><p>Where domestic energy efficiency regulations make provision for the imposition of a civil penalty, the regulations must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.</p></content></subsection><subsection eId="section-45-5"><num>(5)</num><intro><p>Provision falling within subsection (4) includes, in particular, provision—</p></intro><level class="para1" eId="section-45-5-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-45-5-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-45-5-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-45-5-d"><num>(d)</num><content><p>suspending the imposition of the penalty, pending determination of the appeal;</p></content></level><level class="para1" eId="section-45-5-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-45-5-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-45-6"><num>(6)</num><intro><p>The provision referred to in subsection (5)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-45-6-a"><num>(a)</num><content><p>to confirm the penalty;</p></content></level><level class="para1" eId="section-45-6-b"><num>(b)</num><content><p>to withdraw the penalty;</p></content></level><level class="para1" eId="section-45-6-c"><num>(c)</num><content><p>to vary the amount of the penalty;</p></content></level><level class="para1" eId="section-45-6-d"><num>(d)</num><content><p>to award costs.</p></content></level></subsection><subsection eId="section-45-7"><num>(7)</num><content><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within subsection (5) (a), (c), (e) or (f), domestic energy efficiency regulations may revoke or amend any subordinate legislation in so far as the subordinate legislation extends to England and Wales.</p></content></subsection><subsection eId="section-45-8"><num>(8)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-tenants-energy-efficiency-improvements-regulations"><heading><i>Tenants' energy efficiency improvements regulations</i></heading><section eId="section-46"><num>46</num><heading>Tenants' energy efficiency improvements regulations</heading><subsection eId="section-46-1"><num>(1)</num><content><p>The Secretary of State must make regulations for the purpose of securing that a landlord of a domestic PR property which is of such description of domestic PR property as is provided for by the regulations does not unreasonably refuse a request mentioned in subsection (2).</p></content></subsection><subsection eId="section-46-2"><num>(2)</num><content><p>The request is one by the tenant of the property to consent to the making of such relevant energy efficiency improvements as are identified in the request.</p></content></subsection><subsection eId="section-46-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “tenants' energy efficiency improvements regulations”.</p></content></subsection><subsection eId="section-46-4"><num>(4)</num><content><p>For the purposes of tenants' energy efficiency improvements regulations—</p><blockList class="unordered none" ukl:Name="UnorderedList" ukl:Decoration="none"><item><p>“landlord” and “tenant” have the meaning given by the regulations;</p></item><item><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p><blockList class="ordered alpha parens" ukl:Name="OrderedList" ukl:Type="alpha" ukl:Decoration="parens"><item><num>(a)</num><p>are of such description as the regulations provide, and</p></item><item><num>(b)</num><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part,</p></item><item><num>(ii)</num><p>provided free of charge pursuant to an obligation imposed by an order made under section 33BC or 33BD of the Gas Act 1986 or section 41A or 41B of the Electricity Act 1989,</p></item><item><num>(iii)</num><p>wholly financed pursuant to a combination of such a plan and such an obligation, or</p></item><item><num>(iv)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></item></blockList></item></blockList></content></subsection><subsection eId="section-46-5"><num>(5)</num><content><p>The first tenants' energy efficiency improvements regulations must come into force no later than 1 April 2016.</p></content></subsection></section><section eId="section-47"><num>47</num><heading>Further provision about tenants' energy efficiency improvements regulations</heading><subsection eId="section-47-1"><num>(1)</num><intro><p>Tenants' energy efficiency improvements regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-47-1-a"><num>(a)</num><content><p>the form, content and service of a request under the regulations;</p></content></level><level class="para1" eId="section-47-1-b"><num>(b)</num><content><p>the form, content and service of any response by the landlord to a request (including the period within which any response must be given);</p></content></level><level class="para1" eId="section-47-1-c"><num>(c)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-47-1-d"><num>(d)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-47-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-47-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-47-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of consenting to the request.</p></content></level></subsection><subsection eId="section-47-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(d) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-47-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-47-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-47-3-c"><num>(c)</num><content><p>that the improvements for which consent has been requested are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-48"><num>48</num><heading>Sanctions for the purposes of tenants' energy efficiency improvements regulations</heading><subsection eId="section-48-1"><num>(1)</num><content><p>Tenants' energy efficiency improvements regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-48-2"><num>(2)</num><content><p>Provision falling within subsection (1) includes, in particular, provision for a tenant to apply to a court or tribunal for a ruling that a landlord has not complied with a requirement imposed by or under the regulations.</p></content></subsection><subsection eId="section-48-3"><num>(3)</num><intro><p>Where the regulations make provision for a tenant to make an application such as is mentioned in subsection (2), the provision may, in particular, include provision—</p></intro><level class="para1" eId="section-48-3-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an application may be made;</p></content></level><level class="para1" eId="section-48-3-b"><num>(b)</num><content><p>as to the grounds on which an application may be made;</p></content></level><level class="para1" eId="section-48-3-c"><num>(c)</num><content><p>as to the procedure for making an application (including any fee which may be payable);</p></content></level><level class="para1" eId="section-48-3-d"><num>(d)</num><content><p>as to the powers of the court or tribunal to which an application is made (including as to costs which may be awarded);</p></content></level><level class="para1" eId="section-48-3-e"><num>(e)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-48-4"><num>(4)</num><content><p>Where the regulations make provision for a tenant to make an application such as is mentioned in subsection (2), the regulations must also include provision for a right of appeal by the tenant or landlord against any decision of a court or tribunal on an application.</p></content></subsection><subsection eId="section-48-5"><num>(5)</num><intro><p>Provision falling within subsection (4) includes, in particular, provision—</p></intro><level class="para1" eId="section-48-5-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-48-5-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-48-5-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-48-5-d"><num>(d)</num><content><p>suspending the effect of the decision being appealed against, pending determination of the appeal;</p></content></level><level class="para1" eId="section-48-5-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-48-5-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-48-6"><num>(6)</num><intro><p>The provision referred to in subsection (5)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-48-6-a"><num>(a)</num><content><p>to confirm the decision;</p></content></level><level class="para1" eId="section-48-6-b"><num>(b)</num><content><p>to quash the decision;</p></content></level><level class="para1" eId="section-48-6-c"><num>(c)</num><content><p>to make a different decision;</p></content></level><level class="para1" eId="section-48-6-d"><num>(d)</num><content><p>to remit the decision or any matter relating to the decision to the person who made it;</p></content></level><level class="para1" eId="section-48-6-e"><num>(e)</num><content><p>to award costs.</p></content></level></subsection><subsection eId="section-48-7"><num>(7)</num><intro><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within—</p></intro><level class="para1" eId="section-48-7-a"><num>(a)</num><content><p>subsection (3)(a), (c), (d) or (e), or</p></content></level><level class="para1" eId="section-48-7-b"><num>(b)</num><content><p>subsection (5)(a), (c), (e) or (f),</p></content></level><wrapUp><p>tenants' energy efficiency improvements regulations may revoke or amend any subordinate legislation in so far as the subordinate legislation extends to England and Wales.</p></wrapUp></subsection><subsection eId="section-48-8"><num>(8)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-nondomestic-energy-efficiency-regulations"><heading><i>Non-domestic energy efficiency regulations</i></heading><section eId="section-49"><num>49</num><heading>Non-domestic energy efficiency regulations</heading><subsection eId="section-49-1"><num>(1)</num><intro><p>The Secretary of State must make regulations for the purpose of securing that a landlord of a non-domestic PR property—</p></intro><level class="para1" eId="section-49-1-a"><num>(a)</num><content><p>which is of such description of non-domestic PR property as is provided for by the regulations,</p></content></level><level class="para1" eId="section-49-1-b"><num>(b)</num><content><p>in relation to which there is an energy performance certificate, and</p></content></level><level class="para1" eId="section-49-1-c"><num>(c)</num><content><p>which falls below such level of energy efficiency (as demonstrated by the energy performance certificate) as is provided for by the regulations,</p></content></level><wrapUp><p>may not let the property until the landlord has complied with the obligation mentioned in subsection (2).</p></wrapUp></subsection><subsection eId="section-49-2"><num>(2)</num><content><p>The obligation is to make to the property such relevant energy efficiency improvements as are provided for by the regulations.</p></content></subsection><subsection eId="section-49-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “<term refersTo="#term-non-domestic-energy-efficiency-regulations" eId="term-non-domestic-energy-efficiency-regulations">non-domestic energy efficiency regulations</term>”.</p></content></subsection><subsection eId="section-49-4"><num>(4)</num><intro><p>For the purposes of non-domestic energy efficiency regulations—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-performance-certificate" eId="term-energy-performance-certificate">energy performance certificate</term>” has the meaning given by the Energy Performance Regulations;</p></content></hcontainer><hcontainer name="definition"><content><p>“landlord” and “let the property” have the meaning given by the regulations (and “let the property” may be defined to include “continue to let the property”);</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p></intro><level class="para1"><num>(a)</num><content><p>are of such description as the regulations provide, and</p></content></level><level class="para1"><num>(b)</num><content><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part, or</p></item><item><num>(ii)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></content></level></hcontainer></subsection><subsection eId="section-49-5"><num>(5)</num><content><p>The Secretary of State may by order amend the definition of “energy performance certificate” in subsection (4).</p></content></subsection><subsection eId="section-49-6"><num>(6)</num><content><p>The first non-domestic energy efficiency regulations must come into force no later than 1 April 2018.</p></content></subsection></section><section eId="section-50"><num>50</num><heading>Further provision about non-domestic energy efficiency regulations</heading><subsection eId="section-50-1"><num>(1)</num><intro><p>Non-domestic energy efficiency regulations may in particular, include provision about—</p></intro><level class="para1" eId="section-50-1-a"><num>(a)</num><content><p>the period within which improvements required by the regulations must be started or completed;</p></content></level><level class="para1" eId="section-50-1-b"><num>(b)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-50-1-c"><num>(c)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-50-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(b) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-50-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-50-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of complying with a requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-50-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-50-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-50-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-50-3-c"><num>(c)</num><content><p>that the improvements required by or under the regulations are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-51"><num>51</num><heading>Sanctions for the purposes of non-domestic energy efficiency regulations</heading><subsection eId="section-51-1"><num>(1)</num><content><p>Non-domestic energy efficiency regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-51-2"><num>(2)</num><intro><p>Provision falling within subsection (1) includes, in particular, provision—</p></intro><level class="para1" eId="section-51-2-a"><num>(a)</num><content><p>for a local weights and measures authority to enforce any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-51-2-b"><num>(b)</num><content><p>about the sanctions for non-compliance with a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-51-2-c"><num>(c)</num><content><p>about the sanctions for the provision of false information in connection with such a requirement;</p></content></level><wrapUp><p>including, in cases falling within paragraph (b) or (c), the imposition of a civil penalty by a local weights and measures authority.</p></wrapUp></subsection><subsection eId="section-51-3"><num>(3)</num><content><p>Where non-domestic energy efficiency regulations make provision for a civil penalty, the regulations must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.</p></content></subsection><subsection eId="section-51-4"><num>(4)</num><intro><p>Provision falling within subsection (3) includes, in particular, provision—</p></intro><level class="para1" eId="section-51-4-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-51-4-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-51-4-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-51-4-d"><num>(d)</num><content><p>suspending the imposition of the penalty, pending determination of the appeal;</p></content></level><level class="para1" eId="section-51-4-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-51-4-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-51-5"><num>(5)</num><intro><p>The provision referred to in subsection (4)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-51-5-a"><num>(a)</num><content><p>to confirm the penalty;</p></content></level><level class="para1" eId="section-51-5-b"><num>(b)</num><content><p>to withdraw the penalty;</p></content></level><level class="para1" eId="section-51-5-c"><num>(c)</num><content><p>to vary the amount of the penalty;</p></content></level><level class="para1" eId="section-51-5-d"><num>(d)</num><content><p>to award costs.</p></content></level></subsection><subsection eId="section-51-6"><num>(6)</num><content><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within subsection (4)(a), (c), (e) or (f), non-domestic energy efficiency regulations may revoke or amend any subordinate legislation in so far as the subordinate legislation extends to England and Wales.</p></content></subsection><subsection eId="section-51-7"><num>(7)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-general"><heading><i>General</i></heading><section eId="section-52"><num>52</num><heading>Regulations and orders: Chapter 2</heading><subsection eId="section-52-1"><num>(1)</num><content><p>Regulations and orders under this Chapter may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-52-2"><num>(2)</num><content><p>Regulations and orders under this Chapter are to be made by statutory instrument.</p></content></subsection><subsection eId="section-52-3"><num>(3)</num><content><p>A statutory instrument containing an order under section 43(5) or 49(5) is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-52-4"><num>(4)</num><intro><p>A statutory instrument containing—</p></intro><level class="para1" eId="section-52-4-a"><num>(a)</num><content><p>an order under section 42(1)(a)(iii), or</p></content></level><level class="para1" eId="section-52-4-b"><num>(b)</num><content><p>regulations under this Chapter,</p></content></level><wrapUp><p>may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></wrapUp></subsection><subsection eId="section-52-5"><num>(5)</num><intro><p>The Secretary of State must obtain the consent of the Welsh Ministers before making provision under this Chapter amending or revoking—</p></intro><level class="para1" eId="section-52-5-a"><num>(a)</num><content><p>provision included in an instrument made under a Measure or Act of the National Assembly for Wales;</p></content></level><level class="para1" eId="section-52-5-b"><num>(b)</num><content><p>any other subordinate legislation made by the Welsh Ministers (or the National Assembly for Wales established under the Government of Wales Act 1998).</p></content></level></subsection><subsection eId="section-52-6"><num>(6)</num><content><p>Subsection (5) does not apply to the extent that the Secretary of State is making incidental or consequential provision.</p></content></subsection><subsection eId="section-52-7"><num>(7)</num><intro><p>The Secretary of State must consult the Welsh Ministers before making—</p></intro><level class="para1" eId="section-52-7-a"><num>(a)</num><content><p>domestic energy efficiency regulations, or</p></content></level><level class="para1" eId="section-52-7-b"><num>(b)</num><content><p>tenants' energy efficiency improvements regulations,</p></content></level><wrapUp><p>which apply in relation to domestic PR properties situated in Wales.</p></wrapUp></subsection><subsection eId="section-52-8"><num>(8)</num><content><p>Subsection (7) does not apply to the extent that consent has been obtained under subsection (5).</p></content></subsection></section><section eId="section-53"><num>53</num><heading>Crown application: Chapter 2</heading><content><p>This Chapter binds the Crown.</p></content></section></hcontainer></chapter> — Introductory
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-2"><num>CHAPTER 2</num><heading>Private rented sector: England and Wales</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-introductory"><heading><i>Introductory</i></heading><section eId="section-42"><num>42</num><heading>Meaning of “domestic PR property” and “non-domestic PR property”: England and Wales</heading><subsection eId="section-42-1"><num>(1)</num><intro><p>For the purposes of this Chapter—</p></intro><level class="para1" eId="section-42-1-a"><num>(a)</num><intro><p>a property is a “domestic private rented property” if, subject to subsection (2), it is let—</p></intro><level class="para2" eId="section-42-1-a-i"><num>(i)</num><content><p>under a tenancy which is an assured tenancy for the purposes of the Housing Act 1988,</p></content></level><level class="para2" eId="section-42-1-a-ii"><num>(ii)</num><content><p>under a tenancy which is a regulated tenancy for the purposes of the Rent Act 1977, <noteRef href="#key-5bda5789f355ab8bfc771857883af72f" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>...</p></content></level><level class="para2" eId="section-42-1-a-iia"><num><ins class="first" ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2"><noteRef uk:name="commentary" href="#key-712528cdb686e5424cc37b7da37109d2" class="commentary"/>(iia)</ins></num><intro><p><ins ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">under a tenancy which is a standard contract (within the meaning given by section 8 of the Renting Homes (Wales) Act 2016 (anaw 1)) except where—</ins></p></intro><level class="para3" eId="section-42-1-a-iia-i"><num><ins ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">(i)</ins></num><content><p><ins ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">the standard contract is a supported standard contract (within the meaning given by section 143 of the Renting Homes (Wales) Act 2016), or</ins></p></content></level><level class="para3" eId="section-42-1-a-iia-ii"><num><ins ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">(ii)</ins></num><content><p><ins class="last" ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">the interest of the landlord belongs to His Majesty in right of the Crown or to a government department or is held in trust for Her Majesty for the purposes of a government department, or</ins></p></content></level></level><level class="para2" eId="section-42-1-a-iii"><num>(iii)</num><content><p>under a tenancy which is specified for the purposes of this subsection in an order made by the Secretary of State;</p></content></level></level><level class="para1" eId="section-42-1-b"><num>(b)</num><intro><p>a property is a “non-domestic private rented property” if it—</p></intro><level class="para2" eId="section-42-1-b-i"><num>(i)</num><content><p>is situated in England and Wales,</p></content></level><level class="para2" eId="section-42-1-b-ii"><num>(ii)</num><content><p>is let under a tenancy, and</p></content></level><level class="para2" eId="section-42-1-b-iii"><num>(iii)</num><content><p>is not a dwelling.</p></content></level></level></subsection><subsection eId="section-42-2"><num>(2)</num><intro><p>But a property is not a domestic private rented property if—</p></intro><level class="para1" eId="section-42-2-a"><num>(a)</num><content><p>it is low cost rental accommodation within the meaning of section 69 of the Housing and Regeneration Act 2008 and the landlord is a private registered provider of social housing,</p></content></level><level class="para1" eId="section-42-2-b"><num>(b)</num><content><p>it is low cost home ownership accommodation within the meaning of section 70 of that Act, <noteRef href="#key-7423073fec0132527809fa9e071da1e7" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>...</p></content></level><level class="para1" eId="section-42-2-c"><num>(c)</num><content><p>the landlord is a body registered as a social landlord under Chapter 1 of Part 1 of the Housing Act 1996 <ins class="substitution first last" ukl:ChangeId="key-44101252701c4756b8e847f5b0baa8a4-1671190181312" ukl:CommentaryRef="key-44101252701c4756b8e847f5b0baa8a4"><noteRef uk:name="commentary" href="#key-44101252701c4756b8e847f5b0baa8a4" class="commentary"/>, or</ins> </p></content></level><level class="para1" eId="section-42-2-d"><num><ins class="first" ukl:ChangeId="key-47b91ba2d378dc6c88b8045eb4d460ad-1671190201964" ukl:CommentaryRef="key-47b91ba2d378dc6c88b8045eb4d460ad"><noteRef uk:name="commentary" href="#key-47b91ba2d378dc6c88b8045eb4d460ad" class="commentary"/>(d)</ins></num><content><p><ins class="last" ukl:ChangeId="key-47b91ba2d378dc6c88b8045eb4d460ad-1671190201964" ukl:CommentaryRef="key-47b91ba2d378dc6c88b8045eb4d460ad">if the landlord is a community landlord (within the meaning of section 9 of the Renting Homes (Wales) Act 2016.</ins></p></content></level></subsection><subsection eId="section-42-3"><num>(3)</num><content><p>In subsection (1)(b) “<term refersTo="#term-dwelling" eId="term-dwelling">dwelling</term>” has the meaning given by the Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2007/991) (“<term refersTo="#term-the-energy-performance-regulations" eId="term-the-energy-performance-regulations">the Energy Performance Regulations</term>”).</p></content></subsection><subsection eId="section-42-4"><num>(4)</num><content><p>A domestic private rented property is referred to in this Chapter as a “domestic PR property”.</p></content></subsection><subsection eId="section-42-5"><num>(5)</num><content><p>A non-domestic private rented property is referred to in this Chapter as a “non-domestic PR property”.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-domestic-energy-efficiency-regulations"><heading><i>Domestic energy efficiency regulations</i></heading><section eId="section-43"><num>43</num><heading>Domestic energy efficiency regulations</heading><subsection eId="section-43-1"><num>(1)</num><intro><p>The Secretary of State must make regulations for the purpose of securing that a landlord of a domestic PR property—</p></intro><level class="para1" eId="section-43-1-a"><num>(a)</num><content><p>which is of such description of domestic PR property as is provided for by the regulations,</p></content></level><level class="para1" eId="section-43-1-b"><num>(b)</num><content><p>in relation to which there is an energy performance certificate, and</p></content></level><level class="para1" eId="section-43-1-c"><num>(c)</num><content><p>which falls below such level of energy efficiency (as demonstrated by the energy performance certificate) as is provided for by the regulations,</p></content></level><wrapUp><p>may not let the property until the landlord has complied with the obligation mentioned in subsection (2).</p></wrapUp></subsection><subsection eId="section-43-2"><num>(2)</num><content><p>The obligation is to make to the property such relevant energy efficiency improvements as are provided for by the regulations.</p></content></subsection><subsection eId="section-43-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “<term refersTo="#term-domestic-energy-efficiency-regulations" eId="term-domestic-energy-efficiency-regulations">domestic energy efficiency regulations</term>”.</p></content></subsection><subsection eId="section-43-4"><num>(4)</num><intro><p>For the purposes of domestic energy efficiency regulations—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-performance-certificate" eId="term-energy-performance-certificate">energy performance certificate</term>” has the meaning given by the Energy Performance Regulations;</p></content></hcontainer><hcontainer name="definition"><content><p>“landlord” and “let the property” have the meaning given by the regulations (and “let the property” may be defined to include “continue to let the property”);</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p></intro><level class="para1"><num>(a)</num><content><p>are of such description as the regulations provide, and</p></content></level><level class="para1"><num>(b)</num><content><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part,</p></item><item><num>(ii)</num><p>provided free of charge pursuant to an obligation imposed by an order made under section 33BC or 33BD of the Gas Act 1986 or section 41A or 41B of the Electricity Act 1989,</p></item><item><num>(iii)</num><p>wholly financed pursuant to a combination of such a plan and such an obligation, or</p></item><item><num>(iv)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></content></level></hcontainer></subsection><subsection eId="section-43-5"><num>(5)</num><content><p>The Secretary of State may by order amend the definition of “energy performance certificate” in subsection (4).</p></content></subsection><subsection eId="section-43-6"><num>(6)</num><content><p>The first domestic energy efficiency regulations must come into force no later than 1 April 2018.</p></content></subsection></section><section eId="section-44"><num>44</num><heading>Further provision about domestic energy efficiency regulations</heading><subsection eId="section-44-1"><num>(1)</num><intro><p>Domestic energy efficiency regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-44-1-a"><num>(a)</num><content><p>the period within which improvements required by the regulations must be started or completed;</p></content></level><level class="para1" eId="section-44-1-b"><num>(b)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-44-1-c"><num>(c)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-44-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(b) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-44-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-44-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of complying with a requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-44-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-44-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-44-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-44-3-c"><num>(c)</num><content><p>that the improvements required by or under the regulations are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-45"><num>45</num><heading>Sanctions for the purposes of domestic energy efficiency regulations</heading><subsection eId="section-45-1"><num>(1)</num><content><p>Domestic energy efficiency regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-45-2"><num>(2)</num><intro><p>Provision falling within subsection (1) includes, in particular, provision—</p></intro><level class="para1" eId="section-45-2-a"><num>(a)</num><content><p>for a local authority to enforce any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-45-2-b"><num>(b)</num><content><p>about the sanctions for non-compliance with a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-45-2-c"><num>(c)</num><content><p>about the sanctions for the provision of false information in connection with such a requirement;</p></content></level><wrapUp><p>including, in cases falling within paragraph (b) or (c), the imposition of a civil penalty by a local authority.</p></wrapUp></subsection><subsection eId="section-45-3"><num>(3)</num><content><p>The amount of any civil penalty provided for by domestic energy efficiency regulations must not exceed £5,000.</p></content></subsection><subsection eId="section-45-4"><num>(4)</num><content><p>Where domestic energy efficiency regulations make provision for the imposition of a civil penalty, the regulations must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.</p></content></subsection><subsection eId="section-45-5"><num>(5)</num><intro><p>Provision falling within subsection (4) includes, in particular, provision—</p></intro><level class="para1" eId="section-45-5-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-45-5-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-45-5-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-45-5-d"><num>(d)</num><content><p>suspending the imposition of the penalty, pending determination of the appeal;</p></content></level><level class="para1" eId="section-45-5-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-45-5-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-45-6"><num>(6)</num><intro><p>The provision referred to in subsection (5)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-45-6-a"><num>(a)</num><content><p>to confirm the penalty;</p></content></level><level class="para1" eId="section-45-6-b"><num>(b)</num><content><p>to withdraw the penalty;</p></content></level><level class="para1" eId="section-45-6-c"><num>(c)</num><content><p>to vary the amount of the penalty;</p></content></level><level class="para1" eId="section-45-6-d"><num>(d)</num><content><p>to award costs.</p></content></level></subsection><subsection eId="section-45-7"><num>(7)</num><content><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within subsection (5) (a), (c), (e) or (f), domestic energy efficiency regulations may revoke or amend any subordinate legislation in so far as the subordinate legislation extends to England and Wales.</p></content></subsection><subsection eId="section-45-8"><num>(8)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-tenants-energy-efficiency-improvements-regulations"><heading><i>Tenants' energy efficiency improvements regulations</i></heading><section eId="section-46"><num>46</num><heading>Tenants' energy efficiency improvements regulations</heading><subsection eId="section-46-1"><num>(1)</num><content><p>The Secretary of State must make regulations for the purpose of securing that a landlord of a domestic PR property which is of such description of domestic PR property as is provided for by the regulations does not unreasonably refuse a request mentioned in subsection (2).</p></content></subsection><subsection eId="section-46-2"><num>(2)</num><content><p>The request is one by the tenant of the property to consent to the making of such relevant energy efficiency improvements as are identified in the request.</p></content></subsection><subsection eId="section-46-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “tenants' energy efficiency improvements regulations”.</p></content></subsection><subsection eId="section-46-4"><num>(4)</num><content><p>For the purposes of tenants' energy efficiency improvements regulations—</p><blockList class="unordered none" ukl:Name="UnorderedList" ukl:Decoration="none"><item><p>“landlord” and “tenant” have the meaning given by the regulations;</p></item><item><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p><blockList class="ordered alpha parens" ukl:Name="OrderedList" ukl:Type="alpha" ukl:Decoration="parens"><item><num>(a)</num><p>are of such description as the regulations provide, and</p></item><item><num>(b)</num><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part,</p></item><item><num>(ii)</num><p>provided free of charge pursuant to an obligation imposed by an order made under section 33BC or 33BD of the Gas Act 1986 or section 41A or 41B of the Electricity Act 1989,</p></item><item><num>(iii)</num><p>wholly financed pursuant to a combination of such a plan and such an obligation, or</p></item><item><num>(iv)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></item></blockList></item></blockList></content></subsection><subsection eId="section-46-5"><num>(5)</num><content><p>The first tenants' energy efficiency improvements regulations must come into force no later than 1 April 2016.</p></content></subsection></section><section eId="section-47"><num>47</num><heading>Further provision about tenants' energy efficiency improvements regulations</heading><subsection eId="section-47-1"><num>(1)</num><intro><p>Tenants' energy efficiency improvements regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-47-1-a"><num>(a)</num><content><p>the form, content and service of a request under the regulations;</p></content></level><level class="para1" eId="section-47-1-b"><num>(b)</num><content><p>the form, content and service of any response by the landlord to a request (including the period within which any response must be given);</p></content></level><level class="para1" eId="section-47-1-c"><num>(c)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-47-1-d"><num>(d)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-47-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-47-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-47-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of consenting to the request.</p></content></level></subsection><subsection eId="section-47-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(d) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-47-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-47-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-47-3-c"><num>(c)</num><content><p>that the improvements for which consent has been requested are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-48"><num>48</num><heading>Sanctions for the purposes of tenants' energy efficiency improvements regulations</heading><subsection eId="section-48-1"><num>(1)</num><content><p>Tenants' energy efficiency improvements regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-48-2"><num>(2)</num><content><p>Provision falling within subsection (1) includes, in particular, provision for a tenant to apply to a court or tribunal for a ruling that a landlord has not complied with a requirement imposed by or under the regulations.</p></content></subsection><subsection eId="section-48-3"><num>(3)</num><intro><p>Where the regulations make provision for a tenant to make an application such as is mentioned in subsection (2), the provision may, in particular, include provision—</p></intro><level class="para1" eId="section-48-3-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an application may be made;</p></content></level><level class="para1" eId="section-48-3-b"><num>(b)</num><content><p>as to the grounds on which an application may be made;</p></content></level><level class="para1" eId="section-48-3-c"><num>(c)</num><content><p>as to the procedure for making an application (including any fee which may be payable);</p></content></level><level class="para1" eId="section-48-3-d"><num>(d)</num><content><p>as to the powers of the court or tribunal to which an application is made (including as to costs which may be awarded);</p></content></level><level class="para1" eId="section-48-3-e"><num>(e)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-48-4"><num>(4)</num><content><p>Where the regulations make provision for a tenant to make an application such as is mentioned in subsection (2), the regulations must also include provision for a right of appeal by the tenant or landlord against any decision of a court or tribunal on an application.</p></content></subsection><subsection eId="section-48-5"><num>(5)</num><intro><p>Provision falling within subsection (4) includes, in particular, provision—</p></intro><level class="para1" eId="section-48-5-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-48-5-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-48-5-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-48-5-d"><num>(d)</num><content><p>suspending the effect of the decision being appealed against, pending determination of the appeal;</p></content></level><level class="para1" eId="section-48-5-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-48-5-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-48-6"><num>(6)</num><intro><p>The provision referred to in subsection (5)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-48-6-a"><num>(a)</num><content><p>to confirm the decision;</p></content></level><level class="para1" eId="section-48-6-b"><num>(b)</num><content><p>to quash the decision;</p></content></level><level class="para1" eId="section-48-6-c"><num>(c)</num><content><p>to make a different decision;</p></content></level><level class="para1" eId="section-48-6-d"><num>(d)</num><content><p>to remit the decision or any matter relating to the decision to the person who made it;</p></content></level><level class="para1" eId="section-48-6-e"><num>(e)</num><content><p>to award costs.</p></content></level></subsection><subsection eId="section-48-7"><num>(7)</num><intro><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within—</p></intro><level class="para1" eId="section-48-7-a"><num>(a)</num><content><p>subsection (3)(a), (c), (d) or (e), or</p></content></level><level class="para1" eId="section-48-7-b"><num>(b)</num><content><p>subsection (5)(a), (c), (e) or (f),</p></content></level><wrapUp><p>tenants' energy efficiency improvements regulations may revoke or amend any subordinate legislation in so far as the subordinate legislation extends to England and Wales.</p></wrapUp></subsection><subsection eId="section-48-8"><num>(8)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-nondomestic-energy-efficiency-regulations"><heading><i>Non-domestic energy efficiency regulations</i></heading><section eId="section-49"><num>49</num><heading>Non-domestic energy efficiency regulations</heading><subsection eId="section-49-1"><num>(1)</num><intro><p>The Secretary of State must make regulations for the purpose of securing that a landlord of a non-domestic PR property—</p></intro><level class="para1" eId="section-49-1-a"><num>(a)</num><content><p>which is of such description of non-domestic PR property as is provided for by the regulations,</p></content></level><level class="para1" eId="section-49-1-b"><num>(b)</num><content><p>in relation to which there is an energy performance certificate, and</p></content></level><level class="para1" eId="section-49-1-c"><num>(c)</num><content><p>which falls below such level of energy efficiency (as demonstrated by the energy performance certificate) as is provided for by the regulations,</p></content></level><wrapUp><p>may not let the property until the landlord has complied with the obligation mentioned in subsection (2).</p></wrapUp></subsection><subsection eId="section-49-2"><num>(2)</num><content><p>The obligation is to make to the property such relevant energy efficiency improvements as are provided for by the regulations.</p></content></subsection><subsection eId="section-49-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “<term refersTo="#term-non-domestic-energy-efficiency-regulations" eId="term-non-domestic-energy-efficiency-regulations">non-domestic energy efficiency regulations</term>”.</p></content></subsection><subsection eId="section-49-4"><num>(4)</num><intro><p>For the purposes of non-domestic energy efficiency regulations—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-performance-certificate" eId="term-energy-performance-certificate">energy performance certificate</term>” has the meaning given by the Energy Performance Regulations;</p></content></hcontainer><hcontainer name="definition"><content><p>“landlord” and “let the property” have the meaning given by the regulations (and “let the property” may be defined to include “continue to let the property”);</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p></intro><level class="para1"><num>(a)</num><content><p>are of such description as the regulations provide, and</p></content></level><level class="para1"><num>(b)</num><content><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part, or</p></item><item><num>(ii)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></content></level></hcontainer></subsection><subsection eId="section-49-5"><num>(5)</num><content><p>The Secretary of State may by order amend the definition of “energy performance certificate” in subsection (4).</p></content></subsection><subsection eId="section-49-6"><num>(6)</num><content><p>The first non-domestic energy efficiency regulations must come into force no later than 1 April 2018.</p></content></subsection></section><section eId="section-50"><num>50</num><heading>Further provision about non-domestic energy efficiency regulations</heading><subsection eId="section-50-1"><num>(1)</num><intro><p>Non-domestic energy efficiency regulations may in particular, include provision about—</p></intro><level class="para1" eId="section-50-1-a"><num>(a)</num><content><p>the period within which improvements required by the regulations must be started or completed;</p></content></level><level class="para1" eId="section-50-1-b"><num>(b)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-50-1-c"><num>(c)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-50-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(b) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-50-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-50-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of complying with a requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-50-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-50-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-50-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-50-3-c"><num>(c)</num><content><p>that the improvements required by or under the regulations are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-51"><num>51</num><heading>Sanctions for the purposes of non-domestic energy efficiency regulations</heading><subsection eId="section-51-1"><num>(1)</num><content><p>Non-domestic energy efficiency regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-51-2"><num>(2)</num><intro><p>Provision falling within subsection (1) includes, in particular, provision—</p></intro><level class="para1" eId="section-51-2-a"><num>(a)</num><content><p>for a local weights and measures authority to enforce any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-51-2-b"><num>(b)</num><content><p>about the sanctions for non-compliance with a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-51-2-c"><num>(c)</num><content><p>about the sanctions for the provision of false information in connection with such a requirement;</p></content></level><wrapUp><p>including, in cases falling within paragraph (b) or (c), the imposition of a civil penalty by a local weights and measures authority.</p></wrapUp></subsection><subsection eId="section-51-3"><num>(3)</num><content><p>Where non-domestic energy efficiency regulations make provision for a civil penalty, the regulations must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.</p></content></subsection><subsection eId="section-51-4"><num>(4)</num><intro><p>Provision falling within subsection (3) includes, in particular, provision—</p></intro><level class="para1" eId="section-51-4-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-51-4-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-51-4-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-51-4-d"><num>(d)</num><content><p>suspending the imposition of the penalty, pending determination of the appeal;</p></content></level><level class="para1" eId="section-51-4-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-51-4-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-51-5"><num>(5)</num><intro><p>The provision referred to in subsection (4)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-51-5-a"><num>(a)</num><content><p>to confirm the penalty;</p></content></level><level class="para1" eId="section-51-5-b"><num>(b)</num><content><p>to withdraw the penalty;</p></content></level><level class="para1" eId="section-51-5-c"><num>(c)</num><content><p>to vary the amount of the penalty;</p></content></level><level class="para1" eId="section-51-5-d"><num>(d)</num><content><p>to award costs.</p></content></level></subsection><subsection eId="section-51-6"><num>(6)</num><content><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within subsection (4)(a), (c), (e) or (f), non-domestic energy efficiency regulations may revoke or amend any subordinate legislation in so far as the subordinate legislation extends to England and Wales.</p></content></subsection><subsection eId="section-51-7"><num>(7)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-general"><heading><i>General</i></heading><section eId="section-52"><num>52</num><heading>Regulations and orders: Chapter 2</heading><subsection eId="section-52-1"><num>(1)</num><content><p>Regulations and orders under this Chapter may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-52-2"><num>(2)</num><content><p>Regulations and orders under this Chapter are to be made by statutory instrument.</p></content></subsection><subsection eId="section-52-3"><num>(3)</num><content><p>A statutory instrument containing an order under section 43(5) or 49(5) is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-52-4"><num>(4)</num><intro><p>A statutory instrument containing—</p></intro><level class="para1" eId="section-52-4-a"><num>(a)</num><content><p>an order under section 42(1)(a)(iii), or</p></content></level><level class="para1" eId="section-52-4-b"><num>(b)</num><content><p>regulations under this Chapter,</p></content></level><wrapUp><p>may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></wrapUp></subsection><subsection eId="section-52-5"><num>(5)</num><intro><p>The Secretary of State must obtain the consent of the Welsh Ministers before making provision under this Chapter amending or revoking—</p></intro><level class="para1" eId="section-52-5-a"><num>(a)</num><content><p>provision included in an instrument made under a Measure or Act of the National Assembly for Wales;</p></content></level><level class="para1" eId="section-52-5-b"><num>(b)</num><content><p>any other subordinate legislation made by the Welsh Ministers (or the National Assembly for Wales established under the Government of Wales Act 1998).</p></content></level></subsection><subsection eId="section-52-6"><num>(6)</num><content><p>Subsection (5) does not apply to the extent that the Secretary of State is making incidental or consequential provision.</p></content></subsection><subsection eId="section-52-7"><num>(7)</num><intro><p>The Secretary of State must consult the Welsh Ministers before making—</p></intro><level class="para1" eId="section-52-7-a"><num>(a)</num><content><p>domestic energy efficiency regulations, or</p></content></level><level class="para1" eId="section-52-7-b"><num>(b)</num><content><p>tenants' energy efficiency improvements regulations,</p></content></level><wrapUp><p>which apply in relation to domestic PR properties situated in Wales.</p></wrapUp></subsection><subsection eId="section-52-8"><num>(8)</num><content><p>Subsection (7) does not apply to the extent that consent has been obtained under subsection (5).</p></content></subsection></section><section eId="section-53"><num>53</num><heading>Crown application: Chapter 2</heading><content><p>This Chapter binds the Crown.</p></content></section></hcontainer></chapter> — Domestic energy efficiency regulations
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-2"><num>CHAPTER 2</num><heading>Private rented sector: England and Wales</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-introductory"><heading><i>Introductory</i></heading><section eId="section-42"><num>42</num><heading>Meaning of “domestic PR property” and “non-domestic PR property”: England and Wales</heading><subsection eId="section-42-1"><num>(1)</num><intro><p>For the purposes of this Chapter—</p></intro><level class="para1" eId="section-42-1-a"><num>(a)</num><intro><p>a property is a “domestic private rented property” if, subject to subsection (2), it is let—</p></intro><level class="para2" eId="section-42-1-a-i"><num>(i)</num><content><p>under a tenancy which is an assured tenancy for the purposes of the Housing Act 1988,</p></content></level><level class="para2" eId="section-42-1-a-ii"><num>(ii)</num><content><p>under a tenancy which is a regulated tenancy for the purposes of the Rent Act 1977, <noteRef href="#key-5bda5789f355ab8bfc771857883af72f" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>...</p></content></level><level class="para2" eId="section-42-1-a-iia"><num><ins class="first" ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2"><noteRef uk:name="commentary" href="#key-712528cdb686e5424cc37b7da37109d2" class="commentary"/>(iia)</ins></num><intro><p><ins ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">under a tenancy which is a standard contract (within the meaning given by section 8 of the Renting Homes (Wales) Act 2016 (anaw 1)) except where—</ins></p></intro><level class="para3" eId="section-42-1-a-iia-i"><num><ins ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">(i)</ins></num><content><p><ins ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">the standard contract is a supported standard contract (within the meaning given by section 143 of the Renting Homes (Wales) Act 2016), or</ins></p></content></level><level class="para3" eId="section-42-1-a-iia-ii"><num><ins ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">(ii)</ins></num><content><p><ins class="last" ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">the interest of the landlord belongs to His Majesty in right of the Crown or to a government department or is held in trust for Her Majesty for the purposes of a government department, or</ins></p></content></level></level><level class="para2" eId="section-42-1-a-iii"><num>(iii)</num><content><p>under a tenancy which is specified for the purposes of this subsection in an order made by the Secretary of State;</p></content></level></level><level class="para1" eId="section-42-1-b"><num>(b)</num><intro><p>a property is a “non-domestic private rented property” if it—</p></intro><level class="para2" eId="section-42-1-b-i"><num>(i)</num><content><p>is situated in England and Wales,</p></content></level><level class="para2" eId="section-42-1-b-ii"><num>(ii)</num><content><p>is let under a tenancy, and</p></content></level><level class="para2" eId="section-42-1-b-iii"><num>(iii)</num><content><p>is not a dwelling.</p></content></level></level></subsection><subsection eId="section-42-2"><num>(2)</num><intro><p>But a property is not a domestic private rented property if—</p></intro><level class="para1" eId="section-42-2-a"><num>(a)</num><content><p>it is low cost rental accommodation within the meaning of section 69 of the Housing and Regeneration Act 2008 and the landlord is a private registered provider of social housing,</p></content></level><level class="para1" eId="section-42-2-b"><num>(b)</num><content><p>it is low cost home ownership accommodation within the meaning of section 70 of that Act, <noteRef href="#key-7423073fec0132527809fa9e071da1e7" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>...</p></content></level><level class="para1" eId="section-42-2-c"><num>(c)</num><content><p>the landlord is a body registered as a social landlord under Chapter 1 of Part 1 of the Housing Act 1996 <ins class="substitution first last" ukl:ChangeId="key-44101252701c4756b8e847f5b0baa8a4-1671190181312" ukl:CommentaryRef="key-44101252701c4756b8e847f5b0baa8a4"><noteRef uk:name="commentary" href="#key-44101252701c4756b8e847f5b0baa8a4" class="commentary"/>, or</ins> </p></content></level><level class="para1" eId="section-42-2-d"><num><ins class="first" ukl:ChangeId="key-47b91ba2d378dc6c88b8045eb4d460ad-1671190201964" ukl:CommentaryRef="key-47b91ba2d378dc6c88b8045eb4d460ad"><noteRef uk:name="commentary" href="#key-47b91ba2d378dc6c88b8045eb4d460ad" class="commentary"/>(d)</ins></num><content><p><ins class="last" ukl:ChangeId="key-47b91ba2d378dc6c88b8045eb4d460ad-1671190201964" ukl:CommentaryRef="key-47b91ba2d378dc6c88b8045eb4d460ad">if the landlord is a community landlord (within the meaning of section 9 of the Renting Homes (Wales) Act 2016.</ins></p></content></level></subsection><subsection eId="section-42-3"><num>(3)</num><content><p>In subsection (1)(b) “<term refersTo="#term-dwelling" eId="term-dwelling">dwelling</term>” has the meaning given by the Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2007/991) (“<term refersTo="#term-the-energy-performance-regulations" eId="term-the-energy-performance-regulations">the Energy Performance Regulations</term>”).</p></content></subsection><subsection eId="section-42-4"><num>(4)</num><content><p>A domestic private rented property is referred to in this Chapter as a “domestic PR property”.</p></content></subsection><subsection eId="section-42-5"><num>(5)</num><content><p>A non-domestic private rented property is referred to in this Chapter as a “non-domestic PR property”.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-domestic-energy-efficiency-regulations"><heading><i>Domestic energy efficiency regulations</i></heading><section eId="section-43"><num>43</num><heading>Domestic energy efficiency regulations</heading><subsection eId="section-43-1"><num>(1)</num><intro><p>The Secretary of State must make regulations for the purpose of securing that a landlord of a domestic PR property—</p></intro><level class="para1" eId="section-43-1-a"><num>(a)</num><content><p>which is of such description of domestic PR property as is provided for by the regulations,</p></content></level><level class="para1" eId="section-43-1-b"><num>(b)</num><content><p>in relation to which there is an energy performance certificate, and</p></content></level><level class="para1" eId="section-43-1-c"><num>(c)</num><content><p>which falls below such level of energy efficiency (as demonstrated by the energy performance certificate) as is provided for by the regulations,</p></content></level><wrapUp><p>may not let the property until the landlord has complied with the obligation mentioned in subsection (2).</p></wrapUp></subsection><subsection eId="section-43-2"><num>(2)</num><content><p>The obligation is to make to the property such relevant energy efficiency improvements as are provided for by the regulations.</p></content></subsection><subsection eId="section-43-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “<term refersTo="#term-domestic-energy-efficiency-regulations" eId="term-domestic-energy-efficiency-regulations">domestic energy efficiency regulations</term>”.</p></content></subsection><subsection eId="section-43-4"><num>(4)</num><intro><p>For the purposes of domestic energy efficiency regulations—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-performance-certificate" eId="term-energy-performance-certificate">energy performance certificate</term>” has the meaning given by the Energy Performance Regulations;</p></content></hcontainer><hcontainer name="definition"><content><p>“landlord” and “let the property” have the meaning given by the regulations (and “let the property” may be defined to include “continue to let the property”);</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p></intro><level class="para1"><num>(a)</num><content><p>are of such description as the regulations provide, and</p></content></level><level class="para1"><num>(b)</num><content><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part,</p></item><item><num>(ii)</num><p>provided free of charge pursuant to an obligation imposed by an order made under section 33BC or 33BD of the Gas Act 1986 or section 41A or 41B of the Electricity Act 1989,</p></item><item><num>(iii)</num><p>wholly financed pursuant to a combination of such a plan and such an obligation, or</p></item><item><num>(iv)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></content></level></hcontainer></subsection><subsection eId="section-43-5"><num>(5)</num><content><p>The Secretary of State may by order amend the definition of “energy performance certificate” in subsection (4).</p></content></subsection><subsection eId="section-43-6"><num>(6)</num><content><p>The first domestic energy efficiency regulations must come into force no later than 1 April 2018.</p></content></subsection></section><section eId="section-44"><num>44</num><heading>Further provision about domestic energy efficiency regulations</heading><subsection eId="section-44-1"><num>(1)</num><intro><p>Domestic energy efficiency regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-44-1-a"><num>(a)</num><content><p>the period within which improvements required by the regulations must be started or completed;</p></content></level><level class="para1" eId="section-44-1-b"><num>(b)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-44-1-c"><num>(c)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-44-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(b) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-44-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-44-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of complying with a requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-44-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-44-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-44-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-44-3-c"><num>(c)</num><content><p>that the improvements required by or under the regulations are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-45"><num>45</num><heading>Sanctions for the purposes of domestic energy efficiency regulations</heading><subsection eId="section-45-1"><num>(1)</num><content><p>Domestic energy efficiency regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-45-2"><num>(2)</num><intro><p>Provision falling within subsection (1) includes, in particular, provision—</p></intro><level class="para1" eId="section-45-2-a"><num>(a)</num><content><p>for a local authority to enforce any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-45-2-b"><num>(b)</num><content><p>about the sanctions for non-compliance with a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-45-2-c"><num>(c)</num><content><p>about the sanctions for the provision of false information in connection with such a requirement;</p></content></level><wrapUp><p>including, in cases falling within paragraph (b) or (c), the imposition of a civil penalty by a local authority.</p></wrapUp></subsection><subsection eId="section-45-3"><num>(3)</num><content><p>The amount of any civil penalty provided for by domestic energy efficiency regulations must not exceed £5,000.</p></content></subsection><subsection eId="section-45-4"><num>(4)</num><content><p>Where domestic energy efficiency regulations make provision for the imposition of a civil penalty, the regulations must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.</p></content></subsection><subsection eId="section-45-5"><num>(5)</num><intro><p>Provision falling within subsection (4) includes, in particular, provision—</p></intro><level class="para1" eId="section-45-5-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-45-5-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-45-5-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-45-5-d"><num>(d)</num><content><p>suspending the imposition of the penalty, pending determination of the appeal;</p></content></level><level class="para1" eId="section-45-5-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-45-5-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-45-6"><num>(6)</num><intro><p>The provision referred to in subsection (5)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-45-6-a"><num>(a)</num><content><p>to confirm the penalty;</p></content></level><level class="para1" eId="section-45-6-b"><num>(b)</num><content><p>to withdraw the penalty;</p></content></level><level class="para1" eId="section-45-6-c"><num>(c)</num><content><p>to vary the amount of the penalty;</p></content></level><level class="para1" eId="section-45-6-d"><num>(d)</num><content><p>to award costs.</p></content></level></subsection><subsection eId="section-45-7"><num>(7)</num><content><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within subsection (5) (a), (c), (e) or (f), domestic energy efficiency regulations may revoke or amend any subordinate legislation in so far as the subordinate legislation extends to England and Wales.</p></content></subsection><subsection eId="section-45-8"><num>(8)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-tenants-energy-efficiency-improvements-regulations"><heading><i>Tenants' energy efficiency improvements regulations</i></heading><section eId="section-46"><num>46</num><heading>Tenants' energy efficiency improvements regulations</heading><subsection eId="section-46-1"><num>(1)</num><content><p>The Secretary of State must make regulations for the purpose of securing that a landlord of a domestic PR property which is of such description of domestic PR property as is provided for by the regulations does not unreasonably refuse a request mentioned in subsection (2).</p></content></subsection><subsection eId="section-46-2"><num>(2)</num><content><p>The request is one by the tenant of the property to consent to the making of such relevant energy efficiency improvements as are identified in the request.</p></content></subsection><subsection eId="section-46-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “tenants' energy efficiency improvements regulations”.</p></content></subsection><subsection eId="section-46-4"><num>(4)</num><content><p>For the purposes of tenants' energy efficiency improvements regulations—</p><blockList class="unordered none" ukl:Name="UnorderedList" ukl:Decoration="none"><item><p>“landlord” and “tenant” have the meaning given by the regulations;</p></item><item><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p><blockList class="ordered alpha parens" ukl:Name="OrderedList" ukl:Type="alpha" ukl:Decoration="parens"><item><num>(a)</num><p>are of such description as the regulations provide, and</p></item><item><num>(b)</num><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part,</p></item><item><num>(ii)</num><p>provided free of charge pursuant to an obligation imposed by an order made under section 33BC or 33BD of the Gas Act 1986 or section 41A or 41B of the Electricity Act 1989,</p></item><item><num>(iii)</num><p>wholly financed pursuant to a combination of such a plan and such an obligation, or</p></item><item><num>(iv)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></item></blockList></item></blockList></content></subsection><subsection eId="section-46-5"><num>(5)</num><content><p>The first tenants' energy efficiency improvements regulations must come into force no later than 1 April 2016.</p></content></subsection></section><section eId="section-47"><num>47</num><heading>Further provision about tenants' energy efficiency improvements regulations</heading><subsection eId="section-47-1"><num>(1)</num><intro><p>Tenants' energy efficiency improvements regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-47-1-a"><num>(a)</num><content><p>the form, content and service of a request under the regulations;</p></content></level><level class="para1" eId="section-47-1-b"><num>(b)</num><content><p>the form, content and service of any response by the landlord to a request (including the period within which any response must be given);</p></content></level><level class="para1" eId="section-47-1-c"><num>(c)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-47-1-d"><num>(d)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-47-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-47-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-47-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of consenting to the request.</p></content></level></subsection><subsection eId="section-47-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(d) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-47-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-47-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-47-3-c"><num>(c)</num><content><p>that the improvements for which consent has been requested are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-48"><num>48</num><heading>Sanctions for the purposes of tenants' energy efficiency improvements regulations</heading><subsection eId="section-48-1"><num>(1)</num><content><p>Tenants' energy efficiency improvements regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-48-2"><num>(2)</num><content><p>Provision falling within subsection (1) includes, in particular, provision for a tenant to apply to a court or tribunal for a ruling that a landlord has not complied with a requirement imposed by or under the regulations.</p></content></subsection><subsection eId="section-48-3"><num>(3)</num><intro><p>Where the regulations make provision for a tenant to make an application such as is mentioned in subsection (2), the provision may, in particular, include provision—</p></intro><level class="para1" eId="section-48-3-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an application may be made;</p></content></level><level class="para1" eId="section-48-3-b"><num>(b)</num><content><p>as to the grounds on which an application may be made;</p></content></level><level class="para1" eId="section-48-3-c"><num>(c)</num><content><p>as to the procedure for making an application (including any fee which may be payable);</p></content></level><level class="para1" eId="section-48-3-d"><num>(d)</num><content><p>as to the powers of the court or tribunal to which an application is made (including as to costs which may be awarded);</p></content></level><level class="para1" eId="section-48-3-e"><num>(e)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-48-4"><num>(4)</num><content><p>Where the regulations make provision for a tenant to make an application such as is mentioned in subsection (2), the regulations must also include provision for a right of appeal by the tenant or landlord against any decision of a court or tribunal on an application.</p></content></subsection><subsection eId="section-48-5"><num>(5)</num><intro><p>Provision falling within subsection (4) includes, in particular, provision—</p></intro><level class="para1" eId="section-48-5-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-48-5-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-48-5-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-48-5-d"><num>(d)</num><content><p>suspending the effect of the decision being appealed against, pending determination of the appeal;</p></content></level><level class="para1" eId="section-48-5-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-48-5-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-48-6"><num>(6)</num><intro><p>The provision referred to in subsection (5)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-48-6-a"><num>(a)</num><content><p>to confirm the decision;</p></content></level><level class="para1" eId="section-48-6-b"><num>(b)</num><content><p>to quash the decision;</p></content></level><level class="para1" eId="section-48-6-c"><num>(c)</num><content><p>to make a different decision;</p></content></level><level class="para1" eId="section-48-6-d"><num>(d)</num><content><p>to remit the decision or any matter relating to the decision to the person who made it;</p></content></level><level class="para1" eId="section-48-6-e"><num>(e)</num><content><p>to award costs.</p></content></level></subsection><subsection eId="section-48-7"><num>(7)</num><intro><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within—</p></intro><level class="para1" eId="section-48-7-a"><num>(a)</num><content><p>subsection (3)(a), (c), (d) or (e), or</p></content></level><level class="para1" eId="section-48-7-b"><num>(b)</num><content><p>subsection (5)(a), (c), (e) or (f),</p></content></level><wrapUp><p>tenants' energy efficiency improvements regulations may revoke or amend any subordinate legislation in so far as the subordinate legislation extends to England and Wales.</p></wrapUp></subsection><subsection eId="section-48-8"><num>(8)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-nondomestic-energy-efficiency-regulations"><heading><i>Non-domestic energy efficiency regulations</i></heading><section eId="section-49"><num>49</num><heading>Non-domestic energy efficiency regulations</heading><subsection eId="section-49-1"><num>(1)</num><intro><p>The Secretary of State must make regulations for the purpose of securing that a landlord of a non-domestic PR property—</p></intro><level class="para1" eId="section-49-1-a"><num>(a)</num><content><p>which is of such description of non-domestic PR property as is provided for by the regulations,</p></content></level><level class="para1" eId="section-49-1-b"><num>(b)</num><content><p>in relation to which there is an energy performance certificate, and</p></content></level><level class="para1" eId="section-49-1-c"><num>(c)</num><content><p>which falls below such level of energy efficiency (as demonstrated by the energy performance certificate) as is provided for by the regulations,</p></content></level><wrapUp><p>may not let the property until the landlord has complied with the obligation mentioned in subsection (2).</p></wrapUp></subsection><subsection eId="section-49-2"><num>(2)</num><content><p>The obligation is to make to the property such relevant energy efficiency improvements as are provided for by the regulations.</p></content></subsection><subsection eId="section-49-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “<term refersTo="#term-non-domestic-energy-efficiency-regulations" eId="term-non-domestic-energy-efficiency-regulations">non-domestic energy efficiency regulations</term>”.</p></content></subsection><subsection eId="section-49-4"><num>(4)</num><intro><p>For the purposes of non-domestic energy efficiency regulations—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-performance-certificate" eId="term-energy-performance-certificate">energy performance certificate</term>” has the meaning given by the Energy Performance Regulations;</p></content></hcontainer><hcontainer name="definition"><content><p>“landlord” and “let the property” have the meaning given by the regulations (and “let the property” may be defined to include “continue to let the property”);</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p></intro><level class="para1"><num>(a)</num><content><p>are of such description as the regulations provide, and</p></content></level><level class="para1"><num>(b)</num><content><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part, or</p></item><item><num>(ii)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></content></level></hcontainer></subsection><subsection eId="section-49-5"><num>(5)</num><content><p>The Secretary of State may by order amend the definition of “energy performance certificate” in subsection (4).</p></content></subsection><subsection eId="section-49-6"><num>(6)</num><content><p>The first non-domestic energy efficiency regulations must come into force no later than 1 April 2018.</p></content></subsection></section><section eId="section-50"><num>50</num><heading>Further provision about non-domestic energy efficiency regulations</heading><subsection eId="section-50-1"><num>(1)</num><intro><p>Non-domestic energy efficiency regulations may in particular, include provision about—</p></intro><level class="para1" eId="section-50-1-a"><num>(a)</num><content><p>the period within which improvements required by the regulations must be started or completed;</p></content></level><level class="para1" eId="section-50-1-b"><num>(b)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-50-1-c"><num>(c)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-50-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(b) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-50-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-50-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of complying with a requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-50-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-50-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-50-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-50-3-c"><num>(c)</num><content><p>that the improvements required by or under the regulations are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-51"><num>51</num><heading>Sanctions for the purposes of non-domestic energy efficiency regulations</heading><subsection eId="section-51-1"><num>(1)</num><content><p>Non-domestic energy efficiency regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-51-2"><num>(2)</num><intro><p>Provision falling within subsection (1) includes, in particular, provision—</p></intro><level class="para1" eId="section-51-2-a"><num>(a)</num><content><p>for a local weights and measures authority to enforce any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-51-2-b"><num>(b)</num><content><p>about the sanctions for non-compliance with a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-51-2-c"><num>(c)</num><content><p>about the sanctions for the provision of false information in connection with such a requirement;</p></content></level><wrapUp><p>including, in cases falling within paragraph (b) or (c), the imposition of a civil penalty by a local weights and measures authority.</p></wrapUp></subsection><subsection eId="section-51-3"><num>(3)</num><content><p>Where non-domestic energy efficiency regulations make provision for a civil penalty, the regulations must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.</p></content></subsection><subsection eId="section-51-4"><num>(4)</num><intro><p>Provision falling within subsection (3) includes, in particular, provision—</p></intro><level class="para1" eId="section-51-4-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-51-4-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-51-4-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-51-4-d"><num>(d)</num><content><p>suspending the imposition of the penalty, pending determination of the appeal;</p></content></level><level class="para1" eId="section-51-4-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-51-4-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-51-5"><num>(5)</num><intro><p>The provision referred to in subsection (4)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-51-5-a"><num>(a)</num><content><p>to confirm the penalty;</p></content></level><level class="para1" eId="section-51-5-b"><num>(b)</num><content><p>to withdraw the penalty;</p></content></level><level class="para1" eId="section-51-5-c"><num>(c)</num><content><p>to vary the amount of the penalty;</p></content></level><level class="para1" eId="section-51-5-d"><num>(d)</num><content><p>to award costs.</p></content></level></subsection><subsection eId="section-51-6"><num>(6)</num><content><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within subsection (4)(a), (c), (e) or (f), non-domestic energy efficiency regulations may revoke or amend any subordinate legislation in so far as the subordinate legislation extends to England and Wales.</p></content></subsection><subsection eId="section-51-7"><num>(7)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-general"><heading><i>General</i></heading><section eId="section-52"><num>52</num><heading>Regulations and orders: Chapter 2</heading><subsection eId="section-52-1"><num>(1)</num><content><p>Regulations and orders under this Chapter may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-52-2"><num>(2)</num><content><p>Regulations and orders under this Chapter are to be made by statutory instrument.</p></content></subsection><subsection eId="section-52-3"><num>(3)</num><content><p>A statutory instrument containing an order under section 43(5) or 49(5) is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-52-4"><num>(4)</num><intro><p>A statutory instrument containing—</p></intro><level class="para1" eId="section-52-4-a"><num>(a)</num><content><p>an order under section 42(1)(a)(iii), or</p></content></level><level class="para1" eId="section-52-4-b"><num>(b)</num><content><p>regulations under this Chapter,</p></content></level><wrapUp><p>may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></wrapUp></subsection><subsection eId="section-52-5"><num>(5)</num><intro><p>The Secretary of State must obtain the consent of the Welsh Ministers before making provision under this Chapter amending or revoking—</p></intro><level class="para1" eId="section-52-5-a"><num>(a)</num><content><p>provision included in an instrument made under a Measure or Act of the National Assembly for Wales;</p></content></level><level class="para1" eId="section-52-5-b"><num>(b)</num><content><p>any other subordinate legislation made by the Welsh Ministers (or the National Assembly for Wales established under the Government of Wales Act 1998).</p></content></level></subsection><subsection eId="section-52-6"><num>(6)</num><content><p>Subsection (5) does not apply to the extent that the Secretary of State is making incidental or consequential provision.</p></content></subsection><subsection eId="section-52-7"><num>(7)</num><intro><p>The Secretary of State must consult the Welsh Ministers before making—</p></intro><level class="para1" eId="section-52-7-a"><num>(a)</num><content><p>domestic energy efficiency regulations, or</p></content></level><level class="para1" eId="section-52-7-b"><num>(b)</num><content><p>tenants' energy efficiency improvements regulations,</p></content></level><wrapUp><p>which apply in relation to domestic PR properties situated in Wales.</p></wrapUp></subsection><subsection eId="section-52-8"><num>(8)</num><content><p>Subsection (7) does not apply to the extent that consent has been obtained under subsection (5).</p></content></subsection></section><section eId="section-53"><num>53</num><heading>Crown application: Chapter 2</heading><content><p>This Chapter binds the Crown.</p></content></section></hcontainer></chapter> — Tenants' energy efficiency improvements regulations
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-2"><num>CHAPTER 2</num><heading>Private rented sector: England and Wales</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-introductory"><heading><i>Introductory</i></heading><section eId="section-42"><num>42</num><heading>Meaning of “domestic PR property” and “non-domestic PR property”: England and Wales</heading><subsection eId="section-42-1"><num>(1)</num><intro><p>For the purposes of this Chapter—</p></intro><level class="para1" eId="section-42-1-a"><num>(a)</num><intro><p>a property is a “domestic private rented property” if, subject to subsection (2), it is let—</p></intro><level class="para2" eId="section-42-1-a-i"><num>(i)</num><content><p>under a tenancy which is an assured tenancy for the purposes of the Housing Act 1988,</p></content></level><level class="para2" eId="section-42-1-a-ii"><num>(ii)</num><content><p>under a tenancy which is a regulated tenancy for the purposes of the Rent Act 1977, <noteRef href="#key-5bda5789f355ab8bfc771857883af72f" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>...</p></content></level><level class="para2" eId="section-42-1-a-iia"><num><ins class="first" ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2"><noteRef uk:name="commentary" href="#key-712528cdb686e5424cc37b7da37109d2" class="commentary"/>(iia)</ins></num><intro><p><ins ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">under a tenancy which is a standard contract (within the meaning given by section 8 of the Renting Homes (Wales) Act 2016 (anaw 1)) except where—</ins></p></intro><level class="para3" eId="section-42-1-a-iia-i"><num><ins ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">(i)</ins></num><content><p><ins ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">the standard contract is a supported standard contract (within the meaning given by section 143 of the Renting Homes (Wales) Act 2016), or</ins></p></content></level><level class="para3" eId="section-42-1-a-iia-ii"><num><ins ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">(ii)</ins></num><content><p><ins class="last" ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">the interest of the landlord belongs to His Majesty in right of the Crown or to a government department or is held in trust for Her Majesty for the purposes of a government department, or</ins></p></content></level></level><level class="para2" eId="section-42-1-a-iii"><num>(iii)</num><content><p>under a tenancy which is specified for the purposes of this subsection in an order made by the Secretary of State;</p></content></level></level><level class="para1" eId="section-42-1-b"><num>(b)</num><intro><p>a property is a “non-domestic private rented property” if it—</p></intro><level class="para2" eId="section-42-1-b-i"><num>(i)</num><content><p>is situated in England and Wales,</p></content></level><level class="para2" eId="section-42-1-b-ii"><num>(ii)</num><content><p>is let under a tenancy, and</p></content></level><level class="para2" eId="section-42-1-b-iii"><num>(iii)</num><content><p>is not a dwelling.</p></content></level></level></subsection><subsection eId="section-42-2"><num>(2)</num><intro><p>But a property is not a domestic private rented property if—</p></intro><level class="para1" eId="section-42-2-a"><num>(a)</num><content><p>it is low cost rental accommodation within the meaning of section 69 of the Housing and Regeneration Act 2008 and the landlord is a private registered provider of social housing,</p></content></level><level class="para1" eId="section-42-2-b"><num>(b)</num><content><p>it is low cost home ownership accommodation within the meaning of section 70 of that Act, <noteRef href="#key-7423073fec0132527809fa9e071da1e7" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>...</p></content></level><level class="para1" eId="section-42-2-c"><num>(c)</num><content><p>the landlord is a body registered as a social landlord under Chapter 1 of Part 1 of the Housing Act 1996 <ins class="substitution first last" ukl:ChangeId="key-44101252701c4756b8e847f5b0baa8a4-1671190181312" ukl:CommentaryRef="key-44101252701c4756b8e847f5b0baa8a4"><noteRef uk:name="commentary" href="#key-44101252701c4756b8e847f5b0baa8a4" class="commentary"/>, or</ins> </p></content></level><level class="para1" eId="section-42-2-d"><num><ins class="first" ukl:ChangeId="key-47b91ba2d378dc6c88b8045eb4d460ad-1671190201964" ukl:CommentaryRef="key-47b91ba2d378dc6c88b8045eb4d460ad"><noteRef uk:name="commentary" href="#key-47b91ba2d378dc6c88b8045eb4d460ad" class="commentary"/>(d)</ins></num><content><p><ins class="last" ukl:ChangeId="key-47b91ba2d378dc6c88b8045eb4d460ad-1671190201964" ukl:CommentaryRef="key-47b91ba2d378dc6c88b8045eb4d460ad">if the landlord is a community landlord (within the meaning of section 9 of the Renting Homes (Wales) Act 2016.</ins></p></content></level></subsection><subsection eId="section-42-3"><num>(3)</num><content><p>In subsection (1)(b) “<term refersTo="#term-dwelling" eId="term-dwelling">dwelling</term>” has the meaning given by the Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2007/991) (“<term refersTo="#term-the-energy-performance-regulations" eId="term-the-energy-performance-regulations">the Energy Performance Regulations</term>”).</p></content></subsection><subsection eId="section-42-4"><num>(4)</num><content><p>A domestic private rented property is referred to in this Chapter as a “domestic PR property”.</p></content></subsection><subsection eId="section-42-5"><num>(5)</num><content><p>A non-domestic private rented property is referred to in this Chapter as a “non-domestic PR property”.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-domestic-energy-efficiency-regulations"><heading><i>Domestic energy efficiency regulations</i></heading><section eId="section-43"><num>43</num><heading>Domestic energy efficiency regulations</heading><subsection eId="section-43-1"><num>(1)</num><intro><p>The Secretary of State must make regulations for the purpose of securing that a landlord of a domestic PR property—</p></intro><level class="para1" eId="section-43-1-a"><num>(a)</num><content><p>which is of such description of domestic PR property as is provided for by the regulations,</p></content></level><level class="para1" eId="section-43-1-b"><num>(b)</num><content><p>in relation to which there is an energy performance certificate, and</p></content></level><level class="para1" eId="section-43-1-c"><num>(c)</num><content><p>which falls below such level of energy efficiency (as demonstrated by the energy performance certificate) as is provided for by the regulations,</p></content></level><wrapUp><p>may not let the property until the landlord has complied with the obligation mentioned in subsection (2).</p></wrapUp></subsection><subsection eId="section-43-2"><num>(2)</num><content><p>The obligation is to make to the property such relevant energy efficiency improvements as are provided for by the regulations.</p></content></subsection><subsection eId="section-43-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “<term refersTo="#term-domestic-energy-efficiency-regulations" eId="term-domestic-energy-efficiency-regulations">domestic energy efficiency regulations</term>”.</p></content></subsection><subsection eId="section-43-4"><num>(4)</num><intro><p>For the purposes of domestic energy efficiency regulations—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-performance-certificate" eId="term-energy-performance-certificate">energy performance certificate</term>” has the meaning given by the Energy Performance Regulations;</p></content></hcontainer><hcontainer name="definition"><content><p>“landlord” and “let the property” have the meaning given by the regulations (and “let the property” may be defined to include “continue to let the property”);</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p></intro><level class="para1"><num>(a)</num><content><p>are of such description as the regulations provide, and</p></content></level><level class="para1"><num>(b)</num><content><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part,</p></item><item><num>(ii)</num><p>provided free of charge pursuant to an obligation imposed by an order made under section 33BC or 33BD of the Gas Act 1986 or section 41A or 41B of the Electricity Act 1989,</p></item><item><num>(iii)</num><p>wholly financed pursuant to a combination of such a plan and such an obligation, or</p></item><item><num>(iv)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></content></level></hcontainer></subsection><subsection eId="section-43-5"><num>(5)</num><content><p>The Secretary of State may by order amend the definition of “energy performance certificate” in subsection (4).</p></content></subsection><subsection eId="section-43-6"><num>(6)</num><content><p>The first domestic energy efficiency regulations must come into force no later than 1 April 2018.</p></content></subsection></section><section eId="section-44"><num>44</num><heading>Further provision about domestic energy efficiency regulations</heading><subsection eId="section-44-1"><num>(1)</num><intro><p>Domestic energy efficiency regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-44-1-a"><num>(a)</num><content><p>the period within which improvements required by the regulations must be started or completed;</p></content></level><level class="para1" eId="section-44-1-b"><num>(b)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-44-1-c"><num>(c)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-44-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(b) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-44-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-44-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of complying with a requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-44-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-44-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-44-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-44-3-c"><num>(c)</num><content><p>that the improvements required by or under the regulations are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-45"><num>45</num><heading>Sanctions for the purposes of domestic energy efficiency regulations</heading><subsection eId="section-45-1"><num>(1)</num><content><p>Domestic energy efficiency regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-45-2"><num>(2)</num><intro><p>Provision falling within subsection (1) includes, in particular, provision—</p></intro><level class="para1" eId="section-45-2-a"><num>(a)</num><content><p>for a local authority to enforce any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-45-2-b"><num>(b)</num><content><p>about the sanctions for non-compliance with a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-45-2-c"><num>(c)</num><content><p>about the sanctions for the provision of false information in connection with such a requirement;</p></content></level><wrapUp><p>including, in cases falling within paragraph (b) or (c), the imposition of a civil penalty by a local authority.</p></wrapUp></subsection><subsection eId="section-45-3"><num>(3)</num><content><p>The amount of any civil penalty provided for by domestic energy efficiency regulations must not exceed £5,000.</p></content></subsection><subsection eId="section-45-4"><num>(4)</num><content><p>Where domestic energy efficiency regulations make provision for the imposition of a civil penalty, the regulations must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.</p></content></subsection><subsection eId="section-45-5"><num>(5)</num><intro><p>Provision falling within subsection (4) includes, in particular, provision—</p></intro><level class="para1" eId="section-45-5-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-45-5-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-45-5-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-45-5-d"><num>(d)</num><content><p>suspending the imposition of the penalty, pending determination of the appeal;</p></content></level><level class="para1" eId="section-45-5-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-45-5-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-45-6"><num>(6)</num><intro><p>The provision referred to in subsection (5)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-45-6-a"><num>(a)</num><content><p>to confirm the penalty;</p></content></level><level class="para1" eId="section-45-6-b"><num>(b)</num><content><p>to withdraw the penalty;</p></content></level><level class="para1" eId="section-45-6-c"><num>(c)</num><content><p>to vary the amount of the penalty;</p></content></level><level class="para1" eId="section-45-6-d"><num>(d)</num><content><p>to award costs.</p></content></level></subsection><subsection eId="section-45-7"><num>(7)</num><content><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within subsection (5) (a), (c), (e) or (f), domestic energy efficiency regulations may revoke or amend any subordinate legislation in so far as the subordinate legislation extends to England and Wales.</p></content></subsection><subsection eId="section-45-8"><num>(8)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-tenants-energy-efficiency-improvements-regulations"><heading><i>Tenants' energy efficiency improvements regulations</i></heading><section eId="section-46"><num>46</num><heading>Tenants' energy efficiency improvements regulations</heading><subsection eId="section-46-1"><num>(1)</num><content><p>The Secretary of State must make regulations for the purpose of securing that a landlord of a domestic PR property which is of such description of domestic PR property as is provided for by the regulations does not unreasonably refuse a request mentioned in subsection (2).</p></content></subsection><subsection eId="section-46-2"><num>(2)</num><content><p>The request is one by the tenant of the property to consent to the making of such relevant energy efficiency improvements as are identified in the request.</p></content></subsection><subsection eId="section-46-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “tenants' energy efficiency improvements regulations”.</p></content></subsection><subsection eId="section-46-4"><num>(4)</num><content><p>For the purposes of tenants' energy efficiency improvements regulations—</p><blockList class="unordered none" ukl:Name="UnorderedList" ukl:Decoration="none"><item><p>“landlord” and “tenant” have the meaning given by the regulations;</p></item><item><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p><blockList class="ordered alpha parens" ukl:Name="OrderedList" ukl:Type="alpha" ukl:Decoration="parens"><item><num>(a)</num><p>are of such description as the regulations provide, and</p></item><item><num>(b)</num><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part,</p></item><item><num>(ii)</num><p>provided free of charge pursuant to an obligation imposed by an order made under section 33BC or 33BD of the Gas Act 1986 or section 41A or 41B of the Electricity Act 1989,</p></item><item><num>(iii)</num><p>wholly financed pursuant to a combination of such a plan and such an obligation, or</p></item><item><num>(iv)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></item></blockList></item></blockList></content></subsection><subsection eId="section-46-5"><num>(5)</num><content><p>The first tenants' energy efficiency improvements regulations must come into force no later than 1 April 2016.</p></content></subsection></section><section eId="section-47"><num>47</num><heading>Further provision about tenants' energy efficiency improvements regulations</heading><subsection eId="section-47-1"><num>(1)</num><intro><p>Tenants' energy efficiency improvements regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-47-1-a"><num>(a)</num><content><p>the form, content and service of a request under the regulations;</p></content></level><level class="para1" eId="section-47-1-b"><num>(b)</num><content><p>the form, content and service of any response by the landlord to a request (including the period within which any response must be given);</p></content></level><level class="para1" eId="section-47-1-c"><num>(c)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-47-1-d"><num>(d)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-47-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-47-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-47-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of consenting to the request.</p></content></level></subsection><subsection eId="section-47-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(d) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-47-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-47-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-47-3-c"><num>(c)</num><content><p>that the improvements for which consent has been requested are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-48"><num>48</num><heading>Sanctions for the purposes of tenants' energy efficiency improvements regulations</heading><subsection eId="section-48-1"><num>(1)</num><content><p>Tenants' energy efficiency improvements regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-48-2"><num>(2)</num><content><p>Provision falling within subsection (1) includes, in particular, provision for a tenant to apply to a court or tribunal for a ruling that a landlord has not complied with a requirement imposed by or under the regulations.</p></content></subsection><subsection eId="section-48-3"><num>(3)</num><intro><p>Where the regulations make provision for a tenant to make an application such as is mentioned in subsection (2), the provision may, in particular, include provision—</p></intro><level class="para1" eId="section-48-3-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an application may be made;</p></content></level><level class="para1" eId="section-48-3-b"><num>(b)</num><content><p>as to the grounds on which an application may be made;</p></content></level><level class="para1" eId="section-48-3-c"><num>(c)</num><content><p>as to the procedure for making an application (including any fee which may be payable);</p></content></level><level class="para1" eId="section-48-3-d"><num>(d)</num><content><p>as to the powers of the court or tribunal to which an application is made (including as to costs which may be awarded);</p></content></level><level class="para1" eId="section-48-3-e"><num>(e)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-48-4"><num>(4)</num><content><p>Where the regulations make provision for a tenant to make an application such as is mentioned in subsection (2), the regulations must also include provision for a right of appeal by the tenant or landlord against any decision of a court or tribunal on an application.</p></content></subsection><subsection eId="section-48-5"><num>(5)</num><intro><p>Provision falling within subsection (4) includes, in particular, provision—</p></intro><level class="para1" eId="section-48-5-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-48-5-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-48-5-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-48-5-d"><num>(d)</num><content><p>suspending the effect of the decision being appealed against, pending determination of the appeal;</p></content></level><level class="para1" eId="section-48-5-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-48-5-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-48-6"><num>(6)</num><intro><p>The provision referred to in subsection (5)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-48-6-a"><num>(a)</num><content><p>to confirm the decision;</p></content></level><level class="para1" eId="section-48-6-b"><num>(b)</num><content><p>to quash the decision;</p></content></level><level class="para1" eId="section-48-6-c"><num>(c)</num><content><p>to make a different decision;</p></content></level><level class="para1" eId="section-48-6-d"><num>(d)</num><content><p>to remit the decision or any matter relating to the decision to the person who made it;</p></content></level><level class="para1" eId="section-48-6-e"><num>(e)</num><content><p>to award costs.</p></content></level></subsection><subsection eId="section-48-7"><num>(7)</num><intro><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within—</p></intro><level class="para1" eId="section-48-7-a"><num>(a)</num><content><p>subsection (3)(a), (c), (d) or (e), or</p></content></level><level class="para1" eId="section-48-7-b"><num>(b)</num><content><p>subsection (5)(a), (c), (e) or (f),</p></content></level><wrapUp><p>tenants' energy efficiency improvements regulations may revoke or amend any subordinate legislation in so far as the subordinate legislation extends to England and Wales.</p></wrapUp></subsection><subsection eId="section-48-8"><num>(8)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-nondomestic-energy-efficiency-regulations"><heading><i>Non-domestic energy efficiency regulations</i></heading><section eId="section-49"><num>49</num><heading>Non-domestic energy efficiency regulations</heading><subsection eId="section-49-1"><num>(1)</num><intro><p>The Secretary of State must make regulations for the purpose of securing that a landlord of a non-domestic PR property—</p></intro><level class="para1" eId="section-49-1-a"><num>(a)</num><content><p>which is of such description of non-domestic PR property as is provided for by the regulations,</p></content></level><level class="para1" eId="section-49-1-b"><num>(b)</num><content><p>in relation to which there is an energy performance certificate, and</p></content></level><level class="para1" eId="section-49-1-c"><num>(c)</num><content><p>which falls below such level of energy efficiency (as demonstrated by the energy performance certificate) as is provided for by the regulations,</p></content></level><wrapUp><p>may not let the property until the landlord has complied with the obligation mentioned in subsection (2).</p></wrapUp></subsection><subsection eId="section-49-2"><num>(2)</num><content><p>The obligation is to make to the property such relevant energy efficiency improvements as are provided for by the regulations.</p></content></subsection><subsection eId="section-49-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “<term refersTo="#term-non-domestic-energy-efficiency-regulations" eId="term-non-domestic-energy-efficiency-regulations">non-domestic energy efficiency regulations</term>”.</p></content></subsection><subsection eId="section-49-4"><num>(4)</num><intro><p>For the purposes of non-domestic energy efficiency regulations—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-performance-certificate" eId="term-energy-performance-certificate">energy performance certificate</term>” has the meaning given by the Energy Performance Regulations;</p></content></hcontainer><hcontainer name="definition"><content><p>“landlord” and “let the property” have the meaning given by the regulations (and “let the property” may be defined to include “continue to let the property”);</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p></intro><level class="para1"><num>(a)</num><content><p>are of such description as the regulations provide, and</p></content></level><level class="para1"><num>(b)</num><content><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part, or</p></item><item><num>(ii)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></content></level></hcontainer></subsection><subsection eId="section-49-5"><num>(5)</num><content><p>The Secretary of State may by order amend the definition of “energy performance certificate” in subsection (4).</p></content></subsection><subsection eId="section-49-6"><num>(6)</num><content><p>The first non-domestic energy efficiency regulations must come into force no later than 1 April 2018.</p></content></subsection></section><section eId="section-50"><num>50</num><heading>Further provision about non-domestic energy efficiency regulations</heading><subsection eId="section-50-1"><num>(1)</num><intro><p>Non-domestic energy efficiency regulations may in particular, include provision about—</p></intro><level class="para1" eId="section-50-1-a"><num>(a)</num><content><p>the period within which improvements required by the regulations must be started or completed;</p></content></level><level class="para1" eId="section-50-1-b"><num>(b)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-50-1-c"><num>(c)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-50-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(b) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-50-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-50-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of complying with a requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-50-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-50-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-50-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-50-3-c"><num>(c)</num><content><p>that the improvements required by or under the regulations are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-51"><num>51</num><heading>Sanctions for the purposes of non-domestic energy efficiency regulations</heading><subsection eId="section-51-1"><num>(1)</num><content><p>Non-domestic energy efficiency regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-51-2"><num>(2)</num><intro><p>Provision falling within subsection (1) includes, in particular, provision—</p></intro><level class="para1" eId="section-51-2-a"><num>(a)</num><content><p>for a local weights and measures authority to enforce any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-51-2-b"><num>(b)</num><content><p>about the sanctions for non-compliance with a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-51-2-c"><num>(c)</num><content><p>about the sanctions for the provision of false information in connection with such a requirement;</p></content></level><wrapUp><p>including, in cases falling within paragraph (b) or (c), the imposition of a civil penalty by a local weights and measures authority.</p></wrapUp></subsection><subsection eId="section-51-3"><num>(3)</num><content><p>Where non-domestic energy efficiency regulations make provision for a civil penalty, the regulations must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.</p></content></subsection><subsection eId="section-51-4"><num>(4)</num><intro><p>Provision falling within subsection (3) includes, in particular, provision—</p></intro><level class="para1" eId="section-51-4-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-51-4-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-51-4-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-51-4-d"><num>(d)</num><content><p>suspending the imposition of the penalty, pending determination of the appeal;</p></content></level><level class="para1" eId="section-51-4-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-51-4-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-51-5"><num>(5)</num><intro><p>The provision referred to in subsection (4)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-51-5-a"><num>(a)</num><content><p>to confirm the penalty;</p></content></level><level class="para1" eId="section-51-5-b"><num>(b)</num><content><p>to withdraw the penalty;</p></content></level><level class="para1" eId="section-51-5-c"><num>(c)</num><content><p>to vary the amount of the penalty;</p></content></level><level class="para1" eId="section-51-5-d"><num>(d)</num><content><p>to award costs.</p></content></level></subsection><subsection eId="section-51-6"><num>(6)</num><content><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within subsection (4)(a), (c), (e) or (f), non-domestic energy efficiency regulations may revoke or amend any subordinate legislation in so far as the subordinate legislation extends to England and Wales.</p></content></subsection><subsection eId="section-51-7"><num>(7)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-general"><heading><i>General</i></heading><section eId="section-52"><num>52</num><heading>Regulations and orders: Chapter 2</heading><subsection eId="section-52-1"><num>(1)</num><content><p>Regulations and orders under this Chapter may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-52-2"><num>(2)</num><content><p>Regulations and orders under this Chapter are to be made by statutory instrument.</p></content></subsection><subsection eId="section-52-3"><num>(3)</num><content><p>A statutory instrument containing an order under section 43(5) or 49(5) is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-52-4"><num>(4)</num><intro><p>A statutory instrument containing—</p></intro><level class="para1" eId="section-52-4-a"><num>(a)</num><content><p>an order under section 42(1)(a)(iii), or</p></content></level><level class="para1" eId="section-52-4-b"><num>(b)</num><content><p>regulations under this Chapter,</p></content></level><wrapUp><p>may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></wrapUp></subsection><subsection eId="section-52-5"><num>(5)</num><intro><p>The Secretary of State must obtain the consent of the Welsh Ministers before making provision under this Chapter amending or revoking—</p></intro><level class="para1" eId="section-52-5-a"><num>(a)</num><content><p>provision included in an instrument made under a Measure or Act of the National Assembly for Wales;</p></content></level><level class="para1" eId="section-52-5-b"><num>(b)</num><content><p>any other subordinate legislation made by the Welsh Ministers (or the National Assembly for Wales established under the Government of Wales Act 1998).</p></content></level></subsection><subsection eId="section-52-6"><num>(6)</num><content><p>Subsection (5) does not apply to the extent that the Secretary of State is making incidental or consequential provision.</p></content></subsection><subsection eId="section-52-7"><num>(7)</num><intro><p>The Secretary of State must consult the Welsh Ministers before making—</p></intro><level class="para1" eId="section-52-7-a"><num>(a)</num><content><p>domestic energy efficiency regulations, or</p></content></level><level class="para1" eId="section-52-7-b"><num>(b)</num><content><p>tenants' energy efficiency improvements regulations,</p></content></level><wrapUp><p>which apply in relation to domestic PR properties situated in Wales.</p></wrapUp></subsection><subsection eId="section-52-8"><num>(8)</num><content><p>Subsection (7) does not apply to the extent that consent has been obtained under subsection (5).</p></content></subsection></section><section eId="section-53"><num>53</num><heading>Crown application: Chapter 2</heading><content><p>This Chapter binds the Crown.</p></content></section></hcontainer></chapter> — Non-domestic energy efficiency regulations
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-2"><num>CHAPTER 2</num><heading>Private rented sector: England and Wales</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-introductory"><heading><i>Introductory</i></heading><section eId="section-42"><num>42</num><heading>Meaning of “domestic PR property” and “non-domestic PR property”: England and Wales</heading><subsection eId="section-42-1"><num>(1)</num><intro><p>For the purposes of this Chapter—</p></intro><level class="para1" eId="section-42-1-a"><num>(a)</num><intro><p>a property is a “domestic private rented property” if, subject to subsection (2), it is let—</p></intro><level class="para2" eId="section-42-1-a-i"><num>(i)</num><content><p>under a tenancy which is an assured tenancy for the purposes of the Housing Act 1988,</p></content></level><level class="para2" eId="section-42-1-a-ii"><num>(ii)</num><content><p>under a tenancy which is a regulated tenancy for the purposes of the Rent Act 1977, <noteRef href="#key-5bda5789f355ab8bfc771857883af72f" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>...</p></content></level><level class="para2" eId="section-42-1-a-iia"><num><ins class="first" ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2"><noteRef uk:name="commentary" href="#key-712528cdb686e5424cc37b7da37109d2" class="commentary"/>(iia)</ins></num><intro><p><ins ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">under a tenancy which is a standard contract (within the meaning given by section 8 of the Renting Homes (Wales) Act 2016 (anaw 1)) except where—</ins></p></intro><level class="para3" eId="section-42-1-a-iia-i"><num><ins ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">(i)</ins></num><content><p><ins ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">the standard contract is a supported standard contract (within the meaning given by section 143 of the Renting Homes (Wales) Act 2016), or</ins></p></content></level><level class="para3" eId="section-42-1-a-iia-ii"><num><ins ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">(ii)</ins></num><content><p><ins class="last" ukl:ChangeId="key-712528cdb686e5424cc37b7da37109d2-1671190112886" ukl:CommentaryRef="key-712528cdb686e5424cc37b7da37109d2">the interest of the landlord belongs to His Majesty in right of the Crown or to a government department or is held in trust for Her Majesty for the purposes of a government department, or</ins></p></content></level></level><level class="para2" eId="section-42-1-a-iii"><num>(iii)</num><content><p>under a tenancy which is specified for the purposes of this subsection in an order made by the Secretary of State;</p></content></level></level><level class="para1" eId="section-42-1-b"><num>(b)</num><intro><p>a property is a “non-domestic private rented property” if it—</p></intro><level class="para2" eId="section-42-1-b-i"><num>(i)</num><content><p>is situated in England and Wales,</p></content></level><level class="para2" eId="section-42-1-b-ii"><num>(ii)</num><content><p>is let under a tenancy, and</p></content></level><level class="para2" eId="section-42-1-b-iii"><num>(iii)</num><content><p>is not a dwelling.</p></content></level></level></subsection><subsection eId="section-42-2"><num>(2)</num><intro><p>But a property is not a domestic private rented property if—</p></intro><level class="para1" eId="section-42-2-a"><num>(a)</num><content><p>it is low cost rental accommodation within the meaning of section 69 of the Housing and Regeneration Act 2008 and the landlord is a private registered provider of social housing,</p></content></level><level class="para1" eId="section-42-2-b"><num>(b)</num><content><p>it is low cost home ownership accommodation within the meaning of section 70 of that Act, <noteRef href="#key-7423073fec0132527809fa9e071da1e7" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>...</p></content></level><level class="para1" eId="section-42-2-c"><num>(c)</num><content><p>the landlord is a body registered as a social landlord under Chapter 1 of Part 1 of the Housing Act 1996 <ins class="substitution first last" ukl:ChangeId="key-44101252701c4756b8e847f5b0baa8a4-1671190181312" ukl:CommentaryRef="key-44101252701c4756b8e847f5b0baa8a4"><noteRef uk:name="commentary" href="#key-44101252701c4756b8e847f5b0baa8a4" class="commentary"/>, or</ins> </p></content></level><level class="para1" eId="section-42-2-d"><num><ins class="first" ukl:ChangeId="key-47b91ba2d378dc6c88b8045eb4d460ad-1671190201964" ukl:CommentaryRef="key-47b91ba2d378dc6c88b8045eb4d460ad"><noteRef uk:name="commentary" href="#key-47b91ba2d378dc6c88b8045eb4d460ad" class="commentary"/>(d)</ins></num><content><p><ins class="last" ukl:ChangeId="key-47b91ba2d378dc6c88b8045eb4d460ad-1671190201964" ukl:CommentaryRef="key-47b91ba2d378dc6c88b8045eb4d460ad">if the landlord is a community landlord (within the meaning of section 9 of the Renting Homes (Wales) Act 2016.</ins></p></content></level></subsection><subsection eId="section-42-3"><num>(3)</num><content><p>In subsection (1)(b) “<term refersTo="#term-dwelling" eId="term-dwelling">dwelling</term>” has the meaning given by the Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2007/991) (“<term refersTo="#term-the-energy-performance-regulations" eId="term-the-energy-performance-regulations">the Energy Performance Regulations</term>”).</p></content></subsection><subsection eId="section-42-4"><num>(4)</num><content><p>A domestic private rented property is referred to in this Chapter as a “domestic PR property”.</p></content></subsection><subsection eId="section-42-5"><num>(5)</num><content><p>A non-domestic private rented property is referred to in this Chapter as a “non-domestic PR property”.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-domestic-energy-efficiency-regulations"><heading><i>Domestic energy efficiency regulations</i></heading><section eId="section-43"><num>43</num><heading>Domestic energy efficiency regulations</heading><subsection eId="section-43-1"><num>(1)</num><intro><p>The Secretary of State must make regulations for the purpose of securing that a landlord of a domestic PR property—</p></intro><level class="para1" eId="section-43-1-a"><num>(a)</num><content><p>which is of such description of domestic PR property as is provided for by the regulations,</p></content></level><level class="para1" eId="section-43-1-b"><num>(b)</num><content><p>in relation to which there is an energy performance certificate, and</p></content></level><level class="para1" eId="section-43-1-c"><num>(c)</num><content><p>which falls below such level of energy efficiency (as demonstrated by the energy performance certificate) as is provided for by the regulations,</p></content></level><wrapUp><p>may not let the property until the landlord has complied with the obligation mentioned in subsection (2).</p></wrapUp></subsection><subsection eId="section-43-2"><num>(2)</num><content><p>The obligation is to make to the property such relevant energy efficiency improvements as are provided for by the regulations.</p></content></subsection><subsection eId="section-43-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “<term refersTo="#term-domestic-energy-efficiency-regulations" eId="term-domestic-energy-efficiency-regulations">domestic energy efficiency regulations</term>”.</p></content></subsection><subsection eId="section-43-4"><num>(4)</num><intro><p>For the purposes of domestic energy efficiency regulations—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-performance-certificate" eId="term-energy-performance-certificate">energy performance certificate</term>” has the meaning given by the Energy Performance Regulations;</p></content></hcontainer><hcontainer name="definition"><content><p>“landlord” and “let the property” have the meaning given by the regulations (and “let the property” may be defined to include “continue to let the property”);</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p></intro><level class="para1"><num>(a)</num><content><p>are of such description as the regulations provide, and</p></content></level><level class="para1"><num>(b)</num><content><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part,</p></item><item><num>(ii)</num><p>provided free of charge pursuant to an obligation imposed by an order made under section 33BC or 33BD of the Gas Act 1986 or section 41A or 41B of the Electricity Act 1989,</p></item><item><num>(iii)</num><p>wholly financed pursuant to a combination of such a plan and such an obligation, or</p></item><item><num>(iv)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></content></level></hcontainer></subsection><subsection eId="section-43-5"><num>(5)</num><content><p>The Secretary of State may by order amend the definition of “energy performance certificate” in subsection (4).</p></content></subsection><subsection eId="section-43-6"><num>(6)</num><content><p>The first domestic energy efficiency regulations must come into force no later than 1 April 2018.</p></content></subsection></section><section eId="section-44"><num>44</num><heading>Further provision about domestic energy efficiency regulations</heading><subsection eId="section-44-1"><num>(1)</num><intro><p>Domestic energy efficiency regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-44-1-a"><num>(a)</num><content><p>the period within which improvements required by the regulations must be started or completed;</p></content></level><level class="para1" eId="section-44-1-b"><num>(b)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-44-1-c"><num>(c)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-44-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(b) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-44-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-44-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of complying with a requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-44-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-44-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-44-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-44-3-c"><num>(c)</num><content><p>that the improvements required by or under the regulations are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-45"><num>45</num><heading>Sanctions for the purposes of domestic energy efficiency regulations</heading><subsection eId="section-45-1"><num>(1)</num><content><p>Domestic energy efficiency regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-45-2"><num>(2)</num><intro><p>Provision falling within subsection (1) includes, in particular, provision—</p></intro><level class="para1" eId="section-45-2-a"><num>(a)</num><content><p>for a local authority to enforce any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-45-2-b"><num>(b)</num><content><p>about the sanctions for non-compliance with a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-45-2-c"><num>(c)</num><content><p>about the sanctions for the provision of false information in connection with such a requirement;</p></content></level><wrapUp><p>including, in cases falling within paragraph (b) or (c), the imposition of a civil penalty by a local authority.</p></wrapUp></subsection><subsection eId="section-45-3"><num>(3)</num><content><p>The amount of any civil penalty provided for by domestic energy efficiency regulations must not exceed £5,000.</p></content></subsection><subsection eId="section-45-4"><num>(4)</num><content><p>Where domestic energy efficiency regulations make provision for the imposition of a civil penalty, the regulations must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.</p></content></subsection><subsection eId="section-45-5"><num>(5)</num><intro><p>Provision falling within subsection (4) includes, in particular, provision—</p></intro><level class="para1" eId="section-45-5-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-45-5-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-45-5-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-45-5-d"><num>(d)</num><content><p>suspending the imposition of the penalty, pending determination of the appeal;</p></content></level><level class="para1" eId="section-45-5-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-45-5-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-45-6"><num>(6)</num><intro><p>The provision referred to in subsection (5)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-45-6-a"><num>(a)</num><content><p>to confirm the penalty;</p></content></level><level class="para1" eId="section-45-6-b"><num>(b)</num><content><p>to withdraw the penalty;</p></content></level><level class="para1" eId="section-45-6-c"><num>(c)</num><content><p>to vary the amount of the penalty;</p></content></level><level class="para1" eId="section-45-6-d"><num>(d)</num><content><p>to award costs.</p></content></level></subsection><subsection eId="section-45-7"><num>(7)</num><content><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within subsection (5) (a), (c), (e) or (f), domestic energy efficiency regulations may revoke or amend any subordinate legislation in so far as the subordinate legislation extends to England and Wales.</p></content></subsection><subsection eId="section-45-8"><num>(8)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-tenants-energy-efficiency-improvements-regulations"><heading><i>Tenants' energy efficiency improvements regulations</i></heading><section eId="section-46"><num>46</num><heading>Tenants' energy efficiency improvements regulations</heading><subsection eId="section-46-1"><num>(1)</num><content><p>The Secretary of State must make regulations for the purpose of securing that a landlord of a domestic PR property which is of such description of domestic PR property as is provided for by the regulations does not unreasonably refuse a request mentioned in subsection (2).</p></content></subsection><subsection eId="section-46-2"><num>(2)</num><content><p>The request is one by the tenant of the property to consent to the making of such relevant energy efficiency improvements as are identified in the request.</p></content></subsection><subsection eId="section-46-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “tenants' energy efficiency improvements regulations”.</p></content></subsection><subsection eId="section-46-4"><num>(4)</num><content><p>For the purposes of tenants' energy efficiency improvements regulations—</p><blockList class="unordered none" ukl:Name="UnorderedList" ukl:Decoration="none"><item><p>“landlord” and “tenant” have the meaning given by the regulations;</p></item><item><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p><blockList class="ordered alpha parens" ukl:Name="OrderedList" ukl:Type="alpha" ukl:Decoration="parens"><item><num>(a)</num><p>are of such description as the regulations provide, and</p></item><item><num>(b)</num><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part,</p></item><item><num>(ii)</num><p>provided free of charge pursuant to an obligation imposed by an order made under section 33BC or 33BD of the Gas Act 1986 or section 41A or 41B of the Electricity Act 1989,</p></item><item><num>(iii)</num><p>wholly financed pursuant to a combination of such a plan and such an obligation, or</p></item><item><num>(iv)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></item></blockList></item></blockList></content></subsection><subsection eId="section-46-5"><num>(5)</num><content><p>The first tenants' energy efficiency improvements regulations must come into force no later than 1 April 2016.</p></content></subsection></section><section eId="section-47"><num>47</num><heading>Further provision about tenants' energy efficiency improvements regulations</heading><subsection eId="section-47-1"><num>(1)</num><intro><p>Tenants' energy efficiency improvements regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-47-1-a"><num>(a)</num><content><p>the form, content and service of a request under the regulations;</p></content></level><level class="para1" eId="section-47-1-b"><num>(b)</num><content><p>the form, content and service of any response by the landlord to a request (including the period within which any response must be given);</p></content></level><level class="para1" eId="section-47-1-c"><num>(c)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-47-1-d"><num>(d)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-47-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-47-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-47-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of consenting to the request.</p></content></level></subsection><subsection eId="section-47-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(d) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-47-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-47-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-47-3-c"><num>(c)</num><content><p>that the improvements for which consent has been requested are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-48"><num>48</num><heading>Sanctions for the purposes of tenants' energy efficiency improvements regulations</heading><subsection eId="section-48-1"><num>(1)</num><content><p>Tenants' energy efficiency improvements regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-48-2"><num>(2)</num><content><p>Provision falling within subsection (1) includes, in particular, provision for a tenant to apply to a court or tribunal for a ruling that a landlord has not complied with a requirement imposed by or under the regulations.</p></content></subsection><subsection eId="section-48-3"><num>(3)</num><intro><p>Where the regulations make provision for a tenant to make an application such as is mentioned in subsection (2), the provision may, in particular, include provision—</p></intro><level class="para1" eId="section-48-3-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an application may be made;</p></content></level><level class="para1" eId="section-48-3-b"><num>(b)</num><content><p>as to the grounds on which an application may be made;</p></content></level><level class="para1" eId="section-48-3-c"><num>(c)</num><content><p>as to the procedure for making an application (including any fee which may be payable);</p></content></level><level class="para1" eId="section-48-3-d"><num>(d)</num><content><p>as to the powers of the court or tribunal to which an application is made (including as to costs which may be awarded);</p></content></level><level class="para1" eId="section-48-3-e"><num>(e)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-48-4"><num>(4)</num><content><p>Where the regulations make provision for a tenant to make an application such as is mentioned in subsection (2), the regulations must also include provision for a right of appeal by the tenant or landlord against any decision of a court or tribunal on an application.</p></content></subsection><subsection eId="section-48-5"><num>(5)</num><intro><p>Provision falling within subsection (4) includes, in particular, provision—</p></intro><level class="para1" eId="section-48-5-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-48-5-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-48-5-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-48-5-d"><num>(d)</num><content><p>suspending the effect of the decision being appealed against, pending determination of the appeal;</p></content></level><level class="para1" eId="section-48-5-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-48-5-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-48-6"><num>(6)</num><intro><p>The provision referred to in subsection (5)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-48-6-a"><num>(a)</num><content><p>to confirm the decision;</p></content></level><level class="para1" eId="section-48-6-b"><num>(b)</num><content><p>to quash the decision;</p></content></level><level class="para1" eId="section-48-6-c"><num>(c)</num><content><p>to make a different decision;</p></content></level><level class="para1" eId="section-48-6-d"><num>(d)</num><content><p>to remit the decision or any matter relating to the decision to the person who made it;</p></content></level><level class="para1" eId="section-48-6-e"><num>(e)</num><content><p>to award costs.</p></content></level></subsection><subsection eId="section-48-7"><num>(7)</num><intro><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within—</p></intro><level class="para1" eId="section-48-7-a"><num>(a)</num><content><p>subsection (3)(a), (c), (d) or (e), or</p></content></level><level class="para1" eId="section-48-7-b"><num>(b)</num><content><p>subsection (5)(a), (c), (e) or (f),</p></content></level><wrapUp><p>tenants' energy efficiency improvements regulations may revoke or amend any subordinate legislation in so far as the subordinate legislation extends to England and Wales.</p></wrapUp></subsection><subsection eId="section-48-8"><num>(8)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-nondomestic-energy-efficiency-regulations"><heading><i>Non-domestic energy efficiency regulations</i></heading><section eId="section-49"><num>49</num><heading>Non-domestic energy efficiency regulations</heading><subsection eId="section-49-1"><num>(1)</num><intro><p>The Secretary of State must make regulations for the purpose of securing that a landlord of a non-domestic PR property—</p></intro><level class="para1" eId="section-49-1-a"><num>(a)</num><content><p>which is of such description of non-domestic PR property as is provided for by the regulations,</p></content></level><level class="para1" eId="section-49-1-b"><num>(b)</num><content><p>in relation to which there is an energy performance certificate, and</p></content></level><level class="para1" eId="section-49-1-c"><num>(c)</num><content><p>which falls below such level of energy efficiency (as demonstrated by the energy performance certificate) as is provided for by the regulations,</p></content></level><wrapUp><p>may not let the property until the landlord has complied with the obligation mentioned in subsection (2).</p></wrapUp></subsection><subsection eId="section-49-2"><num>(2)</num><content><p>The obligation is to make to the property such relevant energy efficiency improvements as are provided for by the regulations.</p></content></subsection><subsection eId="section-49-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “<term refersTo="#term-non-domestic-energy-efficiency-regulations" eId="term-non-domestic-energy-efficiency-regulations">non-domestic energy efficiency regulations</term>”.</p></content></subsection><subsection eId="section-49-4"><num>(4)</num><intro><p>For the purposes of non-domestic energy efficiency regulations—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-performance-certificate" eId="term-energy-performance-certificate">energy performance certificate</term>” has the meaning given by the Energy Performance Regulations;</p></content></hcontainer><hcontainer name="definition"><content><p>“landlord” and “let the property” have the meaning given by the regulations (and “let the property” may be defined to include “continue to let the property”);</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p></intro><level class="para1"><num>(a)</num><content><p>are of such description as the regulations provide, and</p></content></level><level class="para1"><num>(b)</num><content><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part, or</p></item><item><num>(ii)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></content></level></hcontainer></subsection><subsection eId="section-49-5"><num>(5)</num><content><p>The Secretary of State may by order amend the definition of “energy performance certificate” in subsection (4).</p></content></subsection><subsection eId="section-49-6"><num>(6)</num><content><p>The first non-domestic energy efficiency regulations must come into force no later than 1 April 2018.</p></content></subsection></section><section eId="section-50"><num>50</num><heading>Further provision about non-domestic energy efficiency regulations</heading><subsection eId="section-50-1"><num>(1)</num><intro><p>Non-domestic energy efficiency regulations may in particular, include provision about—</p></intro><level class="para1" eId="section-50-1-a"><num>(a)</num><content><p>the period within which improvements required by the regulations must be started or completed;</p></content></level><level class="para1" eId="section-50-1-b"><num>(b)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-50-1-c"><num>(c)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-50-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(b) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-50-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-50-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of complying with a requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-50-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-50-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-50-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-50-3-c"><num>(c)</num><content><p>that the improvements required by or under the regulations are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-51"><num>51</num><heading>Sanctions for the purposes of non-domestic energy efficiency regulations</heading><subsection eId="section-51-1"><num>(1)</num><content><p>Non-domestic energy efficiency regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-51-2"><num>(2)</num><intro><p>Provision falling within subsection (1) includes, in particular, provision—</p></intro><level class="para1" eId="section-51-2-a"><num>(a)</num><content><p>for a local weights and measures authority to enforce any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-51-2-b"><num>(b)</num><content><p>about the sanctions for non-compliance with a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-51-2-c"><num>(c)</num><content><p>about the sanctions for the provision of false information in connection with such a requirement;</p></content></level><wrapUp><p>including, in cases falling within paragraph (b) or (c), the imposition of a civil penalty by a local weights and measures authority.</p></wrapUp></subsection><subsection eId="section-51-3"><num>(3)</num><content><p>Where non-domestic energy efficiency regulations make provision for a civil penalty, the regulations must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.</p></content></subsection><subsection eId="section-51-4"><num>(4)</num><intro><p>Provision falling within subsection (3) includes, in particular, provision—</p></intro><level class="para1" eId="section-51-4-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-51-4-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-51-4-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-51-4-d"><num>(d)</num><content><p>suspending the imposition of the penalty, pending determination of the appeal;</p></content></level><level class="para1" eId="section-51-4-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-51-4-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-51-5"><num>(5)</num><intro><p>The provision referred to in subsection (4)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-51-5-a"><num>(a)</num><content><p>to confirm the penalty;</p></content></level><level class="para1" eId="section-51-5-b"><num>(b)</num><content><p>to withdraw the penalty;</p></content></level><level class="para1" eId="section-51-5-c"><num>(c)</num><content><p>to vary the amount of the penalty;</p></content></level><level class="para1" eId="section-51-5-d"><num>(d)</num><content><p>to award costs.</p></content></level></subsection><subsection eId="section-51-6"><num>(6)</num><content><p>If the Secretary of State considers it appropriate for the purpose of, or in consequence of, any provision falling within subsection (4)(a), (c), (e) or (f), non-domestic energy efficiency regulations may revoke or amend any subordinate legislation in so far as the subordinate legislation extends to England and Wales.</p></content></subsection><subsection eId="section-51-7"><num>(7)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978 and includes an instrument made under a Measure or Act of the National Assembly for Wales.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-general"><heading><i>General</i></heading><section eId="section-52"><num>52</num><heading>Regulations and orders: Chapter 2</heading><subsection eId="section-52-1"><num>(1)</num><content><p>Regulations and orders under this Chapter may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-52-2"><num>(2)</num><content><p>Regulations and orders under this Chapter are to be made by statutory instrument.</p></content></subsection><subsection eId="section-52-3"><num>(3)</num><content><p>A statutory instrument containing an order under section 43(5) or 49(5) is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-52-4"><num>(4)</num><intro><p>A statutory instrument containing—</p></intro><level class="para1" eId="section-52-4-a"><num>(a)</num><content><p>an order under section 42(1)(a)(iii), or</p></content></level><level class="para1" eId="section-52-4-b"><num>(b)</num><content><p>regulations under this Chapter,</p></content></level><wrapUp><p>may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></wrapUp></subsection><subsection eId="section-52-5"><num>(5)</num><intro><p>The Secretary of State must obtain the consent of the Welsh Ministers before making provision under this Chapter amending or revoking—</p></intro><level class="para1" eId="section-52-5-a"><num>(a)</num><content><p>provision included in an instrument made under a Measure or Act of the National Assembly for Wales;</p></content></level><level class="para1" eId="section-52-5-b"><num>(b)</num><content><p>any other subordinate legislation made by the Welsh Ministers (or the National Assembly for Wales established under the Government of Wales Act 1998).</p></content></level></subsection><subsection eId="section-52-6"><num>(6)</num><content><p>Subsection (5) does not apply to the extent that the Secretary of State is making incidental or consequential provision.</p></content></subsection><subsection eId="section-52-7"><num>(7)</num><intro><p>The Secretary of State must consult the Welsh Ministers before making—</p></intro><level class="para1" eId="section-52-7-a"><num>(a)</num><content><p>domestic energy efficiency regulations, or</p></content></level><level class="para1" eId="section-52-7-b"><num>(b)</num><content><p>tenants' energy efficiency improvements regulations,</p></content></level><wrapUp><p>which apply in relation to domestic PR properties situated in Wales.</p></wrapUp></subsection><subsection eId="section-52-8"><num>(8)</num><content><p>Subsection (7) does not apply to the extent that consent has been obtained under subsection (5).</p></content></subsection></section><section eId="section-53"><num>53</num><heading>Crown application: Chapter 2</heading><content><p>This Chapter binds the Crown.</p></content></section></hcontainer></chapter> — General
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" eId="part-1-chapter-3"><num>CHAPTER 3</num><heading>Private rented sector: Scotland</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-introductory"><heading><i>Introductory</i></heading><section eId="section-54"><num>54</num><heading>Meaning of “domestic PR property” and “non-domestic PR property”: Scotland</heading><subsection eId="section-54-1"><num>(1)</num><intro><p>For the purposes of this Chapter—</p></intro><level class="para1" eId="section-54-1-a"><num>(a)</num><content><p>a property is a “Scottish domestic private rented property” if it is let under a tenancy to which Chapter 4 of Part 1 of the Housing (Scotland) Act 2006 (asp 1) applies;</p></content></level><level class="para1" eId="section-54-1-b"><num>(b)</num><intro><p>a property is a “Scottish non-domestic private rented property” if it—</p></intro><level class="para2" eId="section-54-1-b-i"><num>(i)</num><content><p>is situated in Scotland,</p></content></level><level class="para2" eId="section-54-1-b-ii"><num>(ii)</num><content><p>is let under a tenancy, and</p></content></level><level class="para2" eId="section-54-1-b-iii"><num>(iii)</num><content><p>is not a dwelling.</p></content></level></level></subsection><subsection eId="section-54-2"><num>(2)</num><content><p>In subsection (1)(b) “<term refersTo="#term-dwelling" eId="term-dwelling">dwelling</term>” has the meaning given by the Energy Performance of Buildings (Scotland) Regulations 2008 (<abbr class="acronym" title="Scottish Statutory Instrument">S.S.I.</abbr> 2008/309) (“<term refersTo="#term-the-energy-performance-scotland-regulations" eId="term-the-energy-performance-scotland-regulations">the Energy Performance (Scotland) Regulations</term>”).</p></content></subsection><subsection eId="section-54-3"><num>(3)</num><content><p>A Scottish domestic private rented property is referred to in this Chapter as a “Scottish domestic PR property”.</p></content></subsection><subsection eId="section-54-4"><num>(4)</num><content><p>A Scottish non-domestic private rented property is referred to in this Chapter as a “Scottish non-domestic PR property”.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-scottish-domestic-energy-efficiency-regulations"><heading><i>Scottish domestic energy efficiency regulations</i></heading><section eId="section-55"><num>55</num><heading>Scottish domestic energy efficiency regulations</heading><subsection eId="section-55-1"><num>(1)</num><intro><p>The Scottish Ministers may make regulations for the purpose of securing that a landlord of a Scottish domestic PR property—</p></intro><level class="para1" eId="section-55-1-a"><num>(a)</num><content><p>which is of such description of Scottish domestic PR property as is provided for by the regulations,</p></content></level><level class="para1" eId="section-55-1-b"><num>(b)</num><content><p>in relation to which there is an energy performance certificate, and</p></content></level><level class="para1" eId="section-55-1-c"><num>(c)</num><content><p>which falls below such level of energy efficiency (as demonstrated by the energy performance certificate) as is provided for by the regulations,</p></content></level><wrapUp><p>may not let the property until the landlord has complied with the obligation mentioned in subsection (2).</p></wrapUp></subsection><subsection eId="section-55-2"><num>(2)</num><content><p>The obligation is to make to the property such relevant energy efficiency improvements as are provided for by the regulations.</p></content></subsection><subsection eId="section-55-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “<term refersTo="#term-scottish-domestic-energy-efficiency-regulations" eId="term-scottish-domestic-energy-efficiency-regulations">Scottish domestic energy efficiency regulations</term>”.</p></content></subsection><subsection eId="section-55-4"><num>(4)</num><intro><p>For the purposes of Scottish domestic energy efficiency regulations—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-performance-certificate" eId="term-energy-performance-certificate">energy performance certificate</term>” has the meaning given by the Energy Performance (Scotland) Regulations;</p></content></hcontainer><hcontainer name="definition"><content><p>“landlord” and “let the property” have the meaning given by the regulations (and “let the property” may be defined to include “continue to let the property”);</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p></intro><level class="para1"><num>(a)</num><content><p>are of such description as the regulations provide, and</p></content></level><level class="para1"><num>(b)</num><content><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part,</p></item><item><num>(ii)</num><p>provided free of charge pursuant to an obligation imposed by an order made under section 33BC or 33BD of the Gas Act 1986 or section 41A or 41B of the Electricity Act 1989,</p></item><item><num>(iii)</num><p>wholly financed pursuant to a combination of such a plan and such an obligation, or</p></item><item><num>(iv)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></content></level></hcontainer></subsection><subsection eId="section-55-5"><num>(5)</num><content><p>The Scottish Ministers may by order amend the definition of “energy performance certificate” in subsection (4).</p></content></subsection><subsection eId="section-55-6"><num>(6)</num><content><p>Scottish domestic energy efficiency regulations may come into force no earlier than 1 April 2015.</p></content></subsection></section><section eId="section-56"><num>56</num><heading>Further provision about Scottish domestic energy efficiency regulations</heading><subsection eId="section-56-1"><num>(1)</num><intro><p>Scottish domestic energy efficiency regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-56-1-a"><num>(a)</num><content><p>the period within which improvements required by the regulations must be started or completed;</p></content></level><level class="para1" eId="section-56-1-b"><num>(b)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-56-1-c"><num>(c)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-56-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(b) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-56-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-56-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of complying with a requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-56-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-56-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-56-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-56-3-c"><num>(c)</num><content><p>that the improvements required by or under the regulations are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-57"><num>57</num><heading>Sanctions for the purposes of Scottish domestic energy efficiency regulations</heading><subsection eId="section-57-1"><num>(1)</num><content><p>Scottish domestic energy efficiency regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-57-2"><num>(2)</num><intro><p>Provision falling within subsection (1) includes, in particular, provision—</p></intro><level class="para1" eId="section-57-2-a"><num>(a)</num><content><p>for a local authority to enforce any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-57-2-b"><num>(b)</num><content><p>about the sanctions for non-compliance with a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-57-2-c"><num>(c)</num><content><p>about the sanctions for the provision of false information in connection with such a requirement;</p></content></level><wrapUp><p>including, in cases falling within paragraph (b) or (c), the imposition of a civil penalty by a local authority.</p></wrapUp></subsection><subsection eId="section-57-3"><num>(3)</num><content><p>The amount of any civil penalty provided for by Scottish domestic energy efficiency regulations must not exceed £5,000.</p></content></subsection><subsection eId="section-57-4"><num>(4)</num><content><p>Where Scottish domestic energy efficiency regulations make provision for the imposition of a civil penalty, the regulations must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.</p></content></subsection><subsection eId="section-57-5"><num>(5)</num><intro><p>Provision falling within subsection (4) includes, in particular, provision—</p></intro><level class="para1" eId="section-57-5-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-57-5-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-57-5-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-57-5-d"><num>(d)</num><content><p>suspending the imposition of the penalty, pending determination of the appeal;</p></content></level><level class="para1" eId="section-57-5-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-57-5-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-57-6"><num>(6)</num><intro><p>The provision referred to in subsection (5)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-57-6-a"><num>(a)</num><content><p>to confirm the penalty;</p></content></level><level class="para1" eId="section-57-6-b"><num>(b)</num><content><p>to withdraw the penalty;</p></content></level><level class="para1" eId="section-57-6-c"><num>(c)</num><content><p>to vary the amount of the penalty;</p></content></level><level class="para1" eId="section-57-6-d"><num>(d)</num><content><p>to award expenses.</p></content></level></subsection><subsection eId="section-57-7"><num>(7)</num><content><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within subsection (5)(a), (c), (e) or (f), Scottish domestic energy efficiency regulations may revoke or amend any subordinate legislation if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></content></subsection><subsection eId="section-57-8"><num>(8)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978, except that it includes any instrument made under an Act of the Scottish Parliament.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-scottish-tenants-energy-efficiency-improvements-regulations"><heading><i>Scottish tenants' energy efficiency improvements regulations</i></heading><section eId="section-58"><num>58</num><heading>Scottish tenants' energy efficiency improvements regulations</heading><subsection eId="section-58-1"><num>(1)</num><content><p>The Scottish Ministers may make regulations for the purpose of securing that a landlord of a Scottish domestic PR property which is of such description of Scottish domestic PR property as is provided for by the regulations does not unreasonably refuse a request mentioned in subsection (2).</p></content></subsection><subsection eId="section-58-2"><num>(2)</num><content><p>The request is one by the tenant of the property to consent to the making of such relevant energy efficiency improvements as are identified in the request.</p></content></subsection><subsection eId="section-58-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “Scottish tenants' energy efficiency improvements regulations”.</p></content></subsection><subsection eId="section-58-4"><num>(4)</num><content><p>For the purposes of Scottish tenants' energy efficiency improvements regulations—</p><blockList class="unordered none" ukl:Name="UnorderedList" ukl:Decoration="none"><item><p>“landlord” and “tenant” have the meaning given by the regulations;</p></item><item><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p><blockList class="ordered alpha parens" ukl:Name="OrderedList" ukl:Type="alpha" ukl:Decoration="parens"><item><num>(a)</num><p>are of such description as the regulations provide, and</p></item><item><num>(b)</num><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part,</p></item><item><num>(ii)</num><p>provided free of charge pursuant to an obligation imposed by an order made under section 33BC or 33BD of the Gas Act 1986 or section 41A or 41B of the Electricity Act 1989,</p></item><item><num>(iii)</num><p>wholly financed pursuant to a combination of such a plan and such an obligation, or</p></item><item><num>(iv)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></item></blockList></item></blockList></content></subsection><subsection eId="section-58-5"><num>(5)</num><content><p>Scottish tenants' energy efficiency improvements regulations may come into force no earlier than 1 April 2015.</p></content></subsection></section><section eId="section-59"><num>59</num><heading>Further provision about Scottish tenants' energy efficiency improvements regulations</heading><subsection eId="section-59-1"><num>(1)</num><intro><p>Scottish tenants' energy efficiency improvements regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-59-1-a"><num>(a)</num><content><p>the form, content and service of a request under the regulations;</p></content></level><level class="para1" eId="section-59-1-b"><num>(b)</num><content><p>the form, content and service of any response by the landlord to a request (including the period within which any response must be given);</p></content></level><level class="para1" eId="section-59-1-c"><num>(c)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-59-1-d"><num>(d)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-59-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-59-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-59-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of consenting to the request.</p></content></level></subsection><subsection eId="section-59-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(d) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-59-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-59-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-59-3-c"><num>(c)</num><content><p>that the improvements for which consent has been requested are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-60"><num>60</num><heading>Sanctions for the purposes of Scottish tenants' energy efficiency improvements regulations</heading><subsection eId="section-60-1"><num>(1)</num><content><p>Scottish tenants' energy efficiency improvements regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-60-2"><num>(2)</num><content><p>Provision falling within subsection (1) includes, in particular, provision for a tenant to apply to a court or tribunal for a ruling that a landlord has not complied with a requirement imposed by or under the regulations.</p></content></subsection><subsection eId="section-60-3"><num>(3)</num><intro><p>Where the regulations make provision for a tenant to make an application such as is mentioned in subsection (2), the provision may, in particular, include provision—</p></intro><level class="para1" eId="section-60-3-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an application may be made;</p></content></level><level class="para1" eId="section-60-3-b"><num>(b)</num><content><p>as to the grounds on which an application may be made;</p></content></level><level class="para1" eId="section-60-3-c"><num>(c)</num><content><p>as to the procedure for making an application (including any fee which may be payable);</p></content></level><level class="para1" eId="section-60-3-d"><num>(d)</num><content><p>as to the powers of the court or tribunal to which an application is made (including as to expenses which may be awarded);</p></content></level><level class="para1" eId="section-60-3-e"><num>(e)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-60-4"><num>(4)</num><content><p>Where the regulations make provision for a tenant to make an application such as is mentioned in subsection (2), the regulations must also include provision for a right of appeal by the tenant or landlord against any decision of a court or tribunal on an application.</p></content></subsection><subsection eId="section-60-5"><num>(5)</num><intro><p>Provision falling within subsection (4) includes, in particular, provision—</p></intro><level class="para1" eId="section-60-5-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-60-5-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-60-5-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-60-5-d"><num>(d)</num><content><p>suspending the effect of the decision being appealed against, pending determination of the appeal;</p></content></level><level class="para1" eId="section-60-5-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-60-5-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-60-6"><num>(6)</num><intro><p>The provision referred to in subsection (5)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-60-6-a"><num>(a)</num><content><p>to confirm the decision;</p></content></level><level class="para1" eId="section-60-6-b"><num>(b)</num><content><p>to quash the decision;</p></content></level><level class="para1" eId="section-60-6-c"><num>(c)</num><content><p>to make a different decision;</p></content></level><level class="para1" eId="section-60-6-d"><num>(d)</num><content><p>to remit the decision or any matter relating to the decision to the person who made it;</p></content></level><level class="para1" eId="section-60-6-e"><num>(e)</num><content><p>to award expenses.</p></content></level></subsection><subsection eId="section-60-7"><num>(7)</num><intro><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within—</p></intro><level class="para1" eId="section-60-7-a"><num>(a)</num><content><p>subsection (3)(a), (c), (d) or (e), or</p></content></level><level class="para1" eId="section-60-7-b"><num>(b)</num><content><p>subsection (5)(a), (c), (e) or (f),</p></content></level><wrapUp><p>Scottish tenants' energy efficiency improvements regulations may revoke or amend any subordinate legislation if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></wrapUp></subsection><subsection eId="section-60-8"><num>(8)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978, except that it includes any instrument made under an Act of the Scottish Parliament.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-scottish-nondomestic-energy-efficiency-regulations"><heading><i>Scottish non-domestic energy efficiency regulations</i></heading><section eId="section-61"><num>61</num><heading>Scottish non-domestic energy efficiency regulations</heading><subsection eId="section-61-1"><num>(1)</num><intro><p>The Scottish Ministers may make regulations for the purpose of securing that a landlord of a Scottish non-domestic PR property—</p></intro><level class="para1" eId="section-61-1-a"><num>(a)</num><content><p>which is of such description of Scottish non-domestic PR property as is provided for by the regulations,</p></content></level><level class="para1" eId="section-61-1-b"><num>(b)</num><content><p>in relation to which there is an energy performance certificate, and</p></content></level><level class="para1" eId="section-61-1-c"><num>(c)</num><content><p>which falls below such level of energy efficiency (as demonstrated by the energy performance certificate) as is provided for by the regulations,</p></content></level><wrapUp><p>may not let the property until the landlord has complied with the obligation mentioned in subsection (2).</p></wrapUp></subsection><subsection eId="section-61-2"><num>(2)</num><content><p>The obligation is to make to the property such relevant energy efficiency improvements as are provided for by the regulations.</p></content></subsection><subsection eId="section-61-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “<term refersTo="#term-scottish-non-domestic-energy-efficiency-regulations" eId="term-scottish-non-domestic-energy-efficiency-regulations">Scottish non-domestic energy efficiency regulations</term>”.</p></content></subsection><subsection eId="section-61-4"><num>(4)</num><intro><p>For the purposes of Scottish non-domestic energy efficiency regulations—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-performance-certificate" eId="term-energy-performance-certificate">energy performance certificate</term>” has the meaning given by the Energy Performance (Scotland) Regulations;</p></content></hcontainer><hcontainer name="definition"><content><p>“landlord” and “let the property” have the meaning given by the regulations (and “let the property” may be defined to include “continue to let the property”);</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p></intro><level class="para1"><num>(a)</num><content><p>are of such description as the regulations provide, and</p></content></level><level class="para1"><num>(b)</num><content><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part, or</p></item><item><num>(ii)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></content></level></hcontainer></subsection><subsection eId="section-61-5"><num>(5)</num><content><p>The Scottish Ministers may by order amend the definition of “energy performance certificate” in subsection (4).</p></content></subsection><subsection eId="section-61-6"><num>(6)</num><content><p>Scottish non-domestic energy efficiency regulations may come into force no earlier than 1 April 2015.</p></content></subsection></section><section eId="section-62"><num>62</num><heading>Further provision about Scottish non-domestic energy efficiency regulations</heading><subsection eId="section-62-1"><num>(1)</num><intro><p>Scottish non-domestic energy efficiency regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-62-1-a"><num>(a)</num><content><p>the period within which improvements required by the regulations must be started or completed;</p></content></level><level class="para1" eId="section-62-1-b"><num>(b)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-62-1-c"><num>(c)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-62-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(b) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-62-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-62-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of complying with a requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-62-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-62-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-62-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-62-3-c"><num>(c)</num><content><p>that the improvements required by or under the regulations are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-63"><num>63</num><heading>Sanctions for the purposes of Scottish non-domestic energy efficiency regulations</heading><subsection eId="section-63-1"><num>(1)</num><content><p>Scottish non-domestic energy efficiency regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-63-2"><num>(2)</num><intro><p>Provision falling within subsection (1) includes, in particular, provision—</p></intro><level class="para1" eId="section-63-2-a"><num>(a)</num><content><p>for a local authority constituted under section 2(1) of the Local Government <abbr title="et cetera" xml:lang="la">etc.</abbr> (Scotland) Act 1994 to enforce any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-63-2-b"><num>(b)</num><content><p>about the sanctions for non-compliance with a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-63-2-c"><num>(c)</num><content><p>about the sanctions for the provision of false information in connection with such a requirement;</p></content></level><wrapUp><p>including, in cases falling within paragraph (b) or (c), the imposition of a civil penalty by such a local authority.</p></wrapUp></subsection><subsection eId="section-63-3"><num>(3)</num><content><p>Where Scottish non-domestic energy efficiency regulations make provision for a civil penalty, the regulations must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.</p></content></subsection><subsection eId="section-63-4"><num>(4)</num><intro><p>Provision falling within subsection (3) includes, in particular, provision—</p></intro><level class="para1" eId="section-63-4-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-63-4-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-63-4-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-63-4-d"><num>(d)</num><content><p>suspending the imposition of the penalty, pending determination of the appeal;</p></content></level><level class="para1" eId="section-63-4-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-63-4-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-63-5"><num>(5)</num><intro><p>The provision referred to in subsection (4)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-63-5-a"><num>(a)</num><content><p>to confirm the penalty;</p></content></level><level class="para1" eId="section-63-5-b"><num>(b)</num><content><p>to withdraw the penalty;</p></content></level><level class="para1" eId="section-63-5-c"><num>(c)</num><content><p>to vary the amount of the penalty;</p></content></level><level class="para1" eId="section-63-5-d"><num>(d)</num><content><p>to award expenses.</p></content></level></subsection><subsection eId="section-63-6"><num>(6)</num><content><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within subsection (4)(a), (c), (e) or (f), Scottish non-domestic energy efficiency regulations may revoke or amend any subordinate legislation if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></content></subsection><subsection eId="section-63-7"><num>(7)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978, except that it includes any instrument made under an Act of the Scottish Parliament.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-general"><heading><i>General</i></heading><section eId="section-64"><num>64</num><heading>Regulations and orders: Chapter 3</heading><subsection eId="section-64-1"><num>(1)</num><content><p>Regulations and orders under this Chapter may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-64-2"><num>(2)</num><content><p>Orders under this Chapter are subject to the negative procedure.</p></content></subsection><subsection eId="section-64-3"><num>(3)</num><content><p>Regulations under this Chapter are subject to the affirmative procedure.</p></content></subsection></section><section eId="section-65"><num>65</num><heading>Crown application: Chapter 3</heading><content><p>This Chapter binds the Crown.</p></content></section></hcontainer></chapter> — Introductory
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" eId="part-1-chapter-3"><num>CHAPTER 3</num><heading>Private rented sector: Scotland</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-introductory"><heading><i>Introductory</i></heading><section eId="section-54"><num>54</num><heading>Meaning of “domestic PR property” and “non-domestic PR property”: Scotland</heading><subsection eId="section-54-1"><num>(1)</num><intro><p>For the purposes of this Chapter—</p></intro><level class="para1" eId="section-54-1-a"><num>(a)</num><content><p>a property is a “Scottish domestic private rented property” if it is let under a tenancy to which Chapter 4 of Part 1 of the Housing (Scotland) Act 2006 (asp 1) applies;</p></content></level><level class="para1" eId="section-54-1-b"><num>(b)</num><intro><p>a property is a “Scottish non-domestic private rented property” if it—</p></intro><level class="para2" eId="section-54-1-b-i"><num>(i)</num><content><p>is situated in Scotland,</p></content></level><level class="para2" eId="section-54-1-b-ii"><num>(ii)</num><content><p>is let under a tenancy, and</p></content></level><level class="para2" eId="section-54-1-b-iii"><num>(iii)</num><content><p>is not a dwelling.</p></content></level></level></subsection><subsection eId="section-54-2"><num>(2)</num><content><p>In subsection (1)(b) “<term refersTo="#term-dwelling" eId="term-dwelling">dwelling</term>” has the meaning given by the Energy Performance of Buildings (Scotland) Regulations 2008 (<abbr class="acronym" title="Scottish Statutory Instrument">S.S.I.</abbr> 2008/309) (“<term refersTo="#term-the-energy-performance-scotland-regulations" eId="term-the-energy-performance-scotland-regulations">the Energy Performance (Scotland) Regulations</term>”).</p></content></subsection><subsection eId="section-54-3"><num>(3)</num><content><p>A Scottish domestic private rented property is referred to in this Chapter as a “Scottish domestic PR property”.</p></content></subsection><subsection eId="section-54-4"><num>(4)</num><content><p>A Scottish non-domestic private rented property is referred to in this Chapter as a “Scottish non-domestic PR property”.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-scottish-domestic-energy-efficiency-regulations"><heading><i>Scottish domestic energy efficiency regulations</i></heading><section eId="section-55"><num>55</num><heading>Scottish domestic energy efficiency regulations</heading><subsection eId="section-55-1"><num>(1)</num><intro><p>The Scottish Ministers may make regulations for the purpose of securing that a landlord of a Scottish domestic PR property—</p></intro><level class="para1" eId="section-55-1-a"><num>(a)</num><content><p>which is of such description of Scottish domestic PR property as is provided for by the regulations,</p></content></level><level class="para1" eId="section-55-1-b"><num>(b)</num><content><p>in relation to which there is an energy performance certificate, and</p></content></level><level class="para1" eId="section-55-1-c"><num>(c)</num><content><p>which falls below such level of energy efficiency (as demonstrated by the energy performance certificate) as is provided for by the regulations,</p></content></level><wrapUp><p>may not let the property until the landlord has complied with the obligation mentioned in subsection (2).</p></wrapUp></subsection><subsection eId="section-55-2"><num>(2)</num><content><p>The obligation is to make to the property such relevant energy efficiency improvements as are provided for by the regulations.</p></content></subsection><subsection eId="section-55-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “<term refersTo="#term-scottish-domestic-energy-efficiency-regulations" eId="term-scottish-domestic-energy-efficiency-regulations">Scottish domestic energy efficiency regulations</term>”.</p></content></subsection><subsection eId="section-55-4"><num>(4)</num><intro><p>For the purposes of Scottish domestic energy efficiency regulations—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-performance-certificate" eId="term-energy-performance-certificate">energy performance certificate</term>” has the meaning given by the Energy Performance (Scotland) Regulations;</p></content></hcontainer><hcontainer name="definition"><content><p>“landlord” and “let the property” have the meaning given by the regulations (and “let the property” may be defined to include “continue to let the property”);</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p></intro><level class="para1"><num>(a)</num><content><p>are of such description as the regulations provide, and</p></content></level><level class="para1"><num>(b)</num><content><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part,</p></item><item><num>(ii)</num><p>provided free of charge pursuant to an obligation imposed by an order made under section 33BC or 33BD of the Gas Act 1986 or section 41A or 41B of the Electricity Act 1989,</p></item><item><num>(iii)</num><p>wholly financed pursuant to a combination of such a plan and such an obligation, or</p></item><item><num>(iv)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></content></level></hcontainer></subsection><subsection eId="section-55-5"><num>(5)</num><content><p>The Scottish Ministers may by order amend the definition of “energy performance certificate” in subsection (4).</p></content></subsection><subsection eId="section-55-6"><num>(6)</num><content><p>Scottish domestic energy efficiency regulations may come into force no earlier than 1 April 2015.</p></content></subsection></section><section eId="section-56"><num>56</num><heading>Further provision about Scottish domestic energy efficiency regulations</heading><subsection eId="section-56-1"><num>(1)</num><intro><p>Scottish domestic energy efficiency regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-56-1-a"><num>(a)</num><content><p>the period within which improvements required by the regulations must be started or completed;</p></content></level><level class="para1" eId="section-56-1-b"><num>(b)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-56-1-c"><num>(c)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-56-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(b) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-56-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-56-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of complying with a requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-56-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-56-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-56-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-56-3-c"><num>(c)</num><content><p>that the improvements required by or under the regulations are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-57"><num>57</num><heading>Sanctions for the purposes of Scottish domestic energy efficiency regulations</heading><subsection eId="section-57-1"><num>(1)</num><content><p>Scottish domestic energy efficiency regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-57-2"><num>(2)</num><intro><p>Provision falling within subsection (1) includes, in particular, provision—</p></intro><level class="para1" eId="section-57-2-a"><num>(a)</num><content><p>for a local authority to enforce any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-57-2-b"><num>(b)</num><content><p>about the sanctions for non-compliance with a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-57-2-c"><num>(c)</num><content><p>about the sanctions for the provision of false information in connection with such a requirement;</p></content></level><wrapUp><p>including, in cases falling within paragraph (b) or (c), the imposition of a civil penalty by a local authority.</p></wrapUp></subsection><subsection eId="section-57-3"><num>(3)</num><content><p>The amount of any civil penalty provided for by Scottish domestic energy efficiency regulations must not exceed £5,000.</p></content></subsection><subsection eId="section-57-4"><num>(4)</num><content><p>Where Scottish domestic energy efficiency regulations make provision for the imposition of a civil penalty, the regulations must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.</p></content></subsection><subsection eId="section-57-5"><num>(5)</num><intro><p>Provision falling within subsection (4) includes, in particular, provision—</p></intro><level class="para1" eId="section-57-5-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-57-5-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-57-5-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-57-5-d"><num>(d)</num><content><p>suspending the imposition of the penalty, pending determination of the appeal;</p></content></level><level class="para1" eId="section-57-5-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-57-5-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-57-6"><num>(6)</num><intro><p>The provision referred to in subsection (5)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-57-6-a"><num>(a)</num><content><p>to confirm the penalty;</p></content></level><level class="para1" eId="section-57-6-b"><num>(b)</num><content><p>to withdraw the penalty;</p></content></level><level class="para1" eId="section-57-6-c"><num>(c)</num><content><p>to vary the amount of the penalty;</p></content></level><level class="para1" eId="section-57-6-d"><num>(d)</num><content><p>to award expenses.</p></content></level></subsection><subsection eId="section-57-7"><num>(7)</num><content><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within subsection (5)(a), (c), (e) or (f), Scottish domestic energy efficiency regulations may revoke or amend any subordinate legislation if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></content></subsection><subsection eId="section-57-8"><num>(8)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978, except that it includes any instrument made under an Act of the Scottish Parliament.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-scottish-tenants-energy-efficiency-improvements-regulations"><heading><i>Scottish tenants' energy efficiency improvements regulations</i></heading><section eId="section-58"><num>58</num><heading>Scottish tenants' energy efficiency improvements regulations</heading><subsection eId="section-58-1"><num>(1)</num><content><p>The Scottish Ministers may make regulations for the purpose of securing that a landlord of a Scottish domestic PR property which is of such description of Scottish domestic PR property as is provided for by the regulations does not unreasonably refuse a request mentioned in subsection (2).</p></content></subsection><subsection eId="section-58-2"><num>(2)</num><content><p>The request is one by the tenant of the property to consent to the making of such relevant energy efficiency improvements as are identified in the request.</p></content></subsection><subsection eId="section-58-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “Scottish tenants' energy efficiency improvements regulations”.</p></content></subsection><subsection eId="section-58-4"><num>(4)</num><content><p>For the purposes of Scottish tenants' energy efficiency improvements regulations—</p><blockList class="unordered none" ukl:Name="UnorderedList" ukl:Decoration="none"><item><p>“landlord” and “tenant” have the meaning given by the regulations;</p></item><item><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p><blockList class="ordered alpha parens" ukl:Name="OrderedList" ukl:Type="alpha" ukl:Decoration="parens"><item><num>(a)</num><p>are of such description as the regulations provide, and</p></item><item><num>(b)</num><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part,</p></item><item><num>(ii)</num><p>provided free of charge pursuant to an obligation imposed by an order made under section 33BC or 33BD of the Gas Act 1986 or section 41A or 41B of the Electricity Act 1989,</p></item><item><num>(iii)</num><p>wholly financed pursuant to a combination of such a plan and such an obligation, or</p></item><item><num>(iv)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></item></blockList></item></blockList></content></subsection><subsection eId="section-58-5"><num>(5)</num><content><p>Scottish tenants' energy efficiency improvements regulations may come into force no earlier than 1 April 2015.</p></content></subsection></section><section eId="section-59"><num>59</num><heading>Further provision about Scottish tenants' energy efficiency improvements regulations</heading><subsection eId="section-59-1"><num>(1)</num><intro><p>Scottish tenants' energy efficiency improvements regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-59-1-a"><num>(a)</num><content><p>the form, content and service of a request under the regulations;</p></content></level><level class="para1" eId="section-59-1-b"><num>(b)</num><content><p>the form, content and service of any response by the landlord to a request (including the period within which any response must be given);</p></content></level><level class="para1" eId="section-59-1-c"><num>(c)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-59-1-d"><num>(d)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-59-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-59-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-59-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of consenting to the request.</p></content></level></subsection><subsection eId="section-59-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(d) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-59-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-59-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-59-3-c"><num>(c)</num><content><p>that the improvements for which consent has been requested are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-60"><num>60</num><heading>Sanctions for the purposes of Scottish tenants' energy efficiency improvements regulations</heading><subsection eId="section-60-1"><num>(1)</num><content><p>Scottish tenants' energy efficiency improvements regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-60-2"><num>(2)</num><content><p>Provision falling within subsection (1) includes, in particular, provision for a tenant to apply to a court or tribunal for a ruling that a landlord has not complied with a requirement imposed by or under the regulations.</p></content></subsection><subsection eId="section-60-3"><num>(3)</num><intro><p>Where the regulations make provision for a tenant to make an application such as is mentioned in subsection (2), the provision may, in particular, include provision—</p></intro><level class="para1" eId="section-60-3-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an application may be made;</p></content></level><level class="para1" eId="section-60-3-b"><num>(b)</num><content><p>as to the grounds on which an application may be made;</p></content></level><level class="para1" eId="section-60-3-c"><num>(c)</num><content><p>as to the procedure for making an application (including any fee which may be payable);</p></content></level><level class="para1" eId="section-60-3-d"><num>(d)</num><content><p>as to the powers of the court or tribunal to which an application is made (including as to expenses which may be awarded);</p></content></level><level class="para1" eId="section-60-3-e"><num>(e)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-60-4"><num>(4)</num><content><p>Where the regulations make provision for a tenant to make an application such as is mentioned in subsection (2), the regulations must also include provision for a right of appeal by the tenant or landlord against any decision of a court or tribunal on an application.</p></content></subsection><subsection eId="section-60-5"><num>(5)</num><intro><p>Provision falling within subsection (4) includes, in particular, provision—</p></intro><level class="para1" eId="section-60-5-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-60-5-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-60-5-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-60-5-d"><num>(d)</num><content><p>suspending the effect of the decision being appealed against, pending determination of the appeal;</p></content></level><level class="para1" eId="section-60-5-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-60-5-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-60-6"><num>(6)</num><intro><p>The provision referred to in subsection (5)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-60-6-a"><num>(a)</num><content><p>to confirm the decision;</p></content></level><level class="para1" eId="section-60-6-b"><num>(b)</num><content><p>to quash the decision;</p></content></level><level class="para1" eId="section-60-6-c"><num>(c)</num><content><p>to make a different decision;</p></content></level><level class="para1" eId="section-60-6-d"><num>(d)</num><content><p>to remit the decision or any matter relating to the decision to the person who made it;</p></content></level><level class="para1" eId="section-60-6-e"><num>(e)</num><content><p>to award expenses.</p></content></level></subsection><subsection eId="section-60-7"><num>(7)</num><intro><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within—</p></intro><level class="para1" eId="section-60-7-a"><num>(a)</num><content><p>subsection (3)(a), (c), (d) or (e), or</p></content></level><level class="para1" eId="section-60-7-b"><num>(b)</num><content><p>subsection (5)(a), (c), (e) or (f),</p></content></level><wrapUp><p>Scottish tenants' energy efficiency improvements regulations may revoke or amend any subordinate legislation if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></wrapUp></subsection><subsection eId="section-60-8"><num>(8)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978, except that it includes any instrument made under an Act of the Scottish Parliament.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-scottish-nondomestic-energy-efficiency-regulations"><heading><i>Scottish non-domestic energy efficiency regulations</i></heading><section eId="section-61"><num>61</num><heading>Scottish non-domestic energy efficiency regulations</heading><subsection eId="section-61-1"><num>(1)</num><intro><p>The Scottish Ministers may make regulations for the purpose of securing that a landlord of a Scottish non-domestic PR property—</p></intro><level class="para1" eId="section-61-1-a"><num>(a)</num><content><p>which is of such description of Scottish non-domestic PR property as is provided for by the regulations,</p></content></level><level class="para1" eId="section-61-1-b"><num>(b)</num><content><p>in relation to which there is an energy performance certificate, and</p></content></level><level class="para1" eId="section-61-1-c"><num>(c)</num><content><p>which falls below such level of energy efficiency (as demonstrated by the energy performance certificate) as is provided for by the regulations,</p></content></level><wrapUp><p>may not let the property until the landlord has complied with the obligation mentioned in subsection (2).</p></wrapUp></subsection><subsection eId="section-61-2"><num>(2)</num><content><p>The obligation is to make to the property such relevant energy efficiency improvements as are provided for by the regulations.</p></content></subsection><subsection eId="section-61-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “<term refersTo="#term-scottish-non-domestic-energy-efficiency-regulations" eId="term-scottish-non-domestic-energy-efficiency-regulations">Scottish non-domestic energy efficiency regulations</term>”.</p></content></subsection><subsection eId="section-61-4"><num>(4)</num><intro><p>For the purposes of Scottish non-domestic energy efficiency regulations—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-performance-certificate" eId="term-energy-performance-certificate">energy performance certificate</term>” has the meaning given by the Energy Performance (Scotland) Regulations;</p></content></hcontainer><hcontainer name="definition"><content><p>“landlord” and “let the property” have the meaning given by the regulations (and “let the property” may be defined to include “continue to let the property”);</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p></intro><level class="para1"><num>(a)</num><content><p>are of such description as the regulations provide, and</p></content></level><level class="para1"><num>(b)</num><content><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part, or</p></item><item><num>(ii)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></content></level></hcontainer></subsection><subsection eId="section-61-5"><num>(5)</num><content><p>The Scottish Ministers may by order amend the definition of “energy performance certificate” in subsection (4).</p></content></subsection><subsection eId="section-61-6"><num>(6)</num><content><p>Scottish non-domestic energy efficiency regulations may come into force no earlier than 1 April 2015.</p></content></subsection></section><section eId="section-62"><num>62</num><heading>Further provision about Scottish non-domestic energy efficiency regulations</heading><subsection eId="section-62-1"><num>(1)</num><intro><p>Scottish non-domestic energy efficiency regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-62-1-a"><num>(a)</num><content><p>the period within which improvements required by the regulations must be started or completed;</p></content></level><level class="para1" eId="section-62-1-b"><num>(b)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-62-1-c"><num>(c)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-62-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(b) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-62-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-62-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of complying with a requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-62-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-62-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-62-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-62-3-c"><num>(c)</num><content><p>that the improvements required by or under the regulations are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-63"><num>63</num><heading>Sanctions for the purposes of Scottish non-domestic energy efficiency regulations</heading><subsection eId="section-63-1"><num>(1)</num><content><p>Scottish non-domestic energy efficiency regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-63-2"><num>(2)</num><intro><p>Provision falling within subsection (1) includes, in particular, provision—</p></intro><level class="para1" eId="section-63-2-a"><num>(a)</num><content><p>for a local authority constituted under section 2(1) of the Local Government <abbr title="et cetera" xml:lang="la">etc.</abbr> (Scotland) Act 1994 to enforce any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-63-2-b"><num>(b)</num><content><p>about the sanctions for non-compliance with a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-63-2-c"><num>(c)</num><content><p>about the sanctions for the provision of false information in connection with such a requirement;</p></content></level><wrapUp><p>including, in cases falling within paragraph (b) or (c), the imposition of a civil penalty by such a local authority.</p></wrapUp></subsection><subsection eId="section-63-3"><num>(3)</num><content><p>Where Scottish non-domestic energy efficiency regulations make provision for a civil penalty, the regulations must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.</p></content></subsection><subsection eId="section-63-4"><num>(4)</num><intro><p>Provision falling within subsection (3) includes, in particular, provision—</p></intro><level class="para1" eId="section-63-4-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-63-4-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-63-4-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-63-4-d"><num>(d)</num><content><p>suspending the imposition of the penalty, pending determination of the appeal;</p></content></level><level class="para1" eId="section-63-4-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-63-4-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-63-5"><num>(5)</num><intro><p>The provision referred to in subsection (4)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-63-5-a"><num>(a)</num><content><p>to confirm the penalty;</p></content></level><level class="para1" eId="section-63-5-b"><num>(b)</num><content><p>to withdraw the penalty;</p></content></level><level class="para1" eId="section-63-5-c"><num>(c)</num><content><p>to vary the amount of the penalty;</p></content></level><level class="para1" eId="section-63-5-d"><num>(d)</num><content><p>to award expenses.</p></content></level></subsection><subsection eId="section-63-6"><num>(6)</num><content><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within subsection (4)(a), (c), (e) or (f), Scottish non-domestic energy efficiency regulations may revoke or amend any subordinate legislation if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></content></subsection><subsection eId="section-63-7"><num>(7)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978, except that it includes any instrument made under an Act of the Scottish Parliament.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-general"><heading><i>General</i></heading><section eId="section-64"><num>64</num><heading>Regulations and orders: Chapter 3</heading><subsection eId="section-64-1"><num>(1)</num><content><p>Regulations and orders under this Chapter may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-64-2"><num>(2)</num><content><p>Orders under this Chapter are subject to the negative procedure.</p></content></subsection><subsection eId="section-64-3"><num>(3)</num><content><p>Regulations under this Chapter are subject to the affirmative procedure.</p></content></subsection></section><section eId="section-65"><num>65</num><heading>Crown application: Chapter 3</heading><content><p>This Chapter binds the Crown.</p></content></section></hcontainer></chapter> — Scottish domestic energy efficiency regulations
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" eId="part-1-chapter-3"><num>CHAPTER 3</num><heading>Private rented sector: Scotland</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-introductory"><heading><i>Introductory</i></heading><section eId="section-54"><num>54</num><heading>Meaning of “domestic PR property” and “non-domestic PR property”: Scotland</heading><subsection eId="section-54-1"><num>(1)</num><intro><p>For the purposes of this Chapter—</p></intro><level class="para1" eId="section-54-1-a"><num>(a)</num><content><p>a property is a “Scottish domestic private rented property” if it is let under a tenancy to which Chapter 4 of Part 1 of the Housing (Scotland) Act 2006 (asp 1) applies;</p></content></level><level class="para1" eId="section-54-1-b"><num>(b)</num><intro><p>a property is a “Scottish non-domestic private rented property” if it—</p></intro><level class="para2" eId="section-54-1-b-i"><num>(i)</num><content><p>is situated in Scotland,</p></content></level><level class="para2" eId="section-54-1-b-ii"><num>(ii)</num><content><p>is let under a tenancy, and</p></content></level><level class="para2" eId="section-54-1-b-iii"><num>(iii)</num><content><p>is not a dwelling.</p></content></level></level></subsection><subsection eId="section-54-2"><num>(2)</num><content><p>In subsection (1)(b) “<term refersTo="#term-dwelling" eId="term-dwelling">dwelling</term>” has the meaning given by the Energy Performance of Buildings (Scotland) Regulations 2008 (<abbr class="acronym" title="Scottish Statutory Instrument">S.S.I.</abbr> 2008/309) (“<term refersTo="#term-the-energy-performance-scotland-regulations" eId="term-the-energy-performance-scotland-regulations">the Energy Performance (Scotland) Regulations</term>”).</p></content></subsection><subsection eId="section-54-3"><num>(3)</num><content><p>A Scottish domestic private rented property is referred to in this Chapter as a “Scottish domestic PR property”.</p></content></subsection><subsection eId="section-54-4"><num>(4)</num><content><p>A Scottish non-domestic private rented property is referred to in this Chapter as a “Scottish non-domestic PR property”.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-scottish-domestic-energy-efficiency-regulations"><heading><i>Scottish domestic energy efficiency regulations</i></heading><section eId="section-55"><num>55</num><heading>Scottish domestic energy efficiency regulations</heading><subsection eId="section-55-1"><num>(1)</num><intro><p>The Scottish Ministers may make regulations for the purpose of securing that a landlord of a Scottish domestic PR property—</p></intro><level class="para1" eId="section-55-1-a"><num>(a)</num><content><p>which is of such description of Scottish domestic PR property as is provided for by the regulations,</p></content></level><level class="para1" eId="section-55-1-b"><num>(b)</num><content><p>in relation to which there is an energy performance certificate, and</p></content></level><level class="para1" eId="section-55-1-c"><num>(c)</num><content><p>which falls below such level of energy efficiency (as demonstrated by the energy performance certificate) as is provided for by the regulations,</p></content></level><wrapUp><p>may not let the property until the landlord has complied with the obligation mentioned in subsection (2).</p></wrapUp></subsection><subsection eId="section-55-2"><num>(2)</num><content><p>The obligation is to make to the property such relevant energy efficiency improvements as are provided for by the regulations.</p></content></subsection><subsection eId="section-55-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “<term refersTo="#term-scottish-domestic-energy-efficiency-regulations" eId="term-scottish-domestic-energy-efficiency-regulations">Scottish domestic energy efficiency regulations</term>”.</p></content></subsection><subsection eId="section-55-4"><num>(4)</num><intro><p>For the purposes of Scottish domestic energy efficiency regulations—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-performance-certificate" eId="term-energy-performance-certificate">energy performance certificate</term>” has the meaning given by the Energy Performance (Scotland) Regulations;</p></content></hcontainer><hcontainer name="definition"><content><p>“landlord” and “let the property” have the meaning given by the regulations (and “let the property” may be defined to include “continue to let the property”);</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p></intro><level class="para1"><num>(a)</num><content><p>are of such description as the regulations provide, and</p></content></level><level class="para1"><num>(b)</num><content><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part,</p></item><item><num>(ii)</num><p>provided free of charge pursuant to an obligation imposed by an order made under section 33BC or 33BD of the Gas Act 1986 or section 41A or 41B of the Electricity Act 1989,</p></item><item><num>(iii)</num><p>wholly financed pursuant to a combination of such a plan and such an obligation, or</p></item><item><num>(iv)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></content></level></hcontainer></subsection><subsection eId="section-55-5"><num>(5)</num><content><p>The Scottish Ministers may by order amend the definition of “energy performance certificate” in subsection (4).</p></content></subsection><subsection eId="section-55-6"><num>(6)</num><content><p>Scottish domestic energy efficiency regulations may come into force no earlier than 1 April 2015.</p></content></subsection></section><section eId="section-56"><num>56</num><heading>Further provision about Scottish domestic energy efficiency regulations</heading><subsection eId="section-56-1"><num>(1)</num><intro><p>Scottish domestic energy efficiency regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-56-1-a"><num>(a)</num><content><p>the period within which improvements required by the regulations must be started or completed;</p></content></level><level class="para1" eId="section-56-1-b"><num>(b)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-56-1-c"><num>(c)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-56-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(b) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-56-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-56-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of complying with a requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-56-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-56-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-56-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-56-3-c"><num>(c)</num><content><p>that the improvements required by or under the regulations are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-57"><num>57</num><heading>Sanctions for the purposes of Scottish domestic energy efficiency regulations</heading><subsection eId="section-57-1"><num>(1)</num><content><p>Scottish domestic energy efficiency regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-57-2"><num>(2)</num><intro><p>Provision falling within subsection (1) includes, in particular, provision—</p></intro><level class="para1" eId="section-57-2-a"><num>(a)</num><content><p>for a local authority to enforce any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-57-2-b"><num>(b)</num><content><p>about the sanctions for non-compliance with a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-57-2-c"><num>(c)</num><content><p>about the sanctions for the provision of false information in connection with such a requirement;</p></content></level><wrapUp><p>including, in cases falling within paragraph (b) or (c), the imposition of a civil penalty by a local authority.</p></wrapUp></subsection><subsection eId="section-57-3"><num>(3)</num><content><p>The amount of any civil penalty provided for by Scottish domestic energy efficiency regulations must not exceed £5,000.</p></content></subsection><subsection eId="section-57-4"><num>(4)</num><content><p>Where Scottish domestic energy efficiency regulations make provision for the imposition of a civil penalty, the regulations must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.</p></content></subsection><subsection eId="section-57-5"><num>(5)</num><intro><p>Provision falling within subsection (4) includes, in particular, provision—</p></intro><level class="para1" eId="section-57-5-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-57-5-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-57-5-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-57-5-d"><num>(d)</num><content><p>suspending the imposition of the penalty, pending determination of the appeal;</p></content></level><level class="para1" eId="section-57-5-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-57-5-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-57-6"><num>(6)</num><intro><p>The provision referred to in subsection (5)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-57-6-a"><num>(a)</num><content><p>to confirm the penalty;</p></content></level><level class="para1" eId="section-57-6-b"><num>(b)</num><content><p>to withdraw the penalty;</p></content></level><level class="para1" eId="section-57-6-c"><num>(c)</num><content><p>to vary the amount of the penalty;</p></content></level><level class="para1" eId="section-57-6-d"><num>(d)</num><content><p>to award expenses.</p></content></level></subsection><subsection eId="section-57-7"><num>(7)</num><content><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within subsection (5)(a), (c), (e) or (f), Scottish domestic energy efficiency regulations may revoke or amend any subordinate legislation if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></content></subsection><subsection eId="section-57-8"><num>(8)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978, except that it includes any instrument made under an Act of the Scottish Parliament.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-scottish-tenants-energy-efficiency-improvements-regulations"><heading><i>Scottish tenants' energy efficiency improvements regulations</i></heading><section eId="section-58"><num>58</num><heading>Scottish tenants' energy efficiency improvements regulations</heading><subsection eId="section-58-1"><num>(1)</num><content><p>The Scottish Ministers may make regulations for the purpose of securing that a landlord of a Scottish domestic PR property which is of such description of Scottish domestic PR property as is provided for by the regulations does not unreasonably refuse a request mentioned in subsection (2).</p></content></subsection><subsection eId="section-58-2"><num>(2)</num><content><p>The request is one by the tenant of the property to consent to the making of such relevant energy efficiency improvements as are identified in the request.</p></content></subsection><subsection eId="section-58-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “Scottish tenants' energy efficiency improvements regulations”.</p></content></subsection><subsection eId="section-58-4"><num>(4)</num><content><p>For the purposes of Scottish tenants' energy efficiency improvements regulations—</p><blockList class="unordered none" ukl:Name="UnorderedList" ukl:Decoration="none"><item><p>“landlord” and “tenant” have the meaning given by the regulations;</p></item><item><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p><blockList class="ordered alpha parens" ukl:Name="OrderedList" ukl:Type="alpha" ukl:Decoration="parens"><item><num>(a)</num><p>are of such description as the regulations provide, and</p></item><item><num>(b)</num><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part,</p></item><item><num>(ii)</num><p>provided free of charge pursuant to an obligation imposed by an order made under section 33BC or 33BD of the Gas Act 1986 or section 41A or 41B of the Electricity Act 1989,</p></item><item><num>(iii)</num><p>wholly financed pursuant to a combination of such a plan and such an obligation, or</p></item><item><num>(iv)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></item></blockList></item></blockList></content></subsection><subsection eId="section-58-5"><num>(5)</num><content><p>Scottish tenants' energy efficiency improvements regulations may come into force no earlier than 1 April 2015.</p></content></subsection></section><section eId="section-59"><num>59</num><heading>Further provision about Scottish tenants' energy efficiency improvements regulations</heading><subsection eId="section-59-1"><num>(1)</num><intro><p>Scottish tenants' energy efficiency improvements regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-59-1-a"><num>(a)</num><content><p>the form, content and service of a request under the regulations;</p></content></level><level class="para1" eId="section-59-1-b"><num>(b)</num><content><p>the form, content and service of any response by the landlord to a request (including the period within which any response must be given);</p></content></level><level class="para1" eId="section-59-1-c"><num>(c)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-59-1-d"><num>(d)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-59-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-59-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-59-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of consenting to the request.</p></content></level></subsection><subsection eId="section-59-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(d) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-59-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-59-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-59-3-c"><num>(c)</num><content><p>that the improvements for which consent has been requested are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-60"><num>60</num><heading>Sanctions for the purposes of Scottish tenants' energy efficiency improvements regulations</heading><subsection eId="section-60-1"><num>(1)</num><content><p>Scottish tenants' energy efficiency improvements regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-60-2"><num>(2)</num><content><p>Provision falling within subsection (1) includes, in particular, provision for a tenant to apply to a court or tribunal for a ruling that a landlord has not complied with a requirement imposed by or under the regulations.</p></content></subsection><subsection eId="section-60-3"><num>(3)</num><intro><p>Where the regulations make provision for a tenant to make an application such as is mentioned in subsection (2), the provision may, in particular, include provision—</p></intro><level class="para1" eId="section-60-3-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an application may be made;</p></content></level><level class="para1" eId="section-60-3-b"><num>(b)</num><content><p>as to the grounds on which an application may be made;</p></content></level><level class="para1" eId="section-60-3-c"><num>(c)</num><content><p>as to the procedure for making an application (including any fee which may be payable);</p></content></level><level class="para1" eId="section-60-3-d"><num>(d)</num><content><p>as to the powers of the court or tribunal to which an application is made (including as to expenses which may be awarded);</p></content></level><level class="para1" eId="section-60-3-e"><num>(e)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-60-4"><num>(4)</num><content><p>Where the regulations make provision for a tenant to make an application such as is mentioned in subsection (2), the regulations must also include provision for a right of appeal by the tenant or landlord against any decision of a court or tribunal on an application.</p></content></subsection><subsection eId="section-60-5"><num>(5)</num><intro><p>Provision falling within subsection (4) includes, in particular, provision—</p></intro><level class="para1" eId="section-60-5-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-60-5-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-60-5-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-60-5-d"><num>(d)</num><content><p>suspending the effect of the decision being appealed against, pending determination of the appeal;</p></content></level><level class="para1" eId="section-60-5-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-60-5-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-60-6"><num>(6)</num><intro><p>The provision referred to in subsection (5)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-60-6-a"><num>(a)</num><content><p>to confirm the decision;</p></content></level><level class="para1" eId="section-60-6-b"><num>(b)</num><content><p>to quash the decision;</p></content></level><level class="para1" eId="section-60-6-c"><num>(c)</num><content><p>to make a different decision;</p></content></level><level class="para1" eId="section-60-6-d"><num>(d)</num><content><p>to remit the decision or any matter relating to the decision to the person who made it;</p></content></level><level class="para1" eId="section-60-6-e"><num>(e)</num><content><p>to award expenses.</p></content></level></subsection><subsection eId="section-60-7"><num>(7)</num><intro><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within—</p></intro><level class="para1" eId="section-60-7-a"><num>(a)</num><content><p>subsection (3)(a), (c), (d) or (e), or</p></content></level><level class="para1" eId="section-60-7-b"><num>(b)</num><content><p>subsection (5)(a), (c), (e) or (f),</p></content></level><wrapUp><p>Scottish tenants' energy efficiency improvements regulations may revoke or amend any subordinate legislation if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></wrapUp></subsection><subsection eId="section-60-8"><num>(8)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978, except that it includes any instrument made under an Act of the Scottish Parliament.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-scottish-nondomestic-energy-efficiency-regulations"><heading><i>Scottish non-domestic energy efficiency regulations</i></heading><section eId="section-61"><num>61</num><heading>Scottish non-domestic energy efficiency regulations</heading><subsection eId="section-61-1"><num>(1)</num><intro><p>The Scottish Ministers may make regulations for the purpose of securing that a landlord of a Scottish non-domestic PR property—</p></intro><level class="para1" eId="section-61-1-a"><num>(a)</num><content><p>which is of such description of Scottish non-domestic PR property as is provided for by the regulations,</p></content></level><level class="para1" eId="section-61-1-b"><num>(b)</num><content><p>in relation to which there is an energy performance certificate, and</p></content></level><level class="para1" eId="section-61-1-c"><num>(c)</num><content><p>which falls below such level of energy efficiency (as demonstrated by the energy performance certificate) as is provided for by the regulations,</p></content></level><wrapUp><p>may not let the property until the landlord has complied with the obligation mentioned in subsection (2).</p></wrapUp></subsection><subsection eId="section-61-2"><num>(2)</num><content><p>The obligation is to make to the property such relevant energy efficiency improvements as are provided for by the regulations.</p></content></subsection><subsection eId="section-61-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “<term refersTo="#term-scottish-non-domestic-energy-efficiency-regulations" eId="term-scottish-non-domestic-energy-efficiency-regulations">Scottish non-domestic energy efficiency regulations</term>”.</p></content></subsection><subsection eId="section-61-4"><num>(4)</num><intro><p>For the purposes of Scottish non-domestic energy efficiency regulations—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-performance-certificate" eId="term-energy-performance-certificate">energy performance certificate</term>” has the meaning given by the Energy Performance (Scotland) Regulations;</p></content></hcontainer><hcontainer name="definition"><content><p>“landlord” and “let the property” have the meaning given by the regulations (and “let the property” may be defined to include “continue to let the property”);</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p></intro><level class="para1"><num>(a)</num><content><p>are of such description as the regulations provide, and</p></content></level><level class="para1"><num>(b)</num><content><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part, or</p></item><item><num>(ii)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></content></level></hcontainer></subsection><subsection eId="section-61-5"><num>(5)</num><content><p>The Scottish Ministers may by order amend the definition of “energy performance certificate” in subsection (4).</p></content></subsection><subsection eId="section-61-6"><num>(6)</num><content><p>Scottish non-domestic energy efficiency regulations may come into force no earlier than 1 April 2015.</p></content></subsection></section><section eId="section-62"><num>62</num><heading>Further provision about Scottish non-domestic energy efficiency regulations</heading><subsection eId="section-62-1"><num>(1)</num><intro><p>Scottish non-domestic energy efficiency regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-62-1-a"><num>(a)</num><content><p>the period within which improvements required by the regulations must be started or completed;</p></content></level><level class="para1" eId="section-62-1-b"><num>(b)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-62-1-c"><num>(c)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-62-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(b) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-62-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-62-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of complying with a requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-62-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-62-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-62-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-62-3-c"><num>(c)</num><content><p>that the improvements required by or under the regulations are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-63"><num>63</num><heading>Sanctions for the purposes of Scottish non-domestic energy efficiency regulations</heading><subsection eId="section-63-1"><num>(1)</num><content><p>Scottish non-domestic energy efficiency regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-63-2"><num>(2)</num><intro><p>Provision falling within subsection (1) includes, in particular, provision—</p></intro><level class="para1" eId="section-63-2-a"><num>(a)</num><content><p>for a local authority constituted under section 2(1) of the Local Government <abbr title="et cetera" xml:lang="la">etc.</abbr> (Scotland) Act 1994 to enforce any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-63-2-b"><num>(b)</num><content><p>about the sanctions for non-compliance with a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-63-2-c"><num>(c)</num><content><p>about the sanctions for the provision of false information in connection with such a requirement;</p></content></level><wrapUp><p>including, in cases falling within paragraph (b) or (c), the imposition of a civil penalty by such a local authority.</p></wrapUp></subsection><subsection eId="section-63-3"><num>(3)</num><content><p>Where Scottish non-domestic energy efficiency regulations make provision for a civil penalty, the regulations must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.</p></content></subsection><subsection eId="section-63-4"><num>(4)</num><intro><p>Provision falling within subsection (3) includes, in particular, provision—</p></intro><level class="para1" eId="section-63-4-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-63-4-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-63-4-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-63-4-d"><num>(d)</num><content><p>suspending the imposition of the penalty, pending determination of the appeal;</p></content></level><level class="para1" eId="section-63-4-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-63-4-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-63-5"><num>(5)</num><intro><p>The provision referred to in subsection (4)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-63-5-a"><num>(a)</num><content><p>to confirm the penalty;</p></content></level><level class="para1" eId="section-63-5-b"><num>(b)</num><content><p>to withdraw the penalty;</p></content></level><level class="para1" eId="section-63-5-c"><num>(c)</num><content><p>to vary the amount of the penalty;</p></content></level><level class="para1" eId="section-63-5-d"><num>(d)</num><content><p>to award expenses.</p></content></level></subsection><subsection eId="section-63-6"><num>(6)</num><content><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within subsection (4)(a), (c), (e) or (f), Scottish non-domestic energy efficiency regulations may revoke or amend any subordinate legislation if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></content></subsection><subsection eId="section-63-7"><num>(7)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978, except that it includes any instrument made under an Act of the Scottish Parliament.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-general"><heading><i>General</i></heading><section eId="section-64"><num>64</num><heading>Regulations and orders: Chapter 3</heading><subsection eId="section-64-1"><num>(1)</num><content><p>Regulations and orders under this Chapter may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-64-2"><num>(2)</num><content><p>Orders under this Chapter are subject to the negative procedure.</p></content></subsection><subsection eId="section-64-3"><num>(3)</num><content><p>Regulations under this Chapter are subject to the affirmative procedure.</p></content></subsection></section><section eId="section-65"><num>65</num><heading>Crown application: Chapter 3</heading><content><p>This Chapter binds the Crown.</p></content></section></hcontainer></chapter> — Scottish tenants' energy efficiency improvements regulations
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" eId="part-1-chapter-3"><num>CHAPTER 3</num><heading>Private rented sector: Scotland</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-introductory"><heading><i>Introductory</i></heading><section eId="section-54"><num>54</num><heading>Meaning of “domestic PR property” and “non-domestic PR property”: Scotland</heading><subsection eId="section-54-1"><num>(1)</num><intro><p>For the purposes of this Chapter—</p></intro><level class="para1" eId="section-54-1-a"><num>(a)</num><content><p>a property is a “Scottish domestic private rented property” if it is let under a tenancy to which Chapter 4 of Part 1 of the Housing (Scotland) Act 2006 (asp 1) applies;</p></content></level><level class="para1" eId="section-54-1-b"><num>(b)</num><intro><p>a property is a “Scottish non-domestic private rented property” if it—</p></intro><level class="para2" eId="section-54-1-b-i"><num>(i)</num><content><p>is situated in Scotland,</p></content></level><level class="para2" eId="section-54-1-b-ii"><num>(ii)</num><content><p>is let under a tenancy, and</p></content></level><level class="para2" eId="section-54-1-b-iii"><num>(iii)</num><content><p>is not a dwelling.</p></content></level></level></subsection><subsection eId="section-54-2"><num>(2)</num><content><p>In subsection (1)(b) “<term refersTo="#term-dwelling" eId="term-dwelling">dwelling</term>” has the meaning given by the Energy Performance of Buildings (Scotland) Regulations 2008 (<abbr class="acronym" title="Scottish Statutory Instrument">S.S.I.</abbr> 2008/309) (“<term refersTo="#term-the-energy-performance-scotland-regulations" eId="term-the-energy-performance-scotland-regulations">the Energy Performance (Scotland) Regulations</term>”).</p></content></subsection><subsection eId="section-54-3"><num>(3)</num><content><p>A Scottish domestic private rented property is referred to in this Chapter as a “Scottish domestic PR property”.</p></content></subsection><subsection eId="section-54-4"><num>(4)</num><content><p>A Scottish non-domestic private rented property is referred to in this Chapter as a “Scottish non-domestic PR property”.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-scottish-domestic-energy-efficiency-regulations"><heading><i>Scottish domestic energy efficiency regulations</i></heading><section eId="section-55"><num>55</num><heading>Scottish domestic energy efficiency regulations</heading><subsection eId="section-55-1"><num>(1)</num><intro><p>The Scottish Ministers may make regulations for the purpose of securing that a landlord of a Scottish domestic PR property—</p></intro><level class="para1" eId="section-55-1-a"><num>(a)</num><content><p>which is of such description of Scottish domestic PR property as is provided for by the regulations,</p></content></level><level class="para1" eId="section-55-1-b"><num>(b)</num><content><p>in relation to which there is an energy performance certificate, and</p></content></level><level class="para1" eId="section-55-1-c"><num>(c)</num><content><p>which falls below such level of energy efficiency (as demonstrated by the energy performance certificate) as is provided for by the regulations,</p></content></level><wrapUp><p>may not let the property until the landlord has complied with the obligation mentioned in subsection (2).</p></wrapUp></subsection><subsection eId="section-55-2"><num>(2)</num><content><p>The obligation is to make to the property such relevant energy efficiency improvements as are provided for by the regulations.</p></content></subsection><subsection eId="section-55-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “<term refersTo="#term-scottish-domestic-energy-efficiency-regulations" eId="term-scottish-domestic-energy-efficiency-regulations">Scottish domestic energy efficiency regulations</term>”.</p></content></subsection><subsection eId="section-55-4"><num>(4)</num><intro><p>For the purposes of Scottish domestic energy efficiency regulations—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-performance-certificate" eId="term-energy-performance-certificate">energy performance certificate</term>” has the meaning given by the Energy Performance (Scotland) Regulations;</p></content></hcontainer><hcontainer name="definition"><content><p>“landlord” and “let the property” have the meaning given by the regulations (and “let the property” may be defined to include “continue to let the property”);</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p></intro><level class="para1"><num>(a)</num><content><p>are of such description as the regulations provide, and</p></content></level><level class="para1"><num>(b)</num><content><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part,</p></item><item><num>(ii)</num><p>provided free of charge pursuant to an obligation imposed by an order made under section 33BC or 33BD of the Gas Act 1986 or section 41A or 41B of the Electricity Act 1989,</p></item><item><num>(iii)</num><p>wholly financed pursuant to a combination of such a plan and such an obligation, or</p></item><item><num>(iv)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></content></level></hcontainer></subsection><subsection eId="section-55-5"><num>(5)</num><content><p>The Scottish Ministers may by order amend the definition of “energy performance certificate” in subsection (4).</p></content></subsection><subsection eId="section-55-6"><num>(6)</num><content><p>Scottish domestic energy efficiency regulations may come into force no earlier than 1 April 2015.</p></content></subsection></section><section eId="section-56"><num>56</num><heading>Further provision about Scottish domestic energy efficiency regulations</heading><subsection eId="section-56-1"><num>(1)</num><intro><p>Scottish domestic energy efficiency regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-56-1-a"><num>(a)</num><content><p>the period within which improvements required by the regulations must be started or completed;</p></content></level><level class="para1" eId="section-56-1-b"><num>(b)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-56-1-c"><num>(c)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-56-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(b) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-56-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-56-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of complying with a requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-56-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-56-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-56-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-56-3-c"><num>(c)</num><content><p>that the improvements required by or under the regulations are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-57"><num>57</num><heading>Sanctions for the purposes of Scottish domestic energy efficiency regulations</heading><subsection eId="section-57-1"><num>(1)</num><content><p>Scottish domestic energy efficiency regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-57-2"><num>(2)</num><intro><p>Provision falling within subsection (1) includes, in particular, provision—</p></intro><level class="para1" eId="section-57-2-a"><num>(a)</num><content><p>for a local authority to enforce any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-57-2-b"><num>(b)</num><content><p>about the sanctions for non-compliance with a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-57-2-c"><num>(c)</num><content><p>about the sanctions for the provision of false information in connection with such a requirement;</p></content></level><wrapUp><p>including, in cases falling within paragraph (b) or (c), the imposition of a civil penalty by a local authority.</p></wrapUp></subsection><subsection eId="section-57-3"><num>(3)</num><content><p>The amount of any civil penalty provided for by Scottish domestic energy efficiency regulations must not exceed £5,000.</p></content></subsection><subsection eId="section-57-4"><num>(4)</num><content><p>Where Scottish domestic energy efficiency regulations make provision for the imposition of a civil penalty, the regulations must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.</p></content></subsection><subsection eId="section-57-5"><num>(5)</num><intro><p>Provision falling within subsection (4) includes, in particular, provision—</p></intro><level class="para1" eId="section-57-5-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-57-5-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-57-5-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-57-5-d"><num>(d)</num><content><p>suspending the imposition of the penalty, pending determination of the appeal;</p></content></level><level class="para1" eId="section-57-5-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-57-5-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-57-6"><num>(6)</num><intro><p>The provision referred to in subsection (5)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-57-6-a"><num>(a)</num><content><p>to confirm the penalty;</p></content></level><level class="para1" eId="section-57-6-b"><num>(b)</num><content><p>to withdraw the penalty;</p></content></level><level class="para1" eId="section-57-6-c"><num>(c)</num><content><p>to vary the amount of the penalty;</p></content></level><level class="para1" eId="section-57-6-d"><num>(d)</num><content><p>to award expenses.</p></content></level></subsection><subsection eId="section-57-7"><num>(7)</num><content><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within subsection (5)(a), (c), (e) or (f), Scottish domestic energy efficiency regulations may revoke or amend any subordinate legislation if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></content></subsection><subsection eId="section-57-8"><num>(8)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978, except that it includes any instrument made under an Act of the Scottish Parliament.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-scottish-tenants-energy-efficiency-improvements-regulations"><heading><i>Scottish tenants' energy efficiency improvements regulations</i></heading><section eId="section-58"><num>58</num><heading>Scottish tenants' energy efficiency improvements regulations</heading><subsection eId="section-58-1"><num>(1)</num><content><p>The Scottish Ministers may make regulations for the purpose of securing that a landlord of a Scottish domestic PR property which is of such description of Scottish domestic PR property as is provided for by the regulations does not unreasonably refuse a request mentioned in subsection (2).</p></content></subsection><subsection eId="section-58-2"><num>(2)</num><content><p>The request is one by the tenant of the property to consent to the making of such relevant energy efficiency improvements as are identified in the request.</p></content></subsection><subsection eId="section-58-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “Scottish tenants' energy efficiency improvements regulations”.</p></content></subsection><subsection eId="section-58-4"><num>(4)</num><content><p>For the purposes of Scottish tenants' energy efficiency improvements regulations—</p><blockList class="unordered none" ukl:Name="UnorderedList" ukl:Decoration="none"><item><p>“landlord” and “tenant” have the meaning given by the regulations;</p></item><item><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p><blockList class="ordered alpha parens" ukl:Name="OrderedList" ukl:Type="alpha" ukl:Decoration="parens"><item><num>(a)</num><p>are of such description as the regulations provide, and</p></item><item><num>(b)</num><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part,</p></item><item><num>(ii)</num><p>provided free of charge pursuant to an obligation imposed by an order made under section 33BC or 33BD of the Gas Act 1986 or section 41A or 41B of the Electricity Act 1989,</p></item><item><num>(iii)</num><p>wholly financed pursuant to a combination of such a plan and such an obligation, or</p></item><item><num>(iv)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></item></blockList></item></blockList></content></subsection><subsection eId="section-58-5"><num>(5)</num><content><p>Scottish tenants' energy efficiency improvements regulations may come into force no earlier than 1 April 2015.</p></content></subsection></section><section eId="section-59"><num>59</num><heading>Further provision about Scottish tenants' energy efficiency improvements regulations</heading><subsection eId="section-59-1"><num>(1)</num><intro><p>Scottish tenants' energy efficiency improvements regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-59-1-a"><num>(a)</num><content><p>the form, content and service of a request under the regulations;</p></content></level><level class="para1" eId="section-59-1-b"><num>(b)</num><content><p>the form, content and service of any response by the landlord to a request (including the period within which any response must be given);</p></content></level><level class="para1" eId="section-59-1-c"><num>(c)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-59-1-d"><num>(d)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-59-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-59-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-59-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of consenting to the request.</p></content></level></subsection><subsection eId="section-59-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(d) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-59-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-59-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-59-3-c"><num>(c)</num><content><p>that the improvements for which consent has been requested are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-60"><num>60</num><heading>Sanctions for the purposes of Scottish tenants' energy efficiency improvements regulations</heading><subsection eId="section-60-1"><num>(1)</num><content><p>Scottish tenants' energy efficiency improvements regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-60-2"><num>(2)</num><content><p>Provision falling within subsection (1) includes, in particular, provision for a tenant to apply to a court or tribunal for a ruling that a landlord has not complied with a requirement imposed by or under the regulations.</p></content></subsection><subsection eId="section-60-3"><num>(3)</num><intro><p>Where the regulations make provision for a tenant to make an application such as is mentioned in subsection (2), the provision may, in particular, include provision—</p></intro><level class="para1" eId="section-60-3-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an application may be made;</p></content></level><level class="para1" eId="section-60-3-b"><num>(b)</num><content><p>as to the grounds on which an application may be made;</p></content></level><level class="para1" eId="section-60-3-c"><num>(c)</num><content><p>as to the procedure for making an application (including any fee which may be payable);</p></content></level><level class="para1" eId="section-60-3-d"><num>(d)</num><content><p>as to the powers of the court or tribunal to which an application is made (including as to expenses which may be awarded);</p></content></level><level class="para1" eId="section-60-3-e"><num>(e)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-60-4"><num>(4)</num><content><p>Where the regulations make provision for a tenant to make an application such as is mentioned in subsection (2), the regulations must also include provision for a right of appeal by the tenant or landlord against any decision of a court or tribunal on an application.</p></content></subsection><subsection eId="section-60-5"><num>(5)</num><intro><p>Provision falling within subsection (4) includes, in particular, provision—</p></intro><level class="para1" eId="section-60-5-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-60-5-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-60-5-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-60-5-d"><num>(d)</num><content><p>suspending the effect of the decision being appealed against, pending determination of the appeal;</p></content></level><level class="para1" eId="section-60-5-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-60-5-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-60-6"><num>(6)</num><intro><p>The provision referred to in subsection (5)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-60-6-a"><num>(a)</num><content><p>to confirm the decision;</p></content></level><level class="para1" eId="section-60-6-b"><num>(b)</num><content><p>to quash the decision;</p></content></level><level class="para1" eId="section-60-6-c"><num>(c)</num><content><p>to make a different decision;</p></content></level><level class="para1" eId="section-60-6-d"><num>(d)</num><content><p>to remit the decision or any matter relating to the decision to the person who made it;</p></content></level><level class="para1" eId="section-60-6-e"><num>(e)</num><content><p>to award expenses.</p></content></level></subsection><subsection eId="section-60-7"><num>(7)</num><intro><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within—</p></intro><level class="para1" eId="section-60-7-a"><num>(a)</num><content><p>subsection (3)(a), (c), (d) or (e), or</p></content></level><level class="para1" eId="section-60-7-b"><num>(b)</num><content><p>subsection (5)(a), (c), (e) or (f),</p></content></level><wrapUp><p>Scottish tenants' energy efficiency improvements regulations may revoke or amend any subordinate legislation if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></wrapUp></subsection><subsection eId="section-60-8"><num>(8)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978, except that it includes any instrument made under an Act of the Scottish Parliament.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-scottish-nondomestic-energy-efficiency-regulations"><heading><i>Scottish non-domestic energy efficiency regulations</i></heading><section eId="section-61"><num>61</num><heading>Scottish non-domestic energy efficiency regulations</heading><subsection eId="section-61-1"><num>(1)</num><intro><p>The Scottish Ministers may make regulations for the purpose of securing that a landlord of a Scottish non-domestic PR property—</p></intro><level class="para1" eId="section-61-1-a"><num>(a)</num><content><p>which is of such description of Scottish non-domestic PR property as is provided for by the regulations,</p></content></level><level class="para1" eId="section-61-1-b"><num>(b)</num><content><p>in relation to which there is an energy performance certificate, and</p></content></level><level class="para1" eId="section-61-1-c"><num>(c)</num><content><p>which falls below such level of energy efficiency (as demonstrated by the energy performance certificate) as is provided for by the regulations,</p></content></level><wrapUp><p>may not let the property until the landlord has complied with the obligation mentioned in subsection (2).</p></wrapUp></subsection><subsection eId="section-61-2"><num>(2)</num><content><p>The obligation is to make to the property such relevant energy efficiency improvements as are provided for by the regulations.</p></content></subsection><subsection eId="section-61-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “<term refersTo="#term-scottish-non-domestic-energy-efficiency-regulations" eId="term-scottish-non-domestic-energy-efficiency-regulations">Scottish non-domestic energy efficiency regulations</term>”.</p></content></subsection><subsection eId="section-61-4"><num>(4)</num><intro><p>For the purposes of Scottish non-domestic energy efficiency regulations—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-performance-certificate" eId="term-energy-performance-certificate">energy performance certificate</term>” has the meaning given by the Energy Performance (Scotland) Regulations;</p></content></hcontainer><hcontainer name="definition"><content><p>“landlord” and “let the property” have the meaning given by the regulations (and “let the property” may be defined to include “continue to let the property”);</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p></intro><level class="para1"><num>(a)</num><content><p>are of such description as the regulations provide, and</p></content></level><level class="para1"><num>(b)</num><content><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part, or</p></item><item><num>(ii)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></content></level></hcontainer></subsection><subsection eId="section-61-5"><num>(5)</num><content><p>The Scottish Ministers may by order amend the definition of “energy performance certificate” in subsection (4).</p></content></subsection><subsection eId="section-61-6"><num>(6)</num><content><p>Scottish non-domestic energy efficiency regulations may come into force no earlier than 1 April 2015.</p></content></subsection></section><section eId="section-62"><num>62</num><heading>Further provision about Scottish non-domestic energy efficiency regulations</heading><subsection eId="section-62-1"><num>(1)</num><intro><p>Scottish non-domestic energy efficiency regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-62-1-a"><num>(a)</num><content><p>the period within which improvements required by the regulations must be started or completed;</p></content></level><level class="para1" eId="section-62-1-b"><num>(b)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-62-1-c"><num>(c)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-62-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(b) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-62-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-62-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of complying with a requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-62-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-62-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-62-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-62-3-c"><num>(c)</num><content><p>that the improvements required by or under the regulations are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-63"><num>63</num><heading>Sanctions for the purposes of Scottish non-domestic energy efficiency regulations</heading><subsection eId="section-63-1"><num>(1)</num><content><p>Scottish non-domestic energy efficiency regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-63-2"><num>(2)</num><intro><p>Provision falling within subsection (1) includes, in particular, provision—</p></intro><level class="para1" eId="section-63-2-a"><num>(a)</num><content><p>for a local authority constituted under section 2(1) of the Local Government <abbr title="et cetera" xml:lang="la">etc.</abbr> (Scotland) Act 1994 to enforce any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-63-2-b"><num>(b)</num><content><p>about the sanctions for non-compliance with a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-63-2-c"><num>(c)</num><content><p>about the sanctions for the provision of false information in connection with such a requirement;</p></content></level><wrapUp><p>including, in cases falling within paragraph (b) or (c), the imposition of a civil penalty by such a local authority.</p></wrapUp></subsection><subsection eId="section-63-3"><num>(3)</num><content><p>Where Scottish non-domestic energy efficiency regulations make provision for a civil penalty, the regulations must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.</p></content></subsection><subsection eId="section-63-4"><num>(4)</num><intro><p>Provision falling within subsection (3) includes, in particular, provision—</p></intro><level class="para1" eId="section-63-4-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-63-4-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-63-4-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-63-4-d"><num>(d)</num><content><p>suspending the imposition of the penalty, pending determination of the appeal;</p></content></level><level class="para1" eId="section-63-4-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-63-4-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-63-5"><num>(5)</num><intro><p>The provision referred to in subsection (4)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-63-5-a"><num>(a)</num><content><p>to confirm the penalty;</p></content></level><level class="para1" eId="section-63-5-b"><num>(b)</num><content><p>to withdraw the penalty;</p></content></level><level class="para1" eId="section-63-5-c"><num>(c)</num><content><p>to vary the amount of the penalty;</p></content></level><level class="para1" eId="section-63-5-d"><num>(d)</num><content><p>to award expenses.</p></content></level></subsection><subsection eId="section-63-6"><num>(6)</num><content><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within subsection (4)(a), (c), (e) or (f), Scottish non-domestic energy efficiency regulations may revoke or amend any subordinate legislation if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></content></subsection><subsection eId="section-63-7"><num>(7)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978, except that it includes any instrument made under an Act of the Scottish Parliament.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-general"><heading><i>General</i></heading><section eId="section-64"><num>64</num><heading>Regulations and orders: Chapter 3</heading><subsection eId="section-64-1"><num>(1)</num><content><p>Regulations and orders under this Chapter may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-64-2"><num>(2)</num><content><p>Orders under this Chapter are subject to the negative procedure.</p></content></subsection><subsection eId="section-64-3"><num>(3)</num><content><p>Regulations under this Chapter are subject to the affirmative procedure.</p></content></subsection></section><section eId="section-65"><num>65</num><heading>Crown application: Chapter 3</heading><content><p>This Chapter binds the Crown.</p></content></section></hcontainer></chapter> — Scottish non-domestic energy efficiency regulations
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" eId="part-1-chapter-3"><num>CHAPTER 3</num><heading>Private rented sector: Scotland</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-introductory"><heading><i>Introductory</i></heading><section eId="section-54"><num>54</num><heading>Meaning of “domestic PR property” and “non-domestic PR property”: Scotland</heading><subsection eId="section-54-1"><num>(1)</num><intro><p>For the purposes of this Chapter—</p></intro><level class="para1" eId="section-54-1-a"><num>(a)</num><content><p>a property is a “Scottish domestic private rented property” if it is let under a tenancy to which Chapter 4 of Part 1 of the Housing (Scotland) Act 2006 (asp 1) applies;</p></content></level><level class="para1" eId="section-54-1-b"><num>(b)</num><intro><p>a property is a “Scottish non-domestic private rented property” if it—</p></intro><level class="para2" eId="section-54-1-b-i"><num>(i)</num><content><p>is situated in Scotland,</p></content></level><level class="para2" eId="section-54-1-b-ii"><num>(ii)</num><content><p>is let under a tenancy, and</p></content></level><level class="para2" eId="section-54-1-b-iii"><num>(iii)</num><content><p>is not a dwelling.</p></content></level></level></subsection><subsection eId="section-54-2"><num>(2)</num><content><p>In subsection (1)(b) “<term refersTo="#term-dwelling" eId="term-dwelling">dwelling</term>” has the meaning given by the Energy Performance of Buildings (Scotland) Regulations 2008 (<abbr class="acronym" title="Scottish Statutory Instrument">S.S.I.</abbr> 2008/309) (“<term refersTo="#term-the-energy-performance-scotland-regulations" eId="term-the-energy-performance-scotland-regulations">the Energy Performance (Scotland) Regulations</term>”).</p></content></subsection><subsection eId="section-54-3"><num>(3)</num><content><p>A Scottish domestic private rented property is referred to in this Chapter as a “Scottish domestic PR property”.</p></content></subsection><subsection eId="section-54-4"><num>(4)</num><content><p>A Scottish non-domestic private rented property is referred to in this Chapter as a “Scottish non-domestic PR property”.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-scottish-domestic-energy-efficiency-regulations"><heading><i>Scottish domestic energy efficiency regulations</i></heading><section eId="section-55"><num>55</num><heading>Scottish domestic energy efficiency regulations</heading><subsection eId="section-55-1"><num>(1)</num><intro><p>The Scottish Ministers may make regulations for the purpose of securing that a landlord of a Scottish domestic PR property—</p></intro><level class="para1" eId="section-55-1-a"><num>(a)</num><content><p>which is of such description of Scottish domestic PR property as is provided for by the regulations,</p></content></level><level class="para1" eId="section-55-1-b"><num>(b)</num><content><p>in relation to which there is an energy performance certificate, and</p></content></level><level class="para1" eId="section-55-1-c"><num>(c)</num><content><p>which falls below such level of energy efficiency (as demonstrated by the energy performance certificate) as is provided for by the regulations,</p></content></level><wrapUp><p>may not let the property until the landlord has complied with the obligation mentioned in subsection (2).</p></wrapUp></subsection><subsection eId="section-55-2"><num>(2)</num><content><p>The obligation is to make to the property such relevant energy efficiency improvements as are provided for by the regulations.</p></content></subsection><subsection eId="section-55-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “<term refersTo="#term-scottish-domestic-energy-efficiency-regulations" eId="term-scottish-domestic-energy-efficiency-regulations">Scottish domestic energy efficiency regulations</term>”.</p></content></subsection><subsection eId="section-55-4"><num>(4)</num><intro><p>For the purposes of Scottish domestic energy efficiency regulations—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-performance-certificate" eId="term-energy-performance-certificate">energy performance certificate</term>” has the meaning given by the Energy Performance (Scotland) Regulations;</p></content></hcontainer><hcontainer name="definition"><content><p>“landlord” and “let the property” have the meaning given by the regulations (and “let the property” may be defined to include “continue to let the property”);</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p></intro><level class="para1"><num>(a)</num><content><p>are of such description as the regulations provide, and</p></content></level><level class="para1"><num>(b)</num><content><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part,</p></item><item><num>(ii)</num><p>provided free of charge pursuant to an obligation imposed by an order made under section 33BC or 33BD of the Gas Act 1986 or section 41A or 41B of the Electricity Act 1989,</p></item><item><num>(iii)</num><p>wholly financed pursuant to a combination of such a plan and such an obligation, or</p></item><item><num>(iv)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></content></level></hcontainer></subsection><subsection eId="section-55-5"><num>(5)</num><content><p>The Scottish Ministers may by order amend the definition of “energy performance certificate” in subsection (4).</p></content></subsection><subsection eId="section-55-6"><num>(6)</num><content><p>Scottish domestic energy efficiency regulations may come into force no earlier than 1 April 2015.</p></content></subsection></section><section eId="section-56"><num>56</num><heading>Further provision about Scottish domestic energy efficiency regulations</heading><subsection eId="section-56-1"><num>(1)</num><intro><p>Scottish domestic energy efficiency regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-56-1-a"><num>(a)</num><content><p>the period within which improvements required by the regulations must be started or completed;</p></content></level><level class="para1" eId="section-56-1-b"><num>(b)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-56-1-c"><num>(c)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-56-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(b) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-56-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-56-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of complying with a requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-56-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-56-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-56-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-56-3-c"><num>(c)</num><content><p>that the improvements required by or under the regulations are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-57"><num>57</num><heading>Sanctions for the purposes of Scottish domestic energy efficiency regulations</heading><subsection eId="section-57-1"><num>(1)</num><content><p>Scottish domestic energy efficiency regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-57-2"><num>(2)</num><intro><p>Provision falling within subsection (1) includes, in particular, provision—</p></intro><level class="para1" eId="section-57-2-a"><num>(a)</num><content><p>for a local authority to enforce any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-57-2-b"><num>(b)</num><content><p>about the sanctions for non-compliance with a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-57-2-c"><num>(c)</num><content><p>about the sanctions for the provision of false information in connection with such a requirement;</p></content></level><wrapUp><p>including, in cases falling within paragraph (b) or (c), the imposition of a civil penalty by a local authority.</p></wrapUp></subsection><subsection eId="section-57-3"><num>(3)</num><content><p>The amount of any civil penalty provided for by Scottish domestic energy efficiency regulations must not exceed £5,000.</p></content></subsection><subsection eId="section-57-4"><num>(4)</num><content><p>Where Scottish domestic energy efficiency regulations make provision for the imposition of a civil penalty, the regulations must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.</p></content></subsection><subsection eId="section-57-5"><num>(5)</num><intro><p>Provision falling within subsection (4) includes, in particular, provision—</p></intro><level class="para1" eId="section-57-5-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-57-5-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-57-5-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-57-5-d"><num>(d)</num><content><p>suspending the imposition of the penalty, pending determination of the appeal;</p></content></level><level class="para1" eId="section-57-5-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-57-5-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-57-6"><num>(6)</num><intro><p>The provision referred to in subsection (5)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-57-6-a"><num>(a)</num><content><p>to confirm the penalty;</p></content></level><level class="para1" eId="section-57-6-b"><num>(b)</num><content><p>to withdraw the penalty;</p></content></level><level class="para1" eId="section-57-6-c"><num>(c)</num><content><p>to vary the amount of the penalty;</p></content></level><level class="para1" eId="section-57-6-d"><num>(d)</num><content><p>to award expenses.</p></content></level></subsection><subsection eId="section-57-7"><num>(7)</num><content><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within subsection (5)(a), (c), (e) or (f), Scottish domestic energy efficiency regulations may revoke or amend any subordinate legislation if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></content></subsection><subsection eId="section-57-8"><num>(8)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978, except that it includes any instrument made under an Act of the Scottish Parliament.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-scottish-tenants-energy-efficiency-improvements-regulations"><heading><i>Scottish tenants' energy efficiency improvements regulations</i></heading><section eId="section-58"><num>58</num><heading>Scottish tenants' energy efficiency improvements regulations</heading><subsection eId="section-58-1"><num>(1)</num><content><p>The Scottish Ministers may make regulations for the purpose of securing that a landlord of a Scottish domestic PR property which is of such description of Scottish domestic PR property as is provided for by the regulations does not unreasonably refuse a request mentioned in subsection (2).</p></content></subsection><subsection eId="section-58-2"><num>(2)</num><content><p>The request is one by the tenant of the property to consent to the making of such relevant energy efficiency improvements as are identified in the request.</p></content></subsection><subsection eId="section-58-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “Scottish tenants' energy efficiency improvements regulations”.</p></content></subsection><subsection eId="section-58-4"><num>(4)</num><content><p>For the purposes of Scottish tenants' energy efficiency improvements regulations—</p><blockList class="unordered none" ukl:Name="UnorderedList" ukl:Decoration="none"><item><p>“landlord” and “tenant” have the meaning given by the regulations;</p></item><item><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p><blockList class="ordered alpha parens" ukl:Name="OrderedList" ukl:Type="alpha" ukl:Decoration="parens"><item><num>(a)</num><p>are of such description as the regulations provide, and</p></item><item><num>(b)</num><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part,</p></item><item><num>(ii)</num><p>provided free of charge pursuant to an obligation imposed by an order made under section 33BC or 33BD of the Gas Act 1986 or section 41A or 41B of the Electricity Act 1989,</p></item><item><num>(iii)</num><p>wholly financed pursuant to a combination of such a plan and such an obligation, or</p></item><item><num>(iv)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></item></blockList></item></blockList></content></subsection><subsection eId="section-58-5"><num>(5)</num><content><p>Scottish tenants' energy efficiency improvements regulations may come into force no earlier than 1 April 2015.</p></content></subsection></section><section eId="section-59"><num>59</num><heading>Further provision about Scottish tenants' energy efficiency improvements regulations</heading><subsection eId="section-59-1"><num>(1)</num><intro><p>Scottish tenants' energy efficiency improvements regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-59-1-a"><num>(a)</num><content><p>the form, content and service of a request under the regulations;</p></content></level><level class="para1" eId="section-59-1-b"><num>(b)</num><content><p>the form, content and service of any response by the landlord to a request (including the period within which any response must be given);</p></content></level><level class="para1" eId="section-59-1-c"><num>(c)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-59-1-d"><num>(d)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-59-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-59-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-59-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of consenting to the request.</p></content></level></subsection><subsection eId="section-59-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(d) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-59-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-59-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-59-3-c"><num>(c)</num><content><p>that the improvements for which consent has been requested are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-60"><num>60</num><heading>Sanctions for the purposes of Scottish tenants' energy efficiency improvements regulations</heading><subsection eId="section-60-1"><num>(1)</num><content><p>Scottish tenants' energy efficiency improvements regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-60-2"><num>(2)</num><content><p>Provision falling within subsection (1) includes, in particular, provision for a tenant to apply to a court or tribunal for a ruling that a landlord has not complied with a requirement imposed by or under the regulations.</p></content></subsection><subsection eId="section-60-3"><num>(3)</num><intro><p>Where the regulations make provision for a tenant to make an application such as is mentioned in subsection (2), the provision may, in particular, include provision—</p></intro><level class="para1" eId="section-60-3-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an application may be made;</p></content></level><level class="para1" eId="section-60-3-b"><num>(b)</num><content><p>as to the grounds on which an application may be made;</p></content></level><level class="para1" eId="section-60-3-c"><num>(c)</num><content><p>as to the procedure for making an application (including any fee which may be payable);</p></content></level><level class="para1" eId="section-60-3-d"><num>(d)</num><content><p>as to the powers of the court or tribunal to which an application is made (including as to expenses which may be awarded);</p></content></level><level class="para1" eId="section-60-3-e"><num>(e)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-60-4"><num>(4)</num><content><p>Where the regulations make provision for a tenant to make an application such as is mentioned in subsection (2), the regulations must also include provision for a right of appeal by the tenant or landlord against any decision of a court or tribunal on an application.</p></content></subsection><subsection eId="section-60-5"><num>(5)</num><intro><p>Provision falling within subsection (4) includes, in particular, provision—</p></intro><level class="para1" eId="section-60-5-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-60-5-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-60-5-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-60-5-d"><num>(d)</num><content><p>suspending the effect of the decision being appealed against, pending determination of the appeal;</p></content></level><level class="para1" eId="section-60-5-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-60-5-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-60-6"><num>(6)</num><intro><p>The provision referred to in subsection (5)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-60-6-a"><num>(a)</num><content><p>to confirm the decision;</p></content></level><level class="para1" eId="section-60-6-b"><num>(b)</num><content><p>to quash the decision;</p></content></level><level class="para1" eId="section-60-6-c"><num>(c)</num><content><p>to make a different decision;</p></content></level><level class="para1" eId="section-60-6-d"><num>(d)</num><content><p>to remit the decision or any matter relating to the decision to the person who made it;</p></content></level><level class="para1" eId="section-60-6-e"><num>(e)</num><content><p>to award expenses.</p></content></level></subsection><subsection eId="section-60-7"><num>(7)</num><intro><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within—</p></intro><level class="para1" eId="section-60-7-a"><num>(a)</num><content><p>subsection (3)(a), (c), (d) or (e), or</p></content></level><level class="para1" eId="section-60-7-b"><num>(b)</num><content><p>subsection (5)(a), (c), (e) or (f),</p></content></level><wrapUp><p>Scottish tenants' energy efficiency improvements regulations may revoke or amend any subordinate legislation if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></wrapUp></subsection><subsection eId="section-60-8"><num>(8)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978, except that it includes any instrument made under an Act of the Scottish Parliament.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-scottish-nondomestic-energy-efficiency-regulations"><heading><i>Scottish non-domestic energy efficiency regulations</i></heading><section eId="section-61"><num>61</num><heading>Scottish non-domestic energy efficiency regulations</heading><subsection eId="section-61-1"><num>(1)</num><intro><p>The Scottish Ministers may make regulations for the purpose of securing that a landlord of a Scottish non-domestic PR property—</p></intro><level class="para1" eId="section-61-1-a"><num>(a)</num><content><p>which is of such description of Scottish non-domestic PR property as is provided for by the regulations,</p></content></level><level class="para1" eId="section-61-1-b"><num>(b)</num><content><p>in relation to which there is an energy performance certificate, and</p></content></level><level class="para1" eId="section-61-1-c"><num>(c)</num><content><p>which falls below such level of energy efficiency (as demonstrated by the energy performance certificate) as is provided for by the regulations,</p></content></level><wrapUp><p>may not let the property until the landlord has complied with the obligation mentioned in subsection (2).</p></wrapUp></subsection><subsection eId="section-61-2"><num>(2)</num><content><p>The obligation is to make to the property such relevant energy efficiency improvements as are provided for by the regulations.</p></content></subsection><subsection eId="section-61-3"><num>(3)</num><content><p>Regulations under this section are referred to in this Chapter as “<term refersTo="#term-scottish-non-domestic-energy-efficiency-regulations" eId="term-scottish-non-domestic-energy-efficiency-regulations">Scottish non-domestic energy efficiency regulations</term>”.</p></content></subsection><subsection eId="section-61-4"><num>(4)</num><intro><p>For the purposes of Scottish non-domestic energy efficiency regulations—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-performance-certificate" eId="term-energy-performance-certificate">energy performance certificate</term>” has the meaning given by the Energy Performance (Scotland) Regulations;</p></content></hcontainer><hcontainer name="definition"><content><p>“landlord” and “let the property” have the meaning given by the regulations (and “let the property” may be defined to include “continue to let the property”);</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-energy-efficiency-improvements" eId="term-relevant-energy-efficiency-improvements">relevant energy efficiency improvements</term>” means improvements which—</p></intro><level class="para1"><num>(a)</num><content><p>are of such description as the regulations provide, and</p></content></level><level class="para1"><num>(b)</num><content><p>can be—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>wholly paid for pursuant to a green deal plan as provided for by Chapter 1 of this Part, or</p></item><item><num>(ii)</num><p>financed by such other description of financial arrangement as the regulations provide.</p></item></blockList></content></level></hcontainer></subsection><subsection eId="section-61-5"><num>(5)</num><content><p>The Scottish Ministers may by order amend the definition of “energy performance certificate” in subsection (4).</p></content></subsection><subsection eId="section-61-6"><num>(6)</num><content><p>Scottish non-domestic energy efficiency regulations may come into force no earlier than 1 April 2015.</p></content></subsection></section><section eId="section-62"><num>62</num><heading>Further provision about Scottish non-domestic energy efficiency regulations</heading><subsection eId="section-62-1"><num>(1)</num><intro><p>Scottish non-domestic energy efficiency regulations may, in particular, include provision about—</p></intro><level class="para1" eId="section-62-1-a"><num>(a)</num><content><p>the period within which improvements required by the regulations must be started or completed;</p></content></level><level class="para1" eId="section-62-1-b"><num>(b)</num><content><p>exemptions from any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-62-1-c"><num>(c)</num><content><p>evidence relating to any requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-62-2"><num>(2)</num><intro><p>Provision falling within subsection (1)(b) includes, in particular, provision about exemptions—</p></intro><level class="para1" eId="section-62-2-a"><num>(a)</num><content><p>relating to any necessary permissions or consents;</p></content></level><level class="para1" eId="section-62-2-b"><num>(b)</num><content><p>relating to the likely negative impact on the value of a property of complying with a requirement imposed by or under the regulations.</p></content></level></subsection><subsection eId="section-62-3"><num>(3)</num><intro><p>Provision falling within subsection (1)(c) includes, in particular, provision about evidence for the purpose of demonstrating—</p></intro><level class="para1" eId="section-62-3-a"><num>(a)</num><content><p>an exemption from a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-62-3-b"><num>(b)</num><content><p>that a property is not one in relation to which the regulations have effect;</p></content></level><level class="para1" eId="section-62-3-c"><num>(c)</num><content><p>that the improvements required by or under the regulations are not relevant energy efficiency improvements within the meaning given by the regulations.</p></content></level></subsection></section><section eId="section-63"><num>63</num><heading>Sanctions for the purposes of Scottish non-domestic energy efficiency regulations</heading><subsection eId="section-63-1"><num>(1)</num><content><p>Scottish non-domestic energy efficiency regulations may include provision for the purpose of securing compliance with requirements imposed on landlords by or under the regulations.</p></content></subsection><subsection eId="section-63-2"><num>(2)</num><intro><p>Provision falling within subsection (1) includes, in particular, provision—</p></intro><level class="para1" eId="section-63-2-a"><num>(a)</num><content><p>for a local authority constituted under section 2(1) of the Local Government <abbr title="et cetera" xml:lang="la">etc.</abbr> (Scotland) Act 1994 to enforce any requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-63-2-b"><num>(b)</num><content><p>about the sanctions for non-compliance with a requirement imposed by or under the regulations;</p></content></level><level class="para1" eId="section-63-2-c"><num>(c)</num><content><p>about the sanctions for the provision of false information in connection with such a requirement;</p></content></level><wrapUp><p>including, in cases falling within paragraph (b) or (c), the imposition of a civil penalty by such a local authority.</p></wrapUp></subsection><subsection eId="section-63-3"><num>(3)</num><content><p>Where Scottish non-domestic energy efficiency regulations make provision for a civil penalty, the regulations must also include provision for a right of appeal to a court or tribunal against the imposition of the penalty.</p></content></subsection><subsection eId="section-63-4"><num>(4)</num><intro><p>Provision falling within subsection (3) includes, in particular, provision—</p></intro><level class="para1" eId="section-63-4-a"><num>(a)</num><content><p>as to the jurisdiction of the court or tribunal to which an appeal may be made;</p></content></level><level class="para1" eId="section-63-4-b"><num>(b)</num><content><p>as to the grounds on which an appeal may be made;</p></content></level><level class="para1" eId="section-63-4-c"><num>(c)</num><content><p>as to the procedure for making an appeal (including any fee which may be payable);</p></content></level><level class="para1" eId="section-63-4-d"><num>(d)</num><content><p>suspending the imposition of the penalty, pending determination of the appeal;</p></content></level><level class="para1" eId="section-63-4-e"><num>(e)</num><content><p>as to the powers of the court or tribunal to which an appeal is made;</p></content></level><level class="para1" eId="section-63-4-f"><num>(f)</num><content><p>as to how any sum payable in pursuance of a decision of the court or tribunal is to be recoverable.</p></content></level></subsection><subsection eId="section-63-5"><num>(5)</num><intro><p>The provision referred to in subsection (4)(e) includes provision conferring on the court or tribunal to which an appeal is made power—</p></intro><level class="para1" eId="section-63-5-a"><num>(a)</num><content><p>to confirm the penalty;</p></content></level><level class="para1" eId="section-63-5-b"><num>(b)</num><content><p>to withdraw the penalty;</p></content></level><level class="para1" eId="section-63-5-c"><num>(c)</num><content><p>to vary the amount of the penalty;</p></content></level><level class="para1" eId="section-63-5-d"><num>(d)</num><content><p>to award expenses.</p></content></level></subsection><subsection eId="section-63-6"><num>(6)</num><content><p>If the Scottish Ministers consider it appropriate for the purpose of, or in consequence of, any provision falling within subsection (4)(a), (c), (e) or (f), Scottish non-domestic energy efficiency regulations may revoke or amend any subordinate legislation if the provision making the revocation or amendment would be within the legislative competence of the Scottish Parliament if it were included in an Act of that Parliament.</p></content></subsection><subsection eId="section-63-7"><num>(7)</num><content><p>In this section “<term refersTo="#term-subordinate-legislation" eId="term-subordinate-legislation">subordinate legislation</term>” has the meaning given in section 21(1) of the Interpretation Act 1978, except that it includes any instrument made under an Act of the Scottish Parliament.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-general"><heading><i>General</i></heading><section eId="section-64"><num>64</num><heading>Regulations and orders: Chapter 3</heading><subsection eId="section-64-1"><num>(1)</num><content><p>Regulations and orders under this Chapter may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-64-2"><num>(2)</num><content><p>Orders under this Chapter are subject to the negative procedure.</p></content></subsection><subsection eId="section-64-3"><num>(3)</num><content><p>Regulations under this Chapter are subject to the affirmative procedure.</p></content></subsection></section><section eId="section-65"><num>65</num><heading>Crown application: Chapter 3</heading><content><p>This Chapter binds the Crown.</p></content></section></hcontainer></chapter> — General
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" eId="part-1-chapter-4"><num>CHAPTER 4</num><heading>Reducing carbon emissions and home-heating costs</heading><section eId="section-66"><num>66</num><heading>Promotion of reductions in carbon emissions: gas transporters and suppliers</heading><subsection eId="section-66-1"><num>(1)</num><content><p>Section 33BC of the Gas Act 1986 (promotion of reductions in carbon emissions: gas transporters and suppliers) is amended as follows.</p></content></subsection><subsection eId="section-66-2"><num>(2)</num><content><p><mod>In subsection (1) (power by order to impose an obligation to achieve a carbon emissions reduction target) for “the Authority” substitute <quotedText>“ the Administrator ”</quotedText>.</mod></p></content></subsection><subsection eId="section-66-3"><num>(3)</num><content><p><mod>After subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(2A)</num><intro><p>In this section “<term refersTo="#term-the-administrator">the Administrator</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>the Authority; or</p></content></level><level class="para1"><num>(b)</num><content><p>if the order so provides, the Secretary of State or a specified body other than the Authority.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-66-4"><num>(4)</num><content><p><mod>In subsection (3) for “the Authority” substitute <quotedText>“ the Administrator ”</quotedText>.</mod></p></content></subsection><subsection eId="section-66-5"><num>(5)</num><content><p><mod>In subsection (4) for “the Authority” substitute <quotedText>“ (subject to any directions given under subsection (9B)) the Administrator ”</quotedText>.</mod></p></content></subsection><subsection eId="section-66-6"><num>(6)</num><intro><p>In subsection (5) (general provision that may be included in an order imposing an obligation to achieve a carbon emissions reduction target)—</p></intro><level class="para1" eId="section-66-6-a"><num>(a)</num><content><p><mod>for paragraphs (ba) and (c) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(ba)</num><content><p>requiring part of a carbon emissions reduction target to be met by action of a specified description;</p></content></level><level class="para1"><num>(bb)</num><intro><p>requiring the whole or any part of a carbon emissions reduction target to be met by action relating to—</p></intro><level class="para2"><num>(i)</num><content><p>individuals of a specified description,</p></content></level><level class="para2"><num>(ii)</num><content><p>property of a specified description,</p></content></level><level class="para2"><num>(iii)</num><content><p>specified areas or areas of a specified description, or</p></content></level><level class="para2"><num>(iv)</num><content><p>individuals or property of a specified description in specified areas or areas of a specified description;</p></content></level></level><level class="para1"><num>(bc)</num><content><p>enabling the Administrator to direct a transporter or supplier to meet part of a carbon emissions reduction target by action relating to an individual named in the direction;</p></content></level><level class="para1"><num>(bd)</num><intro><p>preventing action from qualifying for the purpose of meeting the whole or any part of a carbon emissions reduction target unless such persons as are specified in, or determined in accordance with, the order—</p></intro><level class="para2"><num>(i)</num><content><p>have been consulted about the action;</p></content></level><level class="para2"><num>(ii)</num><content><p>have consented to the action;</p></content></level></level><level class="para1"><num>(be)</num><content><p>requiring action which qualifies for the purpose of meeting both a carbon emissions reduction target and a home-heating cost reduction target to be treated as qualifying only for the purpose of meeting such one of those targets as the transporter or supplier concerned elects;</p></content></level><level class="para1"><num>(c)</num><content><p>determining, or specifying the method for determining, the contribution that any action makes towards meeting a carbon emissions reduction target;</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-66-6-b"><num>(b)</num><content><p><mod>in paragraph (d) for “the Authority” substitute <quotedText>“ the Administrator ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-66-6-c"><num>(c)</num><intro><p>in paragraph (e)—</p></intro><level class="para2" eId="section-66-6-c-i"><num>(i)</num><content><p><mod>for “the Authority” substitute <quotedText>“ the Administrator ”</quotedText>;</mod></p></content></level><level class="para2" eId="section-66-6-c-ii"><num>(ii)</num><content><p><mod>for sub-paragraph (ii) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para2"><num>(ii)</num><content><p>if so, what contribution the proposed action (or any result of that action specified in the determination) is to make towards achieving the carbon emissions reduction target;</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level></level><level class="para1" eId="section-66-6-d"><num>(d)</num><content><p><mod>in paragraph (f) for “the Authority” substitute <quotedText>“ the Administrator ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-66-6-e"><num>(e)</num><content><p><mod>after paragraph (f) insert<quotedText startQuote="&#x201C;">; and </quotedText><quotedStructure endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(g)</num><content><p>requiring the Administrator or a specified body to offer services of a specified kind and authorising a specified fee to be charged to those who take up the offer.</p></content></level></quotedStructure></mod></p></content></level></subsection><subsection eId="section-66-7"><num>(7)</num><content><p><mod>After subsection (5) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(5A)</num><intro><p>If the order makes provision by virtue of subsection (5)(bc) enabling the Administrator to direct a transporter or supplier to meet part of a carbon emissions reduction target by action relating to an individual named in the direction the order may also make provision—</p></intro><level class="para1"><num>(a)</num><content><p>authorising the Administrator to require specified persons to provide it with information for the purpose of enabling it to identify and select individuals who are to be the subject of a direction;</p></content></level><level class="para1"><num>(b)</num><content><p>specifying criteria in accordance with which the Administrator is to select individuals who are to be the subject of a direction;</p></content></level><level class="para1"><num>(c)</num><content><p>determining, or specifying the method for determining, which transporter or supplier is to be given a direction in relation to any particular individual selected in accordance with provision made under paragraph (b);</p></content></level><level class="para1"><num>(d)</num><content><p>authorising the Administrator, if it gives a direction to a transporter or supplier, to provide the transporter or supplier with information relating to the individual concerned for the purpose of assisting the transporter or supplier to comply with the direction;</p></content></level><level class="para1"><num>(e)</num><content><p>as to the times at which a direction may be given;</p></content></level><level class="para1"><num>(f)</num><content><p>as to the circumstances in which a direction need not be complied with.</p></content></level></subsection><subsection><num>(5B)</num><intro><p>Provision made by virtue of subsection (5)(c) may in particular provide for an action to be treated as making a greater contribution than it would otherwise do if the action relates to—</p></intro><level class="para1"><num>(a)</num><content><p>an individual of a specified description,</p></content></level><level class="para1"><num>(b)</num><content><p>a property of a specified description, or</p></content></level><level class="para1"><num>(c)</num><content><p>both an individual of a specified description and a property of a specified description.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-66-8"><num>(8)</num><content><p><mod>In subsection (6) for “the Authority” substitute <quotedText>“ the Administrator ”</quotedText>.</mod></p></content></subsection><subsection eId="section-66-9"><num>(9)</num><content><p><mod>After subsection (7) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(7A)</num><intro><p>The order may—</p></intro><level class="para1"><num>(a)</num><content><p>make provision for any specified requirement contained in it to be treated as a relevant requirement for the purposes of this Part; or</p></content></level><level class="para1"><num>(b)</num><content><p>if it provides for the Administrator to be a person other than the Authority, make provision for and in connection with enabling the Administrator to enforce any requirement imposed by the order.</p></content></level></subsection><subsection><num>(7B)</num><content><p>Provision made by virtue of paragraph (b) of subsection (7A) may, in particular, include provision corresponding to or applying (with or without modifications) any of sections 28 to 30F and section 38.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-66-10"><num>(10)</num><content><p>In subsection (8) omit paragraph (b).</p></content></subsection><subsection eId="section-66-11"><num>(11)</num><content><p><mod>After subsection (9) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(9A)</num><content><p>The order may make provision requiring the Administrator to give guidance to transporters or suppliers concerning such matters relating to the order as are specified.</p></content></subsection><subsection><num>(9B)</num><content><p>The Administrator shall carry out its functions under this section in accordance with any general or specific directions given to it by the Secretary of State.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-66-12"><num>(12)</num><content><p><mod>For subsection (10A) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(10A)</num><intro><p>The Secretary of State must obtain the consent of the Scottish Ministers before making an order under this section which contains provision that—</p></intro><level class="para1"><num>(a)</num><content><p>is included by virtue of subsection (2)(b),</p></content></level><level class="para1"><num>(b)</num><content><p>extends to Scotland, and</p></content></level><level class="para1"><num>(c)</num><content><p>would be within the legislative competence of the Scottish Parliament if contained in an Act of that Parliament.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-66-13"><num>(13)</num><content><p><mod>After subsection (12) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(12A)</num><content><p>Subsection (12) does not apply to an order under this section made only for the purpose of amending an earlier order under this section so as to alter the provision included in the earlier order by virtue of any of paragraphs (b), (ba) or (c) of subsection (5).But such an order shall be subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection><num>(12B)</num><content><p>If an order under this section provides for the Administrator to be a body other than the Authority, the Secretary of State may make payments to the body of such amounts as the Secretary of State considers appropriate.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-66-14"><num>(14)</num><content><p><mod>In subsection (13) before the definition of “microgeneration” insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><p>“<term refersTo="#term-home-heating-cost-reduction-target">home-heating cost reduction target</term>” has the meaning given by section 33BD(2)(a);</p></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-66-15"><num>(15)</num><content><p>The reference in subsection (12A) of section 33BC of the Gas Act 1986 to paragraph (c) of subsection (5) of that section includes a reference to paragraph (c) of subsection (5) of that section before its substitution by subsection (6) of this section.</p></content></subsection></section><section eId="section-67"><num>67</num><heading>Promotion of reductions in carbon emissions: electricity generators, distributors and suppliers</heading><subsection eId="section-67-1"><num>(1)</num><content><p>Section 41A of the Electricity Act 1989 (promotion of reductions in carbon emissions: electricity generators, distributors and suppliers) is amended as follows.</p></content></subsection><subsection eId="section-67-2"><num>(2)</num><content><p><mod>In subsection (1) (power by order to impose an obligation to achieve a carbon emissions reduction target) for “the Authority” substitute <quotedText>“ the Administrator ”</quotedText>.</mod></p></content></subsection><subsection eId="section-67-3"><num>(3)</num><content><p><mod>After subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(2A)</num><intro><p>In this section “<term refersTo="#term-the-administrator">the Administrator</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>the Authority; or</p></content></level><level class="para1"><num>(b)</num><content><p>if the order so provides, the Secretary of State or a specified body other than the Authority.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-67-4"><num>(4)</num><content><p><mod>In subsection (3) for “the Authority” substitute <quotedText>“ the Administrator ”</quotedText>.</mod></p></content></subsection><subsection eId="section-67-5"><num>(5)</num><content><p><mod>In subsection (4) for “the Authority” substitute <quotedText>“ (subject to any directions given under subsection (9B)) the Administrator ”</quotedText>.</mod></p></content></subsection><subsection eId="section-67-6"><num>(6)</num><intro><p>In subsection (5) (general provision that may be included in an order imposing an obligation to achieve a carbon emissions reduction target)—</p></intro><level class="para1" eId="section-67-6-a"><num>(a)</num><content><p><mod>for paragraphs (ba) and (c) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(ba)</num><content><p>requiring part of a carbon emissions reduction target to be met by action of a specified description;</p></content></level><level class="para1"><num>(bb)</num><intro><p>requiring the whole or any part of a carbon emissions reduction target to be met by action relating to—</p></intro><level class="para2"><num>(i)</num><content><p>individuals of a specified description,</p></content></level><level class="para2"><num>(ii)</num><content><p>property of a specified description,</p></content></level><level class="para2"><num>(iii)</num><content><p>specified areas or areas of a specified description, or</p></content></level><level class="para2"><num>(iv)</num><content><p>individuals or property of a specified description in specified areas or areas of a specified description;</p></content></level></level><level class="para1"><num>(bc)</num><content><p>enabling the Administrator to direct a distributor or supplier to meet part of a carbon emissions reduction target by action relating to an individual named in the direction;</p></content></level><level class="para1"><num>(bd)</num><intro><p>preventing action from qualifying for the purpose of meeting the whole or any part of a carbon emissions reduction target unless such persons as are specified in, or determined in accordance with, the order—</p></intro><level class="para2"><num>(i)</num><content><p>have been consulted about the action;</p></content></level><level class="para2"><num>(ii)</num><content><p>have consented to the action;</p></content></level></level><level class="para1"><num>(be)</num><content><p>requiring action which qualifies for the purpose of meeting both a carbon emissions reduction target and a home-heating cost reduction target to be treated as qualifying only for the purpose of meeting such one of those targets as the distributor or supplier concerned elects;</p></content></level><level class="para1"><num>(c)</num><content><p>determining, or specifying the method for determining, the contribution that any action makes towards meeting a carbon emissions reduction target;</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-67-6-b"><num>(b)</num><content><p><mod>in paragraph (d) for “the Authority” substitute <quotedText>“ the Administrator ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-67-6-c"><num>(c)</num><intro><p>in paragraph (e)—</p></intro><level class="para2" eId="section-67-6-c-i"><num>(i)</num><content><p><mod>for “the Authority” substitute <quotedText>“ the Administrator ”</quotedText>;</mod></p></content></level><level class="para2" eId="section-67-6-c-ii"><num>(ii)</num><content><p><mod>for sub-paragraph (ii) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para2"><num>(ii)</num><content><p>if so, what contribution the proposed action (or any result of that action specified in the determination) is to make towards achieving the carbon emissions reduction target;</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level></level><level class="para1" eId="section-67-6-d"><num>(d)</num><content><p><mod>in paragraph (f) for “the Authority” substitute <quotedText>“ the Administrator ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-67-6-e"><num>(e)</num><content><p><mod>after paragraph (f) insert<quotedText startQuote="&#x201C;">; and </quotedText><quotedStructure endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(g)</num><content><p>requiring the Administrator or a specified body to offer services of a specified kind and authorising a specified fee to be charged to those who take up the offer.</p></content></level></quotedStructure></mod></p></content></level></subsection><subsection eId="section-67-7"><num>(7)</num><content><p><mod>After subsection (5) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(5A)</num><intro><p>If the order makes provision by virtue of subsection (5)(bc) enabling the Administrator to direct a distributor or supplier to meet part of a carbon emissions reduction target by action relating to an individual named in the direction the order may also make provision—</p></intro><level class="para1"><num>(a)</num><content><p>authorising the Administrator to require specified persons to provide it with information for the purpose of enabling it to identify and select individuals who are to be the subject of a direction;</p></content></level><level class="para1"><num>(b)</num><content><p>specifying criteria in accordance with which the Administrator is to select individuals who are to be the subject of a direction;</p></content></level><level class="para1"><num>(c)</num><content><p>determining, or specifying the method for determining, which distributor or supplier is to be given a direction in relation to any particular individual selected in accordance with provision made under paragraph (b);</p></content></level><level class="para1"><num>(d)</num><content><p>authorising the Administrator, if it gives a direction to a distributor or supplier, to provide the distributor or supplier with information relating to the individual concerned for the purpose of assisting the distributor or supplier to comply with the direction;</p></content></level><level class="para1"><num>(e)</num><content><p>as to the times at which a direction may be given;</p></content></level><level class="para1"><num>(f)</num><content><p>as to the circumstances in which a direction need not be complied with.</p></content></level></subsection><subsection><num>(5B)</num><intro><p>Provision made by virtue of subsection (5)(c) may in particular provide for an action to be treated as making a greater contribution than it would otherwise do if the action relates to—</p></intro><level class="para1"><num>(a)</num><content><p>an individual of a specified description,</p></content></level><level class="para1"><num>(b)</num><content><p>a property of a specified description, or</p></content></level><level class="para1"><num>(c)</num><content><p>both an individual of a specified description and a property of a specified description.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-67-8"><num>(8)</num><content><p><mod>In subsection (6) for “the Authority” substitute <quotedText>“ the Administrator ”</quotedText>.</mod></p></content></subsection><subsection eId="section-67-9"><num>(9)</num><content><p><mod>After subsection (7) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(7A)</num><intro><p>The order may—</p></intro><level class="para1"><num>(a)</num><content><p>make provision for any specified requirement contained in it to be treated as a relevant requirement for the purposes of this Part; or</p></content></level><level class="para1"><num>(b)</num><content><p>if it provides for the Administrator to be a person other than the Authority, make provision for and in connection with enabling the Administrator to enforce any requirement imposed by the order.</p></content></level></subsection><subsection><num>(7B)</num><content><p>Provision made by virtue of paragraph (b) of subsection (7A) may, in particular, include provision corresponding to or applying (with or without modifications) any of sections 25 to 28.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-67-10"><num>(10)</num><content><p>In subsection (8) omit paragraph (b).</p></content></subsection><subsection eId="section-67-11"><num>(11)</num><content><p><mod>After subsection (9) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(9A)</num><content><p>The order may make provision requiring the Administrator to give guidance to distributors or suppliers concerning such matters relating to the order as are specified.</p></content></subsection><subsection><num>(9B)</num><content><p>The Administrator shall carry out its functions under this section in accordance with any general or specific directions given to it by the Secretary of State.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-67-12"><num>(12)</num><content><p><mod>For subsection (10A) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(10A)</num><intro><p>The Secretary of State must obtain the consent of the Scottish Ministers before making an order under this section which contains provision that—</p></intro><level class="para1"><num>(a)</num><content><p>is included by virtue of subsection (2)(b),</p></content></level><level class="para1"><num>(b)</num><content><p>extends to Scotland, and</p></content></level><level class="para1"><num>(c)</num><content><p>would be within the legislative competence of the Scottish Parliament if contained in an Act of that Parliament.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-67-13"><num>(13)</num><content><p><mod>After subsection (12) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(12A)</num><content><p>Subsection (12) does not apply to an order under this section made only for the purpose of amending an earlier order under this section so as to alter the provision included in the earlier order by virtue of any of paragraphs (b), (ba) or (c) of subsection (5). But such an order shall be subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection><num>(12B)</num><content><p>If an order under this section provides for the Administrator to be a body other than the Authority, the Secretary of State may make payments to the body of such amounts as the Secretary of State considers appropriate.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-67-14"><num>(14)</num><content><p><mod>In subsection (13) before the definition of “microgeneration” insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><p>“<term refersTo="#term-home-heating-cost-reduction-target">home-heating cost reduction target</term>” has the meaning given by section 41B(2)(a);</p></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-67-15"><num>(15)</num><content><p>The reference in subsection (12A) of section 41A of the Electricity Act 1989 to paragraph (c) of subsection (5) of that section includes a reference to paragraph (c) of subsection (5) of that section before its substitution by subsection (6) of this section.</p></content></subsection><subsection eId="section-67-16"><num>(16)</num><content><p>The power to make orders under section 41A of the Electricity Act 1989 may not be exercised so as to impose an obligation on an electricity generator that has effect after 31 December 2012.</p></content></subsection></section><section eId="section-68"><num>68</num><heading>Promotion of reductions in home-heating costs: gas transporters and suppliers</heading><content><p><mod>After section 33BC of the Gas Act 1986 (promotion of reductions in carbon emissions: gas transporters and suppliers) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><section><num>33BD</num><heading>Promotion of reductions in home-heating costs: gas transporters and gas suppliers</heading><subsection><num>(1)</num><intro><p>The Secretary of State may by order impose—</p></intro><level class="para1"><num>(a)</num><content><p>on each gas transporter (or each gas transporter of a specified description); and</p></content></level><level class="para1"><num>(b)</num><content><p>on each gas supplier (or each gas supplier of a specified description),</p></content></level><wrapUp><p>an obligation to achieve, within a specified period and in accordance with the order, the home-heating cost reduction target to be determined by the Administrator under the order for that transporter or supplier (and that obligation is referred to in this section as a “<term refersTo="#term-home-heating-cost-reduction-obligation">home-heating cost reduction obligation</term>”).</p></wrapUp></subsection><subsection><num>(2)</num><intro><p>In this section—</p></intro><level class="para1"><num>(a)</num><intro><p>“<term refersTo="#term-the-administrator">the Administrator</term>” means—</p></intro><level class="para2"><num>(i)</num><content><p>the Authority; or</p></content></level><level class="para2"><num>(ii)</num><content><p>if the order so provides, the Secretary of State or a specified body other than the Authority;</p></content></level></level><level class="para1"><num>(b)</num><content><p>“<term refersTo="#term-home-heating-cost-reduction-target">home-heating cost reduction target</term>” means a target for the promotion of measures for reducing the cost to individuals of heating their homes;</p></content></level><level class="para1"><num>(c)</num><content><p>“<term refersTo="#term-specified">specified</term>” means specified in the order.</p></content></level></subsection><subsection><num>(3)</num><content><p>The power to make orders under this section may be exercised so as to impose more than one home-heating cost reduction obligation on a person in relation to the same period or to periods that overlap to any extent.</p></content></subsection><subsection><num>(4)</num><intro><p>Subsections (3), (5) to (8), (9A) and (10A) to (12B) of section 33BC apply to an order under this section as they apply to an order under that section, with the following modifications—</p></intro><level class="para1"><num>(a)</num><content><p><mod>for “carbon emissions reduction obligation” (in each place) substitute <quotedText>“ home-heating cost reduction obligation ”</quotedText>;</mod></p></content></level><level class="para1"><num>(b)</num><content><p><mod>for “carbon emissions reduction obligations” (in each place) substitute <quotedText>“ home-heating cost reduction obligations ”</quotedText>;</mod></p></content></level><level class="para1"><num>(c)</num><content><p><mod>for “carbon emissions reduction target” (in each place other than in paragraph (be) of subsection (5)) substitute <quotedText>“ home-heating cost reduction target ”</quotedText>;</mod></p></content></level><level class="para1"><num>(d)</num><content><p><mod>for “carbon emissions reduction targets” (in each place) substitute <quotedText>“ home-heating cost reduction targets ”</quotedText>; and</mod></p></content></level><level class="para1"><num>(e)</num><content><p>omit paragraph (a) of subsection (10A).</p></content></level></subsection><subsection><num>(5)</num><content><p>Subsections (4) and (9B) of section 33BC apply to the carrying out by the Secretary of State and the Administrator of their respective functions under this section as they apply to the carrying out by those persons of their functions under that section.</p></content></subsection><subsection><num>(6)</num><content><p>No person shall be required by virtue of this section to provide any information which he could not be compelled to give in evidence in civil proceedings in the High Court or, in Scotland, the Court of Session.</p></content></subsection></section></quotedStructure></mod></p></content></section><section eId="section-69"><num>69</num><heading>Promotion of reductions in home-heating costs: electricity distributors and suppliers</heading><content><p><mod>After section 41A of the Electricity Act 1989 (promotion of reductions in carbon emissions: electricity generators, distributors and suppliers) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><section><num>41B</num><heading>Promotion of reductions in home-heating costs: electricity distributors and electricity suppliers</heading><subsection><num>(1)</num><intro><p>The Secretary of State may by order impose—</p></intro><level class="para1"><num>(a)</num><content><p>on each electricity distributor (or each electricity distributor of a specified description); and</p></content></level><level class="para1"><num>(b)</num><content><p>on each electricity supplier (or each electricity supplier of a specified description),</p></content></level><wrapUp><p>an obligation to achieve, within a specified period and in accordance with the order, the home-heating cost reduction target to be determined by the Administrator under the order for that distributor or supplier (and that obligation is referred to in this section as a “<term refersTo="#term-home-heating-cost-reduction-obligation">home-heating cost reduction obligation</term>”).</p></wrapUp></subsection><subsection><num>(2)</num><intro><p>In this section—</p></intro><level class="para1"><num>(a)</num><intro><p>“<term refersTo="#term-the-administrator">the Administrator</term>” means—</p></intro><level class="para2"><num>(i)</num><content><p>the Authority; or</p></content></level><level class="para2"><num>(ii)</num><content><p>if the order so provides, the Secretary of State or a specified body other than the Authority;</p></content></level></level><level class="para1"><num>(b)</num><content><p>“<term refersTo="#term-home-heating-cost-reduction-target">home-heating cost reduction target</term>” means a target for the promotion of measures for reducing the cost to individuals of heating their homes;</p></content></level><level class="para1"><num>(c)</num><content><p>“<term refersTo="#term-specified">specified</term>” means specified in the order.</p></content></level></subsection><subsection><num>(3)</num><content><p>The power to make orders under this section may be exercised so as to impose more than one home-heating cost reduction obligation on a person in relation to the same period or to periods that overlap to any extent.</p></content></subsection><subsection><num>(4)</num><intro><p>Subsections (3), (5) to (8), (9A) and (10A) to (12B) of section 41A apply to an order under this section as they apply to an order under that section, with the following modifications—</p></intro><level class="para1"><num>(a)</num><content><p><mod>for “carbon emissions reduction obligation” (in each place) substitute <quotedText>“ home-heating cost reduction obligation ”</quotedText>;</mod></p></content></level><level class="para1"><num>(b)</num><content><p><mod>for “carbon emissions reduction obligations” (in each place) substitute <quotedText>“ home-heating cost reduction obligations ”</quotedText>;</mod></p></content></level><level class="para1"><num>(c)</num><content><p><mod>for “carbon emissions reduction target” (in each place other than in paragraph (be) of subsection (5)) substitute <quotedText>“ home-heating cost reduction target ”</quotedText>;</mod></p></content></level><level class="para1"><num>(d)</num><content><p><mod>for “carbon emissions reduction targets” (in each place) substitute <quotedText>“ home-heating cost reduction targets ”</quotedText>; and</mod></p></content></level><level class="para1"><num>(e)</num><content><p>omit paragraph (a) of subsection (10A).</p></content></level></subsection><subsection><num>(5)</num><content><p>Subsections (4) and (9B) of section 41A apply to the carrying out by the Secretary of State and the Administrator of their respective functions under this section as they apply to the carrying out by those persons of their functions under that section.</p></content></subsection><subsection><num>(6)</num><content><p>No person shall be required by virtue of this section to provide any information which he could not be compelled to give in evidence in civil proceedings in the High Court or, in Scotland, the Court of Session.</p></content></subsection></section></quotedStructure></mod></p></content></section><section eId="section-70"><num>70</num><heading>Overall home-heating cost reduction targets</heading><content><p><mod>After section 103 of the Utilities Act 2000 (overall carbon emissions reduction targets) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><section><num>103A</num><heading>Overall home-heating cost reduction targets</heading><subsection><num>(1)</num><intro><p>For the purposes of the exercise of the functions of the Administrator under either or both of—</p></intro><level class="para1"><num>(a)</num><content><p>section 33BD of the 1986 Act (promotion of reductions in home-heating costs: gas transporters and suppliers) and any order made under that section, and</p></content></level><level class="para1"><num>(b)</num><content><p>section 41B of the 1989 Act (promotion of reductions in home-heating costs: electricity distributors and suppliers) and any order made under that section,</p></content></level><wrapUp><p>the Secretary of State may by order specify an overall target for the promotion of measures for reducing the cost to individuals of heating their homes.</p></wrapUp></subsection><subsection><num>(2)</num><content><p>The power conferred by this section may be exercised so as to specify more than one overall target in relation to the same period or to periods that overlap to any extent.</p></content></subsection><subsection><num>(3)</num><intro><p>Where an overall target applies in relation to both sections mentioned in subsection (1), the order specifying the target may make provision for the target to be apportioned between—</p></intro><level class="para1"><num>(a)</num><content><p>persons who are gas transporters or gas suppliers (for the purposes of section 33BD of the 1986 Act and any order made under that section); and</p></content></level><level class="para1"><num>(b)</num><content><p>persons who are electricity distributors or electricity suppliers (for the purposes of section 41B of the 1989 Act and any order under that section),</p></content></level><wrapUp><p>by reference to such criteria as may be specified in the order.</p></wrapUp></subsection><subsection><num>(4)</num><content><p>The Administrator shall exercise its functions under the provisions mentioned in subsection (1) in relation to which an overall target applies (and in particular its functions relating to the determination of home-heating cost reduction targets) in the manner it considers best calculated to result in the achievement of the overall target.</p></content></subsection><subsection><num>(5)</num><content><p>Before making an order under this section the Secretary of State shall consult the Authority, the Council, gas transporters, gas suppliers, electricity distributors, electricity suppliers, and such other persons as the Secretary of State considers appropriate.</p></content></subsection><subsection><num>(6)</num><content><p>An order under this section shall not be made unless a draft of the instrument containing it has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection></section></quotedStructure></mod></p></content></section><section eId="section-71"><num>71</num><heading>Power of Secretary of State to require information: carbon emissions reduction targets and home-heating cost reduction targets</heading><content><p><mod>After section 103A of the Utilities Act 2000 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><section><num>103B</num><heading>Power of Secretary of State to require information: carbon emissions reduction targets and home-heating cost reduction targets</heading><subsection><num>(1)</num><intro><p>The Secretary of State may by notice require a person within subsection (3) to provide the Secretary of State with specified information, or information of a specified kind, for the purpose of enabling the Secretary of State—</p></intro><level class="para1"><num>(a)</num><content><p>to decide whether to make a carbon emissions reduction order or a home-heating cost reduction order and, if so, what provision to include in the order;</p></content></level><level class="para1"><num>(b)</num><content><p>to review the operation and effect of a carbon emissions reduction order or a home-heating cost reduction order;</p></content></level><level class="para1"><num>(c)</num><content><p>to establish and maintain a record (“a measures record”) of properties in respect of which carbon emissions reduction measures or home-heating cost reduction measures have been taken and of the type of measure taken in respect of each such property.</p></content></level></subsection><subsection><num>(2)</num><content><p>For the purpose of enabling a person (“A”) to establish and maintain a measures record on behalf of the Secretary of State, the Secretary of State may by notice require any person within subsection (3) to provide A with specified information or information of a specified kind.</p></content></subsection><subsection><num>(3)</num><intro><p>Those persons are—</p></intro><level class="para1"><num>(a)</num><content><p>gas transporters and gas suppliers;</p></content></level><level class="para1"><num>(b)</num><content><p>electricity distributors and electricity suppliers;</p></content></level><level class="para1"><num>(c)</num><content><p>the Authority; and</p></content></level><level class="para1"><num>(d)</num><content><p>any body other than the Authority that is for the time being the Administrator in relation to a carbon emissions reduction order or a home-heating cost reduction order.</p></content></level></subsection><subsection><num>(4)</num><intro><p>Information required to be provided by a notice under this section must be provided—</p></intro><level class="para1"><num>(a)</num><content><p>in such form as may be specified;</p></content></level><level class="para1"><num>(b)</num><content><p>within such period as may be specified or at such intervals as may be specified.</p></content></level></subsection><subsection><num>(5)</num><content><p>No person shall be required by a notice under this section to provide any information which the person could not be compelled to give in evidence in civil proceedings in the High Court or, in Scotland, the Court of Session.</p></content></subsection><subsection><num>(6)</num><intro><p>Information obtained by virtue of this section may be disclosed by the Secretary of State—</p></intro><level class="para1"><num>(a)</num><content><p>to the Welsh Ministers for the purpose of enabling them to review the operation and effect in Wales of a carbon emissions reduction order or a home-heating cost reduction order;</p></content></level><level class="para1"><num>(b)</num><content><p>to the Scottish Ministers for the purpose of enabling them to review the operation and effect in Scotland of a carbon emissions reduction order or a home-heating cost reduction order.</p></content></level></subsection><subsection><num>(7)</num><content><p>In sections 28 to 30F and section 38 of the 1986 Act (enforcement of relevant requirements <abbr title="Et cetera" xml:lang="la">etc</abbr>) a reference to a “relevant requirement” is to be treated as including a reference to a requirement imposed on a gas transporter or gas supplier under this section.</p></content></subsection><subsection><num>(8)</num><content><p>In sections 25 to 28 of the 1989 Act (enforcement of relevant requirements <abbr title="Et cetera" xml:lang="la">etc</abbr>) a reference to a “relevant requirement” is to be treated as including a reference to a requirement imposed on an electricity distributor or electricity supplier under this section.</p></content></subsection><subsection><num>(9)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-a-carbon-emissions-reduction-order">a carbon emissions reduction order</term>” means an order under—</p></intro><level class="para1"><num>(a)</num><content><p>section 33BC of the 1986 Act;</p></content></level><level class="para1"><num>(b)</num><content><p>section 41A of the 1989 Act; or</p></content></level><level class="para1"><num>(c)</num><content><p>section 103 of this Act;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-a-home-heating-cost-reduction-order">a home-heating cost reduction order</term>” means an order under—</p></intro><level class="para1"><num>(a)</num><content><p>section 33BD of the 1986 Act;</p></content></level><level class="para1"><num>(b)</num><content><p>section 41B of the 1989 Act; or</p></content></level><level class="para1"><num>(c)</num><content><p>section 103A of this Act;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“a carbon emissions reduction measure” is a measure of a kind mentioned in subsection (2) of each of section 33BC of the 1986 Act and section 41A of the 1989 Act;</p></content></hcontainer><hcontainer name="definition"><content><p>“a home-heating cost reduction measure” is a measure of a kind mentioned in subsection (2)(b) of each of section 33BD of the 1986 Act and section 41B of the 1989 Act;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-specified">specified</term>” means specified in a notice under this section.</p></content></hcontainer></subsection></section></quotedStructure></mod></p></content></section><section eId="section-72"><num>72</num><heading>Minor and consequential amendments</heading><content><p>Schedule 1 contains minor and consequential amendments relating to this Chapter.</p></content></section></chapter>
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-5"><num>CHAPTER 5</num><heading>Information about energy consumption, efficiency and tariffs</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-5-crossheading-smart-meters"><heading><i>Smart meters</i></heading><section eId="section-73"><num>73</num><heading>Smart meters</heading><subsection eId="section-73-1"><num>(1)</num><content><p>Section 88 of the Energy Act 2008 (power to modify licence conditions <abbr title="Et cetera" xml:lang="la">etc</abbr>: smart meters) is amended in accordance with subsections (2) to (6).</p></content></subsection><subsection eId="section-73-2"><num>(2)</num><intro><p>In subsection (1)(a) (type of licence that may be modified)—</p></intro><level class="para1" eId="section-73-2-a"><num>(a)</num><content><p><mod>for “6(1)(c)” substitute <quotedText>“ 6(1)(b), (c) ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-73-2-b"><num>(b)</num><content><p><mod>before “distribution” insert <quotedText>“ transmission, ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-73-3"><num>(3)</num><content><p><mod>In subsection (3) (non-exhaustive list of modifications that may be made) after paragraph (j) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(ja)</num><content><p>provision requiring the holder of a licence to supply information to the Secretary of State or the Authority (or both) so as to enable them to assess any matter relating to the provision, installation, or operation of meters;</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-73-4"><num>(4)</num><content><p><mod>In subsection (4) (further provision about the manner in which the power may be exercised) in paragraph (a) after “relation to” insert <quotedText>“ different areas or ”</quotedText>.</mod></p></content></subsection><subsection eId="section-73-5"><num><noteRef href="#key-47785622c93af6cacf40c20db9f33112" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>(5)</num><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></subsection><subsection eId="section-73-6"><num>(6)</num><content><p><mod>In subsection (6)(c) for “6(1)(c)” substitute <quotedText>“ 6(1)(b), (c) ”</quotedText>.</mod></p></content></subsection><subsection eId="section-73-7"><num><noteRef href="#key-97169f2fc9e97354f64d505509b03716" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>(7)</num><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></subsection><subsection eId="section-73-8"><num><noteRef href="#key-97169f2fc9e97354f64d505509b03716" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>(8)</num><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-5-crossheading-energy-performance-certificates"><heading><i>Energy performance certificates</i></heading><section eId="section-74"><num>74</num><heading>Access to register of energy performance certificates <abbr title="Et cetera" xml:lang="la">etc</abbr>: England and Wales</heading><subsection eId="section-74-1"><num>(1)</num><content><p>The Secretary of State may make regulations for the purpose of authorising the person keeping a register to disclose, in accordance with the provision made in the regulations, the documents or data entered onto the register.</p></content></subsection><subsection eId="section-74-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised, in particular, to make provision—</p></intro><level class="para1" eId="section-74-2-a"><num>(a)</num><content><p>excluding a document or data, or a specified part of a document or data, from disclosure where the document or data relates to a specified description of buildings;</p></content></level><level class="para1" eId="section-74-2-b"><num>(b)</num><content><p>excluding a document or data, or a specified part of a document or data, from disclosure to a specified description of persons;</p></content></level><level class="para1" eId="section-74-2-c"><num>(c)</num><content><p>restricting the number of disclosures made to a specified description of persons;</p></content></level><level class="para1" eId="section-74-2-d"><num>(d)</num><content><p>for a disclosure made to a specified description of persons to be subject to specified conditions;</p></content></level><level class="para1" eId="section-74-2-e"><num>(e)</num><content><p>as to the sanctions for non-compliance with any condition specified by virtue of paragraph (d) (including sanctions preventing or restricting future disclosures);</p></content></level><level class="para1" eId="section-74-2-f"><num>(f)</num><content><p>in consequence of any provision which is made by virtue of paragraphs (a) to (e).</p></content></level></subsection><subsection eId="section-74-3"><num>(3)</num><content><p>In subsection (1) “<term refersTo="#term-a-register" eId="term-a-register">a register</term>” means a register maintained under Part 6 of the Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2007/991).</p></content></subsection><subsection eId="section-74-4"><num>(4)</num><content><p>In subsection (2) “<term refersTo="#term-specified" eId="term-specified">specified</term>” means specified in the regulations made under this section.</p></content></subsection><subsection eId="section-74-5"><num>(5)</num><content><p>Regulations under this section may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-74-6"><num>(6)</num><content><p>Regulations under this section are subject to the negative procedure.</p></content></subsection><subsection eId="section-74-7"><num>(7)</num><content><p>For the purposes of this section a reference to the disclosure of a document or data includes a reference to disclosure of information derived from the document or data.</p></content></subsection></section><section eId="section-75"><num>75</num><heading>Access to register of energy performance certificates <abbr title="Et cetera" xml:lang="la">etc</abbr>: Scotland</heading><subsection eId="section-75-1"><num>(1)</num><content><p>The Scottish Ministers may make regulations for the purpose of authorising or requiring the person keeping a register to disclose, in accordance with the provision made in the regulations, the documents or data entered onto the register.</p></content></subsection><subsection eId="section-75-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised, in particular, to make provision—</p></intro><level class="para1" eId="section-75-2-a"><num>(a)</num><content><p>excluding a document or data, or a specified part of a document or data, from disclosure where the document or data relates to a specified description of buildings;</p></content></level><level class="para1" eId="section-75-2-b"><num>(b)</num><content><p>excluding a document or data, or a specified part of a document or data, from disclosure to a specified description of persons;</p></content></level><level class="para1" eId="section-75-2-c"><num>(c)</num><content><p>restricting the number of disclosures made to a specified description of persons;</p></content></level><level class="para1" eId="section-75-2-d"><num>(d)</num><content><p>for a disclosure made to a specified description of persons to be subject to specified conditions;</p></content></level><level class="para1" eId="section-75-2-e"><num>(e)</num><content><p>as to the sanctions for non-compliance with any condition specified by virtue of paragraph (d) (including sanctions preventing or restricting future disclosures);</p></content></level><level class="para1" eId="section-75-2-f"><num>(f)</num><content><p>in consequence of any provision which is made by virtue of paragraphs (a) to (e).</p></content></level></subsection><subsection eId="section-75-3"><num>(3)</num><content><p>In subsection (1) “<term refersTo="#term-a-register" eId="term-a-register">a register</term>” means a register maintained under regulation 10 of the Energy Performance of Buildings (Scotland) Regulations 2008 (<abbr class="acronym" title="Scottish Statutory Instrument">S.S.I.</abbr> 2008/309).</p></content></subsection><subsection eId="section-75-4"><num>(4)</num><content><p>In subsection (2) “<term refersTo="#term-specified" eId="term-specified">specified</term>” means specified in the regulations made under this section.</p></content></subsection><subsection eId="section-75-5"><num>(5)</num><content><p>Regulations under this section may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-75-6"><num>(6)</num><content><p>Regulations under this section are subject to the negative procedure.</p></content></subsection><subsection eId="section-75-7"><num>(7)</num><content><p>For the purposes of this section a reference to the disclosure of a document or data includes a reference to disclosure of information derived from the document or data.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-5-crossheading-information-about-tariffs"><heading><i>Information about tariffs</i></heading><section eId="section-76"><num><noteRef href="#key-01ee570d144e7a159926bc9796e08b68" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>76</num><heading>Power to modify energy supply licences: information about tariffs</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-77"><num><noteRef href="#key-01ee570d144e7a159926bc9796e08b68" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>77</num><heading>Power to modify energy supply licences: procedure and supplemental</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-78"><num><noteRef href="#key-01ee570d144e7a159926bc9796e08b68" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>78</num><heading>General duties of the Secretary of State</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section></hcontainer></chapter> — Smart meters
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-5"><num>CHAPTER 5</num><heading>Information about energy consumption, efficiency and tariffs</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-5-crossheading-smart-meters"><heading><i>Smart meters</i></heading><section eId="section-73"><num>73</num><heading>Smart meters</heading><subsection eId="section-73-1"><num>(1)</num><content><p>Section 88 of the Energy Act 2008 (power to modify licence conditions <abbr title="Et cetera" xml:lang="la">etc</abbr>: smart meters) is amended in accordance with subsections (2) to (6).</p></content></subsection><subsection eId="section-73-2"><num>(2)</num><intro><p>In subsection (1)(a) (type of licence that may be modified)—</p></intro><level class="para1" eId="section-73-2-a"><num>(a)</num><content><p><mod>for “6(1)(c)” substitute <quotedText>“ 6(1)(b), (c) ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-73-2-b"><num>(b)</num><content><p><mod>before “distribution” insert <quotedText>“ transmission, ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-73-3"><num>(3)</num><content><p><mod>In subsection (3) (non-exhaustive list of modifications that may be made) after paragraph (j) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(ja)</num><content><p>provision requiring the holder of a licence to supply information to the Secretary of State or the Authority (or both) so as to enable them to assess any matter relating to the provision, installation, or operation of meters;</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-73-4"><num>(4)</num><content><p><mod>In subsection (4) (further provision about the manner in which the power may be exercised) in paragraph (a) after “relation to” insert <quotedText>“ different areas or ”</quotedText>.</mod></p></content></subsection><subsection eId="section-73-5"><num><noteRef href="#key-47785622c93af6cacf40c20db9f33112" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>(5)</num><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></subsection><subsection eId="section-73-6"><num>(6)</num><content><p><mod>In subsection (6)(c) for “6(1)(c)” substitute <quotedText>“ 6(1)(b), (c) ”</quotedText>.</mod></p></content></subsection><subsection eId="section-73-7"><num><noteRef href="#key-97169f2fc9e97354f64d505509b03716" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>(7)</num><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></subsection><subsection eId="section-73-8"><num><noteRef href="#key-97169f2fc9e97354f64d505509b03716" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>(8)</num><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-5-crossheading-energy-performance-certificates"><heading><i>Energy performance certificates</i></heading><section eId="section-74"><num>74</num><heading>Access to register of energy performance certificates <abbr title="Et cetera" xml:lang="la">etc</abbr>: England and Wales</heading><subsection eId="section-74-1"><num>(1)</num><content><p>The Secretary of State may make regulations for the purpose of authorising the person keeping a register to disclose, in accordance with the provision made in the regulations, the documents or data entered onto the register.</p></content></subsection><subsection eId="section-74-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised, in particular, to make provision—</p></intro><level class="para1" eId="section-74-2-a"><num>(a)</num><content><p>excluding a document or data, or a specified part of a document or data, from disclosure where the document or data relates to a specified description of buildings;</p></content></level><level class="para1" eId="section-74-2-b"><num>(b)</num><content><p>excluding a document or data, or a specified part of a document or data, from disclosure to a specified description of persons;</p></content></level><level class="para1" eId="section-74-2-c"><num>(c)</num><content><p>restricting the number of disclosures made to a specified description of persons;</p></content></level><level class="para1" eId="section-74-2-d"><num>(d)</num><content><p>for a disclosure made to a specified description of persons to be subject to specified conditions;</p></content></level><level class="para1" eId="section-74-2-e"><num>(e)</num><content><p>as to the sanctions for non-compliance with any condition specified by virtue of paragraph (d) (including sanctions preventing or restricting future disclosures);</p></content></level><level class="para1" eId="section-74-2-f"><num>(f)</num><content><p>in consequence of any provision which is made by virtue of paragraphs (a) to (e).</p></content></level></subsection><subsection eId="section-74-3"><num>(3)</num><content><p>In subsection (1) “<term refersTo="#term-a-register" eId="term-a-register">a register</term>” means a register maintained under Part 6 of the Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2007/991).</p></content></subsection><subsection eId="section-74-4"><num>(4)</num><content><p>In subsection (2) “<term refersTo="#term-specified" eId="term-specified">specified</term>” means specified in the regulations made under this section.</p></content></subsection><subsection eId="section-74-5"><num>(5)</num><content><p>Regulations under this section may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-74-6"><num>(6)</num><content><p>Regulations under this section are subject to the negative procedure.</p></content></subsection><subsection eId="section-74-7"><num>(7)</num><content><p>For the purposes of this section a reference to the disclosure of a document or data includes a reference to disclosure of information derived from the document or data.</p></content></subsection></section><section eId="section-75"><num>75</num><heading>Access to register of energy performance certificates <abbr title="Et cetera" xml:lang="la">etc</abbr>: Scotland</heading><subsection eId="section-75-1"><num>(1)</num><content><p>The Scottish Ministers may make regulations for the purpose of authorising or requiring the person keeping a register to disclose, in accordance with the provision made in the regulations, the documents or data entered onto the register.</p></content></subsection><subsection eId="section-75-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised, in particular, to make provision—</p></intro><level class="para1" eId="section-75-2-a"><num>(a)</num><content><p>excluding a document or data, or a specified part of a document or data, from disclosure where the document or data relates to a specified description of buildings;</p></content></level><level class="para1" eId="section-75-2-b"><num>(b)</num><content><p>excluding a document or data, or a specified part of a document or data, from disclosure to a specified description of persons;</p></content></level><level class="para1" eId="section-75-2-c"><num>(c)</num><content><p>restricting the number of disclosures made to a specified description of persons;</p></content></level><level class="para1" eId="section-75-2-d"><num>(d)</num><content><p>for a disclosure made to a specified description of persons to be subject to specified conditions;</p></content></level><level class="para1" eId="section-75-2-e"><num>(e)</num><content><p>as to the sanctions for non-compliance with any condition specified by virtue of paragraph (d) (including sanctions preventing or restricting future disclosures);</p></content></level><level class="para1" eId="section-75-2-f"><num>(f)</num><content><p>in consequence of any provision which is made by virtue of paragraphs (a) to (e).</p></content></level></subsection><subsection eId="section-75-3"><num>(3)</num><content><p>In subsection (1) “<term refersTo="#term-a-register" eId="term-a-register">a register</term>” means a register maintained under regulation 10 of the Energy Performance of Buildings (Scotland) Regulations 2008 (<abbr class="acronym" title="Scottish Statutory Instrument">S.S.I.</abbr> 2008/309).</p></content></subsection><subsection eId="section-75-4"><num>(4)</num><content><p>In subsection (2) “<term refersTo="#term-specified" eId="term-specified">specified</term>” means specified in the regulations made under this section.</p></content></subsection><subsection eId="section-75-5"><num>(5)</num><content><p>Regulations under this section may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-75-6"><num>(6)</num><content><p>Regulations under this section are subject to the negative procedure.</p></content></subsection><subsection eId="section-75-7"><num>(7)</num><content><p>For the purposes of this section a reference to the disclosure of a document or data includes a reference to disclosure of information derived from the document or data.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-5-crossheading-information-about-tariffs"><heading><i>Information about tariffs</i></heading><section eId="section-76"><num><noteRef href="#key-01ee570d144e7a159926bc9796e08b68" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>76</num><heading>Power to modify energy supply licences: information about tariffs</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-77"><num><noteRef href="#key-01ee570d144e7a159926bc9796e08b68" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>77</num><heading>Power to modify energy supply licences: procedure and supplemental</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-78"><num><noteRef href="#key-01ee570d144e7a159926bc9796e08b68" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>78</num><heading>General duties of the Secretary of State</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section></hcontainer></chapter> — Energy performance certificates
Part 1 — Energy efficiency — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-5"><num>CHAPTER 5</num><heading>Information about energy consumption, efficiency and tariffs</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-5-crossheading-smart-meters"><heading><i>Smart meters</i></heading><section eId="section-73"><num>73</num><heading>Smart meters</heading><subsection eId="section-73-1"><num>(1)</num><content><p>Section 88 of the Energy Act 2008 (power to modify licence conditions <abbr title="Et cetera" xml:lang="la">etc</abbr>: smart meters) is amended in accordance with subsections (2) to (6).</p></content></subsection><subsection eId="section-73-2"><num>(2)</num><intro><p>In subsection (1)(a) (type of licence that may be modified)—</p></intro><level class="para1" eId="section-73-2-a"><num>(a)</num><content><p><mod>for “6(1)(c)” substitute <quotedText>“ 6(1)(b), (c) ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-73-2-b"><num>(b)</num><content><p><mod>before “distribution” insert <quotedText>“ transmission, ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-73-3"><num>(3)</num><content><p><mod>In subsection (3) (non-exhaustive list of modifications that may be made) after paragraph (j) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(ja)</num><content><p>provision requiring the holder of a licence to supply information to the Secretary of State or the Authority (or both) so as to enable them to assess any matter relating to the provision, installation, or operation of meters;</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-73-4"><num>(4)</num><content><p><mod>In subsection (4) (further provision about the manner in which the power may be exercised) in paragraph (a) after “relation to” insert <quotedText>“ different areas or ”</quotedText>.</mod></p></content></subsection><subsection eId="section-73-5"><num><noteRef href="#key-47785622c93af6cacf40c20db9f33112" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>(5)</num><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></subsection><subsection eId="section-73-6"><num>(6)</num><content><p><mod>In subsection (6)(c) for “6(1)(c)” substitute <quotedText>“ 6(1)(b), (c) ”</quotedText>.</mod></p></content></subsection><subsection eId="section-73-7"><num><noteRef href="#key-97169f2fc9e97354f64d505509b03716" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>(7)</num><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></subsection><subsection eId="section-73-8"><num><noteRef href="#key-97169f2fc9e97354f64d505509b03716" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>(8)</num><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-5-crossheading-energy-performance-certificates"><heading><i>Energy performance certificates</i></heading><section eId="section-74"><num>74</num><heading>Access to register of energy performance certificates <abbr title="Et cetera" xml:lang="la">etc</abbr>: England and Wales</heading><subsection eId="section-74-1"><num>(1)</num><content><p>The Secretary of State may make regulations for the purpose of authorising the person keeping a register to disclose, in accordance with the provision made in the regulations, the documents or data entered onto the register.</p></content></subsection><subsection eId="section-74-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised, in particular, to make provision—</p></intro><level class="para1" eId="section-74-2-a"><num>(a)</num><content><p>excluding a document or data, or a specified part of a document or data, from disclosure where the document or data relates to a specified description of buildings;</p></content></level><level class="para1" eId="section-74-2-b"><num>(b)</num><content><p>excluding a document or data, or a specified part of a document or data, from disclosure to a specified description of persons;</p></content></level><level class="para1" eId="section-74-2-c"><num>(c)</num><content><p>restricting the number of disclosures made to a specified description of persons;</p></content></level><level class="para1" eId="section-74-2-d"><num>(d)</num><content><p>for a disclosure made to a specified description of persons to be subject to specified conditions;</p></content></level><level class="para1" eId="section-74-2-e"><num>(e)</num><content><p>as to the sanctions for non-compliance with any condition specified by virtue of paragraph (d) (including sanctions preventing or restricting future disclosures);</p></content></level><level class="para1" eId="section-74-2-f"><num>(f)</num><content><p>in consequence of any provision which is made by virtue of paragraphs (a) to (e).</p></content></level></subsection><subsection eId="section-74-3"><num>(3)</num><content><p>In subsection (1) “<term refersTo="#term-a-register" eId="term-a-register">a register</term>” means a register maintained under Part 6 of the Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007 (<abbr class="acronym" title="Statutory Instrument">S.I.</abbr> 2007/991).</p></content></subsection><subsection eId="section-74-4"><num>(4)</num><content><p>In subsection (2) “<term refersTo="#term-specified" eId="term-specified">specified</term>” means specified in the regulations made under this section.</p></content></subsection><subsection eId="section-74-5"><num>(5)</num><content><p>Regulations under this section may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-74-6"><num>(6)</num><content><p>Regulations under this section are subject to the negative procedure.</p></content></subsection><subsection eId="section-74-7"><num>(7)</num><content><p>For the purposes of this section a reference to the disclosure of a document or data includes a reference to disclosure of information derived from the document or data.</p></content></subsection></section><section eId="section-75"><num>75</num><heading>Access to register of energy performance certificates <abbr title="Et cetera" xml:lang="la">etc</abbr>: Scotland</heading><subsection eId="section-75-1"><num>(1)</num><content><p>The Scottish Ministers may make regulations for the purpose of authorising or requiring the person keeping a register to disclose, in accordance with the provision made in the regulations, the documents or data entered onto the register.</p></content></subsection><subsection eId="section-75-2"><num>(2)</num><intro><p>The power under subsection (1) may be exercised, in particular, to make provision—</p></intro><level class="para1" eId="section-75-2-a"><num>(a)</num><content><p>excluding a document or data, or a specified part of a document or data, from disclosure where the document or data relates to a specified description of buildings;</p></content></level><level class="para1" eId="section-75-2-b"><num>(b)</num><content><p>excluding a document or data, or a specified part of a document or data, from disclosure to a specified description of persons;</p></content></level><level class="para1" eId="section-75-2-c"><num>(c)</num><content><p>restricting the number of disclosures made to a specified description of persons;</p></content></level><level class="para1" eId="section-75-2-d"><num>(d)</num><content><p>for a disclosure made to a specified description of persons to be subject to specified conditions;</p></content></level><level class="para1" eId="section-75-2-e"><num>(e)</num><content><p>as to the sanctions for non-compliance with any condition specified by virtue of paragraph (d) (including sanctions preventing or restricting future disclosures);</p></content></level><level class="para1" eId="section-75-2-f"><num>(f)</num><content><p>in consequence of any provision which is made by virtue of paragraphs (a) to (e).</p></content></level></subsection><subsection eId="section-75-3"><num>(3)</num><content><p>In subsection (1) “<term refersTo="#term-a-register" eId="term-a-register">a register</term>” means a register maintained under regulation 10 of the Energy Performance of Buildings (Scotland) Regulations 2008 (<abbr class="acronym" title="Scottish Statutory Instrument">S.S.I.</abbr> 2008/309).</p></content></subsection><subsection eId="section-75-4"><num>(4)</num><content><p>In subsection (2) “<term refersTo="#term-specified" eId="term-specified">specified</term>” means specified in the regulations made under this section.</p></content></subsection><subsection eId="section-75-5"><num>(5)</num><content><p>Regulations under this section may make different provision for different cases or circumstances or for different purposes.</p></content></subsection><subsection eId="section-75-6"><num>(6)</num><content><p>Regulations under this section are subject to the negative procedure.</p></content></subsection><subsection eId="section-75-7"><num>(7)</num><content><p>For the purposes of this section a reference to the disclosure of a document or data includes a reference to disclosure of information derived from the document or data.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-5-crossheading-information-about-tariffs"><heading><i>Information about tariffs</i></heading><section eId="section-76"><num><noteRef href="#key-01ee570d144e7a159926bc9796e08b68" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>76</num><heading>Power to modify energy supply licences: information about tariffs</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-77"><num><noteRef href="#key-01ee570d144e7a159926bc9796e08b68" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>77</num><heading>Power to modify energy supply licences: procedure and supplemental</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section><section eId="section-78"><num><noteRef href="#key-01ee570d144e7a159926bc9796e08b68" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>78</num><heading>General duties of the Secretary of State</heading><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></section></hcontainer></chapter> — Information about tariffs
Part 2 — Security of energy supplies — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" eId="part-2-chapter-1"><num>CHAPTER 1</num><heading>Electricity supply</heading><section eId="section-79"><num>79</num><heading>Annual report by Gas and Electricity Markets Authority on security of electricity supply</heading><content><p><mod>Before section 47 of the Electricity Act 1989 (and after the cross-heading immediately preceding that section) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><section><num>47ZA</num><heading>Annual report by Authority on security of electricity supply</heading><subsection><num>(1)</num><intro><p>The Authority must, before 1 September 2012, and before that date in every subsequent calendar year—</p></intro><level class="para1"><num>(a)</num><content><p>prepare a report on the future demand for, and supply of, electricity in Great Britain, in accordance with subsection (2), and</p></content></level><level class="para1"><num>(b)</num><content><p>send the report to the Secretary of State.</p></content></level></subsection><subsection><num>(2)</num><intro><p>A report under subsection (1) must include, as regards each forecast period—</p></intro><level class="para1"><num>(a)</num><content><p>a forecast of the peak demand for the supply of electricity to consumers in Great Britain;</p></content></level><level class="para1"><num>(b)</num><content><p>an assessment of different possible capacity margins for that supply, and of the degree of protection that each would provide against the risk of shortfalls in supply due to unexpected demand or unexpected loss of capacity.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The forecast periods in relation to a report under subsection (1) are—</p></intro><level class="para1"><num>(a)</num><content><p>each of the four calendar years immediately following the year of the report; or</p></content></level><level class="para1"><num>(b)</num><content><p>any other periods that the Secretary of State specifies by order.</p></content></level></subsection><subsection><num>(4)</num><content><p>A forecast by virtue of subsection (2)(a) must be expressed as a single figure in megawatts rounded to the nearest 100 megawatts, unless the Secretary of State directs otherwise.</p></content></subsection><subsection><num>(5)</num><intro><p>An assessment by virtue of subsection (2)(b) must take into account, in particular—</p></intro><level class="para1"><num>(a)</num><content><p>the generation of electricity;</p></content></level><level class="para1"><num>(b)</num><content><p>the operation of electricity interconnectors;</p></content></level><level class="para1"><num>(c)</num><content><p>the storage of electricity;</p></content></level><level class="para1"><num>(d)</num><content><p>the extent to which the available capacity of a generating station is likely to be lower than its maximum possible capacity due to routine maintenance, weather conditions or any other expected limitation on its operation;</p></content></level><level class="para1"><num>(e)</num><content><p>demand side response.</p></content></level></subsection><subsection><num>(6)</num><intro><p>A forecast or assessment by virtue of subsection (2) may to any extent be made by, or based on information provided by—</p></intro><level class="para1"><num>(a)</num><content><p>the holder of a transmission licence;</p></content></level><level class="para1"><num>(b)</num><content><p>any other person.</p></content></level></subsection><subsection><num>(7)</num><intro><p>The Secretary of State may give the Authority directions regarding—</p></intro><level class="para1"><num>(a)</num><content><p>the form of a report under subsection (1);</p></content></level><level class="para1"><num>(b)</num><content><p>the manner in which such a report must be prepared or sent;</p></content></level><level class="para1"><num>(c)</num><content><p>the manner in which a forecast or assessment by virtue of subsection (2) must be made or expressed (including, in particular, the method of calculation of any of the things mentioned in subsection (2)(a) or (b)).</p></content></level></subsection><subsection><num>(8)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-capacity-margin">capacity margin</term>” means the amount by which the peak demand for the supply of electricity is exceeded by the capacity likely to be available to meet that demand;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-consumers">consumers</term>” includes both existing and future consumers;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-demand-side-response">demand side response</term>” means the cessation of, or a reduction in, the provision of electricity to a person at times of high demand, by agreement with the person.</p></content></hcontainer></subsection></section></quotedStructure></mod></p></content></section><section eId="section-80"><num>80</num><heading>Annual report by Secretary of State on security of energy supplies</heading><subsection eId="section-80-1"><num>(1)</num><content><p>Section 172 of the Energy Act 2004 (annual report by Secretary of State on security of energy supplies) is amended as follows.</p></content></subsection><subsection eId="section-80-2"><num>(2)</num><content><p><mod>After subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(2A)</num><content><p>In 2012 and in every subsequent calendar year the report must also include, in particular, as regards each of the assessment periods, an assessment by the Secretary of State of what electricity supply capacity is required.</p></content></subsection><subsection><num>(2B)</num><content><p>For the purposes of subsection (2A) the electricity supply capacity required is the capacity required for the purpose of meeting the demands of consumers for the supply of electricity in Great Britain, including spare capacity to allow for unexpected demands or unexpected loss of capacity.</p></content></subsection><subsection><num>(2C)</num><intro><p>The assessment periods, in relation to a report under subsection (1), are—</p></intro><level class="para1"><num>(a)</num><content><p>each of the four calendar years immediately following the year of the report; or</p></content></level><level class="para1"><num>(b)</num><content><p>any other periods that the Secretary of State specifies by order.</p></content></level></subsection><subsection><num>(2D)</num><intro><p>An assessment by virtue of subsection (2A) must take into account, in particular—</p></intro><level class="para1"><num>(a)</num><content><p>the generation of electricity;</p></content></level><level class="para1"><num>(b)</num><content><p>the operation of electricity interconnectors;</p></content></level><level class="para1"><num>(c)</num><content><p>the storage of electricity;</p></content></level><level class="para1"><num>(d)</num><content><p>the extent to which the available capacity of a generating station is likely to be lower than its maximum possible capacity due to routine maintenance, weather conditions or any other expected limitation on its operation;</p></content></level><level class="para1"><num>(e)</num><content><p>demand side response.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-80-3"><num>(3)</num><content><p><mod>In subsection (3), after “report” insert <quotedText>“ , other than the assessment by virtue of subsection (2A), ”</quotedText>.</mod></p></content></subsection><subsection eId="section-80-4"><num>(4)</num><content><p><mod>After subsection (3) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(3A)</num><content><p>An order under this section is subject to the negative resolution procedure.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-80-5"><num>(5)</num><intro><p>In subsection (4)—</p></intro><level class="para1" eId="section-80-5-a"><num>(a)</num><content><p>after the definition of “consumers” insert—</p><blockContainer ukl:Name="BlockText"><p>“ “<term refersTo="#term-demand-side-response" eId="term-demand-side-response">demand side response</term>” means the cessation of, or a reduction in, the provision of electricity to a person at times of high demand, by agreement with the person;”;</p></blockContainer></content></level><level class="para1" eId="section-80-5-b"><num>(b)</num><content><p><mod>after “distribution system,” insert “ <quotedText>“ electricity interconnector ”</quotedText>, “generating station”, “generation”, “supply,” ”.</mod></p></content></level></subsection></section></chapter>
Part 2 — Security of energy supplies — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" eId="part-2-chapter-2"><num>CHAPTER 2</num><heading>Gas supply</heading><section eId="section-81"><num>81</num><heading>Power of the Gas and Electricity Markets Authority to direct a modification of the Uniform Network Code</heading><subsection eId="section-81-1"><num>(1)</num><content><p><mod>After section 36B of the Gas Act 1986 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><section><num>36C</num><heading>Power to direct a modification of the UNC</heading><subsection><num>(1)</num><content><p>The Authority may direct the operator of the gas National Transmission System to make a modification to which this section applies and which is specified in the direction to the Uniform Network Code.</p></content></subsection><subsection><num>(2)</num><intro><p>This section applies to a modification—</p></intro><level class="para1"><num>(a)</num><content><p>which relates to the arrangements contained in the Code in respect of a Gas Supply Emergency, and</p></content></level><level class="para1"><num>(b)</num><content><p>which the Authority considers is a market-based modification.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The Authority may give a direction under this section only if it considers that the modification will do either or both of the following—</p></intro><level class="para1"><num>(a)</num><content><p>decrease the likelihood of a Gas Supply Emergency occurring;</p></content></level><level class="para1"><num>(b)</num><content><p>decrease the duration or severity of a Gas Supply Emergency which occurs.</p></content></level></subsection><subsection><num>(4)</num><content><p>In the exercise of the power under this section the Authority must have regard to the purposes of Standard Special Condition A11 of licences granted under section 7 of this Act.</p></content></subsection><subsection><num>(5)</num><content><p>For the purposes of subsection (2), a modification is “market-based” if it relates to the creation of financial incentives for gas shippers or gas transporters.</p></content></subsection><subsection><num>(6)</num><content><p>Before giving a direction under this section the Authority must consult such persons as it considers appropriate.</p></content></subsection><subsection><num>(7)</num><content><p>In this section—</p><blockList class="unordered none" ukl:Name="UnorderedList" ukl:Decoration="none"><item><p>“Gas Supply Emergency” and “National Transmission System” have the meaning given by the Uniform Network Code;</p></item><item><p>“<term refersTo="#term-the-uniform-network-code">the Uniform Network Code</term>” means the document of that title required to be prepared pursuant to Standard Special Condition A11 of licences granted under section 7 of this Act.</p></item></blockList></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-81-2"><num>(2)</num><content><p>The requirement of subsection (6) of section 36C of the Gas Act 1986 may be satisfied by consultation before, as well as consultation after, the passing of this Act.</p></content></subsection><subsection eId="section-81-3"><num>(3)</num><content><p><mod>In section 38A of the Gas Act 1986 (reasons for decisions), in subsection (1), after paragraph (e) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(ea)</num><content><p>the giving of a direction under section 36C;</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-81-4"><num>(4)</num><content><p><mod>In section 173 of the Energy Act 2004 (appeals to the Competition Commission), after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(2A)</num><content><p>This section also applies to a decision by <abbr class="acronym" title="Gas and Electricity Markets Authority">GEMA</abbr> to give a direction under section 36C of the Gas Act 1986 (power to direct a modification of the Uniform Network Code).</p></content></subsection><subsection><num>(2B)</num><content><p>But subsection (2A) does not have effect in relation to such a decision if it falls within a description of decisions for the time being excluded from the right of appeal under this section by an order made by the Secretary of State.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-81-5"><num>(5)</num><content><p><mod>In section 175 of the Energy Act 2004 (determination of appeals), in subsection (4)(b) for “the purposes for which the relevant condition has effect” substitute<quotedText startQuote="&#x201C;">— </quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para2"><num>(i)</num><content><p>the purposes for which the relevant condition has effect (in the case of an appeal by virtue of section 173(2)), or</p></content></level><level class="para2"><num>(ii)</num><content><p>the purposes of the power to give a direction under section 36C of the Gas Act 1986 or the purposes of Standard Special Condition A11 of licences granted under section 7 of that Act (in the case of an appeal by virtue of section 173(2A))</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-81-6"><num>(6)</num><content><p><mod>In Schedule 22 to the Energy Act 2004 (procedure for appeals under section 173 of that Act), in paragraph 3(6) (suspension of a decision) after “direction” insert <quotedText>“ (including a direction being appealed against by virtue of section 173(2A) of this Act) ”</quotedText>.</mod></p></content></subsection></section></chapter>
Part 2 — Security of energy supplies — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-2-chapter-3"><num>CHAPTER 3</num><heading>Upstream petroleum infrastructure</heading><section eId="section-82"><num>82</num><heading>Acquisition of rights to use upstream petroleum infrastructure</heading><subsection eId="section-82-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-82-1-a"><num>(a)</num><content><p>a person makes an application to the owner of a relevant upstream petroleum pipeline for a right to have things of a kind specified in the application conveyed by the pipeline during such period as is so specified and in such quantities as are so specified;</p></content></level><level class="para1" eId="section-82-1-b"><num>(b)</num><content><p>a person makes an application to the owner of a relevant oil processing facility for a right to have petroleum of a kind specified in the application processed by the facility during such period as is so specified and in such quantities as are so specified; or</p></content></level><level class="para1" eId="section-82-1-c"><num>(c)</num><content><p>a person makes an application to the owner of a relevant gas processing facility for a right to have piped gas of a kind specified in the application processed by the facility during such period as is so specified and in such quantities as are so specified.</p></content></level><wrapUp><p>And references in this section to “the access application” are to the application made to the owner of the pipeline or facility.</p></wrapUp></subsection><subsection eId="section-82-2"><num>(2)</num><content><p>This section does not apply by virtue of subsection (1)(c) where a person makes an application to the owner of a gas processing facility for a right to have gas processed by the facility for a downstream purpose (as to which, see section 12 of the Gas Act 1995).</p></content></subsection><subsection eId="section-82-3"><num>(3)</num><intro><p>For the purposes of subsection (1) an upstream petroleum pipeline, an oil processing facility or a gas processing facility is “relevant” if and in so far as it is situated—</p></intro><level class="para1" eId="section-82-3-a"><num>(a)</num><content><p>in Great Britain;</p></content></level><level class="para1" eId="section-82-3-b"><num>(b)</num><content><p>in the territorial sea adjacent to Great Britain; or</p></content></level><level class="para1" eId="section-82-3-c"><num>(c)</num><content><p>in the sea in any area designated under section 1(7) of the Continental Shelf Act 1964;</p></content></level><wrapUp><p>but an upstream petroleum pipeline which is so situated is not “relevant” if it is a pipeline to which section 17GA of the Petroleum Act 1998 applies (petroleum pipelines subject to Norwegian access system).</p></wrapUp></subsection><subsection eId="section-82-4"><num>(4)</num><content><p>If the applicant and the owner do not reach agreement on the access application, the applicant may apply to the <ins class="substitution first last" ukl:ChangeId="key-e1426a41facea5298a8f1cff090d0187-1491507948893" ukl:CommentaryRef="key-e1426a41facea5298a8f1cff090d0187"><noteRef uk:name="commentary" href="#key-e1426a41facea5298a8f1cff090d0187" class="commentary"/>OGA</ins> for a notice under subsection (11) which would secure to the applicant the right sought in the access application.</p></content></subsection><subsection eId="section-82-5"><num>(5)</num><content><p>The <ins class="substitution first last" ukl:ChangeId="key-e1426a41facea5298a8f1cff090d0187-1491507969064" ukl:CommentaryRef="key-e1426a41facea5298a8f1cff090d0187"><noteRef uk:name="commentary" href="#key-e1426a41facea5298a8f1cff090d0187" class="commentary"/>OGA</ins> may not consider an application under subsection (4) unless satisfied that the applicant and the owner have had a reasonable time in which to reach agreement.</p></content></subsection><subsection eId="section-82-6"><num>(6)</num><intro><p>When considering an application under subsection (4) the <ins class="substitution first last" ukl:ChangeId="key-e1426a41facea5298a8f1cff090d0187-1491507988611" ukl:CommentaryRef="key-e1426a41facea5298a8f1cff090d0187"><noteRef uk:name="commentary" href="#key-e1426a41facea5298a8f1cff090d0187" class="commentary"/>OGA</ins> must—</p></intro><level class="para1" eId="section-82-6-a"><num>(a)</num><intro><p>decide whether the application is to be—</p></intro><level class="para2" eId="section-82-6-a-i"><num>(i)</num><content><p>rejected,</p></content></level><level class="para2" eId="section-82-6-a-ii"><num>(ii)</num><content><p>adjourned to enable further negotiation between the applicant and the owner, or</p></content></level><level class="para2" eId="section-82-6-a-iii"><num>(iii)</num><content><p>considered further, and</p></content></level></level><level class="para1" eId="section-82-6-b"><num>(b)</num><intro><p>in the case of a decision to consider the application further, give an opportunity to be heard to—</p></intro><level class="para2" eId="section-82-6-b-i"><num>(i)</num><content><p>the applicant and the owner;</p></content></level><level class="para2" eId="section-82-6-b-ii"><num>(ii)</num><content><p>any person with a right to have anything conveyed by the pipeline or processed by the facility;</p></content></level><level class="para2" eId="section-82-6-b-iii"><num>(iii)</num><content><p>the Health and Safety Executive;</p></content></level><level class="para2" eId="section-82-6-b-iv"><num>(iv)</num><content><p>such other persons as the <ins class="substitution first last" ukl:ChangeId="key-e1426a41facea5298a8f1cff090d0187-1491508008688" ukl:CommentaryRef="key-e1426a41facea5298a8f1cff090d0187"><noteRef uk:name="commentary" href="#key-e1426a41facea5298a8f1cff090d0187" class="commentary"/>OGA</ins> considers appropriate.</p></content></level></level></subsection><subsection eId="section-82-7"><num>(7)</num><intro><p>When giving further consideration to an application under subsection (4) the <ins class="substitution first last" ukl:ChangeId="key-e1426a41facea5298a8f1cff090d0187-1491508026004" ukl:CommentaryRef="key-e1426a41facea5298a8f1cff090d0187"><noteRef uk:name="commentary" href="#key-e1426a41facea5298a8f1cff090d0187" class="commentary"/>OGA</ins> must (so far as relevant) take into account—</p></intro><level class="para1" eId="section-82-7-a"><num>(a)</num><content><p>capacity which is or can reasonably be made available in the pipeline or at the facility;</p></content></level><level class="para1" eId="section-82-7-b"><num>(b)</num><content><p>any incompatibilities of technical specification which cannot reasonably be overcome;</p></content></level><level class="para1" eId="section-82-7-c"><num>(c)</num><content><p>difficulties which cannot reasonably be overcome and which could prejudice the efficient, current and planned future production of petroleum;</p></content></level><level class="para1" eId="section-82-7-d"><num>(d)</num><content><p>the reasonable needs of the owner and any associate of the owner for the conveying and processing of petroleum;</p></content></level><level class="para1" eId="section-82-7-e"><num>(e)</num><content><p>the interests of all users and operators of the pipeline or facility;</p></content></level><level class="para1" eId="section-82-7-f"><num>(f)</num><content><p>the need to maintain security and regularity of supplies of petroleum; and</p></content></level><level class="para1" eId="section-82-7-g"><num>(g)</num><content><p>the number of parties involved in the dispute.</p></content></level></subsection><subsection eId="section-82-8"><num>(8)</num><content><p>The <ins class="substitution first last" ukl:ChangeId="key-e1426a41facea5298a8f1cff090d0187-1491508042166" ukl:CommentaryRef="key-e1426a41facea5298a8f1cff090d0187"><noteRef uk:name="commentary" href="#key-e1426a41facea5298a8f1cff090d0187" class="commentary"/>OGA</ins> may give a notice under subsection (11) only if the condition in subsection (9) or (10) is met.</p></content></subsection><subsection eId="section-82-9"><num>(9)</num><intro><p>The condition in this subsection is that the <ins class="substitution first last" ukl:ChangeId="key-e1426a41facea5298a8f1cff090d0187-1491508063039" ukl:CommentaryRef="key-e1426a41facea5298a8f1cff090d0187"><noteRef uk:name="commentary" href="#key-e1426a41facea5298a8f1cff090d0187" class="commentary"/>OGA</ins> is satisfied that the notice will not prejudice—</p></intro><level class="para1" eId="section-82-9-a"><num>(a)</num><content><p>the conveying by the pipeline, or the processing by the facility, of the quantities of substances which the owner or an associate of the owner requires or may reasonably be expected to require;</p></content></level><level class="para1" eId="section-82-9-b"><num>(b)</num><content><p>the conveying by the pipeline, or the processing by the facility, of the quantities of substances which another person with a right to have things so conveyed or processed requires to be conveyed or processed in exercise of that right.</p></content></level></subsection><subsection eId="section-82-10"><num>(10)</num><content><p>The condition in this subsection is that the notice contains provision for the purpose of ensuring that if the notice does prejudice any of the matters mentioned in subsection (9) any person who suffers loss as a result may recover from the applicant payments by way of compensation, of such amounts as are determined in accordance with the notice.</p></content></subsection><subsection eId="section-82-11"><num>(11)</num><intro><p>A notice under this subsection may contain such provisions as the <ins class="substitution first last" ukl:ChangeId="key-e1426a41facea5298a8f1cff090d0187-1491508083412" ukl:CommentaryRef="key-e1426a41facea5298a8f1cff090d0187"><noteRef uk:name="commentary" href="#key-e1426a41facea5298a8f1cff090d0187" class="commentary"/>OGA</ins> considers appropriate for any of the following purposes—</p></intro><level class="para1" eId="section-82-11-a"><num>(a)</num><content><p>to secure to the applicant the right sought in the access application;</p></content></level><level class="para1" eId="section-82-11-b"><num>(b)</num><content><p>to secure that the exercise of the right is not prevented or impeded;</p></content></level><level class="para1" eId="section-82-11-c"><num>(c)</num><content><p>to secure to the applicant such ancillary or incidental rights as the <ins class="substitution first last" ukl:ChangeId="key-e1426a41facea5298a8f1cff090d0187-1491508099387" ukl:CommentaryRef="key-e1426a41facea5298a8f1cff090d0187"><noteRef uk:name="commentary" href="#key-e1426a41facea5298a8f1cff090d0187" class="commentary"/>OGA</ins> considers necessary or expedient, which may include the right to have a pipeline of the applicant's connected to the pipeline or facility by the applicant or the owner;</p></content></level><level class="para1" eId="section-82-11-d"><num>(d)</num><content><p>to regulate the charges which may be made for the exercise of any right secured by the notice.</p></content></level></subsection><subsection eId="section-82-12"><num>(12)</num><intro><p>A notice under subsection (11) may also contain such provisions as the <ins class="substitution first last" ukl:ChangeId="key-e1426a41facea5298a8f1cff090d0187-1491508115564" ukl:CommentaryRef="key-e1426a41facea5298a8f1cff090d0187"><noteRef uk:name="commentary" href="#key-e1426a41facea5298a8f1cff090d0187" class="commentary"/>OGA</ins> considers appropriate for the purpose of ensuring that no person suffers a loss by reason of the mixing together of—</p></intro><level class="para1" eId="section-82-12-a"><num>(a)</num><content><p>substances conveyed by the pipeline or processed by the facility on behalf of the applicant in exercise of a right secured by the notice; and</p></content></level><level class="para1" eId="section-82-12-b"><num>(b)</num><content><p>substances conveyed by the pipeline or processed by the facility by or on behalf of any other person.</p></content></level></subsection><subsection eId="section-82-13"><num>(13)</num><intro><p>A notice under subsection (11) may also—</p></intro><level class="para1" eId="section-82-13-a"><num>(a)</num><content><p>contain provision authorising the owner to recover from the applicant payments by way of consideration for any right secured by the notice of amounts specified in the notice or determined in accordance with the notice;</p></content></level><level class="para1" eId="section-82-13-b"><num><noteRef href="#key-9444d47c399503b661c8c4da1c2fefc7" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>(b)</num><content><p>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .</p></content></level></subsection><subsection eId="section-82-14"><num>(14)</num><content><p>A notice under subsection (11) is to be given to the owner and the applicant.</p></content></subsection><subsection eId="section-82-15"><num>(15)</num><content><p>If a notice under subsection (11) contains provision of a sort mentioned in subsection (10) or (12) the <ins class="substitution first last" ukl:ChangeId="key-e1426a41facea5298a8f1cff090d0187-1491508129651" ukl:CommentaryRef="key-e1426a41facea5298a8f1cff090d0187"><noteRef uk:name="commentary" href="#key-e1426a41facea5298a8f1cff090d0187" class="commentary"/>OGA</ins> must give a copy of the notice to every person who has a right to have anything conveyed by the pipeline or processed by the facility.</p></content></subsection><subsection eId="section-82-16"><num>(16)</num><intro><p>Before giving a copy of a notice under subsection (15) the <ins class="substitution first last" ukl:ChangeId="key-e1426a41facea5298a8f1cff090d0187-1491508147232" ukl:CommentaryRef="key-e1426a41facea5298a8f1cff090d0187"><noteRef uk:name="commentary" href="#key-e1426a41facea5298a8f1cff090d0187" class="commentary"/>OGA</ins> must—</p></intro><level class="para1" eId="section-82-16-a"><num>(a)</num><content><p>remove from the copy any provision included in the notice by virtue of subsection (11)(d) or (13)(a); and</p></content></level><level class="para1" eId="section-82-16-b"><num>(b)</num><content><p>after giving the owner and the applicant an opportunity to be heard, remove from the copy any other provision included in the notice which the <ins class="substitution first last" ukl:ChangeId="key-e1426a41facea5298a8f1cff090d0187-1491508165843" ukl:CommentaryRef="key-e1426a41facea5298a8f1cff090d0187"><noteRef uk:name="commentary" href="#key-e1426a41facea5298a8f1cff090d0187" class="commentary"/>OGA</ins> considers may prejudice the commercial interests of the owner or the applicant if not removed.</p></content></level></subsection><subsection eId="section-82-17"><num>(17)</num><content><p>A notice under subsection (11) does not come into force unless and until the applicant indicates acceptance of the terms of the notice in such manner and within such period as is specified in the notice.</p></content></subsection><subsection eId="section-82-18"><num>(18)</num><content><p>For the purposes of subsection (3)(b) and (c) a pipeline is to be treated as being situated in the sea in any area if it is situated in, under or over the sea in that area.</p></content></subsection><subsection eId="section-82-19"><num>(19)</num><intro><p>In this section and section 83 “<term refersTo="#term-owner" eId="term-owner">owner</term>”, in relation to an upstream petroleum pipeline, an oil processing facility or a gas processing facility, means any of the following—</p></intro><level class="para1" eId="section-82-19-a"><num>(a)</num><content><p>a person in whom the pipeline or facility is vested;</p></content></level><level class="para1" eId="section-82-19-b"><num>(b)</num><content><p>a lessee and any person occupying or controlling the pipeline or facility; and</p></content></level><level class="para1" eId="section-82-19-c"><num>(c)</num><intro><p>a person who has the right to have things conveyed by the pipeline or processed by the facility, where such right has been acquired by that person on terms that—</p></intro><level class="para2" eId="section-82-19-c-i"><num>(i)</num><content><p>the person is entitled to exercise the right for a period of one year or more; and</p></content></level><level class="para2" eId="section-82-19-c-ii"><num>(ii)</num><content><p>the right is capable of being assigned or otherwise disposed of to another person.</p></content></level></level></subsection></section><section eId="section-83"><num>83</num><heading>Power of <ins class="substitution first last" ukl:ChangeId="key-3d9355bb10f39f8d38ccfffb946fabdb-1491509197310" ukl:CommentaryRef="key-3d9355bb10f39f8d38ccfffb946fabdb"><noteRef uk:name="commentary" href="#key-3d9355bb10f39f8d38ccfffb946fabdb" class="commentary"/>OGA</ins> to give a notice under section 82(11) on own initiative</heading><subsection eId="section-83-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-83-1-a"><num>(a)</num><content><p>a person has made an application of a kind mentioned in subsection (1) of section 82 to the owner of a pipeline or facility, and</p></content></level><level class="para1" eId="section-83-1-b"><num>(b)</num><content><p>the applicant and the owner have not reached agreement on the application.</p></content></level></subsection><subsection eId="section-83-2"><num>(2)</num><content><p>The <ins class="substitution first last" ukl:ChangeId="key-8a18c42584e85ccf8cf97558f2ba7511-1491509232722" ukl:CommentaryRef="key-8a18c42584e85ccf8cf97558f2ba7511"><noteRef uk:name="commentary" href="#key-8a18c42584e85ccf8cf97558f2ba7511" class="commentary"/>OGA may on its</ins> own initiative give a notice under subsection (11) of section 82 which would secure to the applicant the right sought in the application; but this is subject to subsection (8) of that section and subsections (3) and (4).</p></content></subsection><subsection eId="section-83-3"><num>(3)</num><intro><p>The <ins class="substitution first last" ukl:ChangeId="key-c0861ff4a22ef58c7db178cd30f7ac92-1491509261504" ukl:CommentaryRef="key-c0861ff4a22ef58c7db178cd30f7ac92"><noteRef uk:name="commentary" href="#key-c0861ff4a22ef58c7db178cd30f7ac92" class="commentary"/>OGA</ins> may not exercise the power conferred by subsection (2) unless the <ins class="substitution first last" ukl:ChangeId="key-c0861ff4a22ef58c7db178cd30f7ac92-1491509285044" ukl:CommentaryRef="key-c0861ff4a22ef58c7db178cd30f7ac92"><noteRef uk:name="commentary" href="#key-c0861ff4a22ef58c7db178cd30f7ac92" class="commentary"/>OGA</ins> is satisfied that—</p></intro><level class="para1" eId="section-83-3-a"><num>(a)</num><content><p>the applicant and the owner have had a reasonable time in which to reach agreement on the application; and</p></content></level><level class="para1" eId="section-83-3-b"><num>(b)</num><content><p>there is no realistic prospect of them doing so.</p></content></level></subsection><subsection eId="section-83-4"><num>(4)</num><intro><p>In considering whether to exercise the power conferred by subsection (2) the <ins class="substitution first last" ukl:ChangeId="key-7aa6416db8b2dd4726739cae817083b9-1491509311658" ukl:CommentaryRef="key-7aa6416db8b2dd4726739cae817083b9"><noteRef uk:name="commentary" href="#key-7aa6416db8b2dd4726739cae817083b9" class="commentary"/>OGA</ins> must—</p></intro><level class="para1" eId="section-83-4-a"><num>(a)</num><content><p>take into account (so far as relevant) the matters mentioned in paragraphs (a) to (g) of subsection (7) of section 82;</p></content></level><level class="para1" eId="section-83-4-b"><num>(b)</num><content><p>give the persons mentioned in subsection (5) an opportunity to be heard.</p></content></level></subsection><subsection eId="section-83-5"><num>(5)</num><intro><p>Those persons are—</p></intro><level class="para1" eId="section-83-5-a"><num>(a)</num><content><p>the applicant and the owner;</p></content></level><level class="para1" eId="section-83-5-b"><num>(b)</num><content><p>any person with a right to have anything conveyed by the pipeline or processed by the facility;</p></content></level><level class="para1" eId="section-83-5-c"><num>(c)</num><content><p>the Health and Safety Executive; and</p></content></level><level class="para1" eId="section-83-5-d"><num>(d)</num><content><p>such other persons as the <ins class="substitution first last" ukl:ChangeId="key-71b1bfbba4d94a8667b6745357f1f4ae-1491509348521" ukl:CommentaryRef="key-71b1bfbba4d94a8667b6745357f1f4ae"><noteRef uk:name="commentary" href="#key-71b1bfbba4d94a8667b6745357f1f4ae" class="commentary"/>OGA</ins> considers appropriate.</p></content></level></subsection></section><section eId="section-84"><num>84</num><heading>Compulsory modification of upstream petroleum infrastructure</heading><subsection eId="section-84-1"><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1" eId="section-84-1-a"><num>(a)</num><content><p>a person has made an application of a kind mentioned in subsection (1) of section 82, and</p></content></level><level class="para1" eId="section-84-1-b"><num>(b)</num><content><p>the <ins class="substitution first last" ukl:ChangeId="key-4fde1f57e65c18d4e767dced49634c4b-1491842141107" ukl:CommentaryRef="key-4fde1f57e65c18d4e767dced49634c4b"><noteRef uk:name="commentary" href="#key-4fde1f57e65c18d4e767dced49634c4b" class="commentary"/>OGA</ins> is considering whether to give a notice under subsection (11) of that section which would secure to the applicant the right sought in the application.</p></content></level></subsection><subsection eId="section-84-2"><num>(2)</num><intro><p>If it appears to the <ins class="substitution first last" ukl:ChangeId="key-4fde1f57e65c18d4e767dced49634c4b-1491842155942" ukl:CommentaryRef="key-4fde1f57e65c18d4e767dced49634c4b"><noteRef uk:name="commentary" href="#key-4fde1f57e65c18d4e767dced49634c4b" class="commentary"/>OGA</ins> —</p></intro><level class="para1" eId="section-84-2-a"><num>(a)</num><content><p>that the pipeline or facility that is the subject of the application can and should be modified so as to increase its capacity; or</p></content></level><level class="para1" eId="section-84-2-b"><num>(b)</num><content><p>that the pipeline or facility that is the subject of the application can and should be modified by installing in it a junction or other apparatus through which a pipeline of the applicant's may be connected,</p></content></level><wrapUp><p>then the <ins class="substitution first last" ukl:ChangeId="key-4fde1f57e65c18d4e767dced49634c4b-1491842170513" ukl:CommentaryRef="key-4fde1f57e65c18d4e767dced49634c4b"><noteRef uk:name="commentary" href="#key-4fde1f57e65c18d4e767dced49634c4b" class="commentary"/>OGA</ins> may give the applicant and the owner of the pipeline or facility a notice in accordance with subsections (3) and (4).</p></wrapUp></subsection><subsection eId="section-84-3"><num>(3)</num><intro><p>A notice under subsection (2) must—</p></intro><level class="para1" eId="section-84-3-a"><num>(a)</num><content><p>specify the modifications which the <ins class="substitution first last" ukl:ChangeId="key-4fde1f57e65c18d4e767dced49634c4b-1491842185567" ukl:CommentaryRef="key-4fde1f57e65c18d4e767dced49634c4b"><noteRef uk:name="commentary" href="#key-4fde1f57e65c18d4e767dced49634c4b" class="commentary"/>OGA</ins> considers should be made to the pipeline or facility;</p></content></level><level class="para1" eId="section-84-3-b"><num>(b)</num><content><p>specify the sums or the method for determining the sums which the <ins class="substitution first last" ukl:ChangeId="key-4fde1f57e65c18d4e767dced49634c4b-1491842208078" ukl:CommentaryRef="key-4fde1f57e65c18d4e767dced49634c4b"><noteRef uk:name="commentary" href="#key-4fde1f57e65c18d4e767dced49634c4b" class="commentary"/>OGA</ins> considers should be paid to the owner by the applicant for the purpose of defraying the cost of the modifications;</p></content></level><level class="para1" eId="section-84-3-c"><num>(c)</num><content><p>require the applicant to make, within the period specified for the purpose in the notice, arrangements which the <ins class="substitution first last" ukl:ChangeId="key-4fde1f57e65c18d4e767dced49634c4b-1491842224598" ukl:CommentaryRef="key-4fde1f57e65c18d4e767dced49634c4b"><noteRef uk:name="commentary" href="#key-4fde1f57e65c18d4e767dced49634c4b" class="commentary"/>OGA</ins> considers appropriate to secure that those sums will be paid to the owner if the owner carries out the modifications or satisfies the <ins class="substitution first last" ukl:ChangeId="key-4fde1f57e65c18d4e767dced49634c4b-1491842250120" ukl:CommentaryRef="key-4fde1f57e65c18d4e767dced49634c4b"><noteRef uk:name="commentary" href="#key-4fde1f57e65c18d4e767dced49634c4b" class="commentary"/>OGA</ins> that they will be carried out;</p></content></level><level class="para1" eId="section-84-3-d"><num>(d)</num><content><p>require the owner, if the applicant makes those arrangements within that period, to carry out the modifications within a period specified for the purpose in the notice; and</p></content></level><level class="para1" eId="section-84-3-e"><num>(e)</num><content><p>authorise the owner, if the <ins class="substitution first last" ukl:ChangeId="key-4fde1f57e65c18d4e767dced49634c4b-1491842265611" ukl:CommentaryRef="key-4fde1f57e65c18d4e767dced49634c4b"><noteRef uk:name="commentary" href="#key-4fde1f57e65c18d4e767dced49634c4b" class="commentary"/>OGA</ins> is satisfied that the owner has carried out or will carry out the modifications, to recover those sums from the applicant.</p></content></level></subsection><subsection eId="section-84-4"><num>(4)</num><content><p>A notice under subsection (2) may also contain provision for the purpose of ensuring that if the carrying out of the modifications prejudices any of the matters mentioned in subsection (9) of section 82 any person who suffers loss as a result may recover from the applicant payments by way of compensation, of such amounts as are determined in accordance with the notice.</p></content></subsection><subsection eId="section-84-5"><num>(5)</num><content><p>If a notice under subsection (2) contains provision by virtue of subsection (4) the <ins class="substitution first last" ukl:ChangeId="key-4fde1f57e65c18d4e767dced49634c4b-1491842281647" ukl:CommentaryRef="key-4fde1f57e65c18d4e767dced49634c4b"><noteRef uk:name="commentary" href="#key-4fde1f57e65c18d4e767dced49634c4b" class="commentary"/>OGA</ins> must give a copy of the notice to every person who has a right to have anything conveyed by the pipeline or processed by the facility.</p></content></subsection><subsection eId="section-84-6"><num>(6)</num><intro><p>Before giving a copy of a notice under subsection (5) the <ins class="substitution first last" ukl:ChangeId="key-4fde1f57e65c18d4e767dced49634c4b-1491842298215" ukl:CommentaryRef="key-4fde1f57e65c18d4e767dced49634c4b"><noteRef uk:name="commentary" href="#key-4fde1f57e65c18d4e767dced49634c4b" class="commentary"/>OGA</ins> must—</p></intro><level class="para1" eId="section-84-6-a"><num>(a)</num><content><p>remove from the copy any provision included in the notice by virtue of subsection (3)(b); and</p></content></level><level class="para1" eId="section-84-6-b"><num>(b)</num><content><p>after giving the owner and the applicant an opportunity to be heard, remove from the copy any other provision included in the notice which the <ins class="substitution first last" ukl:ChangeId="key-4fde1f57e65c18d4e767dced49634c4b-1491842312738" ukl:CommentaryRef="key-4fde1f57e65c18d4e767dced49634c4b"><noteRef uk:name="commentary" href="#key-4fde1f57e65c18d4e767dced49634c4b" class="commentary"/>OGA</ins> considers may prejudice the commercial interests of the owner or the applicant if not removed.</p></content></level></subsection><subsection eId="section-84-7"><num>(7)</num><intro><p>In considering whether to give a notice under subsection (2) the <ins class="substitution first last" ukl:ChangeId="key-4fde1f57e65c18d4e767dced49634c4b-1491842337542" ukl:CommentaryRef="key-4fde1f57e65c18d4e767dced49634c4b"><noteRef uk:name="commentary" href="#key-4fde1f57e65c18d4e767dced49634c4b" class="commentary"/>OGA</ins> must—</p></intro><level class="para1" eId="section-84-7-a"><num>(a)</num><content><p>take into account (so far as relevant) the matters mentioned in paragraphs (a) to (g) of subsection (7) of section 82;</p></content></level><level class="para1" eId="section-84-7-b"><num>(b)</num><content><p>give the persons mentioned in subsection (8) an opportunity to be heard.</p></content></level></subsection><subsection eId="section-84-8"><num>(8)</num><intro><p>Those persons are—</p></intro><level class="para1" eId="section-84-8-a"><num>(a)</num><content><p>the applicant and the owner;</p></content></level><level class="para1" eId="section-84-8-b"><num>(b)</num><content><p>any person with a right to have anything conveyed by the pipeline or processed by the facility;</p></content></level><level class="para1" eId="section-84-8-c"><num>(c)</num><content><p>the Health and Safety Executive; and</p></content></level><level class="para1" eId="section-84-8-d"><num>(d)</num><content><p>such other persons as the <ins class="substitution first last" ukl:ChangeId="key-4fde1f57e65c18d4e767dced49634c4b-1491842355217" ukl:CommentaryRef="key-4fde1f57e65c18d4e767dced49634c4b"><noteRef uk:name="commentary" href="#key-4fde1f57e65c18d4e767dced49634c4b" class="commentary"/>OGA</ins> considers appropriate.</p></content></level></subsection><subsection eId="section-84-9"><num>(9)</num><content><p>If the <ins class="substitution first last" ukl:ChangeId="key-4fde1f57e65c18d4e767dced49634c4b-1491842370770" ukl:CommentaryRef="key-4fde1f57e65c18d4e767dced49634c4b"><noteRef uk:name="commentary" href="#key-4fde1f57e65c18d4e767dced49634c4b" class="commentary"/>OGA</ins> gives a notice under subsection (2), section 82 has effect in relation to the pipeline or facility concerned as if references to the pipeline or facility were references to the pipeline or facility as it would be with the modifications specified in the notice.</p></content></subsection><subsection eId="section-84-10"><num>(10)</num><intro><p>In this section “<term refersTo="#term-owner" eId="term-owner">owner</term>”, in relation to a pipeline or facility, means any of the following—</p></intro><level class="para1" eId="section-84-10-a"><num>(a)</num><content><p>a person in whom the pipeline or facility is vested; and</p></content></level><level class="para1" eId="section-84-10-b"><num>(b)</num><content><p>a lessee and any person occupying or controlling the pipeline or facility.</p></content></level></subsection></section><section eId="section-85"><num>85</num><heading>Variation of notices under sections 82 and 84</heading><subsection eId="section-85-1"><num>(1)</num><content><p>The persons to whom a notice is given under subsection (11) of section 82 or subsection (2) of section 84 may agree to vary or set aside the notice.</p></content></subsection><subsection eId="section-85-2"><num>(2)</num><content><p>The <ins class="substitution first last" ukl:ChangeId="key-0f1d55b2ca6e081c08380a764c9104ff-1491842535765" ukl:CommentaryRef="key-0f1d55b2ca6e081c08380a764c9104ff"><noteRef uk:name="commentary" href="#key-0f1d55b2ca6e081c08380a764c9104ff" class="commentary"/>OGA</ins> may vary a notice under subsection (11) of section 82 or subsection (2) of section 84 on the application of one of the persons to whom the notice was given.</p></content></subsection><subsection eId="section-85-3"><num>(3)</num><content><p>But the <ins class="substitution first last" ukl:ChangeId="key-0f1d55b2ca6e081c08380a764c9104ff-1491842552098" ukl:CommentaryRef="key-0f1d55b2ca6e081c08380a764c9104ff"><noteRef uk:name="commentary" href="#key-0f1d55b2ca6e081c08380a764c9104ff" class="commentary"/>OGA</ins> may do so only if satisfied that the variation is necessary to resolve a dispute that has arisen in connection with the notice between the persons to whom it was given.</p></content></subsection><subsection eId="section-85-4"><num>(4)</num><intro><p>In considering whether to vary a notice the <ins class="substitution first last" ukl:ChangeId="key-0f1d55b2ca6e081c08380a764c9104ff-1491842569274" ukl:CommentaryRef="key-0f1d55b2ca6e081c08380a764c9104ff"><noteRef uk:name="commentary" href="#key-0f1d55b2ca6e081c08380a764c9104ff" class="commentary"/>OGA</ins> must give an opportunity to be heard to—</p></intro><level class="para1" eId="section-85-4-a"><num>(a)</num><content><p>the persons to whom the notice was given;</p></content></level><level class="para1" eId="section-85-4-b"><num>(b)</num><content><p>any person with a right to have anything conveyed by the pipeline concerned or processed by the facility concerned;</p></content></level><level class="para1" eId="section-85-4-c"><num>(c)</num><content><p>the Health and Safety Executive; and</p></content></level><level class="para1" eId="section-85-4-d"><num>(d)</num><content><p>such other persons as the <ins class="substitution first last" ukl:ChangeId="key-0f1d55b2ca6e081c08380a764c9104ff-1491842582643" ukl:CommentaryRef="key-0f1d55b2ca6e081c08380a764c9104ff"><noteRef uk:name="commentary" href="#key-0f1d55b2ca6e081c08380a764c9104ff" class="commentary"/>OGA</ins> considers appropriate.</p></content></level></subsection><subsection eId="section-85-5"><num>(5)</num><content><p>For the purposes of this section and section 86, a person is to be treated as having been given a notice if the person has had assigned to him or her a right which is secured by the notice or a duty which is imposed by the notice.</p></content></subsection></section><section eId="section-86"><num>86</num><heading>Publication of notices and variations</heading><subsection eId="section-86-1"><num>(1)</num><intro><p>Where the <ins class="substitution first last" ukl:ChangeId="key-c30635d09674e234aef4379d13e6c561-1491842724784" ukl:CommentaryRef="key-c30635d09674e234aef4379d13e6c561"><noteRef uk:name="commentary" href="#key-c30635d09674e234aef4379d13e6c561" class="commentary"/>OGA</ins> gives a notice under subsection (11) of section 82 or subsection (2) of section 84, the <ins class="substitution first last" ukl:ChangeId="key-c30635d09674e234aef4379d13e6c561-1491842738902" ukl:CommentaryRef="key-c30635d09674e234aef4379d13e6c561"><noteRef uk:name="commentary" href="#key-c30635d09674e234aef4379d13e6c561" class="commentary"/>OGA</ins> may—</p></intro><level class="para1" eId="section-86-1-a"><num>(a)</num><content><p>publish the notice or any part of it;</p></content></level><level class="para1" eId="section-86-1-b"><num>(b)</num><content><p>publish a summary of the effect of the notice or any part of it.</p></content></level></subsection><subsection eId="section-86-2"><num>(2)</num><intro><p>Where the <ins class="substitution first last" ukl:ChangeId="key-c30635d09674e234aef4379d13e6c561-1491842755890" ukl:CommentaryRef="key-c30635d09674e234aef4379d13e6c561"><noteRef uk:name="commentary" href="#key-c30635d09674e234aef4379d13e6c561" class="commentary"/>OGA</ins> varies a notice in exercise of the power conferred by subsection (2) of section 85, the <ins class="substitution first last" ukl:ChangeId="key-c30635d09674e234aef4379d13e6c561-1491842774111" ukl:CommentaryRef="key-c30635d09674e234aef4379d13e6c561"><noteRef uk:name="commentary" href="#key-c30635d09674e234aef4379d13e6c561" class="commentary"/>OGA</ins> may—</p></intro><level class="para1" eId="section-86-2-a"><num>(a)</num><content><p>publish the variation;</p></content></level><level class="para1" eId="section-86-2-b"><num>(b)</num><content><p>publish the notice, or any part of it, as varied;</p></content></level><level class="para1" eId="section-86-2-c"><num>(c)</num><content><p>publish a summary of the effect of the variation.</p></content></level></subsection><subsection eId="section-86-3"><num>(3)</num><content><p>Before publishing anything under this section the <ins class="substitution first last" ukl:ChangeId="key-c30635d09674e234aef4379d13e6c561-1491842805670" ukl:CommentaryRef="key-c30635d09674e234aef4379d13e6c561"><noteRef uk:name="commentary" href="#key-c30635d09674e234aef4379d13e6c561" class="commentary"/>OGA</ins> must give an opportunity to be heard to the persons to whom the notice was given and to such other persons as the <ins class="substitution first last" ukl:ChangeId="key-c30635d09674e234aef4379d13e6c561-1491842838617" ukl:CommentaryRef="key-c30635d09674e234aef4379d13e6c561"><noteRef uk:name="commentary" href="#key-c30635d09674e234aef4379d13e6c561" class="commentary"/>OGA</ins> considers appropriate.</p></content></subsection></section><section eId="section-87"><num>87</num><heading>Powers of <ins class="substitution first last" ukl:ChangeId="key-5702698be3d027f41c9c83595e83cfd0-1491843000835" ukl:CommentaryRef="key-5702698be3d027f41c9c83595e83cfd0"><noteRef uk:name="commentary" href="#key-5702698be3d027f41c9c83595e83cfd0" class="commentary"/>OGA</ins> to require information</heading><subsection eId="section-87-1"><num>(1)</num><content><p>Where the <ins class="substitution first last" ukl:ChangeId="key-5702698be3d027f41c9c83595e83cfd0-1491843023424" ukl:CommentaryRef="key-5702698be3d027f41c9c83595e83cfd0"><noteRef uk:name="commentary" href="#key-5702698be3d027f41c9c83595e83cfd0" class="commentary"/>OGA</ins> has reason to believe that a person has made or received an application of a kind mentioned in subsection (1) of section 82, the <ins class="substitution first last" ukl:ChangeId="key-5702698be3d027f41c9c83595e83cfd0-1491843040693" ukl:CommentaryRef="key-5702698be3d027f41c9c83595e83cfd0"><noteRef uk:name="commentary" href="#key-5702698be3d027f41c9c83595e83cfd0" class="commentary"/>OGA</ins> may by notice require the person to confirm whether or not that is the case.</p></content></subsection><subsection eId="section-87-2"><num>(2)</num><intro><p>The <ins class="substitution first last" ukl:ChangeId="key-5702698be3d027f41c9c83595e83cfd0-1491843056012" ukl:CommentaryRef="key-5702698be3d027f41c9c83595e83cfd0"><noteRef uk:name="commentary" href="#key-5702698be3d027f41c9c83595e83cfd0" class="commentary"/>OGA</ins> may by notice require a person who has made or received an application of a kind mentioned in subsection (1) of section 82 to provide the <ins class="substitution first last" ukl:ChangeId="key-5702698be3d027f41c9c83595e83cfd0-1491843069818" ukl:CommentaryRef="key-5702698be3d027f41c9c83595e83cfd0"><noteRef uk:name="commentary" href="#key-5702698be3d027f41c9c83595e83cfd0" class="commentary"/>OGA</ins> with specified information for the purpose of enabling the <ins class="substitution first last" ukl:ChangeId="key-5702698be3d027f41c9c83595e83cfd0-1491843087259" ukl:CommentaryRef="key-5702698be3d027f41c9c83595e83cfd0"><noteRef uk:name="commentary" href="#key-5702698be3d027f41c9c83595e83cfd0" class="commentary"/>OGA</ins> to decide—</p></intro><level class="para1" eId="section-87-2-a"><num>(a)</num><content><p>whether to exercise any function conferred on the <ins class="substitution first last" ukl:ChangeId="key-5702698be3d027f41c9c83595e83cfd0-1491843108756" ukl:CommentaryRef="key-5702698be3d027f41c9c83595e83cfd0"><noteRef uk:name="commentary" href="#key-5702698be3d027f41c9c83595e83cfd0" class="commentary"/>OGA</ins> by section 82, 83, or 84; and</p></content></level><level class="para1" eId="section-87-2-b"><num>(b)</num><content><p>if so, how to exercise the function.</p></content></level></subsection><subsection eId="section-87-3"><num>(3)</num><intro><p>Where a person has applied to the <ins class="substitution first last" ukl:ChangeId="key-5702698be3d027f41c9c83595e83cfd0-1491843124996" ukl:CommentaryRef="key-5702698be3d027f41c9c83595e83cfd0"><noteRef uk:name="commentary" href="#key-5702698be3d027f41c9c83595e83cfd0" class="commentary"/>OGA</ins> under section 85 for a notice to be varied, the <ins class="substitution first last" ukl:ChangeId="key-5702698be3d027f41c9c83595e83cfd0-1491843141017" ukl:CommentaryRef="key-5702698be3d027f41c9c83595e83cfd0"><noteRef uk:name="commentary" href="#key-5702698be3d027f41c9c83595e83cfd0" class="commentary"/>OGA</ins> may by notice require any person within subsection (4) to provide the <ins class="substitution first last" ukl:ChangeId="key-5702698be3d027f41c9c83595e83cfd0-1491843158239" ukl:CommentaryRef="key-5702698be3d027f41c9c83595e83cfd0"><noteRef uk:name="commentary" href="#key-5702698be3d027f41c9c83595e83cfd0" class="commentary"/>OGA</ins> with specified information for the purpose of enabling the <ins class="substitution first last" ukl:ChangeId="key-5702698be3d027f41c9c83595e83cfd0-1491843182716" ukl:CommentaryRef="key-5702698be3d027f41c9c83595e83cfd0"><noteRef uk:name="commentary" href="#key-5702698be3d027f41c9c83595e83cfd0" class="commentary"/>OGA</ins> to decide—</p></intro><level class="para1" eId="section-87-3-a"><num>(a)</num><content><p>whether to vary the notice; and</p></content></level><level class="para1" eId="section-87-3-b"><num>(b)</num><content><p>if so, how to vary the notice.</p></content></level></subsection><subsection eId="section-87-4"><num>(4)</num><intro><p>Those persons are—</p></intro><level class="para1" eId="section-87-4-a"><num>(a)</num><content><p>the person who applied for the notice to be varied;</p></content></level><level class="para1" eId="section-87-4-b"><num>(b)</num><content><p>the other person to whom the notice was given;</p></content></level><level class="para1" eId="section-87-4-c"><num>(c)</num><content><p>any person who has had assigned to him or her a right which is secured by the notice or a duty which is imposed by the notice.</p></content></level></subsection><subsection eId="section-87-5"><num>(5)</num><content><p>The information that may be required under subsection (2) and (3) includes financial information.</p></content></subsection><subsection eId="section-87-5A"><num><ins class="first" ukl:ChangeId="key-0281a0ed6f9aadf238d6ef2febfe2622-1491842966467" ukl:CommentaryRef="key-0281a0ed6f9aadf238d6ef2febfe2622"><noteRef uk:name="commentary" href="#key-0281a0ed6f9aadf238d6ef2febfe2622" class="commentary"/>(5A)</ins></num><content><p><ins class="last" ukl:ChangeId="key-0281a0ed6f9aadf238d6ef2febfe2622-1491842966467" ukl:CommentaryRef="key-0281a0ed6f9aadf238d6ef2febfe2622">A notice under subsection (1), (2) or (3) that imposes a requirement on a person must specify when the requirement is to be complied with.</ins></p></content></subsection><subsection eId="section-87-6"><num>(6)</num><intro><p>The <ins class="substitution first last" ukl:ChangeId="key-5702698be3d027f41c9c83595e83cfd0-1491843201233" ukl:CommentaryRef="key-5702698be3d027f41c9c83595e83cfd0"><noteRef uk:name="commentary" href="#key-5702698be3d027f41c9c83595e83cfd0" class="commentary"/>OGA</ins> may not disclose any information obtained under this section unless—</p></intro><level class="para1" eId="section-87-6-a"><num>(a)</num><content><p>the person by or on behalf of whom the information was provided consents to the disclosure, <noteRef href="#key-ec821b8daefeddfb6ad4cdac3fde0c85" uk:name="commentary" ukl:Name="CommentaryRef" class="commentary"/>...</p></content></level><level class="para1" eId="section-87-6-b"><num>(b)</num><content><p>the disclosure is required by virtue of an obligation imposed on the <ins class="substitution first last" ukl:ChangeId="key-5702698be3d027f41c9c83595e83cfd0-1491843215382" ukl:CommentaryRef="key-5702698be3d027f41c9c83595e83cfd0"><noteRef uk:name="commentary" href="#key-5702698be3d027f41c9c83595e83cfd0" class="commentary"/>OGA</ins> by or under an enactment <ins class="first" ukl:ChangeId="key-663adf8db624b8a1b7b4d3eb6f5e3f42-1491843269832" ukl:CommentaryRef="key-663adf8db624b8a1b7b4d3eb6f5e3f42"><noteRef uk:name="commentary" href="#key-663adf8db624b8a1b7b4d3eb6f5e3f42" class="commentary"/>or</ins></p></content></level><level class="para1" eId="section-87-6-c"><num><ins ukl:ChangeId="key-663adf8db624b8a1b7b4d3eb6f5e3f42-1491843269832" ukl:CommentaryRef="key-663adf8db624b8a1b7b4d3eb6f5e3f42">(c)</ins></num><content><p><ins class="last" ukl:ChangeId="key-663adf8db624b8a1b7b4d3eb6f5e3f42-1491843269832" ukl:CommentaryRef="key-663adf8db624b8a1b7b4d3eb6f5e3f42">the disclosure is made under section 89A or 89B.</ins></p></content></level></subsection><subsection eId="section-87-7"><num>(7)</num><content><p>In this section “<term refersTo="#term-specified" eId="term-specified">specified</term>” means specified in a notice under subsection (2) or (3).</p></content></subsection></section><section eId="section-87A"><num><ins class="first" ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525"><noteRef uk:name="commentary" href="#key-249b885d8e7ed53715113eea2feb7525" class="commentary"/>87A</ins></num><heading><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">Appeals against requirements to provide information</ins></heading><subsection eId="section-87A-1"><num><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">(1)</ins></num><intro><p><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">Any person on whom a requirement is imposed by a notice under section 87(1), (2) or (3) may appeal against the notice to the Tribunal on the grounds that—</ins></p></intro><level class="para1" eId="section-87A-1-a"><num><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">(a)</ins></num><content><p><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">the information required by the notice is not relevant to the exercise by the OGA of its functions under this Chapter, or</ins></p></content></level><level class="para1" eId="section-87A-1-b"><num><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">(b)</ins></num><content><p><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">the length of time given to comply with the notice is unreasonable.</ins></p></content></level></subsection><subsection eId="section-87A-2"><num><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">(2)</ins></num><intro><p><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">On an appeal under this section the Tribunal may—</ins></p></intro><level class="para1" eId="section-87A-2-a"><num><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">(a)</ins></num><content><p><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">confirm, vary or cancel the notice, or</ins></p></content></level><level class="para1" eId="section-87A-2-b"><num><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">(b)</ins></num><content><p><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">remit the matter under appeal to the OGA for reconsideration with such directions (if any) as the Tribunal considers appropriate.</ins></p></content></level></subsection><subsection eId="section-87A-3"><num><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">(3)</ins></num><content><p><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">In this section “</ins><term refersTo="#term-the-tribunal"><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">the Tribunal</ins></term><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">” means the First-tier Tribunal.</ins></p></content></subsection></section><section eId="section-87B"><num><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">87B</ins></num><heading><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">Sanctions for failure to provide information</ins></heading><subsection eId="section-87B-1"><num><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">(1)</ins></num><content><p><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">A requirement imposed by a notice under section 87(1), (2) or (3) is to be treated for the purposes of Chapter 5 of Part 2 of the Energy Act 2016 (power of the OGA to impose sanctions) as a petroleum-related requirement.</ins></p></content></subsection><subsection eId="section-87B-2"><num><ins ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">(2)</ins></num><content><p><ins class="last" ukl:ChangeId="key-249b885d8e7ed53715113eea2feb7525-1491849527709" ukl:CommentaryRef="key-249b885d8e7ed53715113eea2feb7525">But the OGA may not give a revocation notice or an operator removal notice under that Chapter by virtue of this section.</ins></p></content></subsection></section><section eId="section-88"><num>88</num><heading>Enforcement</heading><subsection eId="section-88-1"><num>(1)</num><intro><p>A person is guilty of an offence if, in circumstances falling within subsection (2), the person provides false information to the <ins class="substitution first last" ukl:ChangeId="key-807a424f6326f5ff2d4bd0e1543a3ca8-1491848804300" ukl:CommentaryRef="key-807a424f6326f5ff2d4bd0e1543a3ca8"><noteRef uk:name="commentary" href="#key-807a424f6326f5ff2d4bd0e1543a3ca8" class="commentary"/>OGA</ins> for the purpose of—</p></intro><level class="para1" eId="section-88-1-a"><num>(a)</num><content><p>inducing the <ins class="substitution first last" ukl:ChangeId="key-807a424f6326f5ff2d4bd0e1543a3ca8-1491848825001" ukl:CommentaryRef="key-807a424f6326f5ff2d4bd0e1543a3ca8"><noteRef uk:name="commentary" href="#key-807a424f6326f5ff2d4bd0e1543a3ca8" class="commentary"/>OGA</ins> to exercise or not to exercise any of the functions conferred on the <ins class="substitution first last" ukl:ChangeId="key-807a424f6326f5ff2d4bd0e1543a3ca8-1491848841521" ukl:CommentaryRef="key-807a424f6326f5ff2d4bd0e1543a3ca8"><noteRef uk:name="commentary" href="#key-807a424f6326f5ff2d4bd0e1543a3ca8" class="commentary"/>OGA</ins> by sections 82 to 85; or</p></content></level><level class="para1" eId="section-88-1-b"><num>(b)</num><content><p>inducing the <ins class="substitution first last" ukl:ChangeId="key-807a424f6326f5ff2d4bd0e1543a3ca8-1491848863471" ukl:CommentaryRef="key-807a424f6326f5ff2d4bd0e1543a3ca8"><noteRef uk:name="commentary" href="#key-807a424f6326f5ff2d4bd0e1543a3ca8" class="commentary"/>OGA</ins> to exercise any of those functions in a particular way.</p></content></level></subsection><subsection eId="section-88-2"><num>(2)</num><intro><p>Those circumstances are that, at the time the information is provided, the person—</p></intro><level class="para1" eId="section-88-2-a"><num>(a)</num><content><p>knows or believes the information to be false; or</p></content></level><level class="para1" eId="section-88-2-b"><num>(b)</num><content><p>is reckless as to whether or not it is false.</p></content></level></subsection><subsection eId="section-88-3"><num>(3)</num><content><p>A person guilty of an offence under subsection (1) is liable on summary conviction to a fine not exceeding level five on the standard scale.</p></content></subsection><subsection eId="section-88-4"><num>(4)</num><intro><p>Proceedings for an offence under subsection (1) may not be instituted in England and Wales except—</p></intro><level class="para1" eId="section-88-4-a"><num>(a)</num><content><p>by the Secretary of State or by a person authorised to do so by the Secretary of State, or</p></content></level><level class="para1" eId="section-88-4-b"><num>(b)</num><content><p>by or with the consent of the Director of Public Prosecutions.</p></content></level></subsection><subsection eId="section-88-5"><num>(5)</num><content><p>Where an offence under subsection (1) is committed by a body corporate and it is proved to have been committed with the consent or connivance of, or to be attributable to neglect on the part of, an officer of the body corporate, that officer (as well as the body corporate) is guilty of the offence and is liable to be proceeded against and dealt with accordingly.</p></content></subsection><subsection eId="section-88-6"><num>(6)</num><content><p>Where an offence under subsection (1) is committed by a Scottish partnership and it is proved to have been committed with the consent or connivance of, or to be attributable to neglect on the part of, a partner of the partnership, that partner (as well as the partnership) is guilty of the offence and is liable to be proceeded against and dealt with accordingly.</p></content></subsection><subsection eId="section-88-7"><num>(7)</num><content><p>The duty of a person to comply with a notice under subsection (11) of section 82 or subsection (2) of section 84 is a duty owed to any person who may be affected by a failure to comply with it.</p></content></subsection><subsection eId="section-88-8"><num>(8)</num><content><p>Where a duty is owed by virtue of subsection (7) to any person, the duty may be enforced as if it were contained in a contract between that person and the person who owes the duty.</p></content></subsection><subsection eId="section-88-9"><num>(9)</num><intro><p>The duty of a person to comply with a notice under section 87 is enforceable by civil proceedings by the <ins class="substitution first last" ukl:ChangeId="key-37b90941025050b18c45f05bf200a1ff-1491848895622" ukl:CommentaryRef="key-37b90941025050b18c45f05bf200a1ff"><noteRef uk:name="commentary" href="#key-37b90941025050b18c45f05bf200a1ff" class="commentary"/>OGA</ins> —</p></intro><level class="para1" eId="section-88-9-a"><num>(a)</num><content><p>for an injunction or interdict;</p></content></level><level class="para1" eId="section-88-9-b"><num>(b)</num><content><p>for specific performance of a statutory duty under section 45 of the Court of Session Act 1988; or</p></content></level><level class="para1" eId="section-88-9-c"><num>(c)</num><content><p>for any other appropriate relief or remedy.</p></content></level></subsection><subsection eId="section-88-10"><num>(10)</num><intro><p>Civil proceedings under subsection (9) are to be brought—</p></intro><level class="para1" eId="section-88-10-a"><num>(a)</num><content><p>in England and Wales, in the High Court, or</p></content></level><level class="para1" eId="section-88-10-b"><num>(b)</num><content><p>in Scotland, in the Court of Session.</p></content></level></subsection><subsection eId="section-88-11"><num>(11)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-officer" eId="term-officer">officer</term>”, in relation to a body corporate, means—</p></intro><level class="para1"><num>(a)</num><content><p>any director, manager, secretary or other similar officer of the body corporate, or</p></content></level><level class="para1"><num>(b)</num><content><p>any person purporting to act in any such capacity;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-partner" eId="term-partner">partner</term>”, in relation to a Scottish partnership, includes any person who was purporting to act as a partner in the partnership.</p></content></hcontainer></subsection><subsection eId="section-88-12"><num>(12)</num><content><p>In subsection (11) “<term refersTo="#term-director" eId="term-director">director</term>”, in relation to a body corporate whose affairs are managed by its members, means a member of the body corporate.</p></content></subsection></section><section eId="section-89"><num>89</num><heading>Minor, consequential and supplemental provision</heading><subsection eId="section-89-1"><num>(1)</num><content><p>Schedule 2 contains minor and consequential amendments relating to this Chapter.</p></content></subsection><subsection eId="section-89-2"><num>(2)</num><content><p>Before exercising any power conferred by sections 82 to 85 in respect of an upstream petroleum pipeline that is situated partly in a foreign sector of the continental shelf, the <ins class="substitution first last" ukl:ChangeId="key-3d336c9c8ff7a649542033dcbac9b79c-1491849117669" ukl:CommentaryRef="key-3d336c9c8ff7a649542033dcbac9b79c"><noteRef uk:name="commentary" href="#key-3d336c9c8ff7a649542033dcbac9b79c" class="commentary"/>OGA</ins> must consult the relevant authorities in the other country.</p></content></subsection><subsection eId="section-89-3"><num>(3)</num><content><p>The use of a pipeline by any person in accordance with a right secured by a notice under subsection (11) of section 82 is not a contravention of section 14(1) of the Petroleum Act 1998.</p></content></subsection><subsection eId="section-89-4"><num>(4)</num><intro><p>Subsection (5) applies where—</p></intro><level class="para1" eId="section-89-4-a"><num>(a)</num><content><p>an authorisation has been issued under section 14 of the Petroleum Act 1998 (construction and use of controlled pipelines) for works for the construction of a pipeline;</p></content></level><level class="para1" eId="section-89-4-b"><num>(b)</num><content><p>the authorisation contains a term of a kind mentioned in section 15(5) of that Act; and</p></content></level><level class="para1" eId="section-89-4-c"><num>(c)</num><content><p>the proposed pipeline is to be a relevant upstream petroleum pipeline.</p></content></level></subsection><subsection eId="section-89-5"><num>(5)</num><intro><p>Before serving a notice under section 15(6) of the Petroleum Act 1998 on a person other than the holder of the authorisation, the <ins class="substitution first last" ukl:ChangeId="key-3d336c9c8ff7a649542033dcbac9b79c-1491849131584" ukl:CommentaryRef="key-3d336c9c8ff7a649542033dcbac9b79c"><noteRef uk:name="commentary" href="#key-3d336c9c8ff7a649542033dcbac9b79c" class="commentary"/>OGA</ins> must give that person an opportunity to make with respect to the proposed pipeline—</p></intro><level class="para1" eId="section-89-5-a"><num>(a)</num><content><p>an application of a kind mentioned in subsection (1)(a) of section 82 of this Act, and</p></content></level><level class="para1" eId="section-89-5-b"><num>(b)</num><content><p>if applicable, an application under subsection (4) of that section;</p></content></level><wrapUp><p>and for the purposes of any such application the provisions of this Chapter have effect with the modifications in subsection (6).</p></wrapUp></subsection><subsection eId="section-89-6"><num>(6)</num><intro><p>The modification are that—</p></intro><level class="para1" eId="section-89-6-a"><num>(a)</num><content><p>references to a pipeline are to the proposed pipeline as it would be once constructed in accordance with the terms of the authorisation;</p></content></level><level class="para1" eId="section-89-6-b"><num>(b)</num><content><p>references to the owner of a pipeline are to the proposed owner of the proposed pipeline;</p></content></level><level class="para1" eId="section-89-6-c"><num>(c)</num><content><p>section 84 is omitted.</p></content></level></subsection><subsection eId="section-89-7"><num>(7)</num><content><p>In subsection (4)(c) “<term refersTo="#term-relevant-upstream-petroleum-pipeline" eId="term-relevant-upstream-petroleum-pipeline">relevant upstream petroleum pipeline</term>” means an upstream petroleum pipeline that is “<term refersTo="#term-relevant" eId="term-relevant">relevant</term>” for the purposes of subsection (1) of section 82.</p></content></subsection></section><section eId="section-89A"><num><ins class="first" ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6"><noteRef uk:name="commentary" href="#key-daf2bd93338221318948d3a90de229e6" class="commentary"/>89A</ins></num><heading><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">Assignments and assignations of applications</ins></heading><subsection eId="section-89A-1"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(1)</ins></num><intro><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">This section applies where—</ins></p></intro><level class="para1" eId="section-89A-1-a"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(a)</ins></num><content><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">there is an assignment or assignation of an application made under section 82 from one person (“A”) to another (“B”), and</ins></p></content></level><level class="para1" eId="section-89A-1-b"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(b)</ins></num><intro><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">the following are notified of the assignment or assignation—</ins></p></intro><level class="para2" eId="section-89A-1-b-i"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(i)</ins></num><content><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">the owner of the pipeline or facility that is the subject of the application, and</ins></p></content></level><level class="para2" eId="section-89A-1-b-ii"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(ii)</ins></num><content><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">the OGA.</ins></p></content></level></level></subsection><subsection eId="section-89A-2"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(2)</ins></num><intro><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">A notice under subsection (1)(b) must—</ins></p></intro><level class="para1" eId="section-89A-2-a"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(a)</ins></num><content><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">be in writing, and</ins></p></content></level><level class="para1" eId="section-89A-2-b"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(b)</ins></num><content><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">specify the date of the assignment or assignation.</ins></p></content></level></subsection><subsection eId="section-89A-3"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(3)</ins></num><content><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">For the purposes of this Chapter, anything done (or treated as done) by or in relation to A in connection with the application is treated after the assignment or assignation as having been done by or in relation to B. This subsection is subject to subsections (4) and (5) and does not apply for the purposes of subsections (6) and (7).</ins></p></content></subsection><subsection eId="section-89A-4"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(4)</ins></num><content><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">Any provision of this Chapter that requires the OGA to give the applicant an opportunity to be heard has effect after the assignment or assignation as requiring the OGA to give B an opportunity to be heard (whether or not the applicant was heard under that provision before the assignment or assignation).</ins></p></content></subsection><subsection eId="section-89A-5"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(5)</ins></num><content><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">Subsection (3) does not apply in relation to any notice given under section 87 before the assignment or assignation (and, accordingly, the person to whom the notice was given remains under an obligation to comply with it).</ins></p></content></subsection><subsection eId="section-89A-6"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(6)</ins></num><content><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">Any information relating to the application obtained by the OGA before the assignment or assignation from any person who at the time was the applicant may be disclosed to B.</ins></p></content></subsection><subsection eId="section-89A-7"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(7)</ins></num><content><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">Before disclosing any such information to B, the OGA must remove any information which the OGA considers may prejudice the commercial interests of the person from whom the information was obtained.</ins></p></content></subsection></section><section eId="section-89B"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">89B</ins></num><heading><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">Transfers of ownership</ins></heading><subsection eId="section-89B-1"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(1)</ins></num><content><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">This section applies where the ownership of a pipeline or facility that is the subject of an application under section 82, or to which a notice under subsection (11) of that section relates, is transferred from one person (“C”) to another (“D”).</ins></p></content></subsection><subsection eId="section-89B-2"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(2)</ins></num><intro><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">For the purposes of this Chapter—</ins></p></intro><level class="para1" eId="section-89B-2-a"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(a)</ins></num><content><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">anything done (or treated as done) by or in relation to C in connection with C's ownership of the pipeline or facility is treated after the transfer as having been done by or in relation to D, and</ins></p></content></level><level class="para1" eId="section-89B-2-b"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(b)</ins></num><content><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">any obligations imposed or rights conferred (or treated as imposed or conferred) by or under this Chapter on C in connection with C's ownership of the pipeline or facility are treated after the transfer as imposed or conferred on D.</ins></p></content></level><wrapUp><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">This subsection is subject to subsections (3) and (4) and does not apply for the purposes of subsections (5) and (6).</ins></p></wrapUp></subsection><subsection eId="section-89B-3"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(3)</ins></num><content><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">Any provision of this Chapter that requires the OGA to give the owner of the pipeline or facility an opportunity to be heard has effect after the transfer as requiring the OGA to give D an opportunity to be heard (whether or not the owner was heard under that provision before the transfer).</ins></p></content></subsection><subsection eId="section-89B-4"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(4)</ins></num><content><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">Subsection (2) does not affect the obligation to comply with any notice given under section 87 before the transfer (and, accordingly, the person to whom the notice was given remains under an obligation to comply with it).</ins></p></content></subsection><subsection eId="section-89B-5"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(5)</ins></num><content><p><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">Any information relating to the application obtained by the OGA before the transfer from any person who at the time was the owner may be disclosed to D.</ins></p></content></subsection><subsection eId="section-89B-6"><num><ins ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">(6)</ins></num><content><p><ins class="last" ukl:ChangeId="key-daf2bd93338221318948d3a90de229e6-1491849598518" ukl:CommentaryRef="key-daf2bd93338221318948d3a90de229e6">Before disclosing any such information to D, the OGA must remove any information which the OGA considers may prejudice the commercial interests of the person from whom the information was obtained.</ins></p></content></subsection></section><section eId="section-90"><num>90</num><heading>Interpretation</heading><subsection eId="section-90-1"><num>(1)</num><intro><p>In this Chapter—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-foreign-sector-of-the-continental-shelf" eId="term-foreign-sector-of-the-continental-shelf">foreign sector of the continental shelf</term>” means an area within which rights are exercisable with respect to the sea bed and subsoil and their natural resources by a country or territory outside the United Kingdom;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-gas" eId="term-gas">gas</term>” means any substance which is or, if it were in a gaseous state, would be gas within the meaning of Part 1 of the Gas Act 1986;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-gas-processing-facility" eId="term-gas-processing-facility">gas processing facility</term>” means any facility which—</p></intro><level class="para1"><num>(a)</num><content><p>carries out gas processing operations in relation to piped gas;</p></content></level><level class="para1"><num>(b)</num><content><p>is operated otherwise than by a gas transporter; and</p></content></level><level class="para1"><num>(c)</num><content><p>is not an LNG import or export facility (within the meaning of section 12 of the Gas Act 1995);</p></content></level></hcontainer><hcontainer name="definition"><content><p><ins class="first" ukl:ChangeId="key-1b585da658a70a337d72597858ac8e22-1491849252087" ukl:CommentaryRef="key-1b585da658a70a337d72597858ac8e22"><noteRef uk:name="commentary" href="#key-1b585da658a70a337d72597858ac8e22" class="commentary"/>“</ins><term refersTo="#term-the-oga"><ins ukl:ChangeId="key-1b585da658a70a337d72597858ac8e22-1491849252087" ukl:CommentaryRef="key-1b585da658a70a337d72597858ac8e22">the OGA</ins></term><ins class="last" ukl:ChangeId="key-1b585da658a70a337d72597858ac8e22-1491849252087" ukl:CommentaryRef="key-1b585da658a70a337d72597858ac8e22">” means the Oil and Gas Authority;</ins></p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-oil-processing-facility" eId="term-oil-processing-facility">oil processing facility</term>” means any facility which carries out oil processing operations;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-payments" eId="term-payments">payments</term>” means payments in money or money's worth;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-petroleum" eId="term-petroleum">petroleum</term>” has the same meaning as in Part 1 of the Petroleum Act 1998, and includes petroleum that has undergone any processing;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-piped-gas" eId="term-piped-gas">piped gas</term>” means gas which—</p></intro><level class="para1"><num>(a)</num><content><p>originated from a petroleum production project; and</p></content></level><level class="para1"><num>(b)</num><content><p>has been conveyed only by means of pipes;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-pipeline" eId="term-pipeline">pipeline</term>” means a pipe or system of pipes for the conveyance of any thing;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-upstream-petroleum-pipeline" eId="term-upstream-petroleum-pipeline">upstream petroleum pipeline</term>” means a pipeline or one of a network of pipelines—</p></intro><level class="para1"><num>(a)</num><content><p>which is operated or constructed as part of a petroleum production project and is not a carbon dioxide pipeline;</p></content></level><level class="para1"><num>(b)</num><content><p>which is used to convey petroleum from the site of one or more such projects—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>directly to premises, in order for that petroleum to be used at those premises for power generation or for an industrial process;</p></item><item><num>(ii)</num><p>directly to a place outside Great Britain;</p></item><item><num>(iii)</num><p>directly to a terminal; or</p></item><item><num>(iv)</num><p>indirectly to a terminal by way of one or more other terminals, whether or not such intermediate terminals are of the same kind as the final terminal; or</p></item></blockList></content></level><level class="para1"><num>(c)</num><content><p>which is used to convey gas directly from a terminal to a pipeline system operated by a gas transporter or to any premises.</p></content></level></hcontainer></subsection><subsection eId="section-90-2"><num>(2)</num><intro><p>For the purposes of this section—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-carbon-dioxide-pipeline" eId="term-carbon-dioxide-pipeline">carbon dioxide pipeline</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a pipeline used to convey carbon dioxide to a carbon dioxide storage site; or</p></content></level><level class="para1"><num>(b)</num><content><p>a pipeline which is not being used for any purpose but which is intended to be used to convey carbon dioxide to such a site;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-carbon-dioxide-storage-site" eId="term-carbon-dioxide-storage-site">carbon dioxide storage site</term>” means a facility—</p></intro><level class="para1"><num>(a)</num><content><p>for the storage of carbon dioxide (with a view to its permanent disposal, or as an interim measure prior to its permanent disposal); and</p></content></level><level class="para1"><num>(b)</num><content><p>in respect of the use of which a person is required to have a licence under section 18 of the Energy Act 2008;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-gas-processing-operation" eId="term-gas-processing-operation">gas processing operation</term>” means any of the following operations—</p></intro><level class="para1"><num>(a)</num><content><p>purifying, blending, odorising or compressing gas for the purpose of enabling it to be introduced into a pipeline system operated by a gas transporter or to be conveyed to an electricity generating station, a gas storage facility or any place outside Great Britain;</p></content></level><level class="para1"><num>(b)</num><content><p>removing from gas for that purpose any of its constituent gases, or separating from gas for that purpose any oil or water;</p></content></level><level class="para1"><num>(c)</num><content><p>determining the quantity or quality of gas which is or is to be so introduced, or so conveyed, whether generally or by or on behalf of a particular person,</p></content></level><level class="para1"><num>(d)</num><content><p>separating, purifying, blending, odorising or compressing gas for the purpose of—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>converting it into a form in which a purchaser is willing to accept delivery from a seller, or</p></item><item><num>(ii)</num><p>enabling it to be loaded for conveyance to another place (whether inside or outside Great Britain); and</p></item></blockList></content></level><level class="para1"><num>(e)</num><content><p>loading gas—</p><blockList class="ordered roman parens" ukl:Name="OrderedList" ukl:Type="roman" ukl:Decoration="parens"><item><num>(i)</num><p>at a facility which carries out operations of a kind mentioned in paragraph (d), or</p></item><item><num>(ii)</num><p>piped from such a facility,</p></item></blockList><p>for the purpose of enabling the gas to be conveyed to another place (whether inside or outside Great Britain);</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-gas-transporter" eId="term-gas-transporter">gas transporter</term>” has the meaning given by section 7(1) of the Gas Act 1986;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-oil-processing-operations" eId="term-oil-processing-operations">oil processing operations</term>” means any of the following operations—</p></intro><level class="para1"><num>(a)</num><content><p>initial blending and such other treatment of petroleum as may be required to produce stabilised crude oil and other hydrocarbon liquids to the point at which a seller could reasonably make a delivery to a purchaser of such oil and liquids;</p></content></level><level class="para1"><num>(b)</num><content><p>receiving stabilised crude oil and other hydrocarbon liquids piped from an oil processing facility carrying out operations of a kind mentioned in paragraph (a), or storing oil or other hydrocarbon liquids so received, prior to their conveyance to another place (whether inside or outside Great Britain);</p></content></level><level class="para1"><num>(c)</num><content><p>loading stabilised crude oil and other hydrocarbon liquids piped from a facility carrying out operations of a kind mentioned in paragraph (a) or (b) for conveyance to another place (whether inside or outside Great Britain);</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-petroleum-production-project" eId="term-petroleum-production-project">petroleum production project</term>” means a project carried out by virtue of a licence granted under section 3 of the Petroleum Act 1998 or section 2 of the Petroleum (Production) Act 1934, or an equivalent project in a foreign sector of the continental shelf, and includes such a project which is used for the storage of gas;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-terminal" eId="term-terminal">terminal</term>” includes—</p></intro><level class="para1"><num>(a)</num><content><p>facilities for such initial blending and other treatment as may be required to produce stabilised crude oil and other hydrocarbon liquids to the point at which a seller could reasonably make a delivery to a purchaser of such oil and liquids;</p></content></level><level class="para1"><num>(b)</num><content><p>oil processing facilities;</p></content></level><level class="para1"><num>(c)</num><content><p>gas processing facilities; and</p></content></level><level class="para1"><num>(d)</num><content><p>a facility for the reception of gas prior to its conveyance to a place outside Great Britain.</p></content></level></hcontainer></subsection></section><section eId="section-91"><num>91</num><heading>Meaning of “<term refersTo="#term-associate" eId="term-associate">associate</term>” for the purposes of section 82</heading><subsection eId="section-91-1"><num>(1)</num><intro><p>For the purposes of section 82(7)(d) and (9)(a) a person is an associate of another if—</p></intro><level class="para1" eId="section-91-1-a"><num>(a)</num><content><p>either or both of them is a body corporate, and</p></content></level><level class="para1" eId="section-91-1-b"><num>(b)</num><content><p>one of them controls the other, or both are controlled by the same person or persons,</p></content></level><wrapUp><p>and subsections (2) to (6) set out the circumstances in which one person (“A”) controls another (“B”).</p></wrapUp></subsection><subsection eId="section-91-2"><num>(2)</num><intro><p>Where B is a company, A controls B if A possesses or is entitled to acquire—</p></intro><level class="para1" eId="section-91-2-a"><num>(a)</num><content><p>one half or more of the issued share capital of B,</p></content></level><level class="para1" eId="section-91-2-b"><num>(b)</num><content><p>such rights as would entitle A to exercise one half or more of the votes exercisable in general meetings of B,</p></content></level><level class="para1" eId="section-91-2-c"><num>(c)</num><content><p>such part of the issued share capital of B as would entitle A to one half or more of the amount distributed if the whole of the income of B were in fact distributed among the shareholders, or</p></content></level><level class="para1" eId="section-91-2-d"><num>(d)</num><content><p>such rights as would, in the event of the winding up of B or in any other circumstances, entitle it to receive one half or more of the assets of B which would then be available for distribution among the shareholders.</p></content></level></subsection><subsection eId="section-91-3"><num>(3)</num><intro><p>Where B is a limited liability partnership, A controls B if A—</p></intro><level class="para1" eId="section-91-3-a"><num>(a)</num><content><p>holds a majority of the voting rights in B,</p></content></level><level class="para1" eId="section-91-3-b"><num>(b)</num><content><p>is a member of B and has a right to appoint or remove a majority of other members, or</p></content></level><level class="para1" eId="section-91-3-c"><num>(c)</num><content><p>is a member of B and controls alone, or pursuant to an agreement with other members, a majority of the voting rights in B.</p></content></level></subsection><subsection eId="section-91-4"><num>(4)</num><content><p>In subsection (3)(a) and (c) the references to “voting rights” are to the rights conferred on members in respect of their interests in a limited liability partnership to vote on those matters which are to be decided on by a vote of the members of the limited liability partnership.</p></content></subsection><subsection eId="section-91-5"><num>(5)</num><content><p>In any case, A controls B if A has the power, directly or indirectly, to secure that the affairs of B are conducted in accordance with A's wishes.</p></content></subsection><subsection eId="section-91-6"><num>(6)</num><intro><p>In determining whether, by virtue of subsections (2) to (5), A controls B, A shall be taken to possess—</p></intro><level class="para1" eId="section-91-6-a"><num>(a)</num><content><p>any rights and powers possessed by a person as nominee for it, and</p></content></level><level class="para1" eId="section-91-6-b"><num>(b)</num><content><p>any rights and powers possessed by a body corporate which it controls (including rights and powers which such a body corporate would be taken to possess by virtue of this paragraph).</p></content></level></subsection></section></chapter>
Part 2 — Security of energy supplies — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" eId="part-2-chapter-4"><num>CHAPTER 4</num><heading>Downstream gas processing facilities</heading><section eId="section-92"><num>92</num><heading>Acquisition of rights to use gas processing facilities for downstream purposes</heading><subsection eId="section-92-1"><num>(1)</num><content><p>Section 12 of the Gas Act 1995 (acquisition of rights to use gas processing facilities) is amended as follows.</p></content></subsection><subsection eId="section-92-2"><num>(2)</num><content><p><mod>In the heading at the end insert <quotedText>“ for downstream purposes ”</quotedText>.</mod></p></content></subsection><subsection eId="section-92-3"><num>(3)</num><content><p><mod>For “the Secretary of State” (in each place those words occur) substitute <quotedText>“ the Authority ”</quotedText>.</mod></p></content></subsection><subsection eId="section-92-4"><num>(4)</num><intro><p>In subsection (1)—</p></intro><level class="para1" eId="section-92-4-a"><num>(a)</num><content><p><mod>in the words before paragraph (a), after “gas processing facility” insert <quotedText>“ which processes gas for a downstream purpose ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-92-4-b"><num>(b)</num><content><p><mod>in that paragraph for “on that person's behalf” substitute <quotedText>“ for such a purpose ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-92-5"><num>(5)</num><content><p><mod>After subsection (1) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(1ZA)</num><intro><p>At least two months before publishing those conditions or any changes to them under subsection (1), the owner of the facility must—</p></intro><level class="para1"><num>(a)</num><content><p>publish a draft of the proposed conditions or changes; and</p></content></level><level class="para1"><num>(b)</num><content><p>inform any person who has a right to have gas processed by the facility that the draft has been published.</p></content></level></subsection><subsection><num>(1ZB)</num><content><p>The owner of the facility must take into account any representations received about the proposed conditions or changes before publishing them, or a modified version of them, as final conditions or changes under subsection (1).</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-92-6"><num>(6)</num><content><p><mod>In subsection (1B) for “on his behalf” substitute <quotedText>“ for a downstream purpose ”</quotedText>.</mod></p></content></subsection><subsection eId="section-92-7"><num>(7)</num><intro><p>In subsection (1D)—</p></intro><level class="para1" eId="section-92-7-a"><num>(a)</num><content><p>omit the “and” immediately preceding paragraph (c);</p></content></level><level class="para1" eId="section-92-7-b"><num>(b)</num><content><p><mod>after paragraph (c) insert<quotedText startQuote="&#x201C;">; and </quotedText><quotedStructure endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><level class="para1"><num>(d)</num><content><p>that the gas is to be processed for a downstream purpose</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></level></subsection><subsection eId="section-92-8"><num>(8)</num><content><p><mod>In subsection (1G) for “he” substitute <quotedText>“ it ”</quotedText>.</mod></p></content></subsection><subsection eId="section-92-9"><num>(9)</num><content><p><mod>In subsection (2)(b) for “his” substitute <quotedText>“ its ”</quotedText>.</mod></p></content></subsection><subsection eId="section-92-10"><num>(10)</num><content><p><mod>For subsections (5) and (5A) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(5)</num><intro><p>Sections 28 to 30F of the 1986 Act (enforcement of relevant requirements <abbr title="Et cetera" xml:lang="la">etc</abbr>) apply in relation to the owner of a gas processing facility as if—</p></intro><level class="para1"><num>(a)</num><content><p>references to “a licence holder” were references to the owner of the facility; and</p></content></level><level class="para1"><num>(b)</num><content><p>references to a “relevant requirement” were references to a requirement imposed on the owner under this section.</p></content></level></subsection><subsection><num>(5A)</num><content><p>For the purposes of this section, gas is processed for “a downstream purpose” if it is processed with a view to its being put into a gas storage facility, an LNG import or export facility, a gas interconnector or a distribution system pipeline.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-92-11"><num>(11)</num><intro><p>In subsection (6)—</p></intro><level class="para1" eId="section-92-11-a"><num>(a)</num><content><p><mod>in the definition of “gas processing facility” for the words from “carries” to the end substitute<quotedText startQuote="&#x201C;">— </quotedText><quotedStructure endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><subsection><num>(a)</num><content><p>carries out gas processing operations;</p></content></subsection><subsection><num>(b)</num><content><p>is operated otherwise than by a gas transporter; and</p></content></subsection><subsection><num>(c)</num><content><p>is not an LNG import or export facility;</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-92-11-b"><num>(b)</num><content><p><mod>insert, in the appropriate place, the following definitions—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><hcontainer name="definition"><content><p>“<term refersTo="#term-authorised-transporter">authorised transporter</term>” has the same meaning as in Part 1 of the 1986 Act;</p></content></hcontainer></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><p>“<term refersTo="#term-the-authority">the Authority</term>” means the Gas and Electricity Markets Authority;</p></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><p>“<term refersTo="#term-distribution-system-operator">distribution system operator</term>” has the meaning given by Article 2(6) of Directive <ref eId="c00001" href="http://www.legislation.gov.uk/european/directive/2009/0073">2009/73/<abbr class="acronym" title="European Community">EC</abbr></ref> of the European Parliament and of the Council of 13 July 2009 concerning common rules for the internal market in natural gas and repealing Directive <ref eId="c00002" href="http://www.legislation.gov.uk/european/directive/2003/0055">2003/55/<abbr class="acronym" title="European Community">EC</abbr></ref>;</p></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><p>“<term refersTo="#term-distribution-system-pipeline">distribution system pipeline</term>” means a pipeline operated by an authorised transporter who is a distribution system operator;</p></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><p>“<term refersTo="#term-gas-interconnector">gas interconnector</term>” has the same meaning as in Part 1 of the 1986 Act;</p></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><p>“<term refersTo="#term-gas-storage-facility">gas storage facility</term>” means a facility in Great Britain (including the territorial sea adjacent to Great Britain and the sea in any area designated under section 1(7) of the Continental Shelf Act 1964) for either or both of the following—</p><level class="para1"><num>(a)</num><content><p>the storage in porous strata, or in cavities in strata, of gas which has been, or will be, conveyed in a pipeline system operated by the holder of a licence under section 7 or 7ZA of the 1986 Act;</p></content></level><level class="para1"><num>(b)</num><content><p>the storage of liquid gas which, if regasified, would be suitable for conveyance through pipes to premises in accordance with a licence under section 7 of the 1986 Act;</p></content></level><p>but the reference in paragraph (b) to the storage of liquid gas does not include such temporary storage as is mentioned in the definition of “LNG import or export facility”;</p></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><p>“<term refersTo="#term-lng-import-or-export-facility">LNG import or export facility</term>” means a facility in Great Britain (including the territorial sea adjacent to Great Britain and the sea in any area designated under section 1(7) of the Continental Shelf Act 1964) for—</p><level class="para1"><num>(a)</num><content><p>the importation into Great Britain and regasification of liquid gas prior to its conveyance to a pipeline system operated by the holder of a licence under section 7 or section 7ZA of the 1986 Act, or the liquefaction of gas for the purpose of its export from Great Britain; and</p></content></level><level class="para1"><num>(b)</num><content><p>any activity, including temporary storage of gas or liquid gas, which is necessary for that importation, regasification or liquefaction;</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><p>“<term refersTo="#term-storage">storage</term>”, in relation to liquid gas in a gas storage facility, includes any liquefaction of gas or regasification of liquid gas ancillary to the storage of liquid gas, and “<term refersTo="#term-stored">stored</term>”, in relation to liquid gas in a gas storage facility, shall be construed accordingly;</p></quotedStructure><inline name="appendText">.</inline></mod></p></content></level></subsection><subsection eId="section-92-12"><num>(12)</num><content><p><mod>For subsection (7) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(7)</num><content><p>Section 91 of the Energy Act 2011 (meaning of “associate”) applies for the purposes of subsection (3) of this section as it applies for the purposes of section 82(7)(d) and (9)(a) of that Act.</p></content></subsection></quotedStructure></mod></p></content></subsection></section></chapter>
Part 2 — Security of energy supplies — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-2-chapter-5"><num>CHAPTER 5</num><heading>Special administration</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-2-chapter-5-crossheading-special-administration-under-the-energy-act-2004"><heading><i>Special administration under the Energy Act 2004</i></heading><section eId="section-93"><num>93</num><heading>Amendment of section 166 of the Energy Act 2004</heading><subsection eId="section-93-1"><num>(1)</num><content><p>Section 166 of the Energy Act 2004 (indemnities) is amended as follows.</p></content></subsection><subsection eId="section-93-2"><num>(2)</num><content><p><mod>After subsection (3) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(3AA)</num><content><p>As soon as practicable after agreeing to indemnify persons under this section, the Secretary of State must lay a statement of the agreement before Parliament.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-93-3"><num>(3)</num><content><p><mod>After subsection (6) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(6A)</num><intro><p>Where a sum has been paid out by the Secretary of State in consequence of an indemnity agreed to under this section, the Secretary of State must lay a statement relating to that sum before Parliament—</p></intro><level class="para1"><num>(a)</num><content><p>as soon as practicable after the end of the financial year in which that sum is paid out; and</p></content></level><level class="para1"><num>(b)</num><content><p>(except where subsection (4) does not apply in the case of the sum) as soon as practicable after the end of each subsequent relevant financial year.</p></content></level></subsection><subsection><num>(6B)</num><intro><p>In relation to a sum paid out in consequence of an indemnity, a financial year is a relevant financial year for the purposes of subsection (6A) unless—</p></intro><level class="para1"><num>(a)</num><content><p>before the beginning of that year, the whole of that sum has been repaid to the Secretary of State under subsection (4); and</p></content></level><level class="para1"><num>(b)</num><content><p>the company in question is not at any time during that year subject to liability to pay interest on amounts that became due under that subsection in respect of that sum.</p></content></level></subsection></quotedStructure></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-2-chapter-5-crossheading-special-administration-under-this-chapter"><heading><i>Special administration under this Chapter</i></heading><section eId="section-94"><num>94</num><heading>Energy supply company administration orders</heading><subsection eId="section-94-1"><num>(1)</num><intro><p>An energy supply company administration order (referred to in this Chapter as an “esc administration order”) is an order which—</p></intro><level class="para1" eId="section-94-1-a"><num>(a)</num><content><p>is made by the court in relation to an energy supply company; and</p></content></level><level class="para1" eId="section-94-1-b"><num>(b)</num><content><p>directs that, while the order is in force, the affairs, business and property of the company are to be managed by a person appointed by the court.</p></content></level></subsection><subsection eId="section-94-2"><num>(2)</num><content><p>The person appointed in relation to a company for the purposes of an esc administration order is the energy administrator of the company.</p></content></subsection><subsection eId="section-94-3"><num>(3)</num><content><p>The energy administrator of a company must manage its affairs, business and property, and exercise and perform all the powers and duties of an energy administrator, so as to achieve the objective set out in section 95.</p></content></subsection><subsection eId="section-94-4"><num>(4)</num><content><p>In relation to an esc administration order applying to a non-GB company, references in this section to the affairs, business and property of the company are references only to its affairs and business so far as carried on in Great Britain and to its property in Great Britain.</p></content></subsection><subsection eId="section-94-5"><num>(5)</num><intro><p>In this Chapter—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-supply-company" eId="term-energy-supply-company">energy supply company</term>” means a company which is the holder of a relevant licence; and</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-licence" eId="term-relevant-licence">relevant licence</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a licence granted under section 7A(1)(a) or (b) of the Gas Act 1986 to supply gas, or</p></content></level><level class="para1"><num>(b)</num><content><p>a licence granted under section 6(1)(d) of the Electricity Act 1989 to supply electricity.</p></content></level></hcontainer></subsection></section><section eId="section-95"><num>95</num><heading>Objective of an energy supply company administration</heading><subsection eId="section-95-1"><num>(1)</num><intro><p>The objective of an energy supply company administration is to secure—</p></intro><level class="para1" eId="section-95-1-a"><num>(a)</num><content><p>that energy supplies are continued at the lowest cost which it is reasonably practicable to incur; and</p></content></level><level class="para1" eId="section-95-1-b"><num>(b)</num><content><p>that it becomes unnecessary, by one or both of the following means, for the esc administration order to remain in force for that purpose.</p></content></level></subsection><subsection eId="section-95-2"><num>(2)</num><intro><p>Those means are—</p></intro><level class="para1" eId="section-95-2-a"><num>(a)</num><content><p>the rescue as a going concern of the company subject to the esc administration order; and</p></content></level><level class="para1" eId="section-95-2-b"><num>(b)</num><content><p>transfers falling within subsection (3).</p></content></level></subsection><subsection eId="section-95-3"><num>(3)</num><intro><p>A transfer falls within this subsection if it is a transfer as a going concern—</p></intro><level class="para1" eId="section-95-3-a"><num>(a)</num><content><p>to another company, or</p></content></level><level class="para1" eId="section-95-3-b"><num>(b)</num><content><p>as respects different parts of the undertaking of the company subject to the esc administration order, to two or more different companies,</p></content></level><wrapUp><p>of so much of that undertaking as it is appropriate to transfer for the purpose of achieving the objective of the energy supply company administration.</p></wrapUp></subsection><subsection eId="section-95-4"><num>(4)</num><intro><p>The means by which transfers falling within subsection (3) may be effected include, in particular—</p></intro><level class="para1" eId="section-95-4-a"><num>(a)</num><content><p>a transfer of the undertaking of the company subject to the esc administration order, or of a part of its undertaking, to a wholly-owned subsidiary of that company; and</p></content></level><level class="para1" eId="section-95-4-b"><num>(b)</num><content><p>a transfer to a company of securities of a wholly-owned subsidiary to which there has been a transfer falling within paragraph (a).</p></content></level></subsection><subsection eId="section-95-5"><num>(5)</num><intro><p>The objective of an energy supply company administration may be achieved by transfers falling within subsection (3) to the extent only that—</p></intro><level class="para1" eId="section-95-5-a"><num>(a)</num><content><p>the rescue as a going concern of the company subject to the esc administration order is not reasonably practicable or is not reasonably practicable without such transfers;</p></content></level><level class="para1" eId="section-95-5-b"><num>(b)</num><content><p>the rescue of that company as a going concern will not achieve that objective or will not do so without such transfers;</p></content></level><level class="para1" eId="section-95-5-c"><num>(c)</num><content><p>such transfers would produce a result for the company's creditors as a whole that is better than the result that would be produced without them; or</p></content></level><level class="para1" eId="section-95-5-d"><num>(d)</num><content><p>such transfers would, without prejudicing the interests of those creditors as a whole, produce a result for the company's members as a whole that is better than the result that would be produced without them.</p></content></level></subsection></section><section eId="section-96"><num>96</num><heading>Application of certain provisions of the Energy Act 2004 in relation to esc administration orders</heading><subsection eId="section-96-1"><num>(1)</num><content><p>Sections 156 to 167 of, and Schedules 20 and 21 to, the Energy Act 2004 (special administration regime for energy licensees) apply in relation to an esc administration order as they apply in relation to an energy administration order within the meaning given by section 154(1) of that Act, but with the modifications set out in subsections (2) to (4).</p></content></subsection><subsection eId="section-96-2"><num>(2)</num><intro><p>In the application of those provisions generally—</p></intro><level class="para1" eId="section-96-2-a"><num>(a)</num><content><p><mod>for “energy administration”, in each place where it occurs, substitute <quotedText>“ energy supply company administration ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-96-2-b"><num>(b)</num><content><p><mod>for “a protected energy company”, in each place where it occurs, substitute <quotedText>“ an energy supply company ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-96-3"><num>(3)</num><intro><p>In the application of Schedule 20—</p></intro><level class="para1" eId="section-96-3-a"><num>(a)</num><content><p>in paragraph 32(d), for the words from “ “ “energy administration application”” to “Energy Act 2004” substitute “ “ “<term refersTo="#term-energy-supply-company-administration-application" eId="term-energy-supply-company-administration-application">energy supply company administration application</term>” means an application to the court for an energy supply company administration order under Chapter 3 of Part 3 of the Energy Act 2004, as applied by section 96 of the Energy Act 2011”;</p></content></level><level class="para1" eId="section-96-3-b"><num>(b)</num><content><p><mod>in paragraph 32(e), for “section 155 of the Energy Act 2004” substitute <quotedText>“ section 95 of the Energy Act 2011 ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-96-3-c"><num>(c)</num><content><p><mod>in paragraph 36, for “section 154(4) of this Act” substitute <quotedText>“ section 94(4) of the Energy Act 2011 ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-96-3-d"><num>(d)</num><content><p><mod>in paragraph 43, after “the Energy Act 2004” insert <quotedText>“ and section 96 of the Energy Act 2011 ”</quotedText>;</mod></p></content></level></subsection><level class="para1" eId="section-96-e"><num>(e)</num><content><p><mod>in paragraph 44(5), after “the Energy Act 2004” insert <quotedText>“ and section 96 of the Energy Act 2011 ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-96-f"><num>(f)</num><content><p><mod>in paragraph 45, after “section 157(1)(e) of this Act” insert <quotedText>“ as applied by section 96 of the Energy Act 2011 ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-96-g"><num>(g)</num><content><p><mod>in paragraph 47, after “Part 1 of this Schedule” insert <quotedText>“ and section 96 of the Energy Act 2011 ”</quotedText>.</mod></p></content></level><subsection eId="section-96-4"><num>(4)</num><intro><p>In the application of Schedule 21—</p></intro><level class="para1" eId="section-96-4-a"><num>(a)</num><content><p><mod>in paragraph 1(b), for “section 155(3)” substitute <quotedText>“ section 95(3) of the Energy Act 2011 ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-96-4-b"><num>(b)</num><content><p><mod>in paragraph 12, for “section 155” substitute <quotedText>“ section 95 of the Energy Act 2011 ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-96-5"><num>(5)</num><content><p>Sections 171 and 196 of the Energy Act 2004 (interpretation) apply for the purposes of the application by subsection (1) of the provisions mentioned in that subsection, but with the modifications set out in subsection (6).</p></content></subsection><subsection eId="section-96-6"><num>(6)</num><intro><p>In the application of section 171(1)—</p></intro><level class="para1" eId="section-96-6-a"><num>(a)</num><content><p><mod>insert, at the appropriate places, the following definitions—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-supply-company">energy supply company</term>” has the meaning given by section 94(5) of the Energy Act 2011;</p></content></hcontainer></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><p>“<term refersTo="#term-energy-supply-company-administration-order">energy supply company administration order</term>” has the meaning given by section 94(1) of the Energy Act 2011;</p></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><p>“<term refersTo="#term-energy-supply-company-administration-rules">energy supply company administration rules</term>” means rules made under section 411 of the 1986 Act by virtue of section 159(3) of this Act, for the purpose of giving effect to this Chapter as applied by section 96 of the Energy Act 2011;</p></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><p>“<term refersTo="#term-objective-of-the-energy-supply-company-administration">objective of the energy supply company administration</term>” is to be construed in accordance with section 95 of the Energy Act 2011;</p></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-96-6-b"><num>(b)</num><content><p><mod>in the definition of “energy administrator” for “section 154(2)” substitute <quotedText>“ section 94(2) of the Energy Act 2011 ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-96-6-c"><num>(c)</num><content><p><mod>in the definition of “relevant licence” for “section 154(5)” substitute <quotedText>“ section 94(5) of the Energy Act 2011 ”</quotedText>.</mod></p></content></level></subsection></section><section eId="section-97"><num>97</num><heading>Conduct of administration, transfer schemes, <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><content><p><mod>In section 159(3) of the Energy Act 2004 (conduct of administration, transfer schemes, <abbr title="Et cetera" xml:lang="la">etc</abbr> under Chapter 3 of Part 3 of that Act), after “Chapter”, in the second place where it appears, insert <quotedText>“ (including this Chapter as applied by section 96 of the Energy Act 2011) ”</quotedText>.</mod></p></content></section><section eId="section-98"><num>98</num><heading>Modifications of particular or standard conditions</heading><subsection eId="section-98-1"><num>(1)</num><intro><p>Where the Secretary of State considers it appropriate to do so in connection with the provision made by this Chapter, the Secretary of State may make—</p></intro><level class="para1" eId="section-98-1-a"><num>(a)</num><content><p>modifications of the conditions of a gas or electricity licence held by a particular person;</p></content></level><level class="para1" eId="section-98-1-b"><num>(b)</num><content><p>modifications of the standard conditions of such licences of any type.</p></content></level></subsection><subsection eId="section-98-2"><num>(2)</num><content><p>The power to make modifications under this section includes power to make incidental, consequential or transitional modifications.</p></content></subsection><subsection eId="section-98-3"><num>(3)</num><intro><p>Before making a modification under this section, the Secretary of State must consult—</p></intro><level class="para1" eId="section-98-3-a"><num>(a)</num><content><p>the holder of any licence being modified; and</p></content></level><level class="para1" eId="section-98-3-b"><num>(b)</num><content><p>such other persons as the Secretary of State considers appropriate.</p></content></level></subsection><subsection eId="section-98-4"><num>(4)</num><content><p>The Secretary of State must publish every modification made under this section.</p></content></subsection><subsection eId="section-98-5"><num>(5)</num><content><p>The publication must be in such manner as the Secretary of State considers appropriate.</p></content></subsection><subsection eId="section-98-6"><num>(6)</num><content><p>A modification under subsection (1)(a) of part of a standard condition of a licence does not prevent any other part of the condition from continuing to be regarded as a standard condition for the purposes of Part 1 of the Gas Act 1986 or Part 1 of the Electricity Act 1989.</p></content></subsection><subsection eId="section-98-7"><num>(7)</num><intro><p>Where the Secretary of State makes modifications under subsection (1)(b) of the standard conditions of licences of any type, the Gas and Electricity Markets Authority must—</p></intro><level class="para1" eId="section-98-7-a"><num>(a)</num><content><p>make (as nearly as may be) the same modifications of those standard conditions for the purposes of their incorporation in licences of that type granted after that time; and</p></content></level><level class="para1" eId="section-98-7-b"><num>(b)</num><content><p>publish the modifications in such manner as it considers appropriate.</p></content></level></subsection><subsection eId="section-98-8"><num>(8)</num><content><p>The Secretary of State's powers under this section are exercisable only during the eighteen months beginning with the commencement of this section.</p></content></subsection><subsection eId="section-98-9"><num>(9)</num><content><p><mod>In section 33(1) of the Utilities Act 2000 (standard conditions of generation, distribution and supply licences under Part 1 of the Electricity Act 1989), after “76” (as inserted by section 77(5) of this Act) insert <quotedText>“ or 98 ”</quotedText>.</mod></p></content></subsection><subsection eId="section-98-10"><num>(10)</num><content><p><mod>In section 81(2) of the Utilities Act 2000 (standard conditions of transporter, supply and shipping licences under Part 1 of the Gas Act 1986), after “76” (as inserted by section 77(6) of this Act) insert <quotedText>“ or 98 ”</quotedText>.</mod></p></content></subsection><subsection eId="section-98-11"><num>(11)</num><content><p><mod>In section 146(5) of the Energy Act 2004 (standard conditions of interconnector licences under Part 1 of the Electricity Act 1989), for “or under this Act” substitute <quotedText>“ , under this Act or under section 98 of the Energy Act 2011 ”</quotedText>.</mod></p></content></subsection><subsection eId="section-98-12"><num>(12)</num><content><p><mod>In section 150(5) of the Energy Act 2004 (standard conditions of interconnector licences under Part 1 of the Gas Act 1986), for “or under this Act” substitute <quotedText>“ , under this Act or under section 98 of the Energy Act 2011 ”</quotedText>.</mod></p></content></subsection><subsection eId="section-98-13"><num>(13)</num><content><p>Sections 4AA to 4B of the Gas Act 1986 (principal objective and general duties) apply in relation to the powers of the Secretary of State under this section with respect to holders of gas licences as they apply in relation to functions of the Secretary of State under Part 1 of that Act.</p></content></subsection><subsection eId="section-98-14"><num>(14)</num><content><p>Sections 3A to 3D of the Electricity Act 1989 (principal objective and general duties) apply in relation to the powers of the Secretary of State under this section with respect to holders of electricity licences as they apply in relation to functions of the Secretary of State under Part 1 of that Act.</p></content></subsection><subsection eId="section-98-15"><num>(15)</num><intro><p>In this section—</p></intro><level class="para1" eId="section-98-15-a"><num>(a)</num><content><p>references to a gas licence are to a licence for the purposes of section 5 of the Gas Act 1986 (prohibition on unlicensed activities relating to gas), and</p></content></level><level class="para1" eId="section-98-15-b"><num>(b)</num><content><p>references to an electricity licence are to a licence for the purposes of section 4 of the Electricity Act 1989 (prohibition on unlicensed activities relating to electricity).</p></content></level></subsection></section><section eId="section-99"><num>99</num><heading>Licence conditions to secure funding of energy supply company administration</heading><subsection eId="section-99-1"><num>(1)</num><intro><p>The modifications that may be made under section 98 include, in particular, modifications imposing conditions requiring the holder of the licence—</p></intro><level class="para1" eId="section-99-1-a"><num>(a)</num><content><p>so to modify the charges imposed by the licence holder for anything done by the licence holder in the carrying on of the licensed activities as to raise such amounts as may be determined by or under the conditions; and</p></content></level><level class="para1" eId="section-99-1-b"><num>(b)</num><intro><p>to pay the amounts so raised to such persons as may be so determined for the purpose of—</p></intro><level class="para2" eId="section-99-1-b-i"><num>(i)</num><content><p>their applying those amounts in making good any shortfall in the property available for meeting the expenses of an energy supply company administration; or</p></content></level><level class="para2" eId="section-99-1-b-ii"><num>(ii)</num><content><p>enabling those persons to secure that those amounts are so applied.</p></content></level></level></subsection><subsection eId="section-99-2"><num>(2)</num><content><p>Those modifications may include modifications imposing on the licence holder an obligation to apply amounts paid to the licence holder in pursuance of conditions falling within subsection (1)(a) or (b) in making good any such shortfall.</p></content></subsection><subsection eId="section-99-3"><num>(3)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-99-3-a"><num>(a)</num><content><p>there is a shortfall in the property available for meeting the costs of an energy supply company administration if, in a case where a company is or has been subject to an energy supply company administration order, the property available (apart from conditions falling within subsection (1) or (2)) for meeting relevant debts is insufficient for meeting them; and</p></content></level><level class="para1" eId="section-99-3-b"><num>(b)</num><content><p>amounts are applied in making good that shortfall if they are paid in or towards discharging so much of a relevant debt as cannot be met out of the property otherwise available for meeting relevant debts.</p></content></level></subsection><subsection eId="section-99-4"><num>(4)</num><intro><p>In this section “<term refersTo="#term-relevant-debt" eId="term-relevant-debt">relevant debt</term>” in relation to a case in which a company is or has been subject to an energy supply company administration order, means an obligation—</p></intro><level class="para1" eId="section-99-4-a"><num>(a)</num><content><p>to make payments in respect of the expenses or remuneration of any person as the energy administrator of that company;</p></content></level><level class="para1" eId="section-99-4-b"><num>(b)</num><content><p>to make a payment in discharge of a debt or liability of that company arising out of a contract entered into at a time when the order was in force by the person who at that time was the energy administrator of that company;</p></content></level><level class="para1" eId="section-99-4-c"><num>(c)</num><content><p>to repay the whole or a part of a grant made to that company under section 165 of the Energy Act 2004 as applied by section 96 of this Act;</p></content></level><level class="para1" eId="section-99-4-d"><num>(d)</num><content><p>to repay a loan made to the company under that section as so applied, or to pay interest on such a loan;</p></content></level><level class="para1" eId="section-99-4-e"><num>(e)</num><content><p>to make a payment under section 166(4) of that Act as so applied; or</p></content></level><level class="para1" eId="section-99-4-f"><num>(f)</num><content><p>to make a payment under section 167(5) of that Act as so applied.</p></content></level></subsection></section><section eId="section-100"><num>100</num><heading>Modifications under the Enterprise Act 2002</heading><subsection eId="section-100-1"><num>(1)</num><content><p>The power to modify or apply enactments conferred on the Secretary of State by each of the sections of the Enterprise Act 2002 mentioned in subsection (2) includes power to make such consequential modifications of this Chapter as the Secretary of State considers appropriate in connection with any other provision made under that section.</p></content></subsection><subsection eId="section-100-2"><num>(2)</num><intro><p>Those sections are—</p></intro><level class="para1" eId="section-100-2-a"><num>(a)</num><content><p>sections 248 and 277 (amendments consequential on that Act); and</p></content></level><level class="para1" eId="section-100-2-b"><num>(b)</num><content><p>section 254 (power to apply insolvency law to foreign companies).</p></content></level></subsection><subsection eId="section-100-3"><num>(3)</num><content><p><mod>In section 170(1) of the Energy Act 2004 (modification of Chapter 3 of Part 3 of that Act under the Enterprise Act 2002) after “Chapter” insert <quotedText>“ (including this Chapter as applied by section 96 of the Energy Act 2011) ”</quotedText>.</mod></p></content></subsection></section><section eId="section-101"><num>101</num><heading>Power to make further modifications of insolvency legislation</heading><subsection eId="section-101-1"><num>(1)</num><content><p>The power of the Secretary of State under paragraph 46 of Schedule 20 to the Energy Act 2004 (conduct of energy administration) to make modifications includes power to make such modifications as the Secretary of State considers appropriate in relation to any provision made by or under this Chapter.</p></content></subsection><subsection eId="section-101-2"><num>(2)</num><content><p><mod>In paragraph 46 of that Schedule, after “Chapter” insert <quotedText>“ (including this Chapter as applied by section 96 of the Energy Act 2011) ”</quotedText>.</mod></p></content></subsection></section><section eId="section-102"><num>102</num><heading>Interpretation of Chapter 5</heading><subsection eId="section-102-1"><num>(1)</num><intro><p>In this Chapter—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-business" eId="term-business">business</term>”, “<term refersTo="#term-member" eId="term-member">member</term>” and “<term refersTo="#term-property" eId="term-property">property</term>” have the same meanings as in the Insolvency Act 1986;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-company" eId="term-company">company</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a company registered under the Companies Act 2006, or</p></content></level><level class="para1"><num>(b)</num><content><p>an unregistered company;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-court" eId="term-court">court</term>”, in relation to a company, means the court—</p></intro><level class="para1"><num>(a)</num><content><p>having jurisdiction to wind up the company, or</p></content></level><level class="para1"><num>(b)</num><content><p>that would have such jurisdiction apart from section 221(2) or 441(2) of the Insolvency Act 1986 (exclusion of winding up jurisdiction in case of companies having principal place of business in, or incorporated in, Northern Ireland);</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-administrator" eId="term-energy-administrator">energy administrator</term>” has the meaning given by section 94(2) and is to be construed in accordance with subsection (2) of this section;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-supply-company-administration-order" eId="term-energy-supply-company-administration-order">energy supply company administration order</term>” has the meaning given by section 94(1);</p></content></hcontainer><hcontainer name="definition"><content><p>“energy supply company'” has the meaning given by section 94(5);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-modification" eId="term-modification">modification</term>” includes omission, addition or alteration, and cognate expressions are to be construed accordingly;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-non-gb-company" eId="term-non-gb-company">non-GB company</term>” means a company incorporated outside Great Britain;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-objective-of-the-energy-supply-company-administration" eId="term-objective-of-the-energy-supply-company-administration">objective of the energy supply company administration</term>” is to be construed in accordance with section 95;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-relevant-licence" eId="term-relevant-licence">relevant licence</term>” has the meaning given by section 94(5);</p></content></hcontainer><hcontainer name="definition"><content><p>“subsidiary” and “wholly-owned subsidiary” have the meanings given by section 1159 of the Companies Act 2006;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-unregistered-company" eId="term-unregistered-company">unregistered company</term>” means a company that is not registered under the Companies Act 2006.</p></content></hcontainer></subsection><subsection eId="section-102-2"><num>(2)</num><intro><p>In this Chapter references to the energy administrator of a company—</p></intro><level class="para1" eId="section-102-2-a"><num>(a)</num><content><p>include references to a person appointed under paragraph 91 or 103 of Schedule B1 to the Insolvency Act 1986, as applied by Part 1 of Schedule 20 to the Energy Act 2004 and section 96 of this Act to be the energy administrator of that company; and</p></content></level><level class="para1" eId="section-102-2-b"><num>(b)</num><content><p>where two or more persons are appointed to be the energy administrator of that company, are to be construed in accordance with the provision made under section 158(5) of the Energy Act 2004, as applied by section 96 of this Act.</p></content></level></subsection></section></hcontainer></chapter> — Special administration under the Energy Act 2004
Part 2 — Security of energy supplies — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-2-chapter-5"><num>CHAPTER 5</num><heading>Special administration</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-2-chapter-5-crossheading-special-administration-under-the-energy-act-2004"><heading><i>Special administration under the Energy Act 2004</i></heading><section eId="section-93"><num>93</num><heading>Amendment of section 166 of the Energy Act 2004</heading><subsection eId="section-93-1"><num>(1)</num><content><p>Section 166 of the Energy Act 2004 (indemnities) is amended as follows.</p></content></subsection><subsection eId="section-93-2"><num>(2)</num><content><p><mod>After subsection (3) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(3AA)</num><content><p>As soon as practicable after agreeing to indemnify persons under this section, the Secretary of State must lay a statement of the agreement before Parliament.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-93-3"><num>(3)</num><content><p><mod>After subsection (6) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><subsection><num>(6A)</num><intro><p>Where a sum has been paid out by the Secretary of State in consequence of an indemnity agreed to under this section, the Secretary of State must lay a statement relating to that sum before Parliament—</p></intro><level class="para1"><num>(a)</num><content><p>as soon as practicable after the end of the financial year in which that sum is paid out; and</p></content></level><level class="para1"><num>(b)</num><content><p>(except where subsection (4) does not apply in the case of the sum) as soon as practicable after the end of each subsequent relevant financial year.</p></content></level></subsection><subsection><num>(6B)</num><intro><p>In relation to a sum paid out in consequence of an indemnity, a financial year is a relevant financial year for the purposes of subsection (6A) unless—</p></intro><level class="para1"><num>(a)</num><content><p>before the beginning of that year, the whole of that sum has been repaid to the Secretary of State under subsection (4); and</p></content></level><level class="para1"><num>(b)</num><content><p>the company in question is not at any time during that year subject to liability to pay interest on amounts that became due under that subsection in respect of that sum.</p></content></level></subsection></quotedStructure></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-2-chapter-5-crossheading-special-administration-under-this-chapter"><heading><i>Special administration under this Chapter</i></heading><section eId="section-94"><num>94</num><heading>Energy supply company administration orders</heading><subsection eId="section-94-1"><num>(1)</num><intro><p>An energy supply company administration order (referred to in this Chapter as an “esc administration order”) is an order which—</p></intro><level class="para1" eId="section-94-1-a"><num>(a)</num><content><p>is made by the court in relation to an energy supply company; and</p></content></level><level class="para1" eId="section-94-1-b"><num>(b)</num><content><p>directs that, while the order is in force, the affairs, business and property of the company are to be managed by a person appointed by the court.</p></content></level></subsection><subsection eId="section-94-2"><num>(2)</num><content><p>The person appointed in relation to a company for the purposes of an esc administration order is the energy administrator of the company.</p></content></subsection><subsection eId="section-94-3"><num>(3)</num><content><p>The energy administrator of a company must manage its affairs, business and property, and exercise and perform all the powers and duties of an energy administrator, so as to achieve the objective set out in section 95.</p></content></subsection><subsection eId="section-94-4"><num>(4)</num><content><p>In relation to an esc administration order applying to a non-GB company, references in this section to the affairs, business and property of the company are references only to its affairs and business so far as carried on in Great Britain and to its property in Great Britain.</p></content></subsection><subsection eId="section-94-5"><num>(5)</num><intro><p>In this Chapter—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-supply-company" eId="term-energy-supply-company">energy supply company</term>” means a company which is the holder of a relevant licence; and</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-licence" eId="term-relevant-licence">relevant licence</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a licence granted under section 7A(1)(a) or (b) of the Gas Act 1986 to supply gas, or</p></content></level><level class="para1"><num>(b)</num><content><p>a licence granted under section 6(1)(d) of the Electricity Act 1989 to supply electricity.</p></content></level></hcontainer></subsection></section><section eId="section-95"><num>95</num><heading>Objective of an energy supply company administration</heading><subsection eId="section-95-1"><num>(1)</num><intro><p>The objective of an energy supply company administration is to secure—</p></intro><level class="para1" eId="section-95-1-a"><num>(a)</num><content><p>that energy supplies are continued at the lowest cost which it is reasonably practicable to incur; and</p></content></level><level class="para1" eId="section-95-1-b"><num>(b)</num><content><p>that it becomes unnecessary, by one or both of the following means, for the esc administration order to remain in force for that purpose.</p></content></level></subsection><subsection eId="section-95-2"><num>(2)</num><intro><p>Those means are—</p></intro><level class="para1" eId="section-95-2-a"><num>(a)</num><content><p>the rescue as a going concern of the company subject to the esc administration order; and</p></content></level><level class="para1" eId="section-95-2-b"><num>(b)</num><content><p>transfers falling within subsection (3).</p></content></level></subsection><subsection eId="section-95-3"><num>(3)</num><intro><p>A transfer falls within this subsection if it is a transfer as a going concern—</p></intro><level class="para1" eId="section-95-3-a"><num>(a)</num><content><p>to another company, or</p></content></level><level class="para1" eId="section-95-3-b"><num>(b)</num><content><p>as respects different parts of the undertaking of the company subject to the esc administration order, to two or more different companies,</p></content></level><wrapUp><p>of so much of that undertaking as it is appropriate to transfer for the purpose of achieving the objective of the energy supply company administration.</p></wrapUp></subsection><subsection eId="section-95-4"><num>(4)</num><intro><p>The means by which transfers falling within subsection (3) may be effected include, in particular—</p></intro><level class="para1" eId="section-95-4-a"><num>(a)</num><content><p>a transfer of the undertaking of the company subject to the esc administration order, or of a part of its undertaking, to a wholly-owned subsidiary of that company; and</p></content></level><level class="para1" eId="section-95-4-b"><num>(b)</num><content><p>a transfer to a company of securities of a wholly-owned subsidiary to which there has been a transfer falling within paragraph (a).</p></content></level></subsection><subsection eId="section-95-5"><num>(5)</num><intro><p>The objective of an energy supply company administration may be achieved by transfers falling within subsection (3) to the extent only that—</p></intro><level class="para1" eId="section-95-5-a"><num>(a)</num><content><p>the rescue as a going concern of the company subject to the esc administration order is not reasonably practicable or is not reasonably practicable without such transfers;</p></content></level><level class="para1" eId="section-95-5-b"><num>(b)</num><content><p>the rescue of that company as a going concern will not achieve that objective or will not do so without such transfers;</p></content></level><level class="para1" eId="section-95-5-c"><num>(c)</num><content><p>such transfers would produce a result for the company's creditors as a whole that is better than the result that would be produced without them; or</p></content></level><level class="para1" eId="section-95-5-d"><num>(d)</num><content><p>such transfers would, without prejudicing the interests of those creditors as a whole, produce a result for the company's members as a whole that is better than the result that would be produced without them.</p></content></level></subsection></section><section eId="section-96"><num>96</num><heading>Application of certain provisions of the Energy Act 2004 in relation to esc administration orders</heading><subsection eId="section-96-1"><num>(1)</num><content><p>Sections 156 to 167 of, and Schedules 20 and 21 to, the Energy Act 2004 (special administration regime for energy licensees) apply in relation to an esc administration order as they apply in relation to an energy administration order within the meaning given by section 154(1) of that Act, but with the modifications set out in subsections (2) to (4).</p></content></subsection><subsection eId="section-96-2"><num>(2)</num><intro><p>In the application of those provisions generally—</p></intro><level class="para1" eId="section-96-2-a"><num>(a)</num><content><p><mod>for “energy administration”, in each place where it occurs, substitute <quotedText>“ energy supply company administration ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-96-2-b"><num>(b)</num><content><p><mod>for “a protected energy company”, in each place where it occurs, substitute <quotedText>“ an energy supply company ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-96-3"><num>(3)</num><intro><p>In the application of Schedule 20—</p></intro><level class="para1" eId="section-96-3-a"><num>(a)</num><content><p>in paragraph 32(d), for the words from “ “ “energy administration application”” to “Energy Act 2004” substitute “ “ “<term refersTo="#term-energy-supply-company-administration-application" eId="term-energy-supply-company-administration-application">energy supply company administration application</term>” means an application to the court for an energy supply company administration order under Chapter 3 of Part 3 of the Energy Act 2004, as applied by section 96 of the Energy Act 2011”;</p></content></level><level class="para1" eId="section-96-3-b"><num>(b)</num><content><p><mod>in paragraph 32(e), for “section 155 of the Energy Act 2004” substitute <quotedText>“ section 95 of the Energy Act 2011 ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-96-3-c"><num>(c)</num><content><p><mod>in paragraph 36, for “section 154(4) of this Act” substitute <quotedText>“ section 94(4) of the Energy Act 2011 ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-96-3-d"><num>(d)</num><content><p><mod>in paragraph 43, after “the Energy Act 2004” insert <quotedText>“ and section 96 of the Energy Act 2011 ”</quotedText>;</mod></p></content></level></subsection><level class="para1" eId="section-96-e"><num>(e)</num><content><p><mod>in paragraph 44(5), after “the Energy Act 2004” insert <quotedText>“ and section 96 of the Energy Act 2011 ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-96-f"><num>(f)</num><content><p><mod>in paragraph 45, after “section 157(1)(e) of this Act” insert <quotedText>“ as applied by section 96 of the Energy Act 2011 ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-96-g"><num>(g)</num><content><p><mod>in paragraph 47, after “Part 1 of this Schedule” insert <quotedText>“ and section 96 of the Energy Act 2011 ”</quotedText>.</mod></p></content></level><subsection eId="section-96-4"><num>(4)</num><intro><p>In the application of Schedule 21—</p></intro><level class="para1" eId="section-96-4-a"><num>(a)</num><content><p><mod>in paragraph 1(b), for “section 155(3)” substitute <quotedText>“ section 95(3) of the Energy Act 2011 ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-96-4-b"><num>(b)</num><content><p><mod>in paragraph 12, for “section 155” substitute <quotedText>“ section 95 of the Energy Act 2011 ”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-96-5"><num>(5)</num><content><p>Sections 171 and 196 of the Energy Act 2004 (interpretation) apply for the purposes of the application by subsection (1) of the provisions mentioned in that subsection, but with the modifications set out in subsection (6).</p></content></subsection><subsection eId="section-96-6"><num>(6)</num><intro><p>In the application of section 171(1)—</p></intro><level class="para1" eId="section-96-6-a"><num>(a)</num><content><p><mod>insert, at the appropriate places, the following definitions—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-supply-company">energy supply company</term>” has the meaning given by section 94(5) of the Energy Act 2011;</p></content></hcontainer></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><p>“<term refersTo="#term-energy-supply-company-administration-order">energy supply company administration order</term>” has the meaning given by section 94(1) of the Energy Act 2011;</p></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><p>“<term refersTo="#term-energy-supply-company-administration-rules">energy supply company administration rules</term>” means rules made under section 411 of the 1986 Act by virtue of section 159(3) of this Act, for the purpose of giving effect to this Chapter as applied by section 96 of the Energy Act 2011;</p></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="unknown" uk:docName="unknown" ukl:TargetClass="unknown" ukl:TargetSubClass="unknown" ukl:Context="unknown" ukl:Format="default"><p>“<term refersTo="#term-objective-of-the-energy-supply-company-administration">objective of the energy supply company administration</term>” is to be construed in accordance with section 95 of the Energy Act 2011;</p></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-96-6-b"><num>(b)</num><content><p><mod>in the definition of “energy administrator” for “section 154(2)” substitute <quotedText>“ section 94(2) of the Energy Act 2011 ”</quotedText>;</mod></p></content></level><level class="para1" eId="section-96-6-c"><num>(c)</num><content><p><mod>in the definition of “relevant licence” for “section 154(5)” substitute <quotedText>“ section 94(5) of the Energy Act 2011 ”</quotedText>.</mod></p></content></level></subsection></section><section eId="section-97"><num>97</num><heading>Conduct of administration, transfer schemes, <abbr title="Et cetera" xml:lang="la">etc</abbr></heading><content><p><mod>In section 159(3) of the Energy Act 2004 (conduct of administration, transfer schemes, <abbr title="Et cetera" xml:lang="la">etc</abbr> under Chapter 3 of Part 3 of that Act), after “Chapter”, in the second place where it appears, insert <quotedText>“ (including this Chapter as applied by section 96 of the Energy Act 2011) ”</quotedText>.</mod></p></content></section><section eId="section-98"><num>98</num><heading>Modifications of particular or standard conditions</heading><subsection eId="section-98-1"><num>(1)</num><intro><p>Where the Secretary of State considers it appropriate to do so in connection with the provision made by this Chapter, the Secretary of State may make—</p></intro><level class="para1" eId="section-98-1-a"><num>(a)</num><content><p>modifications of the conditions of a gas or electricity licence held by a particular person;</p></content></level><level class="para1" eId="section-98-1-b"><num>(b)</num><content><p>modifications of the standard conditions of such licences of any type.</p></content></level></subsection><subsection eId="section-98-2"><num>(2)</num><content><p>The power to make modifications under this section includes power to make incidental, consequential or transitional modifications.</p></content></subsection><subsection eId="section-98-3"><num>(3)</num><intro><p>Before making a modification under this section, the Secretary of State must consult—</p></intro><level class="para1" eId="section-98-3-a"><num>(a)</num><content><p>the holder of any licence being modified; and</p></content></level><level class="para1" eId="section-98-3-b"><num>(b)</num><content><p>such other persons as the Secretary of State considers appropriate.</p></content></level></subsection><subsection eId="section-98-4"><num>(4)</num><content><p>The Secretary of State must publish every modification made under this section.</p></content></subsection><subsection eId="section-98-5"><num>(5)</num><content><p>The publication must be in such manner as the Secretary of State considers appropriate.</p></content></subsection><subsection eId="section-98-6"><num>(6)</num><content><p>A modification under subsection (1)(a) of part of a standard condition of a licence does not prevent any other part of the condition from continuing to be regarded as a standard condition for the purposes of Part 1 of the Gas Act 1986 or Part 1 of the Electricity Act 1989.</p></content></subsection><subsection eId="section-98-7"><num>(7)</num><intro><p>Where the Secretary of State makes modifications under subsection (1)(b) of the standard conditions of licences of any type, the Gas and Electricity Markets Authority must—</p></intro><level class="para1" eId="section-98-7-a"><num>(a)</num><content><p>make (as nearly as may be) the same modifications of those standard conditions for the purposes of their incorporation in licences of that type granted after that time; and</p></content></level><level class="para1" eId="section-98-7-b"><num>(b)</num><content><p>publish the modifications in such manner as it considers appropriate.</p></content></level></subsection><subsection eId="section-98-8"><num>(8)</num><content><p>The Secretary of State's powers under this section are exercisable only during the eighteen months beginning with the commencement of this section.</p></content></subsection><subsection eId="section-98-9"><num>(9)</num><content><p><mod>In section 33(1) of the Utilities Act 2000 (standard conditions of generation, distribution and supply licences under Part 1 of the Electricity Act 1989), after “76” (as inserted by section 77(5) of this Act) insert <quotedText>“ or 98 ”</quotedText>.</mod></p></content></subsection><subsection eId="section-98-10"><num>(10)</num><content><p><mod>In section 81(2) of the Utilities Act 2000 (standard conditions of transporter, supply and shipping licences under Part 1 of the Gas Act 1986), after “76” (as inserted by section 77(6) of this Act) insert <quotedText>“ or 98 ”</quotedText>.</mod></p></content></subsection><subsection eId="section-98-11"><num>(11)</num><content><p><mod>In section 146(5) of the Energy Act 2004 (standard conditions of interconnector licences under Part 1 of the Electricity Act 1989), for “or under this Act” substitute <quotedText>“ , under this Act or under section 98 of the Energy Act 2011 ”</quotedText>.</mod></p></content></subsection><subsection eId="section-98-12"><num>(12)</num><content><p><mod>In section 150(5) of the Energy Act 2004 (standard conditions of interconnector licences under Part 1 of the Gas Act 1986), for “or under this Act” substitute <quotedText>“ , under this Act or under section 98 of the Energy Act 2011 ”</quotedText>.</mod></p></content></subsection><subsection eId="section-98-13"><num>(13)</num><content><p>Sections 4AA to 4B of the Gas Act 1986 (principal objective and general duties) apply in relation to the powers of the Secretary of State under this section with respect to holders of gas licences as they apply in relation to functions of the Secretary of State under Part 1 of that Act.</p></content></subsection><subsection eId="section-98-14"><num>(14)</num><content><p>Sections 3A to 3D of the Electricity Act 1989 (principal objective and general duties) apply in relation to the powers of the Secretary of State under this section with respect to holders of electricity licences as they apply in relation to functions of the Secretary of State under Part 1 of that Act.</p></content></subsection><subsection eId="section-98-15"><num>(15)</num><intro><p>In this section—</p></intro><level class="para1" eId="section-98-15-a"><num>(a)</num><content><p>references to a gas licence are to a licence for the purposes of section 5 of the Gas Act 1986 (prohibition on unlicensed activities relating to gas), and</p></content></level><level class="para1" eId="section-98-15-b"><num>(b)</num><content><p>references to an electricity licence are to a licence for the purposes of section 4 of the Electricity Act 1989 (prohibition on unlicensed activities relating to electricity).</p></content></level></subsection></section><section eId="section-99"><num>99</num><heading>Licence conditions to secure funding of energy supply company administration</heading><subsection eId="section-99-1"><num>(1)</num><intro><p>The modifications that may be made under section 98 include, in particular, modifications imposing conditions requiring the holder of the licence—</p></intro><level class="para1" eId="section-99-1-a"><num>(a)</num><content><p>so to modify the charges imposed by the licence holder for anything done by the licence holder in the carrying on of the licensed activities as to raise such amounts as may be determined by or under the conditions; and</p></content></level><level class="para1" eId="section-99-1-b"><num>(b)</num><intro><p>to pay the amounts so raised to such persons as may be so determined for the purpose of—</p></intro><level class="para2" eId="section-99-1-b-i"><num>(i)</num><content><p>their applying those amounts in making good any shortfall in the property available for meeting the expenses of an energy supply company administration; or</p></content></level><level class="para2" eId="section-99-1-b-ii"><num>(ii)</num><content><p>enabling those persons to secure that those amounts are so applied.</p></content></level></level></subsection><subsection eId="section-99-2"><num>(2)</num><content><p>Those modifications may include modifications imposing on the licence holder an obligation to apply amounts paid to the licence holder in pursuance of conditions falling within subsection (1)(a) or (b) in making good any such shortfall.</p></content></subsection><subsection eId="section-99-3"><num>(3)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="section-99-3-a"><num>(a)</num><content><p>there is a shortfall in the property available for meeting the costs of an energy supply company administration if, in a case where a company is or has been subject to an energy supply company administration order, the property available (apart from conditions falling within subsection (1) or (2)) for meeting relevant debts is insufficient for meeting them; and</p></content></level><level class="para1" eId="section-99-3-b"><num>(b)</num><content><p>amounts are applied in making good that shortfall if they are paid in or towards discharging so much of a relevant debt as cannot be met out of the property otherwise available for meeting relevant debts.</p></content></level></subsection><subsection eId="section-99-4"><num>(4)</num><intro><p>In this section “<term refersTo="#term-relevant-debt" eId="term-relevant-debt">relevant debt</term>” in relation to a case in which a company is or has been subject to an energy supply company administration order, means an obligation—</p></intro><level class="para1" eId="section-99-4-a"><num>(a)</num><content><p>to make payments in respect of the expenses or remuneration of any person as the energy administrator of that company;</p></content></level><level class="para1" eId="section-99-4-b"><num>(b)</num><content><p>to make a payment in discharge of a debt or liability of that company arising out of a contract entered into at a time when the order was in force by the person who at that time was the energy administrator of that company;</p></content></level><level class="para1" eId="section-99-4-c"><num>(c)</num><content><p>to repay the whole or a part of a grant made to that company under section 165 of the Energy Act 2004 as applied by section 96 of this Act;</p></content></level><level class="para1" eId="section-99-4-d"><num>(d)</num><content><p>to repay a loan made to the company under that section as so applied, or to pay interest on such a loan;</p></content></level><level class="para1" eId="section-99-4-e"><num>(e)</num><content><p>to make a payment under section 166(4) of that Act as so applied; or</p></content></level><level class="para1" eId="section-99-4-f"><num>(f)</num><content><p>to make a payment under section 167(5) of that Act as so applied.</p></content></level></subsection></section><section eId="section-100"><num>100</num><heading>Modifications under the Enterprise Act 2002</heading><subsection eId="section-100-1"><num>(1)</num><content><p>The power to modify or apply enactments conferred on the Secretary of State by each of the sections of the Enterprise Act 2002 mentioned in subsection (2) includes power to make such consequential modifications of this Chapter as the Secretary of State considers appropriate in connection with any other provision made under that section.</p></content></subsection><subsection eId="section-100-2"><num>(2)</num><intro><p>Those sections are—</p></intro><level class="para1" eId="section-100-2-a"><num>(a)</num><content><p>sections 248 and 277 (amendments consequential on that Act); and</p></content></level><level class="para1" eId="section-100-2-b"><num>(b)</num><content><p>section 254 (power to apply insolvency law to foreign companies).</p></content></level></subsection><subsection eId="section-100-3"><num>(3)</num><content><p><mod>In section 170(1) of the Energy Act 2004 (modification of Chapter 3 of Part 3 of that Act under the Enterprise Act 2002) after “Chapter” insert <quotedText>“ (including this Chapter as applied by section 96 of the Energy Act 2011) ”</quotedText>.</mod></p></content></subsection></section><section eId="section-101"><num>101</num><heading>Power to make further modifications of insolvency legislation</heading><subsection eId="section-101-1"><num>(1)</num><content><p>The power of the Secretary of State under paragraph 46 of Schedule 20 to the Energy Act 2004 (conduct of energy administration) to make modifications includes power to make such modifications as the Secretary of State considers appropriate in relation to any provision made by or under this Chapter.</p></content></subsection><subsection eId="section-101-2"><num>(2)</num><content><p><mod>In paragraph 46 of that Schedule, after “Chapter” insert <quotedText>“ (including this Chapter as applied by section 96 of the Energy Act 2011) ”</quotedText>.</mod></p></content></subsection></section><section eId="section-102"><num>102</num><heading>Interpretation of Chapter 5</heading><subsection eId="section-102-1"><num>(1)</num><intro><p>In this Chapter—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-business" eId="term-business">business</term>”, “<term refersTo="#term-member" eId="term-member">member</term>” and “<term refersTo="#term-property" eId="term-property">property</term>” have the same meanings as in the Insolvency Act 1986;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-company" eId="term-company">company</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a company registered under the Companies Act 2006, or</p></content></level><level class="para1"><num>(b)</num><content><p>an unregistered company;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-court" eId="term-court">court</term>”, in relation to a company, means the court—</p></intro><level class="para1"><num>(a)</num><content><p>having jurisdiction to wind up the company, or</p></content></level><level class="para1"><num>(b)</num><content><p>that would have such jurisdiction apart from section 221(2) or 441(2) of the Insolvency Act 1986 (exclusion of winding up jurisdiction in case of companies having principal place of business in, or incorporated in, Northern Ireland);</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-administrator" eId="term-energy-administrator">energy administrator</term>” has the meaning given by section 94(2) and is to be construed in accordance with subsection (2) of this section;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-energy-supply-company-administration-order" eId="term-energy-supply-company-administration-order">energy supply company administration order</term>” has the meaning given by section 94(1);</p></content></hcontainer><hcontainer name="definition"><content><p>“energy supply company'” has the meaning given by section 94(5);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-modification" eId="term-modification">modification</term>” includes omission, addition or alteration, and cognate expressions are to be construed accordingly;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-non-gb-company" eId="term-non-gb-company">non-GB company</term>” means a company incorporated outside Great Britain;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-objective-of-the-energy-supply-company-administration" eId="term-objective-of-the-energy-supply-company-administration">objective of the energy supply company administration</term>” is to be construed in accordance with section 95;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-relevant-licence" eId="term-relevant-licence">relevant licence</term>” has the meaning given by section 94(5);</p></content></hcontainer><hcontainer name="definition"><content><p>“subsidiary” and “wholly-owned subsidiary” have the meanings given by section 1159 of the Companies Act 2006;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-unregistered-company" eId="term-unregistered-company">unregistered company</term>” means a company that is not registered under the Companies Act 2006.</p></content></hcontainer></subsection><subsection eId="section-102-2"><num>(2)</num><intro><p>In this Chapter references to the energy administrator of a company—</p></intro><level class="para1" eId="section-102-2-a"><num>(a)</num><content><p>include references to a person appointed under paragraph 91 or 103 of Schedule B1 to the Insolvency Act 1986, as applied by Part 1 of Schedule 20 to the Energy Act 2004 and section 96 of this Act to be the energy administrator of that company; and</p></content></level><level class="para1" eId="section-102-2-b"><num>(b)</num><content><p>where two or more persons are appointed to be the energy administrator of that company, are to be construed in accordance with the provision made under section 158(5) of the Energy Act 2004, as applied by section 96 of this Act.</p></content></level></subsection></section></hcontainer></chapter> — Special administration under this Chapter
Part 2 — Security of energy supplies — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" eId="part-2-chapter-6"><num>CHAPTER 6</num><heading>Continental shelf</heading><section eId="section-103"><num>103</num><heading>Revocation <abbr title="Et cetera" xml:lang="la">etc</abbr> of designations under Continental Shelf Act 1964</heading><content><p><mod>In section 1(7) of the Continental Shelf Act 1964 (power by Order in Council to designate an area as an area within which rights with respect to the sea bed <abbr title="Et cetera" xml:lang="la">etc</abbr> are exercisable), for “revoke Orders for the purpose of consolidating them” substitute <quotedText>“ revoke, amend or re-enact Orders ”</quotedText>.</mod></p></content></section></chapter>
Part 3 — Measures for reducing carbon emissions — Offshore electricity
Part 3 — Measures for reducing carbon emissions — Security of nuclear construction sites
Part 3 — Measures for reducing carbon emissions — Decommissioning
Part 3 — Measures for reducing carbon emissions — Carbon dioxide pipelines
Part 3 — Measures for reducing carbon emissions — Carbon emissions reduction
Part 3 — Measures for reducing carbon emissions — Electricity from renewable sources
Part 3 — Measures for reducing carbon emissions — Northern Ireland: renewable heat incentives
Part 4 — Coal Authority
Part 5 — Miscellaneous and general — Miscellaneous
Part 5 — Miscellaneous and general — General