Legislation

Planning and Infrastructure Act 2025

Date of adoption: December 18, 2025

Source: www.legislation.gov.uk

Part 1 — Infrastructure — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" eId="part-1-chapter-1"><num>Chapter 1</num><heading>Nationally significant infrastructure projects</heading><section eId="section-1"><num>1</num><heading>National policy statements: review</heading><subsection eId="section-1-1"><num>(1)</num><content><p>Section 6 of the Planning Act 2008 (review) is amended as set out in subsections (2) to (5).</p></content></subsection><subsection eId="section-1-2"><num>(2)</num><content><p><mod>For subsection (1) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(1)</num><intro><p>The Secretary of State—</p></intro><level class="para1"><num>(a)</num><content><p>must review each national policy statement whenever the Secretary of State thinks it appropriate to do so, and</p></content></level><level class="para1"><num>(b)</num><content><p>in any event, must carry out a full review of each national policy statement at times that enable the Secretary of State to comply with subsection (5A).</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-1-3"><num>(3)</num><content><p><mod>In subsection (2), at the end insert <quotedText>“, and in this section a “<term refersTo="#term-full-review" eId="term-full-review">full review</term>” means a single review relating to all of a national policy statement”</quotedText>.</mod></p></content></subsection><subsection eId="section-1-4"><num>(4)</num><content><p><mod>After subsection (4) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(4A)</num><content><p>Whenever the Secretary of State decides to review a national policy statement, the Secretary of State must lay a statement before Parliament announcing the review.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-1-5"><num>(5)</num><content><p><mod>After subsection (5) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e420"><num>(5A)</num><intro><p>But, unless and until a statement’s designation as a national policy statement is withdrawn—</p></intro><level class="para1" eId="d25e426"><num>(a)</num><content><p>the Secretary of State must amend each national policy statement within the initial period (see section 6ZA), and</p></content></level><level class="para1"><num>(b)</num><content><p>the Secretary of State must subsequently amend each national policy statement at intervals of no more than five years.</p></content></level></subsection><subsection><num>(5B)</num><content><p>An amendment of a national policy statement counts for the purposes of subsection (5A) only if the amendment arises from a full review of the statement.</p></content></subsection><subsection><num>(5C)</num><content><p>An amendment of a national policy statement that is required by subsection (5A) to be made by a certain time may be delayed beyond that time only if and for so long as exceptional circumstances exist which, in the opinion of the Secretary of State, make the delay unavoidable.</p></content></subsection><subsection><num>(5D)</num><content><p>In that case the Secretary of State must, before the deadline for amending the national policy statement, lay a statement before Parliament explaining the reasons for the extension and stating when the Secretary of State expects to amend the national policy statement.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-1-6"><num>(6)</num><content><p><mod>After section 6 of the Planning Act 2008 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e466"><num>6ZA</num><heading>Review: supplementary</heading><subsection><num>(1)</num><content><p>Subsections (2) to (5) explain what is meant by “the initial period” in section 6(5A)(a).</p></content></subsection><subsection eId="d25e476"><num>(2)</num><content><p>In the case of a national policy statement that is designated on or after the relevant date, the initial period is the period of five years beginning with the date of designation.</p></content></subsection><subsection><num>(3)</num><intro><p>In the case of a national policy statement that—</p></intro><level class="para1"><num>(a)</num><content><p>was designated before the relevant date, and</p></content></level><level class="para1"><num>(b)</num><content><p>was amended before the relevant date,</p></content></level><wrapUp><p>the initial period is the period of five years beginning with the date of the amendment or, if an amendment was made on more than one occasion before the relevant date, the date of the latest such amendment.</p></wrapUp></subsection><subsection><num>(4)</num><intro><p>In the case of a national policy statement that—</p></intro><level class="para1"><num>(a)</num><content><p>was designated within the period of five years ending with the relevant date, and</p></content></level><level class="para1"><num>(b)</num><content><p>was not amended before the relevant date,</p></content></level><wrapUp><p>the initial period is the period of five years beginning with the date of designation.</p></wrapUp></subsection><subsection eId="d25e522"><num>(5)</num><intro><p>In the case of a national policy statement that—</p></intro><level class="para1"><num>(a)</num><content><p>was designated before the beginning of the period of five years ending with the relevant date, and</p></content></level><level class="para1"><num>(b)</num><content><p>was not amended before the relevant date,</p></content></level><wrapUp><p>the initial period is the period of two years beginning with the relevant date.</p></wrapUp></subsection><subsection><num>(6)</num><content><p>Section 6(5) applies in relation to a full review of a national policy statement within subsection (5) of this section carried out within the initial period as if the option in section 6(5)(c) (leave the statement as it is) was not available to the Secretary of State following that review.</p></content></subsection><subsection><num>(7)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-full-review">full review</term>” has the meaning given by section 6(2);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-relevant-date">the relevant date</term>” means the date on which section 6(5A) comes into force.</p></content></hcontainer></subsection></section></quotedStructure></mod></p></content></subsection></section><section eId="section-2"><num>2</num><heading>National policy statements: parliamentary requirements</heading><subsection eId="section-2-1"><num>(1)</num><content><p>Part 2 of the Planning Act 2008 (national policy statements) is amended as set out in subsections <ref href="#section-2-2">(2)</ref> and <ref href="#section-2-3">(3)</ref>.</p></content></subsection><subsection eId="section-2-2"><num>(2)</num><intro><p>In section 6 (review)—</p></intro><level class="para1" eId="section-2-2-a"><num>(a)</num><content><p>in subsection (7)(b)(i), omit “under section 9(8)”;</p></content></level><level class="para1" eId="section-2-2-b"><num>(b)</num><content><p>in subsection (7A), omit “under section 9(8)”;</p></content></level><level class="para1" eId="section-2-2-c"><num>(c)</num><content><p><mod>after subsection (9) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(10)</num><intro><p>In subsections (7)(b)(i) and (7A), references to an amendment being laid before Parliament are references to—</p></intro><level class="para1"><num>(a)</num><content><p>in the case of an amendment that is, or is included in, a proposal to which subsections (4) to (8) of section 9 do not apply (see section 9(8A)), the amendment being laid under section 9(2);</p></content></level><level class="para1"><num>(b)</num><content><p>in any other case, the amendment being laid under section 9(8).</p></content></level></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-2-3"><num>(3)</num><intro><p>In section 9 (parliamentary requirements)—</p></intro><level class="para1" eId="section-2-3-a"><num>(a)</num><content><p><mod>after subsection (8) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(8A)</num><intro><p>Subsections (4) to (8) do not apply in relation to the proposal if it—</p></intro><level class="para1"><num>(a)</num><content><p>is an amendment within subsection <ref href="#d25e709">(11)</ref>, or</p></content></level><level class="para1"><num>(b)</num><content><p>consists only of amendments within that subsection.</p></content></level></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-2-3-b"><num>(b)</num><intro><p>in subsection (9)—</p></intro><level class="para2" eId="section-2-3-b-i"><num>(i)</num><content><p><mod>for “subsection (8)”, in each place, substitute <quotedText>“the laying requirement”</quotedText>;</mod></p></content></level><level class="para2" eId="section-2-3-b-ii"><num>(ii)</num><content><p><mod>in paragraph (b), after “5(4)(a)” insert <quotedText>“or 6(7)(a)”</quotedText>;</mod></p></content></level></level><level class="para1" eId="section-2-3-c"><num>(c)</num><content><p><mod>in subsection (10), for “subsection (8)” substitute <quotedText>“the laying requirement”</quotedText>;</mod></p></content></level><level class="para1" eId="section-2-3-d"><num>(d)</num><content><p><mod>after subsection (10) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e709"><num>(11)</num><intro><p>An amendment is within this subsection if it is an amendment proposed to a national policy statement in order to reflect—</p></intro><level class="para1"><num>(a)</num><content><p>published Government policy that is relevant to development of a description to which the statement relates,</p></content></level><level class="para1"><num>(b)</num><content><p>the amendment, revocation or repeal of legislation referred to in the statement, or the amendment, revocation, repeal or coming into force of legislation relevant to development of a description to which the statement relates,</p></content></level><level class="para1"><num>(c)</num><content><p>a change (not within paragraph (a) or (b)) to a published document referred to in the statement, or</p></content></level><level class="para1"><num>(d)</num><content><p>a decision of a court in proceedings referred to in section 13 or 118, or other proceedings, so far as relevant to the interpretation of the statement or legislation referred to in the statement.</p></content></level></subsection><subsection><num>(12)</num><content><p>In subsection <ref href="#d25e709">(11)</ref>, “<term refersTo="#term-legislation">legislation</term>” means an Act or an instrument made under an Act.</p></content></subsection><subsection><num>(13)</num><intro><p>In this section, “<term refersTo="#term-the-laying-requirement">the laying requirement</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>if the proposal is one to which subsections (4) to (8) do not apply, subsection (2);</p></content></level><level class="para1"><num>(b)</num><content><p>otherwise, subsection (8).</p></content></level></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-2-4"><num>(4)</num><content><p>The amendments made by this section apply in relation to amendments proposed to be made to a national policy statement that arise from a review of the statement completed or begun before (as well as after) the date on which this section comes into force.</p></content></subsection></section><section eId="section-3"><num>3</num><heading>Projects relating to water</heading><subsection eId="section-3-1"><num>(1)</num><content><p>Part 3 of the Planning Act 2008 (nationally significant infrastructure projects) is amended as set out in <ref href="#section-3-2">subsections (2)</ref> to <ref href="#section-3-4">(4)</ref>.</p></content></subsection><subsection eId="section-3-2"><num>(2)</num><intro><p>In section 27 (dams and reservoirs)—</p></intro><level class="para1" eId="section-3-2-a"><num>(a)</num><content><p><mod>in subsection (1)(b), after “by” insert <quotedText>“, or by a person appointed by,”</quotedText>;</mod></p></content></level><level class="para1" eId="section-3-2-b"><num>(b)</num><content><p><mod>in subsection (2)(b), after “by” insert <quotedText>“, or by a person appointed by,”</quotedText>;</mod></p></content></level><level class="para1" eId="section-3-2-c"><num>(c)</num><content><p><mod>after subsection (3) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(4)</num><content><p>In this section, references to “a person appointed by” a water undertaker include a person whose bid is accepted by a water undertaker under regulation 6(6) of the Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (<ref eId="c00001" href="http://www.legislation.gov.uk/id/uksi/2013/1582">S.I. 2013/1582</ref>) and is designated as an Infrastructure Provider under regulation 8 of those Regulations.</p></content></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-3-3"><num>(3)</num><intro><p>In section 28 (transfer of water resources)—</p></intro><level class="para1" eId="section-3-3-a"><num>(a)</num><content><p><mod>in subsection (1)(a), after “by” insert <quotedText>“, or by a person appointed by,”</quotedText>;</mod></p></content></level><level class="para1" eId="section-3-3-b"><num>(b)</num><content><p><mod>after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(3)</num><content><p>In this section, the reference to “a person appointed by” a water undertaker includes a person whose bid is accepted by a water undertaker under regulation 6(6) of the Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (<ref eId="c00002" href="http://www.legislation.gov.uk/id/uksi/2013/1582">S.I. 2013/1582</ref>) and is designated as an Infrastructure Provider under regulation 8 of those Regulations.</p></content></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-3-4"><num>(4)</num><intro><p>In section 28A (desalination plants)—</p></intro><level class="para1" eId="section-3-4-a"><num>(a)</num><content><p><mod>in subsection (1)(b), after “by” insert <quotedText>“, or by a person appointed by,”</quotedText>;</mod></p></content></level><level class="para1" eId="section-3-4-b"><num>(b)</num><content><p>in subsection (2)(b), after “by” insert , or by a person appointed by,”;</p></content></level><level class="para1" eId="section-3-4-c"><num>(c)</num><content><p><mod>after subsection (3) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(4)</num><content><p>In this section, references to “a person appointed by” a water undertaker include a person whose bid is accepted by a water undertaker under regulation 6(6) of the Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (<ref eId="c00003" href="http://www.legislation.gov.uk/id/uksi/2013/1582">S.I. 2013/1582</ref>) and is designated as an Infrastructure Provider under regulation 8 of those Regulations.</p></content></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-3-5"><num>(5)</num><intro><p>The amendments made by this section do not apply in relation to a project where, before the day on which this section comes into force—</p></intro><level class="para1" eId="section-3-5-a"><num>(a)</num><content><p>consent for the project was required, or otherwise provided for, by or under an enactment other than section 31 of the Planning Act 2008 (requirement for development consent in relation to development that is or forms part of a nationally significant infrastructure project), and</p></content></level><level class="para1" eId="section-3-5-b"><num>(b)</num><content><p>any steps provided for by or under the enactment in question, to obtain that consent, had been taken.</p></content></level></subsection><subsection eId="section-3-6"><num>(6)</num><content><p>In <ref href="#section-3-5">subsection (5)</ref>, “<term refersTo="#term-consent" eId="term-consent">consent</term>” means any consent, approval, permission, authorisation, confirmation, direction or decision (however described, given or made).</p></content></subsection></section><section eId="section-4"><num>4</num><heading>Power to disapply requirement for development consent</heading><subsection eId="section-4-1"><num>(1)</num><content><p>The Planning Act 2008 is amended as set out in subsections <ref href="#section-4-2">(2)</ref> to <ref href="#section-4-4">(4)</ref>.</p></content></subsection><subsection eId="section-4-2"><num>(2)</num><intro><p>In section 31 (when development consent is required)—</p></intro><level class="para1" eId="section-4-2-a"><num>(a)</num><content><p>the existing text becomes subsection (1);</p></content></level><level class="para1" eId="section-4-2-b"><num>(b)</num><content><p><mod>after that subsection insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(2)</num><content><p>But see section <ref href="#d25e1008">35B</ref> (power for the Secretary of State to give a direction disapplying the requirement for development consent).</p></content></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-4-3"><num>(3)</num><content><p><mod>In section 35ZA (directions under section 35), after subsection (10) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(10A)</num><content><p>The Secretary of State must publish a direction under section 35(1) or subsection (3) of this section.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-4-4"><num>(4)</num><content><p><mod>After section 35A insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e1008"><num>35B</num><heading>Directions disapplying requirement for development consent</heading><subsection eId="d25e1012"><num>(1)</num><content><p>The Secretary of State may give a direction that development consent is not required for development specified in the direction.</p><p>This is subject to subsections <ref href="#d25e1027">(2)</ref> and <ref href="#d25e1072">(4)</ref>.</p></content></subsection><subsection eId="d25e1027"><num>(2)</num><intro><p>The Secretary of State may give a direction only if—</p></intro><level class="para1"><num>(a)</num><content><p>the Secretary of State considers that it is appropriate for an alternative consenting regime to apply in relation to the development, rather than this Act,</p></content></level><level class="para1" eId="d25e1039"><num>(b)</num><content><p>no application for an order granting development consent for the development has been made, and</p></content></level><level class="para1"><num>(c)</num><content><p>the development will (when completed) be wholly in one or more of the areas specified in subsection <ref href="#d25e1054">(3)</ref>.</p></content></level></subsection><subsection eId="d25e1054"><num>(3)</num><intro><p>The areas are—</p></intro><level class="para1"><num>(a)</num><content><p>England or waters adjacent to England up to the seaward limits of the territorial sea;</p></content></level><level class="para1"><num>(b)</num><content><p>in the case of development that is or forms part of a project for the carrying out of works in the field of energy, a Renewable Energy Zone, except any part of a Renewable Energy Zone in relation to which the Scottish Ministers have functions.</p></content></level></subsection><subsection eId="d25e1072"><num>(4)</num><intro><p>The Secretary of State may give a direction only if—</p></intro><level class="para1" eId="d25e1078"><num>(a)</num><content><p>the conditions in subsection <ref href="#d25e1108">(5)</ref> are satisfied,</p></content></level><level class="para1" eId="d25e1087"><num>(b)</num><content><p>the conditions in subsection <ref href="#d25e1149">(6)</ref> are satisfied,</p></content></level><level class="para1"><num>(c)</num><content><p>the Secretary of State is the person who proposes to carry out the development, or</p></content></level><level class="para1"><num>(d)</num><content><p>the Secretary of State considers that the appropriate alternative consenting regime for the development is that under section 59 of TCPA 1990 (development orders).</p></content></level></subsection><subsection eId="d25e1108"><num>(5)</num><intro><p>The conditions referred to in subsection <ref href="#d25e1072">(4)</ref><ref href="#d25e1078">(a)</ref> are that—</p></intro><level class="para1"><num>(a)</num><content><p>the Secretary of State receives a written request for a direction from a qualifying person,</p></content></level><level class="para1"><num>(b)</num><content><p>the request specifies the development to which it relates,</p></content></level><level class="para1"><num>(c)</num><content><p>the request identifies the appropriate alternative consenting regime for the development,</p></content></level><level class="para1"><num>(d)</num><content><p>the request explains why the person making the request considers that it is appropriate for that alternative consenting regime to apply in relation to the development, and</p></content></level><level class="para1"><num>(e)</num><content><p>the request includes evidence showing that the alternative consenting authority is aware of the intention to request a direction specifying the development.</p></content></level></subsection><subsection eId="d25e1149"><num>(6)</num><intro><p>The conditions referred to in subsection <ref href="#d25e1072">(4)</ref><ref href="#d25e1087">(b)</ref> are that—</p></intro><level class="para1"><num>(a)</num><content><p>the Secretary of State receives a written request for a direction from a person who has power to make a local development order, a Mayoral development order or a simplified planning zone scheme,</p></content></level><level class="para1"><num>(b)</num><content><p>the request specifies the development to which it relates, and</p></content></level><level class="para1"><num>(c)</num><content><p>the request indicates that the person making the request considers that the appropriate alternative consenting regime for the development is that under section 61A (local development orders), 61DA (Mayoral development orders) or 82 (simplified planning zone schemes) of TCPA 1990 (as the case may be), giving reasons for that view.</p></content></level></subsection><subsection eId="d25e1178"><num>(7)</num><content><p>The condition in subsection <ref href="#d25e1027">(2)</ref><ref href="#d25e1039">(b)</ref> is to be regarded as met in relation to development if an application for an order granting development consent for the development is made during the period beginning with the day on which this Act is passed and ending with the day on which this section comes into force.</p></content></subsection><subsection><num>(8)</num><intro><p>For the purposes of this section—</p></intro><level class="para1" eId="d25e1195"><num>(a)</num><content><p>an “alternative consenting regime” for development means a regime set out in legislation other than this Act under which, if development consent were not required for the development, a specified person would have power to authorise the development, and</p></content></level><level class="para1"><num>(b)</num><content><p>the person referred to in paragraph <ref href="#d25e1195">(a)</ref> is the “<term refersTo="#term-alternative-consenting-authority">alternative consenting authority</term>” in relation to that regime.</p></content></level></subsection><subsection><num>(9)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-direction">direction</term>” means a direction under subsection <ref href="#d25e1012">(1)</ref>;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-legislation">legislation</term>” means an Act or an instrument made under an Act;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-local-development-order">local development order</term>” has the meaning given in section 61A of TCPA 1990;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-mayoral-development-order">Mayoral development order</term>” has the meaning given in section 61DA of TCPA 1990;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-qualifying-person">qualifying person</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a person who proposes to carry out any of the development to which the request relates;</p></content></level><level class="para1"><num>(b)</num><content><p>a person who, if a direction were given specifying the development, proposes to apply to an alternative consenting authority in relation to the development;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-simplified-planning-zone-scheme">simplified planning zone scheme</term>” has the same meaning as in TCPA 1990 (see section 82 of that Act).</p></content></hcontainer></subsection></section><section><num>35C</num><heading>Directions under section <ref href="#d25e1008">35B</ref>: supplementary</heading><subsection><num>(1)</num><content><p>In this section “<term refersTo="#term-direction">direction</term>” means a direction under section <ref href="#d25e1008">35B</ref><ref href="#d25e1012">(1)</ref>.</p></content></subsection><subsection><num>(2)</num><intro><p>Subsection <ref href="#d25e1324">(3)</ref> applies if—</p></intro><level class="para1"><num>(a)</num><content><p>the Secretary of State decides to give a direction that has been requested as described in section <ref href="#d25e1008">35B</ref><ref href="#d25e1108">(5)</ref>, and</p></content></level><level class="para1"><num>(b)</num><content><p>a person proposed (before or after that section came into force) to make an application for an order granting development consent for the development to which the request relates.</p></content></level></subsection><subsection eId="d25e1324"><num>(3)</num><intro><p>The direction may include provision—</p></intro><level class="para1"><num>(a)</num><content><p>for the proposed application to be treated as a proposed application to a specified alternative consenting authority;</p></content></level><level class="para1"><num>(b)</num><intro><p>for specified provisions of legislation governing an alternative consenting regime—</p></intro><level class="para2"><num>(i)</num><content><p>to have effect in relation to the proposed application with any specified modifications;</p></content></level><level class="para2"><num>(ii)</num><content><p>to be treated as having been complied with in relation to the proposed application.</p></content></level></level></subsection><subsection><num>(4)</num><content><p>In the application of subsection <ref href="#d25e1324">(3)</ref> to a direction that is to specify development for which an application seeking development consent has been made (see section <ref href="#d25e1008">35B</ref><ref href="#d25e1178">(7)</ref>), references to the proposed application include references to the application.</p></content></subsection><subsection><num>(5)</num><content><p>If the Secretary of State receives a request for a direction as described in section <ref href="#d25e1008">35B</ref><ref href="#d25e1108">(5)</ref> or <ref href="#d25e1149">(6)</ref>, the Secretary of State must give reasons for the decision to give or not to give the requested direction to the person who made the request.</p></content></subsection><subsection><num>(6)</num><content><p>The Secretary of State must publish a direction.</p></content></subsection><subsection><num>(7)</num><intro><p>In this section, the following expressions have the same meaning as in section <ref href="#d25e1008">35B</ref>—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-alternative-consenting-authority">alternative consenting authority</term>”,</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-alternative-consenting-regime">alternative consenting regime</term>”, and</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-legislation">legislation</term>”.</p></content></hcontainer></subsection></section><section><num>35D</num><heading>Timetable for deciding request for direction under section <ref href="#d25e1008">35B</ref></heading><subsection><num>(1)</num><intro><p>The Secretary of State may by regulations—</p></intro><level class="para1"><num>(a)</num><content><p>make provision about time limits for decisions about whether to give directions under section <ref href="#d25e1008">35B</ref><ref href="#d25e1012">(1)</ref> following qualifying requests (including provision for the extension of any prescribed period in prescribed circumstances);</p></content></level><level class="para1"><num>(b)</num><content><p>make provision for and in connection with the provision of information to the Secretary of State for the purposes of such decisions.</p></content></level></subsection><subsection><num>(2)</num><content><p>In this section “<term refersTo="#term-qualifying-request">qualifying request</term>” means a request in relation to which the conditions in section <ref href="#d25e1008">35B</ref><ref href="#d25e1108">(5)</ref> or <ref href="#d25e1149">(6)</ref> are satisfied.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-4-5"><num>(5)</num><intro><p>In the Electricity Act 1989, in section 36 (consent required for construction etc of generating stations)—</p></intro><level class="para1" eId="section-4-5-a"><num>(a)</num><content><p><mod>after subsection (1A) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(1AA)</num><content><p>Subsection (1) does not apply to the construction or extension of a generating station in England if the construction or extension constitutes development specified in a direction under section <ref href="#d25e1008">35B</ref><ref href="#d25e1012">(1)</ref> of the Planning Act 2008 (direction disapplying requirement for development consent).</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-4-5-b"><num>(b)</num><content><p><mod>after subsection (11) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(12)</num><content><p>In subsection (1AA) “<term refersTo="#term-england">England</term>” does not include waters in England (nor waters adjacent to England).</p></content></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-4-6"><num>(6)</num><intro><p>In the Marine and Coastal Access Act 2009, in section 12 (certain consents under section 36 of the Electricity Act 1989)—</p></intro><level class="para1" eId="section-4-6-a"><num>(a)</num><content><p><mod>in subsection (2), in the words after paragraph (c), for “subsections (3) and (4)” substitute <quotedText>“subsection (3)”</quotedText>;</mod></p></content></level><level class="para1" eId="section-4-6-b"><num>(b)</num><content><p>omit subsection (4).</p></content></level></subsection></section><section eId="section-5"><num>5</num><heading>Applications for development consent: removal of certain pre-application requirements</heading><intro><p>Omit the following sections of the Planning Act 2008—</p></intro><level class="para1" eId="section-5-a"><num>(a)</num><content><p>section 42 (duty to consult);</p></content></level><level class="para1" eId="section-5-b"><num>(b)</num><content><p>section 43 (local authorities for purposes of section 42(1)(b));</p></content></level><level class="para1" eId="section-5-c"><num>(c)</num><content><p>section 44 (categories for purposes of section 42(1)(d));</p></content></level><level class="para1" eId="section-5-d"><num>(d)</num><content><p>section 45 (timetable for consultation under section 42);</p></content></level><level class="para1" eId="section-5-e"><num>(e)</num><content><p>section 47 (duty to consult local community);</p></content></level><level class="para1" eId="section-5-f"><num>(f)</num><content><p>section 49 (duty to take account of responses to consultation and publicity).</p></content></level></section><section eId="section-6"><num>6</num><heading>Applications for development consent: changes related to section <ref href="#section-5">5</ref></heading><subsection eId="section-6-1"><num>(1)</num><content><p>The Planning Act 2008 is amended as set out in subsections <ref href="#section-6-2">(2)</ref> to <ref href="#section-6-9">(9)</ref>.</p></content></subsection><subsection eId="section-6-2"><num>(2)</num><intro><p>In section 37 (applications for orders granting development consent)—</p></intro><level class="para1" eId="section-6-2-a"><num>(a)</num><intro><p>in subsection (3)—</p></intro><level class="para2" eId="section-6-2-a-i"><num>(i)</num><content><p><mod>insert <quotedText>“and”</quotedText> at the end of paragraph (b);</mod></p></content></level><level class="para2" eId="section-6-2-a-ii"><num>(ii)</num><content><p>omit paragraph (c) (together with the final “and”);</p></content></level></level><level class="para1" eId="section-6-2-b"><num>(b)</num><content><p>omit subsections (7) and (8).</p></content></level></subsection><subsection eId="section-6-3"><num>(3)</num><intro><p>In section 39 (register of applications), in subsection (4)—</p></intro><level class="para1" eId="section-6-3-a"><num>(a)</num><content><p><mod>insert <quotedText>“and”</quotedText> at the end of paragraph (a);</mod></p></content></level><level class="para1" eId="section-6-3-b"><num>(b)</num><content><p>omit paragraph (b) (together with the final “and”).</p></content></level></subsection><subsection eId="section-6-4"><num>(4)</num><content><p><mod>In section 41 (Chapter applies before application is made), in subsection (1), at the end insert <quotedText>“(and “<term refersTo="#term-applicants" eId="term-applicants">applicants</term>” is to be construed accordingly)”</quotedText>.</mod></p></content></subsection><subsection eId="section-6-5"><num>(5)</num><intro><p>In section 46 (duty to notify Secretary of State of proposed application)—</p></intro><level class="para1" eId="section-6-5-a"><num>(a)</num><content><p><mod>for subsection (1) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e1680"><num>(1)</num><intro><p>The applicant must supply to the Secretary of State—</p></intro><level class="para1" eId="d25e1686"><num>(a)</num><content><p>the information specified in subsection <ref href="#d25e1743">(1C)</ref>, and</p></content></level><level class="para1"><num>(b)</num><content><p>such further information as may be prescribed.</p></content></level></subsection><subsection eId="d25e1701"><num>(1A)</num><intro><p>The applicant must supply to each host local authority—</p></intro><level class="para1" eId="d25e1707"><num>(a)</num><content><p>the information specified in subsection <ref href="#d25e1743">(1C)</ref>, and</p></content></level><level class="para1"><num>(b)</num><content><p>such further information as may be prescribed.</p></content></level></subsection><subsection eId="d25e1722"><num>(1B)</num><intro><p>In any case where the proposed development would affect, or would be likely to affect, any of the areas specified in subsection (5), the applicant must supply to the Marine Management Organisation—</p></intro><level class="para1" eId="d25e1728"><num>(a)</num><content><p>the information specified in subsection <ref href="#d25e1743">(1C)</ref>, and</p></content></level><level class="para1"><num>(b)</num><content><p>such further information as may be prescribed.</p></content></level></subsection><subsection eId="d25e1743"><num>(1C)</num><intro><p>The information referred to in subsections <ref href="#d25e1680">(1)</ref><ref href="#d25e1686">(a)</ref>, <ref href="#d25e1701">(1A)</ref><ref href="#d25e1707">(a)</ref> and <ref href="#d25e1722">(1B)</ref><ref href="#d25e1728">(a)</ref> is as follows—</p></intro><level class="para1"><num>(a)</num><content><p>the applicant’s name and address,</p></content></level><level class="para1"><num>(b)</num><content><p>a statement that the applicant intends to apply for an order granting development consent,</p></content></level><level class="para1"><num>(c)</num><content><p>a statement about why development consent is required for the proposed development, specifying the relevant provision of Part 3 (or referring to a direction that has been given under section 35), and</p></content></level><level class="para1"><num>(d)</num><content><p>a summary of the proposed application, specifying the location or route of the proposed development.</p></content></level></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-6-5-b"><num>(b)</num><content><p>omit subsection (2);</p></content></level><level class="para1" eId="section-6-5-c"><num>(c)</num><content><p><mod>after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(3)</num><content><p>A local authority is a “host local authority” if the land is in the authority’s area.</p></content></subsection><subsection><num>(4)</num><intro><p>In this section “<term refersTo="#term-local-authority">local authority</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a county council, or district council, in England;</p></content></level><level class="para1"><num>(b)</num><content><p>a London borough council;</p></content></level><level class="para1"><num>(c)</num><content><p>the Common Council of the City of London;</p></content></level><level class="para1"><num>(d)</num><content><p>the Council of the Isles of Scilly;</p></content></level><level class="para1"><num>(e)</num><content><p>a county council, or county borough council, in Wales;</p></content></level><level class="para1"><num>(f)</num><content><p>a council constituted under section 2 of the Local Government etc (Scotland) Act 1994;</p></content></level><level class="para1"><num>(g)</num><content><p>a National Park authority;</p></content></level><level class="para1"><num>(h)</num><content><p>the Broads Authority.</p></content></level></subsection><subsection><num>(5)</num><intro><p>The areas referred to in subsection <ref href="#d25e1722">(1B)</ref> are—</p></intro><level class="para1"><num>(a)</num><content><p>waters in or adjacent to England up to the seaward limits of the territorial sea;</p></content></level><level class="para1"><num>(b)</num><content><p>an exclusive economic zone, except any part of an exclusive economic zone in relation to which the Scottish Ministers have functions;</p></content></level><level class="para1"><num>(c)</num><content><p>a Renewable Energy Zone, except any part of a Renewable Energy Zone in relation to which the Scottish Ministers have functions;</p></content></level><level class="para1"><num>(d)</num><content><p>an area designated under section 1(7) of the Continental Shelf Act 1964, except any part of that area which is within a part of an exclusive economic zone or Renewable Energy Zone in relation to which the Scottish Ministers have functions.</p></content></level></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-6-5-d"><num>(d)</num><content><p><mod>in the heading, after “Secretary of State” insert <quotedText>“and others”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-6-6"><num>(6)</num><content><p>In section 48 (duty to publicise), omit subsection (2).</p></content></subsection><subsection eId="section-6-7"><num>(7)</num><content><p><mod>For section 50 substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section><num>50</num><heading>Guidance about pre-application steps</heading><subsection><num>(1)</num><content><p>Applicants must have regard to any guidance issued by the Secretary of State to assist them in complying with section 48.</p></content></subsection><subsection><num>(2)</num><content><p>The Secretary of State must issue guidance to assist applicants, setting out what the Secretary of State considers to be best practice in terms of the steps they might take in relation to a proposed application in readiness for submitting an actual application.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-6-8"><num>(8)</num><content><p><mod>In section 52 (obtaining information about interests in land), in subsection (1), for “provisions of, or made under, Chapter 2 of this Part or” substitute <quotedText>“regulations made under section 37 or with provisions of, or made under,”</quotedText>.</mod></p></content></subsection><subsection eId="section-6-9"><num>(9)</num><content><p>In Schedule 12 (application of Act to Scotland: modifications), omit paragraph 5.</p></content></subsection><subsection eId="section-6-10"><num>(10)</num><intro><p>In the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (<ref eId="c00004" href="http://www.legislation.gov.uk/id/uksi/2017/572">S.I. 2017/572</ref>)—</p></intro><level class="para1" eId="section-6-10-a"><num>(a)</num><intro><p>in regulation 3(1), in the definition of “the consultation bodies”—</p></intro><level class="para2" eId="section-6-10-a-i"><num>(i)</num><content><p>in paragraph (a), omit “prescribed under section 42(1)(a) (duty to consult) and”;</p></content></level><level class="para2" eId="section-6-10-a-ii"><num>(ii)</num><content><p><mod>in paragraph (a), for “column 2” substitute <quotedText>“column 3”</quotedText>;</mod></p></content></level><level class="para2" eId="section-6-10-a-iii"><num>(iii)</num><content><p><mod>at the end of paragraph (a) insert <quotedText>“(reading references to applications as references to proposed applications, where the context requires)”</quotedText>;</mod></p></content></level><level class="para2" eId="section-6-10-a-iv"><num>(iv)</num><content><p><mod>in paragraph (b), for “section 43 (local authorities for purposes of section 42(1)(b))” substitute <quotedText>“section 56A (local authorities for purposes of sections 56(2)(b) and 60(2)(a))”</quotedText>;</mod></p></content></level></level><level class="para1" eId="section-6-10-b"><num>(b)</num><content><p><mod>in regulation 8(1), for “carrying out consultation under section 42 (duty to consult)” substitute <quotedText>“publicising the proposed application under section 48,”</quotedText>;</mod></p></content></level><level class="para1" eId="section-6-10-c"><num>(c)</num><content><p>omit regulation 12 (consultation statement requirements).</p></content></level></subsection><subsection eId="section-6-11"><num>(11)</num><intro><p>Omit—</p></intro><level class="para1" eId="section-6-11-a"><num>(a)</num><content><p>section 23(2), (3) and (4) of the Marine and Coastal Access Act 2009;</p></content></level><level class="para1" eId="section-6-11-b"><num>(b)</num><intro><p>the following provisions of the Localism Act 2011—</p></intro><level class="para2" eId="section-6-11-b-i"><num>(i)</num><content><p>section 133;</p></content></level><level class="para2" eId="section-6-11-b-ii"><num>(ii)</num><content><p>section 134;</p></content></level><level class="para2" eId="section-6-11-b-iii"><num>(iii)</num><content><p>section 135(8);</p></content></level><level class="para2" eId="section-6-11-b-iv"><num>(iv)</num><content><p>paragraphs 8(2) and 9 of Schedule 13.</p></content></level></level></subsection></section><section eId="section-7"><num>7</num><heading>Applications for development consent: acceptance stage</heading><subsection eId="section-7-1"><num>(1)</num><content><p>The Planning Act 2008 is amended as set out in subsections <ref href="#section-7-2">(2)</ref> to <ref href="#section-7-8">(8)</ref>.</p></content></subsection><subsection eId="section-7-2"><num>(2)</num><content><p>Section 55 (acceptance of applications) is amended as set out in subsections <ref href="#section-7-3">(3)</ref> to <ref href="#section-7-7">(7)</ref>.</p></content></subsection><subsection eId="section-7-3"><num>(3)</num><intro><p>In subsection (3)—</p></intro><level class="para1" eId="section-7-3-a"><num>(a)</num><content><p><mod>after paragraph (c) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(ca)</num><content><p>that the applicant has complied with section 46 (duty to notify Secretary of State and others of proposed application), and</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-7-3-b"><num>(b)</num><content><p>omit paragraph (e).</p></content></level></subsection><subsection eId="section-7-4"><num>(4)</num><content><p><mod>For subsection (4) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(4)</num><intro><p>The Secretary of State, when deciding whether the Secretary of State may reach the conclusion in subsection (3)(f), must take into account—</p></intro><level class="para1"><num>(a)</num><content><p>the extent to which the application complies with section 37(3) (form and contents of application),</p></content></level><level class="para1"><num>(b)</num><content><p>the extent to which any applicable guidance under section 37(4) has been followed in relation to the application,</p></content></level><level class="para1"><num>(c)</num><content><p>the extent to which the application complies with any standards set under section 37(5) (standards for documents etc accompanying application),</p></content></level><level class="para1"><num>(d)</num><content><p>the applicant’s approach to satisfying section 48 (duty to publicise), and</p></content></level><level class="para1"><num>(e)</num><content><p>the extent to which the applicant has had regard to any advice given under section 51 in connection with the application (or the proposed application that has become the application).</p></content></level></subsection><subsection><num>(4A)</num><content><p>In considering the matter in subsection (4)(d), the Secretary of State must take into account the extent to which the applicant has had regard to any guidance under section 50(1).</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-7-5"><num>(5)</num><content><p>Omit subsection (5).</p></content></subsection><subsection eId="section-7-6"><num>(6)</num><content><p>Omit subsection (5A).</p></content></subsection><subsection eId="section-7-7"><num>(7)</num><content><p><mod>For subsections (6) and (7) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(6)</num><content><p>The Secretary of State must notify the applicant of the decision under subsection (2).</p></content></subsection><subsection><num>(7)</num><intro><p>If the Secretary of State decides under subsection (2) not to accept the application, the Secretary of State must—</p></intro><level class="para1"><num>(a)</num><content><p>prepare a statement of the Secretary of State’s reasons for that decision,</p></content></level><level class="para1"><num>(b)</num><content><p>provide a copy of the statement to the applicant, and</p></content></level><level class="para1"><num>(c)</num><content><p>publish the statement in such form and manner as the Secretary of State thinks appropriate.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-7-8"><num>(8)</num><content><p><mod>In section 118 (legal challenges relating to applications for orders granting development consent), in subsection (3)(b), for “notifies the applicant as required by subsection (7)” substitute <quotedText>“provides the copy of the statement of reasons for the decision to the applicant as required by subsection (7)(b)”</quotedText>.</mod></p></content></subsection><subsection eId="section-7-9"><num>(9)</num><content><p>In consequence of the amendment in subsection <ref href="#section-7-6">(6)</ref>, omit section 137(4) of the Localism Act 2011.</p></content></subsection></section><section eId="section-8"><num>8</num><heading>Applications for development consent: local impact reports and representations</heading><subsection eId="section-8-1"><num>(1)</num><content><p>The Planning Act 2008 is amended as follows.</p></content></subsection><subsection eId="section-8-2"><num>(2)</num><content><p><mod>In section 60 (local impact reports), after subsection (5) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(6)</num><content><p>In preparing a local impact report, an authority must have regard to any relevant guidance issued by the Secretary of State.</p></content></subsection><subsection><num>(7)</num><content><p>But that duty does not apply to an authority for an area that is in Scotland.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-8-3"><num>(3)</num><content><p><mod>After section 96 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section><num>96A</num><heading>Representations from public authorities</heading><subsection><num>(1)</num><content><p>In making any representations about the application (oral or written), a relevant public authority must have regard to any guidance issued by the Secretary of State to assist such authorities in making representations for the purposes of the examination of an application.</p></content></subsection><subsection><num>(2)</num><intro><p>“<term refersTo="#term-relevant-public-authority">Relevant public authority</term>” means a public authority within any of paragraphs (a) to (c) of section 56(2), except—</p></intro><level class="para1"><num>(a)</num><content><p>the Scottish Ministers,</p></content></level><level class="para1"><num>(b)</num><content><p>a Northern Ireland department, or</p></content></level><level class="para1"><num>(c)</num><content><p>any other public authority whose functions are exercisable only in or as regards Scotland or Northern Ireland.</p></content></level></subsection></section></quotedStructure></mod></p></content></subsection></section><section eId="section-9"><num>9</num><heading>Examination of applications for development consent</heading><subsection eId="section-9-1"><num>(1)</num><content><p><mod>In section 89 of the Planning Act 2008 (Examining authority’s decisions about how application is to be examined), in subsection (1), after “light of” insert <quotedText>“the assessment under section 88(1) and”</quotedText>.</mod></p></content></subsection><subsection eId="section-9-2"><num>(2)</num><content><p><mod>In section 97 of that Act (procedure rules), after subsection (5) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(5A)</num><content><p>Power under this section to make rules includes power to make transitional provision.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-9-3"><num>(3)</num><content><p>The amendment made by <ref href="#section-9-1">subsection (1)</ref> applies in relation to every application in respect of which the assessment under section 88(1) of the Planning Act 2008 is made on or after the date on which <ref href="#section-9-1">subsection (1)</ref> comes into force (whenever the application was made or accepted).</p></content></subsection></section><section eId="section-10"><num>10</num><heading>Applications for development consent: costs</heading><subsection eId="section-10-1"><num>(1)</num><content><p>The Planning Act 2008 is amended as follows.</p></content></subsection><subsection eId="section-10-2"><num>(2)</num><intro><p>In section 95 (hearings: disruption etc)—</p></intro><level class="para1" eId="section-10-2-a"><num>(a)</num><content><p>omit subsections (4) and (5);</p></content></level><level class="para1" eId="section-10-2-b"><num>(b)</num><content><p>in the heading, omit “, supervision and costs”.</p></content></level></subsection><subsection eId="section-10-3"><num>(3)</num><content><p><mod>After section 96A (inserted by section <ref href="#section-8">8</ref>) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section><num>96B</num><heading>Costs</heading><subsection><num>(1)</num><intro><p>The Examining authority may make orders about—</p></intro><level class="para1"><num>(a)</num><intro><p>the costs of any person who—</p></intro><level class="para2"><num>(i)</num><content><p>is an interested party in relation to the application, or</p></content></level><level class="para2"><num>(ii)</num><content><p>makes a written representation to the Examining authority about the application;</p></content></level></level><level class="para1"><num>(b)</num><content><p>the person or persons who must pay the costs.</p></content></level></subsection><subsection><num>(2)</num><content><p>Every such order may be made a rule of the High Court on the application of any person named in the order.</p></content></subsection></section></quotedStructure></mod></p></content></subsection></section><section eId="section-11"><num>11</num><heading>Planning Act 2008: right to enter and survey land</heading><subsection eId="section-11-1"><num>(1)</num><content><p>Section 53 of the Planning Act 2008 (rights of entry) is amended as set out in subsections <ref href="#section-11-2">(2)</ref> to <ref href="#section-11-7">(7)</ref>.</p></content></subsection><subsection eId="section-11-2"><num>(2)</num><content><p><mod>In subsection (1), for “Any person duly authorised in writing by the Secretary of State” substitute <quotedText>“An authorised person”</quotedText>.</mod></p></content></subsection><subsection eId="section-11-3"><num>(3)</num><content><p><mod>After subsection (1A) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(1B)</num><intro><p>In subsection (1) “<term refersTo="#term-authorised-person">authorised person</term>” means a person who is authorised in writing to exercise the power in that subsection on behalf of—</p></intro><level class="para1"><num>(a)</num><content><p>a person who has made an application for an order granting development consent that has been accepted by the Secretary of State,</p></content></level><level class="para1"><num>(b)</num><content><p>a person who proposes to make an application for an order granting development consent, or</p></content></level><level class="para1"><num>(c)</num><content><p>a person who has been granted the benefit of an order granting development consent of a kind specified in subsection (1)(c).</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-11-4"><num>(4)</num><content><p>Omit subsection (2).</p></content></subsection><subsection eId="section-11-5"><num>(5)</num><intro><p>In subsection (4)—</p></intro><level class="para1" eId="section-11-5-a"><num>(a)</num><content><p><mod>in the words before paragraph (a), for “authorised under subsection (1) to enter any land” substitute <quotedText>“acting in the exercise of a power of entry onto any land conferred under subsection (1)”</quotedText>;</mod></p></content></level><level class="para1" eId="section-11-5-b"><num>(b)</num><content><p><mod>insert <quotedText>“and”</quotedText> at the end of paragraph (a);</mod></p></content></level><level class="para1" eId="section-11-5-c"><num>(c)</num><intro><p>in paragraph (b)—</p></intro><level class="para2" eId="section-11-5-c-i"><num>(i)</num><content><p><mod>for “any land which is occupied” substitute <quotedText>“the land”</quotedText>;</mod></p></content></level><level class="para2" eId="section-11-5-c-ii"><num>(ii)</num><content><p><mod>for “the occupier” substitute <quotedText>“every owner or occupier of the land”</quotedText>;</mod></p></content></level></level><level class="para1" eId="section-11-5-d"><num>(d)</num><content><p>omit “and” at the end of paragraph (b);</p></content></level><level class="para1" eId="section-11-5-e"><num>(e)</num><content><p>omit paragraph (c).</p></content></level></subsection><subsection eId="section-11-6"><num>(6)</num><content><p><mod>After subsection (4) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(4A)</num><content><p>Notice given in accordance with subsection (4)(b) must include prescribed information.</p></content></subsection><subsection eId="d25e2591"><num>(4B)</num><intro><p>A justice of the peace may issue a warrant authorising a person to use force in the exercise of the power conferred under subsection (1) if satisfied—</p></intro><level class="para1"><num>(a)</num><content><p>that another person has prevented or is likely to prevent the exercise of that power, and</p></content></level><level class="para1"><num>(b)</num><content><p>that it is reasonable to use force in the exercise of that power.</p></content></level></subsection><subsection><num>(4C)</num><content><p>The force that may be authorised by a warrant is limited to that which is reasonably necessary.</p></content></subsection><subsection><num>(4D)</num><content><p>A warrant authorising the person to use force must specify the number of occasions on which the person can rely on the warrant when entering land.</p></content></subsection><subsection eId="d25e2621"><num>(4E)</num><content><p>The number specified must be the number which the justice of the peace considers appropriate to achieve the purpose for which the entry is required.</p></content></subsection><subsection><num>(4F)</num><content><p>Any evidence in proceedings for a warrant must be given on oath.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-11-7"><num>(7)</num><content><p><mod>After subsection (8) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e2640"><num>(8A)</num><content><p>Section 4 of the Land Compensation Act 1961 (costs) applies to the determination of a question referred under subsection (8) as it applies to the determination of a question under section 1 of that Act, but as if references to the acquiring authority were references to the person from whom compensation is claimed.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-11-8"><num>(8)</num><intro><p>In paragraph 7 of Schedule 12 to the Planning Act 2008 (application of Act to Scotland: modifications of section 53)—</p></intro><level class="para1" eId="section-11-8-a"><num>(a)</num><content><p><mod>after paragraph (za) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(zb)</num><content><p>in subsections <ref href="#d25e2591">(4B)</ref> and <ref href="#d25e2621">(4E)</ref>, the references to a justice of the peace were references to a sheriff or summary sheriff,</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-11-8-b"><num>(b)</num><content><p>omit “and” at the end of paragraph (b);</p></content></level><level class="para1" eId="section-11-8-c"><num>(c)</num><content><p><mod>after paragraph (b) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(ba)</num><intro><p>in subsection <ref href="#d25e2640">(8A)</ref>—</p></intro><level class="para2"><num>(i)</num><content><p>the reference to section 4 of the Land Compensation Act 1961 were a reference to sections 9 and 11 of the Land Compensation (Scotland) Act 1963, and</p></content></level><level class="para2"><num>(ii)</num><content><p>the reference to section 1 of the Land Compensation Act 1961 were a reference to section 8 of the Land Compensation (Scotland) Act 1963, and</p></content></level></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></level></subsection><subsection eId="section-11-9"><num>(9)</num><intro><p>In the Localism Act 2011—</p></intro><level class="para1" eId="section-11-9-a"><num>(a)</num><content><p>omit section 136(4);</p></content></level><level class="para1" eId="section-11-9-b"><num>(b)</num><intro><p>in paragraph 12 of Schedule 13—</p></intro><level class="para2" eId="section-11-9-b-i"><num>(i)</num><content><p>in sub-paragraph (2), omit “and (2)”;</p></content></level><level class="para2" eId="section-11-9-b-ii"><num>(ii)</num><content><p>omit sub-paragraph (3).</p></content></level></level></subsection></section><section eId="section-12"><num>12</num><heading>Changes to, and revocation of, development consent orders</heading><subsection eId="section-12-1"><num>(1)</num><content><p>Schedule 6 to the Planning Act 2008 (changes to, and revocation of, orders granting development consent) is amended as set out in subsections <ref href="#section-12-2">(2)</ref> to <ref href="#section-12-4">(4)</ref>.</p></content></subsection><subsection eId="section-12-2"><num>(2)</num><content><p>Omit paragraph 2 (non-material changes to orders granting development consent) and the italic heading before it.</p></content></subsection><subsection eId="section-12-3"><num>(3)</num><intro><p>In paragraph 3 (changes to, and revocation of, orders)—</p></intro><level class="para1" eId="section-12-3-a"><num>(a)</num><content><p>in sub-paragraph (3)(b), omit “or paragraph 2 of this Schedule”;</p></content></level><level class="para1" eId="section-12-3-b"><num>(b)</num><content><p><mod>in sub-paragraph (5A), after “should” insert <quotedText>“, when considered in conjunction with any other changes already made,”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-12-4"><num>(4)</num><content><p><mod>In paragraph 4 (changes to, and revocation of, orders: supplementary), after sub-paragraph (6) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><subparagraph><num>(6A)</num><content><p>If a development consent order is changed in exercise of the power conferred by paragraph 3(1), the development consent order continues in force.</p></content></subparagraph><subparagraph><num>(6B)</num><intro><p>If a development consent order is changed or revoked in the exercise of the power conferred by paragraph 3(1), the change or revocation takes effect on—</p></intro><level class="para1"><num>(a)</num><content><p>the date on which the order making the change or revocation is made, or</p></content></level><level class="para1"><num>(b)</num><content><p>if the order specifies a date on which the change or revocation takes effect, the specified date.</p></content></level></subparagraph><subparagraph><num>(6C)</num><content><p>Except in a case within sub-paragraph (7), the Secretary of State must publish an order making a change to, or revoking, a development consent order in such manner as the Secretary of State thinks appropriate.</p></content></subparagraph></quotedStructure></mod></p></content></subsection><subsection eId="section-12-5"><num>(5)</num><intro><p>In section 118 of the Planning Act 2008 (legal challenges)—</p></intro><level class="para1" eId="section-12-5-a"><num>(a)</num><content><p>omit subsection (5);</p></content></level><level class="para1" eId="section-12-5-b"><num>(b)</num><content><p><mod>in subsection (6)(b), for “notice of the change or revocation” to the end substitute <quotedText>“the order making the change or revocation is published.”</quotedText></mod></p></content></level></subsection><subsection eId="section-12-6"><num>(6)</num><intro><p>In consequence of the amendment in subsection (2), omit—</p></intro><level class="para1" eId="section-12-6-a"><num>(a)</num><content><p>paragraph 4(6)(a) of Schedule 8 to the Marine and Coastal Access Act 2009,</p></content></level><level class="para1" eId="section-12-6-b"><num>(b)</num><content><p>paragraph 72(4) to (7) of Schedule 13 to the Localism Act 2011,</p></content></level><level class="para1" eId="section-12-6-c"><num>(c)</num><content><p>section 28(2) of the Infrastructure Act 2015,</p></content></level><level class="para1" eId="section-12-6-d"><num>(d)</num><content><p>paragraph 8(3)(b)(i) of Schedule 7 to the Wales Act 2017, and</p></content></level><level class="para1" eId="section-12-6-e"><num>(e)</num><content><p>section 128 of the Levelling-up and Regeneration Act 2023.</p></content></level></subsection></section><section eId="section-13"><num>13</num><heading>Planning Act 2008: legal challenges</heading><subsection eId="section-13-1"><num>(1)</num><content><p><mod>In the Senior Courts Act 1981, in subsection (1) of section 18 (restrictions on appeals to Court of Appeal), after paragraph (c) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(ca)</num><content><p>from a refusal of permission to apply for judicial review in a case within section 13 or 118 of the Planning Act 2008 (proceedings relating to national policy statements or development consent), if the High Court decides that the application for permission to apply for judicial review is totally without merit;</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-13-2"><num>(2)</num><intro><p>The power to make Civil Procedure Rules must be exercised so as to secure that Civil Procedure Rules include—</p></intro><level class="para1" eId="section-13-2-a"><num>(a)</num><content><p>provision requiring an application for permission to apply for judicial review in a case within section 13 or 118 of the Planning Act 2008 (proceedings relating to national policy statements or development consent) to be decided at an oral hearing;</p></content></level><level class="para1" eId="section-13-2-b"><num>(b)</num><content><p>provision that the court may, at the oral hearing of such an application, decide that the application is totally without merit.</p></content></level></subsection></section></chapter>
Part 1 — Infrastructure — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-2"><num>Chapter 2</num><heading>Electricity infrastructure</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-connections-to-the-electricity-transmission-and-distribution-systems"><heading>Connections to the electricity transmission and distribution systems</heading><section eId="section-14"><num>14</num><heading>Connections to electricity network: licence and other modifications</heading><subsection eId="section-14-1"><num>(1)</num><intro><p>A relevant authority may modify—</p></intro><level class="para1" eId="section-14-1-a"><num>(a)</num><content><p>the conditions of a particular electricity licence;</p></content></level><level class="para1" eId="section-14-1-b"><num>(b)</num><content><p>the terms of a particular electricity licence;</p></content></level><level class="para1" eId="section-14-1-c"><num>(c)</num><content><p>the standard conditions of electricity licences of a particular type;</p></content></level><level class="para1" eId="section-14-1-d"><num>(d)</num><content><p>a document maintained in accordance with the conditions of an electricity licence;</p></content></level><level class="para1" eId="section-14-1-e"><num>(e)</num><content><p>an agreement entered into in pursuance of a document maintained as mentioned in <ref href="#section-14-1-d">paragraph (d)</ref>;</p></content></level><level class="para1" eId="section-14-1-f"><num>(f)</num><content><p>a qualifying distribution agreement.</p></content></level></subsection><subsection eId="section-14-2"><num>(2)</num><content><p>A relevant authority may exercise the power under <ref href="#section-14-1">subsection (1)</ref> only for the purpose of improving the process for managing connections to the transmission system or the distribution system (and such an improvement may include changing the order in which connections are made).</p></content></subsection><subsection eId="section-14-3"><num>(3)</num><content><p>The Secretary of State may direct the GEMA to exercise the power under <ref href="#section-14-1">subsection (1)</ref>.</p></content></subsection><subsection eId="section-14-4"><num>(4)</num><content><p>The Secretary of State may exercise the power under <ref href="#section-14-3">subsection (3)</ref> only for the purpose mentioned in <ref href="#section-14-2">subsection (2)</ref>.</p></content></subsection><subsection eId="section-14-5"><num>(5)</num><content><p>The power conferred by <ref href="#section-14-1">subsection (1)</ref> may not be exercised after the end of the period of three years beginning with the day on which <ref href="#section-14">this section</ref> comes into force.</p></content></subsection><subsection eId="section-14-6"><num>(6)</num><content><p><ref eId="c00005" href="https://www.legislation.gov.uk/ukpga/1989/29/section/3A">Section 3A</ref> of the <ref eId="c00006" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (principal objective and general duties) applies in relation to the functions of the Secretary of State and the GEMA under <ref href="#section-14">this section</ref> and sections <ref href="#section-15">15</ref> to <ref href="#section-17">17</ref> as it applies in relation to functions of the Secretary of State or the GEMA under <ref eId="c00007" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of <ref eId="c00008" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">that Act</ref>.</p></content></subsection><subsection eId="section-14-7"><num>(7)</num><content><p>A relevant authority may under <ref href="#section-14-1">subsection (1)</ref> modify an agreement mentioned in <ref href="#section-14-1">subsection (1)</ref><ref href="#section-14-1-e">(e)</ref> or a qualifying distribution agreement even if the effect of the modification might amount to a repudiation of the agreement.</p></content></subsection><subsection eId="section-14-8"><num>(8)</num><intro><p>In <ref href="#section-14">this section</ref> and sections <ref href="#section-15">15</ref> to <ref href="#section-17">17</ref>—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-distribution-system" eId="term-distribution-system">distribution system</term>” has the same meaning as in <ref eId="c00009" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00010" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (see the definition of “distribute” in section 4(4) of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-electricity-distributor" eId="term-electricity-distributor">electricity distributor</term>” has the same meaning as in Part 1 of that Act (see section 6(9) of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-electricity-licence" eId="term-electricity-licence">electricity licence</term>” means a licence for the purposes of section 4 of that Act;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-gema" eId="term-the-gema">the GEMA</term>” means the Gas and Electricity Markets Authority;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-qualifying-distribution-agreement" eId="term-qualifying-distribution-agreement">qualifying distribution agreement</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>the terms subject to which a connection is made by an electricity distributor in pursuance of section 16(1) of the Electricity Act 1989, or</p></content></level><level class="para1"><num>(b)</num><content><p>a special connection agreement as defined by section 22(1) of that Act;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-relevant-authority" eId="term-relevant-authority">relevant authority</term>” means the Secretary of State or the GEMA;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-transmission-system" eId="term-transmission-system">transmission system</term>” has the same meaning as in <ref eId="c00011" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00012" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (see section 4(4) of that Act).</p></content></hcontainer></subsection></section><section eId="section-15"><num>15</num><heading>Scope of modification power under <ref href="#section-14">section 14</ref></heading><subsection eId="section-15-1"><num>(1)</num><content><p>The power conferred by <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> to “<term refersTo="#term-modify" eId="term-modify">modify</term>” includes power to amend, add to or remove (and, in particular, includes power to make a person a party to an agreement or to discharge a party from its obligations under an agreement); and references in <ref href="#section-14">section 14</ref>, <ref href="#section-15">this section</ref> and <ref href="#section-16">section 16</ref> to modification are to be construed accordingly.</p></content></subsection><subsection eId="section-15-2"><num>(2)</num><intro><p>The power conferred by <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref>—</p></intro><level class="para1" eId="section-15-2-a"><num>(a)</num><content><p>may be exercised generally, only in relation to specified cases, or subject to exceptions (including by making provision for a case to be excepted only so long as specified conditions are satisfied);</p></content></level><level class="para1" eId="section-15-2-b"><num>(b)</num><content><p>may be exercised differently for different purposes or areas;</p></content></level><level class="para1" eId="section-15-2-c"><num>(c)</num><content><p>includes power to make incidental, supplementary, consequential or transitional modifications.</p></content></level></subsection><subsection eId="section-15-3"><num>(3)</num><intro><p>Provision included in an electricity licence by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-a">(a)</ref> or <ref href="#section-14-1-c">(c)</ref>—</p></intro><level class="para1" eId="section-15-3-a"><num>(a)</num><content><p>may include provision of a kind mentioned in <ref eId="c00013" href="https://www.legislation.gov.uk/ukpga/1989/29/section/7">section 7</ref> of the <ref eId="c00014" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref>;</p></content></level><level class="para1" eId="section-15-3-b"><num>(b)</num><content><p>need not relate to the activities authorised by the licence.</p></content></level></subsection><subsection eId="section-15-4"><num>(4)</num><content><p>The modification under <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> of part of a standard condition of an electricity licence does not prevent any other part of the condition from continuing to be regarded as a standard condition for the purposes of <ref eId="c00015" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00016" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref>.</p></content></subsection><subsection eId="section-15-5"><num>(5)</num><content><p>If under <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> a relevant authority modifies the standard conditions of an electricity licence of a particular type, the GEMA must make the same modifications of those standard conditions for the purposes of their incorporation in electricity licences of that type granted after that time.</p></content></subsection><subsection eId="section-15-6"><num>(6)</num><content><p>Provision included in an electricity licence by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-b">(b)</ref> may in particular include provision about the circumstances in which the licence may be revoked or suspended.</p></content></subsection><subsection eId="section-15-7"><num>(7)</num><intro><p>Provision included in an agreement by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-e">(e)</ref> or <ref href="#section-14-1-f">(f)</ref> may in particular include provision—</p></intro><level class="para1" eId="section-15-7-a"><num>(a)</num><content><p>requiring specified conditions to be met before the taking of particular steps under the agreement;</p></content></level><level class="para1" eId="section-15-7-b"><num>(b)</num><content><p>about the procedure for varying the agreement.</p></content></level></subsection><subsection eId="section-15-8"><num>(8)</num><intro><p>In <ref eId="c00017" href="https://www.legislation.gov.uk/ukpga/2000/27/section/33">section 33</ref> of the <ref eId="c00018" href="https://www.legislation.gov.uk/ukpga/2000/27/contents">Utilities Act 2000</ref> (standard conditions of electricity licences), in <ref eId="c00019" href="https://www.legislation.gov.uk/ukpga/2000/27/section/33">subsection (1)</ref>—</p></intro><level class="para1" eId="section-15-8-a"><num>(a)</num><content><p>omit the “or” at the end of paragraph (k), and</p></content></level><level class="para1" eId="section-15-8-b"><num>(b)</num><content><p><mod>at the end insert <quotedText startQuote="&#x201C;">, or</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(m)</num><content><p>under <ref href="#section-14">section 14</ref> of the Planning and Infrastructure Act 2025.</p></content></level></quotedStructure></mod></p></content></level></subsection></section><section eId="section-16"><num>16</num><heading>Procedure relating to modifications under <ref href="#section-14">section 14</ref></heading><subsection eId="section-16-1"><num>(1)</num><intro><p>Before making a modification under <ref href="#section-14">section 14</ref>, a relevant authority must consult—</p></intro><level class="para1" eId="section-16-1-a"><num>(a)</num><content><p>the holder of any electricity licence proposed to be modified,</p></content></level><level class="para1" eId="section-16-1-b"><num>(b)</num><content><p>the Independent System Operator and Planner,</p></content></level><level class="para1" eId="section-16-1-c"><num>(c)</num><content><p>the GEMA or the Secretary of State (depending on which relevant authority is proposing to make the modification), and</p></content></level><level class="para1" eId="section-16-1-d"><num>(d)</num><content><p>such other persons as the relevant authority considers appropriate.</p></content></level></subsection><subsection eId="section-16-2"><num>(2)</num><content><p>Subsection <ref href="#section-16-1">(1)</ref> may be satisfied by consultation carried out before the passing of this Act (as well as by consultation carried out after that time).</p></content></subsection><subsection eId="section-16-3"><num>(3)</num><content><p>A relevant authority must publish details of any modifications made by it under <ref href="#section-14">section 14</ref> as soon as reasonably practicable after they are made.</p></content></subsection><subsection eId="section-16-4"><num>(4)</num><content><p>A relevant authority may exclude from publication under <ref href="#section-16-3">subsection (3)</ref> any information the publication of which would be likely to prejudice the commercial interests of any person.</p></content></subsection><subsection eId="section-16-5"><num>(5)</num><content><p>In <ref href="#section-16">this section</ref>, “<term refersTo="#term-the-independent-system-operator-and-planner" eId="term-the-independent-system-operator-and-planner">the Independent System Operator and Planner</term>” means the person for the time being designated under <ref eId="c00020" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">section 162</ref><ref eId="c00021" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">(1)</ref> of the <ref eId="c00022" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref>.</p></content></subsection></section><section eId="section-17"><num>17</num><heading>Directions to modify connection agreements</heading><subsection eId="section-17-1"><num>(1)</num><intro><p>A relevant authority may—</p></intro><level class="para1" eId="section-17-1-a"><num>(a)</num><content><p>direct the Independent System Operator and Planner (“the ISOP”) to modify an agreement entered into by the ISOP pursuant to a document maintained in accordance with the conditions of an electricity licence;</p></content></level><level class="para1" eId="section-17-1-b"><num>(b)</num><content><p>direct an electricity distributor to modify a qualifying distribution agreement entered into by the electricity distributor.</p></content></level></subsection><subsection eId="section-17-2"><num>(2)</num><content><p>A relevant authority may exercise the power conferred by <ref href="#section-17-1">subsection (1)</ref> only for the purpose of improving the process for managing connections to the transmission system or the distribution system (and such an improvement may include changing the order in which connections are made).</p></content></subsection><subsection eId="section-17-3"><num>(3)</num><content><p>A direction under subsection <ref href="#section-17-1">(1)</ref> must describe the kinds of modification to be made by the person to whom it is given.</p></content></subsection><subsection eId="section-17-4"><num>(4)</num><intro><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may also require the person to whom it is given to modify an agreement by including in it provision—</p></intro><level class="para1" eId="section-17-4-a"><num>(a)</num><content><p>requiring specified conditions to be met before the taking of particular steps under the agreement;</p></content></level><level class="para1" eId="section-17-4-b"><num>(b)</num><content><p>about the procedure for varying the agreement.</p></content></level></subsection><subsection eId="section-17-5"><num>(5)</num><content><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may be expressed as having effect generally, in relation to cases within a description specified in the direction, or in relation to a particular case.</p></content></subsection><subsection eId="section-17-6"><num>(6)</num><intro><p>Before giving a direction under subsection <ref href="#section-17-1">(1)</ref>, the relevant authority must consult—</p></intro><level class="para1" eId="section-17-6-a"><num>(a)</num><content><p>the person to whom it proposes to give the direction, and</p></content></level><level class="para1" eId="section-17-6-b"><num>(b)</num><content><p>such other persons as the relevant authority considers appropriate.</p></content></level></subsection><subsection eId="section-17-7"><num>(7)</num><content><p>Subsection <ref href="#section-17-6">(6)</ref> may be satisfied by consultation carried out before the passing of this Act (as well as by consultation carried out after that time).</p></content></subsection><subsection eId="section-17-8"><num>(8)</num><content><p>A relevant authority must publish details of any direction it gives under subsection <ref href="#section-17-1">(1)</ref> as soon as reasonably practicable after the direction is given.</p></content></subsection><subsection eId="section-17-9"><num>(9)</num><content><p>A relevant authority may exclude from publication under subsection <ref href="#section-17-8">(8)</ref> any information the publication of which would be likely to prejudice the commercial interests of any person.</p></content></subsection><subsection eId="section-17-10"><num>(10)</num><content><p>A person to whom a direction is given under <ref href="#section-17-1">subsection (1)</ref> must comply with it, even if the effect of a modification made to an agreement as a result of the direction might amount to a repudiation of the agreement.</p></content></subsection><subsection eId="section-17-11"><num>(11)</num><content><p>The power to give a direction under subsection <ref href="#section-17-1">(1)</ref> may not be exercised after the end of the period of three years beginning with the day on which this section comes into force.</p></content></subsection><subsection eId="section-17-12"><num>(12)</num><content><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may be varied or revoked by a subsequent direction given by a relevant authority.</p></content></subsection><subsection eId="section-17-13"><num>(13)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-the-independent-system-operator-and-planner" eId="term-the-independent-system-operator-and-planner">the Independent System Operator and Planner</term>” means the person for the time being designated under <ref eId="c00023" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">section 162</ref><ref eId="c00024" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">(1)</ref> of the <ref eId="c00025" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref>;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-modify" eId="term-modify">modify</term>” includes amend, add to and remove (and, in particular, includes making a person a party to an agreement and discharging a party from its obligations under an agreement).</p></content></hcontainer></subsection><subsection eId="section-17-14"><num>(14)</num><intro><p>In Schedule 6A to the Electricity Act 1989 (provisions imposing obligations enforceable as relevant requirements)—</p></intro><level class="para1" eId="section-17-14-a"><num>(a)</num><content><p><mod>in paragraph 4A (electricity system operator), after sub-paragraph (c) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><level class="para1"><num>(d)</num><content><p>section <ref href="#section-17">17</ref><ref href="#section-17-10">(10)</ref> of the Planning and Infrastructure Act 2025 (duty to comply with direction under <ref href="#section-17">section 17</ref> of that Act).</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-17-14-b"><num>(b)</num><content><p><mod>in paragraph 5 (distribution licence holders), after sub-paragraph (g) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><level class="para1"><num>(h)</num><content><p>section <ref href="#section-17">17</ref><ref href="#section-17-10">(10)</ref> of the Planning and Infrastructure Act 2025 (duty to comply with direction under <ref href="#section-17">section 17</ref> of that Act).</p></content></level></quotedStructure></mod></p></content></level></subsection></section><section eId="section-18"><num>18</num><heading>Managing connections to the network: strategic plans etc</heading><subsection eId="section-18-1"><num>(1)</num><content><p><mod>In <ref eId="c00026" href="https://www.legislation.gov.uk/ukpga/2023/52/part/5">Part 5</ref> of the <ref eId="c00027" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref> (Independent System Operator and Planner), after <ref eId="c00028" href="https://www.legislation.gov.uk/ukpga/2023/52/section/165">section 165</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e3701"><num>165A</num><heading>Functions relating to network connections: duty to have regard to designated plans</heading><subsection eId="d25e3705"><num>(1)</num><content><p>The ISOP must, when carrying out any of its functions relating to the management of connections to the transmission system, have regard to the designated strategic plans.</p></content></subsection><subsection eId="d25e3711"><num>(2)</num><content><p>The Secretary of State may by regulations designate plans or documents for the purposes of this section.</p></content></subsection><subsection><num>(3)</num><content><p>In <ref href="#d25e3705">subsection (1)</ref>, the reference to “<term refersTo="#term-the-designated-strategic-plans">the designated strategic plans</term>” is a reference to those plans or documents designated by regulations under <ref href="#d25e3711">subsection (2)</ref> as they have effect at the time when the regulations are made.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-18-2"><num>(2)</num><content><p><ref eId="c00029" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00030" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (electricity supply) is amended as set out in <span><ref href="#section-18-3">subsections (3)</ref> to <ref href="#section-18-5">(5)</ref></span>.</p></content></subsection><subsection eId="section-18-3"><num>(3)</num><intro><p>In <ref eId="c00031" href="https://www.legislation.gov.uk/ukpga/1989/29/section/16">section 16</ref> (duty to connect on request)—</p></intro><level class="para1" eId="section-18-3-a"><num>(a)</num><content><p><mod>after <ref eId="c00032" href="https://www.legislation.gov.uk/ukpga/1989/29/section/16">subsection (2)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(2A)</num><content><p>In deciding how to comply with the duties under this section, and in particular in deciding how to prioritise persons requiring a connection, an electricity distributor must have regard to the designated strategic plans.</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-18-3-b"><num>(b)</num><content><p><mod>at the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(6)</num><content><p>In this section, “<term refersTo="#term-the-designated-strategic-plans">the designated strategic plans</term>” means the plans or documents designated by regulations made under section <ref href="#d25e3701">165A</ref><ref href="#d25e3711">(2)</ref> of the Energy Act 2023 (functions of the Independent System Operator and Planner relating to network connections).</p></content></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-18-4"><num>(4)</num><intro><p>In <ref eId="c00033" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">section 17</ref> (exceptions from duty to connect), in <ref eId="c00034" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">subsection (1)</ref>—</p></intro><level class="para1" eId="section-18-4-a"><num>(a)</num><content><p>omit the “or” at the end of <ref eId="c00035" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">paragraph (b)</ref>;</p></content></level><level class="para1" eId="section-18-4-b"><num>(b)</num><content><p><mod>after <ref eId="c00036" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">paragraph (b)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(ba)</num><content><p>it would not be in accordance with the designated strategic plans (within the meaning of section 16) for the distributor to do so; or</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></level></subsection><subsection eId="section-18-5"><num>(5)</num><content><p><mod>In <ref eId="c00037" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A">Schedule 6A</ref> (provisions imposing obligations enforceable as relevant requirements), in <ref eId="c00038" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A/paragraph/4A">paragraph 4A</ref> (electricity system operator), in <ref eId="c00039" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A/paragraph/4A">paragraph (c)</ref>, for “165” substitute <quotedText>“<ref href="#d25e3701">165A</ref>”</quotedText>.</mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-consents-for-electricity-infrastructure-in-scotland"><heading>Consents for electricity infrastructure in Scotland</heading><section eId="section-19"><num>19</num><heading>Consents for generating stations and overhead lines: applications</heading><subsection eId="section-19-1"><num>(1)</num><content><p>Schedule 8 to the Electricity Act 1989 (consents of the Secretary of State and the Scottish Ministers under sections 36 and 37) is amended as follows.</p></content></subsection><subsection eId="section-19-2"><num>(2)</num><content><p><mod>After paragraph 1 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Applications made to the Scottish Ministers for consent</heading><paragraph eId="d25e3890" class="schProv1"><num>1A</num><subparagraph><num>(1)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations make provision about the following matters in relation to applications to the Scottish Ministers for consent under section 36 or 37.</p></content></subparagraph><subparagraph eId="d25e3900"><num>(2)</num><intro><p>The matters are—</p></intro><level class="para1" eId="d25e3906"><num>(a)</num><content><p>the steps a person must take before making an application;</p></content></level><level class="para1"><num>(b)</num><content><p>the information that must be included in an application;</p></content></level><level class="para1" eId="d25e3918"><num>(c)</num><content><p>an acceptance stage, during which the Scottish Ministers must assess an applicant’s compliance with any requirements imposed by the regulations in order to decide whether or not to accept the application;</p></content></level><level class="para1"><num>(d)</num><intro><p>fees to be paid to the Scottish Ministers—</p></intro><level class="para2"><num>(i)</num><content><p>on application, or</p></content></level><level class="para2"><num>(ii)</num><content><p>for anything done by them in relation to a proposed application;</p></content></level></level><level class="para1"><num>(e)</num><content><p>requests by the Scottish Ministers for additional information to aid their decision whether or not to accept an application or to grant consent.</p></content></level></subparagraph><subparagraph eId="d25e3948"><num>(3)</num><intro><p>The steps that may be the subject of provision made by virtue of sub-paragraph (2)(a) include—</p></intro><level class="para1"><num>(a)</num><content><p>notifying prescribed persons of the proposed application,</p></content></level><level class="para1"><num>(b)</num><content><p>publicising the proposed application, and</p></content></level><level class="para1" eId="d25e3966"><num>(c)</num><content><p>carrying out a consultation about the proposed application.</p></content></level></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-3"><num>(3)</num><intro><p>In paragraph 2 (objections by relevant planning authority)—</p></intro><level class="para1" eId="section-19-3-a"><num>(a)</num><content><p><mod>in sub-paragraph (1), for “Secretary of State for his” substitute <quotedText>“appropriate authority for a”</quotedText>;</mod></p></content></level><level class="para1" eId="section-19-3-b"><num>(b)</num><content><p><mod>in sub-paragraph (2), at the beginning insert <quotedText>“In the case of an application made to the Secretary of State,”</quotedText>;</mod></p></content></level><level class="para1" eId="section-19-3-c"><num>(c)</num><content><p><mod>after sub-paragraph (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><subparagraph><num>(2A)</num><intro><p>In the case of an application made to the Scottish Ministers, where the relevant planning authority notify the Scottish Ministers that they object to the application and their objection is not withdrawn, the Scottish Ministers—</p></intro><level class="para1"><num>(a)</num><content><p>must appoint a person (referred to in this Schedule as the “<term refersTo="#term-reporter">reporter</term>”) to examine the application, and</p></content></level><level class="para1"><num>(b)</num><content><p>before determining whether to give their consent, must consider the objection and the reporter’s final report.</p></content></level><wrapUp><p>See paragraph 2A for the process that must be followed by the reporter.</p></wrapUp></subparagraph></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-19-3-d"><num>(d)</num><intro><p>in sub-paragraph (4)—</p></intro><level class="para2" eId="section-19-3-d-i"><num>(i)</num><content><p><mod>after “(2)” insert <quotedText>“or (2A)”</quotedText>;</mod></p></content></level><level class="para2" eId="section-19-3-d-ii"><num>(ii)</num><content><p><mod>for “Secretary of State” substitute <quotedText>“appropriate authority”</quotedText>;</mod></p></content></level></level><level class="para1" eId="section-19-3-e"><num>(e)</num><content><p><mod>in sub-paragraph (5), for “Secretary of State” substitute <quotedText>“appropriate authority”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-19-4"><num>(4)</num><content><p><mod>After paragraph 2 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Procedure following objection by relevant planning authority: Scotland</heading><paragraph eId="d25e4075" class="schProv1"><num>2A</num><subparagraph><num>(1)</num><content><p>A reporter appointed under paragraph 2(2A)(a) must make proposals as regards the appropriate procedure for examining the application.</p></content></subparagraph><subparagraph eId="d25e4085"><num>(2)</num><intro><p>The appropriate procedure may consist of one or more of the following—</p></intro><level class="para1"><num>(a)</num><intro><p>considering—</p></intro><level class="para2"><num>(i)</num><content><p>the objection by the relevant planning authority,</p></content></level><level class="para2"><num>(ii)</num><content><p>any other objections made in accordance with regulations under paragraph 3(1)(c), and</p></content></level><level class="para2"><num>(iii)</num><content><p>any other representations made in accordance with an enactment;</p></content></level></level><level class="para1" eId="d25e4115"><num>(b)</num><content><p>considering new written representations about the application from persons specified by the reporter;</p></content></level><level class="para1" eId="d25e4121"><num>(c)</num><content><p>holding one or more hearing sessions;</p></content></level><level class="para1"><num>(d)</num><content><p>carrying out an inspection of the land to which the application relates;</p></content></level><level class="para1" eId="d25e4133"><num>(e)</num><content><p>holding a public inquiry.</p></content></level></subparagraph><subparagraph eId="d25e4139"><num>(3)</num><content><p>Where the reporter proposes a procedure that includes proceedings within sub-paragraph (2)(b), (c) or (e), the proposal must include a statement of the issues that are proposed to be within the scope of each of those proceedings.</p></content></subparagraph><subparagraph><num>(4)</num><intro><p>The reporter must—</p></intro><level class="para1"><num>(a)</num><content><p>publish the proposals,</p></content></level><level class="para1"><num>(b)</num><content><p>notify all interested parties of the proposals, and</p></content></level><level class="para1"><num>(c)</num><content><p>invite written representations about the proposals before the end of the time period specified by the reporter.</p></content></level></subparagraph><subparagraph><num>(5)</num><content><p>The published proposals must include or be accompanied by an explanation of the reasons for the proposals.</p></content></subparagraph><subparagraph><num>(6)</num><content><p>The reporter may hold a meeting to hear representations about the proposals.</p></content></subparagraph><subparagraph><num>(7)</num><intro><p>After considering the representations, the reporter must—</p></intro><level class="para1"><num>(a)</num><content><p>decide on the appropriate procedure for examining the application, and</p></content></level><level class="para1"><num>(b)</num><content><p>publish that decision.</p></content></level></subparagraph><subparagraph><num>(8)</num><intro><p>The published decision must include or be accompanied by an explanation of—</p></intro><level class="para1"><num>(a)</num><content><p>the reasons for the decision,</p></content></level><level class="para1"><num>(b)</num><content><p>the intended time period for the carrying out of the procedure, and</p></content></level><level class="para1"><num>(c)</num><content><p>the intended time period within which the reporter will send a final report to the Scottish Ministers.</p></content></level></subparagraph><subparagraph><num>(9)</num><content><p>Sub-paragraph (3) applies to the reporter’s decision as it applies to the reporter’s proposals.</p></content></subparagraph><subparagraph><num>(10)</num><content><p>On completing the examination, the reporter must prepare and send to the Scottish Ministers a final report setting out the reporter’s recommendations on the application.</p></content></subparagraph><subparagraph><num>(11)</num><intro><p>In this paragraph, “<term refersTo="#term-interested-party">interested party</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>the applicant,</p></content></level><level class="para1"><num>(b)</num><content><p>the relevant planning authority which made the objection under paragraph 2(2A),</p></content></level><level class="para1"><num>(c)</num><content><p>any person who has made an objection in accordance with regulations under paragraph 3, or</p></content></level><level class="para1"><num>(d)</num><content><p>any person who has made representations in accordance with any other enactment.</p></content></level></subparagraph><subparagraph><num>(12)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations make provision amending or setting out further detail about the procedure set out in this paragraph. (See also paragraph 7B(2)(e).)</p></content></subparagraph><subparagraph><num>(13)</num><content><p>A statutory instrument containing regulations under this paragraph is not to be made by the Secretary of State unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subparagraph><subparagraph><num>(14)</num><content><p>Regulations made by the Scottish Ministers under this paragraph are subject to the affirmative procedure.</p></content></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-5"><num>(5)</num><content><p><mod>After paragraph 7A insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Applications to the Scottish Ministers: time limits</heading><paragraph eId="d25e4298" class="schProv1"><num>7B</num><subparagraph><num>(1)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations specify a time limit for actions that may or must be taken in relation to an application to the Scottish Ministers for consent under section 36 or 37.</p></content></subparagraph><subparagraph eId="d25e4308"><num>(2)</num><intro><p>The regulations may, for example, specify a time limit for—</p></intro><level class="para1"><num>(a)</num><content><p>a person to comply with a requirement of regulations under paragraph 1A;</p></content></level><level class="para1"><num>(b)</num><content><p>a person to respond to a pre-application consultation (see paragraph 1A(3)(c));</p></content></level><level class="para1"><num>(c)</num><content><p>a person who is notified of an application in accordance with an enactment to provide their opinion or advice on the application;</p></content></level><level class="para1"><num>(d)</num><content><p>a relevant planning authority to object to an application under paragraph 2(2A);</p></content></level><level class="para1" eId="d25e4338"><num>(e)</num><content><p>a reporter to take any steps required by paragraph 2A;</p></content></level><level class="para1"><num>(f)</num><content><p>the Scottish Ministers to decide an application.</p></content></level></subparagraph><subparagraph><num>(3)</num><content><p>The regulations may include provision about the consequences of failure to comply with a time limit.</p></content></subparagraph><subparagraph><num>(4)</num><content><p>Where regulations under this paragraph specify a time limit for the completion of an acceptance stage (see paragraph 1A(2)(c)), the regulations may not permit the extension of that limit.</p></content></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-6"><num>(6)</num><content><p>The amendments made by subsection (3) do not affect the continued application in relation to the Scottish Ministers of regulations made under paragraph 2(3) of Schedule 8 to the Electricity Act 1989 before this section comes into force.</p></content></subsection></section><section eId="section-20"><num>20</num><heading>Variation of consents etc</heading><content><p><mod>After section 37 of the Electricity Act 1989 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e4384"><num>37A</num><heading>Application for variation of section 37 consent: Scotland</heading><subsection><num>(1)</num><content><p>The person for the time being entitled to the benefit of a section 37 consent that was granted by the Scottish Ministers may make an application to the Scottish Ministers for the consent to be varied.</p></content></subsection><subsection><num>(2)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about variation under this section, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the making and withdrawal of applications;</p></content></level><level class="para1"><num>(b)</num><content><p>fees;</p></content></level><level class="para1"><num>(c)</num><content><p>publicity and consultation requirements;</p></content></level><level class="para1"><num>(d)</num><content><p>rights to make representations;</p></content></level><level class="para1"><num>(e)</num><content><p>public inquiries;</p></content></level><level class="para1"><num>(f)</num><content><p>consideration of applications.</p></content></level></subsection><subsection><num>(3)</num><content><p>The regulations may provide for any statutory provision applicable to the grant by the Scottish Ministers of a section 37 consent to apply with specified modifications to the variation of a section 37 consent under this section.</p></content></subsection><subsection><num>(4)</num><intro><p>On an application for a section 37 consent to be varied, the Scottish Ministers may make such variations to the consent as appear to them to be appropriate, having regard (in particular) to—</p></intro><level class="para1"><num>(a)</num><content><p>the applicant’s reason for seeking the variation;</p></content></level><level class="para1"><num>(b)</num><content><p>the variations proposed;</p></content></level><level class="para1"><num>(c)</num><content><p>any objections made to the proposed variations, the views of consultees and the outcome of any public inquiry.</p></content></level></subsection><subsection><num>(5)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-section-37-consent">section 37 consent</term>” means a consent granted under section 37 (consent required for overhead lines);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-statutory-provision">statutory provision</term>” means a provision of or made under an Act, whenever passed or made; and for this purpose “<term refersTo="#term-act">Act</term>” includes an Act of the Scottish Parliament.</p></content></hcontainer></subsection></section><section eId="d25e4493"><num>37B</num><heading>Variation of section 36 and 37 consents on change of circumstances: Scotland</heading><subsection><num>(1)</num><intro><p>The Scottish Ministers may vary a consent under section 36 or 37 if—</p></intro><level class="para1"><num>(a)</num><intro><p>they consider that the consent ought to be varied—</p></intro><level class="para2"><num>(i)</num><content><p>because of a change in circumstances relating to the environment, or</p></content></level><level class="para2"><num>(ii)</num><content><p>because of technological changes, and</p></content></level></level><level class="para1"><num>(b)</num><content><p>the person for the time being entitled to the benefit of the consent agrees to the variation.</p></content></level></subsection><subsection><num>(2)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about variation under this section, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the procedure for getting agreement;</p></content></level><level class="para1"><num>(b)</num><content><p>publicity, notification and consultation requirements;</p></content></level><level class="para1"><num>(c)</num><content><p>rights to make representations.</p></content></level></subsection><subsection><num>(3)</num><content><p>The regulations may provide for any statutory provision applicable to the grant by the Scottish Ministers of a consent under section 36 or 37 to apply with specified modifications to the variation of such a consent under this section.</p></content></subsection><subsection><num>(4)</num><content><p>In this section, “<term refersTo="#term-statutory-provision">statutory provision</term>” has the same meaning as in section <ref href="#d25e4384">37A</ref>.</p></content></subsection></section><section eId="d25e4572"><num>37C</num><heading>Correction of errors in consent documents: Scotland</heading><subsection eId="d25e4576"><num>(1)</num><content><p>The Scottish Ministers may amend a decision document in order to correct a correctable error.</p></content></subsection><subsection><num>(2)</num><intro><p>In <ref href="#d25e4576">subsection (1)</ref>—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-correctable-error">correctable error</term>” means an error or omission which—</p></intro><level class="para1"><num>(a)</num><content><p>is in a part of the decision document which records the decision, and</p></content></level><level class="para1"><num>(b)</num><content><p>is not part of the statement of reasons for the decision;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-decision-document">decision document</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a document recording a consent under section 36 or 37, or</p></content></level><level class="para1"><num>(b)</num><content><p>a document recording a variation of such a consent.</p></content></level></hcontainer></subsection><subsection><num>(3)</num><content><p>The Scottish Ministers may exercise the power in <ref href="#d25e4576">subsection (1)</ref> either of their own accord or following a written request from a person for the time being entitled to the benefit of the consent.</p></content></subsection><subsection><num>(4)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about the process for corrections, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the making of written requests;</p></content></level><level class="para1"><num>(b)</num><content><p>notification requirements;</p></content></level><level class="para1"><num>(c)</num><content><p>rights to make representations.</p></content></level></subsection></section></quotedStructure></mod></p></content></section><section eId="section-21"><num>21</num><heading>Proceedings for questioning certain decisions on consents</heading><subsection eId="section-21-1"><num>(1)</num><content><p>Section 36D of the Electricity Act 1989 (proceedings for questioning certain decisions under section 36) is amended as set out in subsections <ref href="#section-21-2">(2)</ref> to <ref href="#section-21-4">(4)</ref>.</p></content></subsection><subsection eId="section-21-2"><num>(2)</num><content><p><mod>For subsection (3) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(3)</num><intro><p>This section applies to a decision under any of the following—</p></intro><level class="para1"><num>(a)</num><content><p>section 36 (application for consent for generating station);</p></content></level><level class="para1"><num>(b)</num><content><p>section 36C (application for variation of section 36 consent);</p></content></level><level class="para1"><num>(c)</num><content><p>section 37 (application for consent for overhead lines);</p></content></level><level class="para1"><num>(d)</num><content><p>section <ref href="#d25e4384">37A</ref> (application for variation of section 37 consent);</p></content></level><level class="para1"><num>(e)</num><content><p>section <ref href="#d25e4493">37B</ref> (variation of consents by Scottish Ministers);</p></content></level><level class="para1"><num>(f)</num><content><p>section 37C (consents and variation of consents in Scotland: correction of errors).</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-21-3"><num>(3)</num><content><p><mod>In subsection (4), for “taken” substitute <quotedText>“published by the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-4"><num>(4)</num><content><p><mod>In the heading, for “under section 36” substitute <quotedText>“of the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-5"><num>(5)</num><content><p><mod>In Schedule 8 to the Electricity Act 1989, in paragraph 5B (proceedings for questioning certain decisions under paragraph 3(2)), in sub-paragraph (4), for “taken” substitute <quotedText>“published by the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-6"><num>(6)</num><content><p><mod>In section 237 of the Town and Country Planning (Scotland) Act 1997 (challenges to validity of development plans and certain orders, decisions and directions), in subsection (3), after paragraph (b) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(ba)</num><content><p>any decision to give a direction under section 57(2) or (2ZA);</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-21-7"><num>(7)</num><content><p>The amendments made by this section apply only in relation to decisions made on or after the date on which this section comes into force.</p></content></subsection></section><section eId="section-22"><num>22</num><heading>Applications for necessary wayleaves: fees</heading><content><p><mod>In Schedule 4 to the Electricity Act 1989 (other powers etc of licence holders), after paragraph 6 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Fees for applications under paragraph 6(3) to the Scottish Ministers</heading><paragraph eId="d25e4794" class="schProv1"><num>6A</num><content><p>The Scottish Ministers may by regulations make provision about the fees to be paid to the Scottish Ministers in relation to an application made to them under paragraph 6(3).</p></content></paragraph></hcontainer></quotedStructure></mod></p></content></section><section eId="section-23"><num>23</num><heading>Regulations</heading><subsection eId="section-23-1"><num>(1)</num><content><p><ref eId="c00040" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">Section 106</ref> of the <ref eId="c00041" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (regulations and orders) is amended as follows.</p></content></subsection><subsection eId="section-23-2"><num>(2)</num><intro><p>In <ref eId="c00042" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">subsection (1ZA)</ref>—</p></intro><level class="para1" eId="section-23-2-a"><num>(a)</num><content><p><mod>for “the power conferred on” substitute <quotedText>“a power of”</quotedText>;</mod></p></content></level><level class="para1" eId="section-23-2-b"><num>(b)</num><content><p><mod>for “by section 36C” substitute <quotedText>“to make regulations (see section 27 of the Interpretation and Legislative Reform (Scotland) Act 2010 (Scottish statutory instruments))”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-23-3"><num>(3)</num><content><p><mod>After subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e4853"><num>(2ZA)</num><intro><p>Subsection (2) does not apply to a statutory instrument containing (whether alone or with other provision)—</p></intro><level class="para1" eId="d25e4859"><num>(a)</num><content><p>regulations under paragraph <ref href="#d25e4075">2A</ref> of Schedule 8;</p></content></level></subsection></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-23-4"><num>(4)</num><content><p><mod>In <ref eId="c00043" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">subsection (3)</ref>, for the words after “under” substitute <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>section 36C,</p></content></level><level class="para1"><num>(b)</num><content><p>section <ref href="#d25e4384">37A</ref>,</p></content></level><level class="para1"><num>(c)</num><content><p>section <ref href="#d25e4493">37B</ref>,</p></content></level><level class="para1"><num>(d)</num><content><p>section <ref href="#d25e4572">37C</ref>,</p></content></level><level class="para1"><num>(e)</num><content><p>paragraph <ref href="#d25e4794">6A</ref> of Schedule 4, or</p></content></level><level class="para1"><num>(f)</num><content><p>any paragraph of Schedule 8 except paragraph <ref href="#d25e4075">2A</ref>,</p></content></level><p>are subject to the negative procedure.</p></quotedStructure></mod></p></content></subsection><subsection eId="section-23-5"><num>(5)</num><content><p><mod>At the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(4)</num><content><p>Before making regulations under a provision listed in subsection <ref href="#d25e4960">(6)</ref>, the Secretary of State must consult the Scottish Ministers.</p></content></subsection><subsection><num>(5)</num><content><p>Before making regulations under a provision listed in subsection <ref href="#d25e4960">(6)</ref>, the Scottish Ministers must consult the Secretary of State.</p></content></subsection><subsection eId="d25e4960"><num>(6)</num><intro><p>The provisions are—</p></intro><level class="para1"><num>(a)</num><content><p>section <ref href="#d25e4384">37A</ref>;</p></content></level><level class="para1"><num>(b)</num><content><p>section <ref href="#d25e4493">37B</ref>;</p></content></level><level class="para1"><num>(c)</num><content><p>section <ref href="#d25e4572">37C</ref>;</p></content></level><level class="para1"><num>(d)</num><content><p>paragraphs <ref href="#d25e3890">1A</ref>, <ref href="#d25e4075">2A</ref> and <ref href="#d25e4298">7B</ref> of Schedule 8.</p></content></level></subsection></quotedStructure></mod></p></content></subsection></section><section eId="section-24"><num>24</num><heading><span><ref href="#section-19">Sections 19</ref> to <ref href="#section-23">23</ref></span>: minor and consequential amendments</heading><intro><p><ref href="#schedule-1">Schedule 1</ref> makes—</p></intro><level class="para1" eId="section-24-a"><num>(a)</num><content><p>amendments to the <ref eId="c00044" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> that are consequential on the amendments made by sections <ref href="#section-19">19</ref> to <ref href="#section-23">23</ref>, and</p></content></level><level class="para1" eId="section-24-b"><num>(b)</num><content><p>other minor amendments relating to consents for electricity infrastructure in Scotland (including amendments to reflect previous transfers of functions to the Scottish Ministers).</p></content></level></section><section eId="section-25"><num>25</num><heading>Environmental impact assessments for electricity works</heading><subsection eId="section-25-1"><num>(1)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations amend the Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 2017 (<ref eId="c00045" href="http://www.legislation.gov.uk/id/ssi/2017/101">S.S.I. 2017/101</ref>) (the “<term refersTo="#term-2017-regulations" eId="term-2017-regulations">2017 Regulations</term>”) by making provision described in subsection <ref href="#section-25-2">(2)</ref> in connection with environmental impact assessments and applications made to the Scottish Ministers for—</p></intro><level class="para1" eId="section-25-1-a"><num>(a)</num><content><p>consent granted under section 36 or 37 of the Electricity Act 1989 (consent for construction etc of generating stations or for overhead lines), or</p></content></level><level class="para1" eId="section-25-1-b"><num>(b)</num><content><p>variation of consent granted under section 36 of that Act.</p></content></level></subsection><subsection eId="section-25-2"><num>(2)</num><intro><p>That provision is—</p></intro><level class="para1" eId="section-25-2-a"><num>(a)</num><content><p>provision for the Scottish Ministers to refuse an application in respect of Schedule 2 development that is not accompanied by an EIA report if the development has not been the subject of a screening opinion;</p></content></level><level class="para1" eId="section-25-2-b"><num>(b)</num><content><p>provision for the Scottish Ministers to charge developers fees for screening opinions and scoping opinions;</p></content></level><level class="para1" eId="section-25-2-c"><num>(c)</num><content><p>provision about the sending of copies of EIA reports to the Scottish Ministers;</p></content></level><level class="para1" eId="section-25-2-d"><num>(d)</num><content><p>provision about the publication by developers of the information listed in regulation 14(2) of the 2017 Regulations (information about EIA reports);</p></content></level><level class="para1" eId="section-25-2-e"><num>(e)</num><content><p>provision about making EIA reports available for inspection;</p></content></level><level class="para1" eId="section-25-2-f"><num>(f)</num><content><p>provision about time limits for the consultation bodies and other public bodies to make representations to the Scottish Ministers about scoping opinions and EIA reports;</p></content></level><level class="para1" eId="section-25-2-g"><num>(g)</num><content><p>provision about time limits for the consultation bodies and other public bodies to enter into consultation with developers about, and to make available, information relevant to the preparation of EIA reports;</p></content></level><level class="para1" eId="section-25-2-h"><num>(h)</num><content><p>provision about time limits for developers to provide additional information to the Scottish Ministers;</p></content></level><level class="para1" eId="section-25-2-i"><num>(i)</num><content><p>provision about the publication by developers of the information listed in regulation 20(3) of the 2017 Regulations (information about additional information);</p></content></level><level class="para1" eId="section-25-2-j"><num>(j)</num><content><p>provision about making additional information available for inspection;</p></content></level><level class="para1" eId="section-25-2-k"><num>(k)</num><content><p>provision about the publication by developers of the information listed in regulation 23(2) of the 2017 Regulations (information about decisions);</p></content></level><level class="para1" eId="section-25-2-l"><num>(l)</num><content><p>provision that the Secretary of State or the Scottish Ministers consider appropriate for securing that the procedures under the 2017 Regulations operate effectively, or more effectively, alongside the procedures under regulations made under section 36C of the Electricity Act 1989 or paragraph <ref href="#d25e3890">1A</ref> or <ref href="#d25e4298">7B</ref> of Schedule 8 to that Act (inserted by section <ref href="#section-19">19</ref> of this Act).</p></content></level></subsection><subsection eId="section-25-3"><num>(3)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations amend the 2017 Regulations by making provision described in subsection <ref href="#section-25-4">(4)</ref> in connection with environmental impact assessments and applications made to the Scottish Ministers for variation of consent granted under section 37 of the Electricity Act 1989.</p></content></subsection><subsection eId="section-25-4"><num>(4)</num><intro><p>That provision is—</p></intro><level class="para1" eId="section-25-4-a"><num>(a)</num><intro><p>provision requiring an environmental impact assessment in respect of the proposed variation to be carried out before Scottish Ministers—</p></intro><level class="para2" eId="section-25-4-a-i"><num>(i)</num><content><p>vary the consent, or</p></content></level><level class="para2" eId="section-25-4-a-ii"><num>(ii)</num><content><p>direct that planning permission is deemed to be granted under section 57(2) or (2ZA) of the Town and Country Planning (Scotland) Act 1997 in respect of EIA development;</p></content></level></level><level class="para1" eId="section-25-4-b"><num>(b)</num><content><p>provision requiring the Scottish Ministers to take the environmental information into account when carrying out an environmental impact assessment in respect of the proposed variation;</p></content></level><level class="para1" eId="section-25-4-c"><num>(c)</num><content><p>provision applying provisions of the 2017 Regulations (including provisions amended by regulations under subsection <ref href="#section-25-1">(1)</ref>), with or without modifications;</p></content></level><level class="para1" eId="section-25-4-d"><num>(d)</num><content><p>provision that the Secretary of State or the Scottish Ministers consider appropriate for securing that the procedures under the 2017 Regulations operate effectively, or more effectively, alongside the procedures under regulations made under section <ref href="#d25e4384">37A</ref> of the Electricity Act 1989 (inserted by section <ref href="#section-20">20</ref> of this Act).</p></content></level></subsection><subsection eId="section-25-5"><num>(5)</num><intro><p>Regulations under this section may—</p></intro><level class="para1" eId="section-25-5-a"><num>(a)</num><content><p>make different provision for different purposes or different areas;</p></content></level><level class="para1" eId="section-25-5-b"><num>(b)</num><content><p>make consequential or supplementary provision;</p></content></level><level class="para1" eId="section-25-5-c"><num>(c)</num><content><p>make transitional provision.</p></content></level></subsection><subsection eId="section-25-6"><num>(6)</num><content><p>Regulations under this section made by the Secretary of State are to be made by statutory instrument.</p></content></subsection><subsection eId="section-25-7"><num>(7)</num><content><p>A statutory instrument containing regulations made by the Secretary of State under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-25-8"><num>(8)</num><content><p>Before making regulations under this section, the Secretary of State must consult the Scottish Ministers.</p></content></subsection><subsection eId="section-25-9"><num>(9)</num><content><p>For regulations under this section made by the Scottish Ministers, see section 27 of the Interpretation and Legislative Reform (Scotland) Act <ref eId="c00046" href="http://www.legislation.gov.uk/id/asp/2010/10">2010 (asp 10)</ref> (Scottish statutory instruments).</p></content></subsection><subsection eId="section-25-10"><num>(10)</num><content><p>Regulations made by the Scottish Ministers under this section are subject to the negative procedure (see section 28 of the Interpretation and Legislative Reform (Scotland) Act <ref eId="c00047" href="http://www.legislation.gov.uk/id/asp/2010/10">2010 (asp 10)</ref>).</p></content></subsection><subsection eId="section-25-11"><num>(11)</num><content><p>Before making regulations under this section, the Scottish Ministers must consult the Secretary of State.</p></content></subsection><subsection eId="section-25-12"><num>(12)</num><intro><p>In this section, subject to subsection <ref href="#section-25-13">(13)</ref>, the following terms have the same meaning as they have in the 2017 Regulations—</p></intro><hcontainer name="definition"><content><p>“additional information”</p></content></hcontainer><hcontainer name="definition"><content><p>“the consultation bodies”</p></content></hcontainer><hcontainer name="definition"><content><p>“developer”</p></content></hcontainer><hcontainer name="definition"><content><p>“EIA development”</p></content></hcontainer><hcontainer name="definition"><content><p>“EIA report”</p></content></hcontainer><hcontainer name="definition"><content><p>“environmental impact assessment”</p></content></hcontainer><hcontainer name="definition"><content><p>“environmental information”</p></content></hcontainer><hcontainer name="definition"><content><p>“Schedule 2 development”</p></content></hcontainer><hcontainer name="definition"><content><p>“scoping opinion”</p></content></hcontainer><hcontainer name="definition"><content><p>“screening opinion”.</p></content></hcontainer></subsection><subsection eId="section-25-13"><num>(13)</num><content><p>In subsections <ref href="#section-25-3">(3)</ref> and <ref href="#section-25-4">(4)</ref>, those terms have the same meaning in connection with applications for variation of consent granted under section 37 of the Electricity Act 1989 as they have, in the 2017 Regulations, in connection with applications for variation of consent granted under section 36 of that Act.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-long-duration-electricity-storage"><heading>Long duration electricity storage</heading><section eId="section-26"><num>26</num><heading>Long duration electricity storage</heading><content><p><mod>In the Electricity Act 1989, after <ref eId="c00048" href="https://www.legislation.gov.uk/ukpga/1989/29/section/10O">section 10O</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Long duration electricity storage</heading><section><num>10P</num><heading>Long duration electricity storage</heading><subsection><num>(1)</num><content><p>The Authority must, as soon as reasonably practicable after this section comes into force, establish and operate a scheme in accordance with this section.</p></content></subsection><subsection><num>(2)</num><content><p>The scheme must be designed for the purpose of encouraging the development and use of long duration electricity storage installations.</p></content></subsection><subsection><num>(3)</num><intro><p>The scheme must be open to persons who—</p></intro><level class="para1"><num>(a)</num><content><p>hold or intend to apply for a generation licence to operate a long duration electricity storage installation, and</p></content></level><level class="para1"><num>(b)</num><content><p>meet any other specified criteria.</p></content></level></subsection><subsection eId="d25e5416"><num>(4)</num><intro><p>The scheme must provide for an LDES operator who operates an approved installation—</p></intro><level class="para1"><num>(a)</num><content><p>to receive payments from a holder of an electricity system operator licence where the operator’s assessed revenue from that installation is below a specified amount, in specified circumstances, and</p></content></level><level class="para1"><num>(b)</num><content><p>to make payments to a holder of an electricity system operator licence where the operator’s assessed revenue from that installation is above a specified amount, in specified circumstances.</p></content></level></subsection><subsection><num>(5)</num><intro><p>In subsection <ref href="#d25e5416">(4)</ref>—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-an-approved-installation">an approved installation</term>” means a long duration electricity storage installation which is approved by the Authority for the purposes of subsection <ref href="#d25e5416">(4)</ref> in accordance with the scheme;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-assessed-revenue">assessed revenue</term>”, in relation to a long duration electricity storage installation, means the difference between—</p></intro><level class="para1"><num>(a)</num><content><p>revenue of a specified kind earned or derived in connection with that installation, and</p></content></level><level class="para1"><num>(b)</num><content><p>costs of a specified kind incurred in connection with operating the installation.</p></content></level></hcontainer></subsection><subsection><num>(6)</num><content><p>The Authority may determine how costs and revenue are to be calculated for the purposes of the scheme.</p></content></subsection><subsection><num>(7)</num><content><p>In setting charges to which Article 18(1) of the Electricity Regulation applies, the holder of an electricity system operator licence may take account of payments it makes or receives under the scheme.</p></content></subsection><subsection><num>(8)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-ldes-operator">LDES operator</term>” means a person who, under a generation licence, generates electricity by means of a long duration electricity storage installation;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-long-duration-electricity-storage-installation">long duration electricity storage installation</term>” means an installation that—</p></intro><level class="para1"><num>(a)</num><content><p>generates electricity from stored energy,</p></content></level><level class="para1"><num>(b)</num><content><p>has an electricity generating capacity of not less than 50 megawatts, and</p></content></level><level class="para1"><num>(c)</num><content><p>is capable of generating electricity at its full capacity for a continuous period of not less than eight hours;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-specified">specified</term>” means specified by the Authority for the purposes of the scheme in—</p></intro><level class="para1"><num>(a)</num><content><p>a document published by the Authority, or</p></content></level><level class="para1"><num>(b)</num><content><p>a condition of a licence;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-stored-energy">stored energy</term>” has the meaning given by section 4(3ZB).</p></content></hcontainer></subsection><subsection><num>(9)</num><intro><p>The Secretary of State may by regulations amend the definition of “long duration electricity storage installation” by substituting—</p></intro><level class="para1"><num>(a)</num><content><p>for the amount of electricity generating capacity for the time being mentioned in <ref href="#d25e5508">paragraph (b)</ref> of the definition, a different amount;</p></content></level><level class="para1"><num>(b)</num><content><p>for the period for the time being mentioned in <ref href="#d25e5512">paragraph (c)</ref> of the definition, a different period (which may not be less than eight hours).</p></content></level></subsection></section></hcontainer></quotedStructure></mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-consumer-benefits"><heading>Consumer benefits</heading><section eId="section-27"><num>27</num><heading>Benefits for homes near electricity transmission projects</heading><subsection eId="section-27-1"><num>(1)</num><content><p>The Electricity Act 1989 is amended as follows.</p></content></subsection><subsection eId="section-27-2"><num>(2)</num><content><p><mod>After section 38 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Benefits resulting from proximity to new or upgraded transmission infrastructure</heading><section eId="d25e5593"><num>38A</num><heading>Power to establish scheme for giving of benefits</heading><subsection eId="d25e5597"><num>(1)</num><content><p>The Secretary of State may by regulations establish a scheme under which persons with a specified connection to qualifying premises are entitled to financial benefits provided (directly or indirectly) by electricity suppliers.</p></content></subsection><subsection><num>(2)</num><content><p>Qualifying premises must be identified by reference to their proximity to qualifying works.</p></content></subsection><subsection><num>(3)</num><intro><p>Qualifying works must involve the construction, erection, expansion or improvement of electrical plant or an electric line that (in either case)—</p></intro><level class="para1"><num>(a)</num><content><p>is wholly or partly above the ground, and</p></content></level><level class="para1"><num>(b)</num><content><p>forms or is intended to form part of a transmission system.</p></content></level><wrapUp><p>They may be works that took place before the making of the regulations or the coming into force of this section.</p></wrapUp></subsection><subsection eId="d25e5630"><num>(4)</num><intro><p>The regulations may (among other things)—</p></intro><level class="para1"><num>(a)</num><content><p>make further provision determining, or for the determination of, whether premises or works are qualifying;</p></content></level><level class="para1"><num>(b)</num><content><p>confer functions in connection with the scheme;</p></content></level><level class="para1"><num>(c)</num><content><p>provide for the delegation of functions conferred in connection with the scheme;</p></content></level><level class="para1"><num>(d)</num><content><p>provide for payments by electricity suppliers to meet costs incurred in the carrying out of functions in connection with the scheme;</p></content></level><level class="para1"><num>(e)</num><content><p>provide for the costs of electricity suppliers under the scheme to be distributed among suppliers on such basis, and by such means, as the regulations provide;</p></content></level><level class="para1"><num>(f)</num><content><p>restrict a person’s ability to obtain payment of an amount standing to the credit of the person’s account with an electricity supplier, where that amount derives from benefits under the scheme;</p></content></level><level class="para1"><num>(g)</num><content><p>make provision about cases in which a person who has received benefits under the scheme in respect of premises ceases to be entitled under the scheme in respect of the premises, including provision for the withdrawal or recovery of the benefits;</p></content></level><level class="para1" eId="d25e5678"><num>(h)</num><content><p>make pass-through provision and associated provision (see section <ref href="#d25e5753">38B</ref>);</p></content></level><level class="para1" eId="d25e5687"><num>(i)</num><content><p>make enforcement provision (see section <ref href="#d25e5864">38C</ref>);</p></content></level><level class="para1" eId="d25e5696"><num>(j)</num><content><p>make information provision (see section <ref href="#d25e5952">38D</ref>).</p></content></level></subsection><subsection><num>(5)</num><intro><p>To the extent that this section enables provision to be made affecting the holders of licences, provision for that purpose may be made by modifying, or empowering or requiring the Authority to modify—</p></intro><level class="para1"><num>(a)</num><content><p>the conditions of a licence, or</p></content></level><level class="para1"><num>(b)</num><content><p>a document maintained in accordance with the conditions of a licence, or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="d25e5723"><num>(6)</num><content><p>A statutory instrument containing regulations under this section may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection><num>(7)</num><content><p>A draft laid under subsection <ref href="#d25e5723">(6)</ref> is not to be treated as a hybrid instrument for the purposes of the standing orders of either House of Parliament.</p></content></subsection><subsection><num>(8)</num><content><p>Regulations under this section bind the Crown unless they provide otherwise.</p></content></subsection><subsection><num>(9)</num><content><p>The Secretary of State may, out of money provided by Parliament, make payments to a person on whom functions are conferred by regulations under this section for the purposes of meeting (or helping to meet) the expenses of carrying out those functions.</p></content></subsection></section><section eId="d25e5753"><num>38B</num><heading>Passing of benefits to ultimate consumer</heading><subsection><num>(1)</num><content><p>This section applies for the purposes of section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5678">(h)</ref>.</p></content></subsection><subsection eId="d25e5770"><num>(2)</num><intro><p>“Pass-through provision” is provision that—</p></intro><level class="para1" eId="d25e5776"><num>(a)</num><intro><p>applies where—</p></intro><level class="para2"><num>(i)</num><content><p>one person (“the intermediary”) receives benefits under the scheme in connection with qualifying premises, and</p></content></level><level class="para2" eId="d25e5788"><num>(ii)</num><content><p>another person (“the end-user”) who is not living as part of the same household as the intermediary consumes electricity supplied to the premises, and</p></content></level></level><level class="para1" eId="d25e5794"><num>(b)</num><content><p>requires the intermediary to pass on the substance of those benefits to the end-user.</p></content></level></subsection><subsection><num>(3)</num><intro><p>“<term refersTo="#term-associated-provision">Associated provision</term>” means provision that relates to pass-through provision and—</p></intro><level class="para1"><num>(a)</num><content><p>requires intermediaries to take steps to obtain benefits that will be subject to the requirement referred to in subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5794">(b)</ref>,</p></content></level><level class="para1"><num>(b)</num><content><p>requires intermediaries to supply information to end-users,</p></content></level><level class="para1"><num>(c)</num><content><p>provides for the making of payments to intermediaries (in addition to the provision of benefits of the sort mentioned in section <ref href="#d25e5593">38A</ref><ref href="#d25e5597">(1)</ref>), or</p></content></level><level class="para1"><num>(d)</num><content><p>provides for the withdrawal or recovery of benefits given or other payments made to intermediaries who fail to comply with the requirement referred to in subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5794">(b)</ref>.</p></content></level></subsection><subsection><num>(4)</num><content><p>For the purposes of subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5776">(a)</ref><ref href="#d25e5788">(ii)</ref>, the cases in which electricity is consumed by a person include those in which the electricity is used to make available to the person heating, cooling, hot water or energy.</p></content></subsection></section><section eId="d25e5864"><num>38C</num><heading>Enforcement of benefit scheme</heading><subsection eId="d25e5868"><num>(1)</num><intro><p>In section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5687">(i)</ref>, “<term refersTo="#term-enforcement-provision">enforcement provision</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>provision for the enforcement in civil proceedings of requirements under the scheme,</p></content></level><level class="para1"><num>(b)</num><intro><p>provision for a person to impose a monetary penalty where the person is satisfied on the balance of probabilities that—</p></intro><level class="para2"><num>(i)</num><content><p>a requirement under the regulations has not been complied with, or</p></content></level><level class="para2"><num>(ii)</num><content><p>benefits or other payments under the scheme have been wrongfully obtained, or</p></content></level></level><level class="para1" eId="d25e5908"><num>(c)</num><content><p>provision for complaints procedures, dispute resolution, adjudication, appeals or redress in connection with the scheme.</p></content></level></subsection><subsection><num>(2)</num><content><p>If regulations under section <ref href="#d25e5593">38A</ref> provide for the imposition of monetary penalties, they must provide a right of appeal to a court or tribunal on grounds including both error of fact and error of law.</p></content></subsection><subsection eId="d25e5923"><num>(3)</num><content><p>The provision that may be made by virtue of subsection <ref href="#d25e5868">(1)</ref><ref href="#d25e5908">(c)</ref> includes provision for Part 2 of the Consumers, Estate Agents and Redress Act 2007 (complaints handling and redress schemes) to apply (with or without modifications) to end-user complaints as it applies to consumer complaints within the meaning of that Part.</p></content></subsection><subsection><num>(4)</num><content><p>In subsection <ref href="#d25e5923">(3)</ref>, “<term refersTo="#term-end-user-complaints">end-user complaints</term>” means complaints in connection with pass-through provision made by end-users against intermediaries or electricity suppliers (with the definitions in section <ref href="#d25e5753">38B</ref> applying for the purposes of this subsection).</p></content></subsection></section><section eId="d25e5952"><num>38D</num><heading>Disclosure and use of information in connection with benefit scheme</heading><subsection><num>(1)</num><content><p>In section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5696">(j)</ref>, “<term refersTo="#term-information-provision">information provision</term>” means provision within subsection <ref href="#d25e5978">(2)</ref> or <ref href="#d25e6020">(3)</ref>.</p></content></subsection><subsection eId="d25e5978"><num>(2)</num><intro><p>Provision is within this subsection if it is provision for the disclosure of information or evidence for the purposes of—</p></intro><level class="para1"><num>(a)</num><content><p>identifying persons entitled to benefits under the scheme,</p></content></level><level class="para1"><num>(b)</num><content><p>identifying qualifying premises or qualifying works,</p></content></level><level class="para1"><num>(c)</num><content><p>checking whether requirements under, or resulting from, the regulations are being or have been complied with,</p></content></level><level class="para1"><num>(d)</num><content><p>checking payments made under the scheme,</p></content></level><level class="para1"><num>(e)</num><content><p>facilitating the performance of functions conferred, or the enforcement of duties imposed, by or as a result of the regulations, or</p></content></level><level class="para1"><num>(f)</num><content><p>evaluating the performance of the scheme.</p></content></level></subsection><subsection eId="d25e6020"><num>(3)</num><intro><p>Provision is within this subsection if it is provision about the use or further disclosure of information disclosed—</p></intro><level class="para1"><num>(a)</num><content><p>further to provision within subsection <ref href="#d25e5978">(2)</ref>, or</p></content></level><level class="para1"><num>(b)</num><content><p>otherwise in connection with the scheme.</p></content></level></subsection><subsection><num>(4)</num><content><p>The provision that may be made by virtue of subsection <ref href="#d25e6020">(3)</ref> includes provision making it an offence to use or disclose information in an unauthorised manner; but such an offence may not be made punishable by imprisonment.</p></content></subsection><subsection><num>(5)</num><intro><p>Regulations under section <ref href="#d25e5593">38A</ref> that authorise the use or disclosure of information are not to be taken to authorise disclosure or use that would be liable to harm the commercial interests of any person, except to the extent that—</p></intro><level class="para1"><num>(a)</num><content><p>the regulations otherwise provide, or</p></content></level><level class="para1"><num>(b)</num><content><p>the person disclosing or using the information reasonably considers such disclosure or use necessary in view of the purpose of the regulations.</p></content></level></subsection><subsection eId="d25e6071"><num>(6)</num><intro><p>Regulations under section <ref href="#d25e5593">38A</ref> do not require or authorise the disclosure or use of information that—</p></intro><level class="para1"><num>(a)</num><content><p>contravenes the data protection legislation (but this section and the regulations are to be taken into account in determining whether the disclosure or use would contravene that legislation), or</p></content></level><level class="para1"><num>(b)</num><content><p>is prohibited by any of Parts 1 to 7 and Chapter 1 of Part 9 of the Investigatory Powers Act 2016.</p></content></level></subsection><subsection><num>(7)</num><content><p>In subsection <ref href="#d25e6071">(6)</ref>, “<term refersTo="#term-the-data-protection-legislation">the data protection legislation</term>” has the same meaning as in the Data Protection Act 2018 (see section 3 of that Act).</p></content></subsection></section></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-27-3"><num>(3)</num><content><p><mod>In section 106 (regulations and orders under the Act), in subsection <ref href="#d25e4853">(2ZA)</ref> (inserted by section <ref href="#section-23">23</ref><ref href="#section-23-3">(3)</ref>), after paragraph <ref href="#d25e4859">(a)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(b)</num><content><p>regulations under section <ref href="#d25e5593">38A</ref>.</p></content></level></quotedStructure></mod></p></content></subsection><subsection eId="section-27-4"><num>(4)</num><content><p><mod>In paragraph 6 of Schedule 6A (requirements enforceable against suppliers under section 25), before sub-paragraph (a) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(za)</num><content><p>any provision of regulations under section <ref href="#d25e5593">38A</ref> that is designated in the regulations as a relevant provision for the purposes of this paragraph;</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-electricity-transmission-period"><heading>Electricity transmission period</heading><section eId="section-28"><num>28</num><heading>Electricity transmission systems: extension of commissioning period</heading><content><p><mod>In <ref eId="c00049" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">section 6G</ref><ref eId="c00050" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">(1)</ref> of the <ref eId="c00051" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (meaning of “<term refersTo="#term-commissioning-period" eId="term-commissioning-period">commissioning period</term>” for the purposes of determining whether a person is to be regarded as participating in the transmission of electricity), in <ref eId="c00052" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">paragraph (b)</ref>, for “18 months” substitute <quotedText>“27 months”</quotedText>.</mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-electricity-generation-on-forestry-land"><heading>Electricity generation on forestry land</heading><section eId="section-29"><num>29</num><heading>Use of forestry estate for renewable electricity</heading><content><p><mod>In the Forestry Act 1967, after section 3 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e6197"><num>3A</num><heading>Use of land in connection with renewable electricity projects</heading><subsection eId="d25e6201"><num>(1)</num><intro><p>The Commissioners may—</p></intro><level class="para1"><num>(a)</num><content><p>use, or enter into arrangements in connection with the use of, English forestry land for the generation, storage, transmission or supply of renewable electricity;</p></content></level><level class="para1"><num>(b)</num><content><p>sell, or enter into other arrangements concerning, renewable electricity generated, stored or supplied on, or transmitted across, English forestry land;</p></content></level><level class="para1" eId="d25e6219"><num>(c)</num><intro><p>use, or enter into arrangements in connection with the use of, English forestry land for activity that—</p></intro><level class="para2"><num>(i)</num><content><p>is intended to satisfy, or enable the satisfaction of, a relevant condition of development (whether existing or contemplated), or</p></content></level><level class="para2"><num>(ii)</num><content><p>otherwise arises in connection with such a condition.</p></content></level></level></subsection><subsection><num>(2)</num><intro><p>For the purposes of subsection <ref href="#d25e6201">(1)</ref><ref href="#d25e6219">(c)</ref>, a relevant condition of development is a condition of development that—</p></intro><level class="para1"><num>(a)</num><content><p>relates to renewable electricity development located wholly or partly on English forestry land, and</p></content></level><level class="para1"><num>(b)</num><content><p>is intended to benefit the natural environment of land.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The exercise of the powers in subsection <ref href="#d25e6201">(1)</ref> for either of the following purposes is to be taken to be consistent with the Commissioners’ general duty under section 1(2)—</p></intro><level class="para1"><num>(a)</num><content><p>facilitating or promoting the use of renewable electricity;</p></content></level><level class="para1"><num>(b)</num><content><p>obtaining funds for meeting the expenses referred to in section 41(2).</p></content></level></subsection><subsection><num>(4)</num><content><p>When the Commissioners are considering the exercise of those powers, section 1(3A) applies as if it included a further paragraph referring to those purposes.</p></content></subsection><subsection><num>(5)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-condition-of-development">condition of development</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a condition to which planning permission is subject, or</p></content></level><level class="para1"><num>(b)</num><content><p>a requirement contained in an order granting development consent under the Planning Act 2008 (development consent for nationally significant infrastructure);</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-english-forestry-land">English forestry land</term>” means land placed at the disposal of the Commissioners under this Act;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-natural-environment">natural environment</term>”, in relation to land, includes—</p></intro><level class="para1"><num>(a)</num><content><p>its plants, animals and other living organisms,</p></content></level><level class="para1"><num>(b)</num><content><p>their habitats, and</p></content></level><level class="para1"><num>(c)</num><content><p>its geological features;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-renewable-electricity">renewable electricity</term>” means electricity produced from sources other than—</p></intro><level class="para1"><num>(a)</num><content><p>coal,</p></content></level><level class="para1"><num>(b)</num><content><p>lignite,</p></content></level><level class="para1"><num>(c)</num><content><p>peat,</p></content></level><level class="para1"><num>(d)</num><content><p>natural gas, within the meaning of the Energy Act 1976,</p></content></level><level class="para1"><num>(e)</num><content><p>crude liquid petroleum,</p></content></level><level class="para1"><num>(f)</num><content><p>petroleum products, within the meaning of the Energy Act 1976,</p></content></level><level class="para1"><num>(g)</num><content><p>any substance produced directly or indirectly from a substance within paragraphs <ref href="#d25e6345">(a)</ref> to <ref href="#d25e6365">(f)</ref>,</p></content></level><level class="para1"><num>(h)</num><content><p>energy derived from any substance within paragraphs <ref href="#d25e6345">(a)</ref> to <ref href="#d25e6369">(g)</ref>, or</p></content></level><level class="para1"><num>(i)</num><content><p>nuclear fuel;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-renewable-electricity-development">renewable electricity development</term>” means development the main purpose of which is the generation, storage, transmission or supply of renewable electricity.</p></content></hcontainer></subsection><subsection eId="d25e6400"><num>(6)</num><content><p>References in this section to the storage of electricity are to the storage of energy converted from electricity for the purpose of its reconversion into electricity.</p></content></subsection></section><section eId="d25e6412"><num>3B</num><heading>Section <ref href="#d25e6197">3A</ref>: power to require Secretary of State’s consent in certain cases</heading><subsection eId="d25e6416"><num>(1)</num><content><p>The Secretary of State may make regulations that, in a case within subsection <ref href="#d25e6428">(2)</ref>, require the consent of the Secretary of State to an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>.</p></content></subsection><subsection eId="d25e6428"><num>(2)</num><intro><p>The cases are those where—</p></intro><level class="para1"><num>(a)</num><content><p>a proposed exercise of the powers is intended to enable the construction on English forestry land of the whole or part of a generating station (including an extension to an existing station), and</p></content></level><level class="para1"><num>(b)</num><content><p>the capacity threshold is exceeded.</p></content></level></subsection><subsection><num>(3)</num><content><p>In the case of the construction of a new generating station, the capacity threshold is exceeded if it is expected that the generating capacity of the station would equal or exceed the relevant wattage.</p></content></subsection><subsection eId="d25e6452"><num>(4)</num><intro><p>In the case of an extension to an existing station, the capacity threshold is exceeded if it is expected that—</p></intro><level class="para1"><num>(a)</num><content><p>the extension would cause the generating capacity of the station to equal or exceed the relevant wattage, or</p></content></level><level class="para1" eId="d25e6464"><num>(b)</num><content><p>the extension, whether alone or taken together with previous non-consented extensions, would increase the generating capacity of the station by at least the relevant wattage.</p></content></level></subsection><subsection><num>(5)</num><intro><p>An extension is “<term refersTo="#term-non-consented">non-consented</term>” for the purposes of subsection <ref href="#d25e6452">(4)</ref><ref href="#d25e6464">(b)</ref> if—</p></intro><level class="para1"><num>(a)</num><content><p>it was enabled by an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>, and</p></content></level><level class="para1"><num>(b)</num><content><p>that exercise of those powers did not have the consent of the Secretary of State under regulations under subsection <ref href="#d25e6416">(1)</ref>.</p></content></level></subsection><subsection><num>(6)</num><intro><p>But an extension ceases to be “non-consented” for those purposes if—</p></intro><level class="para1"><num>(a)</num><content><p>a subsequent extension to the station in question is constructed having been enabled by an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>, and</p></content></level><level class="para1"><num>(b)</num><content><p>that exercise of those powers had the consent of the Secretary of State under regulations under subsection <ref href="#d25e6416">(1)</ref>.</p></content></level></subsection><subsection><num>(7)</num><intro><p>The relevant wattage is—</p></intro><level class="para1"><num>(a)</num><content><p>5 megawatts, if the station generates electricity from wind, and</p></content></level><level class="para1"><num>(b)</num><content><p>50 megawatts, if it does not.</p></content></level></subsection><subsection eId="d25e6544"><num>(8)</num><content><p>The Secretary of State may by regulations amend this section so as to change the relevant wattage (including by adding or combining categories of station in relation to which a particular wattage is prescribed).</p></content></subsection><subsection><num>(9)</num><intro><p>In calculating the relevant wattage there is to be disregarded—</p></intro><level class="para1"><num>(a)</num><content><p>in the case of a generating station only partly situated on English forestry land, any generating capacity that can be attributed to parts not situated on English forestry land;</p></content></level><level class="para1"><num>(b)</num><content><p>in the case of a generating station whose capacity is provided in part by facilities for the storage of electricity and in part by other means, the capacity provided by those facilities.</p></content></level></subsection><subsection><num>(10)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-generating-station">generating station</term>” has the same meaning as in Part 1 of the Electricity Act 1989 (see section 64(1));</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-storage">storage</term>” is to be read in accordance with section <ref href="#d25e6197">3A</ref><ref href="#d25e6400">(6)</ref>.</p></content></hcontainer></subsection></section><section><num>3C</num><heading>Regulations under section <ref href="#d25e6412">3B</ref>: further provision</heading><subsection><num>(1)</num><intro><p>Regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6416">(1)</ref> may—</p></intro><level class="para1"><num>(a)</num><content><p>make provision about the process by which consent is to be sought and given or refused;</p></content></level><level class="para1"><num>(b)</num><content><p>provide for consent to be given subject to conditions.</p></content></level></subsection><subsection><num>(2)</num><intro><p>Regulations under section <ref href="#d25e6412">3B</ref> may—</p></intro><level class="para1"><num>(a)</num><content><p>make different provision for different purposes or areas;</p></content></level><level class="para1"><num>(b)</num><content><p>include consequential, incidental, supplementary, transitional or saving provision.</p></content></level></subsection><subsection><num>(3)</num><content><p>Regulations under section <ref href="#d25e6412">3B</ref> are to be made by statutory instrument.</p></content></subsection><subsection><num>(4)</num><content><p>A statutory instrument containing (whether alone or with other provision) regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6544">(8)</ref> may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection><num>(5)</num><content><p>A statutory instrument containing regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6416">(1)</ref> (but not regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6544">(8)</ref>) is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection></section></quotedStructure></mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-wind-generating-stations-and-seismic-array-systems"><heading>Wind generating stations and seismic array systems</heading><section eId="section-30"><num>30</num><heading>Wind generating stations that may affect seismic array systems</heading><subsection eId="section-30-1"><num>(1)</num><content><p>The Secretary of State may make regulations about planning permissions or consents relating to wind generating stations that may affect the functioning of a relevant seismic array system.</p></content></subsection><subsection eId="section-30-2"><num>(2)</num><intro><p>A “relevant seismic array system” is a spatially distributed system of linked seismometers, arranged so as to enhance the detection and characterisation of seismic signals, that—</p></intro><level class="para1" eId="section-30-2-a"><num>(a)</num><content><p>is used for defence purposes, and</p></content></level><level class="para1" eId="section-30-2-b"><num>(b)</num><content><p>is in use on the day on which this Act is passed.</p></content></level></subsection><subsection eId="section-30-3"><num>(3)</num><intro><p>The regulations may provide for—</p></intro><level class="para1" eId="section-30-3-a"><num>(a)</num><content><p>an exclusion zone, and</p></content></level><level class="para1" eId="section-30-3-b"><num>(b)</num><content><p>a restricted zone,</p></content></level><wrapUp><p>around a relevant seismic array system.</p></wrapUp></subsection><subsection eId="section-30-4"><num>(4)</num><intro><p>The regulations may—</p></intro><level class="para1" eId="section-30-4-a"><num>(a)</num><content><p>require a planning decision-maker to refuse, or decline to determine or accept, a planning application relating to a wind generating station that is (or would be) situated in an exclusion zone;</p></content></level><level class="para1" eId="section-30-4-b"><num>(b)</num><content><p>provide that a relevant development order or MCA scheme may not be made if it would grant planning permission for development relating to a wind generating station that is (or would be) situated in an exclusion zone;</p></content></level><level class="para1" eId="section-30-4-c"><num>(c)</num><content><p>allow the Secretary of State to direct that a relevant development order or MCA scheme may not be made if it would grant such planning permission.</p></content></level></subsection><subsection eId="section-30-5"><num>(5)</num><intro><p>The regulations may, in relation to a planning application relating to a wind generating station that is (or would be) situated in a restricted zone—</p></intro><level class="para1" eId="section-30-5-a"><num>(a)</num><content><p>require the applicant to provide specified information about the seismic impact of the proposals (“seismic impact information”) to which their application relates;</p></content></level><level class="para1" eId="section-30-5-b"><num>(b)</num><content><p>require the planning decision-maker to use the seismic impact information in a specified way when determining the application (including when determining conditions relating to a permission or consent);</p></content></level><level class="para1" eId="section-30-5-c"><num>(c)</num><content><p>require the planning decision-maker to refuse, or decline to determine or accept, the application in specified circumstances;</p></content></level><level class="para1" eId="section-30-5-d"><num>(d)</num><content><p>require the planning decision-maker to provide the Secretary of State with the seismic impact information, and to seek the Secretary of State’s views on the seismic impact of the proposals;</p></content></level><level class="para1" eId="section-30-5-e"><num>(e)</num><content><p>require the planning decision-maker to refuse, or decline to determine or accept, the application if the Secretary of State objects to it on grounds relating to the seismic impact of the proposals.</p></content></level></subsection><subsection eId="section-30-6"><num>(6)</num><intro><p>The regulations may—</p></intro><level class="para1" eId="section-30-6-a"><num>(a)</num><content><p>require a person proposing to make a relevant development order or MCA scheme to consult the Secretary of State if the order or scheme would grant planning permission for development relating to a wind generating station that is (or would be) situated in a restricted zone;</p></content></level><level class="para1" eId="section-30-6-b"><num>(b)</num><content><p>allow the Secretary of State to direct that a relevant development order or MCA scheme may not be made if it would grant such planning permission.</p></content></level></subsection><subsection eId="section-30-7"><num>(7)</num><intro><p>The regulations may include provision about the procedure for planning applications to which they relate, such as—</p></intro><level class="para1" eId="section-30-7-a"><num>(a)</num><content><p>provision enabling or requiring a planning decision-maker to decline to determine or accept an application;</p></content></level><level class="para1" eId="section-30-7-b"><num>(b)</num><content><p>provision modifying the process for determining an application;</p></content></level><level class="para1" eId="section-30-7-c"><num>(c)</num><content><p>provision allowing the Secretary of State to give a direction to the planning-decision maker about the procedure for an application;</p></content></level><level class="para1" eId="section-30-7-d"><num>(d)</num><content><p>provision modifying or disapplying a right of appeal or review;</p></content></level><level class="para1" eId="section-30-7-e"><num>(e)</num><content><p>provision disapplying a duty imposed on a planning decision-maker when determining an application.</p></content></level></subsection><subsection eId="section-30-8"><num>(8)</num><content><p>The regulations may require a planning decision-maker to have regard to guidance issued by the Secretary of State.</p></content></subsection><subsection eId="section-30-9"><num>(9)</num><intro><p>Regulations under this section may—</p></intro><level class="para1" eId="section-30-9-a"><num>(a)</num><content><p>amend or repeal provision contained in an Act of Parliament or an Act of the Scottish Parliament;</p></content></level><level class="para1" eId="section-30-9-b"><num>(b)</num><content><p>make different provision for different purposes or areas;</p></content></level><level class="para1" eId="section-30-9-c"><num>(c)</num><content><p>make provision binding the Crown;</p></content></level><level class="para1" eId="section-30-9-d"><num>(d)</num><content><p>make transitional, transitory or saving provision;</p></content></level><level class="para1" eId="section-30-9-e"><num>(e)</num><content><p>make incidental, supplementary or consequential provision.</p></content></level></subsection><subsection eId="section-30-10"><num>(10)</num><content><p>Regulations under this section are to be made by statutory instrument.</p></content></subsection><subsection eId="section-30-11"><num>(11)</num><content><p>A statutory instrument containing regulations under this section which amend or repeal provision contained in an Act of Parliament or an Act of the Scottish Parliament may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection eId="section-30-12"><num>(12)</num><content><p>Any other statutory instrument containing regulations under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-30-13"><num>(13)</num><content><p>If a draft of a statutory instrument containing regulations under this section would, apart from this subsection, be treated for the purposes of the standing orders of either House of Parliament as a hybrid instrument, it is to proceed in that House as if it were not such an instrument.</p></content></subsection><subsection eId="section-30-14"><num>(14)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-mca-scheme" eId="term-mca-scheme">MCA scheme</term>” means a masterplan consent area scheme made under Part 3 of the Town and Country Planning (Scotland) Act 1997;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-planning-application" eId="term-planning-application">planning application</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>an application for planning permission under Part 3 or Part 13 of the Town and Country Planning Act 1990,</p></content></level><level class="para1"><num>(b)</num><content><p>an application for planning permission under Part 3 or Part 12 of the Town and Country Planning (Scotland) Act 1997,</p></content></level><level class="para1"><num>(c)</num><content><p>an application for an order granting development consent under section 37 of the Planning Act 2008, or</p></content></level><level class="para1"><num>(d)</num><content><p>an application under section 36 or 36C of the Electricity Act 1989 (consent for construction etc of generating station);</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-planning-decision-maker" eId="term-planning-decision-maker">planning decision-maker</term>” means a person who determines a planning application;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-development-order" eId="term-relevant-development-order">relevant development order</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a local development order made under section 61A of the Town and Country Planning Act 1990;</p></content></level><level class="para1"><num>(b)</num><content><p>a Mayoral development order made under section 61DA of that Act;</p></content></level><level class="para1"><num>(c)</num><content><p>a neighbourhood development order made under section 61E of that Act;</p></content></level><level class="para1"><num>(d)</num><content><p>a development order made under section 30 of the Town and Country Planning (Scotland) Act 1997;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-wind-generating-station" eId="term-wind-generating-station">wind generating station</term>” means a generating station that generates electricity from wind.</p></content></hcontainer></subsection></section></hcontainer></chapter> — Connections to the electricity transmission and distribution systems
Part 1 — Infrastructure — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-2"><num>Chapter 2</num><heading>Electricity infrastructure</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-connections-to-the-electricity-transmission-and-distribution-systems"><heading>Connections to the electricity transmission and distribution systems</heading><section eId="section-14"><num>14</num><heading>Connections to electricity network: licence and other modifications</heading><subsection eId="section-14-1"><num>(1)</num><intro><p>A relevant authority may modify—</p></intro><level class="para1" eId="section-14-1-a"><num>(a)</num><content><p>the conditions of a particular electricity licence;</p></content></level><level class="para1" eId="section-14-1-b"><num>(b)</num><content><p>the terms of a particular electricity licence;</p></content></level><level class="para1" eId="section-14-1-c"><num>(c)</num><content><p>the standard conditions of electricity licences of a particular type;</p></content></level><level class="para1" eId="section-14-1-d"><num>(d)</num><content><p>a document maintained in accordance with the conditions of an electricity licence;</p></content></level><level class="para1" eId="section-14-1-e"><num>(e)</num><content><p>an agreement entered into in pursuance of a document maintained as mentioned in <ref href="#section-14-1-d">paragraph (d)</ref>;</p></content></level><level class="para1" eId="section-14-1-f"><num>(f)</num><content><p>a qualifying distribution agreement.</p></content></level></subsection><subsection eId="section-14-2"><num>(2)</num><content><p>A relevant authority may exercise the power under <ref href="#section-14-1">subsection (1)</ref> only for the purpose of improving the process for managing connections to the transmission system or the distribution system (and such an improvement may include changing the order in which connections are made).</p></content></subsection><subsection eId="section-14-3"><num>(3)</num><content><p>The Secretary of State may direct the GEMA to exercise the power under <ref href="#section-14-1">subsection (1)</ref>.</p></content></subsection><subsection eId="section-14-4"><num>(4)</num><content><p>The Secretary of State may exercise the power under <ref href="#section-14-3">subsection (3)</ref> only for the purpose mentioned in <ref href="#section-14-2">subsection (2)</ref>.</p></content></subsection><subsection eId="section-14-5"><num>(5)</num><content><p>The power conferred by <ref href="#section-14-1">subsection (1)</ref> may not be exercised after the end of the period of three years beginning with the day on which <ref href="#section-14">this section</ref> comes into force.</p></content></subsection><subsection eId="section-14-6"><num>(6)</num><content><p><ref eId="c00005" href="https://www.legislation.gov.uk/ukpga/1989/29/section/3A">Section 3A</ref> of the <ref eId="c00006" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (principal objective and general duties) applies in relation to the functions of the Secretary of State and the GEMA under <ref href="#section-14">this section</ref> and sections <ref href="#section-15">15</ref> to <ref href="#section-17">17</ref> as it applies in relation to functions of the Secretary of State or the GEMA under <ref eId="c00007" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of <ref eId="c00008" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">that Act</ref>.</p></content></subsection><subsection eId="section-14-7"><num>(7)</num><content><p>A relevant authority may under <ref href="#section-14-1">subsection (1)</ref> modify an agreement mentioned in <ref href="#section-14-1">subsection (1)</ref><ref href="#section-14-1-e">(e)</ref> or a qualifying distribution agreement even if the effect of the modification might amount to a repudiation of the agreement.</p></content></subsection><subsection eId="section-14-8"><num>(8)</num><intro><p>In <ref href="#section-14">this section</ref> and sections <ref href="#section-15">15</ref> to <ref href="#section-17">17</ref>—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-distribution-system" eId="term-distribution-system">distribution system</term>” has the same meaning as in <ref eId="c00009" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00010" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (see the definition of “distribute” in section 4(4) of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-electricity-distributor" eId="term-electricity-distributor">electricity distributor</term>” has the same meaning as in Part 1 of that Act (see section 6(9) of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-electricity-licence" eId="term-electricity-licence">electricity licence</term>” means a licence for the purposes of section 4 of that Act;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-gema" eId="term-the-gema">the GEMA</term>” means the Gas and Electricity Markets Authority;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-qualifying-distribution-agreement" eId="term-qualifying-distribution-agreement">qualifying distribution agreement</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>the terms subject to which a connection is made by an electricity distributor in pursuance of section 16(1) of the Electricity Act 1989, or</p></content></level><level class="para1"><num>(b)</num><content><p>a special connection agreement as defined by section 22(1) of that Act;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-relevant-authority" eId="term-relevant-authority">relevant authority</term>” means the Secretary of State or the GEMA;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-transmission-system" eId="term-transmission-system">transmission system</term>” has the same meaning as in <ref eId="c00011" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00012" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (see section 4(4) of that Act).</p></content></hcontainer></subsection></section><section eId="section-15"><num>15</num><heading>Scope of modification power under <ref href="#section-14">section 14</ref></heading><subsection eId="section-15-1"><num>(1)</num><content><p>The power conferred by <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> to “<term refersTo="#term-modify" eId="term-modify">modify</term>” includes power to amend, add to or remove (and, in particular, includes power to make a person a party to an agreement or to discharge a party from its obligations under an agreement); and references in <ref href="#section-14">section 14</ref>, <ref href="#section-15">this section</ref> and <ref href="#section-16">section 16</ref> to modification are to be construed accordingly.</p></content></subsection><subsection eId="section-15-2"><num>(2)</num><intro><p>The power conferred by <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref>—</p></intro><level class="para1" eId="section-15-2-a"><num>(a)</num><content><p>may be exercised generally, only in relation to specified cases, or subject to exceptions (including by making provision for a case to be excepted only so long as specified conditions are satisfied);</p></content></level><level class="para1" eId="section-15-2-b"><num>(b)</num><content><p>may be exercised differently for different purposes or areas;</p></content></level><level class="para1" eId="section-15-2-c"><num>(c)</num><content><p>includes power to make incidental, supplementary, consequential or transitional modifications.</p></content></level></subsection><subsection eId="section-15-3"><num>(3)</num><intro><p>Provision included in an electricity licence by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-a">(a)</ref> or <ref href="#section-14-1-c">(c)</ref>—</p></intro><level class="para1" eId="section-15-3-a"><num>(a)</num><content><p>may include provision of a kind mentioned in <ref eId="c00013" href="https://www.legislation.gov.uk/ukpga/1989/29/section/7">section 7</ref> of the <ref eId="c00014" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref>;</p></content></level><level class="para1" eId="section-15-3-b"><num>(b)</num><content><p>need not relate to the activities authorised by the licence.</p></content></level></subsection><subsection eId="section-15-4"><num>(4)</num><content><p>The modification under <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> of part of a standard condition of an electricity licence does not prevent any other part of the condition from continuing to be regarded as a standard condition for the purposes of <ref eId="c00015" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00016" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref>.</p></content></subsection><subsection eId="section-15-5"><num>(5)</num><content><p>If under <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> a relevant authority modifies the standard conditions of an electricity licence of a particular type, the GEMA must make the same modifications of those standard conditions for the purposes of their incorporation in electricity licences of that type granted after that time.</p></content></subsection><subsection eId="section-15-6"><num>(6)</num><content><p>Provision included in an electricity licence by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-b">(b)</ref> may in particular include provision about the circumstances in which the licence may be revoked or suspended.</p></content></subsection><subsection eId="section-15-7"><num>(7)</num><intro><p>Provision included in an agreement by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-e">(e)</ref> or <ref href="#section-14-1-f">(f)</ref> may in particular include provision—</p></intro><level class="para1" eId="section-15-7-a"><num>(a)</num><content><p>requiring specified conditions to be met before the taking of particular steps under the agreement;</p></content></level><level class="para1" eId="section-15-7-b"><num>(b)</num><content><p>about the procedure for varying the agreement.</p></content></level></subsection><subsection eId="section-15-8"><num>(8)</num><intro><p>In <ref eId="c00017" href="https://www.legislation.gov.uk/ukpga/2000/27/section/33">section 33</ref> of the <ref eId="c00018" href="https://www.legislation.gov.uk/ukpga/2000/27/contents">Utilities Act 2000</ref> (standard conditions of electricity licences), in <ref eId="c00019" href="https://www.legislation.gov.uk/ukpga/2000/27/section/33">subsection (1)</ref>—</p></intro><level class="para1" eId="section-15-8-a"><num>(a)</num><content><p>omit the “or” at the end of paragraph (k), and</p></content></level><level class="para1" eId="section-15-8-b"><num>(b)</num><content><p><mod>at the end insert <quotedText startQuote="&#x201C;">, or</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(m)</num><content><p>under <ref href="#section-14">section 14</ref> of the Planning and Infrastructure Act 2025.</p></content></level></quotedStructure></mod></p></content></level></subsection></section><section eId="section-16"><num>16</num><heading>Procedure relating to modifications under <ref href="#section-14">section 14</ref></heading><subsection eId="section-16-1"><num>(1)</num><intro><p>Before making a modification under <ref href="#section-14">section 14</ref>, a relevant authority must consult—</p></intro><level class="para1" eId="section-16-1-a"><num>(a)</num><content><p>the holder of any electricity licence proposed to be modified,</p></content></level><level class="para1" eId="section-16-1-b"><num>(b)</num><content><p>the Independent System Operator and Planner,</p></content></level><level class="para1" eId="section-16-1-c"><num>(c)</num><content><p>the GEMA or the Secretary of State (depending on which relevant authority is proposing to make the modification), and</p></content></level><level class="para1" eId="section-16-1-d"><num>(d)</num><content><p>such other persons as the relevant authority considers appropriate.</p></content></level></subsection><subsection eId="section-16-2"><num>(2)</num><content><p>Subsection <ref href="#section-16-1">(1)</ref> may be satisfied by consultation carried out before the passing of this Act (as well as by consultation carried out after that time).</p></content></subsection><subsection eId="section-16-3"><num>(3)</num><content><p>A relevant authority must publish details of any modifications made by it under <ref href="#section-14">section 14</ref> as soon as reasonably practicable after they are made.</p></content></subsection><subsection eId="section-16-4"><num>(4)</num><content><p>A relevant authority may exclude from publication under <ref href="#section-16-3">subsection (3)</ref> any information the publication of which would be likely to prejudice the commercial interests of any person.</p></content></subsection><subsection eId="section-16-5"><num>(5)</num><content><p>In <ref href="#section-16">this section</ref>, “<term refersTo="#term-the-independent-system-operator-and-planner" eId="term-the-independent-system-operator-and-planner">the Independent System Operator and Planner</term>” means the person for the time being designated under <ref eId="c00020" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">section 162</ref><ref eId="c00021" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">(1)</ref> of the <ref eId="c00022" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref>.</p></content></subsection></section><section eId="section-17"><num>17</num><heading>Directions to modify connection agreements</heading><subsection eId="section-17-1"><num>(1)</num><intro><p>A relevant authority may—</p></intro><level class="para1" eId="section-17-1-a"><num>(a)</num><content><p>direct the Independent System Operator and Planner (“the ISOP”) to modify an agreement entered into by the ISOP pursuant to a document maintained in accordance with the conditions of an electricity licence;</p></content></level><level class="para1" eId="section-17-1-b"><num>(b)</num><content><p>direct an electricity distributor to modify a qualifying distribution agreement entered into by the electricity distributor.</p></content></level></subsection><subsection eId="section-17-2"><num>(2)</num><content><p>A relevant authority may exercise the power conferred by <ref href="#section-17-1">subsection (1)</ref> only for the purpose of improving the process for managing connections to the transmission system or the distribution system (and such an improvement may include changing the order in which connections are made).</p></content></subsection><subsection eId="section-17-3"><num>(3)</num><content><p>A direction under subsection <ref href="#section-17-1">(1)</ref> must describe the kinds of modification to be made by the person to whom it is given.</p></content></subsection><subsection eId="section-17-4"><num>(4)</num><intro><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may also require the person to whom it is given to modify an agreement by including in it provision—</p></intro><level class="para1" eId="section-17-4-a"><num>(a)</num><content><p>requiring specified conditions to be met before the taking of particular steps under the agreement;</p></content></level><level class="para1" eId="section-17-4-b"><num>(b)</num><content><p>about the procedure for varying the agreement.</p></content></level></subsection><subsection eId="section-17-5"><num>(5)</num><content><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may be expressed as having effect generally, in relation to cases within a description specified in the direction, or in relation to a particular case.</p></content></subsection><subsection eId="section-17-6"><num>(6)</num><intro><p>Before giving a direction under subsection <ref href="#section-17-1">(1)</ref>, the relevant authority must consult—</p></intro><level class="para1" eId="section-17-6-a"><num>(a)</num><content><p>the person to whom it proposes to give the direction, and</p></content></level><level class="para1" eId="section-17-6-b"><num>(b)</num><content><p>such other persons as the relevant authority considers appropriate.</p></content></level></subsection><subsection eId="section-17-7"><num>(7)</num><content><p>Subsection <ref href="#section-17-6">(6)</ref> may be satisfied by consultation carried out before the passing of this Act (as well as by consultation carried out after that time).</p></content></subsection><subsection eId="section-17-8"><num>(8)</num><content><p>A relevant authority must publish details of any direction it gives under subsection <ref href="#section-17-1">(1)</ref> as soon as reasonably practicable after the direction is given.</p></content></subsection><subsection eId="section-17-9"><num>(9)</num><content><p>A relevant authority may exclude from publication under subsection <ref href="#section-17-8">(8)</ref> any information the publication of which would be likely to prejudice the commercial interests of any person.</p></content></subsection><subsection eId="section-17-10"><num>(10)</num><content><p>A person to whom a direction is given under <ref href="#section-17-1">subsection (1)</ref> must comply with it, even if the effect of a modification made to an agreement as a result of the direction might amount to a repudiation of the agreement.</p></content></subsection><subsection eId="section-17-11"><num>(11)</num><content><p>The power to give a direction under subsection <ref href="#section-17-1">(1)</ref> may not be exercised after the end of the period of three years beginning with the day on which this section comes into force.</p></content></subsection><subsection eId="section-17-12"><num>(12)</num><content><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may be varied or revoked by a subsequent direction given by a relevant authority.</p></content></subsection><subsection eId="section-17-13"><num>(13)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-the-independent-system-operator-and-planner" eId="term-the-independent-system-operator-and-planner">the Independent System Operator and Planner</term>” means the person for the time being designated under <ref eId="c00023" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">section 162</ref><ref eId="c00024" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">(1)</ref> of the <ref eId="c00025" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref>;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-modify" eId="term-modify">modify</term>” includes amend, add to and remove (and, in particular, includes making a person a party to an agreement and discharging a party from its obligations under an agreement).</p></content></hcontainer></subsection><subsection eId="section-17-14"><num>(14)</num><intro><p>In Schedule 6A to the Electricity Act 1989 (provisions imposing obligations enforceable as relevant requirements)—</p></intro><level class="para1" eId="section-17-14-a"><num>(a)</num><content><p><mod>in paragraph 4A (electricity system operator), after sub-paragraph (c) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><level class="para1"><num>(d)</num><content><p>section <ref href="#section-17">17</ref><ref href="#section-17-10">(10)</ref> of the Planning and Infrastructure Act 2025 (duty to comply with direction under <ref href="#section-17">section 17</ref> of that Act).</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-17-14-b"><num>(b)</num><content><p><mod>in paragraph 5 (distribution licence holders), after sub-paragraph (g) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><level class="para1"><num>(h)</num><content><p>section <ref href="#section-17">17</ref><ref href="#section-17-10">(10)</ref> of the Planning and Infrastructure Act 2025 (duty to comply with direction under <ref href="#section-17">section 17</ref> of that Act).</p></content></level></quotedStructure></mod></p></content></level></subsection></section><section eId="section-18"><num>18</num><heading>Managing connections to the network: strategic plans etc</heading><subsection eId="section-18-1"><num>(1)</num><content><p><mod>In <ref eId="c00026" href="https://www.legislation.gov.uk/ukpga/2023/52/part/5">Part 5</ref> of the <ref eId="c00027" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref> (Independent System Operator and Planner), after <ref eId="c00028" href="https://www.legislation.gov.uk/ukpga/2023/52/section/165">section 165</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e3701"><num>165A</num><heading>Functions relating to network connections: duty to have regard to designated plans</heading><subsection eId="d25e3705"><num>(1)</num><content><p>The ISOP must, when carrying out any of its functions relating to the management of connections to the transmission system, have regard to the designated strategic plans.</p></content></subsection><subsection eId="d25e3711"><num>(2)</num><content><p>The Secretary of State may by regulations designate plans or documents for the purposes of this section.</p></content></subsection><subsection><num>(3)</num><content><p>In <ref href="#d25e3705">subsection (1)</ref>, the reference to “<term refersTo="#term-the-designated-strategic-plans">the designated strategic plans</term>” is a reference to those plans or documents designated by regulations under <ref href="#d25e3711">subsection (2)</ref> as they have effect at the time when the regulations are made.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-18-2"><num>(2)</num><content><p><ref eId="c00029" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00030" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (electricity supply) is amended as set out in <span><ref href="#section-18-3">subsections (3)</ref> to <ref href="#section-18-5">(5)</ref></span>.</p></content></subsection><subsection eId="section-18-3"><num>(3)</num><intro><p>In <ref eId="c00031" href="https://www.legislation.gov.uk/ukpga/1989/29/section/16">section 16</ref> (duty to connect on request)—</p></intro><level class="para1" eId="section-18-3-a"><num>(a)</num><content><p><mod>after <ref eId="c00032" href="https://www.legislation.gov.uk/ukpga/1989/29/section/16">subsection (2)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(2A)</num><content><p>In deciding how to comply with the duties under this section, and in particular in deciding how to prioritise persons requiring a connection, an electricity distributor must have regard to the designated strategic plans.</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-18-3-b"><num>(b)</num><content><p><mod>at the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(6)</num><content><p>In this section, “<term refersTo="#term-the-designated-strategic-plans">the designated strategic plans</term>” means the plans or documents designated by regulations made under section <ref href="#d25e3701">165A</ref><ref href="#d25e3711">(2)</ref> of the Energy Act 2023 (functions of the Independent System Operator and Planner relating to network connections).</p></content></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-18-4"><num>(4)</num><intro><p>In <ref eId="c00033" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">section 17</ref> (exceptions from duty to connect), in <ref eId="c00034" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">subsection (1)</ref>—</p></intro><level class="para1" eId="section-18-4-a"><num>(a)</num><content><p>omit the “or” at the end of <ref eId="c00035" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">paragraph (b)</ref>;</p></content></level><level class="para1" eId="section-18-4-b"><num>(b)</num><content><p><mod>after <ref eId="c00036" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">paragraph (b)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(ba)</num><content><p>it would not be in accordance with the designated strategic plans (within the meaning of section 16) for the distributor to do so; or</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></level></subsection><subsection eId="section-18-5"><num>(5)</num><content><p><mod>In <ref eId="c00037" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A">Schedule 6A</ref> (provisions imposing obligations enforceable as relevant requirements), in <ref eId="c00038" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A/paragraph/4A">paragraph 4A</ref> (electricity system operator), in <ref eId="c00039" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A/paragraph/4A">paragraph (c)</ref>, for “165” substitute <quotedText>“<ref href="#d25e3701">165A</ref>”</quotedText>.</mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-consents-for-electricity-infrastructure-in-scotland"><heading>Consents for electricity infrastructure in Scotland</heading><section eId="section-19"><num>19</num><heading>Consents for generating stations and overhead lines: applications</heading><subsection eId="section-19-1"><num>(1)</num><content><p>Schedule 8 to the Electricity Act 1989 (consents of the Secretary of State and the Scottish Ministers under sections 36 and 37) is amended as follows.</p></content></subsection><subsection eId="section-19-2"><num>(2)</num><content><p><mod>After paragraph 1 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Applications made to the Scottish Ministers for consent</heading><paragraph eId="d25e3890" class="schProv1"><num>1A</num><subparagraph><num>(1)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations make provision about the following matters in relation to applications to the Scottish Ministers for consent under section 36 or 37.</p></content></subparagraph><subparagraph eId="d25e3900"><num>(2)</num><intro><p>The matters are—</p></intro><level class="para1" eId="d25e3906"><num>(a)</num><content><p>the steps a person must take before making an application;</p></content></level><level class="para1"><num>(b)</num><content><p>the information that must be included in an application;</p></content></level><level class="para1" eId="d25e3918"><num>(c)</num><content><p>an acceptance stage, during which the Scottish Ministers must assess an applicant’s compliance with any requirements imposed by the regulations in order to decide whether or not to accept the application;</p></content></level><level class="para1"><num>(d)</num><intro><p>fees to be paid to the Scottish Ministers—</p></intro><level class="para2"><num>(i)</num><content><p>on application, or</p></content></level><level class="para2"><num>(ii)</num><content><p>for anything done by them in relation to a proposed application;</p></content></level></level><level class="para1"><num>(e)</num><content><p>requests by the Scottish Ministers for additional information to aid their decision whether or not to accept an application or to grant consent.</p></content></level></subparagraph><subparagraph eId="d25e3948"><num>(3)</num><intro><p>The steps that may be the subject of provision made by virtue of sub-paragraph (2)(a) include—</p></intro><level class="para1"><num>(a)</num><content><p>notifying prescribed persons of the proposed application,</p></content></level><level class="para1"><num>(b)</num><content><p>publicising the proposed application, and</p></content></level><level class="para1" eId="d25e3966"><num>(c)</num><content><p>carrying out a consultation about the proposed application.</p></content></level></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-3"><num>(3)</num><intro><p>In paragraph 2 (objections by relevant planning authority)—</p></intro><level class="para1" eId="section-19-3-a"><num>(a)</num><content><p><mod>in sub-paragraph (1), for “Secretary of State for his” substitute <quotedText>“appropriate authority for a”</quotedText>;</mod></p></content></level><level class="para1" eId="section-19-3-b"><num>(b)</num><content><p><mod>in sub-paragraph (2), at the beginning insert <quotedText>“In the case of an application made to the Secretary of State,”</quotedText>;</mod></p></content></level><level class="para1" eId="section-19-3-c"><num>(c)</num><content><p><mod>after sub-paragraph (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><subparagraph><num>(2A)</num><intro><p>In the case of an application made to the Scottish Ministers, where the relevant planning authority notify the Scottish Ministers that they object to the application and their objection is not withdrawn, the Scottish Ministers—</p></intro><level class="para1"><num>(a)</num><content><p>must appoint a person (referred to in this Schedule as the “<term refersTo="#term-reporter">reporter</term>”) to examine the application, and</p></content></level><level class="para1"><num>(b)</num><content><p>before determining whether to give their consent, must consider the objection and the reporter’s final report.</p></content></level><wrapUp><p>See paragraph 2A for the process that must be followed by the reporter.</p></wrapUp></subparagraph></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-19-3-d"><num>(d)</num><intro><p>in sub-paragraph (4)—</p></intro><level class="para2" eId="section-19-3-d-i"><num>(i)</num><content><p><mod>after “(2)” insert <quotedText>“or (2A)”</quotedText>;</mod></p></content></level><level class="para2" eId="section-19-3-d-ii"><num>(ii)</num><content><p><mod>for “Secretary of State” substitute <quotedText>“appropriate authority”</quotedText>;</mod></p></content></level></level><level class="para1" eId="section-19-3-e"><num>(e)</num><content><p><mod>in sub-paragraph (5), for “Secretary of State” substitute <quotedText>“appropriate authority”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-19-4"><num>(4)</num><content><p><mod>After paragraph 2 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Procedure following objection by relevant planning authority: Scotland</heading><paragraph eId="d25e4075" class="schProv1"><num>2A</num><subparagraph><num>(1)</num><content><p>A reporter appointed under paragraph 2(2A)(a) must make proposals as regards the appropriate procedure for examining the application.</p></content></subparagraph><subparagraph eId="d25e4085"><num>(2)</num><intro><p>The appropriate procedure may consist of one or more of the following—</p></intro><level class="para1"><num>(a)</num><intro><p>considering—</p></intro><level class="para2"><num>(i)</num><content><p>the objection by the relevant planning authority,</p></content></level><level class="para2"><num>(ii)</num><content><p>any other objections made in accordance with regulations under paragraph 3(1)(c), and</p></content></level><level class="para2"><num>(iii)</num><content><p>any other representations made in accordance with an enactment;</p></content></level></level><level class="para1" eId="d25e4115"><num>(b)</num><content><p>considering new written representations about the application from persons specified by the reporter;</p></content></level><level class="para1" eId="d25e4121"><num>(c)</num><content><p>holding one or more hearing sessions;</p></content></level><level class="para1"><num>(d)</num><content><p>carrying out an inspection of the land to which the application relates;</p></content></level><level class="para1" eId="d25e4133"><num>(e)</num><content><p>holding a public inquiry.</p></content></level></subparagraph><subparagraph eId="d25e4139"><num>(3)</num><content><p>Where the reporter proposes a procedure that includes proceedings within sub-paragraph (2)(b), (c) or (e), the proposal must include a statement of the issues that are proposed to be within the scope of each of those proceedings.</p></content></subparagraph><subparagraph><num>(4)</num><intro><p>The reporter must—</p></intro><level class="para1"><num>(a)</num><content><p>publish the proposals,</p></content></level><level class="para1"><num>(b)</num><content><p>notify all interested parties of the proposals, and</p></content></level><level class="para1"><num>(c)</num><content><p>invite written representations about the proposals before the end of the time period specified by the reporter.</p></content></level></subparagraph><subparagraph><num>(5)</num><content><p>The published proposals must include or be accompanied by an explanation of the reasons for the proposals.</p></content></subparagraph><subparagraph><num>(6)</num><content><p>The reporter may hold a meeting to hear representations about the proposals.</p></content></subparagraph><subparagraph><num>(7)</num><intro><p>After considering the representations, the reporter must—</p></intro><level class="para1"><num>(a)</num><content><p>decide on the appropriate procedure for examining the application, and</p></content></level><level class="para1"><num>(b)</num><content><p>publish that decision.</p></content></level></subparagraph><subparagraph><num>(8)</num><intro><p>The published decision must include or be accompanied by an explanation of—</p></intro><level class="para1"><num>(a)</num><content><p>the reasons for the decision,</p></content></level><level class="para1"><num>(b)</num><content><p>the intended time period for the carrying out of the procedure, and</p></content></level><level class="para1"><num>(c)</num><content><p>the intended time period within which the reporter will send a final report to the Scottish Ministers.</p></content></level></subparagraph><subparagraph><num>(9)</num><content><p>Sub-paragraph (3) applies to the reporter’s decision as it applies to the reporter’s proposals.</p></content></subparagraph><subparagraph><num>(10)</num><content><p>On completing the examination, the reporter must prepare and send to the Scottish Ministers a final report setting out the reporter’s recommendations on the application.</p></content></subparagraph><subparagraph><num>(11)</num><intro><p>In this paragraph, “<term refersTo="#term-interested-party">interested party</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>the applicant,</p></content></level><level class="para1"><num>(b)</num><content><p>the relevant planning authority which made the objection under paragraph 2(2A),</p></content></level><level class="para1"><num>(c)</num><content><p>any person who has made an objection in accordance with regulations under paragraph 3, or</p></content></level><level class="para1"><num>(d)</num><content><p>any person who has made representations in accordance with any other enactment.</p></content></level></subparagraph><subparagraph><num>(12)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations make provision amending or setting out further detail about the procedure set out in this paragraph. (See also paragraph 7B(2)(e).)</p></content></subparagraph><subparagraph><num>(13)</num><content><p>A statutory instrument containing regulations under this paragraph is not to be made by the Secretary of State unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subparagraph><subparagraph><num>(14)</num><content><p>Regulations made by the Scottish Ministers under this paragraph are subject to the affirmative procedure.</p></content></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-5"><num>(5)</num><content><p><mod>After paragraph 7A insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Applications to the Scottish Ministers: time limits</heading><paragraph eId="d25e4298" class="schProv1"><num>7B</num><subparagraph><num>(1)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations specify a time limit for actions that may or must be taken in relation to an application to the Scottish Ministers for consent under section 36 or 37.</p></content></subparagraph><subparagraph eId="d25e4308"><num>(2)</num><intro><p>The regulations may, for example, specify a time limit for—</p></intro><level class="para1"><num>(a)</num><content><p>a person to comply with a requirement of regulations under paragraph 1A;</p></content></level><level class="para1"><num>(b)</num><content><p>a person to respond to a pre-application consultation (see paragraph 1A(3)(c));</p></content></level><level class="para1"><num>(c)</num><content><p>a person who is notified of an application in accordance with an enactment to provide their opinion or advice on the application;</p></content></level><level class="para1"><num>(d)</num><content><p>a relevant planning authority to object to an application under paragraph 2(2A);</p></content></level><level class="para1" eId="d25e4338"><num>(e)</num><content><p>a reporter to take any steps required by paragraph 2A;</p></content></level><level class="para1"><num>(f)</num><content><p>the Scottish Ministers to decide an application.</p></content></level></subparagraph><subparagraph><num>(3)</num><content><p>The regulations may include provision about the consequences of failure to comply with a time limit.</p></content></subparagraph><subparagraph><num>(4)</num><content><p>Where regulations under this paragraph specify a time limit for the completion of an acceptance stage (see paragraph 1A(2)(c)), the regulations may not permit the extension of that limit.</p></content></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-6"><num>(6)</num><content><p>The amendments made by subsection (3) do not affect the continued application in relation to the Scottish Ministers of regulations made under paragraph 2(3) of Schedule 8 to the Electricity Act 1989 before this section comes into force.</p></content></subsection></section><section eId="section-20"><num>20</num><heading>Variation of consents etc</heading><content><p><mod>After section 37 of the Electricity Act 1989 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e4384"><num>37A</num><heading>Application for variation of section 37 consent: Scotland</heading><subsection><num>(1)</num><content><p>The person for the time being entitled to the benefit of a section 37 consent that was granted by the Scottish Ministers may make an application to the Scottish Ministers for the consent to be varied.</p></content></subsection><subsection><num>(2)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about variation under this section, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the making and withdrawal of applications;</p></content></level><level class="para1"><num>(b)</num><content><p>fees;</p></content></level><level class="para1"><num>(c)</num><content><p>publicity and consultation requirements;</p></content></level><level class="para1"><num>(d)</num><content><p>rights to make representations;</p></content></level><level class="para1"><num>(e)</num><content><p>public inquiries;</p></content></level><level class="para1"><num>(f)</num><content><p>consideration of applications.</p></content></level></subsection><subsection><num>(3)</num><content><p>The regulations may provide for any statutory provision applicable to the grant by the Scottish Ministers of a section 37 consent to apply with specified modifications to the variation of a section 37 consent under this section.</p></content></subsection><subsection><num>(4)</num><intro><p>On an application for a section 37 consent to be varied, the Scottish Ministers may make such variations to the consent as appear to them to be appropriate, having regard (in particular) to—</p></intro><level class="para1"><num>(a)</num><content><p>the applicant’s reason for seeking the variation;</p></content></level><level class="para1"><num>(b)</num><content><p>the variations proposed;</p></content></level><level class="para1"><num>(c)</num><content><p>any objections made to the proposed variations, the views of consultees and the outcome of any public inquiry.</p></content></level></subsection><subsection><num>(5)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-section-37-consent">section 37 consent</term>” means a consent granted under section 37 (consent required for overhead lines);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-statutory-provision">statutory provision</term>” means a provision of or made under an Act, whenever passed or made; and for this purpose “<term refersTo="#term-act">Act</term>” includes an Act of the Scottish Parliament.</p></content></hcontainer></subsection></section><section eId="d25e4493"><num>37B</num><heading>Variation of section 36 and 37 consents on change of circumstances: Scotland</heading><subsection><num>(1)</num><intro><p>The Scottish Ministers may vary a consent under section 36 or 37 if—</p></intro><level class="para1"><num>(a)</num><intro><p>they consider that the consent ought to be varied—</p></intro><level class="para2"><num>(i)</num><content><p>because of a change in circumstances relating to the environment, or</p></content></level><level class="para2"><num>(ii)</num><content><p>because of technological changes, and</p></content></level></level><level class="para1"><num>(b)</num><content><p>the person for the time being entitled to the benefit of the consent agrees to the variation.</p></content></level></subsection><subsection><num>(2)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about variation under this section, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the procedure for getting agreement;</p></content></level><level class="para1"><num>(b)</num><content><p>publicity, notification and consultation requirements;</p></content></level><level class="para1"><num>(c)</num><content><p>rights to make representations.</p></content></level></subsection><subsection><num>(3)</num><content><p>The regulations may provide for any statutory provision applicable to the grant by the Scottish Ministers of a consent under section 36 or 37 to apply with specified modifications to the variation of such a consent under this section.</p></content></subsection><subsection><num>(4)</num><content><p>In this section, “<term refersTo="#term-statutory-provision">statutory provision</term>” has the same meaning as in section <ref href="#d25e4384">37A</ref>.</p></content></subsection></section><section eId="d25e4572"><num>37C</num><heading>Correction of errors in consent documents: Scotland</heading><subsection eId="d25e4576"><num>(1)</num><content><p>The Scottish Ministers may amend a decision document in order to correct a correctable error.</p></content></subsection><subsection><num>(2)</num><intro><p>In <ref href="#d25e4576">subsection (1)</ref>—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-correctable-error">correctable error</term>” means an error or omission which—</p></intro><level class="para1"><num>(a)</num><content><p>is in a part of the decision document which records the decision, and</p></content></level><level class="para1"><num>(b)</num><content><p>is not part of the statement of reasons for the decision;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-decision-document">decision document</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a document recording a consent under section 36 or 37, or</p></content></level><level class="para1"><num>(b)</num><content><p>a document recording a variation of such a consent.</p></content></level></hcontainer></subsection><subsection><num>(3)</num><content><p>The Scottish Ministers may exercise the power in <ref href="#d25e4576">subsection (1)</ref> either of their own accord or following a written request from a person for the time being entitled to the benefit of the consent.</p></content></subsection><subsection><num>(4)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about the process for corrections, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the making of written requests;</p></content></level><level class="para1"><num>(b)</num><content><p>notification requirements;</p></content></level><level class="para1"><num>(c)</num><content><p>rights to make representations.</p></content></level></subsection></section></quotedStructure></mod></p></content></section><section eId="section-21"><num>21</num><heading>Proceedings for questioning certain decisions on consents</heading><subsection eId="section-21-1"><num>(1)</num><content><p>Section 36D of the Electricity Act 1989 (proceedings for questioning certain decisions under section 36) is amended as set out in subsections <ref href="#section-21-2">(2)</ref> to <ref href="#section-21-4">(4)</ref>.</p></content></subsection><subsection eId="section-21-2"><num>(2)</num><content><p><mod>For subsection (3) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(3)</num><intro><p>This section applies to a decision under any of the following—</p></intro><level class="para1"><num>(a)</num><content><p>section 36 (application for consent for generating station);</p></content></level><level class="para1"><num>(b)</num><content><p>section 36C (application for variation of section 36 consent);</p></content></level><level class="para1"><num>(c)</num><content><p>section 37 (application for consent for overhead lines);</p></content></level><level class="para1"><num>(d)</num><content><p>section <ref href="#d25e4384">37A</ref> (application for variation of section 37 consent);</p></content></level><level class="para1"><num>(e)</num><content><p>section <ref href="#d25e4493">37B</ref> (variation of consents by Scottish Ministers);</p></content></level><level class="para1"><num>(f)</num><content><p>section 37C (consents and variation of consents in Scotland: correction of errors).</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-21-3"><num>(3)</num><content><p><mod>In subsection (4), for “taken” substitute <quotedText>“published by the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-4"><num>(4)</num><content><p><mod>In the heading, for “under section 36” substitute <quotedText>“of the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-5"><num>(5)</num><content><p><mod>In Schedule 8 to the Electricity Act 1989, in paragraph 5B (proceedings for questioning certain decisions under paragraph 3(2)), in sub-paragraph (4), for “taken” substitute <quotedText>“published by the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-6"><num>(6)</num><content><p><mod>In section 237 of the Town and Country Planning (Scotland) Act 1997 (challenges to validity of development plans and certain orders, decisions and directions), in subsection (3), after paragraph (b) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(ba)</num><content><p>any decision to give a direction under section 57(2) or (2ZA);</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-21-7"><num>(7)</num><content><p>The amendments made by this section apply only in relation to decisions made on or after the date on which this section comes into force.</p></content></subsection></section><section eId="section-22"><num>22</num><heading>Applications for necessary wayleaves: fees</heading><content><p><mod>In Schedule 4 to the Electricity Act 1989 (other powers etc of licence holders), after paragraph 6 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Fees for applications under paragraph 6(3) to the Scottish Ministers</heading><paragraph eId="d25e4794" class="schProv1"><num>6A</num><content><p>The Scottish Ministers may by regulations make provision about the fees to be paid to the Scottish Ministers in relation to an application made to them under paragraph 6(3).</p></content></paragraph></hcontainer></quotedStructure></mod></p></content></section><section eId="section-23"><num>23</num><heading>Regulations</heading><subsection eId="section-23-1"><num>(1)</num><content><p><ref eId="c00040" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">Section 106</ref> of the <ref eId="c00041" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (regulations and orders) is amended as follows.</p></content></subsection><subsection eId="section-23-2"><num>(2)</num><intro><p>In <ref eId="c00042" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">subsection (1ZA)</ref>—</p></intro><level class="para1" eId="section-23-2-a"><num>(a)</num><content><p><mod>for “the power conferred on” substitute <quotedText>“a power of”</quotedText>;</mod></p></content></level><level class="para1" eId="section-23-2-b"><num>(b)</num><content><p><mod>for “by section 36C” substitute <quotedText>“to make regulations (see section 27 of the Interpretation and Legislative Reform (Scotland) Act 2010 (Scottish statutory instruments))”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-23-3"><num>(3)</num><content><p><mod>After subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e4853"><num>(2ZA)</num><intro><p>Subsection (2) does not apply to a statutory instrument containing (whether alone or with other provision)—</p></intro><level class="para1" eId="d25e4859"><num>(a)</num><content><p>regulations under paragraph <ref href="#d25e4075">2A</ref> of Schedule 8;</p></content></level></subsection></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-23-4"><num>(4)</num><content><p><mod>In <ref eId="c00043" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">subsection (3)</ref>, for the words after “under” substitute <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>section 36C,</p></content></level><level class="para1"><num>(b)</num><content><p>section <ref href="#d25e4384">37A</ref>,</p></content></level><level class="para1"><num>(c)</num><content><p>section <ref href="#d25e4493">37B</ref>,</p></content></level><level class="para1"><num>(d)</num><content><p>section <ref href="#d25e4572">37C</ref>,</p></content></level><level class="para1"><num>(e)</num><content><p>paragraph <ref href="#d25e4794">6A</ref> of Schedule 4, or</p></content></level><level class="para1"><num>(f)</num><content><p>any paragraph of Schedule 8 except paragraph <ref href="#d25e4075">2A</ref>,</p></content></level><p>are subject to the negative procedure.</p></quotedStructure></mod></p></content></subsection><subsection eId="section-23-5"><num>(5)</num><content><p><mod>At the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(4)</num><content><p>Before making regulations under a provision listed in subsection <ref href="#d25e4960">(6)</ref>, the Secretary of State must consult the Scottish Ministers.</p></content></subsection><subsection><num>(5)</num><content><p>Before making regulations under a provision listed in subsection <ref href="#d25e4960">(6)</ref>, the Scottish Ministers must consult the Secretary of State.</p></content></subsection><subsection eId="d25e4960"><num>(6)</num><intro><p>The provisions are—</p></intro><level class="para1"><num>(a)</num><content><p>section <ref href="#d25e4384">37A</ref>;</p></content></level><level class="para1"><num>(b)</num><content><p>section <ref href="#d25e4493">37B</ref>;</p></content></level><level class="para1"><num>(c)</num><content><p>section <ref href="#d25e4572">37C</ref>;</p></content></level><level class="para1"><num>(d)</num><content><p>paragraphs <ref href="#d25e3890">1A</ref>, <ref href="#d25e4075">2A</ref> and <ref href="#d25e4298">7B</ref> of Schedule 8.</p></content></level></subsection></quotedStructure></mod></p></content></subsection></section><section eId="section-24"><num>24</num><heading><span><ref href="#section-19">Sections 19</ref> to <ref href="#section-23">23</ref></span>: minor and consequential amendments</heading><intro><p><ref href="#schedule-1">Schedule 1</ref> makes—</p></intro><level class="para1" eId="section-24-a"><num>(a)</num><content><p>amendments to the <ref eId="c00044" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> that are consequential on the amendments made by sections <ref href="#section-19">19</ref> to <ref href="#section-23">23</ref>, and</p></content></level><level class="para1" eId="section-24-b"><num>(b)</num><content><p>other minor amendments relating to consents for electricity infrastructure in Scotland (including amendments to reflect previous transfers of functions to the Scottish Ministers).</p></content></level></section><section eId="section-25"><num>25</num><heading>Environmental impact assessments for electricity works</heading><subsection eId="section-25-1"><num>(1)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations amend the Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 2017 (<ref eId="c00045" href="http://www.legislation.gov.uk/id/ssi/2017/101">S.S.I. 2017/101</ref>) (the “<term refersTo="#term-2017-regulations" eId="term-2017-regulations">2017 Regulations</term>”) by making provision described in subsection <ref href="#section-25-2">(2)</ref> in connection with environmental impact assessments and applications made to the Scottish Ministers for—</p></intro><level class="para1" eId="section-25-1-a"><num>(a)</num><content><p>consent granted under section 36 or 37 of the Electricity Act 1989 (consent for construction etc of generating stations or for overhead lines), or</p></content></level><level class="para1" eId="section-25-1-b"><num>(b)</num><content><p>variation of consent granted under section 36 of that Act.</p></content></level></subsection><subsection eId="section-25-2"><num>(2)</num><intro><p>That provision is—</p></intro><level class="para1" eId="section-25-2-a"><num>(a)</num><content><p>provision for the Scottish Ministers to refuse an application in respect of Schedule 2 development that is not accompanied by an EIA report if the development has not been the subject of a screening opinion;</p></content></level><level class="para1" eId="section-25-2-b"><num>(b)</num><content><p>provision for the Scottish Ministers to charge developers fees for screening opinions and scoping opinions;</p></content></level><level class="para1" eId="section-25-2-c"><num>(c)</num><content><p>provision about the sending of copies of EIA reports to the Scottish Ministers;</p></content></level><level class="para1" eId="section-25-2-d"><num>(d)</num><content><p>provision about the publication by developers of the information listed in regulation 14(2) of the 2017 Regulations (information about EIA reports);</p></content></level><level class="para1" eId="section-25-2-e"><num>(e)</num><content><p>provision about making EIA reports available for inspection;</p></content></level><level class="para1" eId="section-25-2-f"><num>(f)</num><content><p>provision about time limits for the consultation bodies and other public bodies to make representations to the Scottish Ministers about scoping opinions and EIA reports;</p></content></level><level class="para1" eId="section-25-2-g"><num>(g)</num><content><p>provision about time limits for the consultation bodies and other public bodies to enter into consultation with developers about, and to make available, information relevant to the preparation of EIA reports;</p></content></level><level class="para1" eId="section-25-2-h"><num>(h)</num><content><p>provision about time limits for developers to provide additional information to the Scottish Ministers;</p></content></level><level class="para1" eId="section-25-2-i"><num>(i)</num><content><p>provision about the publication by developers of the information listed in regulation 20(3) of the 2017 Regulations (information about additional information);</p></content></level><level class="para1" eId="section-25-2-j"><num>(j)</num><content><p>provision about making additional information available for inspection;</p></content></level><level class="para1" eId="section-25-2-k"><num>(k)</num><content><p>provision about the publication by developers of the information listed in regulation 23(2) of the 2017 Regulations (information about decisions);</p></content></level><level class="para1" eId="section-25-2-l"><num>(l)</num><content><p>provision that the Secretary of State or the Scottish Ministers consider appropriate for securing that the procedures under the 2017 Regulations operate effectively, or more effectively, alongside the procedures under regulations made under section 36C of the Electricity Act 1989 or paragraph <ref href="#d25e3890">1A</ref> or <ref href="#d25e4298">7B</ref> of Schedule 8 to that Act (inserted by section <ref href="#section-19">19</ref> of this Act).</p></content></level></subsection><subsection eId="section-25-3"><num>(3)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations amend the 2017 Regulations by making provision described in subsection <ref href="#section-25-4">(4)</ref> in connection with environmental impact assessments and applications made to the Scottish Ministers for variation of consent granted under section 37 of the Electricity Act 1989.</p></content></subsection><subsection eId="section-25-4"><num>(4)</num><intro><p>That provision is—</p></intro><level class="para1" eId="section-25-4-a"><num>(a)</num><intro><p>provision requiring an environmental impact assessment in respect of the proposed variation to be carried out before Scottish Ministers—</p></intro><level class="para2" eId="section-25-4-a-i"><num>(i)</num><content><p>vary the consent, or</p></content></level><level class="para2" eId="section-25-4-a-ii"><num>(ii)</num><content><p>direct that planning permission is deemed to be granted under section 57(2) or (2ZA) of the Town and Country Planning (Scotland) Act 1997 in respect of EIA development;</p></content></level></level><level class="para1" eId="section-25-4-b"><num>(b)</num><content><p>provision requiring the Scottish Ministers to take the environmental information into account when carrying out an environmental impact assessment in respect of the proposed variation;</p></content></level><level class="para1" eId="section-25-4-c"><num>(c)</num><content><p>provision applying provisions of the 2017 Regulations (including provisions amended by regulations under subsection <ref href="#section-25-1">(1)</ref>), with or without modifications;</p></content></level><level class="para1" eId="section-25-4-d"><num>(d)</num><content><p>provision that the Secretary of State or the Scottish Ministers consider appropriate for securing that the procedures under the 2017 Regulations operate effectively, or more effectively, alongside the procedures under regulations made under section <ref href="#d25e4384">37A</ref> of the Electricity Act 1989 (inserted by section <ref href="#section-20">20</ref> of this Act).</p></content></level></subsection><subsection eId="section-25-5"><num>(5)</num><intro><p>Regulations under this section may—</p></intro><level class="para1" eId="section-25-5-a"><num>(a)</num><content><p>make different provision for different purposes or different areas;</p></content></level><level class="para1" eId="section-25-5-b"><num>(b)</num><content><p>make consequential or supplementary provision;</p></content></level><level class="para1" eId="section-25-5-c"><num>(c)</num><content><p>make transitional provision.</p></content></level></subsection><subsection eId="section-25-6"><num>(6)</num><content><p>Regulations under this section made by the Secretary of State are to be made by statutory instrument.</p></content></subsection><subsection eId="section-25-7"><num>(7)</num><content><p>A statutory instrument containing regulations made by the Secretary of State under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-25-8"><num>(8)</num><content><p>Before making regulations under this section, the Secretary of State must consult the Scottish Ministers.</p></content></subsection><subsection eId="section-25-9"><num>(9)</num><content><p>For regulations under this section made by the Scottish Ministers, see section 27 of the Interpretation and Legislative Reform (Scotland) Act <ref eId="c00046" href="http://www.legislation.gov.uk/id/asp/2010/10">2010 (asp 10)</ref> (Scottish statutory instruments).</p></content></subsection><subsection eId="section-25-10"><num>(10)</num><content><p>Regulations made by the Scottish Ministers under this section are subject to the negative procedure (see section 28 of the Interpretation and Legislative Reform (Scotland) Act <ref eId="c00047" href="http://www.legislation.gov.uk/id/asp/2010/10">2010 (asp 10)</ref>).</p></content></subsection><subsection eId="section-25-11"><num>(11)</num><content><p>Before making regulations under this section, the Scottish Ministers must consult the Secretary of State.</p></content></subsection><subsection eId="section-25-12"><num>(12)</num><intro><p>In this section, subject to subsection <ref href="#section-25-13">(13)</ref>, the following terms have the same meaning as they have in the 2017 Regulations—</p></intro><hcontainer name="definition"><content><p>“additional information”</p></content></hcontainer><hcontainer name="definition"><content><p>“the consultation bodies”</p></content></hcontainer><hcontainer name="definition"><content><p>“developer”</p></content></hcontainer><hcontainer name="definition"><content><p>“EIA development”</p></content></hcontainer><hcontainer name="definition"><content><p>“EIA report”</p></content></hcontainer><hcontainer name="definition"><content><p>“environmental impact assessment”</p></content></hcontainer><hcontainer name="definition"><content><p>“environmental information”</p></content></hcontainer><hcontainer name="definition"><content><p>“Schedule 2 development”</p></content></hcontainer><hcontainer name="definition"><content><p>“scoping opinion”</p></content></hcontainer><hcontainer name="definition"><content><p>“screening opinion”.</p></content></hcontainer></subsection><subsection eId="section-25-13"><num>(13)</num><content><p>In subsections <ref href="#section-25-3">(3)</ref> and <ref href="#section-25-4">(4)</ref>, those terms have the same meaning in connection with applications for variation of consent granted under section 37 of the Electricity Act 1989 as they have, in the 2017 Regulations, in connection with applications for variation of consent granted under section 36 of that Act.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-long-duration-electricity-storage"><heading>Long duration electricity storage</heading><section eId="section-26"><num>26</num><heading>Long duration electricity storage</heading><content><p><mod>In the Electricity Act 1989, after <ref eId="c00048" href="https://www.legislation.gov.uk/ukpga/1989/29/section/10O">section 10O</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Long duration electricity storage</heading><section><num>10P</num><heading>Long duration electricity storage</heading><subsection><num>(1)</num><content><p>The Authority must, as soon as reasonably practicable after this section comes into force, establish and operate a scheme in accordance with this section.</p></content></subsection><subsection><num>(2)</num><content><p>The scheme must be designed for the purpose of encouraging the development and use of long duration electricity storage installations.</p></content></subsection><subsection><num>(3)</num><intro><p>The scheme must be open to persons who—</p></intro><level class="para1"><num>(a)</num><content><p>hold or intend to apply for a generation licence to operate a long duration electricity storage installation, and</p></content></level><level class="para1"><num>(b)</num><content><p>meet any other specified criteria.</p></content></level></subsection><subsection eId="d25e5416"><num>(4)</num><intro><p>The scheme must provide for an LDES operator who operates an approved installation—</p></intro><level class="para1"><num>(a)</num><content><p>to receive payments from a holder of an electricity system operator licence where the operator’s assessed revenue from that installation is below a specified amount, in specified circumstances, and</p></content></level><level class="para1"><num>(b)</num><content><p>to make payments to a holder of an electricity system operator licence where the operator’s assessed revenue from that installation is above a specified amount, in specified circumstances.</p></content></level></subsection><subsection><num>(5)</num><intro><p>In subsection <ref href="#d25e5416">(4)</ref>—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-an-approved-installation">an approved installation</term>” means a long duration electricity storage installation which is approved by the Authority for the purposes of subsection <ref href="#d25e5416">(4)</ref> in accordance with the scheme;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-assessed-revenue">assessed revenue</term>”, in relation to a long duration electricity storage installation, means the difference between—</p></intro><level class="para1"><num>(a)</num><content><p>revenue of a specified kind earned or derived in connection with that installation, and</p></content></level><level class="para1"><num>(b)</num><content><p>costs of a specified kind incurred in connection with operating the installation.</p></content></level></hcontainer></subsection><subsection><num>(6)</num><content><p>The Authority may determine how costs and revenue are to be calculated for the purposes of the scheme.</p></content></subsection><subsection><num>(7)</num><content><p>In setting charges to which Article 18(1) of the Electricity Regulation applies, the holder of an electricity system operator licence may take account of payments it makes or receives under the scheme.</p></content></subsection><subsection><num>(8)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-ldes-operator">LDES operator</term>” means a person who, under a generation licence, generates electricity by means of a long duration electricity storage installation;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-long-duration-electricity-storage-installation">long duration electricity storage installation</term>” means an installation that—</p></intro><level class="para1"><num>(a)</num><content><p>generates electricity from stored energy,</p></content></level><level class="para1"><num>(b)</num><content><p>has an electricity generating capacity of not less than 50 megawatts, and</p></content></level><level class="para1"><num>(c)</num><content><p>is capable of generating electricity at its full capacity for a continuous period of not less than eight hours;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-specified">specified</term>” means specified by the Authority for the purposes of the scheme in—</p></intro><level class="para1"><num>(a)</num><content><p>a document published by the Authority, or</p></content></level><level class="para1"><num>(b)</num><content><p>a condition of a licence;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-stored-energy">stored energy</term>” has the meaning given by section 4(3ZB).</p></content></hcontainer></subsection><subsection><num>(9)</num><intro><p>The Secretary of State may by regulations amend the definition of “long duration electricity storage installation” by substituting—</p></intro><level class="para1"><num>(a)</num><content><p>for the amount of electricity generating capacity for the time being mentioned in <ref href="#d25e5508">paragraph (b)</ref> of the definition, a different amount;</p></content></level><level class="para1"><num>(b)</num><content><p>for the period for the time being mentioned in <ref href="#d25e5512">paragraph (c)</ref> of the definition, a different period (which may not be less than eight hours).</p></content></level></subsection></section></hcontainer></quotedStructure></mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-consumer-benefits"><heading>Consumer benefits</heading><section eId="section-27"><num>27</num><heading>Benefits for homes near electricity transmission projects</heading><subsection eId="section-27-1"><num>(1)</num><content><p>The Electricity Act 1989 is amended as follows.</p></content></subsection><subsection eId="section-27-2"><num>(2)</num><content><p><mod>After section 38 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Benefits resulting from proximity to new or upgraded transmission infrastructure</heading><section eId="d25e5593"><num>38A</num><heading>Power to establish scheme for giving of benefits</heading><subsection eId="d25e5597"><num>(1)</num><content><p>The Secretary of State may by regulations establish a scheme under which persons with a specified connection to qualifying premises are entitled to financial benefits provided (directly or indirectly) by electricity suppliers.</p></content></subsection><subsection><num>(2)</num><content><p>Qualifying premises must be identified by reference to their proximity to qualifying works.</p></content></subsection><subsection><num>(3)</num><intro><p>Qualifying works must involve the construction, erection, expansion or improvement of electrical plant or an electric line that (in either case)—</p></intro><level class="para1"><num>(a)</num><content><p>is wholly or partly above the ground, and</p></content></level><level class="para1"><num>(b)</num><content><p>forms or is intended to form part of a transmission system.</p></content></level><wrapUp><p>They may be works that took place before the making of the regulations or the coming into force of this section.</p></wrapUp></subsection><subsection eId="d25e5630"><num>(4)</num><intro><p>The regulations may (among other things)—</p></intro><level class="para1"><num>(a)</num><content><p>make further provision determining, or for the determination of, whether premises or works are qualifying;</p></content></level><level class="para1"><num>(b)</num><content><p>confer functions in connection with the scheme;</p></content></level><level class="para1"><num>(c)</num><content><p>provide for the delegation of functions conferred in connection with the scheme;</p></content></level><level class="para1"><num>(d)</num><content><p>provide for payments by electricity suppliers to meet costs incurred in the carrying out of functions in connection with the scheme;</p></content></level><level class="para1"><num>(e)</num><content><p>provide for the costs of electricity suppliers under the scheme to be distributed among suppliers on such basis, and by such means, as the regulations provide;</p></content></level><level class="para1"><num>(f)</num><content><p>restrict a person’s ability to obtain payment of an amount standing to the credit of the person’s account with an electricity supplier, where that amount derives from benefits under the scheme;</p></content></level><level class="para1"><num>(g)</num><content><p>make provision about cases in which a person who has received benefits under the scheme in respect of premises ceases to be entitled under the scheme in respect of the premises, including provision for the withdrawal or recovery of the benefits;</p></content></level><level class="para1" eId="d25e5678"><num>(h)</num><content><p>make pass-through provision and associated provision (see section <ref href="#d25e5753">38B</ref>);</p></content></level><level class="para1" eId="d25e5687"><num>(i)</num><content><p>make enforcement provision (see section <ref href="#d25e5864">38C</ref>);</p></content></level><level class="para1" eId="d25e5696"><num>(j)</num><content><p>make information provision (see section <ref href="#d25e5952">38D</ref>).</p></content></level></subsection><subsection><num>(5)</num><intro><p>To the extent that this section enables provision to be made affecting the holders of licences, provision for that purpose may be made by modifying, or empowering or requiring the Authority to modify—</p></intro><level class="para1"><num>(a)</num><content><p>the conditions of a licence, or</p></content></level><level class="para1"><num>(b)</num><content><p>a document maintained in accordance with the conditions of a licence, or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="d25e5723"><num>(6)</num><content><p>A statutory instrument containing regulations under this section may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection><num>(7)</num><content><p>A draft laid under subsection <ref href="#d25e5723">(6)</ref> is not to be treated as a hybrid instrument for the purposes of the standing orders of either House of Parliament.</p></content></subsection><subsection><num>(8)</num><content><p>Regulations under this section bind the Crown unless they provide otherwise.</p></content></subsection><subsection><num>(9)</num><content><p>The Secretary of State may, out of money provided by Parliament, make payments to a person on whom functions are conferred by regulations under this section for the purposes of meeting (or helping to meet) the expenses of carrying out those functions.</p></content></subsection></section><section eId="d25e5753"><num>38B</num><heading>Passing of benefits to ultimate consumer</heading><subsection><num>(1)</num><content><p>This section applies for the purposes of section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5678">(h)</ref>.</p></content></subsection><subsection eId="d25e5770"><num>(2)</num><intro><p>“Pass-through provision” is provision that—</p></intro><level class="para1" eId="d25e5776"><num>(a)</num><intro><p>applies where—</p></intro><level class="para2"><num>(i)</num><content><p>one person (“the intermediary”) receives benefits under the scheme in connection with qualifying premises, and</p></content></level><level class="para2" eId="d25e5788"><num>(ii)</num><content><p>another person (“the end-user”) who is not living as part of the same household as the intermediary consumes electricity supplied to the premises, and</p></content></level></level><level class="para1" eId="d25e5794"><num>(b)</num><content><p>requires the intermediary to pass on the substance of those benefits to the end-user.</p></content></level></subsection><subsection><num>(3)</num><intro><p>“<term refersTo="#term-associated-provision">Associated provision</term>” means provision that relates to pass-through provision and—</p></intro><level class="para1"><num>(a)</num><content><p>requires intermediaries to take steps to obtain benefits that will be subject to the requirement referred to in subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5794">(b)</ref>,</p></content></level><level class="para1"><num>(b)</num><content><p>requires intermediaries to supply information to end-users,</p></content></level><level class="para1"><num>(c)</num><content><p>provides for the making of payments to intermediaries (in addition to the provision of benefits of the sort mentioned in section <ref href="#d25e5593">38A</ref><ref href="#d25e5597">(1)</ref>), or</p></content></level><level class="para1"><num>(d)</num><content><p>provides for the withdrawal or recovery of benefits given or other payments made to intermediaries who fail to comply with the requirement referred to in subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5794">(b)</ref>.</p></content></level></subsection><subsection><num>(4)</num><content><p>For the purposes of subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5776">(a)</ref><ref href="#d25e5788">(ii)</ref>, the cases in which electricity is consumed by a person include those in which the electricity is used to make available to the person heating, cooling, hot water or energy.</p></content></subsection></section><section eId="d25e5864"><num>38C</num><heading>Enforcement of benefit scheme</heading><subsection eId="d25e5868"><num>(1)</num><intro><p>In section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5687">(i)</ref>, “<term refersTo="#term-enforcement-provision">enforcement provision</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>provision for the enforcement in civil proceedings of requirements under the scheme,</p></content></level><level class="para1"><num>(b)</num><intro><p>provision for a person to impose a monetary penalty where the person is satisfied on the balance of probabilities that—</p></intro><level class="para2"><num>(i)</num><content><p>a requirement under the regulations has not been complied with, or</p></content></level><level class="para2"><num>(ii)</num><content><p>benefits or other payments under the scheme have been wrongfully obtained, or</p></content></level></level><level class="para1" eId="d25e5908"><num>(c)</num><content><p>provision for complaints procedures, dispute resolution, adjudication, appeals or redress in connection with the scheme.</p></content></level></subsection><subsection><num>(2)</num><content><p>If regulations under section <ref href="#d25e5593">38A</ref> provide for the imposition of monetary penalties, they must provide a right of appeal to a court or tribunal on grounds including both error of fact and error of law.</p></content></subsection><subsection eId="d25e5923"><num>(3)</num><content><p>The provision that may be made by virtue of subsection <ref href="#d25e5868">(1)</ref><ref href="#d25e5908">(c)</ref> includes provision for Part 2 of the Consumers, Estate Agents and Redress Act 2007 (complaints handling and redress schemes) to apply (with or without modifications) to end-user complaints as it applies to consumer complaints within the meaning of that Part.</p></content></subsection><subsection><num>(4)</num><content><p>In subsection <ref href="#d25e5923">(3)</ref>, “<term refersTo="#term-end-user-complaints">end-user complaints</term>” means complaints in connection with pass-through provision made by end-users against intermediaries or electricity suppliers (with the definitions in section <ref href="#d25e5753">38B</ref> applying for the purposes of this subsection).</p></content></subsection></section><section eId="d25e5952"><num>38D</num><heading>Disclosure and use of information in connection with benefit scheme</heading><subsection><num>(1)</num><content><p>In section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5696">(j)</ref>, “<term refersTo="#term-information-provision">information provision</term>” means provision within subsection <ref href="#d25e5978">(2)</ref> or <ref href="#d25e6020">(3)</ref>.</p></content></subsection><subsection eId="d25e5978"><num>(2)</num><intro><p>Provision is within this subsection if it is provision for the disclosure of information or evidence for the purposes of—</p></intro><level class="para1"><num>(a)</num><content><p>identifying persons entitled to benefits under the scheme,</p></content></level><level class="para1"><num>(b)</num><content><p>identifying qualifying premises or qualifying works,</p></content></level><level class="para1"><num>(c)</num><content><p>checking whether requirements under, or resulting from, the regulations are being or have been complied with,</p></content></level><level class="para1"><num>(d)</num><content><p>checking payments made under the scheme,</p></content></level><level class="para1"><num>(e)</num><content><p>facilitating the performance of functions conferred, or the enforcement of duties imposed, by or as a result of the regulations, or</p></content></level><level class="para1"><num>(f)</num><content><p>evaluating the performance of the scheme.</p></content></level></subsection><subsection eId="d25e6020"><num>(3)</num><intro><p>Provision is within this subsection if it is provision about the use or further disclosure of information disclosed—</p></intro><level class="para1"><num>(a)</num><content><p>further to provision within subsection <ref href="#d25e5978">(2)</ref>, or</p></content></level><level class="para1"><num>(b)</num><content><p>otherwise in connection with the scheme.</p></content></level></subsection><subsection><num>(4)</num><content><p>The provision that may be made by virtue of subsection <ref href="#d25e6020">(3)</ref> includes provision making it an offence to use or disclose information in an unauthorised manner; but such an offence may not be made punishable by imprisonment.</p></content></subsection><subsection><num>(5)</num><intro><p>Regulations under section <ref href="#d25e5593">38A</ref> that authorise the use or disclosure of information are not to be taken to authorise disclosure or use that would be liable to harm the commercial interests of any person, except to the extent that—</p></intro><level class="para1"><num>(a)</num><content><p>the regulations otherwise provide, or</p></content></level><level class="para1"><num>(b)</num><content><p>the person disclosing or using the information reasonably considers such disclosure or use necessary in view of the purpose of the regulations.</p></content></level></subsection><subsection eId="d25e6071"><num>(6)</num><intro><p>Regulations under section <ref href="#d25e5593">38A</ref> do not require or authorise the disclosure or use of information that—</p></intro><level class="para1"><num>(a)</num><content><p>contravenes the data protection legislation (but this section and the regulations are to be taken into account in determining whether the disclosure or use would contravene that legislation), or</p></content></level><level class="para1"><num>(b)</num><content><p>is prohibited by any of Parts 1 to 7 and Chapter 1 of Part 9 of the Investigatory Powers Act 2016.</p></content></level></subsection><subsection><num>(7)</num><content><p>In subsection <ref href="#d25e6071">(6)</ref>, “<term refersTo="#term-the-data-protection-legislation">the data protection legislation</term>” has the same meaning as in the Data Protection Act 2018 (see section 3 of that Act).</p></content></subsection></section></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-27-3"><num>(3)</num><content><p><mod>In section 106 (regulations and orders under the Act), in subsection <ref href="#d25e4853">(2ZA)</ref> (inserted by section <ref href="#section-23">23</ref><ref href="#section-23-3">(3)</ref>), after paragraph <ref href="#d25e4859">(a)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(b)</num><content><p>regulations under section <ref href="#d25e5593">38A</ref>.</p></content></level></quotedStructure></mod></p></content></subsection><subsection eId="section-27-4"><num>(4)</num><content><p><mod>In paragraph 6 of Schedule 6A (requirements enforceable against suppliers under section 25), before sub-paragraph (a) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(za)</num><content><p>any provision of regulations under section <ref href="#d25e5593">38A</ref> that is designated in the regulations as a relevant provision for the purposes of this paragraph;</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-electricity-transmission-period"><heading>Electricity transmission period</heading><section eId="section-28"><num>28</num><heading>Electricity transmission systems: extension of commissioning period</heading><content><p><mod>In <ref eId="c00049" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">section 6G</ref><ref eId="c00050" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">(1)</ref> of the <ref eId="c00051" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (meaning of “<term refersTo="#term-commissioning-period" eId="term-commissioning-period">commissioning period</term>” for the purposes of determining whether a person is to be regarded as participating in the transmission of electricity), in <ref eId="c00052" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">paragraph (b)</ref>, for “18 months” substitute <quotedText>“27 months”</quotedText>.</mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-electricity-generation-on-forestry-land"><heading>Electricity generation on forestry land</heading><section eId="section-29"><num>29</num><heading>Use of forestry estate for renewable electricity</heading><content><p><mod>In the Forestry Act 1967, after section 3 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e6197"><num>3A</num><heading>Use of land in connection with renewable electricity projects</heading><subsection eId="d25e6201"><num>(1)</num><intro><p>The Commissioners may—</p></intro><level class="para1"><num>(a)</num><content><p>use, or enter into arrangements in connection with the use of, English forestry land for the generation, storage, transmission or supply of renewable electricity;</p></content></level><level class="para1"><num>(b)</num><content><p>sell, or enter into other arrangements concerning, renewable electricity generated, stored or supplied on, or transmitted across, English forestry land;</p></content></level><level class="para1" eId="d25e6219"><num>(c)</num><intro><p>use, or enter into arrangements in connection with the use of, English forestry land for activity that—</p></intro><level class="para2"><num>(i)</num><content><p>is intended to satisfy, or enable the satisfaction of, a relevant condition of development (whether existing or contemplated), or</p></content></level><level class="para2"><num>(ii)</num><content><p>otherwise arises in connection with such a condition.</p></content></level></level></subsection><subsection><num>(2)</num><intro><p>For the purposes of subsection <ref href="#d25e6201">(1)</ref><ref href="#d25e6219">(c)</ref>, a relevant condition of development is a condition of development that—</p></intro><level class="para1"><num>(a)</num><content><p>relates to renewable electricity development located wholly or partly on English forestry land, and</p></content></level><level class="para1"><num>(b)</num><content><p>is intended to benefit the natural environment of land.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The exercise of the powers in subsection <ref href="#d25e6201">(1)</ref> for either of the following purposes is to be taken to be consistent with the Commissioners’ general duty under section 1(2)—</p></intro><level class="para1"><num>(a)</num><content><p>facilitating or promoting the use of renewable electricity;</p></content></level><level class="para1"><num>(b)</num><content><p>obtaining funds for meeting the expenses referred to in section 41(2).</p></content></level></subsection><subsection><num>(4)</num><content><p>When the Commissioners are considering the exercise of those powers, section 1(3A) applies as if it included a further paragraph referring to those purposes.</p></content></subsection><subsection><num>(5)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-condition-of-development">condition of development</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a condition to which planning permission is subject, or</p></content></level><level class="para1"><num>(b)</num><content><p>a requirement contained in an order granting development consent under the Planning Act 2008 (development consent for nationally significant infrastructure);</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-english-forestry-land">English forestry land</term>” means land placed at the disposal of the Commissioners under this Act;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-natural-environment">natural environment</term>”, in relation to land, includes—</p></intro><level class="para1"><num>(a)</num><content><p>its plants, animals and other living organisms,</p></content></level><level class="para1"><num>(b)</num><content><p>their habitats, and</p></content></level><level class="para1"><num>(c)</num><content><p>its geological features;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-renewable-electricity">renewable electricity</term>” means electricity produced from sources other than—</p></intro><level class="para1"><num>(a)</num><content><p>coal,</p></content></level><level class="para1"><num>(b)</num><content><p>lignite,</p></content></level><level class="para1"><num>(c)</num><content><p>peat,</p></content></level><level class="para1"><num>(d)</num><content><p>natural gas, within the meaning of the Energy Act 1976,</p></content></level><level class="para1"><num>(e)</num><content><p>crude liquid petroleum,</p></content></level><level class="para1"><num>(f)</num><content><p>petroleum products, within the meaning of the Energy Act 1976,</p></content></level><level class="para1"><num>(g)</num><content><p>any substance produced directly or indirectly from a substance within paragraphs <ref href="#d25e6345">(a)</ref> to <ref href="#d25e6365">(f)</ref>,</p></content></level><level class="para1"><num>(h)</num><content><p>energy derived from any substance within paragraphs <ref href="#d25e6345">(a)</ref> to <ref href="#d25e6369">(g)</ref>, or</p></content></level><level class="para1"><num>(i)</num><content><p>nuclear fuel;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-renewable-electricity-development">renewable electricity development</term>” means development the main purpose of which is the generation, storage, transmission or supply of renewable electricity.</p></content></hcontainer></subsection><subsection eId="d25e6400"><num>(6)</num><content><p>References in this section to the storage of electricity are to the storage of energy converted from electricity for the purpose of its reconversion into electricity.</p></content></subsection></section><section eId="d25e6412"><num>3B</num><heading>Section <ref href="#d25e6197">3A</ref>: power to require Secretary of State’s consent in certain cases</heading><subsection eId="d25e6416"><num>(1)</num><content><p>The Secretary of State may make regulations that, in a case within subsection <ref href="#d25e6428">(2)</ref>, require the consent of the Secretary of State to an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>.</p></content></subsection><subsection eId="d25e6428"><num>(2)</num><intro><p>The cases are those where—</p></intro><level class="para1"><num>(a)</num><content><p>a proposed exercise of the powers is intended to enable the construction on English forestry land of the whole or part of a generating station (including an extension to an existing station), and</p></content></level><level class="para1"><num>(b)</num><content><p>the capacity threshold is exceeded.</p></content></level></subsection><subsection><num>(3)</num><content><p>In the case of the construction of a new generating station, the capacity threshold is exceeded if it is expected that the generating capacity of the station would equal or exceed the relevant wattage.</p></content></subsection><subsection eId="d25e6452"><num>(4)</num><intro><p>In the case of an extension to an existing station, the capacity threshold is exceeded if it is expected that—</p></intro><level class="para1"><num>(a)</num><content><p>the extension would cause the generating capacity of the station to equal or exceed the relevant wattage, or</p></content></level><level class="para1" eId="d25e6464"><num>(b)</num><content><p>the extension, whether alone or taken together with previous non-consented extensions, would increase the generating capacity of the station by at least the relevant wattage.</p></content></level></subsection><subsection><num>(5)</num><intro><p>An extension is “<term refersTo="#term-non-consented">non-consented</term>” for the purposes of subsection <ref href="#d25e6452">(4)</ref><ref href="#d25e6464">(b)</ref> if—</p></intro><level class="para1"><num>(a)</num><content><p>it was enabled by an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>, and</p></content></level><level class="para1"><num>(b)</num><content><p>that exercise of those powers did not have the consent of the Secretary of State under regulations under subsection <ref href="#d25e6416">(1)</ref>.</p></content></level></subsection><subsection><num>(6)</num><intro><p>But an extension ceases to be “non-consented” for those purposes if—</p></intro><level class="para1"><num>(a)</num><content><p>a subsequent extension to the station in question is constructed having been enabled by an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>, and</p></content></level><level class="para1"><num>(b)</num><content><p>that exercise of those powers had the consent of the Secretary of State under regulations under subsection <ref href="#d25e6416">(1)</ref>.</p></content></level></subsection><subsection><num>(7)</num><intro><p>The relevant wattage is—</p></intro><level class="para1"><num>(a)</num><content><p>5 megawatts, if the station generates electricity from wind, and</p></content></level><level class="para1"><num>(b)</num><content><p>50 megawatts, if it does not.</p></content></level></subsection><subsection eId="d25e6544"><num>(8)</num><content><p>The Secretary of State may by regulations amend this section so as to change the relevant wattage (including by adding or combining categories of station in relation to which a particular wattage is prescribed).</p></content></subsection><subsection><num>(9)</num><intro><p>In calculating the relevant wattage there is to be disregarded—</p></intro><level class="para1"><num>(a)</num><content><p>in the case of a generating station only partly situated on English forestry land, any generating capacity that can be attributed to parts not situated on English forestry land;</p></content></level><level class="para1"><num>(b)</num><content><p>in the case of a generating station whose capacity is provided in part by facilities for the storage of electricity and in part by other means, the capacity provided by those facilities.</p></content></level></subsection><subsection><num>(10)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-generating-station">generating station</term>” has the same meaning as in Part 1 of the Electricity Act 1989 (see section 64(1));</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-storage">storage</term>” is to be read in accordance with section <ref href="#d25e6197">3A</ref><ref href="#d25e6400">(6)</ref>.</p></content></hcontainer></subsection></section><section><num>3C</num><heading>Regulations under section <ref href="#d25e6412">3B</ref>: further provision</heading><subsection><num>(1)</num><intro><p>Regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6416">(1)</ref> may—</p></intro><level class="para1"><num>(a)</num><content><p>make provision about the process by which consent is to be sought and given or refused;</p></content></level><level class="para1"><num>(b)</num><content><p>provide for consent to be given subject to conditions.</p></content></level></subsection><subsection><num>(2)</num><intro><p>Regulations under section <ref href="#d25e6412">3B</ref> may—</p></intro><level class="para1"><num>(a)</num><content><p>make different provision for different purposes or areas;</p></content></level><level class="para1"><num>(b)</num><content><p>include consequential, incidental, supplementary, transitional or saving provision.</p></content></level></subsection><subsection><num>(3)</num><content><p>Regulations under section <ref href="#d25e6412">3B</ref> are to be made by statutory instrument.</p></content></subsection><subsection><num>(4)</num><content><p>A statutory instrument containing (whether alone or with other provision) regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6544">(8)</ref> may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection><num>(5)</num><content><p>A statutory instrument containing regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6416">(1)</ref> (but not regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6544">(8)</ref>) is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection></section></quotedStructure></mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-wind-generating-stations-and-seismic-array-systems"><heading>Wind generating stations and seismic array systems</heading><section eId="section-30"><num>30</num><heading>Wind generating stations that may affect seismic array systems</heading><subsection eId="section-30-1"><num>(1)</num><content><p>The Secretary of State may make regulations about planning permissions or consents relating to wind generating stations that may affect the functioning of a relevant seismic array system.</p></content></subsection><subsection eId="section-30-2"><num>(2)</num><intro><p>A “relevant seismic array system” is a spatially distributed system of linked seismometers, arranged so as to enhance the detection and characterisation of seismic signals, that—</p></intro><level class="para1" eId="section-30-2-a"><num>(a)</num><content><p>is used for defence purposes, and</p></content></level><level class="para1" eId="section-30-2-b"><num>(b)</num><content><p>is in use on the day on which this Act is passed.</p></content></level></subsection><subsection eId="section-30-3"><num>(3)</num><intro><p>The regulations may provide for—</p></intro><level class="para1" eId="section-30-3-a"><num>(a)</num><content><p>an exclusion zone, and</p></content></level><level class="para1" eId="section-30-3-b"><num>(b)</num><content><p>a restricted zone,</p></content></level><wrapUp><p>around a relevant seismic array system.</p></wrapUp></subsection><subsection eId="section-30-4"><num>(4)</num><intro><p>The regulations may—</p></intro><level class="para1" eId="section-30-4-a"><num>(a)</num><content><p>require a planning decision-maker to refuse, or decline to determine or accept, a planning application relating to a wind generating station that is (or would be) situated in an exclusion zone;</p></content></level><level class="para1" eId="section-30-4-b"><num>(b)</num><content><p>provide that a relevant development order or MCA scheme may not be made if it would grant planning permission for development relating to a wind generating station that is (or would be) situated in an exclusion zone;</p></content></level><level class="para1" eId="section-30-4-c"><num>(c)</num><content><p>allow the Secretary of State to direct that a relevant development order or MCA scheme may not be made if it would grant such planning permission.</p></content></level></subsection><subsection eId="section-30-5"><num>(5)</num><intro><p>The regulations may, in relation to a planning application relating to a wind generating station that is (or would be) situated in a restricted zone—</p></intro><level class="para1" eId="section-30-5-a"><num>(a)</num><content><p>require the applicant to provide specified information about the seismic impact of the proposals (“seismic impact information”) to which their application relates;</p></content></level><level class="para1" eId="section-30-5-b"><num>(b)</num><content><p>require the planning decision-maker to use the seismic impact information in a specified way when determining the application (including when determining conditions relating to a permission or consent);</p></content></level><level class="para1" eId="section-30-5-c"><num>(c)</num><content><p>require the planning decision-maker to refuse, or decline to determine or accept, the application in specified circumstances;</p></content></level><level class="para1" eId="section-30-5-d"><num>(d)</num><content><p>require the planning decision-maker to provide the Secretary of State with the seismic impact information, and to seek the Secretary of State’s views on the seismic impact of the proposals;</p></content></level><level class="para1" eId="section-30-5-e"><num>(e)</num><content><p>require the planning decision-maker to refuse, or decline to determine or accept, the application if the Secretary of State objects to it on grounds relating to the seismic impact of the proposals.</p></content></level></subsection><subsection eId="section-30-6"><num>(6)</num><intro><p>The regulations may—</p></intro><level class="para1" eId="section-30-6-a"><num>(a)</num><content><p>require a person proposing to make a relevant development order or MCA scheme to consult the Secretary of State if the order or scheme would grant planning permission for development relating to a wind generating station that is (or would be) situated in a restricted zone;</p></content></level><level class="para1" eId="section-30-6-b"><num>(b)</num><content><p>allow the Secretary of State to direct that a relevant development order or MCA scheme may not be made if it would grant such planning permission.</p></content></level></subsection><subsection eId="section-30-7"><num>(7)</num><intro><p>The regulations may include provision about the procedure for planning applications to which they relate, such as—</p></intro><level class="para1" eId="section-30-7-a"><num>(a)</num><content><p>provision enabling or requiring a planning decision-maker to decline to determine or accept an application;</p></content></level><level class="para1" eId="section-30-7-b"><num>(b)</num><content><p>provision modifying the process for determining an application;</p></content></level><level class="para1" eId="section-30-7-c"><num>(c)</num><content><p>provision allowing the Secretary of State to give a direction to the planning-decision maker about the procedure for an application;</p></content></level><level class="para1" eId="section-30-7-d"><num>(d)</num><content><p>provision modifying or disapplying a right of appeal or review;</p></content></level><level class="para1" eId="section-30-7-e"><num>(e)</num><content><p>provision disapplying a duty imposed on a planning decision-maker when determining an application.</p></content></level></subsection><subsection eId="section-30-8"><num>(8)</num><content><p>The regulations may require a planning decision-maker to have regard to guidance issued by the Secretary of State.</p></content></subsection><subsection eId="section-30-9"><num>(9)</num><intro><p>Regulations under this section may—</p></intro><level class="para1" eId="section-30-9-a"><num>(a)</num><content><p>amend or repeal provision contained in an Act of Parliament or an Act of the Scottish Parliament;</p></content></level><level class="para1" eId="section-30-9-b"><num>(b)</num><content><p>make different provision for different purposes or areas;</p></content></level><level class="para1" eId="section-30-9-c"><num>(c)</num><content><p>make provision binding the Crown;</p></content></level><level class="para1" eId="section-30-9-d"><num>(d)</num><content><p>make transitional, transitory or saving provision;</p></content></level><level class="para1" eId="section-30-9-e"><num>(e)</num><content><p>make incidental, supplementary or consequential provision.</p></content></level></subsection><subsection eId="section-30-10"><num>(10)</num><content><p>Regulations under this section are to be made by statutory instrument.</p></content></subsection><subsection eId="section-30-11"><num>(11)</num><content><p>A statutory instrument containing regulations under this section which amend or repeal provision contained in an Act of Parliament or an Act of the Scottish Parliament may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection eId="section-30-12"><num>(12)</num><content><p>Any other statutory instrument containing regulations under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-30-13"><num>(13)</num><content><p>If a draft of a statutory instrument containing regulations under this section would, apart from this subsection, be treated for the purposes of the standing orders of either House of Parliament as a hybrid instrument, it is to proceed in that House as if it were not such an instrument.</p></content></subsection><subsection eId="section-30-14"><num>(14)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-mca-scheme" eId="term-mca-scheme">MCA scheme</term>” means a masterplan consent area scheme made under Part 3 of the Town and Country Planning (Scotland) Act 1997;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-planning-application" eId="term-planning-application">planning application</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>an application for planning permission under Part 3 or Part 13 of the Town and Country Planning Act 1990,</p></content></level><level class="para1"><num>(b)</num><content><p>an application for planning permission under Part 3 or Part 12 of the Town and Country Planning (Scotland) Act 1997,</p></content></level><level class="para1"><num>(c)</num><content><p>an application for an order granting development consent under section 37 of the Planning Act 2008, or</p></content></level><level class="para1"><num>(d)</num><content><p>an application under section 36 or 36C of the Electricity Act 1989 (consent for construction etc of generating station);</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-planning-decision-maker" eId="term-planning-decision-maker">planning decision-maker</term>” means a person who determines a planning application;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-development-order" eId="term-relevant-development-order">relevant development order</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a local development order made under section 61A of the Town and Country Planning Act 1990;</p></content></level><level class="para1"><num>(b)</num><content><p>a Mayoral development order made under section 61DA of that Act;</p></content></level><level class="para1"><num>(c)</num><content><p>a neighbourhood development order made under section 61E of that Act;</p></content></level><level class="para1"><num>(d)</num><content><p>a development order made under section 30 of the Town and Country Planning (Scotland) Act 1997;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-wind-generating-station" eId="term-wind-generating-station">wind generating station</term>” means a generating station that generates electricity from wind.</p></content></hcontainer></subsection></section></hcontainer></chapter> — Consents for electricity infrastructure in Scotland
Part 1 — Infrastructure — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-2"><num>Chapter 2</num><heading>Electricity infrastructure</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-connections-to-the-electricity-transmission-and-distribution-systems"><heading>Connections to the electricity transmission and distribution systems</heading><section eId="section-14"><num>14</num><heading>Connections to electricity network: licence and other modifications</heading><subsection eId="section-14-1"><num>(1)</num><intro><p>A relevant authority may modify—</p></intro><level class="para1" eId="section-14-1-a"><num>(a)</num><content><p>the conditions of a particular electricity licence;</p></content></level><level class="para1" eId="section-14-1-b"><num>(b)</num><content><p>the terms of a particular electricity licence;</p></content></level><level class="para1" eId="section-14-1-c"><num>(c)</num><content><p>the standard conditions of electricity licences of a particular type;</p></content></level><level class="para1" eId="section-14-1-d"><num>(d)</num><content><p>a document maintained in accordance with the conditions of an electricity licence;</p></content></level><level class="para1" eId="section-14-1-e"><num>(e)</num><content><p>an agreement entered into in pursuance of a document maintained as mentioned in <ref href="#section-14-1-d">paragraph (d)</ref>;</p></content></level><level class="para1" eId="section-14-1-f"><num>(f)</num><content><p>a qualifying distribution agreement.</p></content></level></subsection><subsection eId="section-14-2"><num>(2)</num><content><p>A relevant authority may exercise the power under <ref href="#section-14-1">subsection (1)</ref> only for the purpose of improving the process for managing connections to the transmission system or the distribution system (and such an improvement may include changing the order in which connections are made).</p></content></subsection><subsection eId="section-14-3"><num>(3)</num><content><p>The Secretary of State may direct the GEMA to exercise the power under <ref href="#section-14-1">subsection (1)</ref>.</p></content></subsection><subsection eId="section-14-4"><num>(4)</num><content><p>The Secretary of State may exercise the power under <ref href="#section-14-3">subsection (3)</ref> only for the purpose mentioned in <ref href="#section-14-2">subsection (2)</ref>.</p></content></subsection><subsection eId="section-14-5"><num>(5)</num><content><p>The power conferred by <ref href="#section-14-1">subsection (1)</ref> may not be exercised after the end of the period of three years beginning with the day on which <ref href="#section-14">this section</ref> comes into force.</p></content></subsection><subsection eId="section-14-6"><num>(6)</num><content><p><ref eId="c00005" href="https://www.legislation.gov.uk/ukpga/1989/29/section/3A">Section 3A</ref> of the <ref eId="c00006" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (principal objective and general duties) applies in relation to the functions of the Secretary of State and the GEMA under <ref href="#section-14">this section</ref> and sections <ref href="#section-15">15</ref> to <ref href="#section-17">17</ref> as it applies in relation to functions of the Secretary of State or the GEMA under <ref eId="c00007" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of <ref eId="c00008" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">that Act</ref>.</p></content></subsection><subsection eId="section-14-7"><num>(7)</num><content><p>A relevant authority may under <ref href="#section-14-1">subsection (1)</ref> modify an agreement mentioned in <ref href="#section-14-1">subsection (1)</ref><ref href="#section-14-1-e">(e)</ref> or a qualifying distribution agreement even if the effect of the modification might amount to a repudiation of the agreement.</p></content></subsection><subsection eId="section-14-8"><num>(8)</num><intro><p>In <ref href="#section-14">this section</ref> and sections <ref href="#section-15">15</ref> to <ref href="#section-17">17</ref>—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-distribution-system" eId="term-distribution-system">distribution system</term>” has the same meaning as in <ref eId="c00009" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00010" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (see the definition of “distribute” in section 4(4) of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-electricity-distributor" eId="term-electricity-distributor">electricity distributor</term>” has the same meaning as in Part 1 of that Act (see section 6(9) of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-electricity-licence" eId="term-electricity-licence">electricity licence</term>” means a licence for the purposes of section 4 of that Act;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-gema" eId="term-the-gema">the GEMA</term>” means the Gas and Electricity Markets Authority;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-qualifying-distribution-agreement" eId="term-qualifying-distribution-agreement">qualifying distribution agreement</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>the terms subject to which a connection is made by an electricity distributor in pursuance of section 16(1) of the Electricity Act 1989, or</p></content></level><level class="para1"><num>(b)</num><content><p>a special connection agreement as defined by section 22(1) of that Act;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-relevant-authority" eId="term-relevant-authority">relevant authority</term>” means the Secretary of State or the GEMA;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-transmission-system" eId="term-transmission-system">transmission system</term>” has the same meaning as in <ref eId="c00011" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00012" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (see section 4(4) of that Act).</p></content></hcontainer></subsection></section><section eId="section-15"><num>15</num><heading>Scope of modification power under <ref href="#section-14">section 14</ref></heading><subsection eId="section-15-1"><num>(1)</num><content><p>The power conferred by <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> to “<term refersTo="#term-modify" eId="term-modify">modify</term>” includes power to amend, add to or remove (and, in particular, includes power to make a person a party to an agreement or to discharge a party from its obligations under an agreement); and references in <ref href="#section-14">section 14</ref>, <ref href="#section-15">this section</ref> and <ref href="#section-16">section 16</ref> to modification are to be construed accordingly.</p></content></subsection><subsection eId="section-15-2"><num>(2)</num><intro><p>The power conferred by <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref>—</p></intro><level class="para1" eId="section-15-2-a"><num>(a)</num><content><p>may be exercised generally, only in relation to specified cases, or subject to exceptions (including by making provision for a case to be excepted only so long as specified conditions are satisfied);</p></content></level><level class="para1" eId="section-15-2-b"><num>(b)</num><content><p>may be exercised differently for different purposes or areas;</p></content></level><level class="para1" eId="section-15-2-c"><num>(c)</num><content><p>includes power to make incidental, supplementary, consequential or transitional modifications.</p></content></level></subsection><subsection eId="section-15-3"><num>(3)</num><intro><p>Provision included in an electricity licence by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-a">(a)</ref> or <ref href="#section-14-1-c">(c)</ref>—</p></intro><level class="para1" eId="section-15-3-a"><num>(a)</num><content><p>may include provision of a kind mentioned in <ref eId="c00013" href="https://www.legislation.gov.uk/ukpga/1989/29/section/7">section 7</ref> of the <ref eId="c00014" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref>;</p></content></level><level class="para1" eId="section-15-3-b"><num>(b)</num><content><p>need not relate to the activities authorised by the licence.</p></content></level></subsection><subsection eId="section-15-4"><num>(4)</num><content><p>The modification under <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> of part of a standard condition of an electricity licence does not prevent any other part of the condition from continuing to be regarded as a standard condition for the purposes of <ref eId="c00015" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00016" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref>.</p></content></subsection><subsection eId="section-15-5"><num>(5)</num><content><p>If under <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> a relevant authority modifies the standard conditions of an electricity licence of a particular type, the GEMA must make the same modifications of those standard conditions for the purposes of their incorporation in electricity licences of that type granted after that time.</p></content></subsection><subsection eId="section-15-6"><num>(6)</num><content><p>Provision included in an electricity licence by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-b">(b)</ref> may in particular include provision about the circumstances in which the licence may be revoked or suspended.</p></content></subsection><subsection eId="section-15-7"><num>(7)</num><intro><p>Provision included in an agreement by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-e">(e)</ref> or <ref href="#section-14-1-f">(f)</ref> may in particular include provision—</p></intro><level class="para1" eId="section-15-7-a"><num>(a)</num><content><p>requiring specified conditions to be met before the taking of particular steps under the agreement;</p></content></level><level class="para1" eId="section-15-7-b"><num>(b)</num><content><p>about the procedure for varying the agreement.</p></content></level></subsection><subsection eId="section-15-8"><num>(8)</num><intro><p>In <ref eId="c00017" href="https://www.legislation.gov.uk/ukpga/2000/27/section/33">section 33</ref> of the <ref eId="c00018" href="https://www.legislation.gov.uk/ukpga/2000/27/contents">Utilities Act 2000</ref> (standard conditions of electricity licences), in <ref eId="c00019" href="https://www.legislation.gov.uk/ukpga/2000/27/section/33">subsection (1)</ref>—</p></intro><level class="para1" eId="section-15-8-a"><num>(a)</num><content><p>omit the “or” at the end of paragraph (k), and</p></content></level><level class="para1" eId="section-15-8-b"><num>(b)</num><content><p><mod>at the end insert <quotedText startQuote="&#x201C;">, or</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(m)</num><content><p>under <ref href="#section-14">section 14</ref> of the Planning and Infrastructure Act 2025.</p></content></level></quotedStructure></mod></p></content></level></subsection></section><section eId="section-16"><num>16</num><heading>Procedure relating to modifications under <ref href="#section-14">section 14</ref></heading><subsection eId="section-16-1"><num>(1)</num><intro><p>Before making a modification under <ref href="#section-14">section 14</ref>, a relevant authority must consult—</p></intro><level class="para1" eId="section-16-1-a"><num>(a)</num><content><p>the holder of any electricity licence proposed to be modified,</p></content></level><level class="para1" eId="section-16-1-b"><num>(b)</num><content><p>the Independent System Operator and Planner,</p></content></level><level class="para1" eId="section-16-1-c"><num>(c)</num><content><p>the GEMA or the Secretary of State (depending on which relevant authority is proposing to make the modification), and</p></content></level><level class="para1" eId="section-16-1-d"><num>(d)</num><content><p>such other persons as the relevant authority considers appropriate.</p></content></level></subsection><subsection eId="section-16-2"><num>(2)</num><content><p>Subsection <ref href="#section-16-1">(1)</ref> may be satisfied by consultation carried out before the passing of this Act (as well as by consultation carried out after that time).</p></content></subsection><subsection eId="section-16-3"><num>(3)</num><content><p>A relevant authority must publish details of any modifications made by it under <ref href="#section-14">section 14</ref> as soon as reasonably practicable after they are made.</p></content></subsection><subsection eId="section-16-4"><num>(4)</num><content><p>A relevant authority may exclude from publication under <ref href="#section-16-3">subsection (3)</ref> any information the publication of which would be likely to prejudice the commercial interests of any person.</p></content></subsection><subsection eId="section-16-5"><num>(5)</num><content><p>In <ref href="#section-16">this section</ref>, “<term refersTo="#term-the-independent-system-operator-and-planner" eId="term-the-independent-system-operator-and-planner">the Independent System Operator and Planner</term>” means the person for the time being designated under <ref eId="c00020" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">section 162</ref><ref eId="c00021" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">(1)</ref> of the <ref eId="c00022" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref>.</p></content></subsection></section><section eId="section-17"><num>17</num><heading>Directions to modify connection agreements</heading><subsection eId="section-17-1"><num>(1)</num><intro><p>A relevant authority may—</p></intro><level class="para1" eId="section-17-1-a"><num>(a)</num><content><p>direct the Independent System Operator and Planner (“the ISOP”) to modify an agreement entered into by the ISOP pursuant to a document maintained in accordance with the conditions of an electricity licence;</p></content></level><level class="para1" eId="section-17-1-b"><num>(b)</num><content><p>direct an electricity distributor to modify a qualifying distribution agreement entered into by the electricity distributor.</p></content></level></subsection><subsection eId="section-17-2"><num>(2)</num><content><p>A relevant authority may exercise the power conferred by <ref href="#section-17-1">subsection (1)</ref> only for the purpose of improving the process for managing connections to the transmission system or the distribution system (and such an improvement may include changing the order in which connections are made).</p></content></subsection><subsection eId="section-17-3"><num>(3)</num><content><p>A direction under subsection <ref href="#section-17-1">(1)</ref> must describe the kinds of modification to be made by the person to whom it is given.</p></content></subsection><subsection eId="section-17-4"><num>(4)</num><intro><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may also require the person to whom it is given to modify an agreement by including in it provision—</p></intro><level class="para1" eId="section-17-4-a"><num>(a)</num><content><p>requiring specified conditions to be met before the taking of particular steps under the agreement;</p></content></level><level class="para1" eId="section-17-4-b"><num>(b)</num><content><p>about the procedure for varying the agreement.</p></content></level></subsection><subsection eId="section-17-5"><num>(5)</num><content><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may be expressed as having effect generally, in relation to cases within a description specified in the direction, or in relation to a particular case.</p></content></subsection><subsection eId="section-17-6"><num>(6)</num><intro><p>Before giving a direction under subsection <ref href="#section-17-1">(1)</ref>, the relevant authority must consult—</p></intro><level class="para1" eId="section-17-6-a"><num>(a)</num><content><p>the person to whom it proposes to give the direction, and</p></content></level><level class="para1" eId="section-17-6-b"><num>(b)</num><content><p>such other persons as the relevant authority considers appropriate.</p></content></level></subsection><subsection eId="section-17-7"><num>(7)</num><content><p>Subsection <ref href="#section-17-6">(6)</ref> may be satisfied by consultation carried out before the passing of this Act (as well as by consultation carried out after that time).</p></content></subsection><subsection eId="section-17-8"><num>(8)</num><content><p>A relevant authority must publish details of any direction it gives under subsection <ref href="#section-17-1">(1)</ref> as soon as reasonably practicable after the direction is given.</p></content></subsection><subsection eId="section-17-9"><num>(9)</num><content><p>A relevant authority may exclude from publication under subsection <ref href="#section-17-8">(8)</ref> any information the publication of which would be likely to prejudice the commercial interests of any person.</p></content></subsection><subsection eId="section-17-10"><num>(10)</num><content><p>A person to whom a direction is given under <ref href="#section-17-1">subsection (1)</ref> must comply with it, even if the effect of a modification made to an agreement as a result of the direction might amount to a repudiation of the agreement.</p></content></subsection><subsection eId="section-17-11"><num>(11)</num><content><p>The power to give a direction under subsection <ref href="#section-17-1">(1)</ref> may not be exercised after the end of the period of three years beginning with the day on which this section comes into force.</p></content></subsection><subsection eId="section-17-12"><num>(12)</num><content><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may be varied or revoked by a subsequent direction given by a relevant authority.</p></content></subsection><subsection eId="section-17-13"><num>(13)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-the-independent-system-operator-and-planner" eId="term-the-independent-system-operator-and-planner">the Independent System Operator and Planner</term>” means the person for the time being designated under <ref eId="c00023" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">section 162</ref><ref eId="c00024" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">(1)</ref> of the <ref eId="c00025" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref>;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-modify" eId="term-modify">modify</term>” includes amend, add to and remove (and, in particular, includes making a person a party to an agreement and discharging a party from its obligations under an agreement).</p></content></hcontainer></subsection><subsection eId="section-17-14"><num>(14)</num><intro><p>In Schedule 6A to the Electricity Act 1989 (provisions imposing obligations enforceable as relevant requirements)—</p></intro><level class="para1" eId="section-17-14-a"><num>(a)</num><content><p><mod>in paragraph 4A (electricity system operator), after sub-paragraph (c) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><level class="para1"><num>(d)</num><content><p>section <ref href="#section-17">17</ref><ref href="#section-17-10">(10)</ref> of the Planning and Infrastructure Act 2025 (duty to comply with direction under <ref href="#section-17">section 17</ref> of that Act).</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-17-14-b"><num>(b)</num><content><p><mod>in paragraph 5 (distribution licence holders), after sub-paragraph (g) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><level class="para1"><num>(h)</num><content><p>section <ref href="#section-17">17</ref><ref href="#section-17-10">(10)</ref> of the Planning and Infrastructure Act 2025 (duty to comply with direction under <ref href="#section-17">section 17</ref> of that Act).</p></content></level></quotedStructure></mod></p></content></level></subsection></section><section eId="section-18"><num>18</num><heading>Managing connections to the network: strategic plans etc</heading><subsection eId="section-18-1"><num>(1)</num><content><p><mod>In <ref eId="c00026" href="https://www.legislation.gov.uk/ukpga/2023/52/part/5">Part 5</ref> of the <ref eId="c00027" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref> (Independent System Operator and Planner), after <ref eId="c00028" href="https://www.legislation.gov.uk/ukpga/2023/52/section/165">section 165</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e3701"><num>165A</num><heading>Functions relating to network connections: duty to have regard to designated plans</heading><subsection eId="d25e3705"><num>(1)</num><content><p>The ISOP must, when carrying out any of its functions relating to the management of connections to the transmission system, have regard to the designated strategic plans.</p></content></subsection><subsection eId="d25e3711"><num>(2)</num><content><p>The Secretary of State may by regulations designate plans or documents for the purposes of this section.</p></content></subsection><subsection><num>(3)</num><content><p>In <ref href="#d25e3705">subsection (1)</ref>, the reference to “<term refersTo="#term-the-designated-strategic-plans">the designated strategic plans</term>” is a reference to those plans or documents designated by regulations under <ref href="#d25e3711">subsection (2)</ref> as they have effect at the time when the regulations are made.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-18-2"><num>(2)</num><content><p><ref eId="c00029" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00030" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (electricity supply) is amended as set out in <span><ref href="#section-18-3">subsections (3)</ref> to <ref href="#section-18-5">(5)</ref></span>.</p></content></subsection><subsection eId="section-18-3"><num>(3)</num><intro><p>In <ref eId="c00031" href="https://www.legislation.gov.uk/ukpga/1989/29/section/16">section 16</ref> (duty to connect on request)—</p></intro><level class="para1" eId="section-18-3-a"><num>(a)</num><content><p><mod>after <ref eId="c00032" href="https://www.legislation.gov.uk/ukpga/1989/29/section/16">subsection (2)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(2A)</num><content><p>In deciding how to comply with the duties under this section, and in particular in deciding how to prioritise persons requiring a connection, an electricity distributor must have regard to the designated strategic plans.</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-18-3-b"><num>(b)</num><content><p><mod>at the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(6)</num><content><p>In this section, “<term refersTo="#term-the-designated-strategic-plans">the designated strategic plans</term>” means the plans or documents designated by regulations made under section <ref href="#d25e3701">165A</ref><ref href="#d25e3711">(2)</ref> of the Energy Act 2023 (functions of the Independent System Operator and Planner relating to network connections).</p></content></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-18-4"><num>(4)</num><intro><p>In <ref eId="c00033" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">section 17</ref> (exceptions from duty to connect), in <ref eId="c00034" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">subsection (1)</ref>—</p></intro><level class="para1" eId="section-18-4-a"><num>(a)</num><content><p>omit the “or” at the end of <ref eId="c00035" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">paragraph (b)</ref>;</p></content></level><level class="para1" eId="section-18-4-b"><num>(b)</num><content><p><mod>after <ref eId="c00036" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">paragraph (b)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(ba)</num><content><p>it would not be in accordance with the designated strategic plans (within the meaning of section 16) for the distributor to do so; or</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></level></subsection><subsection eId="section-18-5"><num>(5)</num><content><p><mod>In <ref eId="c00037" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A">Schedule 6A</ref> (provisions imposing obligations enforceable as relevant requirements), in <ref eId="c00038" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A/paragraph/4A">paragraph 4A</ref> (electricity system operator), in <ref eId="c00039" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A/paragraph/4A">paragraph (c)</ref>, for “165” substitute <quotedText>“<ref href="#d25e3701">165A</ref>”</quotedText>.</mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-consents-for-electricity-infrastructure-in-scotland"><heading>Consents for electricity infrastructure in Scotland</heading><section eId="section-19"><num>19</num><heading>Consents for generating stations and overhead lines: applications</heading><subsection eId="section-19-1"><num>(1)</num><content><p>Schedule 8 to the Electricity Act 1989 (consents of the Secretary of State and the Scottish Ministers under sections 36 and 37) is amended as follows.</p></content></subsection><subsection eId="section-19-2"><num>(2)</num><content><p><mod>After paragraph 1 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Applications made to the Scottish Ministers for consent</heading><paragraph eId="d25e3890" class="schProv1"><num>1A</num><subparagraph><num>(1)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations make provision about the following matters in relation to applications to the Scottish Ministers for consent under section 36 or 37.</p></content></subparagraph><subparagraph eId="d25e3900"><num>(2)</num><intro><p>The matters are—</p></intro><level class="para1" eId="d25e3906"><num>(a)</num><content><p>the steps a person must take before making an application;</p></content></level><level class="para1"><num>(b)</num><content><p>the information that must be included in an application;</p></content></level><level class="para1" eId="d25e3918"><num>(c)</num><content><p>an acceptance stage, during which the Scottish Ministers must assess an applicant’s compliance with any requirements imposed by the regulations in order to decide whether or not to accept the application;</p></content></level><level class="para1"><num>(d)</num><intro><p>fees to be paid to the Scottish Ministers—</p></intro><level class="para2"><num>(i)</num><content><p>on application, or</p></content></level><level class="para2"><num>(ii)</num><content><p>for anything done by them in relation to a proposed application;</p></content></level></level><level class="para1"><num>(e)</num><content><p>requests by the Scottish Ministers for additional information to aid their decision whether or not to accept an application or to grant consent.</p></content></level></subparagraph><subparagraph eId="d25e3948"><num>(3)</num><intro><p>The steps that may be the subject of provision made by virtue of sub-paragraph (2)(a) include—</p></intro><level class="para1"><num>(a)</num><content><p>notifying prescribed persons of the proposed application,</p></content></level><level class="para1"><num>(b)</num><content><p>publicising the proposed application, and</p></content></level><level class="para1" eId="d25e3966"><num>(c)</num><content><p>carrying out a consultation about the proposed application.</p></content></level></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-3"><num>(3)</num><intro><p>In paragraph 2 (objections by relevant planning authority)—</p></intro><level class="para1" eId="section-19-3-a"><num>(a)</num><content><p><mod>in sub-paragraph (1), for “Secretary of State for his” substitute <quotedText>“appropriate authority for a”</quotedText>;</mod></p></content></level><level class="para1" eId="section-19-3-b"><num>(b)</num><content><p><mod>in sub-paragraph (2), at the beginning insert <quotedText>“In the case of an application made to the Secretary of State,”</quotedText>;</mod></p></content></level><level class="para1" eId="section-19-3-c"><num>(c)</num><content><p><mod>after sub-paragraph (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><subparagraph><num>(2A)</num><intro><p>In the case of an application made to the Scottish Ministers, where the relevant planning authority notify the Scottish Ministers that they object to the application and their objection is not withdrawn, the Scottish Ministers—</p></intro><level class="para1"><num>(a)</num><content><p>must appoint a person (referred to in this Schedule as the “<term refersTo="#term-reporter">reporter</term>”) to examine the application, and</p></content></level><level class="para1"><num>(b)</num><content><p>before determining whether to give their consent, must consider the objection and the reporter’s final report.</p></content></level><wrapUp><p>See paragraph 2A for the process that must be followed by the reporter.</p></wrapUp></subparagraph></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-19-3-d"><num>(d)</num><intro><p>in sub-paragraph (4)—</p></intro><level class="para2" eId="section-19-3-d-i"><num>(i)</num><content><p><mod>after “(2)” insert <quotedText>“or (2A)”</quotedText>;</mod></p></content></level><level class="para2" eId="section-19-3-d-ii"><num>(ii)</num><content><p><mod>for “Secretary of State” substitute <quotedText>“appropriate authority”</quotedText>;</mod></p></content></level></level><level class="para1" eId="section-19-3-e"><num>(e)</num><content><p><mod>in sub-paragraph (5), for “Secretary of State” substitute <quotedText>“appropriate authority”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-19-4"><num>(4)</num><content><p><mod>After paragraph 2 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Procedure following objection by relevant planning authority: Scotland</heading><paragraph eId="d25e4075" class="schProv1"><num>2A</num><subparagraph><num>(1)</num><content><p>A reporter appointed under paragraph 2(2A)(a) must make proposals as regards the appropriate procedure for examining the application.</p></content></subparagraph><subparagraph eId="d25e4085"><num>(2)</num><intro><p>The appropriate procedure may consist of one or more of the following—</p></intro><level class="para1"><num>(a)</num><intro><p>considering—</p></intro><level class="para2"><num>(i)</num><content><p>the objection by the relevant planning authority,</p></content></level><level class="para2"><num>(ii)</num><content><p>any other objections made in accordance with regulations under paragraph 3(1)(c), and</p></content></level><level class="para2"><num>(iii)</num><content><p>any other representations made in accordance with an enactment;</p></content></level></level><level class="para1" eId="d25e4115"><num>(b)</num><content><p>considering new written representations about the application from persons specified by the reporter;</p></content></level><level class="para1" eId="d25e4121"><num>(c)</num><content><p>holding one or more hearing sessions;</p></content></level><level class="para1"><num>(d)</num><content><p>carrying out an inspection of the land to which the application relates;</p></content></level><level class="para1" eId="d25e4133"><num>(e)</num><content><p>holding a public inquiry.</p></content></level></subparagraph><subparagraph eId="d25e4139"><num>(3)</num><content><p>Where the reporter proposes a procedure that includes proceedings within sub-paragraph (2)(b), (c) or (e), the proposal must include a statement of the issues that are proposed to be within the scope of each of those proceedings.</p></content></subparagraph><subparagraph><num>(4)</num><intro><p>The reporter must—</p></intro><level class="para1"><num>(a)</num><content><p>publish the proposals,</p></content></level><level class="para1"><num>(b)</num><content><p>notify all interested parties of the proposals, and</p></content></level><level class="para1"><num>(c)</num><content><p>invite written representations about the proposals before the end of the time period specified by the reporter.</p></content></level></subparagraph><subparagraph><num>(5)</num><content><p>The published proposals must include or be accompanied by an explanation of the reasons for the proposals.</p></content></subparagraph><subparagraph><num>(6)</num><content><p>The reporter may hold a meeting to hear representations about the proposals.</p></content></subparagraph><subparagraph><num>(7)</num><intro><p>After considering the representations, the reporter must—</p></intro><level class="para1"><num>(a)</num><content><p>decide on the appropriate procedure for examining the application, and</p></content></level><level class="para1"><num>(b)</num><content><p>publish that decision.</p></content></level></subparagraph><subparagraph><num>(8)</num><intro><p>The published decision must include or be accompanied by an explanation of—</p></intro><level class="para1"><num>(a)</num><content><p>the reasons for the decision,</p></content></level><level class="para1"><num>(b)</num><content><p>the intended time period for the carrying out of the procedure, and</p></content></level><level class="para1"><num>(c)</num><content><p>the intended time period within which the reporter will send a final report to the Scottish Ministers.</p></content></level></subparagraph><subparagraph><num>(9)</num><content><p>Sub-paragraph (3) applies to the reporter’s decision as it applies to the reporter’s proposals.</p></content></subparagraph><subparagraph><num>(10)</num><content><p>On completing the examination, the reporter must prepare and send to the Scottish Ministers a final report setting out the reporter’s recommendations on the application.</p></content></subparagraph><subparagraph><num>(11)</num><intro><p>In this paragraph, “<term refersTo="#term-interested-party">interested party</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>the applicant,</p></content></level><level class="para1"><num>(b)</num><content><p>the relevant planning authority which made the objection under paragraph 2(2A),</p></content></level><level class="para1"><num>(c)</num><content><p>any person who has made an objection in accordance with regulations under paragraph 3, or</p></content></level><level class="para1"><num>(d)</num><content><p>any person who has made representations in accordance with any other enactment.</p></content></level></subparagraph><subparagraph><num>(12)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations make provision amending or setting out further detail about the procedure set out in this paragraph. (See also paragraph 7B(2)(e).)</p></content></subparagraph><subparagraph><num>(13)</num><content><p>A statutory instrument containing regulations under this paragraph is not to be made by the Secretary of State unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subparagraph><subparagraph><num>(14)</num><content><p>Regulations made by the Scottish Ministers under this paragraph are subject to the affirmative procedure.</p></content></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-5"><num>(5)</num><content><p><mod>After paragraph 7A insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Applications to the Scottish Ministers: time limits</heading><paragraph eId="d25e4298" class="schProv1"><num>7B</num><subparagraph><num>(1)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations specify a time limit for actions that may or must be taken in relation to an application to the Scottish Ministers for consent under section 36 or 37.</p></content></subparagraph><subparagraph eId="d25e4308"><num>(2)</num><intro><p>The regulations may, for example, specify a time limit for—</p></intro><level class="para1"><num>(a)</num><content><p>a person to comply with a requirement of regulations under paragraph 1A;</p></content></level><level class="para1"><num>(b)</num><content><p>a person to respond to a pre-application consultation (see paragraph 1A(3)(c));</p></content></level><level class="para1"><num>(c)</num><content><p>a person who is notified of an application in accordance with an enactment to provide their opinion or advice on the application;</p></content></level><level class="para1"><num>(d)</num><content><p>a relevant planning authority to object to an application under paragraph 2(2A);</p></content></level><level class="para1" eId="d25e4338"><num>(e)</num><content><p>a reporter to take any steps required by paragraph 2A;</p></content></level><level class="para1"><num>(f)</num><content><p>the Scottish Ministers to decide an application.</p></content></level></subparagraph><subparagraph><num>(3)</num><content><p>The regulations may include provision about the consequences of failure to comply with a time limit.</p></content></subparagraph><subparagraph><num>(4)</num><content><p>Where regulations under this paragraph specify a time limit for the completion of an acceptance stage (see paragraph 1A(2)(c)), the regulations may not permit the extension of that limit.</p></content></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-6"><num>(6)</num><content><p>The amendments made by subsection (3) do not affect the continued application in relation to the Scottish Ministers of regulations made under paragraph 2(3) of Schedule 8 to the Electricity Act 1989 before this section comes into force.</p></content></subsection></section><section eId="section-20"><num>20</num><heading>Variation of consents etc</heading><content><p><mod>After section 37 of the Electricity Act 1989 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e4384"><num>37A</num><heading>Application for variation of section 37 consent: Scotland</heading><subsection><num>(1)</num><content><p>The person for the time being entitled to the benefit of a section 37 consent that was granted by the Scottish Ministers may make an application to the Scottish Ministers for the consent to be varied.</p></content></subsection><subsection><num>(2)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about variation under this section, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the making and withdrawal of applications;</p></content></level><level class="para1"><num>(b)</num><content><p>fees;</p></content></level><level class="para1"><num>(c)</num><content><p>publicity and consultation requirements;</p></content></level><level class="para1"><num>(d)</num><content><p>rights to make representations;</p></content></level><level class="para1"><num>(e)</num><content><p>public inquiries;</p></content></level><level class="para1"><num>(f)</num><content><p>consideration of applications.</p></content></level></subsection><subsection><num>(3)</num><content><p>The regulations may provide for any statutory provision applicable to the grant by the Scottish Ministers of a section 37 consent to apply with specified modifications to the variation of a section 37 consent under this section.</p></content></subsection><subsection><num>(4)</num><intro><p>On an application for a section 37 consent to be varied, the Scottish Ministers may make such variations to the consent as appear to them to be appropriate, having regard (in particular) to—</p></intro><level class="para1"><num>(a)</num><content><p>the applicant’s reason for seeking the variation;</p></content></level><level class="para1"><num>(b)</num><content><p>the variations proposed;</p></content></level><level class="para1"><num>(c)</num><content><p>any objections made to the proposed variations, the views of consultees and the outcome of any public inquiry.</p></content></level></subsection><subsection><num>(5)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-section-37-consent">section 37 consent</term>” means a consent granted under section 37 (consent required for overhead lines);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-statutory-provision">statutory provision</term>” means a provision of or made under an Act, whenever passed or made; and for this purpose “<term refersTo="#term-act">Act</term>” includes an Act of the Scottish Parliament.</p></content></hcontainer></subsection></section><section eId="d25e4493"><num>37B</num><heading>Variation of section 36 and 37 consents on change of circumstances: Scotland</heading><subsection><num>(1)</num><intro><p>The Scottish Ministers may vary a consent under section 36 or 37 if—</p></intro><level class="para1"><num>(a)</num><intro><p>they consider that the consent ought to be varied—</p></intro><level class="para2"><num>(i)</num><content><p>because of a change in circumstances relating to the environment, or</p></content></level><level class="para2"><num>(ii)</num><content><p>because of technological changes, and</p></content></level></level><level class="para1"><num>(b)</num><content><p>the person for the time being entitled to the benefit of the consent agrees to the variation.</p></content></level></subsection><subsection><num>(2)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about variation under this section, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the procedure for getting agreement;</p></content></level><level class="para1"><num>(b)</num><content><p>publicity, notification and consultation requirements;</p></content></level><level class="para1"><num>(c)</num><content><p>rights to make representations.</p></content></level></subsection><subsection><num>(3)</num><content><p>The regulations may provide for any statutory provision applicable to the grant by the Scottish Ministers of a consent under section 36 or 37 to apply with specified modifications to the variation of such a consent under this section.</p></content></subsection><subsection><num>(4)</num><content><p>In this section, “<term refersTo="#term-statutory-provision">statutory provision</term>” has the same meaning as in section <ref href="#d25e4384">37A</ref>.</p></content></subsection></section><section eId="d25e4572"><num>37C</num><heading>Correction of errors in consent documents: Scotland</heading><subsection eId="d25e4576"><num>(1)</num><content><p>The Scottish Ministers may amend a decision document in order to correct a correctable error.</p></content></subsection><subsection><num>(2)</num><intro><p>In <ref href="#d25e4576">subsection (1)</ref>—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-correctable-error">correctable error</term>” means an error or omission which—</p></intro><level class="para1"><num>(a)</num><content><p>is in a part of the decision document which records the decision, and</p></content></level><level class="para1"><num>(b)</num><content><p>is not part of the statement of reasons for the decision;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-decision-document">decision document</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a document recording a consent under section 36 or 37, or</p></content></level><level class="para1"><num>(b)</num><content><p>a document recording a variation of such a consent.</p></content></level></hcontainer></subsection><subsection><num>(3)</num><content><p>The Scottish Ministers may exercise the power in <ref href="#d25e4576">subsection (1)</ref> either of their own accord or following a written request from a person for the time being entitled to the benefit of the consent.</p></content></subsection><subsection><num>(4)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about the process for corrections, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the making of written requests;</p></content></level><level class="para1"><num>(b)</num><content><p>notification requirements;</p></content></level><level class="para1"><num>(c)</num><content><p>rights to make representations.</p></content></level></subsection></section></quotedStructure></mod></p></content></section><section eId="section-21"><num>21</num><heading>Proceedings for questioning certain decisions on consents</heading><subsection eId="section-21-1"><num>(1)</num><content><p>Section 36D of the Electricity Act 1989 (proceedings for questioning certain decisions under section 36) is amended as set out in subsections <ref href="#section-21-2">(2)</ref> to <ref href="#section-21-4">(4)</ref>.</p></content></subsection><subsection eId="section-21-2"><num>(2)</num><content><p><mod>For subsection (3) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(3)</num><intro><p>This section applies to a decision under any of the following—</p></intro><level class="para1"><num>(a)</num><content><p>section 36 (application for consent for generating station);</p></content></level><level class="para1"><num>(b)</num><content><p>section 36C (application for variation of section 36 consent);</p></content></level><level class="para1"><num>(c)</num><content><p>section 37 (application for consent for overhead lines);</p></content></level><level class="para1"><num>(d)</num><content><p>section <ref href="#d25e4384">37A</ref> (application for variation of section 37 consent);</p></content></level><level class="para1"><num>(e)</num><content><p>section <ref href="#d25e4493">37B</ref> (variation of consents by Scottish Ministers);</p></content></level><level class="para1"><num>(f)</num><content><p>section 37C (consents and variation of consents in Scotland: correction of errors).</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-21-3"><num>(3)</num><content><p><mod>In subsection (4), for “taken” substitute <quotedText>“published by the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-4"><num>(4)</num><content><p><mod>In the heading, for “under section 36” substitute <quotedText>“of the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-5"><num>(5)</num><content><p><mod>In Schedule 8 to the Electricity Act 1989, in paragraph 5B (proceedings for questioning certain decisions under paragraph 3(2)), in sub-paragraph (4), for “taken” substitute <quotedText>“published by the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-6"><num>(6)</num><content><p><mod>In section 237 of the Town and Country Planning (Scotland) Act 1997 (challenges to validity of development plans and certain orders, decisions and directions), in subsection (3), after paragraph (b) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(ba)</num><content><p>any decision to give a direction under section 57(2) or (2ZA);</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-21-7"><num>(7)</num><content><p>The amendments made by this section apply only in relation to decisions made on or after the date on which this section comes into force.</p></content></subsection></section><section eId="section-22"><num>22</num><heading>Applications for necessary wayleaves: fees</heading><content><p><mod>In Schedule 4 to the Electricity Act 1989 (other powers etc of licence holders), after paragraph 6 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Fees for applications under paragraph 6(3) to the Scottish Ministers</heading><paragraph eId="d25e4794" class="schProv1"><num>6A</num><content><p>The Scottish Ministers may by regulations make provision about the fees to be paid to the Scottish Ministers in relation to an application made to them under paragraph 6(3).</p></content></paragraph></hcontainer></quotedStructure></mod></p></content></section><section eId="section-23"><num>23</num><heading>Regulations</heading><subsection eId="section-23-1"><num>(1)</num><content><p><ref eId="c00040" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">Section 106</ref> of the <ref eId="c00041" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (regulations and orders) is amended as follows.</p></content></subsection><subsection eId="section-23-2"><num>(2)</num><intro><p>In <ref eId="c00042" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">subsection (1ZA)</ref>—</p></intro><level class="para1" eId="section-23-2-a"><num>(a)</num><content><p><mod>for “the power conferred on” substitute <quotedText>“a power of”</quotedText>;</mod></p></content></level><level class="para1" eId="section-23-2-b"><num>(b)</num><content><p><mod>for “by section 36C” substitute <quotedText>“to make regulations (see section 27 of the Interpretation and Legislative Reform (Scotland) Act 2010 (Scottish statutory instruments))”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-23-3"><num>(3)</num><content><p><mod>After subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e4853"><num>(2ZA)</num><intro><p>Subsection (2) does not apply to a statutory instrument containing (whether alone or with other provision)—</p></intro><level class="para1" eId="d25e4859"><num>(a)</num><content><p>regulations under paragraph <ref href="#d25e4075">2A</ref> of Schedule 8;</p></content></level></subsection></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-23-4"><num>(4)</num><content><p><mod>In <ref eId="c00043" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">subsection (3)</ref>, for the words after “under” substitute <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>section 36C,</p></content></level><level class="para1"><num>(b)</num><content><p>section <ref href="#d25e4384">37A</ref>,</p></content></level><level class="para1"><num>(c)</num><content><p>section <ref href="#d25e4493">37B</ref>,</p></content></level><level class="para1"><num>(d)</num><content><p>section <ref href="#d25e4572">37C</ref>,</p></content></level><level class="para1"><num>(e)</num><content><p>paragraph <ref href="#d25e4794">6A</ref> of Schedule 4, or</p></content></level><level class="para1"><num>(f)</num><content><p>any paragraph of Schedule 8 except paragraph <ref href="#d25e4075">2A</ref>,</p></content></level><p>are subject to the negative procedure.</p></quotedStructure></mod></p></content></subsection><subsection eId="section-23-5"><num>(5)</num><content><p><mod>At the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(4)</num><content><p>Before making regulations under a provision listed in subsection <ref href="#d25e4960">(6)</ref>, the Secretary of State must consult the Scottish Ministers.</p></content></subsection><subsection><num>(5)</num><content><p>Before making regulations under a provision listed in subsection <ref href="#d25e4960">(6)</ref>, the Scottish Ministers must consult the Secretary of State.</p></content></subsection><subsection eId="d25e4960"><num>(6)</num><intro><p>The provisions are—</p></intro><level class="para1"><num>(a)</num><content><p>section <ref href="#d25e4384">37A</ref>;</p></content></level><level class="para1"><num>(b)</num><content><p>section <ref href="#d25e4493">37B</ref>;</p></content></level><level class="para1"><num>(c)</num><content><p>section <ref href="#d25e4572">37C</ref>;</p></content></level><level class="para1"><num>(d)</num><content><p>paragraphs <ref href="#d25e3890">1A</ref>, <ref href="#d25e4075">2A</ref> and <ref href="#d25e4298">7B</ref> of Schedule 8.</p></content></level></subsection></quotedStructure></mod></p></content></subsection></section><section eId="section-24"><num>24</num><heading><span><ref href="#section-19">Sections 19</ref> to <ref href="#section-23">23</ref></span>: minor and consequential amendments</heading><intro><p><ref href="#schedule-1">Schedule 1</ref> makes—</p></intro><level class="para1" eId="section-24-a"><num>(a)</num><content><p>amendments to the <ref eId="c00044" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> that are consequential on the amendments made by sections <ref href="#section-19">19</ref> to <ref href="#section-23">23</ref>, and</p></content></level><level class="para1" eId="section-24-b"><num>(b)</num><content><p>other minor amendments relating to consents for electricity infrastructure in Scotland (including amendments to reflect previous transfers of functions to the Scottish Ministers).</p></content></level></section><section eId="section-25"><num>25</num><heading>Environmental impact assessments for electricity works</heading><subsection eId="section-25-1"><num>(1)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations amend the Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 2017 (<ref eId="c00045" href="http://www.legislation.gov.uk/id/ssi/2017/101">S.S.I. 2017/101</ref>) (the “<term refersTo="#term-2017-regulations" eId="term-2017-regulations">2017 Regulations</term>”) by making provision described in subsection <ref href="#section-25-2">(2)</ref> in connection with environmental impact assessments and applications made to the Scottish Ministers for—</p></intro><level class="para1" eId="section-25-1-a"><num>(a)</num><content><p>consent granted under section 36 or 37 of the Electricity Act 1989 (consent for construction etc of generating stations or for overhead lines), or</p></content></level><level class="para1" eId="section-25-1-b"><num>(b)</num><content><p>variation of consent granted under section 36 of that Act.</p></content></level></subsection><subsection eId="section-25-2"><num>(2)</num><intro><p>That provision is—</p></intro><level class="para1" eId="section-25-2-a"><num>(a)</num><content><p>provision for the Scottish Ministers to refuse an application in respect of Schedule 2 development that is not accompanied by an EIA report if the development has not been the subject of a screening opinion;</p></content></level><level class="para1" eId="section-25-2-b"><num>(b)</num><content><p>provision for the Scottish Ministers to charge developers fees for screening opinions and scoping opinions;</p></content></level><level class="para1" eId="section-25-2-c"><num>(c)</num><content><p>provision about the sending of copies of EIA reports to the Scottish Ministers;</p></content></level><level class="para1" eId="section-25-2-d"><num>(d)</num><content><p>provision about the publication by developers of the information listed in regulation 14(2) of the 2017 Regulations (information about EIA reports);</p></content></level><level class="para1" eId="section-25-2-e"><num>(e)</num><content><p>provision about making EIA reports available for inspection;</p></content></level><level class="para1" eId="section-25-2-f"><num>(f)</num><content><p>provision about time limits for the consultation bodies and other public bodies to make representations to the Scottish Ministers about scoping opinions and EIA reports;</p></content></level><level class="para1" eId="section-25-2-g"><num>(g)</num><content><p>provision about time limits for the consultation bodies and other public bodies to enter into consultation with developers about, and to make available, information relevant to the preparation of EIA reports;</p></content></level><level class="para1" eId="section-25-2-h"><num>(h)</num><content><p>provision about time limits for developers to provide additional information to the Scottish Ministers;</p></content></level><level class="para1" eId="section-25-2-i"><num>(i)</num><content><p>provision about the publication by developers of the information listed in regulation 20(3) of the 2017 Regulations (information about additional information);</p></content></level><level class="para1" eId="section-25-2-j"><num>(j)</num><content><p>provision about making additional information available for inspection;</p></content></level><level class="para1" eId="section-25-2-k"><num>(k)</num><content><p>provision about the publication by developers of the information listed in regulation 23(2) of the 2017 Regulations (information about decisions);</p></content></level><level class="para1" eId="section-25-2-l"><num>(l)</num><content><p>provision that the Secretary of State or the Scottish Ministers consider appropriate for securing that the procedures under the 2017 Regulations operate effectively, or more effectively, alongside the procedures under regulations made under section 36C of the Electricity Act 1989 or paragraph <ref href="#d25e3890">1A</ref> or <ref href="#d25e4298">7B</ref> of Schedule 8 to that Act (inserted by section <ref href="#section-19">19</ref> of this Act).</p></content></level></subsection><subsection eId="section-25-3"><num>(3)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations amend the 2017 Regulations by making provision described in subsection <ref href="#section-25-4">(4)</ref> in connection with environmental impact assessments and applications made to the Scottish Ministers for variation of consent granted under section 37 of the Electricity Act 1989.</p></content></subsection><subsection eId="section-25-4"><num>(4)</num><intro><p>That provision is—</p></intro><level class="para1" eId="section-25-4-a"><num>(a)</num><intro><p>provision requiring an environmental impact assessment in respect of the proposed variation to be carried out before Scottish Ministers—</p></intro><level class="para2" eId="section-25-4-a-i"><num>(i)</num><content><p>vary the consent, or</p></content></level><level class="para2" eId="section-25-4-a-ii"><num>(ii)</num><content><p>direct that planning permission is deemed to be granted under section 57(2) or (2ZA) of the Town and Country Planning (Scotland) Act 1997 in respect of EIA development;</p></content></level></level><level class="para1" eId="section-25-4-b"><num>(b)</num><content><p>provision requiring the Scottish Ministers to take the environmental information into account when carrying out an environmental impact assessment in respect of the proposed variation;</p></content></level><level class="para1" eId="section-25-4-c"><num>(c)</num><content><p>provision applying provisions of the 2017 Regulations (including provisions amended by regulations under subsection <ref href="#section-25-1">(1)</ref>), with or without modifications;</p></content></level><level class="para1" eId="section-25-4-d"><num>(d)</num><content><p>provision that the Secretary of State or the Scottish Ministers consider appropriate for securing that the procedures under the 2017 Regulations operate effectively, or more effectively, alongside the procedures under regulations made under section <ref href="#d25e4384">37A</ref> of the Electricity Act 1989 (inserted by section <ref href="#section-20">20</ref> of this Act).</p></content></level></subsection><subsection eId="section-25-5"><num>(5)</num><intro><p>Regulations under this section may—</p></intro><level class="para1" eId="section-25-5-a"><num>(a)</num><content><p>make different provision for different purposes or different areas;</p></content></level><level class="para1" eId="section-25-5-b"><num>(b)</num><content><p>make consequential or supplementary provision;</p></content></level><level class="para1" eId="section-25-5-c"><num>(c)</num><content><p>make transitional provision.</p></content></level></subsection><subsection eId="section-25-6"><num>(6)</num><content><p>Regulations under this section made by the Secretary of State are to be made by statutory instrument.</p></content></subsection><subsection eId="section-25-7"><num>(7)</num><content><p>A statutory instrument containing regulations made by the Secretary of State under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-25-8"><num>(8)</num><content><p>Before making regulations under this section, the Secretary of State must consult the Scottish Ministers.</p></content></subsection><subsection eId="section-25-9"><num>(9)</num><content><p>For regulations under this section made by the Scottish Ministers, see section 27 of the Interpretation and Legislative Reform (Scotland) Act <ref eId="c00046" href="http://www.legislation.gov.uk/id/asp/2010/10">2010 (asp 10)</ref> (Scottish statutory instruments).</p></content></subsection><subsection eId="section-25-10"><num>(10)</num><content><p>Regulations made by the Scottish Ministers under this section are subject to the negative procedure (see section 28 of the Interpretation and Legislative Reform (Scotland) Act <ref eId="c00047" href="http://www.legislation.gov.uk/id/asp/2010/10">2010 (asp 10)</ref>).</p></content></subsection><subsection eId="section-25-11"><num>(11)</num><content><p>Before making regulations under this section, the Scottish Ministers must consult the Secretary of State.</p></content></subsection><subsection eId="section-25-12"><num>(12)</num><intro><p>In this section, subject to subsection <ref href="#section-25-13">(13)</ref>, the following terms have the same meaning as they have in the 2017 Regulations—</p></intro><hcontainer name="definition"><content><p>“additional information”</p></content></hcontainer><hcontainer name="definition"><content><p>“the consultation bodies”</p></content></hcontainer><hcontainer name="definition"><content><p>“developer”</p></content></hcontainer><hcontainer name="definition"><content><p>“EIA development”</p></content></hcontainer><hcontainer name="definition"><content><p>“EIA report”</p></content></hcontainer><hcontainer name="definition"><content><p>“environmental impact assessment”</p></content></hcontainer><hcontainer name="definition"><content><p>“environmental information”</p></content></hcontainer><hcontainer name="definition"><content><p>“Schedule 2 development”</p></content></hcontainer><hcontainer name="definition"><content><p>“scoping opinion”</p></content></hcontainer><hcontainer name="definition"><content><p>“screening opinion”.</p></content></hcontainer></subsection><subsection eId="section-25-13"><num>(13)</num><content><p>In subsections <ref href="#section-25-3">(3)</ref> and <ref href="#section-25-4">(4)</ref>, those terms have the same meaning in connection with applications for variation of consent granted under section 37 of the Electricity Act 1989 as they have, in the 2017 Regulations, in connection with applications for variation of consent granted under section 36 of that Act.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-long-duration-electricity-storage"><heading>Long duration electricity storage</heading><section eId="section-26"><num>26</num><heading>Long duration electricity storage</heading><content><p><mod>In the Electricity Act 1989, after <ref eId="c00048" href="https://www.legislation.gov.uk/ukpga/1989/29/section/10O">section 10O</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Long duration electricity storage</heading><section><num>10P</num><heading>Long duration electricity storage</heading><subsection><num>(1)</num><content><p>The Authority must, as soon as reasonably practicable after this section comes into force, establish and operate a scheme in accordance with this section.</p></content></subsection><subsection><num>(2)</num><content><p>The scheme must be designed for the purpose of encouraging the development and use of long duration electricity storage installations.</p></content></subsection><subsection><num>(3)</num><intro><p>The scheme must be open to persons who—</p></intro><level class="para1"><num>(a)</num><content><p>hold or intend to apply for a generation licence to operate a long duration electricity storage installation, and</p></content></level><level class="para1"><num>(b)</num><content><p>meet any other specified criteria.</p></content></level></subsection><subsection eId="d25e5416"><num>(4)</num><intro><p>The scheme must provide for an LDES operator who operates an approved installation—</p></intro><level class="para1"><num>(a)</num><content><p>to receive payments from a holder of an electricity system operator licence where the operator’s assessed revenue from that installation is below a specified amount, in specified circumstances, and</p></content></level><level class="para1"><num>(b)</num><content><p>to make payments to a holder of an electricity system operator licence where the operator’s assessed revenue from that installation is above a specified amount, in specified circumstances.</p></content></level></subsection><subsection><num>(5)</num><intro><p>In subsection <ref href="#d25e5416">(4)</ref>—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-an-approved-installation">an approved installation</term>” means a long duration electricity storage installation which is approved by the Authority for the purposes of subsection <ref href="#d25e5416">(4)</ref> in accordance with the scheme;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-assessed-revenue">assessed revenue</term>”, in relation to a long duration electricity storage installation, means the difference between—</p></intro><level class="para1"><num>(a)</num><content><p>revenue of a specified kind earned or derived in connection with that installation, and</p></content></level><level class="para1"><num>(b)</num><content><p>costs of a specified kind incurred in connection with operating the installation.</p></content></level></hcontainer></subsection><subsection><num>(6)</num><content><p>The Authority may determine how costs and revenue are to be calculated for the purposes of the scheme.</p></content></subsection><subsection><num>(7)</num><content><p>In setting charges to which Article 18(1) of the Electricity Regulation applies, the holder of an electricity system operator licence may take account of payments it makes or receives under the scheme.</p></content></subsection><subsection><num>(8)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-ldes-operator">LDES operator</term>” means a person who, under a generation licence, generates electricity by means of a long duration electricity storage installation;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-long-duration-electricity-storage-installation">long duration electricity storage installation</term>” means an installation that—</p></intro><level class="para1"><num>(a)</num><content><p>generates electricity from stored energy,</p></content></level><level class="para1"><num>(b)</num><content><p>has an electricity generating capacity of not less than 50 megawatts, and</p></content></level><level class="para1"><num>(c)</num><content><p>is capable of generating electricity at its full capacity for a continuous period of not less than eight hours;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-specified">specified</term>” means specified by the Authority for the purposes of the scheme in—</p></intro><level class="para1"><num>(a)</num><content><p>a document published by the Authority, or</p></content></level><level class="para1"><num>(b)</num><content><p>a condition of a licence;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-stored-energy">stored energy</term>” has the meaning given by section 4(3ZB).</p></content></hcontainer></subsection><subsection><num>(9)</num><intro><p>The Secretary of State may by regulations amend the definition of “long duration electricity storage installation” by substituting—</p></intro><level class="para1"><num>(a)</num><content><p>for the amount of electricity generating capacity for the time being mentioned in <ref href="#d25e5508">paragraph (b)</ref> of the definition, a different amount;</p></content></level><level class="para1"><num>(b)</num><content><p>for the period for the time being mentioned in <ref href="#d25e5512">paragraph (c)</ref> of the definition, a different period (which may not be less than eight hours).</p></content></level></subsection></section></hcontainer></quotedStructure></mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-consumer-benefits"><heading>Consumer benefits</heading><section eId="section-27"><num>27</num><heading>Benefits for homes near electricity transmission projects</heading><subsection eId="section-27-1"><num>(1)</num><content><p>The Electricity Act 1989 is amended as follows.</p></content></subsection><subsection eId="section-27-2"><num>(2)</num><content><p><mod>After section 38 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Benefits resulting from proximity to new or upgraded transmission infrastructure</heading><section eId="d25e5593"><num>38A</num><heading>Power to establish scheme for giving of benefits</heading><subsection eId="d25e5597"><num>(1)</num><content><p>The Secretary of State may by regulations establish a scheme under which persons with a specified connection to qualifying premises are entitled to financial benefits provided (directly or indirectly) by electricity suppliers.</p></content></subsection><subsection><num>(2)</num><content><p>Qualifying premises must be identified by reference to their proximity to qualifying works.</p></content></subsection><subsection><num>(3)</num><intro><p>Qualifying works must involve the construction, erection, expansion or improvement of electrical plant or an electric line that (in either case)—</p></intro><level class="para1"><num>(a)</num><content><p>is wholly or partly above the ground, and</p></content></level><level class="para1"><num>(b)</num><content><p>forms or is intended to form part of a transmission system.</p></content></level><wrapUp><p>They may be works that took place before the making of the regulations or the coming into force of this section.</p></wrapUp></subsection><subsection eId="d25e5630"><num>(4)</num><intro><p>The regulations may (among other things)—</p></intro><level class="para1"><num>(a)</num><content><p>make further provision determining, or for the determination of, whether premises or works are qualifying;</p></content></level><level class="para1"><num>(b)</num><content><p>confer functions in connection with the scheme;</p></content></level><level class="para1"><num>(c)</num><content><p>provide for the delegation of functions conferred in connection with the scheme;</p></content></level><level class="para1"><num>(d)</num><content><p>provide for payments by electricity suppliers to meet costs incurred in the carrying out of functions in connection with the scheme;</p></content></level><level class="para1"><num>(e)</num><content><p>provide for the costs of electricity suppliers under the scheme to be distributed among suppliers on such basis, and by such means, as the regulations provide;</p></content></level><level class="para1"><num>(f)</num><content><p>restrict a person’s ability to obtain payment of an amount standing to the credit of the person’s account with an electricity supplier, where that amount derives from benefits under the scheme;</p></content></level><level class="para1"><num>(g)</num><content><p>make provision about cases in which a person who has received benefits under the scheme in respect of premises ceases to be entitled under the scheme in respect of the premises, including provision for the withdrawal or recovery of the benefits;</p></content></level><level class="para1" eId="d25e5678"><num>(h)</num><content><p>make pass-through provision and associated provision (see section <ref href="#d25e5753">38B</ref>);</p></content></level><level class="para1" eId="d25e5687"><num>(i)</num><content><p>make enforcement provision (see section <ref href="#d25e5864">38C</ref>);</p></content></level><level class="para1" eId="d25e5696"><num>(j)</num><content><p>make information provision (see section <ref href="#d25e5952">38D</ref>).</p></content></level></subsection><subsection><num>(5)</num><intro><p>To the extent that this section enables provision to be made affecting the holders of licences, provision for that purpose may be made by modifying, or empowering or requiring the Authority to modify—</p></intro><level class="para1"><num>(a)</num><content><p>the conditions of a licence, or</p></content></level><level class="para1"><num>(b)</num><content><p>a document maintained in accordance with the conditions of a licence, or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="d25e5723"><num>(6)</num><content><p>A statutory instrument containing regulations under this section may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection><num>(7)</num><content><p>A draft laid under subsection <ref href="#d25e5723">(6)</ref> is not to be treated as a hybrid instrument for the purposes of the standing orders of either House of Parliament.</p></content></subsection><subsection><num>(8)</num><content><p>Regulations under this section bind the Crown unless they provide otherwise.</p></content></subsection><subsection><num>(9)</num><content><p>The Secretary of State may, out of money provided by Parliament, make payments to a person on whom functions are conferred by regulations under this section for the purposes of meeting (or helping to meet) the expenses of carrying out those functions.</p></content></subsection></section><section eId="d25e5753"><num>38B</num><heading>Passing of benefits to ultimate consumer</heading><subsection><num>(1)</num><content><p>This section applies for the purposes of section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5678">(h)</ref>.</p></content></subsection><subsection eId="d25e5770"><num>(2)</num><intro><p>“Pass-through provision” is provision that—</p></intro><level class="para1" eId="d25e5776"><num>(a)</num><intro><p>applies where—</p></intro><level class="para2"><num>(i)</num><content><p>one person (“the intermediary”) receives benefits under the scheme in connection with qualifying premises, and</p></content></level><level class="para2" eId="d25e5788"><num>(ii)</num><content><p>another person (“the end-user”) who is not living as part of the same household as the intermediary consumes electricity supplied to the premises, and</p></content></level></level><level class="para1" eId="d25e5794"><num>(b)</num><content><p>requires the intermediary to pass on the substance of those benefits to the end-user.</p></content></level></subsection><subsection><num>(3)</num><intro><p>“<term refersTo="#term-associated-provision">Associated provision</term>” means provision that relates to pass-through provision and—</p></intro><level class="para1"><num>(a)</num><content><p>requires intermediaries to take steps to obtain benefits that will be subject to the requirement referred to in subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5794">(b)</ref>,</p></content></level><level class="para1"><num>(b)</num><content><p>requires intermediaries to supply information to end-users,</p></content></level><level class="para1"><num>(c)</num><content><p>provides for the making of payments to intermediaries (in addition to the provision of benefits of the sort mentioned in section <ref href="#d25e5593">38A</ref><ref href="#d25e5597">(1)</ref>), or</p></content></level><level class="para1"><num>(d)</num><content><p>provides for the withdrawal or recovery of benefits given or other payments made to intermediaries who fail to comply with the requirement referred to in subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5794">(b)</ref>.</p></content></level></subsection><subsection><num>(4)</num><content><p>For the purposes of subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5776">(a)</ref><ref href="#d25e5788">(ii)</ref>, the cases in which electricity is consumed by a person include those in which the electricity is used to make available to the person heating, cooling, hot water or energy.</p></content></subsection></section><section eId="d25e5864"><num>38C</num><heading>Enforcement of benefit scheme</heading><subsection eId="d25e5868"><num>(1)</num><intro><p>In section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5687">(i)</ref>, “<term refersTo="#term-enforcement-provision">enforcement provision</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>provision for the enforcement in civil proceedings of requirements under the scheme,</p></content></level><level class="para1"><num>(b)</num><intro><p>provision for a person to impose a monetary penalty where the person is satisfied on the balance of probabilities that—</p></intro><level class="para2"><num>(i)</num><content><p>a requirement under the regulations has not been complied with, or</p></content></level><level class="para2"><num>(ii)</num><content><p>benefits or other payments under the scheme have been wrongfully obtained, or</p></content></level></level><level class="para1" eId="d25e5908"><num>(c)</num><content><p>provision for complaints procedures, dispute resolution, adjudication, appeals or redress in connection with the scheme.</p></content></level></subsection><subsection><num>(2)</num><content><p>If regulations under section <ref href="#d25e5593">38A</ref> provide for the imposition of monetary penalties, they must provide a right of appeal to a court or tribunal on grounds including both error of fact and error of law.</p></content></subsection><subsection eId="d25e5923"><num>(3)</num><content><p>The provision that may be made by virtue of subsection <ref href="#d25e5868">(1)</ref><ref href="#d25e5908">(c)</ref> includes provision for Part 2 of the Consumers, Estate Agents and Redress Act 2007 (complaints handling and redress schemes) to apply (with or without modifications) to end-user complaints as it applies to consumer complaints within the meaning of that Part.</p></content></subsection><subsection><num>(4)</num><content><p>In subsection <ref href="#d25e5923">(3)</ref>, “<term refersTo="#term-end-user-complaints">end-user complaints</term>” means complaints in connection with pass-through provision made by end-users against intermediaries or electricity suppliers (with the definitions in section <ref href="#d25e5753">38B</ref> applying for the purposes of this subsection).</p></content></subsection></section><section eId="d25e5952"><num>38D</num><heading>Disclosure and use of information in connection with benefit scheme</heading><subsection><num>(1)</num><content><p>In section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5696">(j)</ref>, “<term refersTo="#term-information-provision">information provision</term>” means provision within subsection <ref href="#d25e5978">(2)</ref> or <ref href="#d25e6020">(3)</ref>.</p></content></subsection><subsection eId="d25e5978"><num>(2)</num><intro><p>Provision is within this subsection if it is provision for the disclosure of information or evidence for the purposes of—</p></intro><level class="para1"><num>(a)</num><content><p>identifying persons entitled to benefits under the scheme,</p></content></level><level class="para1"><num>(b)</num><content><p>identifying qualifying premises or qualifying works,</p></content></level><level class="para1"><num>(c)</num><content><p>checking whether requirements under, or resulting from, the regulations are being or have been complied with,</p></content></level><level class="para1"><num>(d)</num><content><p>checking payments made under the scheme,</p></content></level><level class="para1"><num>(e)</num><content><p>facilitating the performance of functions conferred, or the enforcement of duties imposed, by or as a result of the regulations, or</p></content></level><level class="para1"><num>(f)</num><content><p>evaluating the performance of the scheme.</p></content></level></subsection><subsection eId="d25e6020"><num>(3)</num><intro><p>Provision is within this subsection if it is provision about the use or further disclosure of information disclosed—</p></intro><level class="para1"><num>(a)</num><content><p>further to provision within subsection <ref href="#d25e5978">(2)</ref>, or</p></content></level><level class="para1"><num>(b)</num><content><p>otherwise in connection with the scheme.</p></content></level></subsection><subsection><num>(4)</num><content><p>The provision that may be made by virtue of subsection <ref href="#d25e6020">(3)</ref> includes provision making it an offence to use or disclose information in an unauthorised manner; but such an offence may not be made punishable by imprisonment.</p></content></subsection><subsection><num>(5)</num><intro><p>Regulations under section <ref href="#d25e5593">38A</ref> that authorise the use or disclosure of information are not to be taken to authorise disclosure or use that would be liable to harm the commercial interests of any person, except to the extent that—</p></intro><level class="para1"><num>(a)</num><content><p>the regulations otherwise provide, or</p></content></level><level class="para1"><num>(b)</num><content><p>the person disclosing or using the information reasonably considers such disclosure or use necessary in view of the purpose of the regulations.</p></content></level></subsection><subsection eId="d25e6071"><num>(6)</num><intro><p>Regulations under section <ref href="#d25e5593">38A</ref> do not require or authorise the disclosure or use of information that—</p></intro><level class="para1"><num>(a)</num><content><p>contravenes the data protection legislation (but this section and the regulations are to be taken into account in determining whether the disclosure or use would contravene that legislation), or</p></content></level><level class="para1"><num>(b)</num><content><p>is prohibited by any of Parts 1 to 7 and Chapter 1 of Part 9 of the Investigatory Powers Act 2016.</p></content></level></subsection><subsection><num>(7)</num><content><p>In subsection <ref href="#d25e6071">(6)</ref>, “<term refersTo="#term-the-data-protection-legislation">the data protection legislation</term>” has the same meaning as in the Data Protection Act 2018 (see section 3 of that Act).</p></content></subsection></section></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-27-3"><num>(3)</num><content><p><mod>In section 106 (regulations and orders under the Act), in subsection <ref href="#d25e4853">(2ZA)</ref> (inserted by section <ref href="#section-23">23</ref><ref href="#section-23-3">(3)</ref>), after paragraph <ref href="#d25e4859">(a)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(b)</num><content><p>regulations under section <ref href="#d25e5593">38A</ref>.</p></content></level></quotedStructure></mod></p></content></subsection><subsection eId="section-27-4"><num>(4)</num><content><p><mod>In paragraph 6 of Schedule 6A (requirements enforceable against suppliers under section 25), before sub-paragraph (a) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(za)</num><content><p>any provision of regulations under section <ref href="#d25e5593">38A</ref> that is designated in the regulations as a relevant provision for the purposes of this paragraph;</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-electricity-transmission-period"><heading>Electricity transmission period</heading><section eId="section-28"><num>28</num><heading>Electricity transmission systems: extension of commissioning period</heading><content><p><mod>In <ref eId="c00049" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">section 6G</ref><ref eId="c00050" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">(1)</ref> of the <ref eId="c00051" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (meaning of “<term refersTo="#term-commissioning-period" eId="term-commissioning-period">commissioning period</term>” for the purposes of determining whether a person is to be regarded as participating in the transmission of electricity), in <ref eId="c00052" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">paragraph (b)</ref>, for “18 months” substitute <quotedText>“27 months”</quotedText>.</mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-electricity-generation-on-forestry-land"><heading>Electricity generation on forestry land</heading><section eId="section-29"><num>29</num><heading>Use of forestry estate for renewable electricity</heading><content><p><mod>In the Forestry Act 1967, after section 3 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e6197"><num>3A</num><heading>Use of land in connection with renewable electricity projects</heading><subsection eId="d25e6201"><num>(1)</num><intro><p>The Commissioners may—</p></intro><level class="para1"><num>(a)</num><content><p>use, or enter into arrangements in connection with the use of, English forestry land for the generation, storage, transmission or supply of renewable electricity;</p></content></level><level class="para1"><num>(b)</num><content><p>sell, or enter into other arrangements concerning, renewable electricity generated, stored or supplied on, or transmitted across, English forestry land;</p></content></level><level class="para1" eId="d25e6219"><num>(c)</num><intro><p>use, or enter into arrangements in connection with the use of, English forestry land for activity that—</p></intro><level class="para2"><num>(i)</num><content><p>is intended to satisfy, or enable the satisfaction of, a relevant condition of development (whether existing or contemplated), or</p></content></level><level class="para2"><num>(ii)</num><content><p>otherwise arises in connection with such a condition.</p></content></level></level></subsection><subsection><num>(2)</num><intro><p>For the purposes of subsection <ref href="#d25e6201">(1)</ref><ref href="#d25e6219">(c)</ref>, a relevant condition of development is a condition of development that—</p></intro><level class="para1"><num>(a)</num><content><p>relates to renewable electricity development located wholly or partly on English forestry land, and</p></content></level><level class="para1"><num>(b)</num><content><p>is intended to benefit the natural environment of land.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The exercise of the powers in subsection <ref href="#d25e6201">(1)</ref> for either of the following purposes is to be taken to be consistent with the Commissioners’ general duty under section 1(2)—</p></intro><level class="para1"><num>(a)</num><content><p>facilitating or promoting the use of renewable electricity;</p></content></level><level class="para1"><num>(b)</num><content><p>obtaining funds for meeting the expenses referred to in section 41(2).</p></content></level></subsection><subsection><num>(4)</num><content><p>When the Commissioners are considering the exercise of those powers, section 1(3A) applies as if it included a further paragraph referring to those purposes.</p></content></subsection><subsection><num>(5)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-condition-of-development">condition of development</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a condition to which planning permission is subject, or</p></content></level><level class="para1"><num>(b)</num><content><p>a requirement contained in an order granting development consent under the Planning Act 2008 (development consent for nationally significant infrastructure);</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-english-forestry-land">English forestry land</term>” means land placed at the disposal of the Commissioners under this Act;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-natural-environment">natural environment</term>”, in relation to land, includes—</p></intro><level class="para1"><num>(a)</num><content><p>its plants, animals and other living organisms,</p></content></level><level class="para1"><num>(b)</num><content><p>their habitats, and</p></content></level><level class="para1"><num>(c)</num><content><p>its geological features;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-renewable-electricity">renewable electricity</term>” means electricity produced from sources other than—</p></intro><level class="para1"><num>(a)</num><content><p>coal,</p></content></level><level class="para1"><num>(b)</num><content><p>lignite,</p></content></level><level class="para1"><num>(c)</num><content><p>peat,</p></content></level><level class="para1"><num>(d)</num><content><p>natural gas, within the meaning of the Energy Act 1976,</p></content></level><level class="para1"><num>(e)</num><content><p>crude liquid petroleum,</p></content></level><level class="para1"><num>(f)</num><content><p>petroleum products, within the meaning of the Energy Act 1976,</p></content></level><level class="para1"><num>(g)</num><content><p>any substance produced directly or indirectly from a substance within paragraphs <ref href="#d25e6345">(a)</ref> to <ref href="#d25e6365">(f)</ref>,</p></content></level><level class="para1"><num>(h)</num><content><p>energy derived from any substance within paragraphs <ref href="#d25e6345">(a)</ref> to <ref href="#d25e6369">(g)</ref>, or</p></content></level><level class="para1"><num>(i)</num><content><p>nuclear fuel;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-renewable-electricity-development">renewable electricity development</term>” means development the main purpose of which is the generation, storage, transmission or supply of renewable electricity.</p></content></hcontainer></subsection><subsection eId="d25e6400"><num>(6)</num><content><p>References in this section to the storage of electricity are to the storage of energy converted from electricity for the purpose of its reconversion into electricity.</p></content></subsection></section><section eId="d25e6412"><num>3B</num><heading>Section <ref href="#d25e6197">3A</ref>: power to require Secretary of State’s consent in certain cases</heading><subsection eId="d25e6416"><num>(1)</num><content><p>The Secretary of State may make regulations that, in a case within subsection <ref href="#d25e6428">(2)</ref>, require the consent of the Secretary of State to an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>.</p></content></subsection><subsection eId="d25e6428"><num>(2)</num><intro><p>The cases are those where—</p></intro><level class="para1"><num>(a)</num><content><p>a proposed exercise of the powers is intended to enable the construction on English forestry land of the whole or part of a generating station (including an extension to an existing station), and</p></content></level><level class="para1"><num>(b)</num><content><p>the capacity threshold is exceeded.</p></content></level></subsection><subsection><num>(3)</num><content><p>In the case of the construction of a new generating station, the capacity threshold is exceeded if it is expected that the generating capacity of the station would equal or exceed the relevant wattage.</p></content></subsection><subsection eId="d25e6452"><num>(4)</num><intro><p>In the case of an extension to an existing station, the capacity threshold is exceeded if it is expected that—</p></intro><level class="para1"><num>(a)</num><content><p>the extension would cause the generating capacity of the station to equal or exceed the relevant wattage, or</p></content></level><level class="para1" eId="d25e6464"><num>(b)</num><content><p>the extension, whether alone or taken together with previous non-consented extensions, would increase the generating capacity of the station by at least the relevant wattage.</p></content></level></subsection><subsection><num>(5)</num><intro><p>An extension is “<term refersTo="#term-non-consented">non-consented</term>” for the purposes of subsection <ref href="#d25e6452">(4)</ref><ref href="#d25e6464">(b)</ref> if—</p></intro><level class="para1"><num>(a)</num><content><p>it was enabled by an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>, and</p></content></level><level class="para1"><num>(b)</num><content><p>that exercise of those powers did not have the consent of the Secretary of State under regulations under subsection <ref href="#d25e6416">(1)</ref>.</p></content></level></subsection><subsection><num>(6)</num><intro><p>But an extension ceases to be “non-consented” for those purposes if—</p></intro><level class="para1"><num>(a)</num><content><p>a subsequent extension to the station in question is constructed having been enabled by an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>, and</p></content></level><level class="para1"><num>(b)</num><content><p>that exercise of those powers had the consent of the Secretary of State under regulations under subsection <ref href="#d25e6416">(1)</ref>.</p></content></level></subsection><subsection><num>(7)</num><intro><p>The relevant wattage is—</p></intro><level class="para1"><num>(a)</num><content><p>5 megawatts, if the station generates electricity from wind, and</p></content></level><level class="para1"><num>(b)</num><content><p>50 megawatts, if it does not.</p></content></level></subsection><subsection eId="d25e6544"><num>(8)</num><content><p>The Secretary of State may by regulations amend this section so as to change the relevant wattage (including by adding or combining categories of station in relation to which a particular wattage is prescribed).</p></content></subsection><subsection><num>(9)</num><intro><p>In calculating the relevant wattage there is to be disregarded—</p></intro><level class="para1"><num>(a)</num><content><p>in the case of a generating station only partly situated on English forestry land, any generating capacity that can be attributed to parts not situated on English forestry land;</p></content></level><level class="para1"><num>(b)</num><content><p>in the case of a generating station whose capacity is provided in part by facilities for the storage of electricity and in part by other means, the capacity provided by those facilities.</p></content></level></subsection><subsection><num>(10)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-generating-station">generating station</term>” has the same meaning as in Part 1 of the Electricity Act 1989 (see section 64(1));</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-storage">storage</term>” is to be read in accordance with section <ref href="#d25e6197">3A</ref><ref href="#d25e6400">(6)</ref>.</p></content></hcontainer></subsection></section><section><num>3C</num><heading>Regulations under section <ref href="#d25e6412">3B</ref>: further provision</heading><subsection><num>(1)</num><intro><p>Regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6416">(1)</ref> may—</p></intro><level class="para1"><num>(a)</num><content><p>make provision about the process by which consent is to be sought and given or refused;</p></content></level><level class="para1"><num>(b)</num><content><p>provide for consent to be given subject to conditions.</p></content></level></subsection><subsection><num>(2)</num><intro><p>Regulations under section <ref href="#d25e6412">3B</ref> may—</p></intro><level class="para1"><num>(a)</num><content><p>make different provision for different purposes or areas;</p></content></level><level class="para1"><num>(b)</num><content><p>include consequential, incidental, supplementary, transitional or saving provision.</p></content></level></subsection><subsection><num>(3)</num><content><p>Regulations under section <ref href="#d25e6412">3B</ref> are to be made by statutory instrument.</p></content></subsection><subsection><num>(4)</num><content><p>A statutory instrument containing (whether alone or with other provision) regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6544">(8)</ref> may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection><num>(5)</num><content><p>A statutory instrument containing regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6416">(1)</ref> (but not regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6544">(8)</ref>) is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection></section></quotedStructure></mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-wind-generating-stations-and-seismic-array-systems"><heading>Wind generating stations and seismic array systems</heading><section eId="section-30"><num>30</num><heading>Wind generating stations that may affect seismic array systems</heading><subsection eId="section-30-1"><num>(1)</num><content><p>The Secretary of State may make regulations about planning permissions or consents relating to wind generating stations that may affect the functioning of a relevant seismic array system.</p></content></subsection><subsection eId="section-30-2"><num>(2)</num><intro><p>A “relevant seismic array system” is a spatially distributed system of linked seismometers, arranged so as to enhance the detection and characterisation of seismic signals, that—</p></intro><level class="para1" eId="section-30-2-a"><num>(a)</num><content><p>is used for defence purposes, and</p></content></level><level class="para1" eId="section-30-2-b"><num>(b)</num><content><p>is in use on the day on which this Act is passed.</p></content></level></subsection><subsection eId="section-30-3"><num>(3)</num><intro><p>The regulations may provide for—</p></intro><level class="para1" eId="section-30-3-a"><num>(a)</num><content><p>an exclusion zone, and</p></content></level><level class="para1" eId="section-30-3-b"><num>(b)</num><content><p>a restricted zone,</p></content></level><wrapUp><p>around a relevant seismic array system.</p></wrapUp></subsection><subsection eId="section-30-4"><num>(4)</num><intro><p>The regulations may—</p></intro><level class="para1" eId="section-30-4-a"><num>(a)</num><content><p>require a planning decision-maker to refuse, or decline to determine or accept, a planning application relating to a wind generating station that is (or would be) situated in an exclusion zone;</p></content></level><level class="para1" eId="section-30-4-b"><num>(b)</num><content><p>provide that a relevant development order or MCA scheme may not be made if it would grant planning permission for development relating to a wind generating station that is (or would be) situated in an exclusion zone;</p></content></level><level class="para1" eId="section-30-4-c"><num>(c)</num><content><p>allow the Secretary of State to direct that a relevant development order or MCA scheme may not be made if it would grant such planning permission.</p></content></level></subsection><subsection eId="section-30-5"><num>(5)</num><intro><p>The regulations may, in relation to a planning application relating to a wind generating station that is (or would be) situated in a restricted zone—</p></intro><level class="para1" eId="section-30-5-a"><num>(a)</num><content><p>require the applicant to provide specified information about the seismic impact of the proposals (“seismic impact information”) to which their application relates;</p></content></level><level class="para1" eId="section-30-5-b"><num>(b)</num><content><p>require the planning decision-maker to use the seismic impact information in a specified way when determining the application (including when determining conditions relating to a permission or consent);</p></content></level><level class="para1" eId="section-30-5-c"><num>(c)</num><content><p>require the planning decision-maker to refuse, or decline to determine or accept, the application in specified circumstances;</p></content></level><level class="para1" eId="section-30-5-d"><num>(d)</num><content><p>require the planning decision-maker to provide the Secretary of State with the seismic impact information, and to seek the Secretary of State’s views on the seismic impact of the proposals;</p></content></level><level class="para1" eId="section-30-5-e"><num>(e)</num><content><p>require the planning decision-maker to refuse, or decline to determine or accept, the application if the Secretary of State objects to it on grounds relating to the seismic impact of the proposals.</p></content></level></subsection><subsection eId="section-30-6"><num>(6)</num><intro><p>The regulations may—</p></intro><level class="para1" eId="section-30-6-a"><num>(a)</num><content><p>require a person proposing to make a relevant development order or MCA scheme to consult the Secretary of State if the order or scheme would grant planning permission for development relating to a wind generating station that is (or would be) situated in a restricted zone;</p></content></level><level class="para1" eId="section-30-6-b"><num>(b)</num><content><p>allow the Secretary of State to direct that a relevant development order or MCA scheme may not be made if it would grant such planning permission.</p></content></level></subsection><subsection eId="section-30-7"><num>(7)</num><intro><p>The regulations may include provision about the procedure for planning applications to which they relate, such as—</p></intro><level class="para1" eId="section-30-7-a"><num>(a)</num><content><p>provision enabling or requiring a planning decision-maker to decline to determine or accept an application;</p></content></level><level class="para1" eId="section-30-7-b"><num>(b)</num><content><p>provision modifying the process for determining an application;</p></content></level><level class="para1" eId="section-30-7-c"><num>(c)</num><content><p>provision allowing the Secretary of State to give a direction to the planning-decision maker about the procedure for an application;</p></content></level><level class="para1" eId="section-30-7-d"><num>(d)</num><content><p>provision modifying or disapplying a right of appeal or review;</p></content></level><level class="para1" eId="section-30-7-e"><num>(e)</num><content><p>provision disapplying a duty imposed on a planning decision-maker when determining an application.</p></content></level></subsection><subsection eId="section-30-8"><num>(8)</num><content><p>The regulations may require a planning decision-maker to have regard to guidance issued by the Secretary of State.</p></content></subsection><subsection eId="section-30-9"><num>(9)</num><intro><p>Regulations under this section may—</p></intro><level class="para1" eId="section-30-9-a"><num>(a)</num><content><p>amend or repeal provision contained in an Act of Parliament or an Act of the Scottish Parliament;</p></content></level><level class="para1" eId="section-30-9-b"><num>(b)</num><content><p>make different provision for different purposes or areas;</p></content></level><level class="para1" eId="section-30-9-c"><num>(c)</num><content><p>make provision binding the Crown;</p></content></level><level class="para1" eId="section-30-9-d"><num>(d)</num><content><p>make transitional, transitory or saving provision;</p></content></level><level class="para1" eId="section-30-9-e"><num>(e)</num><content><p>make incidental, supplementary or consequential provision.</p></content></level></subsection><subsection eId="section-30-10"><num>(10)</num><content><p>Regulations under this section are to be made by statutory instrument.</p></content></subsection><subsection eId="section-30-11"><num>(11)</num><content><p>A statutory instrument containing regulations under this section which amend or repeal provision contained in an Act of Parliament or an Act of the Scottish Parliament may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection eId="section-30-12"><num>(12)</num><content><p>Any other statutory instrument containing regulations under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-30-13"><num>(13)</num><content><p>If a draft of a statutory instrument containing regulations under this section would, apart from this subsection, be treated for the purposes of the standing orders of either House of Parliament as a hybrid instrument, it is to proceed in that House as if it were not such an instrument.</p></content></subsection><subsection eId="section-30-14"><num>(14)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-mca-scheme" eId="term-mca-scheme">MCA scheme</term>” means a masterplan consent area scheme made under Part 3 of the Town and Country Planning (Scotland) Act 1997;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-planning-application" eId="term-planning-application">planning application</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>an application for planning permission under Part 3 or Part 13 of the Town and Country Planning Act 1990,</p></content></level><level class="para1"><num>(b)</num><content><p>an application for planning permission under Part 3 or Part 12 of the Town and Country Planning (Scotland) Act 1997,</p></content></level><level class="para1"><num>(c)</num><content><p>an application for an order granting development consent under section 37 of the Planning Act 2008, or</p></content></level><level class="para1"><num>(d)</num><content><p>an application under section 36 or 36C of the Electricity Act 1989 (consent for construction etc of generating station);</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-planning-decision-maker" eId="term-planning-decision-maker">planning decision-maker</term>” means a person who determines a planning application;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-development-order" eId="term-relevant-development-order">relevant development order</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a local development order made under section 61A of the Town and Country Planning Act 1990;</p></content></level><level class="para1"><num>(b)</num><content><p>a Mayoral development order made under section 61DA of that Act;</p></content></level><level class="para1"><num>(c)</num><content><p>a neighbourhood development order made under section 61E of that Act;</p></content></level><level class="para1"><num>(d)</num><content><p>a development order made under section 30 of the Town and Country Planning (Scotland) Act 1997;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-wind-generating-station" eId="term-wind-generating-station">wind generating station</term>” means a generating station that generates electricity from wind.</p></content></hcontainer></subsection></section></hcontainer></chapter> — Long duration electricity storage
Part 1 — Infrastructure — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-2"><num>Chapter 2</num><heading>Electricity infrastructure</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-connections-to-the-electricity-transmission-and-distribution-systems"><heading>Connections to the electricity transmission and distribution systems</heading><section eId="section-14"><num>14</num><heading>Connections to electricity network: licence and other modifications</heading><subsection eId="section-14-1"><num>(1)</num><intro><p>A relevant authority may modify—</p></intro><level class="para1" eId="section-14-1-a"><num>(a)</num><content><p>the conditions of a particular electricity licence;</p></content></level><level class="para1" eId="section-14-1-b"><num>(b)</num><content><p>the terms of a particular electricity licence;</p></content></level><level class="para1" eId="section-14-1-c"><num>(c)</num><content><p>the standard conditions of electricity licences of a particular type;</p></content></level><level class="para1" eId="section-14-1-d"><num>(d)</num><content><p>a document maintained in accordance with the conditions of an electricity licence;</p></content></level><level class="para1" eId="section-14-1-e"><num>(e)</num><content><p>an agreement entered into in pursuance of a document maintained as mentioned in <ref href="#section-14-1-d">paragraph (d)</ref>;</p></content></level><level class="para1" eId="section-14-1-f"><num>(f)</num><content><p>a qualifying distribution agreement.</p></content></level></subsection><subsection eId="section-14-2"><num>(2)</num><content><p>A relevant authority may exercise the power under <ref href="#section-14-1">subsection (1)</ref> only for the purpose of improving the process for managing connections to the transmission system or the distribution system (and such an improvement may include changing the order in which connections are made).</p></content></subsection><subsection eId="section-14-3"><num>(3)</num><content><p>The Secretary of State may direct the GEMA to exercise the power under <ref href="#section-14-1">subsection (1)</ref>.</p></content></subsection><subsection eId="section-14-4"><num>(4)</num><content><p>The Secretary of State may exercise the power under <ref href="#section-14-3">subsection (3)</ref> only for the purpose mentioned in <ref href="#section-14-2">subsection (2)</ref>.</p></content></subsection><subsection eId="section-14-5"><num>(5)</num><content><p>The power conferred by <ref href="#section-14-1">subsection (1)</ref> may not be exercised after the end of the period of three years beginning with the day on which <ref href="#section-14">this section</ref> comes into force.</p></content></subsection><subsection eId="section-14-6"><num>(6)</num><content><p><ref eId="c00005" href="https://www.legislation.gov.uk/ukpga/1989/29/section/3A">Section 3A</ref> of the <ref eId="c00006" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (principal objective and general duties) applies in relation to the functions of the Secretary of State and the GEMA under <ref href="#section-14">this section</ref> and sections <ref href="#section-15">15</ref> to <ref href="#section-17">17</ref> as it applies in relation to functions of the Secretary of State or the GEMA under <ref eId="c00007" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of <ref eId="c00008" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">that Act</ref>.</p></content></subsection><subsection eId="section-14-7"><num>(7)</num><content><p>A relevant authority may under <ref href="#section-14-1">subsection (1)</ref> modify an agreement mentioned in <ref href="#section-14-1">subsection (1)</ref><ref href="#section-14-1-e">(e)</ref> or a qualifying distribution agreement even if the effect of the modification might amount to a repudiation of the agreement.</p></content></subsection><subsection eId="section-14-8"><num>(8)</num><intro><p>In <ref href="#section-14">this section</ref> and sections <ref href="#section-15">15</ref> to <ref href="#section-17">17</ref>—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-distribution-system" eId="term-distribution-system">distribution system</term>” has the same meaning as in <ref eId="c00009" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00010" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (see the definition of “distribute” in section 4(4) of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-electricity-distributor" eId="term-electricity-distributor">electricity distributor</term>” has the same meaning as in Part 1 of that Act (see section 6(9) of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-electricity-licence" eId="term-electricity-licence">electricity licence</term>” means a licence for the purposes of section 4 of that Act;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-gema" eId="term-the-gema">the GEMA</term>” means the Gas and Electricity Markets Authority;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-qualifying-distribution-agreement" eId="term-qualifying-distribution-agreement">qualifying distribution agreement</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>the terms subject to which a connection is made by an electricity distributor in pursuance of section 16(1) of the Electricity Act 1989, or</p></content></level><level class="para1"><num>(b)</num><content><p>a special connection agreement as defined by section 22(1) of that Act;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-relevant-authority" eId="term-relevant-authority">relevant authority</term>” means the Secretary of State or the GEMA;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-transmission-system" eId="term-transmission-system">transmission system</term>” has the same meaning as in <ref eId="c00011" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00012" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (see section 4(4) of that Act).</p></content></hcontainer></subsection></section><section eId="section-15"><num>15</num><heading>Scope of modification power under <ref href="#section-14">section 14</ref></heading><subsection eId="section-15-1"><num>(1)</num><content><p>The power conferred by <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> to “<term refersTo="#term-modify" eId="term-modify">modify</term>” includes power to amend, add to or remove (and, in particular, includes power to make a person a party to an agreement or to discharge a party from its obligations under an agreement); and references in <ref href="#section-14">section 14</ref>, <ref href="#section-15">this section</ref> and <ref href="#section-16">section 16</ref> to modification are to be construed accordingly.</p></content></subsection><subsection eId="section-15-2"><num>(2)</num><intro><p>The power conferred by <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref>—</p></intro><level class="para1" eId="section-15-2-a"><num>(a)</num><content><p>may be exercised generally, only in relation to specified cases, or subject to exceptions (including by making provision for a case to be excepted only so long as specified conditions are satisfied);</p></content></level><level class="para1" eId="section-15-2-b"><num>(b)</num><content><p>may be exercised differently for different purposes or areas;</p></content></level><level class="para1" eId="section-15-2-c"><num>(c)</num><content><p>includes power to make incidental, supplementary, consequential or transitional modifications.</p></content></level></subsection><subsection eId="section-15-3"><num>(3)</num><intro><p>Provision included in an electricity licence by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-a">(a)</ref> or <ref href="#section-14-1-c">(c)</ref>—</p></intro><level class="para1" eId="section-15-3-a"><num>(a)</num><content><p>may include provision of a kind mentioned in <ref eId="c00013" href="https://www.legislation.gov.uk/ukpga/1989/29/section/7">section 7</ref> of the <ref eId="c00014" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref>;</p></content></level><level class="para1" eId="section-15-3-b"><num>(b)</num><content><p>need not relate to the activities authorised by the licence.</p></content></level></subsection><subsection eId="section-15-4"><num>(4)</num><content><p>The modification under <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> of part of a standard condition of an electricity licence does not prevent any other part of the condition from continuing to be regarded as a standard condition for the purposes of <ref eId="c00015" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00016" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref>.</p></content></subsection><subsection eId="section-15-5"><num>(5)</num><content><p>If under <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> a relevant authority modifies the standard conditions of an electricity licence of a particular type, the GEMA must make the same modifications of those standard conditions for the purposes of their incorporation in electricity licences of that type granted after that time.</p></content></subsection><subsection eId="section-15-6"><num>(6)</num><content><p>Provision included in an electricity licence by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-b">(b)</ref> may in particular include provision about the circumstances in which the licence may be revoked or suspended.</p></content></subsection><subsection eId="section-15-7"><num>(7)</num><intro><p>Provision included in an agreement by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-e">(e)</ref> or <ref href="#section-14-1-f">(f)</ref> may in particular include provision—</p></intro><level class="para1" eId="section-15-7-a"><num>(a)</num><content><p>requiring specified conditions to be met before the taking of particular steps under the agreement;</p></content></level><level class="para1" eId="section-15-7-b"><num>(b)</num><content><p>about the procedure for varying the agreement.</p></content></level></subsection><subsection eId="section-15-8"><num>(8)</num><intro><p>In <ref eId="c00017" href="https://www.legislation.gov.uk/ukpga/2000/27/section/33">section 33</ref> of the <ref eId="c00018" href="https://www.legislation.gov.uk/ukpga/2000/27/contents">Utilities Act 2000</ref> (standard conditions of electricity licences), in <ref eId="c00019" href="https://www.legislation.gov.uk/ukpga/2000/27/section/33">subsection (1)</ref>—</p></intro><level class="para1" eId="section-15-8-a"><num>(a)</num><content><p>omit the “or” at the end of paragraph (k), and</p></content></level><level class="para1" eId="section-15-8-b"><num>(b)</num><content><p><mod>at the end insert <quotedText startQuote="&#x201C;">, or</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(m)</num><content><p>under <ref href="#section-14">section 14</ref> of the Planning and Infrastructure Act 2025.</p></content></level></quotedStructure></mod></p></content></level></subsection></section><section eId="section-16"><num>16</num><heading>Procedure relating to modifications under <ref href="#section-14">section 14</ref></heading><subsection eId="section-16-1"><num>(1)</num><intro><p>Before making a modification under <ref href="#section-14">section 14</ref>, a relevant authority must consult—</p></intro><level class="para1" eId="section-16-1-a"><num>(a)</num><content><p>the holder of any electricity licence proposed to be modified,</p></content></level><level class="para1" eId="section-16-1-b"><num>(b)</num><content><p>the Independent System Operator and Planner,</p></content></level><level class="para1" eId="section-16-1-c"><num>(c)</num><content><p>the GEMA or the Secretary of State (depending on which relevant authority is proposing to make the modification), and</p></content></level><level class="para1" eId="section-16-1-d"><num>(d)</num><content><p>such other persons as the relevant authority considers appropriate.</p></content></level></subsection><subsection eId="section-16-2"><num>(2)</num><content><p>Subsection <ref href="#section-16-1">(1)</ref> may be satisfied by consultation carried out before the passing of this Act (as well as by consultation carried out after that time).</p></content></subsection><subsection eId="section-16-3"><num>(3)</num><content><p>A relevant authority must publish details of any modifications made by it under <ref href="#section-14">section 14</ref> as soon as reasonably practicable after they are made.</p></content></subsection><subsection eId="section-16-4"><num>(4)</num><content><p>A relevant authority may exclude from publication under <ref href="#section-16-3">subsection (3)</ref> any information the publication of which would be likely to prejudice the commercial interests of any person.</p></content></subsection><subsection eId="section-16-5"><num>(5)</num><content><p>In <ref href="#section-16">this section</ref>, “<term refersTo="#term-the-independent-system-operator-and-planner" eId="term-the-independent-system-operator-and-planner">the Independent System Operator and Planner</term>” means the person for the time being designated under <ref eId="c00020" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">section 162</ref><ref eId="c00021" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">(1)</ref> of the <ref eId="c00022" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref>.</p></content></subsection></section><section eId="section-17"><num>17</num><heading>Directions to modify connection agreements</heading><subsection eId="section-17-1"><num>(1)</num><intro><p>A relevant authority may—</p></intro><level class="para1" eId="section-17-1-a"><num>(a)</num><content><p>direct the Independent System Operator and Planner (“the ISOP”) to modify an agreement entered into by the ISOP pursuant to a document maintained in accordance with the conditions of an electricity licence;</p></content></level><level class="para1" eId="section-17-1-b"><num>(b)</num><content><p>direct an electricity distributor to modify a qualifying distribution agreement entered into by the electricity distributor.</p></content></level></subsection><subsection eId="section-17-2"><num>(2)</num><content><p>A relevant authority may exercise the power conferred by <ref href="#section-17-1">subsection (1)</ref> only for the purpose of improving the process for managing connections to the transmission system or the distribution system (and such an improvement may include changing the order in which connections are made).</p></content></subsection><subsection eId="section-17-3"><num>(3)</num><content><p>A direction under subsection <ref href="#section-17-1">(1)</ref> must describe the kinds of modification to be made by the person to whom it is given.</p></content></subsection><subsection eId="section-17-4"><num>(4)</num><intro><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may also require the person to whom it is given to modify an agreement by including in it provision—</p></intro><level class="para1" eId="section-17-4-a"><num>(a)</num><content><p>requiring specified conditions to be met before the taking of particular steps under the agreement;</p></content></level><level class="para1" eId="section-17-4-b"><num>(b)</num><content><p>about the procedure for varying the agreement.</p></content></level></subsection><subsection eId="section-17-5"><num>(5)</num><content><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may be expressed as having effect generally, in relation to cases within a description specified in the direction, or in relation to a particular case.</p></content></subsection><subsection eId="section-17-6"><num>(6)</num><intro><p>Before giving a direction under subsection <ref href="#section-17-1">(1)</ref>, the relevant authority must consult—</p></intro><level class="para1" eId="section-17-6-a"><num>(a)</num><content><p>the person to whom it proposes to give the direction, and</p></content></level><level class="para1" eId="section-17-6-b"><num>(b)</num><content><p>such other persons as the relevant authority considers appropriate.</p></content></level></subsection><subsection eId="section-17-7"><num>(7)</num><content><p>Subsection <ref href="#section-17-6">(6)</ref> may be satisfied by consultation carried out before the passing of this Act (as well as by consultation carried out after that time).</p></content></subsection><subsection eId="section-17-8"><num>(8)</num><content><p>A relevant authority must publish details of any direction it gives under subsection <ref href="#section-17-1">(1)</ref> as soon as reasonably practicable after the direction is given.</p></content></subsection><subsection eId="section-17-9"><num>(9)</num><content><p>A relevant authority may exclude from publication under subsection <ref href="#section-17-8">(8)</ref> any information the publication of which would be likely to prejudice the commercial interests of any person.</p></content></subsection><subsection eId="section-17-10"><num>(10)</num><content><p>A person to whom a direction is given under <ref href="#section-17-1">subsection (1)</ref> must comply with it, even if the effect of a modification made to an agreement as a result of the direction might amount to a repudiation of the agreement.</p></content></subsection><subsection eId="section-17-11"><num>(11)</num><content><p>The power to give a direction under subsection <ref href="#section-17-1">(1)</ref> may not be exercised after the end of the period of three years beginning with the day on which this section comes into force.</p></content></subsection><subsection eId="section-17-12"><num>(12)</num><content><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may be varied or revoked by a subsequent direction given by a relevant authority.</p></content></subsection><subsection eId="section-17-13"><num>(13)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-the-independent-system-operator-and-planner" eId="term-the-independent-system-operator-and-planner">the Independent System Operator and Planner</term>” means the person for the time being designated under <ref eId="c00023" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">section 162</ref><ref eId="c00024" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">(1)</ref> of the <ref eId="c00025" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref>;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-modify" eId="term-modify">modify</term>” includes amend, add to and remove (and, in particular, includes making a person a party to an agreement and discharging a party from its obligations under an agreement).</p></content></hcontainer></subsection><subsection eId="section-17-14"><num>(14)</num><intro><p>In Schedule 6A to the Electricity Act 1989 (provisions imposing obligations enforceable as relevant requirements)—</p></intro><level class="para1" eId="section-17-14-a"><num>(a)</num><content><p><mod>in paragraph 4A (electricity system operator), after sub-paragraph (c) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><level class="para1"><num>(d)</num><content><p>section <ref href="#section-17">17</ref><ref href="#section-17-10">(10)</ref> of the Planning and Infrastructure Act 2025 (duty to comply with direction under <ref href="#section-17">section 17</ref> of that Act).</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-17-14-b"><num>(b)</num><content><p><mod>in paragraph 5 (distribution licence holders), after sub-paragraph (g) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><level class="para1"><num>(h)</num><content><p>section <ref href="#section-17">17</ref><ref href="#section-17-10">(10)</ref> of the Planning and Infrastructure Act 2025 (duty to comply with direction under <ref href="#section-17">section 17</ref> of that Act).</p></content></level></quotedStructure></mod></p></content></level></subsection></section><section eId="section-18"><num>18</num><heading>Managing connections to the network: strategic plans etc</heading><subsection eId="section-18-1"><num>(1)</num><content><p><mod>In <ref eId="c00026" href="https://www.legislation.gov.uk/ukpga/2023/52/part/5">Part 5</ref> of the <ref eId="c00027" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref> (Independent System Operator and Planner), after <ref eId="c00028" href="https://www.legislation.gov.uk/ukpga/2023/52/section/165">section 165</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e3701"><num>165A</num><heading>Functions relating to network connections: duty to have regard to designated plans</heading><subsection eId="d25e3705"><num>(1)</num><content><p>The ISOP must, when carrying out any of its functions relating to the management of connections to the transmission system, have regard to the designated strategic plans.</p></content></subsection><subsection eId="d25e3711"><num>(2)</num><content><p>The Secretary of State may by regulations designate plans or documents for the purposes of this section.</p></content></subsection><subsection><num>(3)</num><content><p>In <ref href="#d25e3705">subsection (1)</ref>, the reference to “<term refersTo="#term-the-designated-strategic-plans">the designated strategic plans</term>” is a reference to those plans or documents designated by regulations under <ref href="#d25e3711">subsection (2)</ref> as they have effect at the time when the regulations are made.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-18-2"><num>(2)</num><content><p><ref eId="c00029" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00030" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (electricity supply) is amended as set out in <span><ref href="#section-18-3">subsections (3)</ref> to <ref href="#section-18-5">(5)</ref></span>.</p></content></subsection><subsection eId="section-18-3"><num>(3)</num><intro><p>In <ref eId="c00031" href="https://www.legislation.gov.uk/ukpga/1989/29/section/16">section 16</ref> (duty to connect on request)—</p></intro><level class="para1" eId="section-18-3-a"><num>(a)</num><content><p><mod>after <ref eId="c00032" href="https://www.legislation.gov.uk/ukpga/1989/29/section/16">subsection (2)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(2A)</num><content><p>In deciding how to comply with the duties under this section, and in particular in deciding how to prioritise persons requiring a connection, an electricity distributor must have regard to the designated strategic plans.</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-18-3-b"><num>(b)</num><content><p><mod>at the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(6)</num><content><p>In this section, “<term refersTo="#term-the-designated-strategic-plans">the designated strategic plans</term>” means the plans or documents designated by regulations made under section <ref href="#d25e3701">165A</ref><ref href="#d25e3711">(2)</ref> of the Energy Act 2023 (functions of the Independent System Operator and Planner relating to network connections).</p></content></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-18-4"><num>(4)</num><intro><p>In <ref eId="c00033" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">section 17</ref> (exceptions from duty to connect), in <ref eId="c00034" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">subsection (1)</ref>—</p></intro><level class="para1" eId="section-18-4-a"><num>(a)</num><content><p>omit the “or” at the end of <ref eId="c00035" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">paragraph (b)</ref>;</p></content></level><level class="para1" eId="section-18-4-b"><num>(b)</num><content><p><mod>after <ref eId="c00036" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">paragraph (b)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(ba)</num><content><p>it would not be in accordance with the designated strategic plans (within the meaning of section 16) for the distributor to do so; or</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></level></subsection><subsection eId="section-18-5"><num>(5)</num><content><p><mod>In <ref eId="c00037" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A">Schedule 6A</ref> (provisions imposing obligations enforceable as relevant requirements), in <ref eId="c00038" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A/paragraph/4A">paragraph 4A</ref> (electricity system operator), in <ref eId="c00039" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A/paragraph/4A">paragraph (c)</ref>, for “165” substitute <quotedText>“<ref href="#d25e3701">165A</ref>”</quotedText>.</mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-consents-for-electricity-infrastructure-in-scotland"><heading>Consents for electricity infrastructure in Scotland</heading><section eId="section-19"><num>19</num><heading>Consents for generating stations and overhead lines: applications</heading><subsection eId="section-19-1"><num>(1)</num><content><p>Schedule 8 to the Electricity Act 1989 (consents of the Secretary of State and the Scottish Ministers under sections 36 and 37) is amended as follows.</p></content></subsection><subsection eId="section-19-2"><num>(2)</num><content><p><mod>After paragraph 1 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Applications made to the Scottish Ministers for consent</heading><paragraph eId="d25e3890" class="schProv1"><num>1A</num><subparagraph><num>(1)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations make provision about the following matters in relation to applications to the Scottish Ministers for consent under section 36 or 37.</p></content></subparagraph><subparagraph eId="d25e3900"><num>(2)</num><intro><p>The matters are—</p></intro><level class="para1" eId="d25e3906"><num>(a)</num><content><p>the steps a person must take before making an application;</p></content></level><level class="para1"><num>(b)</num><content><p>the information that must be included in an application;</p></content></level><level class="para1" eId="d25e3918"><num>(c)</num><content><p>an acceptance stage, during which the Scottish Ministers must assess an applicant’s compliance with any requirements imposed by the regulations in order to decide whether or not to accept the application;</p></content></level><level class="para1"><num>(d)</num><intro><p>fees to be paid to the Scottish Ministers—</p></intro><level class="para2"><num>(i)</num><content><p>on application, or</p></content></level><level class="para2"><num>(ii)</num><content><p>for anything done by them in relation to a proposed application;</p></content></level></level><level class="para1"><num>(e)</num><content><p>requests by the Scottish Ministers for additional information to aid their decision whether or not to accept an application or to grant consent.</p></content></level></subparagraph><subparagraph eId="d25e3948"><num>(3)</num><intro><p>The steps that may be the subject of provision made by virtue of sub-paragraph (2)(a) include—</p></intro><level class="para1"><num>(a)</num><content><p>notifying prescribed persons of the proposed application,</p></content></level><level class="para1"><num>(b)</num><content><p>publicising the proposed application, and</p></content></level><level class="para1" eId="d25e3966"><num>(c)</num><content><p>carrying out a consultation about the proposed application.</p></content></level></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-3"><num>(3)</num><intro><p>In paragraph 2 (objections by relevant planning authority)—</p></intro><level class="para1" eId="section-19-3-a"><num>(a)</num><content><p><mod>in sub-paragraph (1), for “Secretary of State for his” substitute <quotedText>“appropriate authority for a”</quotedText>;</mod></p></content></level><level class="para1" eId="section-19-3-b"><num>(b)</num><content><p><mod>in sub-paragraph (2), at the beginning insert <quotedText>“In the case of an application made to the Secretary of State,”</quotedText>;</mod></p></content></level><level class="para1" eId="section-19-3-c"><num>(c)</num><content><p><mod>after sub-paragraph (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><subparagraph><num>(2A)</num><intro><p>In the case of an application made to the Scottish Ministers, where the relevant planning authority notify the Scottish Ministers that they object to the application and their objection is not withdrawn, the Scottish Ministers—</p></intro><level class="para1"><num>(a)</num><content><p>must appoint a person (referred to in this Schedule as the “<term refersTo="#term-reporter">reporter</term>”) to examine the application, and</p></content></level><level class="para1"><num>(b)</num><content><p>before determining whether to give their consent, must consider the objection and the reporter’s final report.</p></content></level><wrapUp><p>See paragraph 2A for the process that must be followed by the reporter.</p></wrapUp></subparagraph></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-19-3-d"><num>(d)</num><intro><p>in sub-paragraph (4)—</p></intro><level class="para2" eId="section-19-3-d-i"><num>(i)</num><content><p><mod>after “(2)” insert <quotedText>“or (2A)”</quotedText>;</mod></p></content></level><level class="para2" eId="section-19-3-d-ii"><num>(ii)</num><content><p><mod>for “Secretary of State” substitute <quotedText>“appropriate authority”</quotedText>;</mod></p></content></level></level><level class="para1" eId="section-19-3-e"><num>(e)</num><content><p><mod>in sub-paragraph (5), for “Secretary of State” substitute <quotedText>“appropriate authority”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-19-4"><num>(4)</num><content><p><mod>After paragraph 2 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Procedure following objection by relevant planning authority: Scotland</heading><paragraph eId="d25e4075" class="schProv1"><num>2A</num><subparagraph><num>(1)</num><content><p>A reporter appointed under paragraph 2(2A)(a) must make proposals as regards the appropriate procedure for examining the application.</p></content></subparagraph><subparagraph eId="d25e4085"><num>(2)</num><intro><p>The appropriate procedure may consist of one or more of the following—</p></intro><level class="para1"><num>(a)</num><intro><p>considering—</p></intro><level class="para2"><num>(i)</num><content><p>the objection by the relevant planning authority,</p></content></level><level class="para2"><num>(ii)</num><content><p>any other objections made in accordance with regulations under paragraph 3(1)(c), and</p></content></level><level class="para2"><num>(iii)</num><content><p>any other representations made in accordance with an enactment;</p></content></level></level><level class="para1" eId="d25e4115"><num>(b)</num><content><p>considering new written representations about the application from persons specified by the reporter;</p></content></level><level class="para1" eId="d25e4121"><num>(c)</num><content><p>holding one or more hearing sessions;</p></content></level><level class="para1"><num>(d)</num><content><p>carrying out an inspection of the land to which the application relates;</p></content></level><level class="para1" eId="d25e4133"><num>(e)</num><content><p>holding a public inquiry.</p></content></level></subparagraph><subparagraph eId="d25e4139"><num>(3)</num><content><p>Where the reporter proposes a procedure that includes proceedings within sub-paragraph (2)(b), (c) or (e), the proposal must include a statement of the issues that are proposed to be within the scope of each of those proceedings.</p></content></subparagraph><subparagraph><num>(4)</num><intro><p>The reporter must—</p></intro><level class="para1"><num>(a)</num><content><p>publish the proposals,</p></content></level><level class="para1"><num>(b)</num><content><p>notify all interested parties of the proposals, and</p></content></level><level class="para1"><num>(c)</num><content><p>invite written representations about the proposals before the end of the time period specified by the reporter.</p></content></level></subparagraph><subparagraph><num>(5)</num><content><p>The published proposals must include or be accompanied by an explanation of the reasons for the proposals.</p></content></subparagraph><subparagraph><num>(6)</num><content><p>The reporter may hold a meeting to hear representations about the proposals.</p></content></subparagraph><subparagraph><num>(7)</num><intro><p>After considering the representations, the reporter must—</p></intro><level class="para1"><num>(a)</num><content><p>decide on the appropriate procedure for examining the application, and</p></content></level><level class="para1"><num>(b)</num><content><p>publish that decision.</p></content></level></subparagraph><subparagraph><num>(8)</num><intro><p>The published decision must include or be accompanied by an explanation of—</p></intro><level class="para1"><num>(a)</num><content><p>the reasons for the decision,</p></content></level><level class="para1"><num>(b)</num><content><p>the intended time period for the carrying out of the procedure, and</p></content></level><level class="para1"><num>(c)</num><content><p>the intended time period within which the reporter will send a final report to the Scottish Ministers.</p></content></level></subparagraph><subparagraph><num>(9)</num><content><p>Sub-paragraph (3) applies to the reporter’s decision as it applies to the reporter’s proposals.</p></content></subparagraph><subparagraph><num>(10)</num><content><p>On completing the examination, the reporter must prepare and send to the Scottish Ministers a final report setting out the reporter’s recommendations on the application.</p></content></subparagraph><subparagraph><num>(11)</num><intro><p>In this paragraph, “<term refersTo="#term-interested-party">interested party</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>the applicant,</p></content></level><level class="para1"><num>(b)</num><content><p>the relevant planning authority which made the objection under paragraph 2(2A),</p></content></level><level class="para1"><num>(c)</num><content><p>any person who has made an objection in accordance with regulations under paragraph 3, or</p></content></level><level class="para1"><num>(d)</num><content><p>any person who has made representations in accordance with any other enactment.</p></content></level></subparagraph><subparagraph><num>(12)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations make provision amending or setting out further detail about the procedure set out in this paragraph. (See also paragraph 7B(2)(e).)</p></content></subparagraph><subparagraph><num>(13)</num><content><p>A statutory instrument containing regulations under this paragraph is not to be made by the Secretary of State unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subparagraph><subparagraph><num>(14)</num><content><p>Regulations made by the Scottish Ministers under this paragraph are subject to the affirmative procedure.</p></content></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-5"><num>(5)</num><content><p><mod>After paragraph 7A insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Applications to the Scottish Ministers: time limits</heading><paragraph eId="d25e4298" class="schProv1"><num>7B</num><subparagraph><num>(1)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations specify a time limit for actions that may or must be taken in relation to an application to the Scottish Ministers for consent under section 36 or 37.</p></content></subparagraph><subparagraph eId="d25e4308"><num>(2)</num><intro><p>The regulations may, for example, specify a time limit for—</p></intro><level class="para1"><num>(a)</num><content><p>a person to comply with a requirement of regulations under paragraph 1A;</p></content></level><level class="para1"><num>(b)</num><content><p>a person to respond to a pre-application consultation (see paragraph 1A(3)(c));</p></content></level><level class="para1"><num>(c)</num><content><p>a person who is notified of an application in accordance with an enactment to provide their opinion or advice on the application;</p></content></level><level class="para1"><num>(d)</num><content><p>a relevant planning authority to object to an application under paragraph 2(2A);</p></content></level><level class="para1" eId="d25e4338"><num>(e)</num><content><p>a reporter to take any steps required by paragraph 2A;</p></content></level><level class="para1"><num>(f)</num><content><p>the Scottish Ministers to decide an application.</p></content></level></subparagraph><subparagraph><num>(3)</num><content><p>The regulations may include provision about the consequences of failure to comply with a time limit.</p></content></subparagraph><subparagraph><num>(4)</num><content><p>Where regulations under this paragraph specify a time limit for the completion of an acceptance stage (see paragraph 1A(2)(c)), the regulations may not permit the extension of that limit.</p></content></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-6"><num>(6)</num><content><p>The amendments made by subsection (3) do not affect the continued application in relation to the Scottish Ministers of regulations made under paragraph 2(3) of Schedule 8 to the Electricity Act 1989 before this section comes into force.</p></content></subsection></section><section eId="section-20"><num>20</num><heading>Variation of consents etc</heading><content><p><mod>After section 37 of the Electricity Act 1989 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e4384"><num>37A</num><heading>Application for variation of section 37 consent: Scotland</heading><subsection><num>(1)</num><content><p>The person for the time being entitled to the benefit of a section 37 consent that was granted by the Scottish Ministers may make an application to the Scottish Ministers for the consent to be varied.</p></content></subsection><subsection><num>(2)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about variation under this section, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the making and withdrawal of applications;</p></content></level><level class="para1"><num>(b)</num><content><p>fees;</p></content></level><level class="para1"><num>(c)</num><content><p>publicity and consultation requirements;</p></content></level><level class="para1"><num>(d)</num><content><p>rights to make representations;</p></content></level><level class="para1"><num>(e)</num><content><p>public inquiries;</p></content></level><level class="para1"><num>(f)</num><content><p>consideration of applications.</p></content></level></subsection><subsection><num>(3)</num><content><p>The regulations may provide for any statutory provision applicable to the grant by the Scottish Ministers of a section 37 consent to apply with specified modifications to the variation of a section 37 consent under this section.</p></content></subsection><subsection><num>(4)</num><intro><p>On an application for a section 37 consent to be varied, the Scottish Ministers may make such variations to the consent as appear to them to be appropriate, having regard (in particular) to—</p></intro><level class="para1"><num>(a)</num><content><p>the applicant’s reason for seeking the variation;</p></content></level><level class="para1"><num>(b)</num><content><p>the variations proposed;</p></content></level><level class="para1"><num>(c)</num><content><p>any objections made to the proposed variations, the views of consultees and the outcome of any public inquiry.</p></content></level></subsection><subsection><num>(5)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-section-37-consent">section 37 consent</term>” means a consent granted under section 37 (consent required for overhead lines);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-statutory-provision">statutory provision</term>” means a provision of or made under an Act, whenever passed or made; and for this purpose “<term refersTo="#term-act">Act</term>” includes an Act of the Scottish Parliament.</p></content></hcontainer></subsection></section><section eId="d25e4493"><num>37B</num><heading>Variation of section 36 and 37 consents on change of circumstances: Scotland</heading><subsection><num>(1)</num><intro><p>The Scottish Ministers may vary a consent under section 36 or 37 if—</p></intro><level class="para1"><num>(a)</num><intro><p>they consider that the consent ought to be varied—</p></intro><level class="para2"><num>(i)</num><content><p>because of a change in circumstances relating to the environment, or</p></content></level><level class="para2"><num>(ii)</num><content><p>because of technological changes, and</p></content></level></level><level class="para1"><num>(b)</num><content><p>the person for the time being entitled to the benefit of the consent agrees to the variation.</p></content></level></subsection><subsection><num>(2)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about variation under this section, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the procedure for getting agreement;</p></content></level><level class="para1"><num>(b)</num><content><p>publicity, notification and consultation requirements;</p></content></level><level class="para1"><num>(c)</num><content><p>rights to make representations.</p></content></level></subsection><subsection><num>(3)</num><content><p>The regulations may provide for any statutory provision applicable to the grant by the Scottish Ministers of a consent under section 36 or 37 to apply with specified modifications to the variation of such a consent under this section.</p></content></subsection><subsection><num>(4)</num><content><p>In this section, “<term refersTo="#term-statutory-provision">statutory provision</term>” has the same meaning as in section <ref href="#d25e4384">37A</ref>.</p></content></subsection></section><section eId="d25e4572"><num>37C</num><heading>Correction of errors in consent documents: Scotland</heading><subsection eId="d25e4576"><num>(1)</num><content><p>The Scottish Ministers may amend a decision document in order to correct a correctable error.</p></content></subsection><subsection><num>(2)</num><intro><p>In <ref href="#d25e4576">subsection (1)</ref>—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-correctable-error">correctable error</term>” means an error or omission which—</p></intro><level class="para1"><num>(a)</num><content><p>is in a part of the decision document which records the decision, and</p></content></level><level class="para1"><num>(b)</num><content><p>is not part of the statement of reasons for the decision;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-decision-document">decision document</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a document recording a consent under section 36 or 37, or</p></content></level><level class="para1"><num>(b)</num><content><p>a document recording a variation of such a consent.</p></content></level></hcontainer></subsection><subsection><num>(3)</num><content><p>The Scottish Ministers may exercise the power in <ref href="#d25e4576">subsection (1)</ref> either of their own accord or following a written request from a person for the time being entitled to the benefit of the consent.</p></content></subsection><subsection><num>(4)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about the process for corrections, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the making of written requests;</p></content></level><level class="para1"><num>(b)</num><content><p>notification requirements;</p></content></level><level class="para1"><num>(c)</num><content><p>rights to make representations.</p></content></level></subsection></section></quotedStructure></mod></p></content></section><section eId="section-21"><num>21</num><heading>Proceedings for questioning certain decisions on consents</heading><subsection eId="section-21-1"><num>(1)</num><content><p>Section 36D of the Electricity Act 1989 (proceedings for questioning certain decisions under section 36) is amended as set out in subsections <ref href="#section-21-2">(2)</ref> to <ref href="#section-21-4">(4)</ref>.</p></content></subsection><subsection eId="section-21-2"><num>(2)</num><content><p><mod>For subsection (3) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(3)</num><intro><p>This section applies to a decision under any of the following—</p></intro><level class="para1"><num>(a)</num><content><p>section 36 (application for consent for generating station);</p></content></level><level class="para1"><num>(b)</num><content><p>section 36C (application for variation of section 36 consent);</p></content></level><level class="para1"><num>(c)</num><content><p>section 37 (application for consent for overhead lines);</p></content></level><level class="para1"><num>(d)</num><content><p>section <ref href="#d25e4384">37A</ref> (application for variation of section 37 consent);</p></content></level><level class="para1"><num>(e)</num><content><p>section <ref href="#d25e4493">37B</ref> (variation of consents by Scottish Ministers);</p></content></level><level class="para1"><num>(f)</num><content><p>section 37C (consents and variation of consents in Scotland: correction of errors).</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-21-3"><num>(3)</num><content><p><mod>In subsection (4), for “taken” substitute <quotedText>“published by the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-4"><num>(4)</num><content><p><mod>In the heading, for “under section 36” substitute <quotedText>“of the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-5"><num>(5)</num><content><p><mod>In Schedule 8 to the Electricity Act 1989, in paragraph 5B (proceedings for questioning certain decisions under paragraph 3(2)), in sub-paragraph (4), for “taken” substitute <quotedText>“published by the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-6"><num>(6)</num><content><p><mod>In section 237 of the Town and Country Planning (Scotland) Act 1997 (challenges to validity of development plans and certain orders, decisions and directions), in subsection (3), after paragraph (b) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(ba)</num><content><p>any decision to give a direction under section 57(2) or (2ZA);</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-21-7"><num>(7)</num><content><p>The amendments made by this section apply only in relation to decisions made on or after the date on which this section comes into force.</p></content></subsection></section><section eId="section-22"><num>22</num><heading>Applications for necessary wayleaves: fees</heading><content><p><mod>In Schedule 4 to the Electricity Act 1989 (other powers etc of licence holders), after paragraph 6 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Fees for applications under paragraph 6(3) to the Scottish Ministers</heading><paragraph eId="d25e4794" class="schProv1"><num>6A</num><content><p>The Scottish Ministers may by regulations make provision about the fees to be paid to the Scottish Ministers in relation to an application made to them under paragraph 6(3).</p></content></paragraph></hcontainer></quotedStructure></mod></p></content></section><section eId="section-23"><num>23</num><heading>Regulations</heading><subsection eId="section-23-1"><num>(1)</num><content><p><ref eId="c00040" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">Section 106</ref> of the <ref eId="c00041" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (regulations and orders) is amended as follows.</p></content></subsection><subsection eId="section-23-2"><num>(2)</num><intro><p>In <ref eId="c00042" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">subsection (1ZA)</ref>—</p></intro><level class="para1" eId="section-23-2-a"><num>(a)</num><content><p><mod>for “the power conferred on” substitute <quotedText>“a power of”</quotedText>;</mod></p></content></level><level class="para1" eId="section-23-2-b"><num>(b)</num><content><p><mod>for “by section 36C” substitute <quotedText>“to make regulations (see section 27 of the Interpretation and Legislative Reform (Scotland) Act 2010 (Scottish statutory instruments))”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-23-3"><num>(3)</num><content><p><mod>After subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e4853"><num>(2ZA)</num><intro><p>Subsection (2) does not apply to a statutory instrument containing (whether alone or with other provision)—</p></intro><level class="para1" eId="d25e4859"><num>(a)</num><content><p>regulations under paragraph <ref href="#d25e4075">2A</ref> of Schedule 8;</p></content></level></subsection></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-23-4"><num>(4)</num><content><p><mod>In <ref eId="c00043" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">subsection (3)</ref>, for the words after “under” substitute <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>section 36C,</p></content></level><level class="para1"><num>(b)</num><content><p>section <ref href="#d25e4384">37A</ref>,</p></content></level><level class="para1"><num>(c)</num><content><p>section <ref href="#d25e4493">37B</ref>,</p></content></level><level class="para1"><num>(d)</num><content><p>section <ref href="#d25e4572">37C</ref>,</p></content></level><level class="para1"><num>(e)</num><content><p>paragraph <ref href="#d25e4794">6A</ref> of Schedule 4, or</p></content></level><level class="para1"><num>(f)</num><content><p>any paragraph of Schedule 8 except paragraph <ref href="#d25e4075">2A</ref>,</p></content></level><p>are subject to the negative procedure.</p></quotedStructure></mod></p></content></subsection><subsection eId="section-23-5"><num>(5)</num><content><p><mod>At the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(4)</num><content><p>Before making regulations under a provision listed in subsection <ref href="#d25e4960">(6)</ref>, the Secretary of State must consult the Scottish Ministers.</p></content></subsection><subsection><num>(5)</num><content><p>Before making regulations under a provision listed in subsection <ref href="#d25e4960">(6)</ref>, the Scottish Ministers must consult the Secretary of State.</p></content></subsection><subsection eId="d25e4960"><num>(6)</num><intro><p>The provisions are—</p></intro><level class="para1"><num>(a)</num><content><p>section <ref href="#d25e4384">37A</ref>;</p></content></level><level class="para1"><num>(b)</num><content><p>section <ref href="#d25e4493">37B</ref>;</p></content></level><level class="para1"><num>(c)</num><content><p>section <ref href="#d25e4572">37C</ref>;</p></content></level><level class="para1"><num>(d)</num><content><p>paragraphs <ref href="#d25e3890">1A</ref>, <ref href="#d25e4075">2A</ref> and <ref href="#d25e4298">7B</ref> of Schedule 8.</p></content></level></subsection></quotedStructure></mod></p></content></subsection></section><section eId="section-24"><num>24</num><heading><span><ref href="#section-19">Sections 19</ref> to <ref href="#section-23">23</ref></span>: minor and consequential amendments</heading><intro><p><ref href="#schedule-1">Schedule 1</ref> makes—</p></intro><level class="para1" eId="section-24-a"><num>(a)</num><content><p>amendments to the <ref eId="c00044" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> that are consequential on the amendments made by sections <ref href="#section-19">19</ref> to <ref href="#section-23">23</ref>, and</p></content></level><level class="para1" eId="section-24-b"><num>(b)</num><content><p>other minor amendments relating to consents for electricity infrastructure in Scotland (including amendments to reflect previous transfers of functions to the Scottish Ministers).</p></content></level></section><section eId="section-25"><num>25</num><heading>Environmental impact assessments for electricity works</heading><subsection eId="section-25-1"><num>(1)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations amend the Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 2017 (<ref eId="c00045" href="http://www.legislation.gov.uk/id/ssi/2017/101">S.S.I. 2017/101</ref>) (the “<term refersTo="#term-2017-regulations" eId="term-2017-regulations">2017 Regulations</term>”) by making provision described in subsection <ref href="#section-25-2">(2)</ref> in connection with environmental impact assessments and applications made to the Scottish Ministers for—</p></intro><level class="para1" eId="section-25-1-a"><num>(a)</num><content><p>consent granted under section 36 or 37 of the Electricity Act 1989 (consent for construction etc of generating stations or for overhead lines), or</p></content></level><level class="para1" eId="section-25-1-b"><num>(b)</num><content><p>variation of consent granted under section 36 of that Act.</p></content></level></subsection><subsection eId="section-25-2"><num>(2)</num><intro><p>That provision is—</p></intro><level class="para1" eId="section-25-2-a"><num>(a)</num><content><p>provision for the Scottish Ministers to refuse an application in respect of Schedule 2 development that is not accompanied by an EIA report if the development has not been the subject of a screening opinion;</p></content></level><level class="para1" eId="section-25-2-b"><num>(b)</num><content><p>provision for the Scottish Ministers to charge developers fees for screening opinions and scoping opinions;</p></content></level><level class="para1" eId="section-25-2-c"><num>(c)</num><content><p>provision about the sending of copies of EIA reports to the Scottish Ministers;</p></content></level><level class="para1" eId="section-25-2-d"><num>(d)</num><content><p>provision about the publication by developers of the information listed in regulation 14(2) of the 2017 Regulations (information about EIA reports);</p></content></level><level class="para1" eId="section-25-2-e"><num>(e)</num><content><p>provision about making EIA reports available for inspection;</p></content></level><level class="para1" eId="section-25-2-f"><num>(f)</num><content><p>provision about time limits for the consultation bodies and other public bodies to make representations to the Scottish Ministers about scoping opinions and EIA reports;</p></content></level><level class="para1" eId="section-25-2-g"><num>(g)</num><content><p>provision about time limits for the consultation bodies and other public bodies to enter into consultation with developers about, and to make available, information relevant to the preparation of EIA reports;</p></content></level><level class="para1" eId="section-25-2-h"><num>(h)</num><content><p>provision about time limits for developers to provide additional information to the Scottish Ministers;</p></content></level><level class="para1" eId="section-25-2-i"><num>(i)</num><content><p>provision about the publication by developers of the information listed in regulation 20(3) of the 2017 Regulations (information about additional information);</p></content></level><level class="para1" eId="section-25-2-j"><num>(j)</num><content><p>provision about making additional information available for inspection;</p></content></level><level class="para1" eId="section-25-2-k"><num>(k)</num><content><p>provision about the publication by developers of the information listed in regulation 23(2) of the 2017 Regulations (information about decisions);</p></content></level><level class="para1" eId="section-25-2-l"><num>(l)</num><content><p>provision that the Secretary of State or the Scottish Ministers consider appropriate for securing that the procedures under the 2017 Regulations operate effectively, or more effectively, alongside the procedures under regulations made under section 36C of the Electricity Act 1989 or paragraph <ref href="#d25e3890">1A</ref> or <ref href="#d25e4298">7B</ref> of Schedule 8 to that Act (inserted by section <ref href="#section-19">19</ref> of this Act).</p></content></level></subsection><subsection eId="section-25-3"><num>(3)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations amend the 2017 Regulations by making provision described in subsection <ref href="#section-25-4">(4)</ref> in connection with environmental impact assessments and applications made to the Scottish Ministers for variation of consent granted under section 37 of the Electricity Act 1989.</p></content></subsection><subsection eId="section-25-4"><num>(4)</num><intro><p>That provision is—</p></intro><level class="para1" eId="section-25-4-a"><num>(a)</num><intro><p>provision requiring an environmental impact assessment in respect of the proposed variation to be carried out before Scottish Ministers—</p></intro><level class="para2" eId="section-25-4-a-i"><num>(i)</num><content><p>vary the consent, or</p></content></level><level class="para2" eId="section-25-4-a-ii"><num>(ii)</num><content><p>direct that planning permission is deemed to be granted under section 57(2) or (2ZA) of the Town and Country Planning (Scotland) Act 1997 in respect of EIA development;</p></content></level></level><level class="para1" eId="section-25-4-b"><num>(b)</num><content><p>provision requiring the Scottish Ministers to take the environmental information into account when carrying out an environmental impact assessment in respect of the proposed variation;</p></content></level><level class="para1" eId="section-25-4-c"><num>(c)</num><content><p>provision applying provisions of the 2017 Regulations (including provisions amended by regulations under subsection <ref href="#section-25-1">(1)</ref>), with or without modifications;</p></content></level><level class="para1" eId="section-25-4-d"><num>(d)</num><content><p>provision that the Secretary of State or the Scottish Ministers consider appropriate for securing that the procedures under the 2017 Regulations operate effectively, or more effectively, alongside the procedures under regulations made under section <ref href="#d25e4384">37A</ref> of the Electricity Act 1989 (inserted by section <ref href="#section-20">20</ref> of this Act).</p></content></level></subsection><subsection eId="section-25-5"><num>(5)</num><intro><p>Regulations under this section may—</p></intro><level class="para1" eId="section-25-5-a"><num>(a)</num><content><p>make different provision for different purposes or different areas;</p></content></level><level class="para1" eId="section-25-5-b"><num>(b)</num><content><p>make consequential or supplementary provision;</p></content></level><level class="para1" eId="section-25-5-c"><num>(c)</num><content><p>make transitional provision.</p></content></level></subsection><subsection eId="section-25-6"><num>(6)</num><content><p>Regulations under this section made by the Secretary of State are to be made by statutory instrument.</p></content></subsection><subsection eId="section-25-7"><num>(7)</num><content><p>A statutory instrument containing regulations made by the Secretary of State under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-25-8"><num>(8)</num><content><p>Before making regulations under this section, the Secretary of State must consult the Scottish Ministers.</p></content></subsection><subsection eId="section-25-9"><num>(9)</num><content><p>For regulations under this section made by the Scottish Ministers, see section 27 of the Interpretation and Legislative Reform (Scotland) Act <ref eId="c00046" href="http://www.legislation.gov.uk/id/asp/2010/10">2010 (asp 10)</ref> (Scottish statutory instruments).</p></content></subsection><subsection eId="section-25-10"><num>(10)</num><content><p>Regulations made by the Scottish Ministers under this section are subject to the negative procedure (see section 28 of the Interpretation and Legislative Reform (Scotland) Act <ref eId="c00047" href="http://www.legislation.gov.uk/id/asp/2010/10">2010 (asp 10)</ref>).</p></content></subsection><subsection eId="section-25-11"><num>(11)</num><content><p>Before making regulations under this section, the Scottish Ministers must consult the Secretary of State.</p></content></subsection><subsection eId="section-25-12"><num>(12)</num><intro><p>In this section, subject to subsection <ref href="#section-25-13">(13)</ref>, the following terms have the same meaning as they have in the 2017 Regulations—</p></intro><hcontainer name="definition"><content><p>“additional information”</p></content></hcontainer><hcontainer name="definition"><content><p>“the consultation bodies”</p></content></hcontainer><hcontainer name="definition"><content><p>“developer”</p></content></hcontainer><hcontainer name="definition"><content><p>“EIA development”</p></content></hcontainer><hcontainer name="definition"><content><p>“EIA report”</p></content></hcontainer><hcontainer name="definition"><content><p>“environmental impact assessment”</p></content></hcontainer><hcontainer name="definition"><content><p>“environmental information”</p></content></hcontainer><hcontainer name="definition"><content><p>“Schedule 2 development”</p></content></hcontainer><hcontainer name="definition"><content><p>“scoping opinion”</p></content></hcontainer><hcontainer name="definition"><content><p>“screening opinion”.</p></content></hcontainer></subsection><subsection eId="section-25-13"><num>(13)</num><content><p>In subsections <ref href="#section-25-3">(3)</ref> and <ref href="#section-25-4">(4)</ref>, those terms have the same meaning in connection with applications for variation of consent granted under section 37 of the Electricity Act 1989 as they have, in the 2017 Regulations, in connection with applications for variation of consent granted under section 36 of that Act.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-long-duration-electricity-storage"><heading>Long duration electricity storage</heading><section eId="section-26"><num>26</num><heading>Long duration electricity storage</heading><content><p><mod>In the Electricity Act 1989, after <ref eId="c00048" href="https://www.legislation.gov.uk/ukpga/1989/29/section/10O">section 10O</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Long duration electricity storage</heading><section><num>10P</num><heading>Long duration electricity storage</heading><subsection><num>(1)</num><content><p>The Authority must, as soon as reasonably practicable after this section comes into force, establish and operate a scheme in accordance with this section.</p></content></subsection><subsection><num>(2)</num><content><p>The scheme must be designed for the purpose of encouraging the development and use of long duration electricity storage installations.</p></content></subsection><subsection><num>(3)</num><intro><p>The scheme must be open to persons who—</p></intro><level class="para1"><num>(a)</num><content><p>hold or intend to apply for a generation licence to operate a long duration electricity storage installation, and</p></content></level><level class="para1"><num>(b)</num><content><p>meet any other specified criteria.</p></content></level></subsection><subsection eId="d25e5416"><num>(4)</num><intro><p>The scheme must provide for an LDES operator who operates an approved installation—</p></intro><level class="para1"><num>(a)</num><content><p>to receive payments from a holder of an electricity system operator licence where the operator’s assessed revenue from that installation is below a specified amount, in specified circumstances, and</p></content></level><level class="para1"><num>(b)</num><content><p>to make payments to a holder of an electricity system operator licence where the operator’s assessed revenue from that installation is above a specified amount, in specified circumstances.</p></content></level></subsection><subsection><num>(5)</num><intro><p>In subsection <ref href="#d25e5416">(4)</ref>—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-an-approved-installation">an approved installation</term>” means a long duration electricity storage installation which is approved by the Authority for the purposes of subsection <ref href="#d25e5416">(4)</ref> in accordance with the scheme;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-assessed-revenue">assessed revenue</term>”, in relation to a long duration electricity storage installation, means the difference between—</p></intro><level class="para1"><num>(a)</num><content><p>revenue of a specified kind earned or derived in connection with that installation, and</p></content></level><level class="para1"><num>(b)</num><content><p>costs of a specified kind incurred in connection with operating the installation.</p></content></level></hcontainer></subsection><subsection><num>(6)</num><content><p>The Authority may determine how costs and revenue are to be calculated for the purposes of the scheme.</p></content></subsection><subsection><num>(7)</num><content><p>In setting charges to which Article 18(1) of the Electricity Regulation applies, the holder of an electricity system operator licence may take account of payments it makes or receives under the scheme.</p></content></subsection><subsection><num>(8)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-ldes-operator">LDES operator</term>” means a person who, under a generation licence, generates electricity by means of a long duration electricity storage installation;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-long-duration-electricity-storage-installation">long duration electricity storage installation</term>” means an installation that—</p></intro><level class="para1"><num>(a)</num><content><p>generates electricity from stored energy,</p></content></level><level class="para1"><num>(b)</num><content><p>has an electricity generating capacity of not less than 50 megawatts, and</p></content></level><level class="para1"><num>(c)</num><content><p>is capable of generating electricity at its full capacity for a continuous period of not less than eight hours;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-specified">specified</term>” means specified by the Authority for the purposes of the scheme in—</p></intro><level class="para1"><num>(a)</num><content><p>a document published by the Authority, or</p></content></level><level class="para1"><num>(b)</num><content><p>a condition of a licence;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-stored-energy">stored energy</term>” has the meaning given by section 4(3ZB).</p></content></hcontainer></subsection><subsection><num>(9)</num><intro><p>The Secretary of State may by regulations amend the definition of “long duration electricity storage installation” by substituting—</p></intro><level class="para1"><num>(a)</num><content><p>for the amount of electricity generating capacity for the time being mentioned in <ref href="#d25e5508">paragraph (b)</ref> of the definition, a different amount;</p></content></level><level class="para1"><num>(b)</num><content><p>for the period for the time being mentioned in <ref href="#d25e5512">paragraph (c)</ref> of the definition, a different period (which may not be less than eight hours).</p></content></level></subsection></section></hcontainer></quotedStructure></mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-consumer-benefits"><heading>Consumer benefits</heading><section eId="section-27"><num>27</num><heading>Benefits for homes near electricity transmission projects</heading><subsection eId="section-27-1"><num>(1)</num><content><p>The Electricity Act 1989 is amended as follows.</p></content></subsection><subsection eId="section-27-2"><num>(2)</num><content><p><mod>After section 38 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Benefits resulting from proximity to new or upgraded transmission infrastructure</heading><section eId="d25e5593"><num>38A</num><heading>Power to establish scheme for giving of benefits</heading><subsection eId="d25e5597"><num>(1)</num><content><p>The Secretary of State may by regulations establish a scheme under which persons with a specified connection to qualifying premises are entitled to financial benefits provided (directly or indirectly) by electricity suppliers.</p></content></subsection><subsection><num>(2)</num><content><p>Qualifying premises must be identified by reference to their proximity to qualifying works.</p></content></subsection><subsection><num>(3)</num><intro><p>Qualifying works must involve the construction, erection, expansion or improvement of electrical plant or an electric line that (in either case)—</p></intro><level class="para1"><num>(a)</num><content><p>is wholly or partly above the ground, and</p></content></level><level class="para1"><num>(b)</num><content><p>forms or is intended to form part of a transmission system.</p></content></level><wrapUp><p>They may be works that took place before the making of the regulations or the coming into force of this section.</p></wrapUp></subsection><subsection eId="d25e5630"><num>(4)</num><intro><p>The regulations may (among other things)—</p></intro><level class="para1"><num>(a)</num><content><p>make further provision determining, or for the determination of, whether premises or works are qualifying;</p></content></level><level class="para1"><num>(b)</num><content><p>confer functions in connection with the scheme;</p></content></level><level class="para1"><num>(c)</num><content><p>provide for the delegation of functions conferred in connection with the scheme;</p></content></level><level class="para1"><num>(d)</num><content><p>provide for payments by electricity suppliers to meet costs incurred in the carrying out of functions in connection with the scheme;</p></content></level><level class="para1"><num>(e)</num><content><p>provide for the costs of electricity suppliers under the scheme to be distributed among suppliers on such basis, and by such means, as the regulations provide;</p></content></level><level class="para1"><num>(f)</num><content><p>restrict a person’s ability to obtain payment of an amount standing to the credit of the person’s account with an electricity supplier, where that amount derives from benefits under the scheme;</p></content></level><level class="para1"><num>(g)</num><content><p>make provision about cases in which a person who has received benefits under the scheme in respect of premises ceases to be entitled under the scheme in respect of the premises, including provision for the withdrawal or recovery of the benefits;</p></content></level><level class="para1" eId="d25e5678"><num>(h)</num><content><p>make pass-through provision and associated provision (see section <ref href="#d25e5753">38B</ref>);</p></content></level><level class="para1" eId="d25e5687"><num>(i)</num><content><p>make enforcement provision (see section <ref href="#d25e5864">38C</ref>);</p></content></level><level class="para1" eId="d25e5696"><num>(j)</num><content><p>make information provision (see section <ref href="#d25e5952">38D</ref>).</p></content></level></subsection><subsection><num>(5)</num><intro><p>To the extent that this section enables provision to be made affecting the holders of licences, provision for that purpose may be made by modifying, or empowering or requiring the Authority to modify—</p></intro><level class="para1"><num>(a)</num><content><p>the conditions of a licence, or</p></content></level><level class="para1"><num>(b)</num><content><p>a document maintained in accordance with the conditions of a licence, or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="d25e5723"><num>(6)</num><content><p>A statutory instrument containing regulations under this section may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection><num>(7)</num><content><p>A draft laid under subsection <ref href="#d25e5723">(6)</ref> is not to be treated as a hybrid instrument for the purposes of the standing orders of either House of Parliament.</p></content></subsection><subsection><num>(8)</num><content><p>Regulations under this section bind the Crown unless they provide otherwise.</p></content></subsection><subsection><num>(9)</num><content><p>The Secretary of State may, out of money provided by Parliament, make payments to a person on whom functions are conferred by regulations under this section for the purposes of meeting (or helping to meet) the expenses of carrying out those functions.</p></content></subsection></section><section eId="d25e5753"><num>38B</num><heading>Passing of benefits to ultimate consumer</heading><subsection><num>(1)</num><content><p>This section applies for the purposes of section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5678">(h)</ref>.</p></content></subsection><subsection eId="d25e5770"><num>(2)</num><intro><p>“Pass-through provision” is provision that—</p></intro><level class="para1" eId="d25e5776"><num>(a)</num><intro><p>applies where—</p></intro><level class="para2"><num>(i)</num><content><p>one person (“the intermediary”) receives benefits under the scheme in connection with qualifying premises, and</p></content></level><level class="para2" eId="d25e5788"><num>(ii)</num><content><p>another person (“the end-user”) who is not living as part of the same household as the intermediary consumes electricity supplied to the premises, and</p></content></level></level><level class="para1" eId="d25e5794"><num>(b)</num><content><p>requires the intermediary to pass on the substance of those benefits to the end-user.</p></content></level></subsection><subsection><num>(3)</num><intro><p>“<term refersTo="#term-associated-provision">Associated provision</term>” means provision that relates to pass-through provision and—</p></intro><level class="para1"><num>(a)</num><content><p>requires intermediaries to take steps to obtain benefits that will be subject to the requirement referred to in subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5794">(b)</ref>,</p></content></level><level class="para1"><num>(b)</num><content><p>requires intermediaries to supply information to end-users,</p></content></level><level class="para1"><num>(c)</num><content><p>provides for the making of payments to intermediaries (in addition to the provision of benefits of the sort mentioned in section <ref href="#d25e5593">38A</ref><ref href="#d25e5597">(1)</ref>), or</p></content></level><level class="para1"><num>(d)</num><content><p>provides for the withdrawal or recovery of benefits given or other payments made to intermediaries who fail to comply with the requirement referred to in subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5794">(b)</ref>.</p></content></level></subsection><subsection><num>(4)</num><content><p>For the purposes of subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5776">(a)</ref><ref href="#d25e5788">(ii)</ref>, the cases in which electricity is consumed by a person include those in which the electricity is used to make available to the person heating, cooling, hot water or energy.</p></content></subsection></section><section eId="d25e5864"><num>38C</num><heading>Enforcement of benefit scheme</heading><subsection eId="d25e5868"><num>(1)</num><intro><p>In section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5687">(i)</ref>, “<term refersTo="#term-enforcement-provision">enforcement provision</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>provision for the enforcement in civil proceedings of requirements under the scheme,</p></content></level><level class="para1"><num>(b)</num><intro><p>provision for a person to impose a monetary penalty where the person is satisfied on the balance of probabilities that—</p></intro><level class="para2"><num>(i)</num><content><p>a requirement under the regulations has not been complied with, or</p></content></level><level class="para2"><num>(ii)</num><content><p>benefits or other payments under the scheme have been wrongfully obtained, or</p></content></level></level><level class="para1" eId="d25e5908"><num>(c)</num><content><p>provision for complaints procedures, dispute resolution, adjudication, appeals or redress in connection with the scheme.</p></content></level></subsection><subsection><num>(2)</num><content><p>If regulations under section <ref href="#d25e5593">38A</ref> provide for the imposition of monetary penalties, they must provide a right of appeal to a court or tribunal on grounds including both error of fact and error of law.</p></content></subsection><subsection eId="d25e5923"><num>(3)</num><content><p>The provision that may be made by virtue of subsection <ref href="#d25e5868">(1)</ref><ref href="#d25e5908">(c)</ref> includes provision for Part 2 of the Consumers, Estate Agents and Redress Act 2007 (complaints handling and redress schemes) to apply (with or without modifications) to end-user complaints as it applies to consumer complaints within the meaning of that Part.</p></content></subsection><subsection><num>(4)</num><content><p>In subsection <ref href="#d25e5923">(3)</ref>, “<term refersTo="#term-end-user-complaints">end-user complaints</term>” means complaints in connection with pass-through provision made by end-users against intermediaries or electricity suppliers (with the definitions in section <ref href="#d25e5753">38B</ref> applying for the purposes of this subsection).</p></content></subsection></section><section eId="d25e5952"><num>38D</num><heading>Disclosure and use of information in connection with benefit scheme</heading><subsection><num>(1)</num><content><p>In section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5696">(j)</ref>, “<term refersTo="#term-information-provision">information provision</term>” means provision within subsection <ref href="#d25e5978">(2)</ref> or <ref href="#d25e6020">(3)</ref>.</p></content></subsection><subsection eId="d25e5978"><num>(2)</num><intro><p>Provision is within this subsection if it is provision for the disclosure of information or evidence for the purposes of—</p></intro><level class="para1"><num>(a)</num><content><p>identifying persons entitled to benefits under the scheme,</p></content></level><level class="para1"><num>(b)</num><content><p>identifying qualifying premises or qualifying works,</p></content></level><level class="para1"><num>(c)</num><content><p>checking whether requirements under, or resulting from, the regulations are being or have been complied with,</p></content></level><level class="para1"><num>(d)</num><content><p>checking payments made under the scheme,</p></content></level><level class="para1"><num>(e)</num><content><p>facilitating the performance of functions conferred, or the enforcement of duties imposed, by or as a result of the regulations, or</p></content></level><level class="para1"><num>(f)</num><content><p>evaluating the performance of the scheme.</p></content></level></subsection><subsection eId="d25e6020"><num>(3)</num><intro><p>Provision is within this subsection if it is provision about the use or further disclosure of information disclosed—</p></intro><level class="para1"><num>(a)</num><content><p>further to provision within subsection <ref href="#d25e5978">(2)</ref>, or</p></content></level><level class="para1"><num>(b)</num><content><p>otherwise in connection with the scheme.</p></content></level></subsection><subsection><num>(4)</num><content><p>The provision that may be made by virtue of subsection <ref href="#d25e6020">(3)</ref> includes provision making it an offence to use or disclose information in an unauthorised manner; but such an offence may not be made punishable by imprisonment.</p></content></subsection><subsection><num>(5)</num><intro><p>Regulations under section <ref href="#d25e5593">38A</ref> that authorise the use or disclosure of information are not to be taken to authorise disclosure or use that would be liable to harm the commercial interests of any person, except to the extent that—</p></intro><level class="para1"><num>(a)</num><content><p>the regulations otherwise provide, or</p></content></level><level class="para1"><num>(b)</num><content><p>the person disclosing or using the information reasonably considers such disclosure or use necessary in view of the purpose of the regulations.</p></content></level></subsection><subsection eId="d25e6071"><num>(6)</num><intro><p>Regulations under section <ref href="#d25e5593">38A</ref> do not require or authorise the disclosure or use of information that—</p></intro><level class="para1"><num>(a)</num><content><p>contravenes the data protection legislation (but this section and the regulations are to be taken into account in determining whether the disclosure or use would contravene that legislation), or</p></content></level><level class="para1"><num>(b)</num><content><p>is prohibited by any of Parts 1 to 7 and Chapter 1 of Part 9 of the Investigatory Powers Act 2016.</p></content></level></subsection><subsection><num>(7)</num><content><p>In subsection <ref href="#d25e6071">(6)</ref>, “<term refersTo="#term-the-data-protection-legislation">the data protection legislation</term>” has the same meaning as in the Data Protection Act 2018 (see section 3 of that Act).</p></content></subsection></section></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-27-3"><num>(3)</num><content><p><mod>In section 106 (regulations and orders under the Act), in subsection <ref href="#d25e4853">(2ZA)</ref> (inserted by section <ref href="#section-23">23</ref><ref href="#section-23-3">(3)</ref>), after paragraph <ref href="#d25e4859">(a)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(b)</num><content><p>regulations under section <ref href="#d25e5593">38A</ref>.</p></content></level></quotedStructure></mod></p></content></subsection><subsection eId="section-27-4"><num>(4)</num><content><p><mod>In paragraph 6 of Schedule 6A (requirements enforceable against suppliers under section 25), before sub-paragraph (a) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(za)</num><content><p>any provision of regulations under section <ref href="#d25e5593">38A</ref> that is designated in the regulations as a relevant provision for the purposes of this paragraph;</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-electricity-transmission-period"><heading>Electricity transmission period</heading><section eId="section-28"><num>28</num><heading>Electricity transmission systems: extension of commissioning period</heading><content><p><mod>In <ref eId="c00049" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">section 6G</ref><ref eId="c00050" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">(1)</ref> of the <ref eId="c00051" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (meaning of “<term refersTo="#term-commissioning-period" eId="term-commissioning-period">commissioning period</term>” for the purposes of determining whether a person is to be regarded as participating in the transmission of electricity), in <ref eId="c00052" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">paragraph (b)</ref>, for “18 months” substitute <quotedText>“27 months”</quotedText>.</mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-electricity-generation-on-forestry-land"><heading>Electricity generation on forestry land</heading><section eId="section-29"><num>29</num><heading>Use of forestry estate for renewable electricity</heading><content><p><mod>In the Forestry Act 1967, after section 3 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e6197"><num>3A</num><heading>Use of land in connection with renewable electricity projects</heading><subsection eId="d25e6201"><num>(1)</num><intro><p>The Commissioners may—</p></intro><level class="para1"><num>(a)</num><content><p>use, or enter into arrangements in connection with the use of, English forestry land for the generation, storage, transmission or supply of renewable electricity;</p></content></level><level class="para1"><num>(b)</num><content><p>sell, or enter into other arrangements concerning, renewable electricity generated, stored or supplied on, or transmitted across, English forestry land;</p></content></level><level class="para1" eId="d25e6219"><num>(c)</num><intro><p>use, or enter into arrangements in connection with the use of, English forestry land for activity that—</p></intro><level class="para2"><num>(i)</num><content><p>is intended to satisfy, or enable the satisfaction of, a relevant condition of development (whether existing or contemplated), or</p></content></level><level class="para2"><num>(ii)</num><content><p>otherwise arises in connection with such a condition.</p></content></level></level></subsection><subsection><num>(2)</num><intro><p>For the purposes of subsection <ref href="#d25e6201">(1)</ref><ref href="#d25e6219">(c)</ref>, a relevant condition of development is a condition of development that—</p></intro><level class="para1"><num>(a)</num><content><p>relates to renewable electricity development located wholly or partly on English forestry land, and</p></content></level><level class="para1"><num>(b)</num><content><p>is intended to benefit the natural environment of land.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The exercise of the powers in subsection <ref href="#d25e6201">(1)</ref> for either of the following purposes is to be taken to be consistent with the Commissioners’ general duty under section 1(2)—</p></intro><level class="para1"><num>(a)</num><content><p>facilitating or promoting the use of renewable electricity;</p></content></level><level class="para1"><num>(b)</num><content><p>obtaining funds for meeting the expenses referred to in section 41(2).</p></content></level></subsection><subsection><num>(4)</num><content><p>When the Commissioners are considering the exercise of those powers, section 1(3A) applies as if it included a further paragraph referring to those purposes.</p></content></subsection><subsection><num>(5)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-condition-of-development">condition of development</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a condition to which planning permission is subject, or</p></content></level><level class="para1"><num>(b)</num><content><p>a requirement contained in an order granting development consent under the Planning Act 2008 (development consent for nationally significant infrastructure);</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-english-forestry-land">English forestry land</term>” means land placed at the disposal of the Commissioners under this Act;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-natural-environment">natural environment</term>”, in relation to land, includes—</p></intro><level class="para1"><num>(a)</num><content><p>its plants, animals and other living organisms,</p></content></level><level class="para1"><num>(b)</num><content><p>their habitats, and</p></content></level><level class="para1"><num>(c)</num><content><p>its geological features;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-renewable-electricity">renewable electricity</term>” means electricity produced from sources other than—</p></intro><level class="para1"><num>(a)</num><content><p>coal,</p></content></level><level class="para1"><num>(b)</num><content><p>lignite,</p></content></level><level class="para1"><num>(c)</num><content><p>peat,</p></content></level><level class="para1"><num>(d)</num><content><p>natural gas, within the meaning of the Energy Act 1976,</p></content></level><level class="para1"><num>(e)</num><content><p>crude liquid petroleum,</p></content></level><level class="para1"><num>(f)</num><content><p>petroleum products, within the meaning of the Energy Act 1976,</p></content></level><level class="para1"><num>(g)</num><content><p>any substance produced directly or indirectly from a substance within paragraphs <ref href="#d25e6345">(a)</ref> to <ref href="#d25e6365">(f)</ref>,</p></content></level><level class="para1"><num>(h)</num><content><p>energy derived from any substance within paragraphs <ref href="#d25e6345">(a)</ref> to <ref href="#d25e6369">(g)</ref>, or</p></content></level><level class="para1"><num>(i)</num><content><p>nuclear fuel;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-renewable-electricity-development">renewable electricity development</term>” means development the main purpose of which is the generation, storage, transmission or supply of renewable electricity.</p></content></hcontainer></subsection><subsection eId="d25e6400"><num>(6)</num><content><p>References in this section to the storage of electricity are to the storage of energy converted from electricity for the purpose of its reconversion into electricity.</p></content></subsection></section><section eId="d25e6412"><num>3B</num><heading>Section <ref href="#d25e6197">3A</ref>: power to require Secretary of State’s consent in certain cases</heading><subsection eId="d25e6416"><num>(1)</num><content><p>The Secretary of State may make regulations that, in a case within subsection <ref href="#d25e6428">(2)</ref>, require the consent of the Secretary of State to an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>.</p></content></subsection><subsection eId="d25e6428"><num>(2)</num><intro><p>The cases are those where—</p></intro><level class="para1"><num>(a)</num><content><p>a proposed exercise of the powers is intended to enable the construction on English forestry land of the whole or part of a generating station (including an extension to an existing station), and</p></content></level><level class="para1"><num>(b)</num><content><p>the capacity threshold is exceeded.</p></content></level></subsection><subsection><num>(3)</num><content><p>In the case of the construction of a new generating station, the capacity threshold is exceeded if it is expected that the generating capacity of the station would equal or exceed the relevant wattage.</p></content></subsection><subsection eId="d25e6452"><num>(4)</num><intro><p>In the case of an extension to an existing station, the capacity threshold is exceeded if it is expected that—</p></intro><level class="para1"><num>(a)</num><content><p>the extension would cause the generating capacity of the station to equal or exceed the relevant wattage, or</p></content></level><level class="para1" eId="d25e6464"><num>(b)</num><content><p>the extension, whether alone or taken together with previous non-consented extensions, would increase the generating capacity of the station by at least the relevant wattage.</p></content></level></subsection><subsection><num>(5)</num><intro><p>An extension is “<term refersTo="#term-non-consented">non-consented</term>” for the purposes of subsection <ref href="#d25e6452">(4)</ref><ref href="#d25e6464">(b)</ref> if—</p></intro><level class="para1"><num>(a)</num><content><p>it was enabled by an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>, and</p></content></level><level class="para1"><num>(b)</num><content><p>that exercise of those powers did not have the consent of the Secretary of State under regulations under subsection <ref href="#d25e6416">(1)</ref>.</p></content></level></subsection><subsection><num>(6)</num><intro><p>But an extension ceases to be “non-consented” for those purposes if—</p></intro><level class="para1"><num>(a)</num><content><p>a subsequent extension to the station in question is constructed having been enabled by an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>, and</p></content></level><level class="para1"><num>(b)</num><content><p>that exercise of those powers had the consent of the Secretary of State under regulations under subsection <ref href="#d25e6416">(1)</ref>.</p></content></level></subsection><subsection><num>(7)</num><intro><p>The relevant wattage is—</p></intro><level class="para1"><num>(a)</num><content><p>5 megawatts, if the station generates electricity from wind, and</p></content></level><level class="para1"><num>(b)</num><content><p>50 megawatts, if it does not.</p></content></level></subsection><subsection eId="d25e6544"><num>(8)</num><content><p>The Secretary of State may by regulations amend this section so as to change the relevant wattage (including by adding or combining categories of station in relation to which a particular wattage is prescribed).</p></content></subsection><subsection><num>(9)</num><intro><p>In calculating the relevant wattage there is to be disregarded—</p></intro><level class="para1"><num>(a)</num><content><p>in the case of a generating station only partly situated on English forestry land, any generating capacity that can be attributed to parts not situated on English forestry land;</p></content></level><level class="para1"><num>(b)</num><content><p>in the case of a generating station whose capacity is provided in part by facilities for the storage of electricity and in part by other means, the capacity provided by those facilities.</p></content></level></subsection><subsection><num>(10)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-generating-station">generating station</term>” has the same meaning as in Part 1 of the Electricity Act 1989 (see section 64(1));</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-storage">storage</term>” is to be read in accordance with section <ref href="#d25e6197">3A</ref><ref href="#d25e6400">(6)</ref>.</p></content></hcontainer></subsection></section><section><num>3C</num><heading>Regulations under section <ref href="#d25e6412">3B</ref>: further provision</heading><subsection><num>(1)</num><intro><p>Regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6416">(1)</ref> may—</p></intro><level class="para1"><num>(a)</num><content><p>make provision about the process by which consent is to be sought and given or refused;</p></content></level><level class="para1"><num>(b)</num><content><p>provide for consent to be given subject to conditions.</p></content></level></subsection><subsection><num>(2)</num><intro><p>Regulations under section <ref href="#d25e6412">3B</ref> may—</p></intro><level class="para1"><num>(a)</num><content><p>make different provision for different purposes or areas;</p></content></level><level class="para1"><num>(b)</num><content><p>include consequential, incidental, supplementary, transitional or saving provision.</p></content></level></subsection><subsection><num>(3)</num><content><p>Regulations under section <ref href="#d25e6412">3B</ref> are to be made by statutory instrument.</p></content></subsection><subsection><num>(4)</num><content><p>A statutory instrument containing (whether alone or with other provision) regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6544">(8)</ref> may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection><num>(5)</num><content><p>A statutory instrument containing regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6416">(1)</ref> (but not regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6544">(8)</ref>) is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection></section></quotedStructure></mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-wind-generating-stations-and-seismic-array-systems"><heading>Wind generating stations and seismic array systems</heading><section eId="section-30"><num>30</num><heading>Wind generating stations that may affect seismic array systems</heading><subsection eId="section-30-1"><num>(1)</num><content><p>The Secretary of State may make regulations about planning permissions or consents relating to wind generating stations that may affect the functioning of a relevant seismic array system.</p></content></subsection><subsection eId="section-30-2"><num>(2)</num><intro><p>A “relevant seismic array system” is a spatially distributed system of linked seismometers, arranged so as to enhance the detection and characterisation of seismic signals, that—</p></intro><level class="para1" eId="section-30-2-a"><num>(a)</num><content><p>is used for defence purposes, and</p></content></level><level class="para1" eId="section-30-2-b"><num>(b)</num><content><p>is in use on the day on which this Act is passed.</p></content></level></subsection><subsection eId="section-30-3"><num>(3)</num><intro><p>The regulations may provide for—</p></intro><level class="para1" eId="section-30-3-a"><num>(a)</num><content><p>an exclusion zone, and</p></content></level><level class="para1" eId="section-30-3-b"><num>(b)</num><content><p>a restricted zone,</p></content></level><wrapUp><p>around a relevant seismic array system.</p></wrapUp></subsection><subsection eId="section-30-4"><num>(4)</num><intro><p>The regulations may—</p></intro><level class="para1" eId="section-30-4-a"><num>(a)</num><content><p>require a planning decision-maker to refuse, or decline to determine or accept, a planning application relating to a wind generating station that is (or would be) situated in an exclusion zone;</p></content></level><level class="para1" eId="section-30-4-b"><num>(b)</num><content><p>provide that a relevant development order or MCA scheme may not be made if it would grant planning permission for development relating to a wind generating station that is (or would be) situated in an exclusion zone;</p></content></level><level class="para1" eId="section-30-4-c"><num>(c)</num><content><p>allow the Secretary of State to direct that a relevant development order or MCA scheme may not be made if it would grant such planning permission.</p></content></level></subsection><subsection eId="section-30-5"><num>(5)</num><intro><p>The regulations may, in relation to a planning application relating to a wind generating station that is (or would be) situated in a restricted zone—</p></intro><level class="para1" eId="section-30-5-a"><num>(a)</num><content><p>require the applicant to provide specified information about the seismic impact of the proposals (“seismic impact information”) to which their application relates;</p></content></level><level class="para1" eId="section-30-5-b"><num>(b)</num><content><p>require the planning decision-maker to use the seismic impact information in a specified way when determining the application (including when determining conditions relating to a permission or consent);</p></content></level><level class="para1" eId="section-30-5-c"><num>(c)</num><content><p>require the planning decision-maker to refuse, or decline to determine or accept, the application in specified circumstances;</p></content></level><level class="para1" eId="section-30-5-d"><num>(d)</num><content><p>require the planning decision-maker to provide the Secretary of State with the seismic impact information, and to seek the Secretary of State’s views on the seismic impact of the proposals;</p></content></level><level class="para1" eId="section-30-5-e"><num>(e)</num><content><p>require the planning decision-maker to refuse, or decline to determine or accept, the application if the Secretary of State objects to it on grounds relating to the seismic impact of the proposals.</p></content></level></subsection><subsection eId="section-30-6"><num>(6)</num><intro><p>The regulations may—</p></intro><level class="para1" eId="section-30-6-a"><num>(a)</num><content><p>require a person proposing to make a relevant development order or MCA scheme to consult the Secretary of State if the order or scheme would grant planning permission for development relating to a wind generating station that is (or would be) situated in a restricted zone;</p></content></level><level class="para1" eId="section-30-6-b"><num>(b)</num><content><p>allow the Secretary of State to direct that a relevant development order or MCA scheme may not be made if it would grant such planning permission.</p></content></level></subsection><subsection eId="section-30-7"><num>(7)</num><intro><p>The regulations may include provision about the procedure for planning applications to which they relate, such as—</p></intro><level class="para1" eId="section-30-7-a"><num>(a)</num><content><p>provision enabling or requiring a planning decision-maker to decline to determine or accept an application;</p></content></level><level class="para1" eId="section-30-7-b"><num>(b)</num><content><p>provision modifying the process for determining an application;</p></content></level><level class="para1" eId="section-30-7-c"><num>(c)</num><content><p>provision allowing the Secretary of State to give a direction to the planning-decision maker about the procedure for an application;</p></content></level><level class="para1" eId="section-30-7-d"><num>(d)</num><content><p>provision modifying or disapplying a right of appeal or review;</p></content></level><level class="para1" eId="section-30-7-e"><num>(e)</num><content><p>provision disapplying a duty imposed on a planning decision-maker when determining an application.</p></content></level></subsection><subsection eId="section-30-8"><num>(8)</num><content><p>The regulations may require a planning decision-maker to have regard to guidance issued by the Secretary of State.</p></content></subsection><subsection eId="section-30-9"><num>(9)</num><intro><p>Regulations under this section may—</p></intro><level class="para1" eId="section-30-9-a"><num>(a)</num><content><p>amend or repeal provision contained in an Act of Parliament or an Act of the Scottish Parliament;</p></content></level><level class="para1" eId="section-30-9-b"><num>(b)</num><content><p>make different provision for different purposes or areas;</p></content></level><level class="para1" eId="section-30-9-c"><num>(c)</num><content><p>make provision binding the Crown;</p></content></level><level class="para1" eId="section-30-9-d"><num>(d)</num><content><p>make transitional, transitory or saving provision;</p></content></level><level class="para1" eId="section-30-9-e"><num>(e)</num><content><p>make incidental, supplementary or consequential provision.</p></content></level></subsection><subsection eId="section-30-10"><num>(10)</num><content><p>Regulations under this section are to be made by statutory instrument.</p></content></subsection><subsection eId="section-30-11"><num>(11)</num><content><p>A statutory instrument containing regulations under this section which amend or repeal provision contained in an Act of Parliament or an Act of the Scottish Parliament may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection eId="section-30-12"><num>(12)</num><content><p>Any other statutory instrument containing regulations under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-30-13"><num>(13)</num><content><p>If a draft of a statutory instrument containing regulations under this section would, apart from this subsection, be treated for the purposes of the standing orders of either House of Parliament as a hybrid instrument, it is to proceed in that House as if it were not such an instrument.</p></content></subsection><subsection eId="section-30-14"><num>(14)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-mca-scheme" eId="term-mca-scheme">MCA scheme</term>” means a masterplan consent area scheme made under Part 3 of the Town and Country Planning (Scotland) Act 1997;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-planning-application" eId="term-planning-application">planning application</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>an application for planning permission under Part 3 or Part 13 of the Town and Country Planning Act 1990,</p></content></level><level class="para1"><num>(b)</num><content><p>an application for planning permission under Part 3 or Part 12 of the Town and Country Planning (Scotland) Act 1997,</p></content></level><level class="para1"><num>(c)</num><content><p>an application for an order granting development consent under section 37 of the Planning Act 2008, or</p></content></level><level class="para1"><num>(d)</num><content><p>an application under section 36 or 36C of the Electricity Act 1989 (consent for construction etc of generating station);</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-planning-decision-maker" eId="term-planning-decision-maker">planning decision-maker</term>” means a person who determines a planning application;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-development-order" eId="term-relevant-development-order">relevant development order</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a local development order made under section 61A of the Town and Country Planning Act 1990;</p></content></level><level class="para1"><num>(b)</num><content><p>a Mayoral development order made under section 61DA of that Act;</p></content></level><level class="para1"><num>(c)</num><content><p>a neighbourhood development order made under section 61E of that Act;</p></content></level><level class="para1"><num>(d)</num><content><p>a development order made under section 30 of the Town and Country Planning (Scotland) Act 1997;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-wind-generating-station" eId="term-wind-generating-station">wind generating station</term>” means a generating station that generates electricity from wind.</p></content></hcontainer></subsection></section></hcontainer></chapter> — Consumer benefits
Part 1 — Infrastructure — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-2"><num>Chapter 2</num><heading>Electricity infrastructure</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-connections-to-the-electricity-transmission-and-distribution-systems"><heading>Connections to the electricity transmission and distribution systems</heading><section eId="section-14"><num>14</num><heading>Connections to electricity network: licence and other modifications</heading><subsection eId="section-14-1"><num>(1)</num><intro><p>A relevant authority may modify—</p></intro><level class="para1" eId="section-14-1-a"><num>(a)</num><content><p>the conditions of a particular electricity licence;</p></content></level><level class="para1" eId="section-14-1-b"><num>(b)</num><content><p>the terms of a particular electricity licence;</p></content></level><level class="para1" eId="section-14-1-c"><num>(c)</num><content><p>the standard conditions of electricity licences of a particular type;</p></content></level><level class="para1" eId="section-14-1-d"><num>(d)</num><content><p>a document maintained in accordance with the conditions of an electricity licence;</p></content></level><level class="para1" eId="section-14-1-e"><num>(e)</num><content><p>an agreement entered into in pursuance of a document maintained as mentioned in <ref href="#section-14-1-d">paragraph (d)</ref>;</p></content></level><level class="para1" eId="section-14-1-f"><num>(f)</num><content><p>a qualifying distribution agreement.</p></content></level></subsection><subsection eId="section-14-2"><num>(2)</num><content><p>A relevant authority may exercise the power under <ref href="#section-14-1">subsection (1)</ref> only for the purpose of improving the process for managing connections to the transmission system or the distribution system (and such an improvement may include changing the order in which connections are made).</p></content></subsection><subsection eId="section-14-3"><num>(3)</num><content><p>The Secretary of State may direct the GEMA to exercise the power under <ref href="#section-14-1">subsection (1)</ref>.</p></content></subsection><subsection eId="section-14-4"><num>(4)</num><content><p>The Secretary of State may exercise the power under <ref href="#section-14-3">subsection (3)</ref> only for the purpose mentioned in <ref href="#section-14-2">subsection (2)</ref>.</p></content></subsection><subsection eId="section-14-5"><num>(5)</num><content><p>The power conferred by <ref href="#section-14-1">subsection (1)</ref> may not be exercised after the end of the period of three years beginning with the day on which <ref href="#section-14">this section</ref> comes into force.</p></content></subsection><subsection eId="section-14-6"><num>(6)</num><content><p><ref eId="c00005" href="https://www.legislation.gov.uk/ukpga/1989/29/section/3A">Section 3A</ref> of the <ref eId="c00006" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (principal objective and general duties) applies in relation to the functions of the Secretary of State and the GEMA under <ref href="#section-14">this section</ref> and sections <ref href="#section-15">15</ref> to <ref href="#section-17">17</ref> as it applies in relation to functions of the Secretary of State or the GEMA under <ref eId="c00007" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of <ref eId="c00008" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">that Act</ref>.</p></content></subsection><subsection eId="section-14-7"><num>(7)</num><content><p>A relevant authority may under <ref href="#section-14-1">subsection (1)</ref> modify an agreement mentioned in <ref href="#section-14-1">subsection (1)</ref><ref href="#section-14-1-e">(e)</ref> or a qualifying distribution agreement even if the effect of the modification might amount to a repudiation of the agreement.</p></content></subsection><subsection eId="section-14-8"><num>(8)</num><intro><p>In <ref href="#section-14">this section</ref> and sections <ref href="#section-15">15</ref> to <ref href="#section-17">17</ref>—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-distribution-system" eId="term-distribution-system">distribution system</term>” has the same meaning as in <ref eId="c00009" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00010" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (see the definition of “distribute” in section 4(4) of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-electricity-distributor" eId="term-electricity-distributor">electricity distributor</term>” has the same meaning as in Part 1 of that Act (see section 6(9) of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-electricity-licence" eId="term-electricity-licence">electricity licence</term>” means a licence for the purposes of section 4 of that Act;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-gema" eId="term-the-gema">the GEMA</term>” means the Gas and Electricity Markets Authority;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-qualifying-distribution-agreement" eId="term-qualifying-distribution-agreement">qualifying distribution agreement</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>the terms subject to which a connection is made by an electricity distributor in pursuance of section 16(1) of the Electricity Act 1989, or</p></content></level><level class="para1"><num>(b)</num><content><p>a special connection agreement as defined by section 22(1) of that Act;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-relevant-authority" eId="term-relevant-authority">relevant authority</term>” means the Secretary of State or the GEMA;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-transmission-system" eId="term-transmission-system">transmission system</term>” has the same meaning as in <ref eId="c00011" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00012" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (see section 4(4) of that Act).</p></content></hcontainer></subsection></section><section eId="section-15"><num>15</num><heading>Scope of modification power under <ref href="#section-14">section 14</ref></heading><subsection eId="section-15-1"><num>(1)</num><content><p>The power conferred by <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> to “<term refersTo="#term-modify" eId="term-modify">modify</term>” includes power to amend, add to or remove (and, in particular, includes power to make a person a party to an agreement or to discharge a party from its obligations under an agreement); and references in <ref href="#section-14">section 14</ref>, <ref href="#section-15">this section</ref> and <ref href="#section-16">section 16</ref> to modification are to be construed accordingly.</p></content></subsection><subsection eId="section-15-2"><num>(2)</num><intro><p>The power conferred by <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref>—</p></intro><level class="para1" eId="section-15-2-a"><num>(a)</num><content><p>may be exercised generally, only in relation to specified cases, or subject to exceptions (including by making provision for a case to be excepted only so long as specified conditions are satisfied);</p></content></level><level class="para1" eId="section-15-2-b"><num>(b)</num><content><p>may be exercised differently for different purposes or areas;</p></content></level><level class="para1" eId="section-15-2-c"><num>(c)</num><content><p>includes power to make incidental, supplementary, consequential or transitional modifications.</p></content></level></subsection><subsection eId="section-15-3"><num>(3)</num><intro><p>Provision included in an electricity licence by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-a">(a)</ref> or <ref href="#section-14-1-c">(c)</ref>—</p></intro><level class="para1" eId="section-15-3-a"><num>(a)</num><content><p>may include provision of a kind mentioned in <ref eId="c00013" href="https://www.legislation.gov.uk/ukpga/1989/29/section/7">section 7</ref> of the <ref eId="c00014" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref>;</p></content></level><level class="para1" eId="section-15-3-b"><num>(b)</num><content><p>need not relate to the activities authorised by the licence.</p></content></level></subsection><subsection eId="section-15-4"><num>(4)</num><content><p>The modification under <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> of part of a standard condition of an electricity licence does not prevent any other part of the condition from continuing to be regarded as a standard condition for the purposes of <ref eId="c00015" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00016" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref>.</p></content></subsection><subsection eId="section-15-5"><num>(5)</num><content><p>If under <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> a relevant authority modifies the standard conditions of an electricity licence of a particular type, the GEMA must make the same modifications of those standard conditions for the purposes of their incorporation in electricity licences of that type granted after that time.</p></content></subsection><subsection eId="section-15-6"><num>(6)</num><content><p>Provision included in an electricity licence by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-b">(b)</ref> may in particular include provision about the circumstances in which the licence may be revoked or suspended.</p></content></subsection><subsection eId="section-15-7"><num>(7)</num><intro><p>Provision included in an agreement by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-e">(e)</ref> or <ref href="#section-14-1-f">(f)</ref> may in particular include provision—</p></intro><level class="para1" eId="section-15-7-a"><num>(a)</num><content><p>requiring specified conditions to be met before the taking of particular steps under the agreement;</p></content></level><level class="para1" eId="section-15-7-b"><num>(b)</num><content><p>about the procedure for varying the agreement.</p></content></level></subsection><subsection eId="section-15-8"><num>(8)</num><intro><p>In <ref eId="c00017" href="https://www.legislation.gov.uk/ukpga/2000/27/section/33">section 33</ref> of the <ref eId="c00018" href="https://www.legislation.gov.uk/ukpga/2000/27/contents">Utilities Act 2000</ref> (standard conditions of electricity licences), in <ref eId="c00019" href="https://www.legislation.gov.uk/ukpga/2000/27/section/33">subsection (1)</ref>—</p></intro><level class="para1" eId="section-15-8-a"><num>(a)</num><content><p>omit the “or” at the end of paragraph (k), and</p></content></level><level class="para1" eId="section-15-8-b"><num>(b)</num><content><p><mod>at the end insert <quotedText startQuote="&#x201C;">, or</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(m)</num><content><p>under <ref href="#section-14">section 14</ref> of the Planning and Infrastructure Act 2025.</p></content></level></quotedStructure></mod></p></content></level></subsection></section><section eId="section-16"><num>16</num><heading>Procedure relating to modifications under <ref href="#section-14">section 14</ref></heading><subsection eId="section-16-1"><num>(1)</num><intro><p>Before making a modification under <ref href="#section-14">section 14</ref>, a relevant authority must consult—</p></intro><level class="para1" eId="section-16-1-a"><num>(a)</num><content><p>the holder of any electricity licence proposed to be modified,</p></content></level><level class="para1" eId="section-16-1-b"><num>(b)</num><content><p>the Independent System Operator and Planner,</p></content></level><level class="para1" eId="section-16-1-c"><num>(c)</num><content><p>the GEMA or the Secretary of State (depending on which relevant authority is proposing to make the modification), and</p></content></level><level class="para1" eId="section-16-1-d"><num>(d)</num><content><p>such other persons as the relevant authority considers appropriate.</p></content></level></subsection><subsection eId="section-16-2"><num>(2)</num><content><p>Subsection <ref href="#section-16-1">(1)</ref> may be satisfied by consultation carried out before the passing of this Act (as well as by consultation carried out after that time).</p></content></subsection><subsection eId="section-16-3"><num>(3)</num><content><p>A relevant authority must publish details of any modifications made by it under <ref href="#section-14">section 14</ref> as soon as reasonably practicable after they are made.</p></content></subsection><subsection eId="section-16-4"><num>(4)</num><content><p>A relevant authority may exclude from publication under <ref href="#section-16-3">subsection (3)</ref> any information the publication of which would be likely to prejudice the commercial interests of any person.</p></content></subsection><subsection eId="section-16-5"><num>(5)</num><content><p>In <ref href="#section-16">this section</ref>, “<term refersTo="#term-the-independent-system-operator-and-planner" eId="term-the-independent-system-operator-and-planner">the Independent System Operator and Planner</term>” means the person for the time being designated under <ref eId="c00020" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">section 162</ref><ref eId="c00021" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">(1)</ref> of the <ref eId="c00022" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref>.</p></content></subsection></section><section eId="section-17"><num>17</num><heading>Directions to modify connection agreements</heading><subsection eId="section-17-1"><num>(1)</num><intro><p>A relevant authority may—</p></intro><level class="para1" eId="section-17-1-a"><num>(a)</num><content><p>direct the Independent System Operator and Planner (“the ISOP”) to modify an agreement entered into by the ISOP pursuant to a document maintained in accordance with the conditions of an electricity licence;</p></content></level><level class="para1" eId="section-17-1-b"><num>(b)</num><content><p>direct an electricity distributor to modify a qualifying distribution agreement entered into by the electricity distributor.</p></content></level></subsection><subsection eId="section-17-2"><num>(2)</num><content><p>A relevant authority may exercise the power conferred by <ref href="#section-17-1">subsection (1)</ref> only for the purpose of improving the process for managing connections to the transmission system or the distribution system (and such an improvement may include changing the order in which connections are made).</p></content></subsection><subsection eId="section-17-3"><num>(3)</num><content><p>A direction under subsection <ref href="#section-17-1">(1)</ref> must describe the kinds of modification to be made by the person to whom it is given.</p></content></subsection><subsection eId="section-17-4"><num>(4)</num><intro><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may also require the person to whom it is given to modify an agreement by including in it provision—</p></intro><level class="para1" eId="section-17-4-a"><num>(a)</num><content><p>requiring specified conditions to be met before the taking of particular steps under the agreement;</p></content></level><level class="para1" eId="section-17-4-b"><num>(b)</num><content><p>about the procedure for varying the agreement.</p></content></level></subsection><subsection eId="section-17-5"><num>(5)</num><content><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may be expressed as having effect generally, in relation to cases within a description specified in the direction, or in relation to a particular case.</p></content></subsection><subsection eId="section-17-6"><num>(6)</num><intro><p>Before giving a direction under subsection <ref href="#section-17-1">(1)</ref>, the relevant authority must consult—</p></intro><level class="para1" eId="section-17-6-a"><num>(a)</num><content><p>the person to whom it proposes to give the direction, and</p></content></level><level class="para1" eId="section-17-6-b"><num>(b)</num><content><p>such other persons as the relevant authority considers appropriate.</p></content></level></subsection><subsection eId="section-17-7"><num>(7)</num><content><p>Subsection <ref href="#section-17-6">(6)</ref> may be satisfied by consultation carried out before the passing of this Act (as well as by consultation carried out after that time).</p></content></subsection><subsection eId="section-17-8"><num>(8)</num><content><p>A relevant authority must publish details of any direction it gives under subsection <ref href="#section-17-1">(1)</ref> as soon as reasonably practicable after the direction is given.</p></content></subsection><subsection eId="section-17-9"><num>(9)</num><content><p>A relevant authority may exclude from publication under subsection <ref href="#section-17-8">(8)</ref> any information the publication of which would be likely to prejudice the commercial interests of any person.</p></content></subsection><subsection eId="section-17-10"><num>(10)</num><content><p>A person to whom a direction is given under <ref href="#section-17-1">subsection (1)</ref> must comply with it, even if the effect of a modification made to an agreement as a result of the direction might amount to a repudiation of the agreement.</p></content></subsection><subsection eId="section-17-11"><num>(11)</num><content><p>The power to give a direction under subsection <ref href="#section-17-1">(1)</ref> may not be exercised after the end of the period of three years beginning with the day on which this section comes into force.</p></content></subsection><subsection eId="section-17-12"><num>(12)</num><content><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may be varied or revoked by a subsequent direction given by a relevant authority.</p></content></subsection><subsection eId="section-17-13"><num>(13)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-the-independent-system-operator-and-planner" eId="term-the-independent-system-operator-and-planner">the Independent System Operator and Planner</term>” means the person for the time being designated under <ref eId="c00023" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">section 162</ref><ref eId="c00024" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">(1)</ref> of the <ref eId="c00025" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref>;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-modify" eId="term-modify">modify</term>” includes amend, add to and remove (and, in particular, includes making a person a party to an agreement and discharging a party from its obligations under an agreement).</p></content></hcontainer></subsection><subsection eId="section-17-14"><num>(14)</num><intro><p>In Schedule 6A to the Electricity Act 1989 (provisions imposing obligations enforceable as relevant requirements)—</p></intro><level class="para1" eId="section-17-14-a"><num>(a)</num><content><p><mod>in paragraph 4A (electricity system operator), after sub-paragraph (c) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><level class="para1"><num>(d)</num><content><p>section <ref href="#section-17">17</ref><ref href="#section-17-10">(10)</ref> of the Planning and Infrastructure Act 2025 (duty to comply with direction under <ref href="#section-17">section 17</ref> of that Act).</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-17-14-b"><num>(b)</num><content><p><mod>in paragraph 5 (distribution licence holders), after sub-paragraph (g) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><level class="para1"><num>(h)</num><content><p>section <ref href="#section-17">17</ref><ref href="#section-17-10">(10)</ref> of the Planning and Infrastructure Act 2025 (duty to comply with direction under <ref href="#section-17">section 17</ref> of that Act).</p></content></level></quotedStructure></mod></p></content></level></subsection></section><section eId="section-18"><num>18</num><heading>Managing connections to the network: strategic plans etc</heading><subsection eId="section-18-1"><num>(1)</num><content><p><mod>In <ref eId="c00026" href="https://www.legislation.gov.uk/ukpga/2023/52/part/5">Part 5</ref> of the <ref eId="c00027" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref> (Independent System Operator and Planner), after <ref eId="c00028" href="https://www.legislation.gov.uk/ukpga/2023/52/section/165">section 165</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e3701"><num>165A</num><heading>Functions relating to network connections: duty to have regard to designated plans</heading><subsection eId="d25e3705"><num>(1)</num><content><p>The ISOP must, when carrying out any of its functions relating to the management of connections to the transmission system, have regard to the designated strategic plans.</p></content></subsection><subsection eId="d25e3711"><num>(2)</num><content><p>The Secretary of State may by regulations designate plans or documents for the purposes of this section.</p></content></subsection><subsection><num>(3)</num><content><p>In <ref href="#d25e3705">subsection (1)</ref>, the reference to “<term refersTo="#term-the-designated-strategic-plans">the designated strategic plans</term>” is a reference to those plans or documents designated by regulations under <ref href="#d25e3711">subsection (2)</ref> as they have effect at the time when the regulations are made.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-18-2"><num>(2)</num><content><p><ref eId="c00029" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00030" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (electricity supply) is amended as set out in <span><ref href="#section-18-3">subsections (3)</ref> to <ref href="#section-18-5">(5)</ref></span>.</p></content></subsection><subsection eId="section-18-3"><num>(3)</num><intro><p>In <ref eId="c00031" href="https://www.legislation.gov.uk/ukpga/1989/29/section/16">section 16</ref> (duty to connect on request)—</p></intro><level class="para1" eId="section-18-3-a"><num>(a)</num><content><p><mod>after <ref eId="c00032" href="https://www.legislation.gov.uk/ukpga/1989/29/section/16">subsection (2)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(2A)</num><content><p>In deciding how to comply with the duties under this section, and in particular in deciding how to prioritise persons requiring a connection, an electricity distributor must have regard to the designated strategic plans.</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-18-3-b"><num>(b)</num><content><p><mod>at the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(6)</num><content><p>In this section, “<term refersTo="#term-the-designated-strategic-plans">the designated strategic plans</term>” means the plans or documents designated by regulations made under section <ref href="#d25e3701">165A</ref><ref href="#d25e3711">(2)</ref> of the Energy Act 2023 (functions of the Independent System Operator and Planner relating to network connections).</p></content></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-18-4"><num>(4)</num><intro><p>In <ref eId="c00033" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">section 17</ref> (exceptions from duty to connect), in <ref eId="c00034" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">subsection (1)</ref>—</p></intro><level class="para1" eId="section-18-4-a"><num>(a)</num><content><p>omit the “or” at the end of <ref eId="c00035" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">paragraph (b)</ref>;</p></content></level><level class="para1" eId="section-18-4-b"><num>(b)</num><content><p><mod>after <ref eId="c00036" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">paragraph (b)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(ba)</num><content><p>it would not be in accordance with the designated strategic plans (within the meaning of section 16) for the distributor to do so; or</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></level></subsection><subsection eId="section-18-5"><num>(5)</num><content><p><mod>In <ref eId="c00037" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A">Schedule 6A</ref> (provisions imposing obligations enforceable as relevant requirements), in <ref eId="c00038" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A/paragraph/4A">paragraph 4A</ref> (electricity system operator), in <ref eId="c00039" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A/paragraph/4A">paragraph (c)</ref>, for “165” substitute <quotedText>“<ref href="#d25e3701">165A</ref>”</quotedText>.</mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-consents-for-electricity-infrastructure-in-scotland"><heading>Consents for electricity infrastructure in Scotland</heading><section eId="section-19"><num>19</num><heading>Consents for generating stations and overhead lines: applications</heading><subsection eId="section-19-1"><num>(1)</num><content><p>Schedule 8 to the Electricity Act 1989 (consents of the Secretary of State and the Scottish Ministers under sections 36 and 37) is amended as follows.</p></content></subsection><subsection eId="section-19-2"><num>(2)</num><content><p><mod>After paragraph 1 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Applications made to the Scottish Ministers for consent</heading><paragraph eId="d25e3890" class="schProv1"><num>1A</num><subparagraph><num>(1)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations make provision about the following matters in relation to applications to the Scottish Ministers for consent under section 36 or 37.</p></content></subparagraph><subparagraph eId="d25e3900"><num>(2)</num><intro><p>The matters are—</p></intro><level class="para1" eId="d25e3906"><num>(a)</num><content><p>the steps a person must take before making an application;</p></content></level><level class="para1"><num>(b)</num><content><p>the information that must be included in an application;</p></content></level><level class="para1" eId="d25e3918"><num>(c)</num><content><p>an acceptance stage, during which the Scottish Ministers must assess an applicant’s compliance with any requirements imposed by the regulations in order to decide whether or not to accept the application;</p></content></level><level class="para1"><num>(d)</num><intro><p>fees to be paid to the Scottish Ministers—</p></intro><level class="para2"><num>(i)</num><content><p>on application, or</p></content></level><level class="para2"><num>(ii)</num><content><p>for anything done by them in relation to a proposed application;</p></content></level></level><level class="para1"><num>(e)</num><content><p>requests by the Scottish Ministers for additional information to aid their decision whether or not to accept an application or to grant consent.</p></content></level></subparagraph><subparagraph eId="d25e3948"><num>(3)</num><intro><p>The steps that may be the subject of provision made by virtue of sub-paragraph (2)(a) include—</p></intro><level class="para1"><num>(a)</num><content><p>notifying prescribed persons of the proposed application,</p></content></level><level class="para1"><num>(b)</num><content><p>publicising the proposed application, and</p></content></level><level class="para1" eId="d25e3966"><num>(c)</num><content><p>carrying out a consultation about the proposed application.</p></content></level></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-3"><num>(3)</num><intro><p>In paragraph 2 (objections by relevant planning authority)—</p></intro><level class="para1" eId="section-19-3-a"><num>(a)</num><content><p><mod>in sub-paragraph (1), for “Secretary of State for his” substitute <quotedText>“appropriate authority for a”</quotedText>;</mod></p></content></level><level class="para1" eId="section-19-3-b"><num>(b)</num><content><p><mod>in sub-paragraph (2), at the beginning insert <quotedText>“In the case of an application made to the Secretary of State,”</quotedText>;</mod></p></content></level><level class="para1" eId="section-19-3-c"><num>(c)</num><content><p><mod>after sub-paragraph (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><subparagraph><num>(2A)</num><intro><p>In the case of an application made to the Scottish Ministers, where the relevant planning authority notify the Scottish Ministers that they object to the application and their objection is not withdrawn, the Scottish Ministers—</p></intro><level class="para1"><num>(a)</num><content><p>must appoint a person (referred to in this Schedule as the “<term refersTo="#term-reporter">reporter</term>”) to examine the application, and</p></content></level><level class="para1"><num>(b)</num><content><p>before determining whether to give their consent, must consider the objection and the reporter’s final report.</p></content></level><wrapUp><p>See paragraph 2A for the process that must be followed by the reporter.</p></wrapUp></subparagraph></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-19-3-d"><num>(d)</num><intro><p>in sub-paragraph (4)—</p></intro><level class="para2" eId="section-19-3-d-i"><num>(i)</num><content><p><mod>after “(2)” insert <quotedText>“or (2A)”</quotedText>;</mod></p></content></level><level class="para2" eId="section-19-3-d-ii"><num>(ii)</num><content><p><mod>for “Secretary of State” substitute <quotedText>“appropriate authority”</quotedText>;</mod></p></content></level></level><level class="para1" eId="section-19-3-e"><num>(e)</num><content><p><mod>in sub-paragraph (5), for “Secretary of State” substitute <quotedText>“appropriate authority”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-19-4"><num>(4)</num><content><p><mod>After paragraph 2 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Procedure following objection by relevant planning authority: Scotland</heading><paragraph eId="d25e4075" class="schProv1"><num>2A</num><subparagraph><num>(1)</num><content><p>A reporter appointed under paragraph 2(2A)(a) must make proposals as regards the appropriate procedure for examining the application.</p></content></subparagraph><subparagraph eId="d25e4085"><num>(2)</num><intro><p>The appropriate procedure may consist of one or more of the following—</p></intro><level class="para1"><num>(a)</num><intro><p>considering—</p></intro><level class="para2"><num>(i)</num><content><p>the objection by the relevant planning authority,</p></content></level><level class="para2"><num>(ii)</num><content><p>any other objections made in accordance with regulations under paragraph 3(1)(c), and</p></content></level><level class="para2"><num>(iii)</num><content><p>any other representations made in accordance with an enactment;</p></content></level></level><level class="para1" eId="d25e4115"><num>(b)</num><content><p>considering new written representations about the application from persons specified by the reporter;</p></content></level><level class="para1" eId="d25e4121"><num>(c)</num><content><p>holding one or more hearing sessions;</p></content></level><level class="para1"><num>(d)</num><content><p>carrying out an inspection of the land to which the application relates;</p></content></level><level class="para1" eId="d25e4133"><num>(e)</num><content><p>holding a public inquiry.</p></content></level></subparagraph><subparagraph eId="d25e4139"><num>(3)</num><content><p>Where the reporter proposes a procedure that includes proceedings within sub-paragraph (2)(b), (c) or (e), the proposal must include a statement of the issues that are proposed to be within the scope of each of those proceedings.</p></content></subparagraph><subparagraph><num>(4)</num><intro><p>The reporter must—</p></intro><level class="para1"><num>(a)</num><content><p>publish the proposals,</p></content></level><level class="para1"><num>(b)</num><content><p>notify all interested parties of the proposals, and</p></content></level><level class="para1"><num>(c)</num><content><p>invite written representations about the proposals before the end of the time period specified by the reporter.</p></content></level></subparagraph><subparagraph><num>(5)</num><content><p>The published proposals must include or be accompanied by an explanation of the reasons for the proposals.</p></content></subparagraph><subparagraph><num>(6)</num><content><p>The reporter may hold a meeting to hear representations about the proposals.</p></content></subparagraph><subparagraph><num>(7)</num><intro><p>After considering the representations, the reporter must—</p></intro><level class="para1"><num>(a)</num><content><p>decide on the appropriate procedure for examining the application, and</p></content></level><level class="para1"><num>(b)</num><content><p>publish that decision.</p></content></level></subparagraph><subparagraph><num>(8)</num><intro><p>The published decision must include or be accompanied by an explanation of—</p></intro><level class="para1"><num>(a)</num><content><p>the reasons for the decision,</p></content></level><level class="para1"><num>(b)</num><content><p>the intended time period for the carrying out of the procedure, and</p></content></level><level class="para1"><num>(c)</num><content><p>the intended time period within which the reporter will send a final report to the Scottish Ministers.</p></content></level></subparagraph><subparagraph><num>(9)</num><content><p>Sub-paragraph (3) applies to the reporter’s decision as it applies to the reporter’s proposals.</p></content></subparagraph><subparagraph><num>(10)</num><content><p>On completing the examination, the reporter must prepare and send to the Scottish Ministers a final report setting out the reporter’s recommendations on the application.</p></content></subparagraph><subparagraph><num>(11)</num><intro><p>In this paragraph, “<term refersTo="#term-interested-party">interested party</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>the applicant,</p></content></level><level class="para1"><num>(b)</num><content><p>the relevant planning authority which made the objection under paragraph 2(2A),</p></content></level><level class="para1"><num>(c)</num><content><p>any person who has made an objection in accordance with regulations under paragraph 3, or</p></content></level><level class="para1"><num>(d)</num><content><p>any person who has made representations in accordance with any other enactment.</p></content></level></subparagraph><subparagraph><num>(12)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations make provision amending or setting out further detail about the procedure set out in this paragraph. (See also paragraph 7B(2)(e).)</p></content></subparagraph><subparagraph><num>(13)</num><content><p>A statutory instrument containing regulations under this paragraph is not to be made by the Secretary of State unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subparagraph><subparagraph><num>(14)</num><content><p>Regulations made by the Scottish Ministers under this paragraph are subject to the affirmative procedure.</p></content></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-5"><num>(5)</num><content><p><mod>After paragraph 7A insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Applications to the Scottish Ministers: time limits</heading><paragraph eId="d25e4298" class="schProv1"><num>7B</num><subparagraph><num>(1)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations specify a time limit for actions that may or must be taken in relation to an application to the Scottish Ministers for consent under section 36 or 37.</p></content></subparagraph><subparagraph eId="d25e4308"><num>(2)</num><intro><p>The regulations may, for example, specify a time limit for—</p></intro><level class="para1"><num>(a)</num><content><p>a person to comply with a requirement of regulations under paragraph 1A;</p></content></level><level class="para1"><num>(b)</num><content><p>a person to respond to a pre-application consultation (see paragraph 1A(3)(c));</p></content></level><level class="para1"><num>(c)</num><content><p>a person who is notified of an application in accordance with an enactment to provide their opinion or advice on the application;</p></content></level><level class="para1"><num>(d)</num><content><p>a relevant planning authority to object to an application under paragraph 2(2A);</p></content></level><level class="para1" eId="d25e4338"><num>(e)</num><content><p>a reporter to take any steps required by paragraph 2A;</p></content></level><level class="para1"><num>(f)</num><content><p>the Scottish Ministers to decide an application.</p></content></level></subparagraph><subparagraph><num>(3)</num><content><p>The regulations may include provision about the consequences of failure to comply with a time limit.</p></content></subparagraph><subparagraph><num>(4)</num><content><p>Where regulations under this paragraph specify a time limit for the completion of an acceptance stage (see paragraph 1A(2)(c)), the regulations may not permit the extension of that limit.</p></content></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-6"><num>(6)</num><content><p>The amendments made by subsection (3) do not affect the continued application in relation to the Scottish Ministers of regulations made under paragraph 2(3) of Schedule 8 to the Electricity Act 1989 before this section comes into force.</p></content></subsection></section><section eId="section-20"><num>20</num><heading>Variation of consents etc</heading><content><p><mod>After section 37 of the Electricity Act 1989 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e4384"><num>37A</num><heading>Application for variation of section 37 consent: Scotland</heading><subsection><num>(1)</num><content><p>The person for the time being entitled to the benefit of a section 37 consent that was granted by the Scottish Ministers may make an application to the Scottish Ministers for the consent to be varied.</p></content></subsection><subsection><num>(2)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about variation under this section, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the making and withdrawal of applications;</p></content></level><level class="para1"><num>(b)</num><content><p>fees;</p></content></level><level class="para1"><num>(c)</num><content><p>publicity and consultation requirements;</p></content></level><level class="para1"><num>(d)</num><content><p>rights to make representations;</p></content></level><level class="para1"><num>(e)</num><content><p>public inquiries;</p></content></level><level class="para1"><num>(f)</num><content><p>consideration of applications.</p></content></level></subsection><subsection><num>(3)</num><content><p>The regulations may provide for any statutory provision applicable to the grant by the Scottish Ministers of a section 37 consent to apply with specified modifications to the variation of a section 37 consent under this section.</p></content></subsection><subsection><num>(4)</num><intro><p>On an application for a section 37 consent to be varied, the Scottish Ministers may make such variations to the consent as appear to them to be appropriate, having regard (in particular) to—</p></intro><level class="para1"><num>(a)</num><content><p>the applicant’s reason for seeking the variation;</p></content></level><level class="para1"><num>(b)</num><content><p>the variations proposed;</p></content></level><level class="para1"><num>(c)</num><content><p>any objections made to the proposed variations, the views of consultees and the outcome of any public inquiry.</p></content></level></subsection><subsection><num>(5)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-section-37-consent">section 37 consent</term>” means a consent granted under section 37 (consent required for overhead lines);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-statutory-provision">statutory provision</term>” means a provision of or made under an Act, whenever passed or made; and for this purpose “<term refersTo="#term-act">Act</term>” includes an Act of the Scottish Parliament.</p></content></hcontainer></subsection></section><section eId="d25e4493"><num>37B</num><heading>Variation of section 36 and 37 consents on change of circumstances: Scotland</heading><subsection><num>(1)</num><intro><p>The Scottish Ministers may vary a consent under section 36 or 37 if—</p></intro><level class="para1"><num>(a)</num><intro><p>they consider that the consent ought to be varied—</p></intro><level class="para2"><num>(i)</num><content><p>because of a change in circumstances relating to the environment, or</p></content></level><level class="para2"><num>(ii)</num><content><p>because of technological changes, and</p></content></level></level><level class="para1"><num>(b)</num><content><p>the person for the time being entitled to the benefit of the consent agrees to the variation.</p></content></level></subsection><subsection><num>(2)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about variation under this section, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the procedure for getting agreement;</p></content></level><level class="para1"><num>(b)</num><content><p>publicity, notification and consultation requirements;</p></content></level><level class="para1"><num>(c)</num><content><p>rights to make representations.</p></content></level></subsection><subsection><num>(3)</num><content><p>The regulations may provide for any statutory provision applicable to the grant by the Scottish Ministers of a consent under section 36 or 37 to apply with specified modifications to the variation of such a consent under this section.</p></content></subsection><subsection><num>(4)</num><content><p>In this section, “<term refersTo="#term-statutory-provision">statutory provision</term>” has the same meaning as in section <ref href="#d25e4384">37A</ref>.</p></content></subsection></section><section eId="d25e4572"><num>37C</num><heading>Correction of errors in consent documents: Scotland</heading><subsection eId="d25e4576"><num>(1)</num><content><p>The Scottish Ministers may amend a decision document in order to correct a correctable error.</p></content></subsection><subsection><num>(2)</num><intro><p>In <ref href="#d25e4576">subsection (1)</ref>—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-correctable-error">correctable error</term>” means an error or omission which—</p></intro><level class="para1"><num>(a)</num><content><p>is in a part of the decision document which records the decision, and</p></content></level><level class="para1"><num>(b)</num><content><p>is not part of the statement of reasons for the decision;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-decision-document">decision document</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a document recording a consent under section 36 or 37, or</p></content></level><level class="para1"><num>(b)</num><content><p>a document recording a variation of such a consent.</p></content></level></hcontainer></subsection><subsection><num>(3)</num><content><p>The Scottish Ministers may exercise the power in <ref href="#d25e4576">subsection (1)</ref> either of their own accord or following a written request from a person for the time being entitled to the benefit of the consent.</p></content></subsection><subsection><num>(4)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about the process for corrections, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the making of written requests;</p></content></level><level class="para1"><num>(b)</num><content><p>notification requirements;</p></content></level><level class="para1"><num>(c)</num><content><p>rights to make representations.</p></content></level></subsection></section></quotedStructure></mod></p></content></section><section eId="section-21"><num>21</num><heading>Proceedings for questioning certain decisions on consents</heading><subsection eId="section-21-1"><num>(1)</num><content><p>Section 36D of the Electricity Act 1989 (proceedings for questioning certain decisions under section 36) is amended as set out in subsections <ref href="#section-21-2">(2)</ref> to <ref href="#section-21-4">(4)</ref>.</p></content></subsection><subsection eId="section-21-2"><num>(2)</num><content><p><mod>For subsection (3) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(3)</num><intro><p>This section applies to a decision under any of the following—</p></intro><level class="para1"><num>(a)</num><content><p>section 36 (application for consent for generating station);</p></content></level><level class="para1"><num>(b)</num><content><p>section 36C (application for variation of section 36 consent);</p></content></level><level class="para1"><num>(c)</num><content><p>section 37 (application for consent for overhead lines);</p></content></level><level class="para1"><num>(d)</num><content><p>section <ref href="#d25e4384">37A</ref> (application for variation of section 37 consent);</p></content></level><level class="para1"><num>(e)</num><content><p>section <ref href="#d25e4493">37B</ref> (variation of consents by Scottish Ministers);</p></content></level><level class="para1"><num>(f)</num><content><p>section 37C (consents and variation of consents in Scotland: correction of errors).</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-21-3"><num>(3)</num><content><p><mod>In subsection (4), for “taken” substitute <quotedText>“published by the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-4"><num>(4)</num><content><p><mod>In the heading, for “under section 36” substitute <quotedText>“of the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-5"><num>(5)</num><content><p><mod>In Schedule 8 to the Electricity Act 1989, in paragraph 5B (proceedings for questioning certain decisions under paragraph 3(2)), in sub-paragraph (4), for “taken” substitute <quotedText>“published by the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-6"><num>(6)</num><content><p><mod>In section 237 of the Town and Country Planning (Scotland) Act 1997 (challenges to validity of development plans and certain orders, decisions and directions), in subsection (3), after paragraph (b) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(ba)</num><content><p>any decision to give a direction under section 57(2) or (2ZA);</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-21-7"><num>(7)</num><content><p>The amendments made by this section apply only in relation to decisions made on or after the date on which this section comes into force.</p></content></subsection></section><section eId="section-22"><num>22</num><heading>Applications for necessary wayleaves: fees</heading><content><p><mod>In Schedule 4 to the Electricity Act 1989 (other powers etc of licence holders), after paragraph 6 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Fees for applications under paragraph 6(3) to the Scottish Ministers</heading><paragraph eId="d25e4794" class="schProv1"><num>6A</num><content><p>The Scottish Ministers may by regulations make provision about the fees to be paid to the Scottish Ministers in relation to an application made to them under paragraph 6(3).</p></content></paragraph></hcontainer></quotedStructure></mod></p></content></section><section eId="section-23"><num>23</num><heading>Regulations</heading><subsection eId="section-23-1"><num>(1)</num><content><p><ref eId="c00040" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">Section 106</ref> of the <ref eId="c00041" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (regulations and orders) is amended as follows.</p></content></subsection><subsection eId="section-23-2"><num>(2)</num><intro><p>In <ref eId="c00042" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">subsection (1ZA)</ref>—</p></intro><level class="para1" eId="section-23-2-a"><num>(a)</num><content><p><mod>for “the power conferred on” substitute <quotedText>“a power of”</quotedText>;</mod></p></content></level><level class="para1" eId="section-23-2-b"><num>(b)</num><content><p><mod>for “by section 36C” substitute <quotedText>“to make regulations (see section 27 of the Interpretation and Legislative Reform (Scotland) Act 2010 (Scottish statutory instruments))”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-23-3"><num>(3)</num><content><p><mod>After subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e4853"><num>(2ZA)</num><intro><p>Subsection (2) does not apply to a statutory instrument containing (whether alone or with other provision)—</p></intro><level class="para1" eId="d25e4859"><num>(a)</num><content><p>regulations under paragraph <ref href="#d25e4075">2A</ref> of Schedule 8;</p></content></level></subsection></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-23-4"><num>(4)</num><content><p><mod>In <ref eId="c00043" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">subsection (3)</ref>, for the words after “under” substitute <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>section 36C,</p></content></level><level class="para1"><num>(b)</num><content><p>section <ref href="#d25e4384">37A</ref>,</p></content></level><level class="para1"><num>(c)</num><content><p>section <ref href="#d25e4493">37B</ref>,</p></content></level><level class="para1"><num>(d)</num><content><p>section <ref href="#d25e4572">37C</ref>,</p></content></level><level class="para1"><num>(e)</num><content><p>paragraph <ref href="#d25e4794">6A</ref> of Schedule 4, or</p></content></level><level class="para1"><num>(f)</num><content><p>any paragraph of Schedule 8 except paragraph <ref href="#d25e4075">2A</ref>,</p></content></level><p>are subject to the negative procedure.</p></quotedStructure></mod></p></content></subsection><subsection eId="section-23-5"><num>(5)</num><content><p><mod>At the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(4)</num><content><p>Before making regulations under a provision listed in subsection <ref href="#d25e4960">(6)</ref>, the Secretary of State must consult the Scottish Ministers.</p></content></subsection><subsection><num>(5)</num><content><p>Before making regulations under a provision listed in subsection <ref href="#d25e4960">(6)</ref>, the Scottish Ministers must consult the Secretary of State.</p></content></subsection><subsection eId="d25e4960"><num>(6)</num><intro><p>The provisions are—</p></intro><level class="para1"><num>(a)</num><content><p>section <ref href="#d25e4384">37A</ref>;</p></content></level><level class="para1"><num>(b)</num><content><p>section <ref href="#d25e4493">37B</ref>;</p></content></level><level class="para1"><num>(c)</num><content><p>section <ref href="#d25e4572">37C</ref>;</p></content></level><level class="para1"><num>(d)</num><content><p>paragraphs <ref href="#d25e3890">1A</ref>, <ref href="#d25e4075">2A</ref> and <ref href="#d25e4298">7B</ref> of Schedule 8.</p></content></level></subsection></quotedStructure></mod></p></content></subsection></section><section eId="section-24"><num>24</num><heading><span><ref href="#section-19">Sections 19</ref> to <ref href="#section-23">23</ref></span>: minor and consequential amendments</heading><intro><p><ref href="#schedule-1">Schedule 1</ref> makes—</p></intro><level class="para1" eId="section-24-a"><num>(a)</num><content><p>amendments to the <ref eId="c00044" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> that are consequential on the amendments made by sections <ref href="#section-19">19</ref> to <ref href="#section-23">23</ref>, and</p></content></level><level class="para1" eId="section-24-b"><num>(b)</num><content><p>other minor amendments relating to consents for electricity infrastructure in Scotland (including amendments to reflect previous transfers of functions to the Scottish Ministers).</p></content></level></section><section eId="section-25"><num>25</num><heading>Environmental impact assessments for electricity works</heading><subsection eId="section-25-1"><num>(1)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations amend the Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 2017 (<ref eId="c00045" href="http://www.legislation.gov.uk/id/ssi/2017/101">S.S.I. 2017/101</ref>) (the “<term refersTo="#term-2017-regulations" eId="term-2017-regulations">2017 Regulations</term>”) by making provision described in subsection <ref href="#section-25-2">(2)</ref> in connection with environmental impact assessments and applications made to the Scottish Ministers for—</p></intro><level class="para1" eId="section-25-1-a"><num>(a)</num><content><p>consent granted under section 36 or 37 of the Electricity Act 1989 (consent for construction etc of generating stations or for overhead lines), or</p></content></level><level class="para1" eId="section-25-1-b"><num>(b)</num><content><p>variation of consent granted under section 36 of that Act.</p></content></level></subsection><subsection eId="section-25-2"><num>(2)</num><intro><p>That provision is—</p></intro><level class="para1" eId="section-25-2-a"><num>(a)</num><content><p>provision for the Scottish Ministers to refuse an application in respect of Schedule 2 development that is not accompanied by an EIA report if the development has not been the subject of a screening opinion;</p></content></level><level class="para1" eId="section-25-2-b"><num>(b)</num><content><p>provision for the Scottish Ministers to charge developers fees for screening opinions and scoping opinions;</p></content></level><level class="para1" eId="section-25-2-c"><num>(c)</num><content><p>provision about the sending of copies of EIA reports to the Scottish Ministers;</p></content></level><level class="para1" eId="section-25-2-d"><num>(d)</num><content><p>provision about the publication by developers of the information listed in regulation 14(2) of the 2017 Regulations (information about EIA reports);</p></content></level><level class="para1" eId="section-25-2-e"><num>(e)</num><content><p>provision about making EIA reports available for inspection;</p></content></level><level class="para1" eId="section-25-2-f"><num>(f)</num><content><p>provision about time limits for the consultation bodies and other public bodies to make representations to the Scottish Ministers about scoping opinions and EIA reports;</p></content></level><level class="para1" eId="section-25-2-g"><num>(g)</num><content><p>provision about time limits for the consultation bodies and other public bodies to enter into consultation with developers about, and to make available, information relevant to the preparation of EIA reports;</p></content></level><level class="para1" eId="section-25-2-h"><num>(h)</num><content><p>provision about time limits for developers to provide additional information to the Scottish Ministers;</p></content></level><level class="para1" eId="section-25-2-i"><num>(i)</num><content><p>provision about the publication by developers of the information listed in regulation 20(3) of the 2017 Regulations (information about additional information);</p></content></level><level class="para1" eId="section-25-2-j"><num>(j)</num><content><p>provision about making additional information available for inspection;</p></content></level><level class="para1" eId="section-25-2-k"><num>(k)</num><content><p>provision about the publication by developers of the information listed in regulation 23(2) of the 2017 Regulations (information about decisions);</p></content></level><level class="para1" eId="section-25-2-l"><num>(l)</num><content><p>provision that the Secretary of State or the Scottish Ministers consider appropriate for securing that the procedures under the 2017 Regulations operate effectively, or more effectively, alongside the procedures under regulations made under section 36C of the Electricity Act 1989 or paragraph <ref href="#d25e3890">1A</ref> or <ref href="#d25e4298">7B</ref> of Schedule 8 to that Act (inserted by section <ref href="#section-19">19</ref> of this Act).</p></content></level></subsection><subsection eId="section-25-3"><num>(3)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations amend the 2017 Regulations by making provision described in subsection <ref href="#section-25-4">(4)</ref> in connection with environmental impact assessments and applications made to the Scottish Ministers for variation of consent granted under section 37 of the Electricity Act 1989.</p></content></subsection><subsection eId="section-25-4"><num>(4)</num><intro><p>That provision is—</p></intro><level class="para1" eId="section-25-4-a"><num>(a)</num><intro><p>provision requiring an environmental impact assessment in respect of the proposed variation to be carried out before Scottish Ministers—</p></intro><level class="para2" eId="section-25-4-a-i"><num>(i)</num><content><p>vary the consent, or</p></content></level><level class="para2" eId="section-25-4-a-ii"><num>(ii)</num><content><p>direct that planning permission is deemed to be granted under section 57(2) or (2ZA) of the Town and Country Planning (Scotland) Act 1997 in respect of EIA development;</p></content></level></level><level class="para1" eId="section-25-4-b"><num>(b)</num><content><p>provision requiring the Scottish Ministers to take the environmental information into account when carrying out an environmental impact assessment in respect of the proposed variation;</p></content></level><level class="para1" eId="section-25-4-c"><num>(c)</num><content><p>provision applying provisions of the 2017 Regulations (including provisions amended by regulations under subsection <ref href="#section-25-1">(1)</ref>), with or without modifications;</p></content></level><level class="para1" eId="section-25-4-d"><num>(d)</num><content><p>provision that the Secretary of State or the Scottish Ministers consider appropriate for securing that the procedures under the 2017 Regulations operate effectively, or more effectively, alongside the procedures under regulations made under section <ref href="#d25e4384">37A</ref> of the Electricity Act 1989 (inserted by section <ref href="#section-20">20</ref> of this Act).</p></content></level></subsection><subsection eId="section-25-5"><num>(5)</num><intro><p>Regulations under this section may—</p></intro><level class="para1" eId="section-25-5-a"><num>(a)</num><content><p>make different provision for different purposes or different areas;</p></content></level><level class="para1" eId="section-25-5-b"><num>(b)</num><content><p>make consequential or supplementary provision;</p></content></level><level class="para1" eId="section-25-5-c"><num>(c)</num><content><p>make transitional provision.</p></content></level></subsection><subsection eId="section-25-6"><num>(6)</num><content><p>Regulations under this section made by the Secretary of State are to be made by statutory instrument.</p></content></subsection><subsection eId="section-25-7"><num>(7)</num><content><p>A statutory instrument containing regulations made by the Secretary of State under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-25-8"><num>(8)</num><content><p>Before making regulations under this section, the Secretary of State must consult the Scottish Ministers.</p></content></subsection><subsection eId="section-25-9"><num>(9)</num><content><p>For regulations under this section made by the Scottish Ministers, see section 27 of the Interpretation and Legislative Reform (Scotland) Act <ref eId="c00046" href="http://www.legislation.gov.uk/id/asp/2010/10">2010 (asp 10)</ref> (Scottish statutory instruments).</p></content></subsection><subsection eId="section-25-10"><num>(10)</num><content><p>Regulations made by the Scottish Ministers under this section are subject to the negative procedure (see section 28 of the Interpretation and Legislative Reform (Scotland) Act <ref eId="c00047" href="http://www.legislation.gov.uk/id/asp/2010/10">2010 (asp 10)</ref>).</p></content></subsection><subsection eId="section-25-11"><num>(11)</num><content><p>Before making regulations under this section, the Scottish Ministers must consult the Secretary of State.</p></content></subsection><subsection eId="section-25-12"><num>(12)</num><intro><p>In this section, subject to subsection <ref href="#section-25-13">(13)</ref>, the following terms have the same meaning as they have in the 2017 Regulations—</p></intro><hcontainer name="definition"><content><p>“additional information”</p></content></hcontainer><hcontainer name="definition"><content><p>“the consultation bodies”</p></content></hcontainer><hcontainer name="definition"><content><p>“developer”</p></content></hcontainer><hcontainer name="definition"><content><p>“EIA development”</p></content></hcontainer><hcontainer name="definition"><content><p>“EIA report”</p></content></hcontainer><hcontainer name="definition"><content><p>“environmental impact assessment”</p></content></hcontainer><hcontainer name="definition"><content><p>“environmental information”</p></content></hcontainer><hcontainer name="definition"><content><p>“Schedule 2 development”</p></content></hcontainer><hcontainer name="definition"><content><p>“scoping opinion”</p></content></hcontainer><hcontainer name="definition"><content><p>“screening opinion”.</p></content></hcontainer></subsection><subsection eId="section-25-13"><num>(13)</num><content><p>In subsections <ref href="#section-25-3">(3)</ref> and <ref href="#section-25-4">(4)</ref>, those terms have the same meaning in connection with applications for variation of consent granted under section 37 of the Electricity Act 1989 as they have, in the 2017 Regulations, in connection with applications for variation of consent granted under section 36 of that Act.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-long-duration-electricity-storage"><heading>Long duration electricity storage</heading><section eId="section-26"><num>26</num><heading>Long duration electricity storage</heading><content><p><mod>In the Electricity Act 1989, after <ref eId="c00048" href="https://www.legislation.gov.uk/ukpga/1989/29/section/10O">section 10O</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Long duration electricity storage</heading><section><num>10P</num><heading>Long duration electricity storage</heading><subsection><num>(1)</num><content><p>The Authority must, as soon as reasonably practicable after this section comes into force, establish and operate a scheme in accordance with this section.</p></content></subsection><subsection><num>(2)</num><content><p>The scheme must be designed for the purpose of encouraging the development and use of long duration electricity storage installations.</p></content></subsection><subsection><num>(3)</num><intro><p>The scheme must be open to persons who—</p></intro><level class="para1"><num>(a)</num><content><p>hold or intend to apply for a generation licence to operate a long duration electricity storage installation, and</p></content></level><level class="para1"><num>(b)</num><content><p>meet any other specified criteria.</p></content></level></subsection><subsection eId="d25e5416"><num>(4)</num><intro><p>The scheme must provide for an LDES operator who operates an approved installation—</p></intro><level class="para1"><num>(a)</num><content><p>to receive payments from a holder of an electricity system operator licence where the operator’s assessed revenue from that installation is below a specified amount, in specified circumstances, and</p></content></level><level class="para1"><num>(b)</num><content><p>to make payments to a holder of an electricity system operator licence where the operator’s assessed revenue from that installation is above a specified amount, in specified circumstances.</p></content></level></subsection><subsection><num>(5)</num><intro><p>In subsection <ref href="#d25e5416">(4)</ref>—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-an-approved-installation">an approved installation</term>” means a long duration electricity storage installation which is approved by the Authority for the purposes of subsection <ref href="#d25e5416">(4)</ref> in accordance with the scheme;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-assessed-revenue">assessed revenue</term>”, in relation to a long duration electricity storage installation, means the difference between—</p></intro><level class="para1"><num>(a)</num><content><p>revenue of a specified kind earned or derived in connection with that installation, and</p></content></level><level class="para1"><num>(b)</num><content><p>costs of a specified kind incurred in connection with operating the installation.</p></content></level></hcontainer></subsection><subsection><num>(6)</num><content><p>The Authority may determine how costs and revenue are to be calculated for the purposes of the scheme.</p></content></subsection><subsection><num>(7)</num><content><p>In setting charges to which Article 18(1) of the Electricity Regulation applies, the holder of an electricity system operator licence may take account of payments it makes or receives under the scheme.</p></content></subsection><subsection><num>(8)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-ldes-operator">LDES operator</term>” means a person who, under a generation licence, generates electricity by means of a long duration electricity storage installation;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-long-duration-electricity-storage-installation">long duration electricity storage installation</term>” means an installation that—</p></intro><level class="para1"><num>(a)</num><content><p>generates electricity from stored energy,</p></content></level><level class="para1"><num>(b)</num><content><p>has an electricity generating capacity of not less than 50 megawatts, and</p></content></level><level class="para1"><num>(c)</num><content><p>is capable of generating electricity at its full capacity for a continuous period of not less than eight hours;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-specified">specified</term>” means specified by the Authority for the purposes of the scheme in—</p></intro><level class="para1"><num>(a)</num><content><p>a document published by the Authority, or</p></content></level><level class="para1"><num>(b)</num><content><p>a condition of a licence;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-stored-energy">stored energy</term>” has the meaning given by section 4(3ZB).</p></content></hcontainer></subsection><subsection><num>(9)</num><intro><p>The Secretary of State may by regulations amend the definition of “long duration electricity storage installation” by substituting—</p></intro><level class="para1"><num>(a)</num><content><p>for the amount of electricity generating capacity for the time being mentioned in <ref href="#d25e5508">paragraph (b)</ref> of the definition, a different amount;</p></content></level><level class="para1"><num>(b)</num><content><p>for the period for the time being mentioned in <ref href="#d25e5512">paragraph (c)</ref> of the definition, a different period (which may not be less than eight hours).</p></content></level></subsection></section></hcontainer></quotedStructure></mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-consumer-benefits"><heading>Consumer benefits</heading><section eId="section-27"><num>27</num><heading>Benefits for homes near electricity transmission projects</heading><subsection eId="section-27-1"><num>(1)</num><content><p>The Electricity Act 1989 is amended as follows.</p></content></subsection><subsection eId="section-27-2"><num>(2)</num><content><p><mod>After section 38 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Benefits resulting from proximity to new or upgraded transmission infrastructure</heading><section eId="d25e5593"><num>38A</num><heading>Power to establish scheme for giving of benefits</heading><subsection eId="d25e5597"><num>(1)</num><content><p>The Secretary of State may by regulations establish a scheme under which persons with a specified connection to qualifying premises are entitled to financial benefits provided (directly or indirectly) by electricity suppliers.</p></content></subsection><subsection><num>(2)</num><content><p>Qualifying premises must be identified by reference to their proximity to qualifying works.</p></content></subsection><subsection><num>(3)</num><intro><p>Qualifying works must involve the construction, erection, expansion or improvement of electrical plant or an electric line that (in either case)—</p></intro><level class="para1"><num>(a)</num><content><p>is wholly or partly above the ground, and</p></content></level><level class="para1"><num>(b)</num><content><p>forms or is intended to form part of a transmission system.</p></content></level><wrapUp><p>They may be works that took place before the making of the regulations or the coming into force of this section.</p></wrapUp></subsection><subsection eId="d25e5630"><num>(4)</num><intro><p>The regulations may (among other things)—</p></intro><level class="para1"><num>(a)</num><content><p>make further provision determining, or for the determination of, whether premises or works are qualifying;</p></content></level><level class="para1"><num>(b)</num><content><p>confer functions in connection with the scheme;</p></content></level><level class="para1"><num>(c)</num><content><p>provide for the delegation of functions conferred in connection with the scheme;</p></content></level><level class="para1"><num>(d)</num><content><p>provide for payments by electricity suppliers to meet costs incurred in the carrying out of functions in connection with the scheme;</p></content></level><level class="para1"><num>(e)</num><content><p>provide for the costs of electricity suppliers under the scheme to be distributed among suppliers on such basis, and by such means, as the regulations provide;</p></content></level><level class="para1"><num>(f)</num><content><p>restrict a person’s ability to obtain payment of an amount standing to the credit of the person’s account with an electricity supplier, where that amount derives from benefits under the scheme;</p></content></level><level class="para1"><num>(g)</num><content><p>make provision about cases in which a person who has received benefits under the scheme in respect of premises ceases to be entitled under the scheme in respect of the premises, including provision for the withdrawal or recovery of the benefits;</p></content></level><level class="para1" eId="d25e5678"><num>(h)</num><content><p>make pass-through provision and associated provision (see section <ref href="#d25e5753">38B</ref>);</p></content></level><level class="para1" eId="d25e5687"><num>(i)</num><content><p>make enforcement provision (see section <ref href="#d25e5864">38C</ref>);</p></content></level><level class="para1" eId="d25e5696"><num>(j)</num><content><p>make information provision (see section <ref href="#d25e5952">38D</ref>).</p></content></level></subsection><subsection><num>(5)</num><intro><p>To the extent that this section enables provision to be made affecting the holders of licences, provision for that purpose may be made by modifying, or empowering or requiring the Authority to modify—</p></intro><level class="para1"><num>(a)</num><content><p>the conditions of a licence, or</p></content></level><level class="para1"><num>(b)</num><content><p>a document maintained in accordance with the conditions of a licence, or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="d25e5723"><num>(6)</num><content><p>A statutory instrument containing regulations under this section may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection><num>(7)</num><content><p>A draft laid under subsection <ref href="#d25e5723">(6)</ref> is not to be treated as a hybrid instrument for the purposes of the standing orders of either House of Parliament.</p></content></subsection><subsection><num>(8)</num><content><p>Regulations under this section bind the Crown unless they provide otherwise.</p></content></subsection><subsection><num>(9)</num><content><p>The Secretary of State may, out of money provided by Parliament, make payments to a person on whom functions are conferred by regulations under this section for the purposes of meeting (or helping to meet) the expenses of carrying out those functions.</p></content></subsection></section><section eId="d25e5753"><num>38B</num><heading>Passing of benefits to ultimate consumer</heading><subsection><num>(1)</num><content><p>This section applies for the purposes of section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5678">(h)</ref>.</p></content></subsection><subsection eId="d25e5770"><num>(2)</num><intro><p>“Pass-through provision” is provision that—</p></intro><level class="para1" eId="d25e5776"><num>(a)</num><intro><p>applies where—</p></intro><level class="para2"><num>(i)</num><content><p>one person (“the intermediary”) receives benefits under the scheme in connection with qualifying premises, and</p></content></level><level class="para2" eId="d25e5788"><num>(ii)</num><content><p>another person (“the end-user”) who is not living as part of the same household as the intermediary consumes electricity supplied to the premises, and</p></content></level></level><level class="para1" eId="d25e5794"><num>(b)</num><content><p>requires the intermediary to pass on the substance of those benefits to the end-user.</p></content></level></subsection><subsection><num>(3)</num><intro><p>“<term refersTo="#term-associated-provision">Associated provision</term>” means provision that relates to pass-through provision and—</p></intro><level class="para1"><num>(a)</num><content><p>requires intermediaries to take steps to obtain benefits that will be subject to the requirement referred to in subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5794">(b)</ref>,</p></content></level><level class="para1"><num>(b)</num><content><p>requires intermediaries to supply information to end-users,</p></content></level><level class="para1"><num>(c)</num><content><p>provides for the making of payments to intermediaries (in addition to the provision of benefits of the sort mentioned in section <ref href="#d25e5593">38A</ref><ref href="#d25e5597">(1)</ref>), or</p></content></level><level class="para1"><num>(d)</num><content><p>provides for the withdrawal or recovery of benefits given or other payments made to intermediaries who fail to comply with the requirement referred to in subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5794">(b)</ref>.</p></content></level></subsection><subsection><num>(4)</num><content><p>For the purposes of subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5776">(a)</ref><ref href="#d25e5788">(ii)</ref>, the cases in which electricity is consumed by a person include those in which the electricity is used to make available to the person heating, cooling, hot water or energy.</p></content></subsection></section><section eId="d25e5864"><num>38C</num><heading>Enforcement of benefit scheme</heading><subsection eId="d25e5868"><num>(1)</num><intro><p>In section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5687">(i)</ref>, “<term refersTo="#term-enforcement-provision">enforcement provision</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>provision for the enforcement in civil proceedings of requirements under the scheme,</p></content></level><level class="para1"><num>(b)</num><intro><p>provision for a person to impose a monetary penalty where the person is satisfied on the balance of probabilities that—</p></intro><level class="para2"><num>(i)</num><content><p>a requirement under the regulations has not been complied with, or</p></content></level><level class="para2"><num>(ii)</num><content><p>benefits or other payments under the scheme have been wrongfully obtained, or</p></content></level></level><level class="para1" eId="d25e5908"><num>(c)</num><content><p>provision for complaints procedures, dispute resolution, adjudication, appeals or redress in connection with the scheme.</p></content></level></subsection><subsection><num>(2)</num><content><p>If regulations under section <ref href="#d25e5593">38A</ref> provide for the imposition of monetary penalties, they must provide a right of appeal to a court or tribunal on grounds including both error of fact and error of law.</p></content></subsection><subsection eId="d25e5923"><num>(3)</num><content><p>The provision that may be made by virtue of subsection <ref href="#d25e5868">(1)</ref><ref href="#d25e5908">(c)</ref> includes provision for Part 2 of the Consumers, Estate Agents and Redress Act 2007 (complaints handling and redress schemes) to apply (with or without modifications) to end-user complaints as it applies to consumer complaints within the meaning of that Part.</p></content></subsection><subsection><num>(4)</num><content><p>In subsection <ref href="#d25e5923">(3)</ref>, “<term refersTo="#term-end-user-complaints">end-user complaints</term>” means complaints in connection with pass-through provision made by end-users against intermediaries or electricity suppliers (with the definitions in section <ref href="#d25e5753">38B</ref> applying for the purposes of this subsection).</p></content></subsection></section><section eId="d25e5952"><num>38D</num><heading>Disclosure and use of information in connection with benefit scheme</heading><subsection><num>(1)</num><content><p>In section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5696">(j)</ref>, “<term refersTo="#term-information-provision">information provision</term>” means provision within subsection <ref href="#d25e5978">(2)</ref> or <ref href="#d25e6020">(3)</ref>.</p></content></subsection><subsection eId="d25e5978"><num>(2)</num><intro><p>Provision is within this subsection if it is provision for the disclosure of information or evidence for the purposes of—</p></intro><level class="para1"><num>(a)</num><content><p>identifying persons entitled to benefits under the scheme,</p></content></level><level class="para1"><num>(b)</num><content><p>identifying qualifying premises or qualifying works,</p></content></level><level class="para1"><num>(c)</num><content><p>checking whether requirements under, or resulting from, the regulations are being or have been complied with,</p></content></level><level class="para1"><num>(d)</num><content><p>checking payments made under the scheme,</p></content></level><level class="para1"><num>(e)</num><content><p>facilitating the performance of functions conferred, or the enforcement of duties imposed, by or as a result of the regulations, or</p></content></level><level class="para1"><num>(f)</num><content><p>evaluating the performance of the scheme.</p></content></level></subsection><subsection eId="d25e6020"><num>(3)</num><intro><p>Provision is within this subsection if it is provision about the use or further disclosure of information disclosed—</p></intro><level class="para1"><num>(a)</num><content><p>further to provision within subsection <ref href="#d25e5978">(2)</ref>, or</p></content></level><level class="para1"><num>(b)</num><content><p>otherwise in connection with the scheme.</p></content></level></subsection><subsection><num>(4)</num><content><p>The provision that may be made by virtue of subsection <ref href="#d25e6020">(3)</ref> includes provision making it an offence to use or disclose information in an unauthorised manner; but such an offence may not be made punishable by imprisonment.</p></content></subsection><subsection><num>(5)</num><intro><p>Regulations under section <ref href="#d25e5593">38A</ref> that authorise the use or disclosure of information are not to be taken to authorise disclosure or use that would be liable to harm the commercial interests of any person, except to the extent that—</p></intro><level class="para1"><num>(a)</num><content><p>the regulations otherwise provide, or</p></content></level><level class="para1"><num>(b)</num><content><p>the person disclosing or using the information reasonably considers such disclosure or use necessary in view of the purpose of the regulations.</p></content></level></subsection><subsection eId="d25e6071"><num>(6)</num><intro><p>Regulations under section <ref href="#d25e5593">38A</ref> do not require or authorise the disclosure or use of information that—</p></intro><level class="para1"><num>(a)</num><content><p>contravenes the data protection legislation (but this section and the regulations are to be taken into account in determining whether the disclosure or use would contravene that legislation), or</p></content></level><level class="para1"><num>(b)</num><content><p>is prohibited by any of Parts 1 to 7 and Chapter 1 of Part 9 of the Investigatory Powers Act 2016.</p></content></level></subsection><subsection><num>(7)</num><content><p>In subsection <ref href="#d25e6071">(6)</ref>, “<term refersTo="#term-the-data-protection-legislation">the data protection legislation</term>” has the same meaning as in the Data Protection Act 2018 (see section 3 of that Act).</p></content></subsection></section></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-27-3"><num>(3)</num><content><p><mod>In section 106 (regulations and orders under the Act), in subsection <ref href="#d25e4853">(2ZA)</ref> (inserted by section <ref href="#section-23">23</ref><ref href="#section-23-3">(3)</ref>), after paragraph <ref href="#d25e4859">(a)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(b)</num><content><p>regulations under section <ref href="#d25e5593">38A</ref>.</p></content></level></quotedStructure></mod></p></content></subsection><subsection eId="section-27-4"><num>(4)</num><content><p><mod>In paragraph 6 of Schedule 6A (requirements enforceable against suppliers under section 25), before sub-paragraph (a) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(za)</num><content><p>any provision of regulations under section <ref href="#d25e5593">38A</ref> that is designated in the regulations as a relevant provision for the purposes of this paragraph;</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-electricity-transmission-period"><heading>Electricity transmission period</heading><section eId="section-28"><num>28</num><heading>Electricity transmission systems: extension of commissioning period</heading><content><p><mod>In <ref eId="c00049" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">section 6G</ref><ref eId="c00050" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">(1)</ref> of the <ref eId="c00051" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (meaning of “<term refersTo="#term-commissioning-period" eId="term-commissioning-period">commissioning period</term>” for the purposes of determining whether a person is to be regarded as participating in the transmission of electricity), in <ref eId="c00052" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">paragraph (b)</ref>, for “18 months” substitute <quotedText>“27 months”</quotedText>.</mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-electricity-generation-on-forestry-land"><heading>Electricity generation on forestry land</heading><section eId="section-29"><num>29</num><heading>Use of forestry estate for renewable electricity</heading><content><p><mod>In the Forestry Act 1967, after section 3 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e6197"><num>3A</num><heading>Use of land in connection with renewable electricity projects</heading><subsection eId="d25e6201"><num>(1)</num><intro><p>The Commissioners may—</p></intro><level class="para1"><num>(a)</num><content><p>use, or enter into arrangements in connection with the use of, English forestry land for the generation, storage, transmission or supply of renewable electricity;</p></content></level><level class="para1"><num>(b)</num><content><p>sell, or enter into other arrangements concerning, renewable electricity generated, stored or supplied on, or transmitted across, English forestry land;</p></content></level><level class="para1" eId="d25e6219"><num>(c)</num><intro><p>use, or enter into arrangements in connection with the use of, English forestry land for activity that—</p></intro><level class="para2"><num>(i)</num><content><p>is intended to satisfy, or enable the satisfaction of, a relevant condition of development (whether existing or contemplated), or</p></content></level><level class="para2"><num>(ii)</num><content><p>otherwise arises in connection with such a condition.</p></content></level></level></subsection><subsection><num>(2)</num><intro><p>For the purposes of subsection <ref href="#d25e6201">(1)</ref><ref href="#d25e6219">(c)</ref>, a relevant condition of development is a condition of development that—</p></intro><level class="para1"><num>(a)</num><content><p>relates to renewable electricity development located wholly or partly on English forestry land, and</p></content></level><level class="para1"><num>(b)</num><content><p>is intended to benefit the natural environment of land.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The exercise of the powers in subsection <ref href="#d25e6201">(1)</ref> for either of the following purposes is to be taken to be consistent with the Commissioners’ general duty under section 1(2)—</p></intro><level class="para1"><num>(a)</num><content><p>facilitating or promoting the use of renewable electricity;</p></content></level><level class="para1"><num>(b)</num><content><p>obtaining funds for meeting the expenses referred to in section 41(2).</p></content></level></subsection><subsection><num>(4)</num><content><p>When the Commissioners are considering the exercise of those powers, section 1(3A) applies as if it included a further paragraph referring to those purposes.</p></content></subsection><subsection><num>(5)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-condition-of-development">condition of development</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a condition to which planning permission is subject, or</p></content></level><level class="para1"><num>(b)</num><content><p>a requirement contained in an order granting development consent under the Planning Act 2008 (development consent for nationally significant infrastructure);</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-english-forestry-land">English forestry land</term>” means land placed at the disposal of the Commissioners under this Act;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-natural-environment">natural environment</term>”, in relation to land, includes—</p></intro><level class="para1"><num>(a)</num><content><p>its plants, animals and other living organisms,</p></content></level><level class="para1"><num>(b)</num><content><p>their habitats, and</p></content></level><level class="para1"><num>(c)</num><content><p>its geological features;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-renewable-electricity">renewable electricity</term>” means electricity produced from sources other than—</p></intro><level class="para1"><num>(a)</num><content><p>coal,</p></content></level><level class="para1"><num>(b)</num><content><p>lignite,</p></content></level><level class="para1"><num>(c)</num><content><p>peat,</p></content></level><level class="para1"><num>(d)</num><content><p>natural gas, within the meaning of the Energy Act 1976,</p></content></level><level class="para1"><num>(e)</num><content><p>crude liquid petroleum,</p></content></level><level class="para1"><num>(f)</num><content><p>petroleum products, within the meaning of the Energy Act 1976,</p></content></level><level class="para1"><num>(g)</num><content><p>any substance produced directly or indirectly from a substance within paragraphs <ref href="#d25e6345">(a)</ref> to <ref href="#d25e6365">(f)</ref>,</p></content></level><level class="para1"><num>(h)</num><content><p>energy derived from any substance within paragraphs <ref href="#d25e6345">(a)</ref> to <ref href="#d25e6369">(g)</ref>, or</p></content></level><level class="para1"><num>(i)</num><content><p>nuclear fuel;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-renewable-electricity-development">renewable electricity development</term>” means development the main purpose of which is the generation, storage, transmission or supply of renewable electricity.</p></content></hcontainer></subsection><subsection eId="d25e6400"><num>(6)</num><content><p>References in this section to the storage of electricity are to the storage of energy converted from electricity for the purpose of its reconversion into electricity.</p></content></subsection></section><section eId="d25e6412"><num>3B</num><heading>Section <ref href="#d25e6197">3A</ref>: power to require Secretary of State’s consent in certain cases</heading><subsection eId="d25e6416"><num>(1)</num><content><p>The Secretary of State may make regulations that, in a case within subsection <ref href="#d25e6428">(2)</ref>, require the consent of the Secretary of State to an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>.</p></content></subsection><subsection eId="d25e6428"><num>(2)</num><intro><p>The cases are those where—</p></intro><level class="para1"><num>(a)</num><content><p>a proposed exercise of the powers is intended to enable the construction on English forestry land of the whole or part of a generating station (including an extension to an existing station), and</p></content></level><level class="para1"><num>(b)</num><content><p>the capacity threshold is exceeded.</p></content></level></subsection><subsection><num>(3)</num><content><p>In the case of the construction of a new generating station, the capacity threshold is exceeded if it is expected that the generating capacity of the station would equal or exceed the relevant wattage.</p></content></subsection><subsection eId="d25e6452"><num>(4)</num><intro><p>In the case of an extension to an existing station, the capacity threshold is exceeded if it is expected that—</p></intro><level class="para1"><num>(a)</num><content><p>the extension would cause the generating capacity of the station to equal or exceed the relevant wattage, or</p></content></level><level class="para1" eId="d25e6464"><num>(b)</num><content><p>the extension, whether alone or taken together with previous non-consented extensions, would increase the generating capacity of the station by at least the relevant wattage.</p></content></level></subsection><subsection><num>(5)</num><intro><p>An extension is “<term refersTo="#term-non-consented">non-consented</term>” for the purposes of subsection <ref href="#d25e6452">(4)</ref><ref href="#d25e6464">(b)</ref> if—</p></intro><level class="para1"><num>(a)</num><content><p>it was enabled by an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>, and</p></content></level><level class="para1"><num>(b)</num><content><p>that exercise of those powers did not have the consent of the Secretary of State under regulations under subsection <ref href="#d25e6416">(1)</ref>.</p></content></level></subsection><subsection><num>(6)</num><intro><p>But an extension ceases to be “non-consented” for those purposes if—</p></intro><level class="para1"><num>(a)</num><content><p>a subsequent extension to the station in question is constructed having been enabled by an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>, and</p></content></level><level class="para1"><num>(b)</num><content><p>that exercise of those powers had the consent of the Secretary of State under regulations under subsection <ref href="#d25e6416">(1)</ref>.</p></content></level></subsection><subsection><num>(7)</num><intro><p>The relevant wattage is—</p></intro><level class="para1"><num>(a)</num><content><p>5 megawatts, if the station generates electricity from wind, and</p></content></level><level class="para1"><num>(b)</num><content><p>50 megawatts, if it does not.</p></content></level></subsection><subsection eId="d25e6544"><num>(8)</num><content><p>The Secretary of State may by regulations amend this section so as to change the relevant wattage (including by adding or combining categories of station in relation to which a particular wattage is prescribed).</p></content></subsection><subsection><num>(9)</num><intro><p>In calculating the relevant wattage there is to be disregarded—</p></intro><level class="para1"><num>(a)</num><content><p>in the case of a generating station only partly situated on English forestry land, any generating capacity that can be attributed to parts not situated on English forestry land;</p></content></level><level class="para1"><num>(b)</num><content><p>in the case of a generating station whose capacity is provided in part by facilities for the storage of electricity and in part by other means, the capacity provided by those facilities.</p></content></level></subsection><subsection><num>(10)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-generating-station">generating station</term>” has the same meaning as in Part 1 of the Electricity Act 1989 (see section 64(1));</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-storage">storage</term>” is to be read in accordance with section <ref href="#d25e6197">3A</ref><ref href="#d25e6400">(6)</ref>.</p></content></hcontainer></subsection></section><section><num>3C</num><heading>Regulations under section <ref href="#d25e6412">3B</ref>: further provision</heading><subsection><num>(1)</num><intro><p>Regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6416">(1)</ref> may—</p></intro><level class="para1"><num>(a)</num><content><p>make provision about the process by which consent is to be sought and given or refused;</p></content></level><level class="para1"><num>(b)</num><content><p>provide for consent to be given subject to conditions.</p></content></level></subsection><subsection><num>(2)</num><intro><p>Regulations under section <ref href="#d25e6412">3B</ref> may—</p></intro><level class="para1"><num>(a)</num><content><p>make different provision for different purposes or areas;</p></content></level><level class="para1"><num>(b)</num><content><p>include consequential, incidental, supplementary, transitional or saving provision.</p></content></level></subsection><subsection><num>(3)</num><content><p>Regulations under section <ref href="#d25e6412">3B</ref> are to be made by statutory instrument.</p></content></subsection><subsection><num>(4)</num><content><p>A statutory instrument containing (whether alone or with other provision) regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6544">(8)</ref> may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection><num>(5)</num><content><p>A statutory instrument containing regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6416">(1)</ref> (but not regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6544">(8)</ref>) is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection></section></quotedStructure></mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-wind-generating-stations-and-seismic-array-systems"><heading>Wind generating stations and seismic array systems</heading><section eId="section-30"><num>30</num><heading>Wind generating stations that may affect seismic array systems</heading><subsection eId="section-30-1"><num>(1)</num><content><p>The Secretary of State may make regulations about planning permissions or consents relating to wind generating stations that may affect the functioning of a relevant seismic array system.</p></content></subsection><subsection eId="section-30-2"><num>(2)</num><intro><p>A “relevant seismic array system” is a spatially distributed system of linked seismometers, arranged so as to enhance the detection and characterisation of seismic signals, that—</p></intro><level class="para1" eId="section-30-2-a"><num>(a)</num><content><p>is used for defence purposes, and</p></content></level><level class="para1" eId="section-30-2-b"><num>(b)</num><content><p>is in use on the day on which this Act is passed.</p></content></level></subsection><subsection eId="section-30-3"><num>(3)</num><intro><p>The regulations may provide for—</p></intro><level class="para1" eId="section-30-3-a"><num>(a)</num><content><p>an exclusion zone, and</p></content></level><level class="para1" eId="section-30-3-b"><num>(b)</num><content><p>a restricted zone,</p></content></level><wrapUp><p>around a relevant seismic array system.</p></wrapUp></subsection><subsection eId="section-30-4"><num>(4)</num><intro><p>The regulations may—</p></intro><level class="para1" eId="section-30-4-a"><num>(a)</num><content><p>require a planning decision-maker to refuse, or decline to determine or accept, a planning application relating to a wind generating station that is (or would be) situated in an exclusion zone;</p></content></level><level class="para1" eId="section-30-4-b"><num>(b)</num><content><p>provide that a relevant development order or MCA scheme may not be made if it would grant planning permission for development relating to a wind generating station that is (or would be) situated in an exclusion zone;</p></content></level><level class="para1" eId="section-30-4-c"><num>(c)</num><content><p>allow the Secretary of State to direct that a relevant development order or MCA scheme may not be made if it would grant such planning permission.</p></content></level></subsection><subsection eId="section-30-5"><num>(5)</num><intro><p>The regulations may, in relation to a planning application relating to a wind generating station that is (or would be) situated in a restricted zone—</p></intro><level class="para1" eId="section-30-5-a"><num>(a)</num><content><p>require the applicant to provide specified information about the seismic impact of the proposals (“seismic impact information”) to which their application relates;</p></content></level><level class="para1" eId="section-30-5-b"><num>(b)</num><content><p>require the planning decision-maker to use the seismic impact information in a specified way when determining the application (including when determining conditions relating to a permission or consent);</p></content></level><level class="para1" eId="section-30-5-c"><num>(c)</num><content><p>require the planning decision-maker to refuse, or decline to determine or accept, the application in specified circumstances;</p></content></level><level class="para1" eId="section-30-5-d"><num>(d)</num><content><p>require the planning decision-maker to provide the Secretary of State with the seismic impact information, and to seek the Secretary of State’s views on the seismic impact of the proposals;</p></content></level><level class="para1" eId="section-30-5-e"><num>(e)</num><content><p>require the planning decision-maker to refuse, or decline to determine or accept, the application if the Secretary of State objects to it on grounds relating to the seismic impact of the proposals.</p></content></level></subsection><subsection eId="section-30-6"><num>(6)</num><intro><p>The regulations may—</p></intro><level class="para1" eId="section-30-6-a"><num>(a)</num><content><p>require a person proposing to make a relevant development order or MCA scheme to consult the Secretary of State if the order or scheme would grant planning permission for development relating to a wind generating station that is (or would be) situated in a restricted zone;</p></content></level><level class="para1" eId="section-30-6-b"><num>(b)</num><content><p>allow the Secretary of State to direct that a relevant development order or MCA scheme may not be made if it would grant such planning permission.</p></content></level></subsection><subsection eId="section-30-7"><num>(7)</num><intro><p>The regulations may include provision about the procedure for planning applications to which they relate, such as—</p></intro><level class="para1" eId="section-30-7-a"><num>(a)</num><content><p>provision enabling or requiring a planning decision-maker to decline to determine or accept an application;</p></content></level><level class="para1" eId="section-30-7-b"><num>(b)</num><content><p>provision modifying the process for determining an application;</p></content></level><level class="para1" eId="section-30-7-c"><num>(c)</num><content><p>provision allowing the Secretary of State to give a direction to the planning-decision maker about the procedure for an application;</p></content></level><level class="para1" eId="section-30-7-d"><num>(d)</num><content><p>provision modifying or disapplying a right of appeal or review;</p></content></level><level class="para1" eId="section-30-7-e"><num>(e)</num><content><p>provision disapplying a duty imposed on a planning decision-maker when determining an application.</p></content></level></subsection><subsection eId="section-30-8"><num>(8)</num><content><p>The regulations may require a planning decision-maker to have regard to guidance issued by the Secretary of State.</p></content></subsection><subsection eId="section-30-9"><num>(9)</num><intro><p>Regulations under this section may—</p></intro><level class="para1" eId="section-30-9-a"><num>(a)</num><content><p>amend or repeal provision contained in an Act of Parliament or an Act of the Scottish Parliament;</p></content></level><level class="para1" eId="section-30-9-b"><num>(b)</num><content><p>make different provision for different purposes or areas;</p></content></level><level class="para1" eId="section-30-9-c"><num>(c)</num><content><p>make provision binding the Crown;</p></content></level><level class="para1" eId="section-30-9-d"><num>(d)</num><content><p>make transitional, transitory or saving provision;</p></content></level><level class="para1" eId="section-30-9-e"><num>(e)</num><content><p>make incidental, supplementary or consequential provision.</p></content></level></subsection><subsection eId="section-30-10"><num>(10)</num><content><p>Regulations under this section are to be made by statutory instrument.</p></content></subsection><subsection eId="section-30-11"><num>(11)</num><content><p>A statutory instrument containing regulations under this section which amend or repeal provision contained in an Act of Parliament or an Act of the Scottish Parliament may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection eId="section-30-12"><num>(12)</num><content><p>Any other statutory instrument containing regulations under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-30-13"><num>(13)</num><content><p>If a draft of a statutory instrument containing regulations under this section would, apart from this subsection, be treated for the purposes of the standing orders of either House of Parliament as a hybrid instrument, it is to proceed in that House as if it were not such an instrument.</p></content></subsection><subsection eId="section-30-14"><num>(14)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-mca-scheme" eId="term-mca-scheme">MCA scheme</term>” means a masterplan consent area scheme made under Part 3 of the Town and Country Planning (Scotland) Act 1997;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-planning-application" eId="term-planning-application">planning application</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>an application for planning permission under Part 3 or Part 13 of the Town and Country Planning Act 1990,</p></content></level><level class="para1"><num>(b)</num><content><p>an application for planning permission under Part 3 or Part 12 of the Town and Country Planning (Scotland) Act 1997,</p></content></level><level class="para1"><num>(c)</num><content><p>an application for an order granting development consent under section 37 of the Planning Act 2008, or</p></content></level><level class="para1"><num>(d)</num><content><p>an application under section 36 or 36C of the Electricity Act 1989 (consent for construction etc of generating station);</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-planning-decision-maker" eId="term-planning-decision-maker">planning decision-maker</term>” means a person who determines a planning application;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-development-order" eId="term-relevant-development-order">relevant development order</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a local development order made under section 61A of the Town and Country Planning Act 1990;</p></content></level><level class="para1"><num>(b)</num><content><p>a Mayoral development order made under section 61DA of that Act;</p></content></level><level class="para1"><num>(c)</num><content><p>a neighbourhood development order made under section 61E of that Act;</p></content></level><level class="para1"><num>(d)</num><content><p>a development order made under section 30 of the Town and Country Planning (Scotland) Act 1997;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-wind-generating-station" eId="term-wind-generating-station">wind generating station</term>” means a generating station that generates electricity from wind.</p></content></hcontainer></subsection></section></hcontainer></chapter> — Electricity transmission period
Part 1 — Infrastructure — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-2"><num>Chapter 2</num><heading>Electricity infrastructure</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-connections-to-the-electricity-transmission-and-distribution-systems"><heading>Connections to the electricity transmission and distribution systems</heading><section eId="section-14"><num>14</num><heading>Connections to electricity network: licence and other modifications</heading><subsection eId="section-14-1"><num>(1)</num><intro><p>A relevant authority may modify—</p></intro><level class="para1" eId="section-14-1-a"><num>(a)</num><content><p>the conditions of a particular electricity licence;</p></content></level><level class="para1" eId="section-14-1-b"><num>(b)</num><content><p>the terms of a particular electricity licence;</p></content></level><level class="para1" eId="section-14-1-c"><num>(c)</num><content><p>the standard conditions of electricity licences of a particular type;</p></content></level><level class="para1" eId="section-14-1-d"><num>(d)</num><content><p>a document maintained in accordance with the conditions of an electricity licence;</p></content></level><level class="para1" eId="section-14-1-e"><num>(e)</num><content><p>an agreement entered into in pursuance of a document maintained as mentioned in <ref href="#section-14-1-d">paragraph (d)</ref>;</p></content></level><level class="para1" eId="section-14-1-f"><num>(f)</num><content><p>a qualifying distribution agreement.</p></content></level></subsection><subsection eId="section-14-2"><num>(2)</num><content><p>A relevant authority may exercise the power under <ref href="#section-14-1">subsection (1)</ref> only for the purpose of improving the process for managing connections to the transmission system or the distribution system (and such an improvement may include changing the order in which connections are made).</p></content></subsection><subsection eId="section-14-3"><num>(3)</num><content><p>The Secretary of State may direct the GEMA to exercise the power under <ref href="#section-14-1">subsection (1)</ref>.</p></content></subsection><subsection eId="section-14-4"><num>(4)</num><content><p>The Secretary of State may exercise the power under <ref href="#section-14-3">subsection (3)</ref> only for the purpose mentioned in <ref href="#section-14-2">subsection (2)</ref>.</p></content></subsection><subsection eId="section-14-5"><num>(5)</num><content><p>The power conferred by <ref href="#section-14-1">subsection (1)</ref> may not be exercised after the end of the period of three years beginning with the day on which <ref href="#section-14">this section</ref> comes into force.</p></content></subsection><subsection eId="section-14-6"><num>(6)</num><content><p><ref eId="c00005" href="https://www.legislation.gov.uk/ukpga/1989/29/section/3A">Section 3A</ref> of the <ref eId="c00006" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (principal objective and general duties) applies in relation to the functions of the Secretary of State and the GEMA under <ref href="#section-14">this section</ref> and sections <ref href="#section-15">15</ref> to <ref href="#section-17">17</ref> as it applies in relation to functions of the Secretary of State or the GEMA under <ref eId="c00007" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of <ref eId="c00008" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">that Act</ref>.</p></content></subsection><subsection eId="section-14-7"><num>(7)</num><content><p>A relevant authority may under <ref href="#section-14-1">subsection (1)</ref> modify an agreement mentioned in <ref href="#section-14-1">subsection (1)</ref><ref href="#section-14-1-e">(e)</ref> or a qualifying distribution agreement even if the effect of the modification might amount to a repudiation of the agreement.</p></content></subsection><subsection eId="section-14-8"><num>(8)</num><intro><p>In <ref href="#section-14">this section</ref> and sections <ref href="#section-15">15</ref> to <ref href="#section-17">17</ref>—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-distribution-system" eId="term-distribution-system">distribution system</term>” has the same meaning as in <ref eId="c00009" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00010" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (see the definition of “distribute” in section 4(4) of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-electricity-distributor" eId="term-electricity-distributor">electricity distributor</term>” has the same meaning as in Part 1 of that Act (see section 6(9) of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-electricity-licence" eId="term-electricity-licence">electricity licence</term>” means a licence for the purposes of section 4 of that Act;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-gema" eId="term-the-gema">the GEMA</term>” means the Gas and Electricity Markets Authority;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-qualifying-distribution-agreement" eId="term-qualifying-distribution-agreement">qualifying distribution agreement</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>the terms subject to which a connection is made by an electricity distributor in pursuance of section 16(1) of the Electricity Act 1989, or</p></content></level><level class="para1"><num>(b)</num><content><p>a special connection agreement as defined by section 22(1) of that Act;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-relevant-authority" eId="term-relevant-authority">relevant authority</term>” means the Secretary of State or the GEMA;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-transmission-system" eId="term-transmission-system">transmission system</term>” has the same meaning as in <ref eId="c00011" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00012" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (see section 4(4) of that Act).</p></content></hcontainer></subsection></section><section eId="section-15"><num>15</num><heading>Scope of modification power under <ref href="#section-14">section 14</ref></heading><subsection eId="section-15-1"><num>(1)</num><content><p>The power conferred by <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> to “<term refersTo="#term-modify" eId="term-modify">modify</term>” includes power to amend, add to or remove (and, in particular, includes power to make a person a party to an agreement or to discharge a party from its obligations under an agreement); and references in <ref href="#section-14">section 14</ref>, <ref href="#section-15">this section</ref> and <ref href="#section-16">section 16</ref> to modification are to be construed accordingly.</p></content></subsection><subsection eId="section-15-2"><num>(2)</num><intro><p>The power conferred by <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref>—</p></intro><level class="para1" eId="section-15-2-a"><num>(a)</num><content><p>may be exercised generally, only in relation to specified cases, or subject to exceptions (including by making provision for a case to be excepted only so long as specified conditions are satisfied);</p></content></level><level class="para1" eId="section-15-2-b"><num>(b)</num><content><p>may be exercised differently for different purposes or areas;</p></content></level><level class="para1" eId="section-15-2-c"><num>(c)</num><content><p>includes power to make incidental, supplementary, consequential or transitional modifications.</p></content></level></subsection><subsection eId="section-15-3"><num>(3)</num><intro><p>Provision included in an electricity licence by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-a">(a)</ref> or <ref href="#section-14-1-c">(c)</ref>—</p></intro><level class="para1" eId="section-15-3-a"><num>(a)</num><content><p>may include provision of a kind mentioned in <ref eId="c00013" href="https://www.legislation.gov.uk/ukpga/1989/29/section/7">section 7</ref> of the <ref eId="c00014" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref>;</p></content></level><level class="para1" eId="section-15-3-b"><num>(b)</num><content><p>need not relate to the activities authorised by the licence.</p></content></level></subsection><subsection eId="section-15-4"><num>(4)</num><content><p>The modification under <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> of part of a standard condition of an electricity licence does not prevent any other part of the condition from continuing to be regarded as a standard condition for the purposes of <ref eId="c00015" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00016" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref>.</p></content></subsection><subsection eId="section-15-5"><num>(5)</num><content><p>If under <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> a relevant authority modifies the standard conditions of an electricity licence of a particular type, the GEMA must make the same modifications of those standard conditions for the purposes of their incorporation in electricity licences of that type granted after that time.</p></content></subsection><subsection eId="section-15-6"><num>(6)</num><content><p>Provision included in an electricity licence by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-b">(b)</ref> may in particular include provision about the circumstances in which the licence may be revoked or suspended.</p></content></subsection><subsection eId="section-15-7"><num>(7)</num><intro><p>Provision included in an agreement by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-e">(e)</ref> or <ref href="#section-14-1-f">(f)</ref> may in particular include provision—</p></intro><level class="para1" eId="section-15-7-a"><num>(a)</num><content><p>requiring specified conditions to be met before the taking of particular steps under the agreement;</p></content></level><level class="para1" eId="section-15-7-b"><num>(b)</num><content><p>about the procedure for varying the agreement.</p></content></level></subsection><subsection eId="section-15-8"><num>(8)</num><intro><p>In <ref eId="c00017" href="https://www.legislation.gov.uk/ukpga/2000/27/section/33">section 33</ref> of the <ref eId="c00018" href="https://www.legislation.gov.uk/ukpga/2000/27/contents">Utilities Act 2000</ref> (standard conditions of electricity licences), in <ref eId="c00019" href="https://www.legislation.gov.uk/ukpga/2000/27/section/33">subsection (1)</ref>—</p></intro><level class="para1" eId="section-15-8-a"><num>(a)</num><content><p>omit the “or” at the end of paragraph (k), and</p></content></level><level class="para1" eId="section-15-8-b"><num>(b)</num><content><p><mod>at the end insert <quotedText startQuote="&#x201C;">, or</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(m)</num><content><p>under <ref href="#section-14">section 14</ref> of the Planning and Infrastructure Act 2025.</p></content></level></quotedStructure></mod></p></content></level></subsection></section><section eId="section-16"><num>16</num><heading>Procedure relating to modifications under <ref href="#section-14">section 14</ref></heading><subsection eId="section-16-1"><num>(1)</num><intro><p>Before making a modification under <ref href="#section-14">section 14</ref>, a relevant authority must consult—</p></intro><level class="para1" eId="section-16-1-a"><num>(a)</num><content><p>the holder of any electricity licence proposed to be modified,</p></content></level><level class="para1" eId="section-16-1-b"><num>(b)</num><content><p>the Independent System Operator and Planner,</p></content></level><level class="para1" eId="section-16-1-c"><num>(c)</num><content><p>the GEMA or the Secretary of State (depending on which relevant authority is proposing to make the modification), and</p></content></level><level class="para1" eId="section-16-1-d"><num>(d)</num><content><p>such other persons as the relevant authority considers appropriate.</p></content></level></subsection><subsection eId="section-16-2"><num>(2)</num><content><p>Subsection <ref href="#section-16-1">(1)</ref> may be satisfied by consultation carried out before the passing of this Act (as well as by consultation carried out after that time).</p></content></subsection><subsection eId="section-16-3"><num>(3)</num><content><p>A relevant authority must publish details of any modifications made by it under <ref href="#section-14">section 14</ref> as soon as reasonably practicable after they are made.</p></content></subsection><subsection eId="section-16-4"><num>(4)</num><content><p>A relevant authority may exclude from publication under <ref href="#section-16-3">subsection (3)</ref> any information the publication of which would be likely to prejudice the commercial interests of any person.</p></content></subsection><subsection eId="section-16-5"><num>(5)</num><content><p>In <ref href="#section-16">this section</ref>, “<term refersTo="#term-the-independent-system-operator-and-planner" eId="term-the-independent-system-operator-and-planner">the Independent System Operator and Planner</term>” means the person for the time being designated under <ref eId="c00020" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">section 162</ref><ref eId="c00021" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">(1)</ref> of the <ref eId="c00022" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref>.</p></content></subsection></section><section eId="section-17"><num>17</num><heading>Directions to modify connection agreements</heading><subsection eId="section-17-1"><num>(1)</num><intro><p>A relevant authority may—</p></intro><level class="para1" eId="section-17-1-a"><num>(a)</num><content><p>direct the Independent System Operator and Planner (“the ISOP”) to modify an agreement entered into by the ISOP pursuant to a document maintained in accordance with the conditions of an electricity licence;</p></content></level><level class="para1" eId="section-17-1-b"><num>(b)</num><content><p>direct an electricity distributor to modify a qualifying distribution agreement entered into by the electricity distributor.</p></content></level></subsection><subsection eId="section-17-2"><num>(2)</num><content><p>A relevant authority may exercise the power conferred by <ref href="#section-17-1">subsection (1)</ref> only for the purpose of improving the process for managing connections to the transmission system or the distribution system (and such an improvement may include changing the order in which connections are made).</p></content></subsection><subsection eId="section-17-3"><num>(3)</num><content><p>A direction under subsection <ref href="#section-17-1">(1)</ref> must describe the kinds of modification to be made by the person to whom it is given.</p></content></subsection><subsection eId="section-17-4"><num>(4)</num><intro><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may also require the person to whom it is given to modify an agreement by including in it provision—</p></intro><level class="para1" eId="section-17-4-a"><num>(a)</num><content><p>requiring specified conditions to be met before the taking of particular steps under the agreement;</p></content></level><level class="para1" eId="section-17-4-b"><num>(b)</num><content><p>about the procedure for varying the agreement.</p></content></level></subsection><subsection eId="section-17-5"><num>(5)</num><content><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may be expressed as having effect generally, in relation to cases within a description specified in the direction, or in relation to a particular case.</p></content></subsection><subsection eId="section-17-6"><num>(6)</num><intro><p>Before giving a direction under subsection <ref href="#section-17-1">(1)</ref>, the relevant authority must consult—</p></intro><level class="para1" eId="section-17-6-a"><num>(a)</num><content><p>the person to whom it proposes to give the direction, and</p></content></level><level class="para1" eId="section-17-6-b"><num>(b)</num><content><p>such other persons as the relevant authority considers appropriate.</p></content></level></subsection><subsection eId="section-17-7"><num>(7)</num><content><p>Subsection <ref href="#section-17-6">(6)</ref> may be satisfied by consultation carried out before the passing of this Act (as well as by consultation carried out after that time).</p></content></subsection><subsection eId="section-17-8"><num>(8)</num><content><p>A relevant authority must publish details of any direction it gives under subsection <ref href="#section-17-1">(1)</ref> as soon as reasonably practicable after the direction is given.</p></content></subsection><subsection eId="section-17-9"><num>(9)</num><content><p>A relevant authority may exclude from publication under subsection <ref href="#section-17-8">(8)</ref> any information the publication of which would be likely to prejudice the commercial interests of any person.</p></content></subsection><subsection eId="section-17-10"><num>(10)</num><content><p>A person to whom a direction is given under <ref href="#section-17-1">subsection (1)</ref> must comply with it, even if the effect of a modification made to an agreement as a result of the direction might amount to a repudiation of the agreement.</p></content></subsection><subsection eId="section-17-11"><num>(11)</num><content><p>The power to give a direction under subsection <ref href="#section-17-1">(1)</ref> may not be exercised after the end of the period of three years beginning with the day on which this section comes into force.</p></content></subsection><subsection eId="section-17-12"><num>(12)</num><content><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may be varied or revoked by a subsequent direction given by a relevant authority.</p></content></subsection><subsection eId="section-17-13"><num>(13)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-the-independent-system-operator-and-planner" eId="term-the-independent-system-operator-and-planner">the Independent System Operator and Planner</term>” means the person for the time being designated under <ref eId="c00023" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">section 162</ref><ref eId="c00024" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">(1)</ref> of the <ref eId="c00025" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref>;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-modify" eId="term-modify">modify</term>” includes amend, add to and remove (and, in particular, includes making a person a party to an agreement and discharging a party from its obligations under an agreement).</p></content></hcontainer></subsection><subsection eId="section-17-14"><num>(14)</num><intro><p>In Schedule 6A to the Electricity Act 1989 (provisions imposing obligations enforceable as relevant requirements)—</p></intro><level class="para1" eId="section-17-14-a"><num>(a)</num><content><p><mod>in paragraph 4A (electricity system operator), after sub-paragraph (c) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><level class="para1"><num>(d)</num><content><p>section <ref href="#section-17">17</ref><ref href="#section-17-10">(10)</ref> of the Planning and Infrastructure Act 2025 (duty to comply with direction under <ref href="#section-17">section 17</ref> of that Act).</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-17-14-b"><num>(b)</num><content><p><mod>in paragraph 5 (distribution licence holders), after sub-paragraph (g) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><level class="para1"><num>(h)</num><content><p>section <ref href="#section-17">17</ref><ref href="#section-17-10">(10)</ref> of the Planning and Infrastructure Act 2025 (duty to comply with direction under <ref href="#section-17">section 17</ref> of that Act).</p></content></level></quotedStructure></mod></p></content></level></subsection></section><section eId="section-18"><num>18</num><heading>Managing connections to the network: strategic plans etc</heading><subsection eId="section-18-1"><num>(1)</num><content><p><mod>In <ref eId="c00026" href="https://www.legislation.gov.uk/ukpga/2023/52/part/5">Part 5</ref> of the <ref eId="c00027" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref> (Independent System Operator and Planner), after <ref eId="c00028" href="https://www.legislation.gov.uk/ukpga/2023/52/section/165">section 165</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e3701"><num>165A</num><heading>Functions relating to network connections: duty to have regard to designated plans</heading><subsection eId="d25e3705"><num>(1)</num><content><p>The ISOP must, when carrying out any of its functions relating to the management of connections to the transmission system, have regard to the designated strategic plans.</p></content></subsection><subsection eId="d25e3711"><num>(2)</num><content><p>The Secretary of State may by regulations designate plans or documents for the purposes of this section.</p></content></subsection><subsection><num>(3)</num><content><p>In <ref href="#d25e3705">subsection (1)</ref>, the reference to “<term refersTo="#term-the-designated-strategic-plans">the designated strategic plans</term>” is a reference to those plans or documents designated by regulations under <ref href="#d25e3711">subsection (2)</ref> as they have effect at the time when the regulations are made.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-18-2"><num>(2)</num><content><p><ref eId="c00029" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00030" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (electricity supply) is amended as set out in <span><ref href="#section-18-3">subsections (3)</ref> to <ref href="#section-18-5">(5)</ref></span>.</p></content></subsection><subsection eId="section-18-3"><num>(3)</num><intro><p>In <ref eId="c00031" href="https://www.legislation.gov.uk/ukpga/1989/29/section/16">section 16</ref> (duty to connect on request)—</p></intro><level class="para1" eId="section-18-3-a"><num>(a)</num><content><p><mod>after <ref eId="c00032" href="https://www.legislation.gov.uk/ukpga/1989/29/section/16">subsection (2)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(2A)</num><content><p>In deciding how to comply with the duties under this section, and in particular in deciding how to prioritise persons requiring a connection, an electricity distributor must have regard to the designated strategic plans.</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-18-3-b"><num>(b)</num><content><p><mod>at the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(6)</num><content><p>In this section, “<term refersTo="#term-the-designated-strategic-plans">the designated strategic plans</term>” means the plans or documents designated by regulations made under section <ref href="#d25e3701">165A</ref><ref href="#d25e3711">(2)</ref> of the Energy Act 2023 (functions of the Independent System Operator and Planner relating to network connections).</p></content></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-18-4"><num>(4)</num><intro><p>In <ref eId="c00033" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">section 17</ref> (exceptions from duty to connect), in <ref eId="c00034" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">subsection (1)</ref>—</p></intro><level class="para1" eId="section-18-4-a"><num>(a)</num><content><p>omit the “or” at the end of <ref eId="c00035" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">paragraph (b)</ref>;</p></content></level><level class="para1" eId="section-18-4-b"><num>(b)</num><content><p><mod>after <ref eId="c00036" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">paragraph (b)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(ba)</num><content><p>it would not be in accordance with the designated strategic plans (within the meaning of section 16) for the distributor to do so; or</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></level></subsection><subsection eId="section-18-5"><num>(5)</num><content><p><mod>In <ref eId="c00037" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A">Schedule 6A</ref> (provisions imposing obligations enforceable as relevant requirements), in <ref eId="c00038" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A/paragraph/4A">paragraph 4A</ref> (electricity system operator), in <ref eId="c00039" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A/paragraph/4A">paragraph (c)</ref>, for “165” substitute <quotedText>“<ref href="#d25e3701">165A</ref>”</quotedText>.</mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-consents-for-electricity-infrastructure-in-scotland"><heading>Consents for electricity infrastructure in Scotland</heading><section eId="section-19"><num>19</num><heading>Consents for generating stations and overhead lines: applications</heading><subsection eId="section-19-1"><num>(1)</num><content><p>Schedule 8 to the Electricity Act 1989 (consents of the Secretary of State and the Scottish Ministers under sections 36 and 37) is amended as follows.</p></content></subsection><subsection eId="section-19-2"><num>(2)</num><content><p><mod>After paragraph 1 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Applications made to the Scottish Ministers for consent</heading><paragraph eId="d25e3890" class="schProv1"><num>1A</num><subparagraph><num>(1)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations make provision about the following matters in relation to applications to the Scottish Ministers for consent under section 36 or 37.</p></content></subparagraph><subparagraph eId="d25e3900"><num>(2)</num><intro><p>The matters are—</p></intro><level class="para1" eId="d25e3906"><num>(a)</num><content><p>the steps a person must take before making an application;</p></content></level><level class="para1"><num>(b)</num><content><p>the information that must be included in an application;</p></content></level><level class="para1" eId="d25e3918"><num>(c)</num><content><p>an acceptance stage, during which the Scottish Ministers must assess an applicant’s compliance with any requirements imposed by the regulations in order to decide whether or not to accept the application;</p></content></level><level class="para1"><num>(d)</num><intro><p>fees to be paid to the Scottish Ministers—</p></intro><level class="para2"><num>(i)</num><content><p>on application, or</p></content></level><level class="para2"><num>(ii)</num><content><p>for anything done by them in relation to a proposed application;</p></content></level></level><level class="para1"><num>(e)</num><content><p>requests by the Scottish Ministers for additional information to aid their decision whether or not to accept an application or to grant consent.</p></content></level></subparagraph><subparagraph eId="d25e3948"><num>(3)</num><intro><p>The steps that may be the subject of provision made by virtue of sub-paragraph (2)(a) include—</p></intro><level class="para1"><num>(a)</num><content><p>notifying prescribed persons of the proposed application,</p></content></level><level class="para1"><num>(b)</num><content><p>publicising the proposed application, and</p></content></level><level class="para1" eId="d25e3966"><num>(c)</num><content><p>carrying out a consultation about the proposed application.</p></content></level></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-3"><num>(3)</num><intro><p>In paragraph 2 (objections by relevant planning authority)—</p></intro><level class="para1" eId="section-19-3-a"><num>(a)</num><content><p><mod>in sub-paragraph (1), for “Secretary of State for his” substitute <quotedText>“appropriate authority for a”</quotedText>;</mod></p></content></level><level class="para1" eId="section-19-3-b"><num>(b)</num><content><p><mod>in sub-paragraph (2), at the beginning insert <quotedText>“In the case of an application made to the Secretary of State,”</quotedText>;</mod></p></content></level><level class="para1" eId="section-19-3-c"><num>(c)</num><content><p><mod>after sub-paragraph (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><subparagraph><num>(2A)</num><intro><p>In the case of an application made to the Scottish Ministers, where the relevant planning authority notify the Scottish Ministers that they object to the application and their objection is not withdrawn, the Scottish Ministers—</p></intro><level class="para1"><num>(a)</num><content><p>must appoint a person (referred to in this Schedule as the “<term refersTo="#term-reporter">reporter</term>”) to examine the application, and</p></content></level><level class="para1"><num>(b)</num><content><p>before determining whether to give their consent, must consider the objection and the reporter’s final report.</p></content></level><wrapUp><p>See paragraph 2A for the process that must be followed by the reporter.</p></wrapUp></subparagraph></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-19-3-d"><num>(d)</num><intro><p>in sub-paragraph (4)—</p></intro><level class="para2" eId="section-19-3-d-i"><num>(i)</num><content><p><mod>after “(2)” insert <quotedText>“or (2A)”</quotedText>;</mod></p></content></level><level class="para2" eId="section-19-3-d-ii"><num>(ii)</num><content><p><mod>for “Secretary of State” substitute <quotedText>“appropriate authority”</quotedText>;</mod></p></content></level></level><level class="para1" eId="section-19-3-e"><num>(e)</num><content><p><mod>in sub-paragraph (5), for “Secretary of State” substitute <quotedText>“appropriate authority”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-19-4"><num>(4)</num><content><p><mod>After paragraph 2 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Procedure following objection by relevant planning authority: Scotland</heading><paragraph eId="d25e4075" class="schProv1"><num>2A</num><subparagraph><num>(1)</num><content><p>A reporter appointed under paragraph 2(2A)(a) must make proposals as regards the appropriate procedure for examining the application.</p></content></subparagraph><subparagraph eId="d25e4085"><num>(2)</num><intro><p>The appropriate procedure may consist of one or more of the following—</p></intro><level class="para1"><num>(a)</num><intro><p>considering—</p></intro><level class="para2"><num>(i)</num><content><p>the objection by the relevant planning authority,</p></content></level><level class="para2"><num>(ii)</num><content><p>any other objections made in accordance with regulations under paragraph 3(1)(c), and</p></content></level><level class="para2"><num>(iii)</num><content><p>any other representations made in accordance with an enactment;</p></content></level></level><level class="para1" eId="d25e4115"><num>(b)</num><content><p>considering new written representations about the application from persons specified by the reporter;</p></content></level><level class="para1" eId="d25e4121"><num>(c)</num><content><p>holding one or more hearing sessions;</p></content></level><level class="para1"><num>(d)</num><content><p>carrying out an inspection of the land to which the application relates;</p></content></level><level class="para1" eId="d25e4133"><num>(e)</num><content><p>holding a public inquiry.</p></content></level></subparagraph><subparagraph eId="d25e4139"><num>(3)</num><content><p>Where the reporter proposes a procedure that includes proceedings within sub-paragraph (2)(b), (c) or (e), the proposal must include a statement of the issues that are proposed to be within the scope of each of those proceedings.</p></content></subparagraph><subparagraph><num>(4)</num><intro><p>The reporter must—</p></intro><level class="para1"><num>(a)</num><content><p>publish the proposals,</p></content></level><level class="para1"><num>(b)</num><content><p>notify all interested parties of the proposals, and</p></content></level><level class="para1"><num>(c)</num><content><p>invite written representations about the proposals before the end of the time period specified by the reporter.</p></content></level></subparagraph><subparagraph><num>(5)</num><content><p>The published proposals must include or be accompanied by an explanation of the reasons for the proposals.</p></content></subparagraph><subparagraph><num>(6)</num><content><p>The reporter may hold a meeting to hear representations about the proposals.</p></content></subparagraph><subparagraph><num>(7)</num><intro><p>After considering the representations, the reporter must—</p></intro><level class="para1"><num>(a)</num><content><p>decide on the appropriate procedure for examining the application, and</p></content></level><level class="para1"><num>(b)</num><content><p>publish that decision.</p></content></level></subparagraph><subparagraph><num>(8)</num><intro><p>The published decision must include or be accompanied by an explanation of—</p></intro><level class="para1"><num>(a)</num><content><p>the reasons for the decision,</p></content></level><level class="para1"><num>(b)</num><content><p>the intended time period for the carrying out of the procedure, and</p></content></level><level class="para1"><num>(c)</num><content><p>the intended time period within which the reporter will send a final report to the Scottish Ministers.</p></content></level></subparagraph><subparagraph><num>(9)</num><content><p>Sub-paragraph (3) applies to the reporter’s decision as it applies to the reporter’s proposals.</p></content></subparagraph><subparagraph><num>(10)</num><content><p>On completing the examination, the reporter must prepare and send to the Scottish Ministers a final report setting out the reporter’s recommendations on the application.</p></content></subparagraph><subparagraph><num>(11)</num><intro><p>In this paragraph, “<term refersTo="#term-interested-party">interested party</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>the applicant,</p></content></level><level class="para1"><num>(b)</num><content><p>the relevant planning authority which made the objection under paragraph 2(2A),</p></content></level><level class="para1"><num>(c)</num><content><p>any person who has made an objection in accordance with regulations under paragraph 3, or</p></content></level><level class="para1"><num>(d)</num><content><p>any person who has made representations in accordance with any other enactment.</p></content></level></subparagraph><subparagraph><num>(12)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations make provision amending or setting out further detail about the procedure set out in this paragraph. (See also paragraph 7B(2)(e).)</p></content></subparagraph><subparagraph><num>(13)</num><content><p>A statutory instrument containing regulations under this paragraph is not to be made by the Secretary of State unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subparagraph><subparagraph><num>(14)</num><content><p>Regulations made by the Scottish Ministers under this paragraph are subject to the affirmative procedure.</p></content></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-5"><num>(5)</num><content><p><mod>After paragraph 7A insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Applications to the Scottish Ministers: time limits</heading><paragraph eId="d25e4298" class="schProv1"><num>7B</num><subparagraph><num>(1)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations specify a time limit for actions that may or must be taken in relation to an application to the Scottish Ministers for consent under section 36 or 37.</p></content></subparagraph><subparagraph eId="d25e4308"><num>(2)</num><intro><p>The regulations may, for example, specify a time limit for—</p></intro><level class="para1"><num>(a)</num><content><p>a person to comply with a requirement of regulations under paragraph 1A;</p></content></level><level class="para1"><num>(b)</num><content><p>a person to respond to a pre-application consultation (see paragraph 1A(3)(c));</p></content></level><level class="para1"><num>(c)</num><content><p>a person who is notified of an application in accordance with an enactment to provide their opinion or advice on the application;</p></content></level><level class="para1"><num>(d)</num><content><p>a relevant planning authority to object to an application under paragraph 2(2A);</p></content></level><level class="para1" eId="d25e4338"><num>(e)</num><content><p>a reporter to take any steps required by paragraph 2A;</p></content></level><level class="para1"><num>(f)</num><content><p>the Scottish Ministers to decide an application.</p></content></level></subparagraph><subparagraph><num>(3)</num><content><p>The regulations may include provision about the consequences of failure to comply with a time limit.</p></content></subparagraph><subparagraph><num>(4)</num><content><p>Where regulations under this paragraph specify a time limit for the completion of an acceptance stage (see paragraph 1A(2)(c)), the regulations may not permit the extension of that limit.</p></content></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-6"><num>(6)</num><content><p>The amendments made by subsection (3) do not affect the continued application in relation to the Scottish Ministers of regulations made under paragraph 2(3) of Schedule 8 to the Electricity Act 1989 before this section comes into force.</p></content></subsection></section><section eId="section-20"><num>20</num><heading>Variation of consents etc</heading><content><p><mod>After section 37 of the Electricity Act 1989 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e4384"><num>37A</num><heading>Application for variation of section 37 consent: Scotland</heading><subsection><num>(1)</num><content><p>The person for the time being entitled to the benefit of a section 37 consent that was granted by the Scottish Ministers may make an application to the Scottish Ministers for the consent to be varied.</p></content></subsection><subsection><num>(2)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about variation under this section, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the making and withdrawal of applications;</p></content></level><level class="para1"><num>(b)</num><content><p>fees;</p></content></level><level class="para1"><num>(c)</num><content><p>publicity and consultation requirements;</p></content></level><level class="para1"><num>(d)</num><content><p>rights to make representations;</p></content></level><level class="para1"><num>(e)</num><content><p>public inquiries;</p></content></level><level class="para1"><num>(f)</num><content><p>consideration of applications.</p></content></level></subsection><subsection><num>(3)</num><content><p>The regulations may provide for any statutory provision applicable to the grant by the Scottish Ministers of a section 37 consent to apply with specified modifications to the variation of a section 37 consent under this section.</p></content></subsection><subsection><num>(4)</num><intro><p>On an application for a section 37 consent to be varied, the Scottish Ministers may make such variations to the consent as appear to them to be appropriate, having regard (in particular) to—</p></intro><level class="para1"><num>(a)</num><content><p>the applicant’s reason for seeking the variation;</p></content></level><level class="para1"><num>(b)</num><content><p>the variations proposed;</p></content></level><level class="para1"><num>(c)</num><content><p>any objections made to the proposed variations, the views of consultees and the outcome of any public inquiry.</p></content></level></subsection><subsection><num>(5)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-section-37-consent">section 37 consent</term>” means a consent granted under section 37 (consent required for overhead lines);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-statutory-provision">statutory provision</term>” means a provision of or made under an Act, whenever passed or made; and for this purpose “<term refersTo="#term-act">Act</term>” includes an Act of the Scottish Parliament.</p></content></hcontainer></subsection></section><section eId="d25e4493"><num>37B</num><heading>Variation of section 36 and 37 consents on change of circumstances: Scotland</heading><subsection><num>(1)</num><intro><p>The Scottish Ministers may vary a consent under section 36 or 37 if—</p></intro><level class="para1"><num>(a)</num><intro><p>they consider that the consent ought to be varied—</p></intro><level class="para2"><num>(i)</num><content><p>because of a change in circumstances relating to the environment, or</p></content></level><level class="para2"><num>(ii)</num><content><p>because of technological changes, and</p></content></level></level><level class="para1"><num>(b)</num><content><p>the person for the time being entitled to the benefit of the consent agrees to the variation.</p></content></level></subsection><subsection><num>(2)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about variation under this section, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the procedure for getting agreement;</p></content></level><level class="para1"><num>(b)</num><content><p>publicity, notification and consultation requirements;</p></content></level><level class="para1"><num>(c)</num><content><p>rights to make representations.</p></content></level></subsection><subsection><num>(3)</num><content><p>The regulations may provide for any statutory provision applicable to the grant by the Scottish Ministers of a consent under section 36 or 37 to apply with specified modifications to the variation of such a consent under this section.</p></content></subsection><subsection><num>(4)</num><content><p>In this section, “<term refersTo="#term-statutory-provision">statutory provision</term>” has the same meaning as in section <ref href="#d25e4384">37A</ref>.</p></content></subsection></section><section eId="d25e4572"><num>37C</num><heading>Correction of errors in consent documents: Scotland</heading><subsection eId="d25e4576"><num>(1)</num><content><p>The Scottish Ministers may amend a decision document in order to correct a correctable error.</p></content></subsection><subsection><num>(2)</num><intro><p>In <ref href="#d25e4576">subsection (1)</ref>—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-correctable-error">correctable error</term>” means an error or omission which—</p></intro><level class="para1"><num>(a)</num><content><p>is in a part of the decision document which records the decision, and</p></content></level><level class="para1"><num>(b)</num><content><p>is not part of the statement of reasons for the decision;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-decision-document">decision document</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a document recording a consent under section 36 or 37, or</p></content></level><level class="para1"><num>(b)</num><content><p>a document recording a variation of such a consent.</p></content></level></hcontainer></subsection><subsection><num>(3)</num><content><p>The Scottish Ministers may exercise the power in <ref href="#d25e4576">subsection (1)</ref> either of their own accord or following a written request from a person for the time being entitled to the benefit of the consent.</p></content></subsection><subsection><num>(4)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about the process for corrections, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the making of written requests;</p></content></level><level class="para1"><num>(b)</num><content><p>notification requirements;</p></content></level><level class="para1"><num>(c)</num><content><p>rights to make representations.</p></content></level></subsection></section></quotedStructure></mod></p></content></section><section eId="section-21"><num>21</num><heading>Proceedings for questioning certain decisions on consents</heading><subsection eId="section-21-1"><num>(1)</num><content><p>Section 36D of the Electricity Act 1989 (proceedings for questioning certain decisions under section 36) is amended as set out in subsections <ref href="#section-21-2">(2)</ref> to <ref href="#section-21-4">(4)</ref>.</p></content></subsection><subsection eId="section-21-2"><num>(2)</num><content><p><mod>For subsection (3) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(3)</num><intro><p>This section applies to a decision under any of the following—</p></intro><level class="para1"><num>(a)</num><content><p>section 36 (application for consent for generating station);</p></content></level><level class="para1"><num>(b)</num><content><p>section 36C (application for variation of section 36 consent);</p></content></level><level class="para1"><num>(c)</num><content><p>section 37 (application for consent for overhead lines);</p></content></level><level class="para1"><num>(d)</num><content><p>section <ref href="#d25e4384">37A</ref> (application for variation of section 37 consent);</p></content></level><level class="para1"><num>(e)</num><content><p>section <ref href="#d25e4493">37B</ref> (variation of consents by Scottish Ministers);</p></content></level><level class="para1"><num>(f)</num><content><p>section 37C (consents and variation of consents in Scotland: correction of errors).</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-21-3"><num>(3)</num><content><p><mod>In subsection (4), for “taken” substitute <quotedText>“published by the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-4"><num>(4)</num><content><p><mod>In the heading, for “under section 36” substitute <quotedText>“of the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-5"><num>(5)</num><content><p><mod>In Schedule 8 to the Electricity Act 1989, in paragraph 5B (proceedings for questioning certain decisions under paragraph 3(2)), in sub-paragraph (4), for “taken” substitute <quotedText>“published by the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-6"><num>(6)</num><content><p><mod>In section 237 of the Town and Country Planning (Scotland) Act 1997 (challenges to validity of development plans and certain orders, decisions and directions), in subsection (3), after paragraph (b) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(ba)</num><content><p>any decision to give a direction under section 57(2) or (2ZA);</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-21-7"><num>(7)</num><content><p>The amendments made by this section apply only in relation to decisions made on or after the date on which this section comes into force.</p></content></subsection></section><section eId="section-22"><num>22</num><heading>Applications for necessary wayleaves: fees</heading><content><p><mod>In Schedule 4 to the Electricity Act 1989 (other powers etc of licence holders), after paragraph 6 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Fees for applications under paragraph 6(3) to the Scottish Ministers</heading><paragraph eId="d25e4794" class="schProv1"><num>6A</num><content><p>The Scottish Ministers may by regulations make provision about the fees to be paid to the Scottish Ministers in relation to an application made to them under paragraph 6(3).</p></content></paragraph></hcontainer></quotedStructure></mod></p></content></section><section eId="section-23"><num>23</num><heading>Regulations</heading><subsection eId="section-23-1"><num>(1)</num><content><p><ref eId="c00040" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">Section 106</ref> of the <ref eId="c00041" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (regulations and orders) is amended as follows.</p></content></subsection><subsection eId="section-23-2"><num>(2)</num><intro><p>In <ref eId="c00042" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">subsection (1ZA)</ref>—</p></intro><level class="para1" eId="section-23-2-a"><num>(a)</num><content><p><mod>for “the power conferred on” substitute <quotedText>“a power of”</quotedText>;</mod></p></content></level><level class="para1" eId="section-23-2-b"><num>(b)</num><content><p><mod>for “by section 36C” substitute <quotedText>“to make regulations (see section 27 of the Interpretation and Legislative Reform (Scotland) Act 2010 (Scottish statutory instruments))”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-23-3"><num>(3)</num><content><p><mod>After subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e4853"><num>(2ZA)</num><intro><p>Subsection (2) does not apply to a statutory instrument containing (whether alone or with other provision)—</p></intro><level class="para1" eId="d25e4859"><num>(a)</num><content><p>regulations under paragraph <ref href="#d25e4075">2A</ref> of Schedule 8;</p></content></level></subsection></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-23-4"><num>(4)</num><content><p><mod>In <ref eId="c00043" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">subsection (3)</ref>, for the words after “under” substitute <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>section 36C,</p></content></level><level class="para1"><num>(b)</num><content><p>section <ref href="#d25e4384">37A</ref>,</p></content></level><level class="para1"><num>(c)</num><content><p>section <ref href="#d25e4493">37B</ref>,</p></content></level><level class="para1"><num>(d)</num><content><p>section <ref href="#d25e4572">37C</ref>,</p></content></level><level class="para1"><num>(e)</num><content><p>paragraph <ref href="#d25e4794">6A</ref> of Schedule 4, or</p></content></level><level class="para1"><num>(f)</num><content><p>any paragraph of Schedule 8 except paragraph <ref href="#d25e4075">2A</ref>,</p></content></level><p>are subject to the negative procedure.</p></quotedStructure></mod></p></content></subsection><subsection eId="section-23-5"><num>(5)</num><content><p><mod>At the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(4)</num><content><p>Before making regulations under a provision listed in subsection <ref href="#d25e4960">(6)</ref>, the Secretary of State must consult the Scottish Ministers.</p></content></subsection><subsection><num>(5)</num><content><p>Before making regulations under a provision listed in subsection <ref href="#d25e4960">(6)</ref>, the Scottish Ministers must consult the Secretary of State.</p></content></subsection><subsection eId="d25e4960"><num>(6)</num><intro><p>The provisions are—</p></intro><level class="para1"><num>(a)</num><content><p>section <ref href="#d25e4384">37A</ref>;</p></content></level><level class="para1"><num>(b)</num><content><p>section <ref href="#d25e4493">37B</ref>;</p></content></level><level class="para1"><num>(c)</num><content><p>section <ref href="#d25e4572">37C</ref>;</p></content></level><level class="para1"><num>(d)</num><content><p>paragraphs <ref href="#d25e3890">1A</ref>, <ref href="#d25e4075">2A</ref> and <ref href="#d25e4298">7B</ref> of Schedule 8.</p></content></level></subsection></quotedStructure></mod></p></content></subsection></section><section eId="section-24"><num>24</num><heading><span><ref href="#section-19">Sections 19</ref> to <ref href="#section-23">23</ref></span>: minor and consequential amendments</heading><intro><p><ref href="#schedule-1">Schedule 1</ref> makes—</p></intro><level class="para1" eId="section-24-a"><num>(a)</num><content><p>amendments to the <ref eId="c00044" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> that are consequential on the amendments made by sections <ref href="#section-19">19</ref> to <ref href="#section-23">23</ref>, and</p></content></level><level class="para1" eId="section-24-b"><num>(b)</num><content><p>other minor amendments relating to consents for electricity infrastructure in Scotland (including amendments to reflect previous transfers of functions to the Scottish Ministers).</p></content></level></section><section eId="section-25"><num>25</num><heading>Environmental impact assessments for electricity works</heading><subsection eId="section-25-1"><num>(1)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations amend the Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 2017 (<ref eId="c00045" href="http://www.legislation.gov.uk/id/ssi/2017/101">S.S.I. 2017/101</ref>) (the “<term refersTo="#term-2017-regulations" eId="term-2017-regulations">2017 Regulations</term>”) by making provision described in subsection <ref href="#section-25-2">(2)</ref> in connection with environmental impact assessments and applications made to the Scottish Ministers for—</p></intro><level class="para1" eId="section-25-1-a"><num>(a)</num><content><p>consent granted under section 36 or 37 of the Electricity Act 1989 (consent for construction etc of generating stations or for overhead lines), or</p></content></level><level class="para1" eId="section-25-1-b"><num>(b)</num><content><p>variation of consent granted under section 36 of that Act.</p></content></level></subsection><subsection eId="section-25-2"><num>(2)</num><intro><p>That provision is—</p></intro><level class="para1" eId="section-25-2-a"><num>(a)</num><content><p>provision for the Scottish Ministers to refuse an application in respect of Schedule 2 development that is not accompanied by an EIA report if the development has not been the subject of a screening opinion;</p></content></level><level class="para1" eId="section-25-2-b"><num>(b)</num><content><p>provision for the Scottish Ministers to charge developers fees for screening opinions and scoping opinions;</p></content></level><level class="para1" eId="section-25-2-c"><num>(c)</num><content><p>provision about the sending of copies of EIA reports to the Scottish Ministers;</p></content></level><level class="para1" eId="section-25-2-d"><num>(d)</num><content><p>provision about the publication by developers of the information listed in regulation 14(2) of the 2017 Regulations (information about EIA reports);</p></content></level><level class="para1" eId="section-25-2-e"><num>(e)</num><content><p>provision about making EIA reports available for inspection;</p></content></level><level class="para1" eId="section-25-2-f"><num>(f)</num><content><p>provision about time limits for the consultation bodies and other public bodies to make representations to the Scottish Ministers about scoping opinions and EIA reports;</p></content></level><level class="para1" eId="section-25-2-g"><num>(g)</num><content><p>provision about time limits for the consultation bodies and other public bodies to enter into consultation with developers about, and to make available, information relevant to the preparation of EIA reports;</p></content></level><level class="para1" eId="section-25-2-h"><num>(h)</num><content><p>provision about time limits for developers to provide additional information to the Scottish Ministers;</p></content></level><level class="para1" eId="section-25-2-i"><num>(i)</num><content><p>provision about the publication by developers of the information listed in regulation 20(3) of the 2017 Regulations (information about additional information);</p></content></level><level class="para1" eId="section-25-2-j"><num>(j)</num><content><p>provision about making additional information available for inspection;</p></content></level><level class="para1" eId="section-25-2-k"><num>(k)</num><content><p>provision about the publication by developers of the information listed in regulation 23(2) of the 2017 Regulations (information about decisions);</p></content></level><level class="para1" eId="section-25-2-l"><num>(l)</num><content><p>provision that the Secretary of State or the Scottish Ministers consider appropriate for securing that the procedures under the 2017 Regulations operate effectively, or more effectively, alongside the procedures under regulations made under section 36C of the Electricity Act 1989 or paragraph <ref href="#d25e3890">1A</ref> or <ref href="#d25e4298">7B</ref> of Schedule 8 to that Act (inserted by section <ref href="#section-19">19</ref> of this Act).</p></content></level></subsection><subsection eId="section-25-3"><num>(3)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations amend the 2017 Regulations by making provision described in subsection <ref href="#section-25-4">(4)</ref> in connection with environmental impact assessments and applications made to the Scottish Ministers for variation of consent granted under section 37 of the Electricity Act 1989.</p></content></subsection><subsection eId="section-25-4"><num>(4)</num><intro><p>That provision is—</p></intro><level class="para1" eId="section-25-4-a"><num>(a)</num><intro><p>provision requiring an environmental impact assessment in respect of the proposed variation to be carried out before Scottish Ministers—</p></intro><level class="para2" eId="section-25-4-a-i"><num>(i)</num><content><p>vary the consent, or</p></content></level><level class="para2" eId="section-25-4-a-ii"><num>(ii)</num><content><p>direct that planning permission is deemed to be granted under section 57(2) or (2ZA) of the Town and Country Planning (Scotland) Act 1997 in respect of EIA development;</p></content></level></level><level class="para1" eId="section-25-4-b"><num>(b)</num><content><p>provision requiring the Scottish Ministers to take the environmental information into account when carrying out an environmental impact assessment in respect of the proposed variation;</p></content></level><level class="para1" eId="section-25-4-c"><num>(c)</num><content><p>provision applying provisions of the 2017 Regulations (including provisions amended by regulations under subsection <ref href="#section-25-1">(1)</ref>), with or without modifications;</p></content></level><level class="para1" eId="section-25-4-d"><num>(d)</num><content><p>provision that the Secretary of State or the Scottish Ministers consider appropriate for securing that the procedures under the 2017 Regulations operate effectively, or more effectively, alongside the procedures under regulations made under section <ref href="#d25e4384">37A</ref> of the Electricity Act 1989 (inserted by section <ref href="#section-20">20</ref> of this Act).</p></content></level></subsection><subsection eId="section-25-5"><num>(5)</num><intro><p>Regulations under this section may—</p></intro><level class="para1" eId="section-25-5-a"><num>(a)</num><content><p>make different provision for different purposes or different areas;</p></content></level><level class="para1" eId="section-25-5-b"><num>(b)</num><content><p>make consequential or supplementary provision;</p></content></level><level class="para1" eId="section-25-5-c"><num>(c)</num><content><p>make transitional provision.</p></content></level></subsection><subsection eId="section-25-6"><num>(6)</num><content><p>Regulations under this section made by the Secretary of State are to be made by statutory instrument.</p></content></subsection><subsection eId="section-25-7"><num>(7)</num><content><p>A statutory instrument containing regulations made by the Secretary of State under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-25-8"><num>(8)</num><content><p>Before making regulations under this section, the Secretary of State must consult the Scottish Ministers.</p></content></subsection><subsection eId="section-25-9"><num>(9)</num><content><p>For regulations under this section made by the Scottish Ministers, see section 27 of the Interpretation and Legislative Reform (Scotland) Act <ref eId="c00046" href="http://www.legislation.gov.uk/id/asp/2010/10">2010 (asp 10)</ref> (Scottish statutory instruments).</p></content></subsection><subsection eId="section-25-10"><num>(10)</num><content><p>Regulations made by the Scottish Ministers under this section are subject to the negative procedure (see section 28 of the Interpretation and Legislative Reform (Scotland) Act <ref eId="c00047" href="http://www.legislation.gov.uk/id/asp/2010/10">2010 (asp 10)</ref>).</p></content></subsection><subsection eId="section-25-11"><num>(11)</num><content><p>Before making regulations under this section, the Scottish Ministers must consult the Secretary of State.</p></content></subsection><subsection eId="section-25-12"><num>(12)</num><intro><p>In this section, subject to subsection <ref href="#section-25-13">(13)</ref>, the following terms have the same meaning as they have in the 2017 Regulations—</p></intro><hcontainer name="definition"><content><p>“additional information”</p></content></hcontainer><hcontainer name="definition"><content><p>“the consultation bodies”</p></content></hcontainer><hcontainer name="definition"><content><p>“developer”</p></content></hcontainer><hcontainer name="definition"><content><p>“EIA development”</p></content></hcontainer><hcontainer name="definition"><content><p>“EIA report”</p></content></hcontainer><hcontainer name="definition"><content><p>“environmental impact assessment”</p></content></hcontainer><hcontainer name="definition"><content><p>“environmental information”</p></content></hcontainer><hcontainer name="definition"><content><p>“Schedule 2 development”</p></content></hcontainer><hcontainer name="definition"><content><p>“scoping opinion”</p></content></hcontainer><hcontainer name="definition"><content><p>“screening opinion”.</p></content></hcontainer></subsection><subsection eId="section-25-13"><num>(13)</num><content><p>In subsections <ref href="#section-25-3">(3)</ref> and <ref href="#section-25-4">(4)</ref>, those terms have the same meaning in connection with applications for variation of consent granted under section 37 of the Electricity Act 1989 as they have, in the 2017 Regulations, in connection with applications for variation of consent granted under section 36 of that Act.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-long-duration-electricity-storage"><heading>Long duration electricity storage</heading><section eId="section-26"><num>26</num><heading>Long duration electricity storage</heading><content><p><mod>In the Electricity Act 1989, after <ref eId="c00048" href="https://www.legislation.gov.uk/ukpga/1989/29/section/10O">section 10O</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Long duration electricity storage</heading><section><num>10P</num><heading>Long duration electricity storage</heading><subsection><num>(1)</num><content><p>The Authority must, as soon as reasonably practicable after this section comes into force, establish and operate a scheme in accordance with this section.</p></content></subsection><subsection><num>(2)</num><content><p>The scheme must be designed for the purpose of encouraging the development and use of long duration electricity storage installations.</p></content></subsection><subsection><num>(3)</num><intro><p>The scheme must be open to persons who—</p></intro><level class="para1"><num>(a)</num><content><p>hold or intend to apply for a generation licence to operate a long duration electricity storage installation, and</p></content></level><level class="para1"><num>(b)</num><content><p>meet any other specified criteria.</p></content></level></subsection><subsection eId="d25e5416"><num>(4)</num><intro><p>The scheme must provide for an LDES operator who operates an approved installation—</p></intro><level class="para1"><num>(a)</num><content><p>to receive payments from a holder of an electricity system operator licence where the operator’s assessed revenue from that installation is below a specified amount, in specified circumstances, and</p></content></level><level class="para1"><num>(b)</num><content><p>to make payments to a holder of an electricity system operator licence where the operator’s assessed revenue from that installation is above a specified amount, in specified circumstances.</p></content></level></subsection><subsection><num>(5)</num><intro><p>In subsection <ref href="#d25e5416">(4)</ref>—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-an-approved-installation">an approved installation</term>” means a long duration electricity storage installation which is approved by the Authority for the purposes of subsection <ref href="#d25e5416">(4)</ref> in accordance with the scheme;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-assessed-revenue">assessed revenue</term>”, in relation to a long duration electricity storage installation, means the difference between—</p></intro><level class="para1"><num>(a)</num><content><p>revenue of a specified kind earned or derived in connection with that installation, and</p></content></level><level class="para1"><num>(b)</num><content><p>costs of a specified kind incurred in connection with operating the installation.</p></content></level></hcontainer></subsection><subsection><num>(6)</num><content><p>The Authority may determine how costs and revenue are to be calculated for the purposes of the scheme.</p></content></subsection><subsection><num>(7)</num><content><p>In setting charges to which Article 18(1) of the Electricity Regulation applies, the holder of an electricity system operator licence may take account of payments it makes or receives under the scheme.</p></content></subsection><subsection><num>(8)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-ldes-operator">LDES operator</term>” means a person who, under a generation licence, generates electricity by means of a long duration electricity storage installation;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-long-duration-electricity-storage-installation">long duration electricity storage installation</term>” means an installation that—</p></intro><level class="para1"><num>(a)</num><content><p>generates electricity from stored energy,</p></content></level><level class="para1"><num>(b)</num><content><p>has an electricity generating capacity of not less than 50 megawatts, and</p></content></level><level class="para1"><num>(c)</num><content><p>is capable of generating electricity at its full capacity for a continuous period of not less than eight hours;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-specified">specified</term>” means specified by the Authority for the purposes of the scheme in—</p></intro><level class="para1"><num>(a)</num><content><p>a document published by the Authority, or</p></content></level><level class="para1"><num>(b)</num><content><p>a condition of a licence;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-stored-energy">stored energy</term>” has the meaning given by section 4(3ZB).</p></content></hcontainer></subsection><subsection><num>(9)</num><intro><p>The Secretary of State may by regulations amend the definition of “long duration electricity storage installation” by substituting—</p></intro><level class="para1"><num>(a)</num><content><p>for the amount of electricity generating capacity for the time being mentioned in <ref href="#d25e5508">paragraph (b)</ref> of the definition, a different amount;</p></content></level><level class="para1"><num>(b)</num><content><p>for the period for the time being mentioned in <ref href="#d25e5512">paragraph (c)</ref> of the definition, a different period (which may not be less than eight hours).</p></content></level></subsection></section></hcontainer></quotedStructure></mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-consumer-benefits"><heading>Consumer benefits</heading><section eId="section-27"><num>27</num><heading>Benefits for homes near electricity transmission projects</heading><subsection eId="section-27-1"><num>(1)</num><content><p>The Electricity Act 1989 is amended as follows.</p></content></subsection><subsection eId="section-27-2"><num>(2)</num><content><p><mod>After section 38 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Benefits resulting from proximity to new or upgraded transmission infrastructure</heading><section eId="d25e5593"><num>38A</num><heading>Power to establish scheme for giving of benefits</heading><subsection eId="d25e5597"><num>(1)</num><content><p>The Secretary of State may by regulations establish a scheme under which persons with a specified connection to qualifying premises are entitled to financial benefits provided (directly or indirectly) by electricity suppliers.</p></content></subsection><subsection><num>(2)</num><content><p>Qualifying premises must be identified by reference to their proximity to qualifying works.</p></content></subsection><subsection><num>(3)</num><intro><p>Qualifying works must involve the construction, erection, expansion or improvement of electrical plant or an electric line that (in either case)—</p></intro><level class="para1"><num>(a)</num><content><p>is wholly or partly above the ground, and</p></content></level><level class="para1"><num>(b)</num><content><p>forms or is intended to form part of a transmission system.</p></content></level><wrapUp><p>They may be works that took place before the making of the regulations or the coming into force of this section.</p></wrapUp></subsection><subsection eId="d25e5630"><num>(4)</num><intro><p>The regulations may (among other things)—</p></intro><level class="para1"><num>(a)</num><content><p>make further provision determining, or for the determination of, whether premises or works are qualifying;</p></content></level><level class="para1"><num>(b)</num><content><p>confer functions in connection with the scheme;</p></content></level><level class="para1"><num>(c)</num><content><p>provide for the delegation of functions conferred in connection with the scheme;</p></content></level><level class="para1"><num>(d)</num><content><p>provide for payments by electricity suppliers to meet costs incurred in the carrying out of functions in connection with the scheme;</p></content></level><level class="para1"><num>(e)</num><content><p>provide for the costs of electricity suppliers under the scheme to be distributed among suppliers on such basis, and by such means, as the regulations provide;</p></content></level><level class="para1"><num>(f)</num><content><p>restrict a person’s ability to obtain payment of an amount standing to the credit of the person’s account with an electricity supplier, where that amount derives from benefits under the scheme;</p></content></level><level class="para1"><num>(g)</num><content><p>make provision about cases in which a person who has received benefits under the scheme in respect of premises ceases to be entitled under the scheme in respect of the premises, including provision for the withdrawal or recovery of the benefits;</p></content></level><level class="para1" eId="d25e5678"><num>(h)</num><content><p>make pass-through provision and associated provision (see section <ref href="#d25e5753">38B</ref>);</p></content></level><level class="para1" eId="d25e5687"><num>(i)</num><content><p>make enforcement provision (see section <ref href="#d25e5864">38C</ref>);</p></content></level><level class="para1" eId="d25e5696"><num>(j)</num><content><p>make information provision (see section <ref href="#d25e5952">38D</ref>).</p></content></level></subsection><subsection><num>(5)</num><intro><p>To the extent that this section enables provision to be made affecting the holders of licences, provision for that purpose may be made by modifying, or empowering or requiring the Authority to modify—</p></intro><level class="para1"><num>(a)</num><content><p>the conditions of a licence, or</p></content></level><level class="para1"><num>(b)</num><content><p>a document maintained in accordance with the conditions of a licence, or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="d25e5723"><num>(6)</num><content><p>A statutory instrument containing regulations under this section may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection><num>(7)</num><content><p>A draft laid under subsection <ref href="#d25e5723">(6)</ref> is not to be treated as a hybrid instrument for the purposes of the standing orders of either House of Parliament.</p></content></subsection><subsection><num>(8)</num><content><p>Regulations under this section bind the Crown unless they provide otherwise.</p></content></subsection><subsection><num>(9)</num><content><p>The Secretary of State may, out of money provided by Parliament, make payments to a person on whom functions are conferred by regulations under this section for the purposes of meeting (or helping to meet) the expenses of carrying out those functions.</p></content></subsection></section><section eId="d25e5753"><num>38B</num><heading>Passing of benefits to ultimate consumer</heading><subsection><num>(1)</num><content><p>This section applies for the purposes of section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5678">(h)</ref>.</p></content></subsection><subsection eId="d25e5770"><num>(2)</num><intro><p>“Pass-through provision” is provision that—</p></intro><level class="para1" eId="d25e5776"><num>(a)</num><intro><p>applies where—</p></intro><level class="para2"><num>(i)</num><content><p>one person (“the intermediary”) receives benefits under the scheme in connection with qualifying premises, and</p></content></level><level class="para2" eId="d25e5788"><num>(ii)</num><content><p>another person (“the end-user”) who is not living as part of the same household as the intermediary consumes electricity supplied to the premises, and</p></content></level></level><level class="para1" eId="d25e5794"><num>(b)</num><content><p>requires the intermediary to pass on the substance of those benefits to the end-user.</p></content></level></subsection><subsection><num>(3)</num><intro><p>“<term refersTo="#term-associated-provision">Associated provision</term>” means provision that relates to pass-through provision and—</p></intro><level class="para1"><num>(a)</num><content><p>requires intermediaries to take steps to obtain benefits that will be subject to the requirement referred to in subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5794">(b)</ref>,</p></content></level><level class="para1"><num>(b)</num><content><p>requires intermediaries to supply information to end-users,</p></content></level><level class="para1"><num>(c)</num><content><p>provides for the making of payments to intermediaries (in addition to the provision of benefits of the sort mentioned in section <ref href="#d25e5593">38A</ref><ref href="#d25e5597">(1)</ref>), or</p></content></level><level class="para1"><num>(d)</num><content><p>provides for the withdrawal or recovery of benefits given or other payments made to intermediaries who fail to comply with the requirement referred to in subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5794">(b)</ref>.</p></content></level></subsection><subsection><num>(4)</num><content><p>For the purposes of subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5776">(a)</ref><ref href="#d25e5788">(ii)</ref>, the cases in which electricity is consumed by a person include those in which the electricity is used to make available to the person heating, cooling, hot water or energy.</p></content></subsection></section><section eId="d25e5864"><num>38C</num><heading>Enforcement of benefit scheme</heading><subsection eId="d25e5868"><num>(1)</num><intro><p>In section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5687">(i)</ref>, “<term refersTo="#term-enforcement-provision">enforcement provision</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>provision for the enforcement in civil proceedings of requirements under the scheme,</p></content></level><level class="para1"><num>(b)</num><intro><p>provision for a person to impose a monetary penalty where the person is satisfied on the balance of probabilities that—</p></intro><level class="para2"><num>(i)</num><content><p>a requirement under the regulations has not been complied with, or</p></content></level><level class="para2"><num>(ii)</num><content><p>benefits or other payments under the scheme have been wrongfully obtained, or</p></content></level></level><level class="para1" eId="d25e5908"><num>(c)</num><content><p>provision for complaints procedures, dispute resolution, adjudication, appeals or redress in connection with the scheme.</p></content></level></subsection><subsection><num>(2)</num><content><p>If regulations under section <ref href="#d25e5593">38A</ref> provide for the imposition of monetary penalties, they must provide a right of appeal to a court or tribunal on grounds including both error of fact and error of law.</p></content></subsection><subsection eId="d25e5923"><num>(3)</num><content><p>The provision that may be made by virtue of subsection <ref href="#d25e5868">(1)</ref><ref href="#d25e5908">(c)</ref> includes provision for Part 2 of the Consumers, Estate Agents and Redress Act 2007 (complaints handling and redress schemes) to apply (with or without modifications) to end-user complaints as it applies to consumer complaints within the meaning of that Part.</p></content></subsection><subsection><num>(4)</num><content><p>In subsection <ref href="#d25e5923">(3)</ref>, “<term refersTo="#term-end-user-complaints">end-user complaints</term>” means complaints in connection with pass-through provision made by end-users against intermediaries or electricity suppliers (with the definitions in section <ref href="#d25e5753">38B</ref> applying for the purposes of this subsection).</p></content></subsection></section><section eId="d25e5952"><num>38D</num><heading>Disclosure and use of information in connection with benefit scheme</heading><subsection><num>(1)</num><content><p>In section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5696">(j)</ref>, “<term refersTo="#term-information-provision">information provision</term>” means provision within subsection <ref href="#d25e5978">(2)</ref> or <ref href="#d25e6020">(3)</ref>.</p></content></subsection><subsection eId="d25e5978"><num>(2)</num><intro><p>Provision is within this subsection if it is provision for the disclosure of information or evidence for the purposes of—</p></intro><level class="para1"><num>(a)</num><content><p>identifying persons entitled to benefits under the scheme,</p></content></level><level class="para1"><num>(b)</num><content><p>identifying qualifying premises or qualifying works,</p></content></level><level class="para1"><num>(c)</num><content><p>checking whether requirements under, or resulting from, the regulations are being or have been complied with,</p></content></level><level class="para1"><num>(d)</num><content><p>checking payments made under the scheme,</p></content></level><level class="para1"><num>(e)</num><content><p>facilitating the performance of functions conferred, or the enforcement of duties imposed, by or as a result of the regulations, or</p></content></level><level class="para1"><num>(f)</num><content><p>evaluating the performance of the scheme.</p></content></level></subsection><subsection eId="d25e6020"><num>(3)</num><intro><p>Provision is within this subsection if it is provision about the use or further disclosure of information disclosed—</p></intro><level class="para1"><num>(a)</num><content><p>further to provision within subsection <ref href="#d25e5978">(2)</ref>, or</p></content></level><level class="para1"><num>(b)</num><content><p>otherwise in connection with the scheme.</p></content></level></subsection><subsection><num>(4)</num><content><p>The provision that may be made by virtue of subsection <ref href="#d25e6020">(3)</ref> includes provision making it an offence to use or disclose information in an unauthorised manner; but such an offence may not be made punishable by imprisonment.</p></content></subsection><subsection><num>(5)</num><intro><p>Regulations under section <ref href="#d25e5593">38A</ref> that authorise the use or disclosure of information are not to be taken to authorise disclosure or use that would be liable to harm the commercial interests of any person, except to the extent that—</p></intro><level class="para1"><num>(a)</num><content><p>the regulations otherwise provide, or</p></content></level><level class="para1"><num>(b)</num><content><p>the person disclosing or using the information reasonably considers such disclosure or use necessary in view of the purpose of the regulations.</p></content></level></subsection><subsection eId="d25e6071"><num>(6)</num><intro><p>Regulations under section <ref href="#d25e5593">38A</ref> do not require or authorise the disclosure or use of information that—</p></intro><level class="para1"><num>(a)</num><content><p>contravenes the data protection legislation (but this section and the regulations are to be taken into account in determining whether the disclosure or use would contravene that legislation), or</p></content></level><level class="para1"><num>(b)</num><content><p>is prohibited by any of Parts 1 to 7 and Chapter 1 of Part 9 of the Investigatory Powers Act 2016.</p></content></level></subsection><subsection><num>(7)</num><content><p>In subsection <ref href="#d25e6071">(6)</ref>, “<term refersTo="#term-the-data-protection-legislation">the data protection legislation</term>” has the same meaning as in the Data Protection Act 2018 (see section 3 of that Act).</p></content></subsection></section></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-27-3"><num>(3)</num><content><p><mod>In section 106 (regulations and orders under the Act), in subsection <ref href="#d25e4853">(2ZA)</ref> (inserted by section <ref href="#section-23">23</ref><ref href="#section-23-3">(3)</ref>), after paragraph <ref href="#d25e4859">(a)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(b)</num><content><p>regulations under section <ref href="#d25e5593">38A</ref>.</p></content></level></quotedStructure></mod></p></content></subsection><subsection eId="section-27-4"><num>(4)</num><content><p><mod>In paragraph 6 of Schedule 6A (requirements enforceable against suppliers under section 25), before sub-paragraph (a) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(za)</num><content><p>any provision of regulations under section <ref href="#d25e5593">38A</ref> that is designated in the regulations as a relevant provision for the purposes of this paragraph;</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-electricity-transmission-period"><heading>Electricity transmission period</heading><section eId="section-28"><num>28</num><heading>Electricity transmission systems: extension of commissioning period</heading><content><p><mod>In <ref eId="c00049" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">section 6G</ref><ref eId="c00050" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">(1)</ref> of the <ref eId="c00051" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (meaning of “<term refersTo="#term-commissioning-period" eId="term-commissioning-period">commissioning period</term>” for the purposes of determining whether a person is to be regarded as participating in the transmission of electricity), in <ref eId="c00052" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">paragraph (b)</ref>, for “18 months” substitute <quotedText>“27 months”</quotedText>.</mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-electricity-generation-on-forestry-land"><heading>Electricity generation on forestry land</heading><section eId="section-29"><num>29</num><heading>Use of forestry estate for renewable electricity</heading><content><p><mod>In the Forestry Act 1967, after section 3 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e6197"><num>3A</num><heading>Use of land in connection with renewable electricity projects</heading><subsection eId="d25e6201"><num>(1)</num><intro><p>The Commissioners may—</p></intro><level class="para1"><num>(a)</num><content><p>use, or enter into arrangements in connection with the use of, English forestry land for the generation, storage, transmission or supply of renewable electricity;</p></content></level><level class="para1"><num>(b)</num><content><p>sell, or enter into other arrangements concerning, renewable electricity generated, stored or supplied on, or transmitted across, English forestry land;</p></content></level><level class="para1" eId="d25e6219"><num>(c)</num><intro><p>use, or enter into arrangements in connection with the use of, English forestry land for activity that—</p></intro><level class="para2"><num>(i)</num><content><p>is intended to satisfy, or enable the satisfaction of, a relevant condition of development (whether existing or contemplated), or</p></content></level><level class="para2"><num>(ii)</num><content><p>otherwise arises in connection with such a condition.</p></content></level></level></subsection><subsection><num>(2)</num><intro><p>For the purposes of subsection <ref href="#d25e6201">(1)</ref><ref href="#d25e6219">(c)</ref>, a relevant condition of development is a condition of development that—</p></intro><level class="para1"><num>(a)</num><content><p>relates to renewable electricity development located wholly or partly on English forestry land, and</p></content></level><level class="para1"><num>(b)</num><content><p>is intended to benefit the natural environment of land.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The exercise of the powers in subsection <ref href="#d25e6201">(1)</ref> for either of the following purposes is to be taken to be consistent with the Commissioners’ general duty under section 1(2)—</p></intro><level class="para1"><num>(a)</num><content><p>facilitating or promoting the use of renewable electricity;</p></content></level><level class="para1"><num>(b)</num><content><p>obtaining funds for meeting the expenses referred to in section 41(2).</p></content></level></subsection><subsection><num>(4)</num><content><p>When the Commissioners are considering the exercise of those powers, section 1(3A) applies as if it included a further paragraph referring to those purposes.</p></content></subsection><subsection><num>(5)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-condition-of-development">condition of development</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a condition to which planning permission is subject, or</p></content></level><level class="para1"><num>(b)</num><content><p>a requirement contained in an order granting development consent under the Planning Act 2008 (development consent for nationally significant infrastructure);</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-english-forestry-land">English forestry land</term>” means land placed at the disposal of the Commissioners under this Act;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-natural-environment">natural environment</term>”, in relation to land, includes—</p></intro><level class="para1"><num>(a)</num><content><p>its plants, animals and other living organisms,</p></content></level><level class="para1"><num>(b)</num><content><p>their habitats, and</p></content></level><level class="para1"><num>(c)</num><content><p>its geological features;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-renewable-electricity">renewable electricity</term>” means electricity produced from sources other than—</p></intro><level class="para1"><num>(a)</num><content><p>coal,</p></content></level><level class="para1"><num>(b)</num><content><p>lignite,</p></content></level><level class="para1"><num>(c)</num><content><p>peat,</p></content></level><level class="para1"><num>(d)</num><content><p>natural gas, within the meaning of the Energy Act 1976,</p></content></level><level class="para1"><num>(e)</num><content><p>crude liquid petroleum,</p></content></level><level class="para1"><num>(f)</num><content><p>petroleum products, within the meaning of the Energy Act 1976,</p></content></level><level class="para1"><num>(g)</num><content><p>any substance produced directly or indirectly from a substance within paragraphs <ref href="#d25e6345">(a)</ref> to <ref href="#d25e6365">(f)</ref>,</p></content></level><level class="para1"><num>(h)</num><content><p>energy derived from any substance within paragraphs <ref href="#d25e6345">(a)</ref> to <ref href="#d25e6369">(g)</ref>, or</p></content></level><level class="para1"><num>(i)</num><content><p>nuclear fuel;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-renewable-electricity-development">renewable electricity development</term>” means development the main purpose of which is the generation, storage, transmission or supply of renewable electricity.</p></content></hcontainer></subsection><subsection eId="d25e6400"><num>(6)</num><content><p>References in this section to the storage of electricity are to the storage of energy converted from electricity for the purpose of its reconversion into electricity.</p></content></subsection></section><section eId="d25e6412"><num>3B</num><heading>Section <ref href="#d25e6197">3A</ref>: power to require Secretary of State’s consent in certain cases</heading><subsection eId="d25e6416"><num>(1)</num><content><p>The Secretary of State may make regulations that, in a case within subsection <ref href="#d25e6428">(2)</ref>, require the consent of the Secretary of State to an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>.</p></content></subsection><subsection eId="d25e6428"><num>(2)</num><intro><p>The cases are those where—</p></intro><level class="para1"><num>(a)</num><content><p>a proposed exercise of the powers is intended to enable the construction on English forestry land of the whole or part of a generating station (including an extension to an existing station), and</p></content></level><level class="para1"><num>(b)</num><content><p>the capacity threshold is exceeded.</p></content></level></subsection><subsection><num>(3)</num><content><p>In the case of the construction of a new generating station, the capacity threshold is exceeded if it is expected that the generating capacity of the station would equal or exceed the relevant wattage.</p></content></subsection><subsection eId="d25e6452"><num>(4)</num><intro><p>In the case of an extension to an existing station, the capacity threshold is exceeded if it is expected that—</p></intro><level class="para1"><num>(a)</num><content><p>the extension would cause the generating capacity of the station to equal or exceed the relevant wattage, or</p></content></level><level class="para1" eId="d25e6464"><num>(b)</num><content><p>the extension, whether alone or taken together with previous non-consented extensions, would increase the generating capacity of the station by at least the relevant wattage.</p></content></level></subsection><subsection><num>(5)</num><intro><p>An extension is “<term refersTo="#term-non-consented">non-consented</term>” for the purposes of subsection <ref href="#d25e6452">(4)</ref><ref href="#d25e6464">(b)</ref> if—</p></intro><level class="para1"><num>(a)</num><content><p>it was enabled by an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>, and</p></content></level><level class="para1"><num>(b)</num><content><p>that exercise of those powers did not have the consent of the Secretary of State under regulations under subsection <ref href="#d25e6416">(1)</ref>.</p></content></level></subsection><subsection><num>(6)</num><intro><p>But an extension ceases to be “non-consented” for those purposes if—</p></intro><level class="para1"><num>(a)</num><content><p>a subsequent extension to the station in question is constructed having been enabled by an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>, and</p></content></level><level class="para1"><num>(b)</num><content><p>that exercise of those powers had the consent of the Secretary of State under regulations under subsection <ref href="#d25e6416">(1)</ref>.</p></content></level></subsection><subsection><num>(7)</num><intro><p>The relevant wattage is—</p></intro><level class="para1"><num>(a)</num><content><p>5 megawatts, if the station generates electricity from wind, and</p></content></level><level class="para1"><num>(b)</num><content><p>50 megawatts, if it does not.</p></content></level></subsection><subsection eId="d25e6544"><num>(8)</num><content><p>The Secretary of State may by regulations amend this section so as to change the relevant wattage (including by adding or combining categories of station in relation to which a particular wattage is prescribed).</p></content></subsection><subsection><num>(9)</num><intro><p>In calculating the relevant wattage there is to be disregarded—</p></intro><level class="para1"><num>(a)</num><content><p>in the case of a generating station only partly situated on English forestry land, any generating capacity that can be attributed to parts not situated on English forestry land;</p></content></level><level class="para1"><num>(b)</num><content><p>in the case of a generating station whose capacity is provided in part by facilities for the storage of electricity and in part by other means, the capacity provided by those facilities.</p></content></level></subsection><subsection><num>(10)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-generating-station">generating station</term>” has the same meaning as in Part 1 of the Electricity Act 1989 (see section 64(1));</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-storage">storage</term>” is to be read in accordance with section <ref href="#d25e6197">3A</ref><ref href="#d25e6400">(6)</ref>.</p></content></hcontainer></subsection></section><section><num>3C</num><heading>Regulations under section <ref href="#d25e6412">3B</ref>: further provision</heading><subsection><num>(1)</num><intro><p>Regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6416">(1)</ref> may—</p></intro><level class="para1"><num>(a)</num><content><p>make provision about the process by which consent is to be sought and given or refused;</p></content></level><level class="para1"><num>(b)</num><content><p>provide for consent to be given subject to conditions.</p></content></level></subsection><subsection><num>(2)</num><intro><p>Regulations under section <ref href="#d25e6412">3B</ref> may—</p></intro><level class="para1"><num>(a)</num><content><p>make different provision for different purposes or areas;</p></content></level><level class="para1"><num>(b)</num><content><p>include consequential, incidental, supplementary, transitional or saving provision.</p></content></level></subsection><subsection><num>(3)</num><content><p>Regulations under section <ref href="#d25e6412">3B</ref> are to be made by statutory instrument.</p></content></subsection><subsection><num>(4)</num><content><p>A statutory instrument containing (whether alone or with other provision) regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6544">(8)</ref> may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection><num>(5)</num><content><p>A statutory instrument containing regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6416">(1)</ref> (but not regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6544">(8)</ref>) is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection></section></quotedStructure></mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-wind-generating-stations-and-seismic-array-systems"><heading>Wind generating stations and seismic array systems</heading><section eId="section-30"><num>30</num><heading>Wind generating stations that may affect seismic array systems</heading><subsection eId="section-30-1"><num>(1)</num><content><p>The Secretary of State may make regulations about planning permissions or consents relating to wind generating stations that may affect the functioning of a relevant seismic array system.</p></content></subsection><subsection eId="section-30-2"><num>(2)</num><intro><p>A “relevant seismic array system” is a spatially distributed system of linked seismometers, arranged so as to enhance the detection and characterisation of seismic signals, that—</p></intro><level class="para1" eId="section-30-2-a"><num>(a)</num><content><p>is used for defence purposes, and</p></content></level><level class="para1" eId="section-30-2-b"><num>(b)</num><content><p>is in use on the day on which this Act is passed.</p></content></level></subsection><subsection eId="section-30-3"><num>(3)</num><intro><p>The regulations may provide for—</p></intro><level class="para1" eId="section-30-3-a"><num>(a)</num><content><p>an exclusion zone, and</p></content></level><level class="para1" eId="section-30-3-b"><num>(b)</num><content><p>a restricted zone,</p></content></level><wrapUp><p>around a relevant seismic array system.</p></wrapUp></subsection><subsection eId="section-30-4"><num>(4)</num><intro><p>The regulations may—</p></intro><level class="para1" eId="section-30-4-a"><num>(a)</num><content><p>require a planning decision-maker to refuse, or decline to determine or accept, a planning application relating to a wind generating station that is (or would be) situated in an exclusion zone;</p></content></level><level class="para1" eId="section-30-4-b"><num>(b)</num><content><p>provide that a relevant development order or MCA scheme may not be made if it would grant planning permission for development relating to a wind generating station that is (or would be) situated in an exclusion zone;</p></content></level><level class="para1" eId="section-30-4-c"><num>(c)</num><content><p>allow the Secretary of State to direct that a relevant development order or MCA scheme may not be made if it would grant such planning permission.</p></content></level></subsection><subsection eId="section-30-5"><num>(5)</num><intro><p>The regulations may, in relation to a planning application relating to a wind generating station that is (or would be) situated in a restricted zone—</p></intro><level class="para1" eId="section-30-5-a"><num>(a)</num><content><p>require the applicant to provide specified information about the seismic impact of the proposals (“seismic impact information”) to which their application relates;</p></content></level><level class="para1" eId="section-30-5-b"><num>(b)</num><content><p>require the planning decision-maker to use the seismic impact information in a specified way when determining the application (including when determining conditions relating to a permission or consent);</p></content></level><level class="para1" eId="section-30-5-c"><num>(c)</num><content><p>require the planning decision-maker to refuse, or decline to determine or accept, the application in specified circumstances;</p></content></level><level class="para1" eId="section-30-5-d"><num>(d)</num><content><p>require the planning decision-maker to provide the Secretary of State with the seismic impact information, and to seek the Secretary of State’s views on the seismic impact of the proposals;</p></content></level><level class="para1" eId="section-30-5-e"><num>(e)</num><content><p>require the planning decision-maker to refuse, or decline to determine or accept, the application if the Secretary of State objects to it on grounds relating to the seismic impact of the proposals.</p></content></level></subsection><subsection eId="section-30-6"><num>(6)</num><intro><p>The regulations may—</p></intro><level class="para1" eId="section-30-6-a"><num>(a)</num><content><p>require a person proposing to make a relevant development order or MCA scheme to consult the Secretary of State if the order or scheme would grant planning permission for development relating to a wind generating station that is (or would be) situated in a restricted zone;</p></content></level><level class="para1" eId="section-30-6-b"><num>(b)</num><content><p>allow the Secretary of State to direct that a relevant development order or MCA scheme may not be made if it would grant such planning permission.</p></content></level></subsection><subsection eId="section-30-7"><num>(7)</num><intro><p>The regulations may include provision about the procedure for planning applications to which they relate, such as—</p></intro><level class="para1" eId="section-30-7-a"><num>(a)</num><content><p>provision enabling or requiring a planning decision-maker to decline to determine or accept an application;</p></content></level><level class="para1" eId="section-30-7-b"><num>(b)</num><content><p>provision modifying the process for determining an application;</p></content></level><level class="para1" eId="section-30-7-c"><num>(c)</num><content><p>provision allowing the Secretary of State to give a direction to the planning-decision maker about the procedure for an application;</p></content></level><level class="para1" eId="section-30-7-d"><num>(d)</num><content><p>provision modifying or disapplying a right of appeal or review;</p></content></level><level class="para1" eId="section-30-7-e"><num>(e)</num><content><p>provision disapplying a duty imposed on a planning decision-maker when determining an application.</p></content></level></subsection><subsection eId="section-30-8"><num>(8)</num><content><p>The regulations may require a planning decision-maker to have regard to guidance issued by the Secretary of State.</p></content></subsection><subsection eId="section-30-9"><num>(9)</num><intro><p>Regulations under this section may—</p></intro><level class="para1" eId="section-30-9-a"><num>(a)</num><content><p>amend or repeal provision contained in an Act of Parliament or an Act of the Scottish Parliament;</p></content></level><level class="para1" eId="section-30-9-b"><num>(b)</num><content><p>make different provision for different purposes or areas;</p></content></level><level class="para1" eId="section-30-9-c"><num>(c)</num><content><p>make provision binding the Crown;</p></content></level><level class="para1" eId="section-30-9-d"><num>(d)</num><content><p>make transitional, transitory or saving provision;</p></content></level><level class="para1" eId="section-30-9-e"><num>(e)</num><content><p>make incidental, supplementary or consequential provision.</p></content></level></subsection><subsection eId="section-30-10"><num>(10)</num><content><p>Regulations under this section are to be made by statutory instrument.</p></content></subsection><subsection eId="section-30-11"><num>(11)</num><content><p>A statutory instrument containing regulations under this section which amend or repeal provision contained in an Act of Parliament or an Act of the Scottish Parliament may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection eId="section-30-12"><num>(12)</num><content><p>Any other statutory instrument containing regulations under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-30-13"><num>(13)</num><content><p>If a draft of a statutory instrument containing regulations under this section would, apart from this subsection, be treated for the purposes of the standing orders of either House of Parliament as a hybrid instrument, it is to proceed in that House as if it were not such an instrument.</p></content></subsection><subsection eId="section-30-14"><num>(14)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-mca-scheme" eId="term-mca-scheme">MCA scheme</term>” means a masterplan consent area scheme made under Part 3 of the Town and Country Planning (Scotland) Act 1997;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-planning-application" eId="term-planning-application">planning application</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>an application for planning permission under Part 3 or Part 13 of the Town and Country Planning Act 1990,</p></content></level><level class="para1"><num>(b)</num><content><p>an application for planning permission under Part 3 or Part 12 of the Town and Country Planning (Scotland) Act 1997,</p></content></level><level class="para1"><num>(c)</num><content><p>an application for an order granting development consent under section 37 of the Planning Act 2008, or</p></content></level><level class="para1"><num>(d)</num><content><p>an application under section 36 or 36C of the Electricity Act 1989 (consent for construction etc of generating station);</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-planning-decision-maker" eId="term-planning-decision-maker">planning decision-maker</term>” means a person who determines a planning application;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-development-order" eId="term-relevant-development-order">relevant development order</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a local development order made under section 61A of the Town and Country Planning Act 1990;</p></content></level><level class="para1"><num>(b)</num><content><p>a Mayoral development order made under section 61DA of that Act;</p></content></level><level class="para1"><num>(c)</num><content><p>a neighbourhood development order made under section 61E of that Act;</p></content></level><level class="para1"><num>(d)</num><content><p>a development order made under section 30 of the Town and Country Planning (Scotland) Act 1997;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-wind-generating-station" eId="term-wind-generating-station">wind generating station</term>” means a generating station that generates electricity from wind.</p></content></hcontainer></subsection></section></hcontainer></chapter> — Electricity generation on forestry land
Part 1 — Infrastructure — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" eId="part-1-chapter-2"><num>Chapter 2</num><heading>Electricity infrastructure</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-connections-to-the-electricity-transmission-and-distribution-systems"><heading>Connections to the electricity transmission and distribution systems</heading><section eId="section-14"><num>14</num><heading>Connections to electricity network: licence and other modifications</heading><subsection eId="section-14-1"><num>(1)</num><intro><p>A relevant authority may modify—</p></intro><level class="para1" eId="section-14-1-a"><num>(a)</num><content><p>the conditions of a particular electricity licence;</p></content></level><level class="para1" eId="section-14-1-b"><num>(b)</num><content><p>the terms of a particular electricity licence;</p></content></level><level class="para1" eId="section-14-1-c"><num>(c)</num><content><p>the standard conditions of electricity licences of a particular type;</p></content></level><level class="para1" eId="section-14-1-d"><num>(d)</num><content><p>a document maintained in accordance with the conditions of an electricity licence;</p></content></level><level class="para1" eId="section-14-1-e"><num>(e)</num><content><p>an agreement entered into in pursuance of a document maintained as mentioned in <ref href="#section-14-1-d">paragraph (d)</ref>;</p></content></level><level class="para1" eId="section-14-1-f"><num>(f)</num><content><p>a qualifying distribution agreement.</p></content></level></subsection><subsection eId="section-14-2"><num>(2)</num><content><p>A relevant authority may exercise the power under <ref href="#section-14-1">subsection (1)</ref> only for the purpose of improving the process for managing connections to the transmission system or the distribution system (and such an improvement may include changing the order in which connections are made).</p></content></subsection><subsection eId="section-14-3"><num>(3)</num><content><p>The Secretary of State may direct the GEMA to exercise the power under <ref href="#section-14-1">subsection (1)</ref>.</p></content></subsection><subsection eId="section-14-4"><num>(4)</num><content><p>The Secretary of State may exercise the power under <ref href="#section-14-3">subsection (3)</ref> only for the purpose mentioned in <ref href="#section-14-2">subsection (2)</ref>.</p></content></subsection><subsection eId="section-14-5"><num>(5)</num><content><p>The power conferred by <ref href="#section-14-1">subsection (1)</ref> may not be exercised after the end of the period of three years beginning with the day on which <ref href="#section-14">this section</ref> comes into force.</p></content></subsection><subsection eId="section-14-6"><num>(6)</num><content><p><ref eId="c00005" href="https://www.legislation.gov.uk/ukpga/1989/29/section/3A">Section 3A</ref> of the <ref eId="c00006" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (principal objective and general duties) applies in relation to the functions of the Secretary of State and the GEMA under <ref href="#section-14">this section</ref> and sections <ref href="#section-15">15</ref> to <ref href="#section-17">17</ref> as it applies in relation to functions of the Secretary of State or the GEMA under <ref eId="c00007" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of <ref eId="c00008" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">that Act</ref>.</p></content></subsection><subsection eId="section-14-7"><num>(7)</num><content><p>A relevant authority may under <ref href="#section-14-1">subsection (1)</ref> modify an agreement mentioned in <ref href="#section-14-1">subsection (1)</ref><ref href="#section-14-1-e">(e)</ref> or a qualifying distribution agreement even if the effect of the modification might amount to a repudiation of the agreement.</p></content></subsection><subsection eId="section-14-8"><num>(8)</num><intro><p>In <ref href="#section-14">this section</ref> and sections <ref href="#section-15">15</ref> to <ref href="#section-17">17</ref>—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-distribution-system" eId="term-distribution-system">distribution system</term>” has the same meaning as in <ref eId="c00009" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00010" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (see the definition of “distribute” in section 4(4) of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-electricity-distributor" eId="term-electricity-distributor">electricity distributor</term>” has the same meaning as in Part 1 of that Act (see section 6(9) of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-electricity-licence" eId="term-electricity-licence">electricity licence</term>” means a licence for the purposes of section 4 of that Act;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-gema" eId="term-the-gema">the GEMA</term>” means the Gas and Electricity Markets Authority;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-qualifying-distribution-agreement" eId="term-qualifying-distribution-agreement">qualifying distribution agreement</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>the terms subject to which a connection is made by an electricity distributor in pursuance of section 16(1) of the Electricity Act 1989, or</p></content></level><level class="para1"><num>(b)</num><content><p>a special connection agreement as defined by section 22(1) of that Act;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-relevant-authority" eId="term-relevant-authority">relevant authority</term>” means the Secretary of State or the GEMA;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-transmission-system" eId="term-transmission-system">transmission system</term>” has the same meaning as in <ref eId="c00011" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00012" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (see section 4(4) of that Act).</p></content></hcontainer></subsection></section><section eId="section-15"><num>15</num><heading>Scope of modification power under <ref href="#section-14">section 14</ref></heading><subsection eId="section-15-1"><num>(1)</num><content><p>The power conferred by <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> to “<term refersTo="#term-modify" eId="term-modify">modify</term>” includes power to amend, add to or remove (and, in particular, includes power to make a person a party to an agreement or to discharge a party from its obligations under an agreement); and references in <ref href="#section-14">section 14</ref>, <ref href="#section-15">this section</ref> and <ref href="#section-16">section 16</ref> to modification are to be construed accordingly.</p></content></subsection><subsection eId="section-15-2"><num>(2)</num><intro><p>The power conferred by <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref>—</p></intro><level class="para1" eId="section-15-2-a"><num>(a)</num><content><p>may be exercised generally, only in relation to specified cases, or subject to exceptions (including by making provision for a case to be excepted only so long as specified conditions are satisfied);</p></content></level><level class="para1" eId="section-15-2-b"><num>(b)</num><content><p>may be exercised differently for different purposes or areas;</p></content></level><level class="para1" eId="section-15-2-c"><num>(c)</num><content><p>includes power to make incidental, supplementary, consequential or transitional modifications.</p></content></level></subsection><subsection eId="section-15-3"><num>(3)</num><intro><p>Provision included in an electricity licence by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-a">(a)</ref> or <ref href="#section-14-1-c">(c)</ref>—</p></intro><level class="para1" eId="section-15-3-a"><num>(a)</num><content><p>may include provision of a kind mentioned in <ref eId="c00013" href="https://www.legislation.gov.uk/ukpga/1989/29/section/7">section 7</ref> of the <ref eId="c00014" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref>;</p></content></level><level class="para1" eId="section-15-3-b"><num>(b)</num><content><p>need not relate to the activities authorised by the licence.</p></content></level></subsection><subsection eId="section-15-4"><num>(4)</num><content><p>The modification under <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> of part of a standard condition of an electricity licence does not prevent any other part of the condition from continuing to be regarded as a standard condition for the purposes of <ref eId="c00015" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00016" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref>.</p></content></subsection><subsection eId="section-15-5"><num>(5)</num><content><p>If under <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref> a relevant authority modifies the standard conditions of an electricity licence of a particular type, the GEMA must make the same modifications of those standard conditions for the purposes of their incorporation in electricity licences of that type granted after that time.</p></content></subsection><subsection eId="section-15-6"><num>(6)</num><content><p>Provision included in an electricity licence by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-b">(b)</ref> may in particular include provision about the circumstances in which the licence may be revoked or suspended.</p></content></subsection><subsection eId="section-15-7"><num>(7)</num><intro><p>Provision included in an agreement by virtue of <ref href="#section-14">section 14</ref><ref href="#section-14-1">(1)</ref><ref href="#section-14-1-e">(e)</ref> or <ref href="#section-14-1-f">(f)</ref> may in particular include provision—</p></intro><level class="para1" eId="section-15-7-a"><num>(a)</num><content><p>requiring specified conditions to be met before the taking of particular steps under the agreement;</p></content></level><level class="para1" eId="section-15-7-b"><num>(b)</num><content><p>about the procedure for varying the agreement.</p></content></level></subsection><subsection eId="section-15-8"><num>(8)</num><intro><p>In <ref eId="c00017" href="https://www.legislation.gov.uk/ukpga/2000/27/section/33">section 33</ref> of the <ref eId="c00018" href="https://www.legislation.gov.uk/ukpga/2000/27/contents">Utilities Act 2000</ref> (standard conditions of electricity licences), in <ref eId="c00019" href="https://www.legislation.gov.uk/ukpga/2000/27/section/33">subsection (1)</ref>—</p></intro><level class="para1" eId="section-15-8-a"><num>(a)</num><content><p>omit the “or” at the end of paragraph (k), and</p></content></level><level class="para1" eId="section-15-8-b"><num>(b)</num><content><p><mod>at the end insert <quotedText startQuote="&#x201C;">, or</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(m)</num><content><p>under <ref href="#section-14">section 14</ref> of the Planning and Infrastructure Act 2025.</p></content></level></quotedStructure></mod></p></content></level></subsection></section><section eId="section-16"><num>16</num><heading>Procedure relating to modifications under <ref href="#section-14">section 14</ref></heading><subsection eId="section-16-1"><num>(1)</num><intro><p>Before making a modification under <ref href="#section-14">section 14</ref>, a relevant authority must consult—</p></intro><level class="para1" eId="section-16-1-a"><num>(a)</num><content><p>the holder of any electricity licence proposed to be modified,</p></content></level><level class="para1" eId="section-16-1-b"><num>(b)</num><content><p>the Independent System Operator and Planner,</p></content></level><level class="para1" eId="section-16-1-c"><num>(c)</num><content><p>the GEMA or the Secretary of State (depending on which relevant authority is proposing to make the modification), and</p></content></level><level class="para1" eId="section-16-1-d"><num>(d)</num><content><p>such other persons as the relevant authority considers appropriate.</p></content></level></subsection><subsection eId="section-16-2"><num>(2)</num><content><p>Subsection <ref href="#section-16-1">(1)</ref> may be satisfied by consultation carried out before the passing of this Act (as well as by consultation carried out after that time).</p></content></subsection><subsection eId="section-16-3"><num>(3)</num><content><p>A relevant authority must publish details of any modifications made by it under <ref href="#section-14">section 14</ref> as soon as reasonably practicable after they are made.</p></content></subsection><subsection eId="section-16-4"><num>(4)</num><content><p>A relevant authority may exclude from publication under <ref href="#section-16-3">subsection (3)</ref> any information the publication of which would be likely to prejudice the commercial interests of any person.</p></content></subsection><subsection eId="section-16-5"><num>(5)</num><content><p>In <ref href="#section-16">this section</ref>, “<term refersTo="#term-the-independent-system-operator-and-planner" eId="term-the-independent-system-operator-and-planner">the Independent System Operator and Planner</term>” means the person for the time being designated under <ref eId="c00020" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">section 162</ref><ref eId="c00021" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">(1)</ref> of the <ref eId="c00022" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref>.</p></content></subsection></section><section eId="section-17"><num>17</num><heading>Directions to modify connection agreements</heading><subsection eId="section-17-1"><num>(1)</num><intro><p>A relevant authority may—</p></intro><level class="para1" eId="section-17-1-a"><num>(a)</num><content><p>direct the Independent System Operator and Planner (“the ISOP”) to modify an agreement entered into by the ISOP pursuant to a document maintained in accordance with the conditions of an electricity licence;</p></content></level><level class="para1" eId="section-17-1-b"><num>(b)</num><content><p>direct an electricity distributor to modify a qualifying distribution agreement entered into by the electricity distributor.</p></content></level></subsection><subsection eId="section-17-2"><num>(2)</num><content><p>A relevant authority may exercise the power conferred by <ref href="#section-17-1">subsection (1)</ref> only for the purpose of improving the process for managing connections to the transmission system or the distribution system (and such an improvement may include changing the order in which connections are made).</p></content></subsection><subsection eId="section-17-3"><num>(3)</num><content><p>A direction under subsection <ref href="#section-17-1">(1)</ref> must describe the kinds of modification to be made by the person to whom it is given.</p></content></subsection><subsection eId="section-17-4"><num>(4)</num><intro><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may also require the person to whom it is given to modify an agreement by including in it provision—</p></intro><level class="para1" eId="section-17-4-a"><num>(a)</num><content><p>requiring specified conditions to be met before the taking of particular steps under the agreement;</p></content></level><level class="para1" eId="section-17-4-b"><num>(b)</num><content><p>about the procedure for varying the agreement.</p></content></level></subsection><subsection eId="section-17-5"><num>(5)</num><content><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may be expressed as having effect generally, in relation to cases within a description specified in the direction, or in relation to a particular case.</p></content></subsection><subsection eId="section-17-6"><num>(6)</num><intro><p>Before giving a direction under subsection <ref href="#section-17-1">(1)</ref>, the relevant authority must consult—</p></intro><level class="para1" eId="section-17-6-a"><num>(a)</num><content><p>the person to whom it proposes to give the direction, and</p></content></level><level class="para1" eId="section-17-6-b"><num>(b)</num><content><p>such other persons as the relevant authority considers appropriate.</p></content></level></subsection><subsection eId="section-17-7"><num>(7)</num><content><p>Subsection <ref href="#section-17-6">(6)</ref> may be satisfied by consultation carried out before the passing of this Act (as well as by consultation carried out after that time).</p></content></subsection><subsection eId="section-17-8"><num>(8)</num><content><p>A relevant authority must publish details of any direction it gives under subsection <ref href="#section-17-1">(1)</ref> as soon as reasonably practicable after the direction is given.</p></content></subsection><subsection eId="section-17-9"><num>(9)</num><content><p>A relevant authority may exclude from publication under subsection <ref href="#section-17-8">(8)</ref> any information the publication of which would be likely to prejudice the commercial interests of any person.</p></content></subsection><subsection eId="section-17-10"><num>(10)</num><content><p>A person to whom a direction is given under <ref href="#section-17-1">subsection (1)</ref> must comply with it, even if the effect of a modification made to an agreement as a result of the direction might amount to a repudiation of the agreement.</p></content></subsection><subsection eId="section-17-11"><num>(11)</num><content><p>The power to give a direction under subsection <ref href="#section-17-1">(1)</ref> may not be exercised after the end of the period of three years beginning with the day on which this section comes into force.</p></content></subsection><subsection eId="section-17-12"><num>(12)</num><content><p>A direction under <ref href="#section-17-1">subsection (1)</ref> may be varied or revoked by a subsequent direction given by a relevant authority.</p></content></subsection><subsection eId="section-17-13"><num>(13)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-the-independent-system-operator-and-planner" eId="term-the-independent-system-operator-and-planner">the Independent System Operator and Planner</term>” means the person for the time being designated under <ref eId="c00023" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">section 162</ref><ref eId="c00024" href="https://www.legislation.gov.uk/ukpga/2023/52/section/162">(1)</ref> of the <ref eId="c00025" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref>;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-modify" eId="term-modify">modify</term>” includes amend, add to and remove (and, in particular, includes making a person a party to an agreement and discharging a party from its obligations under an agreement).</p></content></hcontainer></subsection><subsection eId="section-17-14"><num>(14)</num><intro><p>In Schedule 6A to the Electricity Act 1989 (provisions imposing obligations enforceable as relevant requirements)—</p></intro><level class="para1" eId="section-17-14-a"><num>(a)</num><content><p><mod>in paragraph 4A (electricity system operator), after sub-paragraph (c) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><level class="para1"><num>(d)</num><content><p>section <ref href="#section-17">17</ref><ref href="#section-17-10">(10)</ref> of the Planning and Infrastructure Act 2025 (duty to comply with direction under <ref href="#section-17">section 17</ref> of that Act).</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-17-14-b"><num>(b)</num><content><p><mod>in paragraph 5 (distribution licence holders), after sub-paragraph (g) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><level class="para1"><num>(h)</num><content><p>section <ref href="#section-17">17</ref><ref href="#section-17-10">(10)</ref> of the Planning and Infrastructure Act 2025 (duty to comply with direction under <ref href="#section-17">section 17</ref> of that Act).</p></content></level></quotedStructure></mod></p></content></level></subsection></section><section eId="section-18"><num>18</num><heading>Managing connections to the network: strategic plans etc</heading><subsection eId="section-18-1"><num>(1)</num><content><p><mod>In <ref eId="c00026" href="https://www.legislation.gov.uk/ukpga/2023/52/part/5">Part 5</ref> of the <ref eId="c00027" href="https://www.legislation.gov.uk/ukpga/2023/52/contents">Energy Act 2023</ref> (Independent System Operator and Planner), after <ref eId="c00028" href="https://www.legislation.gov.uk/ukpga/2023/52/section/165">section 165</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e3701"><num>165A</num><heading>Functions relating to network connections: duty to have regard to designated plans</heading><subsection eId="d25e3705"><num>(1)</num><content><p>The ISOP must, when carrying out any of its functions relating to the management of connections to the transmission system, have regard to the designated strategic plans.</p></content></subsection><subsection eId="d25e3711"><num>(2)</num><content><p>The Secretary of State may by regulations designate plans or documents for the purposes of this section.</p></content></subsection><subsection><num>(3)</num><content><p>In <ref href="#d25e3705">subsection (1)</ref>, the reference to “<term refersTo="#term-the-designated-strategic-plans">the designated strategic plans</term>” is a reference to those plans or documents designated by regulations under <ref href="#d25e3711">subsection (2)</ref> as they have effect at the time when the regulations are made.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-18-2"><num>(2)</num><content><p><ref eId="c00029" href="https://www.legislation.gov.uk/ukpga/1989/29/part/1">Part 1</ref> of the <ref eId="c00030" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (electricity supply) is amended as set out in <span><ref href="#section-18-3">subsections (3)</ref> to <ref href="#section-18-5">(5)</ref></span>.</p></content></subsection><subsection eId="section-18-3"><num>(3)</num><intro><p>In <ref eId="c00031" href="https://www.legislation.gov.uk/ukpga/1989/29/section/16">section 16</ref> (duty to connect on request)—</p></intro><level class="para1" eId="section-18-3-a"><num>(a)</num><content><p><mod>after <ref eId="c00032" href="https://www.legislation.gov.uk/ukpga/1989/29/section/16">subsection (2)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(2A)</num><content><p>In deciding how to comply with the duties under this section, and in particular in deciding how to prioritise persons requiring a connection, an electricity distributor must have regard to the designated strategic plans.</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-18-3-b"><num>(b)</num><content><p><mod>at the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(6)</num><content><p>In this section, “<term refersTo="#term-the-designated-strategic-plans">the designated strategic plans</term>” means the plans or documents designated by regulations made under section <ref href="#d25e3701">165A</ref><ref href="#d25e3711">(2)</ref> of the Energy Act 2023 (functions of the Independent System Operator and Planner relating to network connections).</p></content></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-18-4"><num>(4)</num><intro><p>In <ref eId="c00033" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">section 17</ref> (exceptions from duty to connect), in <ref eId="c00034" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">subsection (1)</ref>—</p></intro><level class="para1" eId="section-18-4-a"><num>(a)</num><content><p>omit the “or” at the end of <ref eId="c00035" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">paragraph (b)</ref>;</p></content></level><level class="para1" eId="section-18-4-b"><num>(b)</num><content><p><mod>after <ref eId="c00036" href="https://www.legislation.gov.uk/ukpga/1989/29/section/17">paragraph (b)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(ba)</num><content><p>it would not be in accordance with the designated strategic plans (within the meaning of section 16) for the distributor to do so; or</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></level></subsection><subsection eId="section-18-5"><num>(5)</num><content><p><mod>In <ref eId="c00037" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A">Schedule 6A</ref> (provisions imposing obligations enforceable as relevant requirements), in <ref eId="c00038" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A/paragraph/4A">paragraph 4A</ref> (electricity system operator), in <ref eId="c00039" href="https://www.legislation.gov.uk/ukpga/1989/29/schedule/6A/paragraph/4A">paragraph (c)</ref>, for “165” substitute <quotedText>“<ref href="#d25e3701">165A</ref>”</quotedText>.</mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-consents-for-electricity-infrastructure-in-scotland"><heading>Consents for electricity infrastructure in Scotland</heading><section eId="section-19"><num>19</num><heading>Consents for generating stations and overhead lines: applications</heading><subsection eId="section-19-1"><num>(1)</num><content><p>Schedule 8 to the Electricity Act 1989 (consents of the Secretary of State and the Scottish Ministers under sections 36 and 37) is amended as follows.</p></content></subsection><subsection eId="section-19-2"><num>(2)</num><content><p><mod>After paragraph 1 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Applications made to the Scottish Ministers for consent</heading><paragraph eId="d25e3890" class="schProv1"><num>1A</num><subparagraph><num>(1)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations make provision about the following matters in relation to applications to the Scottish Ministers for consent under section 36 or 37.</p></content></subparagraph><subparagraph eId="d25e3900"><num>(2)</num><intro><p>The matters are—</p></intro><level class="para1" eId="d25e3906"><num>(a)</num><content><p>the steps a person must take before making an application;</p></content></level><level class="para1"><num>(b)</num><content><p>the information that must be included in an application;</p></content></level><level class="para1" eId="d25e3918"><num>(c)</num><content><p>an acceptance stage, during which the Scottish Ministers must assess an applicant’s compliance with any requirements imposed by the regulations in order to decide whether or not to accept the application;</p></content></level><level class="para1"><num>(d)</num><intro><p>fees to be paid to the Scottish Ministers—</p></intro><level class="para2"><num>(i)</num><content><p>on application, or</p></content></level><level class="para2"><num>(ii)</num><content><p>for anything done by them in relation to a proposed application;</p></content></level></level><level class="para1"><num>(e)</num><content><p>requests by the Scottish Ministers for additional information to aid their decision whether or not to accept an application or to grant consent.</p></content></level></subparagraph><subparagraph eId="d25e3948"><num>(3)</num><intro><p>The steps that may be the subject of provision made by virtue of sub-paragraph (2)(a) include—</p></intro><level class="para1"><num>(a)</num><content><p>notifying prescribed persons of the proposed application,</p></content></level><level class="para1"><num>(b)</num><content><p>publicising the proposed application, and</p></content></level><level class="para1" eId="d25e3966"><num>(c)</num><content><p>carrying out a consultation about the proposed application.</p></content></level></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-3"><num>(3)</num><intro><p>In paragraph 2 (objections by relevant planning authority)—</p></intro><level class="para1" eId="section-19-3-a"><num>(a)</num><content><p><mod>in sub-paragraph (1), for “Secretary of State for his” substitute <quotedText>“appropriate authority for a”</quotedText>;</mod></p></content></level><level class="para1" eId="section-19-3-b"><num>(b)</num><content><p><mod>in sub-paragraph (2), at the beginning insert <quotedText>“In the case of an application made to the Secretary of State,”</quotedText>;</mod></p></content></level><level class="para1" eId="section-19-3-c"><num>(c)</num><content><p><mod>after sub-paragraph (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><subparagraph><num>(2A)</num><intro><p>In the case of an application made to the Scottish Ministers, where the relevant planning authority notify the Scottish Ministers that they object to the application and their objection is not withdrawn, the Scottish Ministers—</p></intro><level class="para1"><num>(a)</num><content><p>must appoint a person (referred to in this Schedule as the “<term refersTo="#term-reporter">reporter</term>”) to examine the application, and</p></content></level><level class="para1"><num>(b)</num><content><p>before determining whether to give their consent, must consider the objection and the reporter’s final report.</p></content></level><wrapUp><p>See paragraph 2A for the process that must be followed by the reporter.</p></wrapUp></subparagraph></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-19-3-d"><num>(d)</num><intro><p>in sub-paragraph (4)—</p></intro><level class="para2" eId="section-19-3-d-i"><num>(i)</num><content><p><mod>after “(2)” insert <quotedText>“or (2A)”</quotedText>;</mod></p></content></level><level class="para2" eId="section-19-3-d-ii"><num>(ii)</num><content><p><mod>for “Secretary of State” substitute <quotedText>“appropriate authority”</quotedText>;</mod></p></content></level></level><level class="para1" eId="section-19-3-e"><num>(e)</num><content><p><mod>in sub-paragraph (5), for “Secretary of State” substitute <quotedText>“appropriate authority”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-19-4"><num>(4)</num><content><p><mod>After paragraph 2 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Procedure following objection by relevant planning authority: Scotland</heading><paragraph eId="d25e4075" class="schProv1"><num>2A</num><subparagraph><num>(1)</num><content><p>A reporter appointed under paragraph 2(2A)(a) must make proposals as regards the appropriate procedure for examining the application.</p></content></subparagraph><subparagraph eId="d25e4085"><num>(2)</num><intro><p>The appropriate procedure may consist of one or more of the following—</p></intro><level class="para1"><num>(a)</num><intro><p>considering—</p></intro><level class="para2"><num>(i)</num><content><p>the objection by the relevant planning authority,</p></content></level><level class="para2"><num>(ii)</num><content><p>any other objections made in accordance with regulations under paragraph 3(1)(c), and</p></content></level><level class="para2"><num>(iii)</num><content><p>any other representations made in accordance with an enactment;</p></content></level></level><level class="para1" eId="d25e4115"><num>(b)</num><content><p>considering new written representations about the application from persons specified by the reporter;</p></content></level><level class="para1" eId="d25e4121"><num>(c)</num><content><p>holding one or more hearing sessions;</p></content></level><level class="para1"><num>(d)</num><content><p>carrying out an inspection of the land to which the application relates;</p></content></level><level class="para1" eId="d25e4133"><num>(e)</num><content><p>holding a public inquiry.</p></content></level></subparagraph><subparagraph eId="d25e4139"><num>(3)</num><content><p>Where the reporter proposes a procedure that includes proceedings within sub-paragraph (2)(b), (c) or (e), the proposal must include a statement of the issues that are proposed to be within the scope of each of those proceedings.</p></content></subparagraph><subparagraph><num>(4)</num><intro><p>The reporter must—</p></intro><level class="para1"><num>(a)</num><content><p>publish the proposals,</p></content></level><level class="para1"><num>(b)</num><content><p>notify all interested parties of the proposals, and</p></content></level><level class="para1"><num>(c)</num><content><p>invite written representations about the proposals before the end of the time period specified by the reporter.</p></content></level></subparagraph><subparagraph><num>(5)</num><content><p>The published proposals must include or be accompanied by an explanation of the reasons for the proposals.</p></content></subparagraph><subparagraph><num>(6)</num><content><p>The reporter may hold a meeting to hear representations about the proposals.</p></content></subparagraph><subparagraph><num>(7)</num><intro><p>After considering the representations, the reporter must—</p></intro><level class="para1"><num>(a)</num><content><p>decide on the appropriate procedure for examining the application, and</p></content></level><level class="para1"><num>(b)</num><content><p>publish that decision.</p></content></level></subparagraph><subparagraph><num>(8)</num><intro><p>The published decision must include or be accompanied by an explanation of—</p></intro><level class="para1"><num>(a)</num><content><p>the reasons for the decision,</p></content></level><level class="para1"><num>(b)</num><content><p>the intended time period for the carrying out of the procedure, and</p></content></level><level class="para1"><num>(c)</num><content><p>the intended time period within which the reporter will send a final report to the Scottish Ministers.</p></content></level></subparagraph><subparagraph><num>(9)</num><content><p>Sub-paragraph (3) applies to the reporter’s decision as it applies to the reporter’s proposals.</p></content></subparagraph><subparagraph><num>(10)</num><content><p>On completing the examination, the reporter must prepare and send to the Scottish Ministers a final report setting out the reporter’s recommendations on the application.</p></content></subparagraph><subparagraph><num>(11)</num><intro><p>In this paragraph, “<term refersTo="#term-interested-party">interested party</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>the applicant,</p></content></level><level class="para1"><num>(b)</num><content><p>the relevant planning authority which made the objection under paragraph 2(2A),</p></content></level><level class="para1"><num>(c)</num><content><p>any person who has made an objection in accordance with regulations under paragraph 3, or</p></content></level><level class="para1"><num>(d)</num><content><p>any person who has made representations in accordance with any other enactment.</p></content></level></subparagraph><subparagraph><num>(12)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations make provision amending or setting out further detail about the procedure set out in this paragraph. (See also paragraph 7B(2)(e).)</p></content></subparagraph><subparagraph><num>(13)</num><content><p>A statutory instrument containing regulations under this paragraph is not to be made by the Secretary of State unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subparagraph><subparagraph><num>(14)</num><content><p>Regulations made by the Scottish Ministers under this paragraph are subject to the affirmative procedure.</p></content></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-5"><num>(5)</num><content><p><mod>After paragraph 7A insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Applications to the Scottish Ministers: time limits</heading><paragraph eId="d25e4298" class="schProv1"><num>7B</num><subparagraph><num>(1)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations specify a time limit for actions that may or must be taken in relation to an application to the Scottish Ministers for consent under section 36 or 37.</p></content></subparagraph><subparagraph eId="d25e4308"><num>(2)</num><intro><p>The regulations may, for example, specify a time limit for—</p></intro><level class="para1"><num>(a)</num><content><p>a person to comply with a requirement of regulations under paragraph 1A;</p></content></level><level class="para1"><num>(b)</num><content><p>a person to respond to a pre-application consultation (see paragraph 1A(3)(c));</p></content></level><level class="para1"><num>(c)</num><content><p>a person who is notified of an application in accordance with an enactment to provide their opinion or advice on the application;</p></content></level><level class="para1"><num>(d)</num><content><p>a relevant planning authority to object to an application under paragraph 2(2A);</p></content></level><level class="para1" eId="d25e4338"><num>(e)</num><content><p>a reporter to take any steps required by paragraph 2A;</p></content></level><level class="para1"><num>(f)</num><content><p>the Scottish Ministers to decide an application.</p></content></level></subparagraph><subparagraph><num>(3)</num><content><p>The regulations may include provision about the consequences of failure to comply with a time limit.</p></content></subparagraph><subparagraph><num>(4)</num><content><p>Where regulations under this paragraph specify a time limit for the completion of an acceptance stage (see paragraph 1A(2)(c)), the regulations may not permit the extension of that limit.</p></content></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-19-6"><num>(6)</num><content><p>The amendments made by subsection (3) do not affect the continued application in relation to the Scottish Ministers of regulations made under paragraph 2(3) of Schedule 8 to the Electricity Act 1989 before this section comes into force.</p></content></subsection></section><section eId="section-20"><num>20</num><heading>Variation of consents etc</heading><content><p><mod>After section 37 of the Electricity Act 1989 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e4384"><num>37A</num><heading>Application for variation of section 37 consent: Scotland</heading><subsection><num>(1)</num><content><p>The person for the time being entitled to the benefit of a section 37 consent that was granted by the Scottish Ministers may make an application to the Scottish Ministers for the consent to be varied.</p></content></subsection><subsection><num>(2)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about variation under this section, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the making and withdrawal of applications;</p></content></level><level class="para1"><num>(b)</num><content><p>fees;</p></content></level><level class="para1"><num>(c)</num><content><p>publicity and consultation requirements;</p></content></level><level class="para1"><num>(d)</num><content><p>rights to make representations;</p></content></level><level class="para1"><num>(e)</num><content><p>public inquiries;</p></content></level><level class="para1"><num>(f)</num><content><p>consideration of applications.</p></content></level></subsection><subsection><num>(3)</num><content><p>The regulations may provide for any statutory provision applicable to the grant by the Scottish Ministers of a section 37 consent to apply with specified modifications to the variation of a section 37 consent under this section.</p></content></subsection><subsection><num>(4)</num><intro><p>On an application for a section 37 consent to be varied, the Scottish Ministers may make such variations to the consent as appear to them to be appropriate, having regard (in particular) to—</p></intro><level class="para1"><num>(a)</num><content><p>the applicant’s reason for seeking the variation;</p></content></level><level class="para1"><num>(b)</num><content><p>the variations proposed;</p></content></level><level class="para1"><num>(c)</num><content><p>any objections made to the proposed variations, the views of consultees and the outcome of any public inquiry.</p></content></level></subsection><subsection><num>(5)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-section-37-consent">section 37 consent</term>” means a consent granted under section 37 (consent required for overhead lines);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-statutory-provision">statutory provision</term>” means a provision of or made under an Act, whenever passed or made; and for this purpose “<term refersTo="#term-act">Act</term>” includes an Act of the Scottish Parliament.</p></content></hcontainer></subsection></section><section eId="d25e4493"><num>37B</num><heading>Variation of section 36 and 37 consents on change of circumstances: Scotland</heading><subsection><num>(1)</num><intro><p>The Scottish Ministers may vary a consent under section 36 or 37 if—</p></intro><level class="para1"><num>(a)</num><intro><p>they consider that the consent ought to be varied—</p></intro><level class="para2"><num>(i)</num><content><p>because of a change in circumstances relating to the environment, or</p></content></level><level class="para2"><num>(ii)</num><content><p>because of technological changes, and</p></content></level></level><level class="para1"><num>(b)</num><content><p>the person for the time being entitled to the benefit of the consent agrees to the variation.</p></content></level></subsection><subsection><num>(2)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about variation under this section, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the procedure for getting agreement;</p></content></level><level class="para1"><num>(b)</num><content><p>publicity, notification and consultation requirements;</p></content></level><level class="para1"><num>(c)</num><content><p>rights to make representations.</p></content></level></subsection><subsection><num>(3)</num><content><p>The regulations may provide for any statutory provision applicable to the grant by the Scottish Ministers of a consent under section 36 or 37 to apply with specified modifications to the variation of such a consent under this section.</p></content></subsection><subsection><num>(4)</num><content><p>In this section, “<term refersTo="#term-statutory-provision">statutory provision</term>” has the same meaning as in section <ref href="#d25e4384">37A</ref>.</p></content></subsection></section><section eId="d25e4572"><num>37C</num><heading>Correction of errors in consent documents: Scotland</heading><subsection eId="d25e4576"><num>(1)</num><content><p>The Scottish Ministers may amend a decision document in order to correct a correctable error.</p></content></subsection><subsection><num>(2)</num><intro><p>In <ref href="#d25e4576">subsection (1)</ref>—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-correctable-error">correctable error</term>” means an error or omission which—</p></intro><level class="para1"><num>(a)</num><content><p>is in a part of the decision document which records the decision, and</p></content></level><level class="para1"><num>(b)</num><content><p>is not part of the statement of reasons for the decision;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-decision-document">decision document</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a document recording a consent under section 36 or 37, or</p></content></level><level class="para1"><num>(b)</num><content><p>a document recording a variation of such a consent.</p></content></level></hcontainer></subsection><subsection><num>(3)</num><content><p>The Scottish Ministers may exercise the power in <ref href="#d25e4576">subsection (1)</ref> either of their own accord or following a written request from a person for the time being entitled to the benefit of the consent.</p></content></subsection><subsection><num>(4)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations make provision about the process for corrections, including in particular provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the making of written requests;</p></content></level><level class="para1"><num>(b)</num><content><p>notification requirements;</p></content></level><level class="para1"><num>(c)</num><content><p>rights to make representations.</p></content></level></subsection></section></quotedStructure></mod></p></content></section><section eId="section-21"><num>21</num><heading>Proceedings for questioning certain decisions on consents</heading><subsection eId="section-21-1"><num>(1)</num><content><p>Section 36D of the Electricity Act 1989 (proceedings for questioning certain decisions under section 36) is amended as set out in subsections <ref href="#section-21-2">(2)</ref> to <ref href="#section-21-4">(4)</ref>.</p></content></subsection><subsection eId="section-21-2"><num>(2)</num><content><p><mod>For subsection (3) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(3)</num><intro><p>This section applies to a decision under any of the following—</p></intro><level class="para1"><num>(a)</num><content><p>section 36 (application for consent for generating station);</p></content></level><level class="para1"><num>(b)</num><content><p>section 36C (application for variation of section 36 consent);</p></content></level><level class="para1"><num>(c)</num><content><p>section 37 (application for consent for overhead lines);</p></content></level><level class="para1"><num>(d)</num><content><p>section <ref href="#d25e4384">37A</ref> (application for variation of section 37 consent);</p></content></level><level class="para1"><num>(e)</num><content><p>section <ref href="#d25e4493">37B</ref> (variation of consents by Scottish Ministers);</p></content></level><level class="para1"><num>(f)</num><content><p>section 37C (consents and variation of consents in Scotland: correction of errors).</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-21-3"><num>(3)</num><content><p><mod>In subsection (4), for “taken” substitute <quotedText>“published by the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-4"><num>(4)</num><content><p><mod>In the heading, for “under section 36” substitute <quotedText>“of the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-5"><num>(5)</num><content><p><mod>In Schedule 8 to the Electricity Act 1989, in paragraph 5B (proceedings for questioning certain decisions under paragraph 3(2)), in sub-paragraph (4), for “taken” substitute <quotedText>“published by the Scottish Ministers”</quotedText>.</mod></p></content></subsection><subsection eId="section-21-6"><num>(6)</num><content><p><mod>In section 237 of the Town and Country Planning (Scotland) Act 1997 (challenges to validity of development plans and certain orders, decisions and directions), in subsection (3), after paragraph (b) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(ba)</num><content><p>any decision to give a direction under section 57(2) or (2ZA);</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-21-7"><num>(7)</num><content><p>The amendments made by this section apply only in relation to decisions made on or after the date on which this section comes into force.</p></content></subsection></section><section eId="section-22"><num>22</num><heading>Applications for necessary wayleaves: fees</heading><content><p><mod>In Schedule 4 to the Electricity Act 1989 (other powers etc of licence holders), after paragraph 6 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Fees for applications under paragraph 6(3) to the Scottish Ministers</heading><paragraph eId="d25e4794" class="schProv1"><num>6A</num><content><p>The Scottish Ministers may by regulations make provision about the fees to be paid to the Scottish Ministers in relation to an application made to them under paragraph 6(3).</p></content></paragraph></hcontainer></quotedStructure></mod></p></content></section><section eId="section-23"><num>23</num><heading>Regulations</heading><subsection eId="section-23-1"><num>(1)</num><content><p><ref eId="c00040" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">Section 106</ref> of the <ref eId="c00041" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (regulations and orders) is amended as follows.</p></content></subsection><subsection eId="section-23-2"><num>(2)</num><intro><p>In <ref eId="c00042" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">subsection (1ZA)</ref>—</p></intro><level class="para1" eId="section-23-2-a"><num>(a)</num><content><p><mod>for “the power conferred on” substitute <quotedText>“a power of”</quotedText>;</mod></p></content></level><level class="para1" eId="section-23-2-b"><num>(b)</num><content><p><mod>for “by section 36C” substitute <quotedText>“to make regulations (see section 27 of the Interpretation and Legislative Reform (Scotland) Act 2010 (Scottish statutory instruments))”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-23-3"><num>(3)</num><content><p><mod>After subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e4853"><num>(2ZA)</num><intro><p>Subsection (2) does not apply to a statutory instrument containing (whether alone or with other provision)—</p></intro><level class="para1" eId="d25e4859"><num>(a)</num><content><p>regulations under paragraph <ref href="#d25e4075">2A</ref> of Schedule 8;</p></content></level></subsection></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-23-4"><num>(4)</num><content><p><mod>In <ref eId="c00043" href="https://www.legislation.gov.uk/ukpga/1989/29/section/106">subsection (3)</ref>, for the words after “under” substitute <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>section 36C,</p></content></level><level class="para1"><num>(b)</num><content><p>section <ref href="#d25e4384">37A</ref>,</p></content></level><level class="para1"><num>(c)</num><content><p>section <ref href="#d25e4493">37B</ref>,</p></content></level><level class="para1"><num>(d)</num><content><p>section <ref href="#d25e4572">37C</ref>,</p></content></level><level class="para1"><num>(e)</num><content><p>paragraph <ref href="#d25e4794">6A</ref> of Schedule 4, or</p></content></level><level class="para1"><num>(f)</num><content><p>any paragraph of Schedule 8 except paragraph <ref href="#d25e4075">2A</ref>,</p></content></level><p>are subject to the negative procedure.</p></quotedStructure></mod></p></content></subsection><subsection eId="section-23-5"><num>(5)</num><content><p><mod>At the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(4)</num><content><p>Before making regulations under a provision listed in subsection <ref href="#d25e4960">(6)</ref>, the Secretary of State must consult the Scottish Ministers.</p></content></subsection><subsection><num>(5)</num><content><p>Before making regulations under a provision listed in subsection <ref href="#d25e4960">(6)</ref>, the Scottish Ministers must consult the Secretary of State.</p></content></subsection><subsection eId="d25e4960"><num>(6)</num><intro><p>The provisions are—</p></intro><level class="para1"><num>(a)</num><content><p>section <ref href="#d25e4384">37A</ref>;</p></content></level><level class="para1"><num>(b)</num><content><p>section <ref href="#d25e4493">37B</ref>;</p></content></level><level class="para1"><num>(c)</num><content><p>section <ref href="#d25e4572">37C</ref>;</p></content></level><level class="para1"><num>(d)</num><content><p>paragraphs <ref href="#d25e3890">1A</ref>, <ref href="#d25e4075">2A</ref> and <ref href="#d25e4298">7B</ref> of Schedule 8.</p></content></level></subsection></quotedStructure></mod></p></content></subsection></section><section eId="section-24"><num>24</num><heading><span><ref href="#section-19">Sections 19</ref> to <ref href="#section-23">23</ref></span>: minor and consequential amendments</heading><intro><p><ref href="#schedule-1">Schedule 1</ref> makes—</p></intro><level class="para1" eId="section-24-a"><num>(a)</num><content><p>amendments to the <ref eId="c00044" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> that are consequential on the amendments made by sections <ref href="#section-19">19</ref> to <ref href="#section-23">23</ref>, and</p></content></level><level class="para1" eId="section-24-b"><num>(b)</num><content><p>other minor amendments relating to consents for electricity infrastructure in Scotland (including amendments to reflect previous transfers of functions to the Scottish Ministers).</p></content></level></section><section eId="section-25"><num>25</num><heading>Environmental impact assessments for electricity works</heading><subsection eId="section-25-1"><num>(1)</num><intro><p>The Secretary of State or the Scottish Ministers may by regulations amend the Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 2017 (<ref eId="c00045" href="http://www.legislation.gov.uk/id/ssi/2017/101">S.S.I. 2017/101</ref>) (the “<term refersTo="#term-2017-regulations" eId="term-2017-regulations">2017 Regulations</term>”) by making provision described in subsection <ref href="#section-25-2">(2)</ref> in connection with environmental impact assessments and applications made to the Scottish Ministers for—</p></intro><level class="para1" eId="section-25-1-a"><num>(a)</num><content><p>consent granted under section 36 or 37 of the Electricity Act 1989 (consent for construction etc of generating stations or for overhead lines), or</p></content></level><level class="para1" eId="section-25-1-b"><num>(b)</num><content><p>variation of consent granted under section 36 of that Act.</p></content></level></subsection><subsection eId="section-25-2"><num>(2)</num><intro><p>That provision is—</p></intro><level class="para1" eId="section-25-2-a"><num>(a)</num><content><p>provision for the Scottish Ministers to refuse an application in respect of Schedule 2 development that is not accompanied by an EIA report if the development has not been the subject of a screening opinion;</p></content></level><level class="para1" eId="section-25-2-b"><num>(b)</num><content><p>provision for the Scottish Ministers to charge developers fees for screening opinions and scoping opinions;</p></content></level><level class="para1" eId="section-25-2-c"><num>(c)</num><content><p>provision about the sending of copies of EIA reports to the Scottish Ministers;</p></content></level><level class="para1" eId="section-25-2-d"><num>(d)</num><content><p>provision about the publication by developers of the information listed in regulation 14(2) of the 2017 Regulations (information about EIA reports);</p></content></level><level class="para1" eId="section-25-2-e"><num>(e)</num><content><p>provision about making EIA reports available for inspection;</p></content></level><level class="para1" eId="section-25-2-f"><num>(f)</num><content><p>provision about time limits for the consultation bodies and other public bodies to make representations to the Scottish Ministers about scoping opinions and EIA reports;</p></content></level><level class="para1" eId="section-25-2-g"><num>(g)</num><content><p>provision about time limits for the consultation bodies and other public bodies to enter into consultation with developers about, and to make available, information relevant to the preparation of EIA reports;</p></content></level><level class="para1" eId="section-25-2-h"><num>(h)</num><content><p>provision about time limits for developers to provide additional information to the Scottish Ministers;</p></content></level><level class="para1" eId="section-25-2-i"><num>(i)</num><content><p>provision about the publication by developers of the information listed in regulation 20(3) of the 2017 Regulations (information about additional information);</p></content></level><level class="para1" eId="section-25-2-j"><num>(j)</num><content><p>provision about making additional information available for inspection;</p></content></level><level class="para1" eId="section-25-2-k"><num>(k)</num><content><p>provision about the publication by developers of the information listed in regulation 23(2) of the 2017 Regulations (information about decisions);</p></content></level><level class="para1" eId="section-25-2-l"><num>(l)</num><content><p>provision that the Secretary of State or the Scottish Ministers consider appropriate for securing that the procedures under the 2017 Regulations operate effectively, or more effectively, alongside the procedures under regulations made under section 36C of the Electricity Act 1989 or paragraph <ref href="#d25e3890">1A</ref> or <ref href="#d25e4298">7B</ref> of Schedule 8 to that Act (inserted by section <ref href="#section-19">19</ref> of this Act).</p></content></level></subsection><subsection eId="section-25-3"><num>(3)</num><content><p>The Secretary of State or the Scottish Ministers may by regulations amend the 2017 Regulations by making provision described in subsection <ref href="#section-25-4">(4)</ref> in connection with environmental impact assessments and applications made to the Scottish Ministers for variation of consent granted under section 37 of the Electricity Act 1989.</p></content></subsection><subsection eId="section-25-4"><num>(4)</num><intro><p>That provision is—</p></intro><level class="para1" eId="section-25-4-a"><num>(a)</num><intro><p>provision requiring an environmental impact assessment in respect of the proposed variation to be carried out before Scottish Ministers—</p></intro><level class="para2" eId="section-25-4-a-i"><num>(i)</num><content><p>vary the consent, or</p></content></level><level class="para2" eId="section-25-4-a-ii"><num>(ii)</num><content><p>direct that planning permission is deemed to be granted under section 57(2) or (2ZA) of the Town and Country Planning (Scotland) Act 1997 in respect of EIA development;</p></content></level></level><level class="para1" eId="section-25-4-b"><num>(b)</num><content><p>provision requiring the Scottish Ministers to take the environmental information into account when carrying out an environmental impact assessment in respect of the proposed variation;</p></content></level><level class="para1" eId="section-25-4-c"><num>(c)</num><content><p>provision applying provisions of the 2017 Regulations (including provisions amended by regulations under subsection <ref href="#section-25-1">(1)</ref>), with or without modifications;</p></content></level><level class="para1" eId="section-25-4-d"><num>(d)</num><content><p>provision that the Secretary of State or the Scottish Ministers consider appropriate for securing that the procedures under the 2017 Regulations operate effectively, or more effectively, alongside the procedures under regulations made under section <ref href="#d25e4384">37A</ref> of the Electricity Act 1989 (inserted by section <ref href="#section-20">20</ref> of this Act).</p></content></level></subsection><subsection eId="section-25-5"><num>(5)</num><intro><p>Regulations under this section may—</p></intro><level class="para1" eId="section-25-5-a"><num>(a)</num><content><p>make different provision for different purposes or different areas;</p></content></level><level class="para1" eId="section-25-5-b"><num>(b)</num><content><p>make consequential or supplementary provision;</p></content></level><level class="para1" eId="section-25-5-c"><num>(c)</num><content><p>make transitional provision.</p></content></level></subsection><subsection eId="section-25-6"><num>(6)</num><content><p>Regulations under this section made by the Secretary of State are to be made by statutory instrument.</p></content></subsection><subsection eId="section-25-7"><num>(7)</num><content><p>A statutory instrument containing regulations made by the Secretary of State under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-25-8"><num>(8)</num><content><p>Before making regulations under this section, the Secretary of State must consult the Scottish Ministers.</p></content></subsection><subsection eId="section-25-9"><num>(9)</num><content><p>For regulations under this section made by the Scottish Ministers, see section 27 of the Interpretation and Legislative Reform (Scotland) Act <ref eId="c00046" href="http://www.legislation.gov.uk/id/asp/2010/10">2010 (asp 10)</ref> (Scottish statutory instruments).</p></content></subsection><subsection eId="section-25-10"><num>(10)</num><content><p>Regulations made by the Scottish Ministers under this section are subject to the negative procedure (see section 28 of the Interpretation and Legislative Reform (Scotland) Act <ref eId="c00047" href="http://www.legislation.gov.uk/id/asp/2010/10">2010 (asp 10)</ref>).</p></content></subsection><subsection eId="section-25-11"><num>(11)</num><content><p>Before making regulations under this section, the Scottish Ministers must consult the Secretary of State.</p></content></subsection><subsection eId="section-25-12"><num>(12)</num><intro><p>In this section, subject to subsection <ref href="#section-25-13">(13)</ref>, the following terms have the same meaning as they have in the 2017 Regulations—</p></intro><hcontainer name="definition"><content><p>“additional information”</p></content></hcontainer><hcontainer name="definition"><content><p>“the consultation bodies”</p></content></hcontainer><hcontainer name="definition"><content><p>“developer”</p></content></hcontainer><hcontainer name="definition"><content><p>“EIA development”</p></content></hcontainer><hcontainer name="definition"><content><p>“EIA report”</p></content></hcontainer><hcontainer name="definition"><content><p>“environmental impact assessment”</p></content></hcontainer><hcontainer name="definition"><content><p>“environmental information”</p></content></hcontainer><hcontainer name="definition"><content><p>“Schedule 2 development”</p></content></hcontainer><hcontainer name="definition"><content><p>“scoping opinion”</p></content></hcontainer><hcontainer name="definition"><content><p>“screening opinion”.</p></content></hcontainer></subsection><subsection eId="section-25-13"><num>(13)</num><content><p>In subsections <ref href="#section-25-3">(3)</ref> and <ref href="#section-25-4">(4)</ref>, those terms have the same meaning in connection with applications for variation of consent granted under section 37 of the Electricity Act 1989 as they have, in the 2017 Regulations, in connection with applications for variation of consent granted under section 36 of that Act.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-long-duration-electricity-storage"><heading>Long duration electricity storage</heading><section eId="section-26"><num>26</num><heading>Long duration electricity storage</heading><content><p><mod>In the Electricity Act 1989, after <ref eId="c00048" href="https://www.legislation.gov.uk/ukpga/1989/29/section/10O">section 10O</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Long duration electricity storage</heading><section><num>10P</num><heading>Long duration electricity storage</heading><subsection><num>(1)</num><content><p>The Authority must, as soon as reasonably practicable after this section comes into force, establish and operate a scheme in accordance with this section.</p></content></subsection><subsection><num>(2)</num><content><p>The scheme must be designed for the purpose of encouraging the development and use of long duration electricity storage installations.</p></content></subsection><subsection><num>(3)</num><intro><p>The scheme must be open to persons who—</p></intro><level class="para1"><num>(a)</num><content><p>hold or intend to apply for a generation licence to operate a long duration electricity storage installation, and</p></content></level><level class="para1"><num>(b)</num><content><p>meet any other specified criteria.</p></content></level></subsection><subsection eId="d25e5416"><num>(4)</num><intro><p>The scheme must provide for an LDES operator who operates an approved installation—</p></intro><level class="para1"><num>(a)</num><content><p>to receive payments from a holder of an electricity system operator licence where the operator’s assessed revenue from that installation is below a specified amount, in specified circumstances, and</p></content></level><level class="para1"><num>(b)</num><content><p>to make payments to a holder of an electricity system operator licence where the operator’s assessed revenue from that installation is above a specified amount, in specified circumstances.</p></content></level></subsection><subsection><num>(5)</num><intro><p>In subsection <ref href="#d25e5416">(4)</ref>—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-an-approved-installation">an approved installation</term>” means a long duration electricity storage installation which is approved by the Authority for the purposes of subsection <ref href="#d25e5416">(4)</ref> in accordance with the scheme;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-assessed-revenue">assessed revenue</term>”, in relation to a long duration electricity storage installation, means the difference between—</p></intro><level class="para1"><num>(a)</num><content><p>revenue of a specified kind earned or derived in connection with that installation, and</p></content></level><level class="para1"><num>(b)</num><content><p>costs of a specified kind incurred in connection with operating the installation.</p></content></level></hcontainer></subsection><subsection><num>(6)</num><content><p>The Authority may determine how costs and revenue are to be calculated for the purposes of the scheme.</p></content></subsection><subsection><num>(7)</num><content><p>In setting charges to which Article 18(1) of the Electricity Regulation applies, the holder of an electricity system operator licence may take account of payments it makes or receives under the scheme.</p></content></subsection><subsection><num>(8)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-ldes-operator">LDES operator</term>” means a person who, under a generation licence, generates electricity by means of a long duration electricity storage installation;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-long-duration-electricity-storage-installation">long duration electricity storage installation</term>” means an installation that—</p></intro><level class="para1"><num>(a)</num><content><p>generates electricity from stored energy,</p></content></level><level class="para1"><num>(b)</num><content><p>has an electricity generating capacity of not less than 50 megawatts, and</p></content></level><level class="para1"><num>(c)</num><content><p>is capable of generating electricity at its full capacity for a continuous period of not less than eight hours;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-specified">specified</term>” means specified by the Authority for the purposes of the scheme in—</p></intro><level class="para1"><num>(a)</num><content><p>a document published by the Authority, or</p></content></level><level class="para1"><num>(b)</num><content><p>a condition of a licence;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-stored-energy">stored energy</term>” has the meaning given by section 4(3ZB).</p></content></hcontainer></subsection><subsection><num>(9)</num><intro><p>The Secretary of State may by regulations amend the definition of “long duration electricity storage installation” by substituting—</p></intro><level class="para1"><num>(a)</num><content><p>for the amount of electricity generating capacity for the time being mentioned in <ref href="#d25e5508">paragraph (b)</ref> of the definition, a different amount;</p></content></level><level class="para1"><num>(b)</num><content><p>for the period for the time being mentioned in <ref href="#d25e5512">paragraph (c)</ref> of the definition, a different period (which may not be less than eight hours).</p></content></level></subsection></section></hcontainer></quotedStructure></mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-consumer-benefits"><heading>Consumer benefits</heading><section eId="section-27"><num>27</num><heading>Benefits for homes near electricity transmission projects</heading><subsection eId="section-27-1"><num>(1)</num><content><p>The Electricity Act 1989 is amended as follows.</p></content></subsection><subsection eId="section-27-2"><num>(2)</num><content><p><mod>After section 38 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Benefits resulting from proximity to new or upgraded transmission infrastructure</heading><section eId="d25e5593"><num>38A</num><heading>Power to establish scheme for giving of benefits</heading><subsection eId="d25e5597"><num>(1)</num><content><p>The Secretary of State may by regulations establish a scheme under which persons with a specified connection to qualifying premises are entitled to financial benefits provided (directly or indirectly) by electricity suppliers.</p></content></subsection><subsection><num>(2)</num><content><p>Qualifying premises must be identified by reference to their proximity to qualifying works.</p></content></subsection><subsection><num>(3)</num><intro><p>Qualifying works must involve the construction, erection, expansion or improvement of electrical plant or an electric line that (in either case)—</p></intro><level class="para1"><num>(a)</num><content><p>is wholly or partly above the ground, and</p></content></level><level class="para1"><num>(b)</num><content><p>forms or is intended to form part of a transmission system.</p></content></level><wrapUp><p>They may be works that took place before the making of the regulations or the coming into force of this section.</p></wrapUp></subsection><subsection eId="d25e5630"><num>(4)</num><intro><p>The regulations may (among other things)—</p></intro><level class="para1"><num>(a)</num><content><p>make further provision determining, or for the determination of, whether premises or works are qualifying;</p></content></level><level class="para1"><num>(b)</num><content><p>confer functions in connection with the scheme;</p></content></level><level class="para1"><num>(c)</num><content><p>provide for the delegation of functions conferred in connection with the scheme;</p></content></level><level class="para1"><num>(d)</num><content><p>provide for payments by electricity suppliers to meet costs incurred in the carrying out of functions in connection with the scheme;</p></content></level><level class="para1"><num>(e)</num><content><p>provide for the costs of electricity suppliers under the scheme to be distributed among suppliers on such basis, and by such means, as the regulations provide;</p></content></level><level class="para1"><num>(f)</num><content><p>restrict a person’s ability to obtain payment of an amount standing to the credit of the person’s account with an electricity supplier, where that amount derives from benefits under the scheme;</p></content></level><level class="para1"><num>(g)</num><content><p>make provision about cases in which a person who has received benefits under the scheme in respect of premises ceases to be entitled under the scheme in respect of the premises, including provision for the withdrawal or recovery of the benefits;</p></content></level><level class="para1" eId="d25e5678"><num>(h)</num><content><p>make pass-through provision and associated provision (see section <ref href="#d25e5753">38B</ref>);</p></content></level><level class="para1" eId="d25e5687"><num>(i)</num><content><p>make enforcement provision (see section <ref href="#d25e5864">38C</ref>);</p></content></level><level class="para1" eId="d25e5696"><num>(j)</num><content><p>make information provision (see section <ref href="#d25e5952">38D</ref>).</p></content></level></subsection><subsection><num>(5)</num><intro><p>To the extent that this section enables provision to be made affecting the holders of licences, provision for that purpose may be made by modifying, or empowering or requiring the Authority to modify—</p></intro><level class="para1"><num>(a)</num><content><p>the conditions of a licence, or</p></content></level><level class="para1"><num>(b)</num><content><p>a document maintained in accordance with the conditions of a licence, or an agreement that gives effect to a document so maintained.</p></content></level></subsection><subsection eId="d25e5723"><num>(6)</num><content><p>A statutory instrument containing regulations under this section may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection><num>(7)</num><content><p>A draft laid under subsection <ref href="#d25e5723">(6)</ref> is not to be treated as a hybrid instrument for the purposes of the standing orders of either House of Parliament.</p></content></subsection><subsection><num>(8)</num><content><p>Regulations under this section bind the Crown unless they provide otherwise.</p></content></subsection><subsection><num>(9)</num><content><p>The Secretary of State may, out of money provided by Parliament, make payments to a person on whom functions are conferred by regulations under this section for the purposes of meeting (or helping to meet) the expenses of carrying out those functions.</p></content></subsection></section><section eId="d25e5753"><num>38B</num><heading>Passing of benefits to ultimate consumer</heading><subsection><num>(1)</num><content><p>This section applies for the purposes of section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5678">(h)</ref>.</p></content></subsection><subsection eId="d25e5770"><num>(2)</num><intro><p>“Pass-through provision” is provision that—</p></intro><level class="para1" eId="d25e5776"><num>(a)</num><intro><p>applies where—</p></intro><level class="para2"><num>(i)</num><content><p>one person (“the intermediary”) receives benefits under the scheme in connection with qualifying premises, and</p></content></level><level class="para2" eId="d25e5788"><num>(ii)</num><content><p>another person (“the end-user”) who is not living as part of the same household as the intermediary consumes electricity supplied to the premises, and</p></content></level></level><level class="para1" eId="d25e5794"><num>(b)</num><content><p>requires the intermediary to pass on the substance of those benefits to the end-user.</p></content></level></subsection><subsection><num>(3)</num><intro><p>“<term refersTo="#term-associated-provision">Associated provision</term>” means provision that relates to pass-through provision and—</p></intro><level class="para1"><num>(a)</num><content><p>requires intermediaries to take steps to obtain benefits that will be subject to the requirement referred to in subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5794">(b)</ref>,</p></content></level><level class="para1"><num>(b)</num><content><p>requires intermediaries to supply information to end-users,</p></content></level><level class="para1"><num>(c)</num><content><p>provides for the making of payments to intermediaries (in addition to the provision of benefits of the sort mentioned in section <ref href="#d25e5593">38A</ref><ref href="#d25e5597">(1)</ref>), or</p></content></level><level class="para1"><num>(d)</num><content><p>provides for the withdrawal or recovery of benefits given or other payments made to intermediaries who fail to comply with the requirement referred to in subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5794">(b)</ref>.</p></content></level></subsection><subsection><num>(4)</num><content><p>For the purposes of subsection <ref href="#d25e5770">(2)</ref><ref href="#d25e5776">(a)</ref><ref href="#d25e5788">(ii)</ref>, the cases in which electricity is consumed by a person include those in which the electricity is used to make available to the person heating, cooling, hot water or energy.</p></content></subsection></section><section eId="d25e5864"><num>38C</num><heading>Enforcement of benefit scheme</heading><subsection eId="d25e5868"><num>(1)</num><intro><p>In section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5687">(i)</ref>, “<term refersTo="#term-enforcement-provision">enforcement provision</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>provision for the enforcement in civil proceedings of requirements under the scheme,</p></content></level><level class="para1"><num>(b)</num><intro><p>provision for a person to impose a monetary penalty where the person is satisfied on the balance of probabilities that—</p></intro><level class="para2"><num>(i)</num><content><p>a requirement under the regulations has not been complied with, or</p></content></level><level class="para2"><num>(ii)</num><content><p>benefits or other payments under the scheme have been wrongfully obtained, or</p></content></level></level><level class="para1" eId="d25e5908"><num>(c)</num><content><p>provision for complaints procedures, dispute resolution, adjudication, appeals or redress in connection with the scheme.</p></content></level></subsection><subsection><num>(2)</num><content><p>If regulations under section <ref href="#d25e5593">38A</ref> provide for the imposition of monetary penalties, they must provide a right of appeal to a court or tribunal on grounds including both error of fact and error of law.</p></content></subsection><subsection eId="d25e5923"><num>(3)</num><content><p>The provision that may be made by virtue of subsection <ref href="#d25e5868">(1)</ref><ref href="#d25e5908">(c)</ref> includes provision for Part 2 of the Consumers, Estate Agents and Redress Act 2007 (complaints handling and redress schemes) to apply (with or without modifications) to end-user complaints as it applies to consumer complaints within the meaning of that Part.</p></content></subsection><subsection><num>(4)</num><content><p>In subsection <ref href="#d25e5923">(3)</ref>, “<term refersTo="#term-end-user-complaints">end-user complaints</term>” means complaints in connection with pass-through provision made by end-users against intermediaries or electricity suppliers (with the definitions in section <ref href="#d25e5753">38B</ref> applying for the purposes of this subsection).</p></content></subsection></section><section eId="d25e5952"><num>38D</num><heading>Disclosure and use of information in connection with benefit scheme</heading><subsection><num>(1)</num><content><p>In section <ref href="#d25e5593">38A</ref><ref href="#d25e5630">(4)</ref><ref href="#d25e5696">(j)</ref>, “<term refersTo="#term-information-provision">information provision</term>” means provision within subsection <ref href="#d25e5978">(2)</ref> or <ref href="#d25e6020">(3)</ref>.</p></content></subsection><subsection eId="d25e5978"><num>(2)</num><intro><p>Provision is within this subsection if it is provision for the disclosure of information or evidence for the purposes of—</p></intro><level class="para1"><num>(a)</num><content><p>identifying persons entitled to benefits under the scheme,</p></content></level><level class="para1"><num>(b)</num><content><p>identifying qualifying premises or qualifying works,</p></content></level><level class="para1"><num>(c)</num><content><p>checking whether requirements under, or resulting from, the regulations are being or have been complied with,</p></content></level><level class="para1"><num>(d)</num><content><p>checking payments made under the scheme,</p></content></level><level class="para1"><num>(e)</num><content><p>facilitating the performance of functions conferred, or the enforcement of duties imposed, by or as a result of the regulations, or</p></content></level><level class="para1"><num>(f)</num><content><p>evaluating the performance of the scheme.</p></content></level></subsection><subsection eId="d25e6020"><num>(3)</num><intro><p>Provision is within this subsection if it is provision about the use or further disclosure of information disclosed—</p></intro><level class="para1"><num>(a)</num><content><p>further to provision within subsection <ref href="#d25e5978">(2)</ref>, or</p></content></level><level class="para1"><num>(b)</num><content><p>otherwise in connection with the scheme.</p></content></level></subsection><subsection><num>(4)</num><content><p>The provision that may be made by virtue of subsection <ref href="#d25e6020">(3)</ref> includes provision making it an offence to use or disclose information in an unauthorised manner; but such an offence may not be made punishable by imprisonment.</p></content></subsection><subsection><num>(5)</num><intro><p>Regulations under section <ref href="#d25e5593">38A</ref> that authorise the use or disclosure of information are not to be taken to authorise disclosure or use that would be liable to harm the commercial interests of any person, except to the extent that—</p></intro><level class="para1"><num>(a)</num><content><p>the regulations otherwise provide, or</p></content></level><level class="para1"><num>(b)</num><content><p>the person disclosing or using the information reasonably considers such disclosure or use necessary in view of the purpose of the regulations.</p></content></level></subsection><subsection eId="d25e6071"><num>(6)</num><intro><p>Regulations under section <ref href="#d25e5593">38A</ref> do not require or authorise the disclosure or use of information that—</p></intro><level class="para1"><num>(a)</num><content><p>contravenes the data protection legislation (but this section and the regulations are to be taken into account in determining whether the disclosure or use would contravene that legislation), or</p></content></level><level class="para1"><num>(b)</num><content><p>is prohibited by any of Parts 1 to 7 and Chapter 1 of Part 9 of the Investigatory Powers Act 2016.</p></content></level></subsection><subsection><num>(7)</num><content><p>In subsection <ref href="#d25e6071">(6)</ref>, “<term refersTo="#term-the-data-protection-legislation">the data protection legislation</term>” has the same meaning as in the Data Protection Act 2018 (see section 3 of that Act).</p></content></subsection></section></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-27-3"><num>(3)</num><content><p><mod>In section 106 (regulations and orders under the Act), in subsection <ref href="#d25e4853">(2ZA)</ref> (inserted by section <ref href="#section-23">23</ref><ref href="#section-23-3">(3)</ref>), after paragraph <ref href="#d25e4859">(a)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(b)</num><content><p>regulations under section <ref href="#d25e5593">38A</ref>.</p></content></level></quotedStructure></mod></p></content></subsection><subsection eId="section-27-4"><num>(4)</num><content><p><mod>In paragraph 6 of Schedule 6A (requirements enforceable against suppliers under section 25), before sub-paragraph (a) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(za)</num><content><p>any provision of regulations under section <ref href="#d25e5593">38A</ref> that is designated in the regulations as a relevant provision for the purposes of this paragraph;</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-electricity-transmission-period"><heading>Electricity transmission period</heading><section eId="section-28"><num>28</num><heading>Electricity transmission systems: extension of commissioning period</heading><content><p><mod>In <ref eId="c00049" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">section 6G</ref><ref eId="c00050" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">(1)</ref> of the <ref eId="c00051" href="https://www.legislation.gov.uk/ukpga/1989/29/contents">Electricity Act 1989</ref> (meaning of “<term refersTo="#term-commissioning-period" eId="term-commissioning-period">commissioning period</term>” for the purposes of determining whether a person is to be regarded as participating in the transmission of electricity), in <ref eId="c00052" href="https://www.legislation.gov.uk/ukpga/1989/29/section/6G">paragraph (b)</ref>, for “18 months” substitute <quotedText>“27 months”</quotedText>.</mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-electricity-generation-on-forestry-land"><heading>Electricity generation on forestry land</heading><section eId="section-29"><num>29</num><heading>Use of forestry estate for renewable electricity</heading><content><p><mod>In the Forestry Act 1967, after section 3 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e6197"><num>3A</num><heading>Use of land in connection with renewable electricity projects</heading><subsection eId="d25e6201"><num>(1)</num><intro><p>The Commissioners may—</p></intro><level class="para1"><num>(a)</num><content><p>use, or enter into arrangements in connection with the use of, English forestry land for the generation, storage, transmission or supply of renewable electricity;</p></content></level><level class="para1"><num>(b)</num><content><p>sell, or enter into other arrangements concerning, renewable electricity generated, stored or supplied on, or transmitted across, English forestry land;</p></content></level><level class="para1" eId="d25e6219"><num>(c)</num><intro><p>use, or enter into arrangements in connection with the use of, English forestry land for activity that—</p></intro><level class="para2"><num>(i)</num><content><p>is intended to satisfy, or enable the satisfaction of, a relevant condition of development (whether existing or contemplated), or</p></content></level><level class="para2"><num>(ii)</num><content><p>otherwise arises in connection with such a condition.</p></content></level></level></subsection><subsection><num>(2)</num><intro><p>For the purposes of subsection <ref href="#d25e6201">(1)</ref><ref href="#d25e6219">(c)</ref>, a relevant condition of development is a condition of development that—</p></intro><level class="para1"><num>(a)</num><content><p>relates to renewable electricity development located wholly or partly on English forestry land, and</p></content></level><level class="para1"><num>(b)</num><content><p>is intended to benefit the natural environment of land.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The exercise of the powers in subsection <ref href="#d25e6201">(1)</ref> for either of the following purposes is to be taken to be consistent with the Commissioners’ general duty under section 1(2)—</p></intro><level class="para1"><num>(a)</num><content><p>facilitating or promoting the use of renewable electricity;</p></content></level><level class="para1"><num>(b)</num><content><p>obtaining funds for meeting the expenses referred to in section 41(2).</p></content></level></subsection><subsection><num>(4)</num><content><p>When the Commissioners are considering the exercise of those powers, section 1(3A) applies as if it included a further paragraph referring to those purposes.</p></content></subsection><subsection><num>(5)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-condition-of-development">condition of development</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a condition to which planning permission is subject, or</p></content></level><level class="para1"><num>(b)</num><content><p>a requirement contained in an order granting development consent under the Planning Act 2008 (development consent for nationally significant infrastructure);</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-english-forestry-land">English forestry land</term>” means land placed at the disposal of the Commissioners under this Act;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-natural-environment">natural environment</term>”, in relation to land, includes—</p></intro><level class="para1"><num>(a)</num><content><p>its plants, animals and other living organisms,</p></content></level><level class="para1"><num>(b)</num><content><p>their habitats, and</p></content></level><level class="para1"><num>(c)</num><content><p>its geological features;</p></content></level></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-renewable-electricity">renewable electricity</term>” means electricity produced from sources other than—</p></intro><level class="para1"><num>(a)</num><content><p>coal,</p></content></level><level class="para1"><num>(b)</num><content><p>lignite,</p></content></level><level class="para1"><num>(c)</num><content><p>peat,</p></content></level><level class="para1"><num>(d)</num><content><p>natural gas, within the meaning of the Energy Act 1976,</p></content></level><level class="para1"><num>(e)</num><content><p>crude liquid petroleum,</p></content></level><level class="para1"><num>(f)</num><content><p>petroleum products, within the meaning of the Energy Act 1976,</p></content></level><level class="para1"><num>(g)</num><content><p>any substance produced directly or indirectly from a substance within paragraphs <ref href="#d25e6345">(a)</ref> to <ref href="#d25e6365">(f)</ref>,</p></content></level><level class="para1"><num>(h)</num><content><p>energy derived from any substance within paragraphs <ref href="#d25e6345">(a)</ref> to <ref href="#d25e6369">(g)</ref>, or</p></content></level><level class="para1"><num>(i)</num><content><p>nuclear fuel;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-renewable-electricity-development">renewable electricity development</term>” means development the main purpose of which is the generation, storage, transmission or supply of renewable electricity.</p></content></hcontainer></subsection><subsection eId="d25e6400"><num>(6)</num><content><p>References in this section to the storage of electricity are to the storage of energy converted from electricity for the purpose of its reconversion into electricity.</p></content></subsection></section><section eId="d25e6412"><num>3B</num><heading>Section <ref href="#d25e6197">3A</ref>: power to require Secretary of State’s consent in certain cases</heading><subsection eId="d25e6416"><num>(1)</num><content><p>The Secretary of State may make regulations that, in a case within subsection <ref href="#d25e6428">(2)</ref>, require the consent of the Secretary of State to an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>.</p></content></subsection><subsection eId="d25e6428"><num>(2)</num><intro><p>The cases are those where—</p></intro><level class="para1"><num>(a)</num><content><p>a proposed exercise of the powers is intended to enable the construction on English forestry land of the whole or part of a generating station (including an extension to an existing station), and</p></content></level><level class="para1"><num>(b)</num><content><p>the capacity threshold is exceeded.</p></content></level></subsection><subsection><num>(3)</num><content><p>In the case of the construction of a new generating station, the capacity threshold is exceeded if it is expected that the generating capacity of the station would equal or exceed the relevant wattage.</p></content></subsection><subsection eId="d25e6452"><num>(4)</num><intro><p>In the case of an extension to an existing station, the capacity threshold is exceeded if it is expected that—</p></intro><level class="para1"><num>(a)</num><content><p>the extension would cause the generating capacity of the station to equal or exceed the relevant wattage, or</p></content></level><level class="para1" eId="d25e6464"><num>(b)</num><content><p>the extension, whether alone or taken together with previous non-consented extensions, would increase the generating capacity of the station by at least the relevant wattage.</p></content></level></subsection><subsection><num>(5)</num><intro><p>An extension is “<term refersTo="#term-non-consented">non-consented</term>” for the purposes of subsection <ref href="#d25e6452">(4)</ref><ref href="#d25e6464">(b)</ref> if—</p></intro><level class="para1"><num>(a)</num><content><p>it was enabled by an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>, and</p></content></level><level class="para1"><num>(b)</num><content><p>that exercise of those powers did not have the consent of the Secretary of State under regulations under subsection <ref href="#d25e6416">(1)</ref>.</p></content></level></subsection><subsection><num>(6)</num><intro><p>But an extension ceases to be “non-consented” for those purposes if—</p></intro><level class="para1"><num>(a)</num><content><p>a subsequent extension to the station in question is constructed having been enabled by an exercise of the Commissioners’ powers under section <ref href="#d25e6197">3A</ref>, and</p></content></level><level class="para1"><num>(b)</num><content><p>that exercise of those powers had the consent of the Secretary of State under regulations under subsection <ref href="#d25e6416">(1)</ref>.</p></content></level></subsection><subsection><num>(7)</num><intro><p>The relevant wattage is—</p></intro><level class="para1"><num>(a)</num><content><p>5 megawatts, if the station generates electricity from wind, and</p></content></level><level class="para1"><num>(b)</num><content><p>50 megawatts, if it does not.</p></content></level></subsection><subsection eId="d25e6544"><num>(8)</num><content><p>The Secretary of State may by regulations amend this section so as to change the relevant wattage (including by adding or combining categories of station in relation to which a particular wattage is prescribed).</p></content></subsection><subsection><num>(9)</num><intro><p>In calculating the relevant wattage there is to be disregarded—</p></intro><level class="para1"><num>(a)</num><content><p>in the case of a generating station only partly situated on English forestry land, any generating capacity that can be attributed to parts not situated on English forestry land;</p></content></level><level class="para1"><num>(b)</num><content><p>in the case of a generating station whose capacity is provided in part by facilities for the storage of electricity and in part by other means, the capacity provided by those facilities.</p></content></level></subsection><subsection><num>(10)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-generating-station">generating station</term>” has the same meaning as in Part 1 of the Electricity Act 1989 (see section 64(1));</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-storage">storage</term>” is to be read in accordance with section <ref href="#d25e6197">3A</ref><ref href="#d25e6400">(6)</ref>.</p></content></hcontainer></subsection></section><section><num>3C</num><heading>Regulations under section <ref href="#d25e6412">3B</ref>: further provision</heading><subsection><num>(1)</num><intro><p>Regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6416">(1)</ref> may—</p></intro><level class="para1"><num>(a)</num><content><p>make provision about the process by which consent is to be sought and given or refused;</p></content></level><level class="para1"><num>(b)</num><content><p>provide for consent to be given subject to conditions.</p></content></level></subsection><subsection><num>(2)</num><intro><p>Regulations under section <ref href="#d25e6412">3B</ref> may—</p></intro><level class="para1"><num>(a)</num><content><p>make different provision for different purposes or areas;</p></content></level><level class="para1"><num>(b)</num><content><p>include consequential, incidental, supplementary, transitional or saving provision.</p></content></level></subsection><subsection><num>(3)</num><content><p>Regulations under section <ref href="#d25e6412">3B</ref> are to be made by statutory instrument.</p></content></subsection><subsection><num>(4)</num><content><p>A statutory instrument containing (whether alone or with other provision) regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6544">(8)</ref> may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection><num>(5)</num><content><p>A statutory instrument containing regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6416">(1)</ref> (but not regulations under section <ref href="#d25e6412">3B</ref><ref href="#d25e6544">(8)</ref>) is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection></section></quotedStructure></mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-2-crossheading-wind-generating-stations-and-seismic-array-systems"><heading>Wind generating stations and seismic array systems</heading><section eId="section-30"><num>30</num><heading>Wind generating stations that may affect seismic array systems</heading><subsection eId="section-30-1"><num>(1)</num><content><p>The Secretary of State may make regulations about planning permissions or consents relating to wind generating stations that may affect the functioning of a relevant seismic array system.</p></content></subsection><subsection eId="section-30-2"><num>(2)</num><intro><p>A “relevant seismic array system” is a spatially distributed system of linked seismometers, arranged so as to enhance the detection and characterisation of seismic signals, that—</p></intro><level class="para1" eId="section-30-2-a"><num>(a)</num><content><p>is used for defence purposes, and</p></content></level><level class="para1" eId="section-30-2-b"><num>(b)</num><content><p>is in use on the day on which this Act is passed.</p></content></level></subsection><subsection eId="section-30-3"><num>(3)</num><intro><p>The regulations may provide for—</p></intro><level class="para1" eId="section-30-3-a"><num>(a)</num><content><p>an exclusion zone, and</p></content></level><level class="para1" eId="section-30-3-b"><num>(b)</num><content><p>a restricted zone,</p></content></level><wrapUp><p>around a relevant seismic array system.</p></wrapUp></subsection><subsection eId="section-30-4"><num>(4)</num><intro><p>The regulations may—</p></intro><level class="para1" eId="section-30-4-a"><num>(a)</num><content><p>require a planning decision-maker to refuse, or decline to determine or accept, a planning application relating to a wind generating station that is (or would be) situated in an exclusion zone;</p></content></level><level class="para1" eId="section-30-4-b"><num>(b)</num><content><p>provide that a relevant development order or MCA scheme may not be made if it would grant planning permission for development relating to a wind generating station that is (or would be) situated in an exclusion zone;</p></content></level><level class="para1" eId="section-30-4-c"><num>(c)</num><content><p>allow the Secretary of State to direct that a relevant development order or MCA scheme may not be made if it would grant such planning permission.</p></content></level></subsection><subsection eId="section-30-5"><num>(5)</num><intro><p>The regulations may, in relation to a planning application relating to a wind generating station that is (or would be) situated in a restricted zone—</p></intro><level class="para1" eId="section-30-5-a"><num>(a)</num><content><p>require the applicant to provide specified information about the seismic impact of the proposals (“seismic impact information”) to which their application relates;</p></content></level><level class="para1" eId="section-30-5-b"><num>(b)</num><content><p>require the planning decision-maker to use the seismic impact information in a specified way when determining the application (including when determining conditions relating to a permission or consent);</p></content></level><level class="para1" eId="section-30-5-c"><num>(c)</num><content><p>require the planning decision-maker to refuse, or decline to determine or accept, the application in specified circumstances;</p></content></level><level class="para1" eId="section-30-5-d"><num>(d)</num><content><p>require the planning decision-maker to provide the Secretary of State with the seismic impact information, and to seek the Secretary of State’s views on the seismic impact of the proposals;</p></content></level><level class="para1" eId="section-30-5-e"><num>(e)</num><content><p>require the planning decision-maker to refuse, or decline to determine or accept, the application if the Secretary of State objects to it on grounds relating to the seismic impact of the proposals.</p></content></level></subsection><subsection eId="section-30-6"><num>(6)</num><intro><p>The regulations may—</p></intro><level class="para1" eId="section-30-6-a"><num>(a)</num><content><p>require a person proposing to make a relevant development order or MCA scheme to consult the Secretary of State if the order or scheme would grant planning permission for development relating to a wind generating station that is (or would be) situated in a restricted zone;</p></content></level><level class="para1" eId="section-30-6-b"><num>(b)</num><content><p>allow the Secretary of State to direct that a relevant development order or MCA scheme may not be made if it would grant such planning permission.</p></content></level></subsection><subsection eId="section-30-7"><num>(7)</num><intro><p>The regulations may include provision about the procedure for planning applications to which they relate, such as—</p></intro><level class="para1" eId="section-30-7-a"><num>(a)</num><content><p>provision enabling or requiring a planning decision-maker to decline to determine or accept an application;</p></content></level><level class="para1" eId="section-30-7-b"><num>(b)</num><content><p>provision modifying the process for determining an application;</p></content></level><level class="para1" eId="section-30-7-c"><num>(c)</num><content><p>provision allowing the Secretary of State to give a direction to the planning-decision maker about the procedure for an application;</p></content></level><level class="para1" eId="section-30-7-d"><num>(d)</num><content><p>provision modifying or disapplying a right of appeal or review;</p></content></level><level class="para1" eId="section-30-7-e"><num>(e)</num><content><p>provision disapplying a duty imposed on a planning decision-maker when determining an application.</p></content></level></subsection><subsection eId="section-30-8"><num>(8)</num><content><p>The regulations may require a planning decision-maker to have regard to guidance issued by the Secretary of State.</p></content></subsection><subsection eId="section-30-9"><num>(9)</num><intro><p>Regulations under this section may—</p></intro><level class="para1" eId="section-30-9-a"><num>(a)</num><content><p>amend or repeal provision contained in an Act of Parliament or an Act of the Scottish Parliament;</p></content></level><level class="para1" eId="section-30-9-b"><num>(b)</num><content><p>make different provision for different purposes or areas;</p></content></level><level class="para1" eId="section-30-9-c"><num>(c)</num><content><p>make provision binding the Crown;</p></content></level><level class="para1" eId="section-30-9-d"><num>(d)</num><content><p>make transitional, transitory or saving provision;</p></content></level><level class="para1" eId="section-30-9-e"><num>(e)</num><content><p>make incidental, supplementary or consequential provision.</p></content></level></subsection><subsection eId="section-30-10"><num>(10)</num><content><p>Regulations under this section are to be made by statutory instrument.</p></content></subsection><subsection eId="section-30-11"><num>(11)</num><content><p>A statutory instrument containing regulations under this section which amend or repeal provision contained in an Act of Parliament or an Act of the Scottish Parliament may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection eId="section-30-12"><num>(12)</num><content><p>Any other statutory instrument containing regulations under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection eId="section-30-13"><num>(13)</num><content><p>If a draft of a statutory instrument containing regulations under this section would, apart from this subsection, be treated for the purposes of the standing orders of either House of Parliament as a hybrid instrument, it is to proceed in that House as if it were not such an instrument.</p></content></subsection><subsection eId="section-30-14"><num>(14)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-mca-scheme" eId="term-mca-scheme">MCA scheme</term>” means a masterplan consent area scheme made under Part 3 of the Town and Country Planning (Scotland) Act 1997;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-planning-application" eId="term-planning-application">planning application</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>an application for planning permission under Part 3 or Part 13 of the Town and Country Planning Act 1990,</p></content></level><level class="para1"><num>(b)</num><content><p>an application for planning permission under Part 3 or Part 12 of the Town and Country Planning (Scotland) Act 1997,</p></content></level><level class="para1"><num>(c)</num><content><p>an application for an order granting development consent under section 37 of the Planning Act 2008, or</p></content></level><level class="para1"><num>(d)</num><content><p>an application under section 36 or 36C of the Electricity Act 1989 (consent for construction etc of generating station);</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-planning-decision-maker" eId="term-planning-decision-maker">planning decision-maker</term>” means a person who determines a planning application;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-relevant-development-order" eId="term-relevant-development-order">relevant development order</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a local development order made under section 61A of the Town and Country Planning Act 1990;</p></content></level><level class="para1"><num>(b)</num><content><p>a Mayoral development order made under section 61DA of that Act;</p></content></level><level class="para1"><num>(c)</num><content><p>a neighbourhood development order made under section 61E of that Act;</p></content></level><level class="para1"><num>(d)</num><content><p>a development order made under section 30 of the Town and Country Planning (Scotland) Act 1997;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-wind-generating-station" eId="term-wind-generating-station">wind generating station</term>” means a generating station that generates electricity from wind.</p></content></hcontainer></subsection></section></hcontainer></chapter> — Wind generating stations and seismic array systems
Part 1 — Infrastructure — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" xmlns:default="http://www.w3.org/1999/xhtml" eId="part-1-chapter-3"><num>Chapter 3</num><heading>Transport infrastructure</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-amendments-to-the-highways-act-1980"><heading>Amendments to the Highways Act 1980</heading><section eId="section-31"><num>31</num><heading>Fees for certain services</heading><subsection eId="section-31-1"><num>(1)</num><content><p>The Highways Act 1980 is amended as follows.</p></content></subsection><subsection eId="section-31-2"><num>(2)</num><content><p><mod>After section 281A (stamp duty land tax) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e7028"><num>281B</num><heading>Power to provide for fees for certain services</heading><subsection eId="d25e7032"><num>(1)</num><content><p>The appropriate national authority may by regulations make provision for, or in connection with, the charging of fees to highway authorities by prescribed public authorities, in relation to the provision of relevant services.</p></content></subsection><subsection><num>(2)</num><intro><p>A “<term refersTo="#term-relevant-service">relevant service</term>” means any advice, information or other assistance (including a response to a consultation) provided, whether or not to a highway authority, in connection with—</p></intro><level class="para1"><num>(a)</num><content><p>an order made, or proposed to be made, under Part 2, 6 or 12, or</p></content></level><level class="para1"><num>(b)</num><content><p>any other prescribed matter relating to any of those Parts.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The regulations under subsection <ref href="#d25e7032">(1)</ref> may, in particular, make provision—</p></intro><level class="para1"><num>(a)</num><content><p>about when a fee (including a supplementary fee) may, and may not, be charged;</p></content></level><level class="para1"><num>(b)</num><content><p>about the amount which may be charged;</p></content></level><level class="para1"><num>(c)</num><content><p>about what may, and may not, be taken into account in calculating the amount charged;</p></content></level><level class="para1"><num>(d)</num><content><p>about which highway authority is liable to pay a fee charged;</p></content></level><level class="para1"><num>(e)</num><content><p>about when a fee charged is payable;</p></content></level><level class="para1"><num>(f)</num><content><p>about the recovery of fees charged;</p></content></level><level class="para1"><num>(g)</num><content><p>about waiver, reduction or repayment of fees;</p></content></level><level class="para1"><num>(h)</num><content><p>about the effect of paying or failing to pay fees charged (including provision permitting a prescribed public authority to withhold a relevant service that it would otherwise be required to provide under an enactment until any outstanding fees for that service are paid);</p></content></level><level class="para1"><num>(i)</num><content><p>for the supply of information for any purpose of the regulations;</p></content></level><level class="para1"><num>(j)</num><content><p>conferring a function, including a function involving the exercise of a discretion, on any person.</p></content></level></subsection><subsection><num>(4)</num><intro><p>A prescribed public authority must have regard to—</p></intro><level class="para1"><num>(a)</num><content><p>any guidance published by the Secretary of State in relation to the exercise of the authority’s functions under regulations made under this section by the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>any guidance published by the Welsh Ministers in relation to the exercise of the authority’s functions under regulations made under this section by the Welsh Ministers.</p></content></level></subsection><subsection><num>(5)</num><intro><p>Regulations under this section may make—</p></intro><level class="para1"><num>(a)</num><content><p>different provision for different purposes or areas;</p></content></level><level class="para1"><num>(b)</num><content><p>incidental, consequential, supplementary, transitional or transitory provision or savings.</p></content></level></subsection><subsection><num>(6)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-appropriate-national-authority">appropriate national authority</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>in relation to England, the Secretary of State, and</p></content></level><level class="para1"><num>(b)</num><content><p>in relation to Wales, the Welsh Ministers;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-prescribed">prescribed</term>” means prescribed by regulations made by the appropriate national authority under this section;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-public-authority">public authority</term>” means any person certain of whose functions are of a public nature.</p></content></hcontainer></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-31-3"><num>(3)</num><intro><p>In section 325 (provisions as to regulations, schemes and orders)—</p></intro><level class="para1" eId="section-31-3-a"><num>(a)</num><content><p><mod>before subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(1B)</num><content><p>The power of the Welsh Ministers to make regulations under section <ref href="#d25e7028">281B</ref> is exercisable by statutory instrument.</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-31-3-b"><num>(b)</num><content><p><mod>in subsection (2)(a), after “8A” insert <quotedText>“or regulations made by the Welsh Ministers under section <ref href="#d25e7028">281B</ref>”</quotedText>;</mod></p></content></level><level class="para1" eId="section-31-3-c"><num>(c)</num><content><p><mod>after subsection (2A) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(2B)</num><content><p>A statutory instrument containing regulations made by the Welsh Ministers under section <ref href="#d25e7028">281B</ref> is subject to annulment in pursuance of a resolution of Senedd Cymru.</p></content></subsection></quotedStructure></mod></p></content></level></subsection></section><section eId="section-32"><num>32</num><heading>Power of strategic highways company in relation to trunk roads</heading><subsection eId="section-32-1"><num>(1)</num><content><p>Section 10 of the Highways Act 1980 (trunk roads) is amended as set out in subsections <ref href="#section-32-2">(2)</ref> to <ref href="#section-32-6">(6)</ref>.</p></content></subsection><subsection eId="section-32-2"><num>(2)</num><content><p>Omit subsection (2A).</p></content></subsection><subsection eId="section-32-3"><num>(3)</num><content><p><mod>In subsection (3), for “this section” substitute <quotedText>“subsection (2)”</quotedText>.</mod></p></content></subsection><subsection eId="section-32-4"><num>(4)</num><content><p><mod>In subsection (3A), after “power” insert <quotedText>“under subsection (2)”</quotedText>.</mod></p></content></subsection><subsection eId="section-32-5"><num>(5)</num><content><p><mod>In subsection (4), for “this section” substitute <quotedText>“subsection (2)”</quotedText>.</mod></p></content></subsection><subsection eId="section-32-6"><num>(6)</num><content><p><mod>After subsection (4) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e7313"><num>(4A)</num><intro><p>A strategic highways company may by order direct—</p></intro><level class="para1"><num>(a)</num><content><p>that a highway for which the company is the highway authority is to become a trunk road,</p></content></level><level class="para1" eId="d25e7325"><num>(b)</num><intro><p>in relation to a highway in the company’s area for which the company is not the highway authority, that—</p></intro><level class="para2"><num>(i)</num><content><p>the highway is to become a trunk road, and</p></content></level><level class="para2"><num>(ii)</num><content><p>the company is to become the highway authority for it, or</p></content></level></level><level class="para1"><num>(c)</num><content><p>that a trunk road for which the company is the highway authority is to cease to be a trunk road.</p></content></level></subsection><subsection><num>(4B)</num><intro><p>In subsection <ref href="#d25e7313">(4A)</ref><ref href="#d25e7325">(b)</ref>—</p></intro><level class="para1"><num>(a)</num><content><p>the reference to the company’s area is to the area in respect of which it was appointed (see section 2(1) of the Infrastructure Act 2015), and</p></content></level><level class="para1"><num>(b)</num><content><p>the reference to a highway for which the company is not the highway authority includes a proposed highway to be constructed by the company.</p></content></level></subsection><subsection eId="d25e7372"><num>(4C)</num><content><p>A strategic highways company may make an order under subsection <ref href="#d25e7313">(4A)</ref> only if it is satisfied that the order is expedient for the purpose of extending, improving or reorganising the national system of routes for through traffic in England and Wales.</p></content></subsection><subsection><num>(4D)</num><content><p>A strategic highways company may be satisfied as mentioned in subsection <ref href="#d25e7372">(4C)</ref> only after taking into consideration the requirements of local and national planning, including the requirements of agriculture.</p></content></subsection><subsection><num>(4E)</num><intro><p>An order under subsection <ref href="#d25e7313">(4A)</ref>—</p></intro><level class="para1"><num>(a)</num><content><p>must specify the date on which it takes effect, and</p></content></level><level class="para1"><num>(b)</num><content><p>must be confirmed by the Secretary of State.</p></content></level></subsection><subsection><num>(4F)</num><content><p>Subsections (3) and (4) apply in relation to the power in subsection <ref href="#d25e7313">(4A)</ref> as they apply in relation to the power in subsection (2).</p></content></subsection><subsection><num>(4G)</num><content><p>The powers in this section are subject to section 33(4) of the Planning Act 2008 (exclusion of powers to make or confirm orders in relation to highways for which development consent required).</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-32-7"><num>(7)</num><content><p><mod>In Schedule 1 to the Highways Act 1980 (procedures for making or confirming orders and schemes), after paragraph 1 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><paragraph class="schProv1"><num>1A</num><content><p>Where an order under section 10 of this Act is submitted to the Secretary of State by a strategic highways company, that company must publish, in the manner specified in paragraph 1, the notice there referred to; and that paragraph has effect in relation to the notice as if, for the references to the draft order and the making of the order, there were substituted references to the order as submitted to the Secretary of State and the confirmation of the order respectively.</p></content></paragraph></quotedStructure></mod></p></content></subsection></section><section eId="section-33"><num>33</num><heading>Deadlines for consultation and decisions on certain orders and schemes</heading><subsection eId="section-33-1"><num>(1)</num><content><p>Schedule 1 to the <ref eId="c00053" href="https://www.legislation.gov.uk/ukpga/1980/66/contents">Highways Act 1980</ref> (procedures for making or confirming certain orders and schemes) is amended as follows.</p></content></subsection><subsection eId="section-33-2"><num>(2)</num><content><p><mod>In <ref eId="c00054" href="https://www.legislation.gov.uk/ukpga/1980/66/schedule/1/paragraph/1">paragraph 1</ref>, in sub-paragraph (b), for “6 weeks from the date of the publication of the notice” substitute <quotedText>“the minimum period specified in paragraph <ref href="#d25e7478">2A</ref>”</quotedText>.</mod></p></content></subsection><subsection eId="section-33-3"><num>(3)</num><content><p><mod>After paragraph 2 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><paragraph eId="d25e7478" class="schProv1"><num>2A</num><intro><p>The minimum period is—</p></intro><level class="para1"><num>(a)</num><content><p>30 days from the date of the publication of the notice, in the case of an order proposed by, or submitted to, the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>6 weeks from the date of the publication of the notice, in the case of an order proposed by, or submitted to, the Welsh Ministers.</p></content></level></paragraph></quotedStructure></mod></p></content></subsection><subsection eId="section-33-4"><num>(4)</num><content><p><mod>After paragraph 8 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><paragraph class="schProv1"><num>8A</num><subparagraph><num>(1)</num><content><p>This paragraph applies where the Secretary of State is exercising the functions conferred by paragraph 8.</p></content></subparagraph><subparagraph eId="d25e7513"><num>(2)</num><intro><p>The Secretary of State must—</p></intro><level class="para1"><num>(a)</num><content><p>decide to make or confirm the proposed order,</p></content></level><level class="para1"><num>(b)</num><content><p>decide not to make or confirm the proposed order, or</p></content></level><level class="para1"><num>(c)</num><content><p>decide to give notification under paragraph 8(3)(a),</p></content></level><wrapUp><p>within the period of 10 weeks beginning with the relevant day.</p></wrapUp></subparagraph><subparagraph eId="d25e7539"><num>(3)</num><intro><p>Subject to sub-paragraph <ref href="#d25e7572">(4)</ref>, the relevant day is the day on which any of the following occurs in relation to the proposed order—</p></intro><level class="para1"><num>(a)</num><content><p>the period specified in the notice published under paragraph 1 or (as the case may be) paragraph 5 expires with no qualifying objection having been received by the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>a qualifying objection is withdrawn with the result that no qualifying objections remain live;</p></content></level><level class="para1"><num>(c)</num><content><p>the Secretary of State decides under paragraph 7(2) to dispense with an inquiry;</p></content></level><level class="para1"><num>(d)</num><content><p>the Secretary of State receives the report of the person who has held a local inquiry.</p></content></level></subparagraph><subparagraph eId="d25e7572"><num>(4)</num><intro><p>In a case where—</p></intro><level class="para1"><num>(a)</num><content><p>the Secretary of State has to decide whether to confirm a related compulsory purchase order, and</p></content></level><level class="para1"><num>(b)</num><content><p>the relevant day in relation to that compulsory purchase order is later than the relevant day specified in sub-paragraph <ref href="#d25e7539">(3)</ref>,</p></content></level><wrapUp><p>the relevant day for the purposes of sub-paragraph <ref href="#d25e7513">(2)</ref> is the relevant day in relation to the compulsory purchase order.</p></wrapUp></subparagraph><subparagraph eId="d25e7598"><num>(5)</num><content><p>The relevant day in relation to a related compulsory purchase order is the day on which the procedure that must be followed before the Secretary of State can decide whether to confirm the order (not including any duty on the Secretary of State to consider certain matters before taking that decision) is completed.</p></content></subparagraph><subparagraph eId="d25e7604"><num>(6)</num><content><p>Where the Secretary of State gives notification under paragraph 8(3)(a), the Secretary of State must decide whether or not to make or confirm the proposed order within the period of 10 weeks beginning with the final day of the period specified under paragraph 8(3)(b).</p></content></subparagraph><subparagraph eId="d25e7610"><num>(7)</num><content><p>Sub-paragraphs <ref href="#d25e7572">(4)</ref> and <ref href="#d25e7598">(5)</ref> apply for postponing the first day of the period referred to in sub-paragraph <ref href="#d25e7604">(6)</ref> as they apply for postponing the relevant day for the purposes of sub-paragraph <ref href="#d25e7513">(2)</ref>.</p></content></subparagraph><subparagraph><num>(8)</num><content><p>If the Secretary of State has decided to proceed in accordance with paragraph 8(2), sub-paragraphs <ref href="#d25e7513">(2)</ref> to <ref href="#d25e7610">(7)</ref> of this paragraph apply separately in relation to each part of the proposals that is being given separate consideration.</p></content></subparagraph><subparagraph eId="d25e7640"><num>(9)</num><content><p>The Secretary of State may in any particular case, if the Secretary of State considers it appropriate, extend a period that applies under this paragraph.</p></content></subparagraph><subparagraph><num>(10)</num><intro><p>The power under sub-paragraph <ref href="#d25e7640">(9)</ref> may be exercised—</p></intro><level class="para1"><num>(a)</num><content><p>more than once in relation to the same period;</p></content></level><level class="para1"><num>(b)</num><content><p>after the expiry of the period.</p></content></level></subparagraph><subparagraph><num>(11)</num><intro><p>The Secretary of State must give written notice of any extension—</p></intro><level class="para1"><num>(a)</num><content><p>in a case where the proposed order has already been made, to the authority that made it, and</p></content></level><level class="para1"><num>(b)</num><content><p>to each person who has made a qualifying objection and not withdrawn it.</p></content></level></subparagraph><subparagraph><num>(12)</num><intro><p>In this paragraph—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-qualifying-objection">qualifying objection</term>” means an objection received as described in paragraph 7(1)(a) or (b);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-related-compulsory-purchase-order">related compulsory purchase order</term>”, in relation to a proposed order, means a compulsory purchase order proceedings on which could, by virtue of section 257(1), be taken concurrently with any proceedings under this Schedule on the proposed order.</p></content></hcontainer></subparagraph></paragraph></quotedStructure></mod></p></content></subsection><subsection eId="section-33-5"><num>(5)</num><intro><p>In <ref eId="c00055" href="https://www.legislation.gov.uk/ukpga/1980/66/schedule/1/paragraph/10">paragraph 10</ref>—</p></intro><level class="para1" eId="section-33-5-a"><num>(a)</num><content><p>the existing text becomes sub-paragraph (1);</p></content></level><level class="para1" eId="section-33-5-b"><num>(b)</num><content><p><mod>in paragraph (b) of that sub-paragraph, for “6 weeks from the date of the publication of the notice” substitute <quotedText>“the minimum period specified in sub-paragraph <ref href="#d25e7741">(2)</ref>”</quotedText>;</mod></p></content></level><level class="para1" eId="section-33-5-c"><num>(c)</num><content><p><mod>after that sub-paragraph insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><subparagraph eId="d25e7741"><num>(2)</num><intro><p>The minimum period is—</p></intro><level class="para1"><num>(a)</num><content><p>30 days from the date of the publication of the notice, in the case of a scheme proposed by, or submitted to, the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>6 weeks from the date of the publication of the notice, in the case of a scheme proposed by, or submitted to, the Welsh Ministers.</p></content></level></subparagraph></quotedStructure></mod></p></content></level></subsection><subsection eId="section-33-6"><num>(6)</num><content><p><mod>After paragraph 15 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><paragraph class="schProv1"><num>15A</num><subparagraph><num>(1)</num><content><p>This paragraph applies where the Secretary of State is exercising the functions conferred by paragraph 15.</p></content></subparagraph><subparagraph eId="d25e7776"><num>(2)</num><intro><p>The Secretary of State must—</p></intro><level class="para1"><num>(a)</num><content><p>decide to make or confirm the proposed scheme,</p></content></level><level class="para1"><num>(b)</num><content><p>decide not to make or confirm the proposed scheme, or</p></content></level><level class="para1"><num>(c)</num><content><p>decide to give notification under paragraph 15(3)(a),</p></content></level><wrapUp><p>within the period of 10 weeks beginning with the relevant day.</p></wrapUp></subparagraph><subparagraph eId="d25e7802"><num>(3)</num><intro><p>Subject to sub-paragraph <ref href="#d25e7835">(4)</ref>, the relevant day is the day on which any of the following occurs in relation to the proposed scheme—</p></intro><level class="para1"><num>(a)</num><content><p>the period specified in the notice published under paragraph 10 or (as the case may be) paragraph 12 expires with no qualifying objection having been received by the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>a qualifying objection is withdrawn with the result that no qualifying objections remain live;</p></content></level><level class="para1"><num>(c)</num><content><p>the Secretary of State decides under paragraph 14(2) to dispense with an inquiry;</p></content></level><level class="para1"><num>(d)</num><content><p>the Secretary of State receives the report of the person who has held a local inquiry.</p></content></level></subparagraph><subparagraph eId="d25e7835"><num>(4)</num><intro><p>In a case where—</p></intro><level class="para1"><num>(a)</num><content><p>the Secretary of State has to decide whether to confirm a related compulsory purchase order, and</p></content></level><level class="para1"><num>(b)</num><content><p>the relevant day in relation to that compulsory purchase order is later than the relevant day specified in sub-paragraph <ref href="#d25e7802">(3)</ref>,</p></content></level><wrapUp><p>the relevant day for the purposes of sub-paragraph <ref href="#d25e7776">(2)</ref> is the relevant day in relation to the compulsory purchase order.</p></wrapUp></subparagraph><subparagraph eId="d25e7861"><num>(5)</num><content><p>The relevant day in relation to a related compulsory purchase order is the day on which the procedure that must be followed before the Secretary of State can decide whether to confirm the order (not including any duty on the Secretary of State to consider certain matters before taking that decision) is completed.</p></content></subparagraph><subparagraph eId="d25e7867"><num>(6)</num><content><p>Where the Secretary of State gives notification under paragraph 15(3)(a), the Secretary of State must decide whether or not to make or confirm the proposed scheme within the period of 10 weeks beginning with the final day of the period specified under paragraph 15(3)(b).</p></content></subparagraph><subparagraph eId="d25e7873"><num>(7)</num><content><p>Sub-paragraphs <ref href="#d25e7835">(4)</ref> and <ref href="#d25e7861">(5)</ref> apply for postponing the first day of the period referred to in sub-paragraph <ref href="#d25e7867">(6)</ref> as they apply for postponing the relevant day for the purposes of sub-paragraph <ref href="#d25e7776">(2)</ref>.</p></content></subparagraph><subparagraph><num>(8)</num><content><p>If the Secretary of State has decided to proceed in accordance with paragraph 15(2), sub-paragraphs <ref href="#d25e7776">(2)</ref> to <ref href="#d25e7873">(7)</ref> of this paragraph apply separately in relation to each part of the proposals that is being given separate consideration.</p></content></subparagraph><subparagraph eId="d25e7903"><num>(9)</num><content><p>The Secretary of State may in any particular case, if the Secretary of State considers it appropriate, extend a period that applies under this paragraph.</p></content></subparagraph><subparagraph><num>(10)</num><intro><p>The power under sub-paragraph <ref href="#d25e7903">(9)</ref> may be exercised—</p></intro><level class="para1"><num>(a)</num><content><p>more than once in relation to the same period;</p></content></level><level class="para1"><num>(b)</num><content><p>after the expiry of the period.</p></content></level></subparagraph><subparagraph><num>(11)</num><intro><p>The Secretary of State must give written notice of any extension—</p></intro><level class="para1"><num>(a)</num><content><p>in a case where the proposed scheme has already been made, to the authority that made it, and</p></content></level><level class="para1"><num>(b)</num><content><p>to each person who has made a qualifying objection and not withdrawn it.</p></content></level></subparagraph><subparagraph><num>(12)</num><intro><p>In this paragraph—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-qualifying-objection">qualifying objection</term>” means an objection received as described in paragraph 14(1)(a) or (b);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-related-compulsory-purchase-order">related compulsory purchase order</term>”, in relation to a proposed scheme, means a compulsory purchase order proceedings on which could, by virtue of section 257(1), be taken concurrently with any proceedings under this Schedule on the proposed scheme.</p></content></hcontainer></subparagraph></paragraph></quotedStructure></mod></p></content></subsection></section><section eId="section-34"><num>34</num><heading>Procedure for certain orders and schemes</heading><subsection eId="section-34-1"><num>(1)</num><content><p>The Highways Act 1980 is amended as follows.</p></content></subsection><subsection eId="section-34-2"><num>(2)</num><intro><p>In section 325 (provision for certain regulations, orders and schemes to be made by statutory instrument)—</p></intro><level class="para1" eId="section-34-2-a"><num>(a)</num><content><p>in the heading, omit “, schemes”;</p></content></level><level class="para1" eId="section-34-2-b"><num>(b)</num><intro><p>in subsection (1)—</p></intro><level class="para2" eId="section-34-2-b-i"><num>(i)</num><content><p>omit paragraph (b);</p></content></level><level class="para2" eId="section-34-2-b-ii"><num>(ii)</num><content><p><mod>in paragraph (d), after “sections” insert <quotedText>“10,”</quotedText>.</mod></p></content></level></level></subsection><subsection eId="section-34-3"><num>(3)</num><intro><p>In section 326 (revocation and variation of schemes and orders)—</p></intro><level class="para1" eId="section-34-3-a"><num>(a)</num><intro><p>in subsection (2)—</p></intro><level class="para2" eId="section-34-3-a-i"><num>(i)</num><content><p><mod>after “An order” insert <quotedText>“or scheme”</quotedText>;</mod></p></content></level><level class="para2" eId="section-34-3-a-ii"><num>(ii)</num><content><p><mod>after “section” insert <quotedText>“10,”</quotedText>;</mod></p></content></level><level class="para2" eId="section-34-3-a-iii"><num>(iii)</num><content><p><mod>after “14B,” insert <quotedText>“16,”</quotedText>;</mod></p></content></level><level class="para2" eId="section-34-3-a-iv"><num>(iv)</num><content><p><mod>after “27,” insert <quotedText>“106(3),”</quotedText>;</mod></p></content></level><level class="para2" eId="section-34-3-a-v"><num>(v)</num><content><p><mod>after “orders” insert <quotedText>“or schemes”</quotedText>;</mod></p></content></level><level class="para2" eId="section-34-3-a-vi"><num>(vi)</num><content><p><mod>after “subsequent order” insert <quotedText>“or scheme”</quotedText>;</mod></p></content></level></level><level class="para1" eId="section-34-3-b"><num>(b)</num><content><p><mod>after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(2A)</num><content><p>Subsection (2) does not apply to an order or scheme under section 10, 16 or 106(3) made or confirmed by the Welsh Ministers (but see section 325(1A)).</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-34-3-c"><num>(c)</num><content><p><mod>in subsection (6), before “14,” insert <quotedText>“10,”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-34-4"><num>(4)</num><content><p><mod>In Schedule 1 (procedures for making or confirming certain orders and schemes), after paragraph 19 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><paragraph class="schProv1"><num>19A</num><intro><p>On making or confirming an order or scheme in accordance with this Schedule, the Secretary of State must publish on a government website—</p></intro><level class="para1"><num>(a)</num><content><p>notice of the making or confirmation of the order or scheme,</p></content></level><level class="para1"><num>(b)</num><content><p>if the order or scheme was made with modifications, a summary of those modifications, and</p></content></level><level class="para1"><num>(c)</num><intro><p>either—</p></intro><level class="para2"><num>(i)</num><content><p>a copy of the order or scheme, together with any maps or plans referred to in it, or</p></content></level><level class="para2"><num>(ii)</num><content><p>an explanation of where and how that documentation can be inspected.</p></content></level></level></paragraph></quotedStructure></mod></p></content></subsection></section><section eId="section-35"><num>35</num><heading>Compulsory acquisition powers to include taking of temporary possession</heading><content><p><mod>In section 250(8) of the Highways Act 1980 (compulsory acquisition by creation of new rights to include rights of carrying out certain activity on land), after “references to” insert <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>the right to take temporary possession or occupation of land, and</p></content></level><level class="para1"><num>(b)</num><content><p/></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-amendments-to-the-transport-and-works-act-1992"><heading>Amendments to the Transport and Works Act 1992</heading><section eId="section-36"><num>36</num><heading>Replacement of model clauses with guidance</heading><content><p><mod>In the Transport and Works Act 1992, for section 8 (model clauses) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section><num>8</num><heading>Guidance on draft orders</heading><subsection><num>(1)</num><content><p>The Secretary of State may publish guidance about the preparation of draft orders, for cases in which rules under section 6 require the submission of such drafts to the Secretary of State.</p></content></subsection><subsection><num>(2)</num><content><p>The Welsh Ministers may publish guidance about the preparation of draft orders, for cases in which rules under section 6 require the submission of such drafts to the Welsh Ministers.</p></content></subsection><subsection><num>(3)</num><content><p>The guidance may set out model provisions considered suitable for inclusion in the drafts (whether generally or in certain cases).</p></content></subsection><subsection><num>(4)</num><intro><p>In arriving at a determination under section 13 in a case to which guidance under this section applies, the Secretary of State or (as the case may be) the Welsh Ministers must have regard to—</p></intro><level class="para1"><num>(a)</num><content><p>any departure from the guidance, and</p></content></level><level class="para1"><num>(b)</num><content><p>any reasons given by the applicant for that departure.</p></content></level></subsection></section></quotedStructure></mod></p></content></section><section eId="section-37"><num>37</num><heading>Removal of special procedure for projects of national significance</heading><subsection eId="section-37-1"><num>(1)</num><content><p>In the Transport and Works Act 1992, omit section 9 (special procedure for projects considered to be of national significance).</p></content></subsection><subsection eId="section-37-2"><num>(2)</num><intro><p>In consequence of that amendment—</p></intro><level class="para1" eId="section-37-2-a"><num>(a)</num><content><p>in section 3 of the Statutory Orders (Special Procedure) Act 1945 (petitions against orders), omit subsection (4A);</p></content></level><level class="para1" eId="section-37-2-b"><num>(b)</num><content><p>in section 12 of the Transport and Works Act 1992 (special parliamentary procedure), omit subsection (2);</p></content></level><level class="para1" eId="section-37-2-c"><num>(c)</num><content><p>in the Channel Tunnel Rail Link Act 1996, omit section 42 (application of section 9 of the 1992 Act to certain proposals affecting the Channel Tunnel).</p></content></level></subsection><subsection eId="section-37-3"><num>(3)</num><content><p>The amendments made by this section do not apply in relation to an application in respect of which a notice under section 9(2) of the Transport and Works Act 1992 has been published before this section comes into force.</p></content></subsection></section><section eId="section-38"><num>38</num><heading>Duty to hold inquiry or hearing</heading><subsection eId="section-38-1"><num>(1)</num><content><p>Section 11 of the Transport and Works Act 1992 (inquiries and hearings) is amended as follows.</p></content></subsection><subsection eId="section-38-2"><num>(2)</num><content><p><mod>In subsection (3) (duty to hold inquiry or hearing on request from objector), for the words from “an objection” to “applies,” substitute <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>an objection is made by a person within subsection (4),</p></content></level><level class="para1"><num>(b)</num><content><p>the person informs the Secretary of State in writing that the person wishes the objection to be referred to an inquiry or dealt with in accordance with subsection (2), and</p></content></level><level class="para1"><num>(c)</num><content><p>the Secretary of State considers that the objection is serious enough to merit such treatment,</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-38-3"><num>(3)</num><content><p><mod>After subsection (3) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(3A)</num><content><p>In a case in which the powers in subsections (1) and (2) are exercisable by the Welsh Ministers, subsection (3) is to be read as referring to the Welsh Ministers instead of the Secretary of State.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-38-4"><num>(4)</num><content><p>The amendments made by this section do not apply in relation to an application in respect of which rule 5(1) of the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2006 (<ref eId="c00056" href="http://www.legislation.gov.uk/id/uksi/2006/1466">S.I. 2006/1466</ref>) has been complied with before this section comes into force.</p></content></subsection></section><section eId="section-39"><num>39</num><heading>Costs of inquiries</heading><subsection eId="section-39-1"><num>(1)</num><content><p>Section 11 of the Transport and Works Act 1992 (inquiries and hearings) is amended as follows.</p></content></subsection><subsection eId="section-39-2"><num>(2)</num><content><p><mod>In subsection (5) (application of section 250 of the Local Government Act 1972), before paragraph (a) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(za)</num><content><p>the powers of direction, certification and order-making conferred by section 250(4) and (5) as applied by this subsection may, unless otherwise directed by the Secretary of State or the Welsh Ministers, be exercised on their behalf by the person holding the inquiry,</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-39-3"><num>(3)</num><content><p><mod>After subsection (5) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e8378"><num>(5A)</num><content><p>The power of direction conferred by section 250(4) of the Local Government Act 1972 (costs of inquiry) as applied by subsection (5) is, in the case of an application under section 6, to be exercised so as to require the applicant to pay the costs in question, unless the person exercising the power considers that there is good reason to exercise it differently.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-39-4"><num>(4)</num><content><p><mod>In subsection (6) (application to hearings of provisions applied to inquiries), after “(costs)” insert <quotedText>“, and subsection <ref href="#d25e8378">(5A)</ref> of this section,”</quotedText>.</mod></p></content></subsection><subsection eId="section-39-5"><num>(5)</num><content><p>The amendments made by subsections <ref href="#section-39-3">(3)</ref> and <ref href="#section-39-4">(4)</ref> do not apply in relation to an application in respect of which rule 5(1) of the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2006 (<ref eId="c00057" href="http://www.legislation.gov.uk/id/uksi/2006/1466">S.I. 2006/1466</ref>) has been complied with before this section comes into force.</p></content></subsection></section><section eId="section-40"><num>40</num><heading>Deadline for decisions</heading><subsection eId="section-40-1"><num>(1)</num><content><p>The Transport and Works Act 1992 is amended as follows.</p></content></subsection><subsection eId="section-40-2"><num>(2)</num><content><p><mod>In section 13 (making or refusal of orders), after subsection (6) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e8434"><num>(7)</num><intro><p>The Secretary of State may, for cases involving applications under section 6, make rules as to the period within which—</p></intro><level class="para1"><num>(a)</num><content><p>a determination under subsection (1) must be made, or</p></content></level><level class="para1"><num>(b)</num><content><p>a step must be taken as required by subsection (4), section 13B or section 13C.</p></content></level></subsection><subsection><num>(8)</num><intro><p>Rules under subsection <ref href="#d25e8434">(7)</ref>—</p></intro><level class="para1"><num>(a)</num><content><p>may provide for periods to be determined or changed by the Secretary of State or the Welsh Ministers in individual cases;</p></content></level><level class="para1"><num>(b)</num><content><p>may provide for the postponement of a requirement under the rules where a fee payable in connection with the application is not paid on time;</p></content></level><level class="para1"><num>(c)</num><content><p>may make different provision for different cases;</p></content></level><level class="para1"><num>(d)</num><content><p>if they apply in relation to Wales, may be made only with the agreement of the Welsh Ministers;</p></content></level><level class="para1"><num>(e)</num><content><p>must be made by statutory instrument;</p></content></level><wrapUp><p>and such an instrument is subject to annulment in pursuance of a resolution of either House of Parliament.</p></wrapUp></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-40-3"><num>(3)</num><intro><p>In consequence of that amendment—</p></intro><level class="para1" eId="section-40-3-a"><num>(a)</num><content><p><mod>in section 13(6), for “to 13D” substitute <quotedText>“and 13C”</quotedText>;</mod></p></content></level><level class="para1" eId="section-40-3-b"><num>(b)</num><content><p>omit section 13D (requirement to determine EIA application or proposal within reasonable time);</p></content></level><level class="para1" eId="section-40-3-c"><num>(c)</num><content><p><mod>in section 14(3A)(a), for “to 13D” substitute <quotedText>“and 13C”</quotedText>.</mod></p></content></level></subsection></section><section eId="section-41"><num>41</num><heading>Publication of decisions and time for bringing challenge</heading><subsection eId="section-41-1"><num>(1)</num><content><p>The Transport and Works Act 1992 is amended as follows.</p></content></subsection><subsection eId="section-41-2"><num>(2)</num><intro><p>In section 14 (publicity for making or refusal of order)—</p></intro><level class="para1" eId="section-41-2-a"><num>(a)</num><content><p><mod>in subsection (1), for paragraphs (b) and (c) substitute <quotedText startQuote="&#x201C;">and</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1" eId="d25e8552"><num>(b)</num><content><p>publish the notice on a government website.</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-41-2-b"><num>(b)</num><content><p><mod>in subsection (2), for “(1)(a)” substitute <quotedText>“(1)”</quotedText>;</mod></p></content></level><level class="para1" eId="section-41-2-c"><num>(c)</num><content><p>omit subsection (2A);</p></content></level><level class="para1" eId="section-41-2-d"><num>(d)</num><content><p><mod>in subsection (3A), for “notices” substitute <quotedText>“notice”</quotedText>;</mod></p></content></level><level class="para1" eId="section-41-2-e"><num>(e)</num><content><p><mod>for subsection (3AA) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(3AA)</num><content><p>If the determination is for the making of an EIA order, the notice under subsection (1) must include the information specified in subsection (3AB).</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-41-2-f"><num>(f)</num><intro><p>in subsection (4)—</p></intro><level class="para2" eId="section-41-2-f-i"><num>(i)</num><content><p><mod>for “a notice” substitute <quotedText>“a copy of the notice under subsection (1)”</quotedText>;</mod></p></content></level><level class="para2" eId="section-41-2-f-ii"><num>(ii)</num><content><p>omit the words from “; and” to the end.</p></content></level></level></subsection><subsection eId="section-41-3"><num>(3)</num><content><p><mod>In section 22(1) (period for challenging order), for the words from “within” to “published” substitute <quotedText>“before the end of the period of 6 weeks beginning with the day after the day on which notice of the determination to make the order is first published under section 14(1)<ref href="#d25e8552">(b)</ref>”</quotedText>.</mod></p></content></subsection><subsection eId="section-41-4"><num>(4)</num><intro><p>In consequence of those amendments—</p></intro><level class="para1" eId="section-41-4-a"><num>(a)</num><content><p><mod>in section 12(3)(c) (modification of section 22(1) where special parliamentary procedure applies), for “the notice required by section 14(1)(b) is published” substitute <quotedText>“notice is first published under section 14(1)<ref href="#d25e8552">(b)</ref>”</quotedText>;</mod></p></content></level><level class="para1" eId="section-41-4-b"><num>(b)</num><content><p><mod>in section 13(5) (date of operation of order), for the words from “the notice” to “published” substitute <quotedText>“notice of the determination to make the order is first published under section 14(1)<ref href="#d25e8552">(b)</ref>”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-41-5"><num>(5)</num><content><p>The amendments made by this section do not apply in relation to a determination made before this section comes into force or any order made further to such a determination.</p></content></subsection></section><section eId="section-42"><num>42</num><heading>Fees for certain services</heading><content><p><mod>After section 23 of the Transport and Works Act 1992 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section><num>23A</num><heading>Fees for certain services in connection with orders</heading><subsection eId="d25e8686"><num>(1)</num><content><p>The appropriate national authority may by regulations make provision for, or in connection with, the charging of fees to applicants under section 6 by prescribed public authorities, in relation to the provision of relevant services.</p></content></subsection><subsection><num>(2)</num><intro><p>A “<term refersTo="#term-relevant-service">relevant service</term>” means any advice, information or other assistance (including a response to a consultation) provided, whether or not to an applicant under section 6, in connection with—</p></intro><level class="para1"><num>(a)</num><content><p>an application under section 6, or</p></content></level><level class="para1"><num>(b)</num><content><p>any other prescribed matter relating to an order, or proposed order, under section 1 or 3.</p></content></level></subsection><subsection><num>(3)</num><intro><p>Regulations made under subsection <ref href="#d25e8686">(1)</ref> may, in particular, make provision—</p></intro><level class="para1"><num>(a)</num><content><p>about when a fee (including a supplementary fee) may, and may not, be charged;</p></content></level><level class="para1"><num>(b)</num><content><p>about the amount which may be charged;</p></content></level><level class="para1"><num>(c)</num><content><p>about what may, and may not, be taken into account in calculating the amount charged;</p></content></level><level class="para1"><num>(d)</num><content><p>about when a fee charged is payable;</p></content></level><level class="para1"><num>(e)</num><content><p>about the recovery of fees charged;</p></content></level><level class="para1"><num>(f)</num><content><p>about waiver, reduction or repayment of fees;</p></content></level><level class="para1"><num>(g)</num><content><p>about the effect of paying or failing to pay fees charged (including provision permitting a prescribed public authority to withhold a relevant service that it would otherwise be required to provide under an enactment until any outstanding fees for that service are paid);</p></content></level><level class="para1"><num>(h)</num><content><p>for the supply of information for any purpose of the regulations;</p></content></level><level class="para1"><num>(i)</num><content><p>conferring a function, including a function involving the exercise of a discretion, on any person.</p></content></level></subsection><subsection><num>(4)</num><intro><p>A prescribed public authority must have regard to—</p></intro><level class="para1"><num>(a)</num><content><p>any guidance published by the Secretary of State in relation to the exercise of the authority’s functions under regulations made under this section by the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>any guidance published by the Welsh Ministers in relation to the exercise of the authority’s functions under regulations made under this section by the Welsh Ministers.</p></content></level></subsection><subsection><num>(5)</num><intro><p>Regulations under this section may make—</p></intro><level class="para1"><num>(a)</num><content><p>different provision for different purposes or areas;</p></content></level><level class="para1"><num>(b)</num><content><p>incidental, consequential, supplementary, transitional or transitory provision or savings.</p></content></level></subsection><subsection><num>(6)</num><content><p>Regulations under this section are to be made by statutory instrument.</p></content></subsection><subsection><num>(7)</num><content><p>A statutory instrument containing regulations made by the Secretary of State under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection><num>(8)</num><content><p>A statutory instrument containing regulations made by the Welsh Ministers under this section is subject to annulment in pursuance of a resolution of Senedd Cymru.</p></content></subsection><subsection><num>(9)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-appropriate-national-authority">appropriate national authority</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>in relation to England and cross-border orders, the Secretary of State, and</p></content></level><level class="para1"><num>(b)</num><content><p>in relation to Wales but not cross-border orders, the Welsh Ministers;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-cross-border-order">cross-border order</term>” means an order under section 1 or 3 that has effect both in England and in Wales;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-prescribed">prescribed</term>” means prescribed by regulations made by the appropriate national authority under this section;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-public-authority">public authority</term>” means any person certain of whose functions are of a public nature.</p></content></hcontainer></subsection></section></quotedStructure></mod></p></content></section><section eId="section-43"><num>43</num><heading>Deemed grant of listed building consent etc</heading><subsection eId="section-43-1"><num>(1)</num><content><p><mod>In the Transport and Works Act 1992, for section 17 (listed buildings and conservation areas) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e8892"><num>17</num><heading>Listed buildings: England</heading><subsection><num>(1)</num><content><p>On making an order under section 1 or 3 that authorises controlled listed building works in England, the Secretary of State may direct that listed building consent for the works is deemed to be granted, subject to such conditions (if any) as may be specified in the direction.</p></content></subsection><subsection><num>(2)</num><content><p>Section 16(2) of the Listed Buildings Act (duty of special regard to listed buildings) applies to the making of a direction under this section as it would apply to the grant of listed building consent in relation to the building concerned.</p></content></subsection><subsection><num>(3)</num><content><p>Section 72(1) of the Listed Buildings Act (duty of special attention to conservation areas) applies to the making of a direction under this section in relation to a building in a conservation area as it would apply to the grant of listed building consent in relation to that building.</p></content></subsection><subsection><num>(4)</num><content><p>The provisions of the Listed Buildings Act apply in relation to any listed building consent deemed to be granted by virtue of a direction of the Secretary of State under this section as if the consent had been granted by the Secretary of State on an application referred under section 12 of that Act.</p></content></subsection><subsection><num>(5)</num><content><p>But that does not bring the decision to make the direction within section 62(2)(a) of that Act (decisions of Secretary of State that may only be challenged by way of statutory review).</p></content></subsection><subsection><num>(6)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-conservation-area">conservation area</term>” has the same meaning as in the Listed Buildings Act (see section 91(1) of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-controlled-listed-building-works-in-england">controlled listed building works in England</term>” means works to which section 7(1) of the Listed Buildings Act (demolition or alteration in character of a listed building in England) applies;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-listed-building-consent">listed building consent</term>” means consent under section 8 of the Listed Buildings Act (listed building consent in England);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-listed-buildings-act">the Listed Buildings Act</term>” means the Planning (Listed Buildings and Conservation Areas) Act 1990.</p></content></hcontainer></subsection></section><section eId="d25e8964"><num>17A</num><heading>Listed buildings and conservation areas: Wales</heading><subsection eId="d25e8968"><num>(1)</num><content><p>On making an order under section 1 or 3 that authorises controlled listed building works in Wales, the Welsh Ministers may direct that listed building consent for the works is deemed to be granted, subject to such conditions (if any) as may be specified in the direction.</p></content></subsection><subsection eId="d25e8974"><num>(2)</num><content><p>On making an order under section 1 or 3 that authorises controlled conservation area works in Wales, the Welsh Ministers may direct that conservation area consent for the works is deemed to be granted, subject to such conditions (if any) as may be specified in the direction.</p></content></subsection><subsection><num>(3)</num><content><p>Section 96(2) of HEWA 2023 (duty of special regard to listed buildings) applies to the making of a direction under subsection <ref href="#d25e8968">(1)</ref> as it would apply to the grant of listed building consent in relation to the building concerned.</p></content></subsection><subsection><num>(4)</num><intro><p>Section 160(1) of HEWA 2023 (duty of special regard to conservation areas) applies—</p></intro><level class="para1"><num>(a)</num><content><p>to the making of a direction under subsection <ref href="#d25e8968">(1)</ref> in relation to a building in a conservation area, as it would apply to the grant of listed building consent in relation to that building, and</p></content></level><level class="para1"><num>(b)</num><content><p>to the making of a direction under subsection <ref href="#d25e8974">(2)</ref>, as it would apply to the grant of conservation area consent in relation to the building concerned.</p></content></level></subsection><subsection><num>(5)</num><content><p>The provisions of HEWA 2023 apply in relation to any consent deemed to be granted by virtue of a direction of the Welsh Ministers under this section as if the consent had been granted by the Welsh Ministers on an application referred under section 94 of that Act.</p></content></subsection><subsection><num>(6)</num><content><p>But that does not bring the decision to make the direction within section 182(2)(b) of that Act (decisions of Welsh Ministers that may only be challenged by way of statutory review).</p></content></subsection><subsection><num>(7)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-conservation-area">conservation area</term>” has the same meaning as in HEWA 2023 (see section 210 of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-conservation-area-consent">conservation area consent</term>” means consent under section 162 of HEWA 2023 (conservation area consent in Wales);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-controlled-conservation-area-works-in-wales">controlled conservation area works in Wales</term>” means works to which section 161 of HEWA 2023 (demolition of building in conservation area in Wales) applies;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-controlled-listed-building-works-in-wales">controlled listed building works in Wales</term>” means works to which section 88 of HEWA 2023 (demolition or alteration in character of a listed building in Wales) applies;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-hewa-2023">HEWA 2023</term>” means the Historic Environment (Wales) Act 2023;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-listed-building-consent">listed building consent</term>” means consent under section 89 of HEWA 2023 (listed building consent in Wales).</p></content></hcontainer></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-43-2"><num>(2)</num><intro><p>In section 22 of that Act (validity of orders)—</p></intro><level class="para1" eId="section-43-2-a"><num>(a)</num><content><p><mod>in the heading, for “under section 1 or 3” substitute <quotedText>“and directions”</quotedText>;</mod></p></content></level><level class="para1" eId="section-43-2-b"><num>(b)</num><content><p><mod>after subsection (3) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(4)</num><intro><p>This section applies to a direction under—</p></intro><level class="para1"><num>(a)</num><content><p>section 90(2A) of the Town and Country Planning Act 1990 (deemed planning permission),</p></content></level><level class="para1"><num>(b)</num><content><p>section <ref href="#d25e8892">17</ref> or <ref href="#d25e8964">17A</ref> of this Act (deemed listed building or conservation area consent), or</p></content></level><level class="para1"><num>(c)</num><content><p>section 12(2A) of the Planning (Hazardous Substances) Act 1990 (deemed hazardous substances consent),</p></content></level><wrapUp><p>as it applies to an order under section 1 or 3.</p></wrapUp></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-43-3"><num>(3)</num><content><p>In section 12 of the Planning (Listed Buildings and Conservation Areas) Act 1990 (reference of applications for listed building consent to Secretary of State), omit subsection (3A).</p></content></subsection><subsection eId="section-43-4"><num>(4)</num><content><p><mod>In section 94(4) of the Historic Environment (Wales) Act 2023 (reference to Welsh Ministers of application for listed building consent associated with Transport and Works Act application), after “application” in the second place it occurs insert <quotedText>“to the Secretary of State”</quotedText>.</mod></p></content></subsection></section><section eId="section-44"><num>44</num><heading>Deemed consent under marine licence</heading><subsection eId="section-44-1"><num>(1)</num><content><p><mod>In the Transport and Works Act 1992, after section 19 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section><num>19A</num><heading>Deemed consent under marine licences</heading><subsection eId="d25e9165"><num>(1)</num><content><p>An order of the Secretary of State under section 1 or 3 may include provision deeming a marine licence to have been granted by the Secretary of State for activities specified in the order (being activities for which the Secretary of State is the appropriate licensing authority).</p></content></subsection><subsection><num>(2)</num><intro><p>Activity specified under subsection <ref href="#d25e9165">(1)</ref> must be carried out wholly in one or more of these areas—</p></intro><level class="para1"><num>(a)</num><content><p>England;</p></content></level><level class="para1"><num>(b)</num><content><p>waters adjacent to England up to the seaward limits of the territorial sea;</p></content></level><level class="para1"><num>(c)</num><content><p>an exclusive economic zone, except any part of an exclusive economic zone in relation to which the Scottish Ministers have functions;</p></content></level><level class="para1"><num>(d)</num><content><p>a Renewable Energy Zone, except any part of a Renewable Energy Zone in relation to which the Scottish Ministers have functions;</p></content></level><level class="para1"><num>(e)</num><content><p>an area designated under section 1(7) of the Continental Shelf Act 1964, except any part of that area which is within a part of an exclusive economic zone or Renewable Energy Zone in relation to which the Scottish Ministers have functions.</p></content></level></subsection><subsection eId="d25e9210"><num>(3)</num><content><p>An order of the Welsh Ministers under section 1 or 3 may include provision deeming a marine licence to have been granted by the Welsh Ministers for activities specified in the order (being activities for which the Welsh Ministers are the appropriate licensing authority).</p></content></subsection><subsection eId="d25e9216"><num>(4)</num><intro><p>An order including provision under subsection <ref href="#d25e9165">(1)</ref> or <ref href="#d25e9210">(3)</ref> may also include provision—</p></intro><level class="para1" eId="d25e9228"><num>(a)</num><content><p>deeming the licence to have been granted subject to such conditions as may be specified in the order;</p></content></level><level class="para1" eId="d25e9234"><num>(b)</num><content><p>deeming any such conditions to have been attached to the marine licence by the Secretary of State or (as the case may be) the Welsh Ministers under Part 4 of the MCAA 2009.</p></content></level></subsection><subsection><num>(5)</num><content><p>If an order includes provision of the sort mentioned in paragraphs <ref href="#d25e9228">(a)</ref> and <ref href="#d25e9234">(b)</ref> of subsection <ref href="#d25e9216">(4)</ref>, sections 68 (notice of applications) and 69(3) and (5) (representations) of the MCAA 2009 do not apply in relation to the deemed marine licence.</p></content></subsection><subsection><num>(6)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-the-appropriate-licensing-authority">the appropriate licensing authority</term>” has the meaning given by section 113 of the MCAA 2009;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-exclusive-economic-zone">exclusive economic zone</term>” has the meaning given by section 322(1) of the MCAA 2009;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-marine-licence">marine licence</term>” means a marine licence under Part 4 of the MCAA 2009;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-mcaa-2009">the MCAA 2009</term>” means the Marine and Coastal Access Act 2009;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-renewable-energy-zone">Renewable Energy Zone</term>” has the meaning given by section 84(4) of the Energy Act 2004.</p></content></hcontainer></subsection><subsection><num>(7)</num><content><p>For the purposes of this section, waters are to be treated as adjacent, or as not adjacent, to England if they would be so treated for the purposes of section 113 of the MCAA 2009 as a result of sections 322(4) to (9) of that Act.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-44-2"><num>(2)</num><content><p>The amendments made by this section do not apply in relation to an order applied for under section 6 of the Transport and Works Act 1992 if rule 5(1) of the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2006 (<ref eId="c00058" href="http://www.legislation.gov.uk/id/uksi/2006/1466">S.I. 2006/1466</ref>) has been complied with in respect of the application before this section comes into force.</p></content></subsection></section><section eId="section-45"><num>45</num><heading>Authorisation of applications by local authorities</heading><subsection eId="section-45-1"><num>(1)</num><intro><p>In section 20 of the Transport and Works Act 1992 (power to apply for or object to orders)—</p></intro><level class="para1" eId="section-45-1-a"><num>(a)</num><content><p>in subsection (2), omit “by subsection (3) or (4)”;</p></content></level><level class="para1" eId="section-45-1-b"><num>(b)</num><content><p><mod>after subsection (4) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(5)</num><content><p>In the case of a local authority to which section 239 of the Local Government Act 1972 applies, a resolution to make an application passed, by virtue of this section, in accordance with subsection (2)(a) of that section does not need to be confirmed in accordance with subsection (2)(b) of that section.</p></content></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-45-2"><num>(2)</num><content><p>The amendments made by this section do not apply in relation to an application or objection that is the subject of a resolution under section 239(2)(a) of the Local Government Act 1972 passed before this section comes into force.</p></content></subsection></section><section eId="section-46"><num>46</num><heading>Extension to Scotland of certain amendments</heading><intro><p>The amendments made to the Transport and Works Act 1992 by the following provisions are extended to Scotland—</p></intro><level class="para1" eId="section-46-a"><num>(a)</num><content><p>Schedule 3 to the Environmental Impact Assessment (Miscellaneous Amendments Relating to Harbours, Highways and Transport) Regulations 2017 (<ref eId="c00059" href="http://www.legislation.gov.uk/id/uksi/2017/1070">S.I. 2017/1070</ref>);</p></content></level><level class="para1" eId="section-46-b"><num>(b)</num><content><p>regulation 4(3) and (4) of the Merchant Shipping and Other Transport (Environmental Protection) (Amendment) (EU Exit) Regulations 2019 (<ref eId="c00060" href="http://www.legislation.gov.uk/id/uksi/2019/311">S.I. 2019/311</ref>).</p></content></level></section><section eId="section-47"><num>47</num><heading>Power to make consequential amendments</heading><subsection eId="section-47-1"><num>(1)</num><content><p>The Secretary of State may by regulations made by statutory instrument make provision that is consequential on sections <ref href="#section-36">36</ref> to <ref href="#section-46">46</ref>.</p></content></subsection><subsection eId="section-47-2"><num>(2)</num><intro><p>Regulations under this section may amend—</p></intro><level class="para1" eId="section-47-2-a"><num>(a)</num><content><p>an Act, or</p></content></level><level class="para1" eId="section-47-2-b"><num>(b)</num><content><p>an Act or Measure of Senedd Cymru,</p></content></level><wrapUp><p>passed before the end of the session of Parliament in which this Act is passed.</p></wrapUp></subsection><subsection eId="section-47-3"><num>(3)</num><content><p>Regulations under this section may include incidental, supplemental, transitional and saving provision.</p></content></subsection><subsection eId="section-47-4"><num>(4)</num><content><p>A statutory instrument containing (whether alone or with other provision) regulations made in reliance on subsection <ref href="#section-47-2">(2)</ref> may not be made unless a draft of the statutory instrument containing them has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection eId="section-47-5"><num>(5)</num><content><p>Any other statutory instrument containing regulations under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-harbours"><heading>Harbours</heading><section eId="section-48"><num>48</num><heading>Fees for applications for harbour orders</heading><subsection eId="section-48-1"><num>(1)</num><content><p>Schedule 3 to the Harbours Act 1964 (procedure for making harbour revision orders and harbour empowerment orders) is amended as set out in subsections <ref href="#section-48-2">(2)</ref> to <ref href="#section-48-4">(4)</ref>.</p></content></subsection><subsection eId="section-48-2"><num>(2)</num><intro><p>In paragraph 7(1) (things to accompany applications)—</p></intro><level class="para1" eId="section-48-2-a"><num>(a)</num><content><p><mod>after paragraph (a) insert <quotedText>“and”</quotedText>;</mod></p></content></level><level class="para1" eId="section-48-2-b"><num>(b)</num><content><p>omit paragraph (c) and the preceding “and”.</p></content></level></subsection><subsection eId="section-48-3"><num>(3)</num><content><p>In paragraph 9 (duty not to consider application unless certain requirements met), omit sub-paragraph (a).</p></content></subsection><subsection eId="section-48-4"><num>(4)</num><content><p><mod>After paragraph 9 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Fees</heading><paragraph eId="d25e9504" class="schProv1"><num>9A</num><subparagraph><num>(1)</num><content><p>The Secretary of State may, by regulations, provide for fees to be payable by applicants for harbour revision orders.</p></content></subparagraph><subparagraph><num>(2)</num><intro><p>Such regulations may—</p></intro><level class="para1" eId="d25e9520"><num>(a)</num><content><p>provide for the amount of a fee to be determined by a method laid down in the regulations;</p></content></level><level class="para1" eId="d25e9526"><num>(b)</num><content><p>empower or require the Secretary of State not to take steps in relation to an application if a fee is not paid on time;</p></content></level><level class="para1"><num>(c)</num><content><p>provide for the payment of a deposit on account of a fee that will or may become payable (in which case paragraphs <ref href="#d25e9520">(a)</ref> and <ref href="#d25e9526">(b)</ref> apply to the deposit as they apply to the fee);</p></content></level><level class="para1"><num>(d)</num><content><p>make incidental or supplemental provision;</p></content></level><level class="para1"><num>(e)</num><content><p>make different provision for different purposes.</p></content></level></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-48-5"><num>(5)</num><content><p><mod>In section 54 of the Harbours Act 1964 (orders and regulations), after subsection (6) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(7)</num><intro><p>As to the power to make regulations under paragraph <ref href="#d25e9504">9A</ref> of Schedule 3 (fees for applications)—</p></intro><level class="para1"><num>(a)</num><intro><p>where the power is exercised by the Secretary of State—</p></intro><level class="para2"><num>(i)</num><content><p>the regulations are to be made by statutory instrument, and</p></content></level><level class="para2"><num>(ii)</num><content><p>a statutory instrument containing such regulations is subject to annulment in pursuance of a resolution of either House of Parliament;</p></content></level></level><level class="para1"><num>(b)</num><intro><p>where the power is exercised by the Welsh Ministers (see section 17(2C))—</p></intro><level class="para2"><num>(i)</num><content><p>the regulations are to be made by statutory instrument, and</p></content></level><level class="para2"><num>(ii)</num><content><p>a statutory instrument containing such regulations is subject to annulment in pursuance of a resolution of Senedd Cymru;</p></content></level></level><level class="para1"><num>(c)</num><content><p>where the power is exercised by the Scottish Ministers (see section 17(2C)), the regulations are subject to the negative procedure (see section 28 of the Interpretation and Legislative Reform (Scotland) Act 2010).</p></content></level></subsection></quotedStructure></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-electric-vehicle-charge-points-etc"><heading>Electric vehicle charge points etc</heading><section eId="section-49"><num>49</num><heading>Installation of electric vehicle charge points</heading><subsection eId="section-49-1"><num>(1)</num><content><p><ref eId="c00061" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">Section 48</ref> of the <ref eId="c00062" href="https://www.legislation.gov.uk/ukpga/1991/22/contents">New Roads and Street Works Act 1991</ref> (streets, street works and undertakers) is amended as set out in <span>subsections (2) to (5)</span>.</p></content></subsection><subsection eId="section-49-2"><num>(2)</num><content><p><mod>After <ref eId="c00063" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">subsection (3)</ref>, insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e9650"><num>(3ZA)</num><intro><p>In this Part “street works” also includes works of any of the following kinds executed in a street in England in pursuance of a street works permit—</p></intro><level class="para1"><num>(a)</num><content><p>placing apparatus that is a public charge point, or</p></content></level><level class="para1"><num>(b)</num><content><p>inspecting, maintaining, adjusting, repairing, altering, renewing, changing the position of or removing apparatus that is a public charge point,</p></content></level><wrapUp><p>or works required for or incidental to any such works (including, in particular, breaking up or opening the street, or any sewer, drain or tunnel under it, or tunnelling or boring under the street).</p></wrapUp></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-49-3"><num>(3)</num><content><p><mod>In <ref eId="c00064" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">subsection (3A)</ref>, in the words before <ref eId="c00065" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">paragraph (a)</ref>, after “(3)” insert <quotedText>“or (3ZA)”</quotedText>.</mod></p></content></subsection><subsection eId="section-49-4"><num>(4)</num><intro><p>In <ref eId="c00066" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">subsection (4)</ref>—</p></intro><level class="para1" eId="section-49-4-a"><num>(a)</num><content><p><mod>for “in relation to street works” substitute <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>in relation to street works mentioned in subsection (3),</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-49-4-b"><num>(b)</num><content><p><mod>at the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(b)</num><content><p>in relation to street works described in subsection (3ZA), means the person who in accordance with the street works permit is permitted to carry out the works.</p></content></level></quotedStructure></mod></p></content></level></subsection><subsection eId="section-49-5"><num>(5)</num><intro><p>In <ref eId="c00067" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">subsection (5)</ref>—</p></intro><level class="para1" eId="section-49-5-a"><num>(a)</num><content><p><mod>from “are to” to “licence” substitute <quotedText startQuote="&#x201C;">(including public charge points) are to the person entitled, by virtue of—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>a statutory right,</p></content></level><level class="para1"><num>(b)</num><content><p>a street works licence, or</p></content></level><level class="para1"><num>(c)</num><content><p>where the apparatus is a public charge point installed in England in pursuance of a street works permit, the permit,</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-49-5-b"><num>(b)</num><content><p><mod>after (3) insert <quotedText>“or (3ZA)”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-49-6"><num>(6)</num><content><p><mod>In <ref eId="c00068" href="https://www.legislation.gov.uk/ukpga/1991/22/section/51">section 51</ref> of <ref eId="c00069" href="https://www.legislation.gov.uk/ukpga/1991/22/contents">that Act</ref> (prohibition of unauthorised street works), in <ref eId="c00070" href="https://www.legislation.gov.uk/ukpga/1991/22/section/51">subsection (3)</ref> for “works for” to the end substitute <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>works for road purposes,</p></content></level><level class="para1"><num>(b)</num><content><p>emergency works of any description, or</p></content></level><level class="para1"><num>(c)</num><content><p>street works as described in section 48(3ZA) (works relating to public charge points executed in a street in England in pursuance of a street works permit).</p></content></level></quotedStructure></mod></p></content></subsection><subsection eId="section-49-7"><num>(7)</num><intro><p>In <ref eId="c00071" href="https://www.legislation.gov.uk/ukpga/1991/22/section/105">section 105</ref><ref eId="c00072" href="https://www.legislation.gov.uk/ukpga/1991/22/section/105">(1)</ref> of <ref eId="c00073" href="https://www.legislation.gov.uk/ukpga/1991/22/contents">that Act</ref> (minor definitions)—</p></intro><level class="para1" eId="section-49-7-a"><num>(a)</num><content><p><mod>at the appropriate places insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="definition"><content><p>“<term refersTo="#term-public-charge-point">public charge point</term>” means a charge point within the meaning of <ref eId="c00074" href="https://www.legislation.gov.uk/ukpga/2018/18/part/2">Part 2</ref> of the <ref eId="c00075" href="https://www.legislation.gov.uk/ukpga/2018/18/contents">Automated and Electric Vehicles Act 2018</ref> that is provided for use by members of the general public;</p></content></hcontainer></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="definition"><content><p>“<term refersTo="#term-street-works-permit">street works permit</term>” means a permit granted pursuant to a permit scheme prepared under <ref eId="c00076" href="https://www.legislation.gov.uk/ukpga/2004/18/part/3">Part 3</ref> of the <ref eId="c00077" href="https://www.legislation.gov.uk/ukpga/2004/18/contents">Traffic Management Act 2004</ref>;</p></content></hcontainer></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-49-7-b"><num>(b)</num><content><p><mod>in the definition of “statutory right”, for the words from “a right exercisable” to the end substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(a)</num><content><p>a right exercisable by virtue of a street works licence, or</p></content></level><level class="para1"><num>(b)</num><content><p>a right, exercisable by virtue of a street works permit, to carry out street works described in section 48(3ZA).</p></content></level></quotedStructure></mod></p></content></level></subsection><subsection eId="section-49-8"><num>(8)</num><intro><p>In <ref eId="c00078" href="https://www.legislation.gov.uk/ukpga/1991/22/section/106">section 106</ref> of <ref eId="c00079" href="https://www.legislation.gov.uk/ukpga/1991/22/contents">that Act</ref> (index of defined expressions)—</p></intro><level class="para1" eId="section-49-8-a"><num>(a)</num><content><p><mod>at the appropriate places insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><tblock class="table" ukl:Orientation="portrait"><foreign><default:table xmlns="http://www.w3.org/1999/xhtml"><default:colgroup><default:col span="1" style="width:50%"/><default:col span="1" style="width:50%"/></default:colgroup><default:tbody><default:tr><default:td><p xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0">public charge point</p></default:td><default:td><p xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0">section 105(1)</p></default:td></default:tr></default:tbody></default:table></foreign></tblock></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><tblock class="table" ukl:Orientation="portrait"><foreign><default:table xmlns="http://www.w3.org/1999/xhtml"><default:colgroup><default:col span="1" style="width:50%"/><default:col span="1" style="width:50%"/></default:colgroup><default:tbody><default:tr><default:td><p xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0">street works permit</p></default:td><default:td><p xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0">section 105(1)</p></default:td></default:tr></default:tbody></default:table></foreign></tblock></quotedStructure><inline name="appendText">.</inline></mod></p></content></level><level class="para1" eId="section-49-8-b"><num>(b)</num><content><p><mod>in the entry for “street works”, after “48(3)” insert <quotedText>“and (3ZA)”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-49-9"><num>(9)</num><intro><p>In <ref eId="c00080" href="https://www.legislation.gov.uk/ukpga/1980/66/section/115E">section 115E</ref> of the <ref eId="c00081" href="https://www.legislation.gov.uk/ukpga/1980/66/contents">Highways Act 1980</ref> (execution of works and use of objects etc. by persons other than councils)—</p></intro><level class="para1" eId="section-49-9-a"><num>(a)</num><content><p><mod>in <ref eId="c00082" href="https://www.legislation.gov.uk/ukpga/1980/66/section/115E">subsection (1)</ref>, for “(5)” substitute <quotedText>“(6)”</quotedText>;</mod></p></content></level><level class="para1" eId="section-49-9-b"><num>(b)</num><content><p><mod>after <ref eId="c00083" href="https://www.legislation.gov.uk/ukpga/1980/66/section/115E">subsection (5)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(6)</num><content><p>A council may not under this section grant a person permission to do anything relating to a public charge point in England which is capable of being authorised by a street works permit or a street works licence.</p></content></subsection><subsection><num>(7)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-public-charge-point">public charge point</term>” means a charge point within the meaning of <ref eId="c00084" href="https://www.legislation.gov.uk/ukpga/2018/18/part/2">Part 2</ref> of the <ref eId="c00085" href="https://www.legislation.gov.uk/ukpga/2018/18/contents">Automated and Electric Vehicles Act 2018</ref> that is provided for use by members of the general public;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-street-works-permit">street works permit</term>” means a permit granted pursuant to a permit scheme prepared under <ref eId="c00086" href="https://www.legislation.gov.uk/ukpga/2004/18/part/3">Part 3</ref> of the <ref eId="c00087" href="https://www.legislation.gov.uk/ukpga/2004/18/contents">Traffic Management Act 2004</ref>.</p></content></hcontainer></subsection></quotedStructure></mod></p></content></level></subsection></section><section eId="section-50"><num>50</num><heading>Accessibility of public charging or refuelling points</heading><content><p><mod>In section 10 of the Automated and Electric Vehicles Act 2018 (public charging or refuelling points: access, standards and connection) at the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(5)</num><intro><p>Regulations may impose requirements in connection with the accessibility of public charging or refuelling points in England, Wales and Scotland, such as requirements relating to—</p></intro><level class="para1"><num>(a)</num><content><p>the design of the point,</p></content></level><level class="para1"><num>(b)</num><content><p>the location, placement or surroundings of the point, and</p></content></level><level class="para1"><num>(c)</num><content><p>the provision of assistance in using the point.</p></content></level></subsection><subsection><num>(6)</num><content><p>Regulations under subsection (5) may prescribe requirements by reference to technical standards or specifications published by a person specified in the regulations (including standards or specifications as amended from time to time).</p></content></subsection><subsection><num>(7)</num><intro><p>Regulations under subsection (5) may impose requirements on any person, including—</p></intro><level class="para1"><num>(a)</num><content><p>persons making, supplying, importing, operating or installing public charging or refuelling points;</p></content></level><level class="para1"><num>(b)</num><content><p>the owners or occupiers of land on which public charging or refuelling points are situated.</p></content></level></subsection><subsection><num>(8)</num><content><p>Regulations under subsection (5) may not impose requirements on owners or occupiers of domestic premises.</p></content></subsection></quotedStructure></mod></p></content></section></hcontainer></chapter> — Amendments to the Highways Act 1980
Part 1 — Infrastructure — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" xmlns:default="http://www.w3.org/1999/xhtml" eId="part-1-chapter-3"><num>Chapter 3</num><heading>Transport infrastructure</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-amendments-to-the-highways-act-1980"><heading>Amendments to the Highways Act 1980</heading><section eId="section-31"><num>31</num><heading>Fees for certain services</heading><subsection eId="section-31-1"><num>(1)</num><content><p>The Highways Act 1980 is amended as follows.</p></content></subsection><subsection eId="section-31-2"><num>(2)</num><content><p><mod>After section 281A (stamp duty land tax) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e7028"><num>281B</num><heading>Power to provide for fees for certain services</heading><subsection eId="d25e7032"><num>(1)</num><content><p>The appropriate national authority may by regulations make provision for, or in connection with, the charging of fees to highway authorities by prescribed public authorities, in relation to the provision of relevant services.</p></content></subsection><subsection><num>(2)</num><intro><p>A “<term refersTo="#term-relevant-service">relevant service</term>” means any advice, information or other assistance (including a response to a consultation) provided, whether or not to a highway authority, in connection with—</p></intro><level class="para1"><num>(a)</num><content><p>an order made, or proposed to be made, under Part 2, 6 or 12, or</p></content></level><level class="para1"><num>(b)</num><content><p>any other prescribed matter relating to any of those Parts.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The regulations under subsection <ref href="#d25e7032">(1)</ref> may, in particular, make provision—</p></intro><level class="para1"><num>(a)</num><content><p>about when a fee (including a supplementary fee) may, and may not, be charged;</p></content></level><level class="para1"><num>(b)</num><content><p>about the amount which may be charged;</p></content></level><level class="para1"><num>(c)</num><content><p>about what may, and may not, be taken into account in calculating the amount charged;</p></content></level><level class="para1"><num>(d)</num><content><p>about which highway authority is liable to pay a fee charged;</p></content></level><level class="para1"><num>(e)</num><content><p>about when a fee charged is payable;</p></content></level><level class="para1"><num>(f)</num><content><p>about the recovery of fees charged;</p></content></level><level class="para1"><num>(g)</num><content><p>about waiver, reduction or repayment of fees;</p></content></level><level class="para1"><num>(h)</num><content><p>about the effect of paying or failing to pay fees charged (including provision permitting a prescribed public authority to withhold a relevant service that it would otherwise be required to provide under an enactment until any outstanding fees for that service are paid);</p></content></level><level class="para1"><num>(i)</num><content><p>for the supply of information for any purpose of the regulations;</p></content></level><level class="para1"><num>(j)</num><content><p>conferring a function, including a function involving the exercise of a discretion, on any person.</p></content></level></subsection><subsection><num>(4)</num><intro><p>A prescribed public authority must have regard to—</p></intro><level class="para1"><num>(a)</num><content><p>any guidance published by the Secretary of State in relation to the exercise of the authority’s functions under regulations made under this section by the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>any guidance published by the Welsh Ministers in relation to the exercise of the authority’s functions under regulations made under this section by the Welsh Ministers.</p></content></level></subsection><subsection><num>(5)</num><intro><p>Regulations under this section may make—</p></intro><level class="para1"><num>(a)</num><content><p>different provision for different purposes or areas;</p></content></level><level class="para1"><num>(b)</num><content><p>incidental, consequential, supplementary, transitional or transitory provision or savings.</p></content></level></subsection><subsection><num>(6)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-appropriate-national-authority">appropriate national authority</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>in relation to England, the Secretary of State, and</p></content></level><level class="para1"><num>(b)</num><content><p>in relation to Wales, the Welsh Ministers;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-prescribed">prescribed</term>” means prescribed by regulations made by the appropriate national authority under this section;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-public-authority">public authority</term>” means any person certain of whose functions are of a public nature.</p></content></hcontainer></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-31-3"><num>(3)</num><intro><p>In section 325 (provisions as to regulations, schemes and orders)—</p></intro><level class="para1" eId="section-31-3-a"><num>(a)</num><content><p><mod>before subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(1B)</num><content><p>The power of the Welsh Ministers to make regulations under section <ref href="#d25e7028">281B</ref> is exercisable by statutory instrument.</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-31-3-b"><num>(b)</num><content><p><mod>in subsection (2)(a), after “8A” insert <quotedText>“or regulations made by the Welsh Ministers under section <ref href="#d25e7028">281B</ref>”</quotedText>;</mod></p></content></level><level class="para1" eId="section-31-3-c"><num>(c)</num><content><p><mod>after subsection (2A) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(2B)</num><content><p>A statutory instrument containing regulations made by the Welsh Ministers under section <ref href="#d25e7028">281B</ref> is subject to annulment in pursuance of a resolution of Senedd Cymru.</p></content></subsection></quotedStructure></mod></p></content></level></subsection></section><section eId="section-32"><num>32</num><heading>Power of strategic highways company in relation to trunk roads</heading><subsection eId="section-32-1"><num>(1)</num><content><p>Section 10 of the Highways Act 1980 (trunk roads) is amended as set out in subsections <ref href="#section-32-2">(2)</ref> to <ref href="#section-32-6">(6)</ref>.</p></content></subsection><subsection eId="section-32-2"><num>(2)</num><content><p>Omit subsection (2A).</p></content></subsection><subsection eId="section-32-3"><num>(3)</num><content><p><mod>In subsection (3), for “this section” substitute <quotedText>“subsection (2)”</quotedText>.</mod></p></content></subsection><subsection eId="section-32-4"><num>(4)</num><content><p><mod>In subsection (3A), after “power” insert <quotedText>“under subsection (2)”</quotedText>.</mod></p></content></subsection><subsection eId="section-32-5"><num>(5)</num><content><p><mod>In subsection (4), for “this section” substitute <quotedText>“subsection (2)”</quotedText>.</mod></p></content></subsection><subsection eId="section-32-6"><num>(6)</num><content><p><mod>After subsection (4) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e7313"><num>(4A)</num><intro><p>A strategic highways company may by order direct—</p></intro><level class="para1"><num>(a)</num><content><p>that a highway for which the company is the highway authority is to become a trunk road,</p></content></level><level class="para1" eId="d25e7325"><num>(b)</num><intro><p>in relation to a highway in the company’s area for which the company is not the highway authority, that—</p></intro><level class="para2"><num>(i)</num><content><p>the highway is to become a trunk road, and</p></content></level><level class="para2"><num>(ii)</num><content><p>the company is to become the highway authority for it, or</p></content></level></level><level class="para1"><num>(c)</num><content><p>that a trunk road for which the company is the highway authority is to cease to be a trunk road.</p></content></level></subsection><subsection><num>(4B)</num><intro><p>In subsection <ref href="#d25e7313">(4A)</ref><ref href="#d25e7325">(b)</ref>—</p></intro><level class="para1"><num>(a)</num><content><p>the reference to the company’s area is to the area in respect of which it was appointed (see section 2(1) of the Infrastructure Act 2015), and</p></content></level><level class="para1"><num>(b)</num><content><p>the reference to a highway for which the company is not the highway authority includes a proposed highway to be constructed by the company.</p></content></level></subsection><subsection eId="d25e7372"><num>(4C)</num><content><p>A strategic highways company may make an order under subsection <ref href="#d25e7313">(4A)</ref> only if it is satisfied that the order is expedient for the purpose of extending, improving or reorganising the national system of routes for through traffic in England and Wales.</p></content></subsection><subsection><num>(4D)</num><content><p>A strategic highways company may be satisfied as mentioned in subsection <ref href="#d25e7372">(4C)</ref> only after taking into consideration the requirements of local and national planning, including the requirements of agriculture.</p></content></subsection><subsection><num>(4E)</num><intro><p>An order under subsection <ref href="#d25e7313">(4A)</ref>—</p></intro><level class="para1"><num>(a)</num><content><p>must specify the date on which it takes effect, and</p></content></level><level class="para1"><num>(b)</num><content><p>must be confirmed by the Secretary of State.</p></content></level></subsection><subsection><num>(4F)</num><content><p>Subsections (3) and (4) apply in relation to the power in subsection <ref href="#d25e7313">(4A)</ref> as they apply in relation to the power in subsection (2).</p></content></subsection><subsection><num>(4G)</num><content><p>The powers in this section are subject to section 33(4) of the Planning Act 2008 (exclusion of powers to make or confirm orders in relation to highways for which development consent required).</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-32-7"><num>(7)</num><content><p><mod>In Schedule 1 to the Highways Act 1980 (procedures for making or confirming orders and schemes), after paragraph 1 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><paragraph class="schProv1"><num>1A</num><content><p>Where an order under section 10 of this Act is submitted to the Secretary of State by a strategic highways company, that company must publish, in the manner specified in paragraph 1, the notice there referred to; and that paragraph has effect in relation to the notice as if, for the references to the draft order and the making of the order, there were substituted references to the order as submitted to the Secretary of State and the confirmation of the order respectively.</p></content></paragraph></quotedStructure></mod></p></content></subsection></section><section eId="section-33"><num>33</num><heading>Deadlines for consultation and decisions on certain orders and schemes</heading><subsection eId="section-33-1"><num>(1)</num><content><p>Schedule 1 to the <ref eId="c00053" href="https://www.legislation.gov.uk/ukpga/1980/66/contents">Highways Act 1980</ref> (procedures for making or confirming certain orders and schemes) is amended as follows.</p></content></subsection><subsection eId="section-33-2"><num>(2)</num><content><p><mod>In <ref eId="c00054" href="https://www.legislation.gov.uk/ukpga/1980/66/schedule/1/paragraph/1">paragraph 1</ref>, in sub-paragraph (b), for “6 weeks from the date of the publication of the notice” substitute <quotedText>“the minimum period specified in paragraph <ref href="#d25e7478">2A</ref>”</quotedText>.</mod></p></content></subsection><subsection eId="section-33-3"><num>(3)</num><content><p><mod>After paragraph 2 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><paragraph eId="d25e7478" class="schProv1"><num>2A</num><intro><p>The minimum period is—</p></intro><level class="para1"><num>(a)</num><content><p>30 days from the date of the publication of the notice, in the case of an order proposed by, or submitted to, the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>6 weeks from the date of the publication of the notice, in the case of an order proposed by, or submitted to, the Welsh Ministers.</p></content></level></paragraph></quotedStructure></mod></p></content></subsection><subsection eId="section-33-4"><num>(4)</num><content><p><mod>After paragraph 8 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><paragraph class="schProv1"><num>8A</num><subparagraph><num>(1)</num><content><p>This paragraph applies where the Secretary of State is exercising the functions conferred by paragraph 8.</p></content></subparagraph><subparagraph eId="d25e7513"><num>(2)</num><intro><p>The Secretary of State must—</p></intro><level class="para1"><num>(a)</num><content><p>decide to make or confirm the proposed order,</p></content></level><level class="para1"><num>(b)</num><content><p>decide not to make or confirm the proposed order, or</p></content></level><level class="para1"><num>(c)</num><content><p>decide to give notification under paragraph 8(3)(a),</p></content></level><wrapUp><p>within the period of 10 weeks beginning with the relevant day.</p></wrapUp></subparagraph><subparagraph eId="d25e7539"><num>(3)</num><intro><p>Subject to sub-paragraph <ref href="#d25e7572">(4)</ref>, the relevant day is the day on which any of the following occurs in relation to the proposed order—</p></intro><level class="para1"><num>(a)</num><content><p>the period specified in the notice published under paragraph 1 or (as the case may be) paragraph 5 expires with no qualifying objection having been received by the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>a qualifying objection is withdrawn with the result that no qualifying objections remain live;</p></content></level><level class="para1"><num>(c)</num><content><p>the Secretary of State decides under paragraph 7(2) to dispense with an inquiry;</p></content></level><level class="para1"><num>(d)</num><content><p>the Secretary of State receives the report of the person who has held a local inquiry.</p></content></level></subparagraph><subparagraph eId="d25e7572"><num>(4)</num><intro><p>In a case where—</p></intro><level class="para1"><num>(a)</num><content><p>the Secretary of State has to decide whether to confirm a related compulsory purchase order, and</p></content></level><level class="para1"><num>(b)</num><content><p>the relevant day in relation to that compulsory purchase order is later than the relevant day specified in sub-paragraph <ref href="#d25e7539">(3)</ref>,</p></content></level><wrapUp><p>the relevant day for the purposes of sub-paragraph <ref href="#d25e7513">(2)</ref> is the relevant day in relation to the compulsory purchase order.</p></wrapUp></subparagraph><subparagraph eId="d25e7598"><num>(5)</num><content><p>The relevant day in relation to a related compulsory purchase order is the day on which the procedure that must be followed before the Secretary of State can decide whether to confirm the order (not including any duty on the Secretary of State to consider certain matters before taking that decision) is completed.</p></content></subparagraph><subparagraph eId="d25e7604"><num>(6)</num><content><p>Where the Secretary of State gives notification under paragraph 8(3)(a), the Secretary of State must decide whether or not to make or confirm the proposed order within the period of 10 weeks beginning with the final day of the period specified under paragraph 8(3)(b).</p></content></subparagraph><subparagraph eId="d25e7610"><num>(7)</num><content><p>Sub-paragraphs <ref href="#d25e7572">(4)</ref> and <ref href="#d25e7598">(5)</ref> apply for postponing the first day of the period referred to in sub-paragraph <ref href="#d25e7604">(6)</ref> as they apply for postponing the relevant day for the purposes of sub-paragraph <ref href="#d25e7513">(2)</ref>.</p></content></subparagraph><subparagraph><num>(8)</num><content><p>If the Secretary of State has decided to proceed in accordance with paragraph 8(2), sub-paragraphs <ref href="#d25e7513">(2)</ref> to <ref href="#d25e7610">(7)</ref> of this paragraph apply separately in relation to each part of the proposals that is being given separate consideration.</p></content></subparagraph><subparagraph eId="d25e7640"><num>(9)</num><content><p>The Secretary of State may in any particular case, if the Secretary of State considers it appropriate, extend a period that applies under this paragraph.</p></content></subparagraph><subparagraph><num>(10)</num><intro><p>The power under sub-paragraph <ref href="#d25e7640">(9)</ref> may be exercised—</p></intro><level class="para1"><num>(a)</num><content><p>more than once in relation to the same period;</p></content></level><level class="para1"><num>(b)</num><content><p>after the expiry of the period.</p></content></level></subparagraph><subparagraph><num>(11)</num><intro><p>The Secretary of State must give written notice of any extension—</p></intro><level class="para1"><num>(a)</num><content><p>in a case where the proposed order has already been made, to the authority that made it, and</p></content></level><level class="para1"><num>(b)</num><content><p>to each person who has made a qualifying objection and not withdrawn it.</p></content></level></subparagraph><subparagraph><num>(12)</num><intro><p>In this paragraph—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-qualifying-objection">qualifying objection</term>” means an objection received as described in paragraph 7(1)(a) or (b);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-related-compulsory-purchase-order">related compulsory purchase order</term>”, in relation to a proposed order, means a compulsory purchase order proceedings on which could, by virtue of section 257(1), be taken concurrently with any proceedings under this Schedule on the proposed order.</p></content></hcontainer></subparagraph></paragraph></quotedStructure></mod></p></content></subsection><subsection eId="section-33-5"><num>(5)</num><intro><p>In <ref eId="c00055" href="https://www.legislation.gov.uk/ukpga/1980/66/schedule/1/paragraph/10">paragraph 10</ref>—</p></intro><level class="para1" eId="section-33-5-a"><num>(a)</num><content><p>the existing text becomes sub-paragraph (1);</p></content></level><level class="para1" eId="section-33-5-b"><num>(b)</num><content><p><mod>in paragraph (b) of that sub-paragraph, for “6 weeks from the date of the publication of the notice” substitute <quotedText>“the minimum period specified in sub-paragraph <ref href="#d25e7741">(2)</ref>”</quotedText>;</mod></p></content></level><level class="para1" eId="section-33-5-c"><num>(c)</num><content><p><mod>after that sub-paragraph insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><subparagraph eId="d25e7741"><num>(2)</num><intro><p>The minimum period is—</p></intro><level class="para1"><num>(a)</num><content><p>30 days from the date of the publication of the notice, in the case of a scheme proposed by, or submitted to, the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>6 weeks from the date of the publication of the notice, in the case of a scheme proposed by, or submitted to, the Welsh Ministers.</p></content></level></subparagraph></quotedStructure></mod></p></content></level></subsection><subsection eId="section-33-6"><num>(6)</num><content><p><mod>After paragraph 15 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><paragraph class="schProv1"><num>15A</num><subparagraph><num>(1)</num><content><p>This paragraph applies where the Secretary of State is exercising the functions conferred by paragraph 15.</p></content></subparagraph><subparagraph eId="d25e7776"><num>(2)</num><intro><p>The Secretary of State must—</p></intro><level class="para1"><num>(a)</num><content><p>decide to make or confirm the proposed scheme,</p></content></level><level class="para1"><num>(b)</num><content><p>decide not to make or confirm the proposed scheme, or</p></content></level><level class="para1"><num>(c)</num><content><p>decide to give notification under paragraph 15(3)(a),</p></content></level><wrapUp><p>within the period of 10 weeks beginning with the relevant day.</p></wrapUp></subparagraph><subparagraph eId="d25e7802"><num>(3)</num><intro><p>Subject to sub-paragraph <ref href="#d25e7835">(4)</ref>, the relevant day is the day on which any of the following occurs in relation to the proposed scheme—</p></intro><level class="para1"><num>(a)</num><content><p>the period specified in the notice published under paragraph 10 or (as the case may be) paragraph 12 expires with no qualifying objection having been received by the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>a qualifying objection is withdrawn with the result that no qualifying objections remain live;</p></content></level><level class="para1"><num>(c)</num><content><p>the Secretary of State decides under paragraph 14(2) to dispense with an inquiry;</p></content></level><level class="para1"><num>(d)</num><content><p>the Secretary of State receives the report of the person who has held a local inquiry.</p></content></level></subparagraph><subparagraph eId="d25e7835"><num>(4)</num><intro><p>In a case where—</p></intro><level class="para1"><num>(a)</num><content><p>the Secretary of State has to decide whether to confirm a related compulsory purchase order, and</p></content></level><level class="para1"><num>(b)</num><content><p>the relevant day in relation to that compulsory purchase order is later than the relevant day specified in sub-paragraph <ref href="#d25e7802">(3)</ref>,</p></content></level><wrapUp><p>the relevant day for the purposes of sub-paragraph <ref href="#d25e7776">(2)</ref> is the relevant day in relation to the compulsory purchase order.</p></wrapUp></subparagraph><subparagraph eId="d25e7861"><num>(5)</num><content><p>The relevant day in relation to a related compulsory purchase order is the day on which the procedure that must be followed before the Secretary of State can decide whether to confirm the order (not including any duty on the Secretary of State to consider certain matters before taking that decision) is completed.</p></content></subparagraph><subparagraph eId="d25e7867"><num>(6)</num><content><p>Where the Secretary of State gives notification under paragraph 15(3)(a), the Secretary of State must decide whether or not to make or confirm the proposed scheme within the period of 10 weeks beginning with the final day of the period specified under paragraph 15(3)(b).</p></content></subparagraph><subparagraph eId="d25e7873"><num>(7)</num><content><p>Sub-paragraphs <ref href="#d25e7835">(4)</ref> and <ref href="#d25e7861">(5)</ref> apply for postponing the first day of the period referred to in sub-paragraph <ref href="#d25e7867">(6)</ref> as they apply for postponing the relevant day for the purposes of sub-paragraph <ref href="#d25e7776">(2)</ref>.</p></content></subparagraph><subparagraph><num>(8)</num><content><p>If the Secretary of State has decided to proceed in accordance with paragraph 15(2), sub-paragraphs <ref href="#d25e7776">(2)</ref> to <ref href="#d25e7873">(7)</ref> of this paragraph apply separately in relation to each part of the proposals that is being given separate consideration.</p></content></subparagraph><subparagraph eId="d25e7903"><num>(9)</num><content><p>The Secretary of State may in any particular case, if the Secretary of State considers it appropriate, extend a period that applies under this paragraph.</p></content></subparagraph><subparagraph><num>(10)</num><intro><p>The power under sub-paragraph <ref href="#d25e7903">(9)</ref> may be exercised—</p></intro><level class="para1"><num>(a)</num><content><p>more than once in relation to the same period;</p></content></level><level class="para1"><num>(b)</num><content><p>after the expiry of the period.</p></content></level></subparagraph><subparagraph><num>(11)</num><intro><p>The Secretary of State must give written notice of any extension—</p></intro><level class="para1"><num>(a)</num><content><p>in a case where the proposed scheme has already been made, to the authority that made it, and</p></content></level><level class="para1"><num>(b)</num><content><p>to each person who has made a qualifying objection and not withdrawn it.</p></content></level></subparagraph><subparagraph><num>(12)</num><intro><p>In this paragraph—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-qualifying-objection">qualifying objection</term>” means an objection received as described in paragraph 14(1)(a) or (b);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-related-compulsory-purchase-order">related compulsory purchase order</term>”, in relation to a proposed scheme, means a compulsory purchase order proceedings on which could, by virtue of section 257(1), be taken concurrently with any proceedings under this Schedule on the proposed scheme.</p></content></hcontainer></subparagraph></paragraph></quotedStructure></mod></p></content></subsection></section><section eId="section-34"><num>34</num><heading>Procedure for certain orders and schemes</heading><subsection eId="section-34-1"><num>(1)</num><content><p>The Highways Act 1980 is amended as follows.</p></content></subsection><subsection eId="section-34-2"><num>(2)</num><intro><p>In section 325 (provision for certain regulations, orders and schemes to be made by statutory instrument)—</p></intro><level class="para1" eId="section-34-2-a"><num>(a)</num><content><p>in the heading, omit “, schemes”;</p></content></level><level class="para1" eId="section-34-2-b"><num>(b)</num><intro><p>in subsection (1)—</p></intro><level class="para2" eId="section-34-2-b-i"><num>(i)</num><content><p>omit paragraph (b);</p></content></level><level class="para2" eId="section-34-2-b-ii"><num>(ii)</num><content><p><mod>in paragraph (d), after “sections” insert <quotedText>“10,”</quotedText>.</mod></p></content></level></level></subsection><subsection eId="section-34-3"><num>(3)</num><intro><p>In section 326 (revocation and variation of schemes and orders)—</p></intro><level class="para1" eId="section-34-3-a"><num>(a)</num><intro><p>in subsection (2)—</p></intro><level class="para2" eId="section-34-3-a-i"><num>(i)</num><content><p><mod>after “An order” insert <quotedText>“or scheme”</quotedText>;</mod></p></content></level><level class="para2" eId="section-34-3-a-ii"><num>(ii)</num><content><p><mod>after “section” insert <quotedText>“10,”</quotedText>;</mod></p></content></level><level class="para2" eId="section-34-3-a-iii"><num>(iii)</num><content><p><mod>after “14B,” insert <quotedText>“16,”</quotedText>;</mod></p></content></level><level class="para2" eId="section-34-3-a-iv"><num>(iv)</num><content><p><mod>after “27,” insert <quotedText>“106(3),”</quotedText>;</mod></p></content></level><level class="para2" eId="section-34-3-a-v"><num>(v)</num><content><p><mod>after “orders” insert <quotedText>“or schemes”</quotedText>;</mod></p></content></level><level class="para2" eId="section-34-3-a-vi"><num>(vi)</num><content><p><mod>after “subsequent order” insert <quotedText>“or scheme”</quotedText>;</mod></p></content></level></level><level class="para1" eId="section-34-3-b"><num>(b)</num><content><p><mod>after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(2A)</num><content><p>Subsection (2) does not apply to an order or scheme under section 10, 16 or 106(3) made or confirmed by the Welsh Ministers (but see section 325(1A)).</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-34-3-c"><num>(c)</num><content><p><mod>in subsection (6), before “14,” insert <quotedText>“10,”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-34-4"><num>(4)</num><content><p><mod>In Schedule 1 (procedures for making or confirming certain orders and schemes), after paragraph 19 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><paragraph class="schProv1"><num>19A</num><intro><p>On making or confirming an order or scheme in accordance with this Schedule, the Secretary of State must publish on a government website—</p></intro><level class="para1"><num>(a)</num><content><p>notice of the making or confirmation of the order or scheme,</p></content></level><level class="para1"><num>(b)</num><content><p>if the order or scheme was made with modifications, a summary of those modifications, and</p></content></level><level class="para1"><num>(c)</num><intro><p>either—</p></intro><level class="para2"><num>(i)</num><content><p>a copy of the order or scheme, together with any maps or plans referred to in it, or</p></content></level><level class="para2"><num>(ii)</num><content><p>an explanation of where and how that documentation can be inspected.</p></content></level></level></paragraph></quotedStructure></mod></p></content></subsection></section><section eId="section-35"><num>35</num><heading>Compulsory acquisition powers to include taking of temporary possession</heading><content><p><mod>In section 250(8) of the Highways Act 1980 (compulsory acquisition by creation of new rights to include rights of carrying out certain activity on land), after “references to” insert <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>the right to take temporary possession or occupation of land, and</p></content></level><level class="para1"><num>(b)</num><content><p/></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-amendments-to-the-transport-and-works-act-1992"><heading>Amendments to the Transport and Works Act 1992</heading><section eId="section-36"><num>36</num><heading>Replacement of model clauses with guidance</heading><content><p><mod>In the Transport and Works Act 1992, for section 8 (model clauses) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section><num>8</num><heading>Guidance on draft orders</heading><subsection><num>(1)</num><content><p>The Secretary of State may publish guidance about the preparation of draft orders, for cases in which rules under section 6 require the submission of such drafts to the Secretary of State.</p></content></subsection><subsection><num>(2)</num><content><p>The Welsh Ministers may publish guidance about the preparation of draft orders, for cases in which rules under section 6 require the submission of such drafts to the Welsh Ministers.</p></content></subsection><subsection><num>(3)</num><content><p>The guidance may set out model provisions considered suitable for inclusion in the drafts (whether generally or in certain cases).</p></content></subsection><subsection><num>(4)</num><intro><p>In arriving at a determination under section 13 in a case to which guidance under this section applies, the Secretary of State or (as the case may be) the Welsh Ministers must have regard to—</p></intro><level class="para1"><num>(a)</num><content><p>any departure from the guidance, and</p></content></level><level class="para1"><num>(b)</num><content><p>any reasons given by the applicant for that departure.</p></content></level></subsection></section></quotedStructure></mod></p></content></section><section eId="section-37"><num>37</num><heading>Removal of special procedure for projects of national significance</heading><subsection eId="section-37-1"><num>(1)</num><content><p>In the Transport and Works Act 1992, omit section 9 (special procedure for projects considered to be of national significance).</p></content></subsection><subsection eId="section-37-2"><num>(2)</num><intro><p>In consequence of that amendment—</p></intro><level class="para1" eId="section-37-2-a"><num>(a)</num><content><p>in section 3 of the Statutory Orders (Special Procedure) Act 1945 (petitions against orders), omit subsection (4A);</p></content></level><level class="para1" eId="section-37-2-b"><num>(b)</num><content><p>in section 12 of the Transport and Works Act 1992 (special parliamentary procedure), omit subsection (2);</p></content></level><level class="para1" eId="section-37-2-c"><num>(c)</num><content><p>in the Channel Tunnel Rail Link Act 1996, omit section 42 (application of section 9 of the 1992 Act to certain proposals affecting the Channel Tunnel).</p></content></level></subsection><subsection eId="section-37-3"><num>(3)</num><content><p>The amendments made by this section do not apply in relation to an application in respect of which a notice under section 9(2) of the Transport and Works Act 1992 has been published before this section comes into force.</p></content></subsection></section><section eId="section-38"><num>38</num><heading>Duty to hold inquiry or hearing</heading><subsection eId="section-38-1"><num>(1)</num><content><p>Section 11 of the Transport and Works Act 1992 (inquiries and hearings) is amended as follows.</p></content></subsection><subsection eId="section-38-2"><num>(2)</num><content><p><mod>In subsection (3) (duty to hold inquiry or hearing on request from objector), for the words from “an objection” to “applies,” substitute <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>an objection is made by a person within subsection (4),</p></content></level><level class="para1"><num>(b)</num><content><p>the person informs the Secretary of State in writing that the person wishes the objection to be referred to an inquiry or dealt with in accordance with subsection (2), and</p></content></level><level class="para1"><num>(c)</num><content><p>the Secretary of State considers that the objection is serious enough to merit such treatment,</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-38-3"><num>(3)</num><content><p><mod>After subsection (3) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(3A)</num><content><p>In a case in which the powers in subsections (1) and (2) are exercisable by the Welsh Ministers, subsection (3) is to be read as referring to the Welsh Ministers instead of the Secretary of State.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-38-4"><num>(4)</num><content><p>The amendments made by this section do not apply in relation to an application in respect of which rule 5(1) of the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2006 (<ref eId="c00056" href="http://www.legislation.gov.uk/id/uksi/2006/1466">S.I. 2006/1466</ref>) has been complied with before this section comes into force.</p></content></subsection></section><section eId="section-39"><num>39</num><heading>Costs of inquiries</heading><subsection eId="section-39-1"><num>(1)</num><content><p>Section 11 of the Transport and Works Act 1992 (inquiries and hearings) is amended as follows.</p></content></subsection><subsection eId="section-39-2"><num>(2)</num><content><p><mod>In subsection (5) (application of section 250 of the Local Government Act 1972), before paragraph (a) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(za)</num><content><p>the powers of direction, certification and order-making conferred by section 250(4) and (5) as applied by this subsection may, unless otherwise directed by the Secretary of State or the Welsh Ministers, be exercised on their behalf by the person holding the inquiry,</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-39-3"><num>(3)</num><content><p><mod>After subsection (5) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e8378"><num>(5A)</num><content><p>The power of direction conferred by section 250(4) of the Local Government Act 1972 (costs of inquiry) as applied by subsection (5) is, in the case of an application under section 6, to be exercised so as to require the applicant to pay the costs in question, unless the person exercising the power considers that there is good reason to exercise it differently.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-39-4"><num>(4)</num><content><p><mod>In subsection (6) (application to hearings of provisions applied to inquiries), after “(costs)” insert <quotedText>“, and subsection <ref href="#d25e8378">(5A)</ref> of this section,”</quotedText>.</mod></p></content></subsection><subsection eId="section-39-5"><num>(5)</num><content><p>The amendments made by subsections <ref href="#section-39-3">(3)</ref> and <ref href="#section-39-4">(4)</ref> do not apply in relation to an application in respect of which rule 5(1) of the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2006 (<ref eId="c00057" href="http://www.legislation.gov.uk/id/uksi/2006/1466">S.I. 2006/1466</ref>) has been complied with before this section comes into force.</p></content></subsection></section><section eId="section-40"><num>40</num><heading>Deadline for decisions</heading><subsection eId="section-40-1"><num>(1)</num><content><p>The Transport and Works Act 1992 is amended as follows.</p></content></subsection><subsection eId="section-40-2"><num>(2)</num><content><p><mod>In section 13 (making or refusal of orders), after subsection (6) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e8434"><num>(7)</num><intro><p>The Secretary of State may, for cases involving applications under section 6, make rules as to the period within which—</p></intro><level class="para1"><num>(a)</num><content><p>a determination under subsection (1) must be made, or</p></content></level><level class="para1"><num>(b)</num><content><p>a step must be taken as required by subsection (4), section 13B or section 13C.</p></content></level></subsection><subsection><num>(8)</num><intro><p>Rules under subsection <ref href="#d25e8434">(7)</ref>—</p></intro><level class="para1"><num>(a)</num><content><p>may provide for periods to be determined or changed by the Secretary of State or the Welsh Ministers in individual cases;</p></content></level><level class="para1"><num>(b)</num><content><p>may provide for the postponement of a requirement under the rules where a fee payable in connection with the application is not paid on time;</p></content></level><level class="para1"><num>(c)</num><content><p>may make different provision for different cases;</p></content></level><level class="para1"><num>(d)</num><content><p>if they apply in relation to Wales, may be made only with the agreement of the Welsh Ministers;</p></content></level><level class="para1"><num>(e)</num><content><p>must be made by statutory instrument;</p></content></level><wrapUp><p>and such an instrument is subject to annulment in pursuance of a resolution of either House of Parliament.</p></wrapUp></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-40-3"><num>(3)</num><intro><p>In consequence of that amendment—</p></intro><level class="para1" eId="section-40-3-a"><num>(a)</num><content><p><mod>in section 13(6), for “to 13D” substitute <quotedText>“and 13C”</quotedText>;</mod></p></content></level><level class="para1" eId="section-40-3-b"><num>(b)</num><content><p>omit section 13D (requirement to determine EIA application or proposal within reasonable time);</p></content></level><level class="para1" eId="section-40-3-c"><num>(c)</num><content><p><mod>in section 14(3A)(a), for “to 13D” substitute <quotedText>“and 13C”</quotedText>.</mod></p></content></level></subsection></section><section eId="section-41"><num>41</num><heading>Publication of decisions and time for bringing challenge</heading><subsection eId="section-41-1"><num>(1)</num><content><p>The Transport and Works Act 1992 is amended as follows.</p></content></subsection><subsection eId="section-41-2"><num>(2)</num><intro><p>In section 14 (publicity for making or refusal of order)—</p></intro><level class="para1" eId="section-41-2-a"><num>(a)</num><content><p><mod>in subsection (1), for paragraphs (b) and (c) substitute <quotedText startQuote="&#x201C;">and</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1" eId="d25e8552"><num>(b)</num><content><p>publish the notice on a government website.</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-41-2-b"><num>(b)</num><content><p><mod>in subsection (2), for “(1)(a)” substitute <quotedText>“(1)”</quotedText>;</mod></p></content></level><level class="para1" eId="section-41-2-c"><num>(c)</num><content><p>omit subsection (2A);</p></content></level><level class="para1" eId="section-41-2-d"><num>(d)</num><content><p><mod>in subsection (3A), for “notices” substitute <quotedText>“notice”</quotedText>;</mod></p></content></level><level class="para1" eId="section-41-2-e"><num>(e)</num><content><p><mod>for subsection (3AA) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(3AA)</num><content><p>If the determination is for the making of an EIA order, the notice under subsection (1) must include the information specified in subsection (3AB).</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-41-2-f"><num>(f)</num><intro><p>in subsection (4)—</p></intro><level class="para2" eId="section-41-2-f-i"><num>(i)</num><content><p><mod>for “a notice” substitute <quotedText>“a copy of the notice under subsection (1)”</quotedText>;</mod></p></content></level><level class="para2" eId="section-41-2-f-ii"><num>(ii)</num><content><p>omit the words from “; and” to the end.</p></content></level></level></subsection><subsection eId="section-41-3"><num>(3)</num><content><p><mod>In section 22(1) (period for challenging order), for the words from “within” to “published” substitute <quotedText>“before the end of the period of 6 weeks beginning with the day after the day on which notice of the determination to make the order is first published under section 14(1)<ref href="#d25e8552">(b)</ref>”</quotedText>.</mod></p></content></subsection><subsection eId="section-41-4"><num>(4)</num><intro><p>In consequence of those amendments—</p></intro><level class="para1" eId="section-41-4-a"><num>(a)</num><content><p><mod>in section 12(3)(c) (modification of section 22(1) where special parliamentary procedure applies), for “the notice required by section 14(1)(b) is published” substitute <quotedText>“notice is first published under section 14(1)<ref href="#d25e8552">(b)</ref>”</quotedText>;</mod></p></content></level><level class="para1" eId="section-41-4-b"><num>(b)</num><content><p><mod>in section 13(5) (date of operation of order), for the words from “the notice” to “published” substitute <quotedText>“notice of the determination to make the order is first published under section 14(1)<ref href="#d25e8552">(b)</ref>”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-41-5"><num>(5)</num><content><p>The amendments made by this section do not apply in relation to a determination made before this section comes into force or any order made further to such a determination.</p></content></subsection></section><section eId="section-42"><num>42</num><heading>Fees for certain services</heading><content><p><mod>After section 23 of the Transport and Works Act 1992 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section><num>23A</num><heading>Fees for certain services in connection with orders</heading><subsection eId="d25e8686"><num>(1)</num><content><p>The appropriate national authority may by regulations make provision for, or in connection with, the charging of fees to applicants under section 6 by prescribed public authorities, in relation to the provision of relevant services.</p></content></subsection><subsection><num>(2)</num><intro><p>A “<term refersTo="#term-relevant-service">relevant service</term>” means any advice, information or other assistance (including a response to a consultation) provided, whether or not to an applicant under section 6, in connection with—</p></intro><level class="para1"><num>(a)</num><content><p>an application under section 6, or</p></content></level><level class="para1"><num>(b)</num><content><p>any other prescribed matter relating to an order, or proposed order, under section 1 or 3.</p></content></level></subsection><subsection><num>(3)</num><intro><p>Regulations made under subsection <ref href="#d25e8686">(1)</ref> may, in particular, make provision—</p></intro><level class="para1"><num>(a)</num><content><p>about when a fee (including a supplementary fee) may, and may not, be charged;</p></content></level><level class="para1"><num>(b)</num><content><p>about the amount which may be charged;</p></content></level><level class="para1"><num>(c)</num><content><p>about what may, and may not, be taken into account in calculating the amount charged;</p></content></level><level class="para1"><num>(d)</num><content><p>about when a fee charged is payable;</p></content></level><level class="para1"><num>(e)</num><content><p>about the recovery of fees charged;</p></content></level><level class="para1"><num>(f)</num><content><p>about waiver, reduction or repayment of fees;</p></content></level><level class="para1"><num>(g)</num><content><p>about the effect of paying or failing to pay fees charged (including provision permitting a prescribed public authority to withhold a relevant service that it would otherwise be required to provide under an enactment until any outstanding fees for that service are paid);</p></content></level><level class="para1"><num>(h)</num><content><p>for the supply of information for any purpose of the regulations;</p></content></level><level class="para1"><num>(i)</num><content><p>conferring a function, including a function involving the exercise of a discretion, on any person.</p></content></level></subsection><subsection><num>(4)</num><intro><p>A prescribed public authority must have regard to—</p></intro><level class="para1"><num>(a)</num><content><p>any guidance published by the Secretary of State in relation to the exercise of the authority’s functions under regulations made under this section by the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>any guidance published by the Welsh Ministers in relation to the exercise of the authority’s functions under regulations made under this section by the Welsh Ministers.</p></content></level></subsection><subsection><num>(5)</num><intro><p>Regulations under this section may make—</p></intro><level class="para1"><num>(a)</num><content><p>different provision for different purposes or areas;</p></content></level><level class="para1"><num>(b)</num><content><p>incidental, consequential, supplementary, transitional or transitory provision or savings.</p></content></level></subsection><subsection><num>(6)</num><content><p>Regulations under this section are to be made by statutory instrument.</p></content></subsection><subsection><num>(7)</num><content><p>A statutory instrument containing regulations made by the Secretary of State under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection><num>(8)</num><content><p>A statutory instrument containing regulations made by the Welsh Ministers under this section is subject to annulment in pursuance of a resolution of Senedd Cymru.</p></content></subsection><subsection><num>(9)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-appropriate-national-authority">appropriate national authority</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>in relation to England and cross-border orders, the Secretary of State, and</p></content></level><level class="para1"><num>(b)</num><content><p>in relation to Wales but not cross-border orders, the Welsh Ministers;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-cross-border-order">cross-border order</term>” means an order under section 1 or 3 that has effect both in England and in Wales;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-prescribed">prescribed</term>” means prescribed by regulations made by the appropriate national authority under this section;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-public-authority">public authority</term>” means any person certain of whose functions are of a public nature.</p></content></hcontainer></subsection></section></quotedStructure></mod></p></content></section><section eId="section-43"><num>43</num><heading>Deemed grant of listed building consent etc</heading><subsection eId="section-43-1"><num>(1)</num><content><p><mod>In the Transport and Works Act 1992, for section 17 (listed buildings and conservation areas) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e8892"><num>17</num><heading>Listed buildings: England</heading><subsection><num>(1)</num><content><p>On making an order under section 1 or 3 that authorises controlled listed building works in England, the Secretary of State may direct that listed building consent for the works is deemed to be granted, subject to such conditions (if any) as may be specified in the direction.</p></content></subsection><subsection><num>(2)</num><content><p>Section 16(2) of the Listed Buildings Act (duty of special regard to listed buildings) applies to the making of a direction under this section as it would apply to the grant of listed building consent in relation to the building concerned.</p></content></subsection><subsection><num>(3)</num><content><p>Section 72(1) of the Listed Buildings Act (duty of special attention to conservation areas) applies to the making of a direction under this section in relation to a building in a conservation area as it would apply to the grant of listed building consent in relation to that building.</p></content></subsection><subsection><num>(4)</num><content><p>The provisions of the Listed Buildings Act apply in relation to any listed building consent deemed to be granted by virtue of a direction of the Secretary of State under this section as if the consent had been granted by the Secretary of State on an application referred under section 12 of that Act.</p></content></subsection><subsection><num>(5)</num><content><p>But that does not bring the decision to make the direction within section 62(2)(a) of that Act (decisions of Secretary of State that may only be challenged by way of statutory review).</p></content></subsection><subsection><num>(6)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-conservation-area">conservation area</term>” has the same meaning as in the Listed Buildings Act (see section 91(1) of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-controlled-listed-building-works-in-england">controlled listed building works in England</term>” means works to which section 7(1) of the Listed Buildings Act (demolition or alteration in character of a listed building in England) applies;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-listed-building-consent">listed building consent</term>” means consent under section 8 of the Listed Buildings Act (listed building consent in England);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-listed-buildings-act">the Listed Buildings Act</term>” means the Planning (Listed Buildings and Conservation Areas) Act 1990.</p></content></hcontainer></subsection></section><section eId="d25e8964"><num>17A</num><heading>Listed buildings and conservation areas: Wales</heading><subsection eId="d25e8968"><num>(1)</num><content><p>On making an order under section 1 or 3 that authorises controlled listed building works in Wales, the Welsh Ministers may direct that listed building consent for the works is deemed to be granted, subject to such conditions (if any) as may be specified in the direction.</p></content></subsection><subsection eId="d25e8974"><num>(2)</num><content><p>On making an order under section 1 or 3 that authorises controlled conservation area works in Wales, the Welsh Ministers may direct that conservation area consent for the works is deemed to be granted, subject to such conditions (if any) as may be specified in the direction.</p></content></subsection><subsection><num>(3)</num><content><p>Section 96(2) of HEWA 2023 (duty of special regard to listed buildings) applies to the making of a direction under subsection <ref href="#d25e8968">(1)</ref> as it would apply to the grant of listed building consent in relation to the building concerned.</p></content></subsection><subsection><num>(4)</num><intro><p>Section 160(1) of HEWA 2023 (duty of special regard to conservation areas) applies—</p></intro><level class="para1"><num>(a)</num><content><p>to the making of a direction under subsection <ref href="#d25e8968">(1)</ref> in relation to a building in a conservation area, as it would apply to the grant of listed building consent in relation to that building, and</p></content></level><level class="para1"><num>(b)</num><content><p>to the making of a direction under subsection <ref href="#d25e8974">(2)</ref>, as it would apply to the grant of conservation area consent in relation to the building concerned.</p></content></level></subsection><subsection><num>(5)</num><content><p>The provisions of HEWA 2023 apply in relation to any consent deemed to be granted by virtue of a direction of the Welsh Ministers under this section as if the consent had been granted by the Welsh Ministers on an application referred under section 94 of that Act.</p></content></subsection><subsection><num>(6)</num><content><p>But that does not bring the decision to make the direction within section 182(2)(b) of that Act (decisions of Welsh Ministers that may only be challenged by way of statutory review).</p></content></subsection><subsection><num>(7)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-conservation-area">conservation area</term>” has the same meaning as in HEWA 2023 (see section 210 of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-conservation-area-consent">conservation area consent</term>” means consent under section 162 of HEWA 2023 (conservation area consent in Wales);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-controlled-conservation-area-works-in-wales">controlled conservation area works in Wales</term>” means works to which section 161 of HEWA 2023 (demolition of building in conservation area in Wales) applies;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-controlled-listed-building-works-in-wales">controlled listed building works in Wales</term>” means works to which section 88 of HEWA 2023 (demolition or alteration in character of a listed building in Wales) applies;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-hewa-2023">HEWA 2023</term>” means the Historic Environment (Wales) Act 2023;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-listed-building-consent">listed building consent</term>” means consent under section 89 of HEWA 2023 (listed building consent in Wales).</p></content></hcontainer></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-43-2"><num>(2)</num><intro><p>In section 22 of that Act (validity of orders)—</p></intro><level class="para1" eId="section-43-2-a"><num>(a)</num><content><p><mod>in the heading, for “under section 1 or 3” substitute <quotedText>“and directions”</quotedText>;</mod></p></content></level><level class="para1" eId="section-43-2-b"><num>(b)</num><content><p><mod>after subsection (3) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(4)</num><intro><p>This section applies to a direction under—</p></intro><level class="para1"><num>(a)</num><content><p>section 90(2A) of the Town and Country Planning Act 1990 (deemed planning permission),</p></content></level><level class="para1"><num>(b)</num><content><p>section <ref href="#d25e8892">17</ref> or <ref href="#d25e8964">17A</ref> of this Act (deemed listed building or conservation area consent), or</p></content></level><level class="para1"><num>(c)</num><content><p>section 12(2A) of the Planning (Hazardous Substances) Act 1990 (deemed hazardous substances consent),</p></content></level><wrapUp><p>as it applies to an order under section 1 or 3.</p></wrapUp></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-43-3"><num>(3)</num><content><p>In section 12 of the Planning (Listed Buildings and Conservation Areas) Act 1990 (reference of applications for listed building consent to Secretary of State), omit subsection (3A).</p></content></subsection><subsection eId="section-43-4"><num>(4)</num><content><p><mod>In section 94(4) of the Historic Environment (Wales) Act 2023 (reference to Welsh Ministers of application for listed building consent associated with Transport and Works Act application), after “application” in the second place it occurs insert <quotedText>“to the Secretary of State”</quotedText>.</mod></p></content></subsection></section><section eId="section-44"><num>44</num><heading>Deemed consent under marine licence</heading><subsection eId="section-44-1"><num>(1)</num><content><p><mod>In the Transport and Works Act 1992, after section 19 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section><num>19A</num><heading>Deemed consent under marine licences</heading><subsection eId="d25e9165"><num>(1)</num><content><p>An order of the Secretary of State under section 1 or 3 may include provision deeming a marine licence to have been granted by the Secretary of State for activities specified in the order (being activities for which the Secretary of State is the appropriate licensing authority).</p></content></subsection><subsection><num>(2)</num><intro><p>Activity specified under subsection <ref href="#d25e9165">(1)</ref> must be carried out wholly in one or more of these areas—</p></intro><level class="para1"><num>(a)</num><content><p>England;</p></content></level><level class="para1"><num>(b)</num><content><p>waters adjacent to England up to the seaward limits of the territorial sea;</p></content></level><level class="para1"><num>(c)</num><content><p>an exclusive economic zone, except any part of an exclusive economic zone in relation to which the Scottish Ministers have functions;</p></content></level><level class="para1"><num>(d)</num><content><p>a Renewable Energy Zone, except any part of a Renewable Energy Zone in relation to which the Scottish Ministers have functions;</p></content></level><level class="para1"><num>(e)</num><content><p>an area designated under section 1(7) of the Continental Shelf Act 1964, except any part of that area which is within a part of an exclusive economic zone or Renewable Energy Zone in relation to which the Scottish Ministers have functions.</p></content></level></subsection><subsection eId="d25e9210"><num>(3)</num><content><p>An order of the Welsh Ministers under section 1 or 3 may include provision deeming a marine licence to have been granted by the Welsh Ministers for activities specified in the order (being activities for which the Welsh Ministers are the appropriate licensing authority).</p></content></subsection><subsection eId="d25e9216"><num>(4)</num><intro><p>An order including provision under subsection <ref href="#d25e9165">(1)</ref> or <ref href="#d25e9210">(3)</ref> may also include provision—</p></intro><level class="para1" eId="d25e9228"><num>(a)</num><content><p>deeming the licence to have been granted subject to such conditions as may be specified in the order;</p></content></level><level class="para1" eId="d25e9234"><num>(b)</num><content><p>deeming any such conditions to have been attached to the marine licence by the Secretary of State or (as the case may be) the Welsh Ministers under Part 4 of the MCAA 2009.</p></content></level></subsection><subsection><num>(5)</num><content><p>If an order includes provision of the sort mentioned in paragraphs <ref href="#d25e9228">(a)</ref> and <ref href="#d25e9234">(b)</ref> of subsection <ref href="#d25e9216">(4)</ref>, sections 68 (notice of applications) and 69(3) and (5) (representations) of the MCAA 2009 do not apply in relation to the deemed marine licence.</p></content></subsection><subsection><num>(6)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-the-appropriate-licensing-authority">the appropriate licensing authority</term>” has the meaning given by section 113 of the MCAA 2009;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-exclusive-economic-zone">exclusive economic zone</term>” has the meaning given by section 322(1) of the MCAA 2009;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-marine-licence">marine licence</term>” means a marine licence under Part 4 of the MCAA 2009;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-mcaa-2009">the MCAA 2009</term>” means the Marine and Coastal Access Act 2009;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-renewable-energy-zone">Renewable Energy Zone</term>” has the meaning given by section 84(4) of the Energy Act 2004.</p></content></hcontainer></subsection><subsection><num>(7)</num><content><p>For the purposes of this section, waters are to be treated as adjacent, or as not adjacent, to England if they would be so treated for the purposes of section 113 of the MCAA 2009 as a result of sections 322(4) to (9) of that Act.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-44-2"><num>(2)</num><content><p>The amendments made by this section do not apply in relation to an order applied for under section 6 of the Transport and Works Act 1992 if rule 5(1) of the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2006 (<ref eId="c00058" href="http://www.legislation.gov.uk/id/uksi/2006/1466">S.I. 2006/1466</ref>) has been complied with in respect of the application before this section comes into force.</p></content></subsection></section><section eId="section-45"><num>45</num><heading>Authorisation of applications by local authorities</heading><subsection eId="section-45-1"><num>(1)</num><intro><p>In section 20 of the Transport and Works Act 1992 (power to apply for or object to orders)—</p></intro><level class="para1" eId="section-45-1-a"><num>(a)</num><content><p>in subsection (2), omit “by subsection (3) or (4)”;</p></content></level><level class="para1" eId="section-45-1-b"><num>(b)</num><content><p><mod>after subsection (4) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(5)</num><content><p>In the case of a local authority to which section 239 of the Local Government Act 1972 applies, a resolution to make an application passed, by virtue of this section, in accordance with subsection (2)(a) of that section does not need to be confirmed in accordance with subsection (2)(b) of that section.</p></content></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-45-2"><num>(2)</num><content><p>The amendments made by this section do not apply in relation to an application or objection that is the subject of a resolution under section 239(2)(a) of the Local Government Act 1972 passed before this section comes into force.</p></content></subsection></section><section eId="section-46"><num>46</num><heading>Extension to Scotland of certain amendments</heading><intro><p>The amendments made to the Transport and Works Act 1992 by the following provisions are extended to Scotland—</p></intro><level class="para1" eId="section-46-a"><num>(a)</num><content><p>Schedule 3 to the Environmental Impact Assessment (Miscellaneous Amendments Relating to Harbours, Highways and Transport) Regulations 2017 (<ref eId="c00059" href="http://www.legislation.gov.uk/id/uksi/2017/1070">S.I. 2017/1070</ref>);</p></content></level><level class="para1" eId="section-46-b"><num>(b)</num><content><p>regulation 4(3) and (4) of the Merchant Shipping and Other Transport (Environmental Protection) (Amendment) (EU Exit) Regulations 2019 (<ref eId="c00060" href="http://www.legislation.gov.uk/id/uksi/2019/311">S.I. 2019/311</ref>).</p></content></level></section><section eId="section-47"><num>47</num><heading>Power to make consequential amendments</heading><subsection eId="section-47-1"><num>(1)</num><content><p>The Secretary of State may by regulations made by statutory instrument make provision that is consequential on sections <ref href="#section-36">36</ref> to <ref href="#section-46">46</ref>.</p></content></subsection><subsection eId="section-47-2"><num>(2)</num><intro><p>Regulations under this section may amend—</p></intro><level class="para1" eId="section-47-2-a"><num>(a)</num><content><p>an Act, or</p></content></level><level class="para1" eId="section-47-2-b"><num>(b)</num><content><p>an Act or Measure of Senedd Cymru,</p></content></level><wrapUp><p>passed before the end of the session of Parliament in which this Act is passed.</p></wrapUp></subsection><subsection eId="section-47-3"><num>(3)</num><content><p>Regulations under this section may include incidental, supplemental, transitional and saving provision.</p></content></subsection><subsection eId="section-47-4"><num>(4)</num><content><p>A statutory instrument containing (whether alone or with other provision) regulations made in reliance on subsection <ref href="#section-47-2">(2)</ref> may not be made unless a draft of the statutory instrument containing them has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection eId="section-47-5"><num>(5)</num><content><p>Any other statutory instrument containing regulations under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-harbours"><heading>Harbours</heading><section eId="section-48"><num>48</num><heading>Fees for applications for harbour orders</heading><subsection eId="section-48-1"><num>(1)</num><content><p>Schedule 3 to the Harbours Act 1964 (procedure for making harbour revision orders and harbour empowerment orders) is amended as set out in subsections <ref href="#section-48-2">(2)</ref> to <ref href="#section-48-4">(4)</ref>.</p></content></subsection><subsection eId="section-48-2"><num>(2)</num><intro><p>In paragraph 7(1) (things to accompany applications)—</p></intro><level class="para1" eId="section-48-2-a"><num>(a)</num><content><p><mod>after paragraph (a) insert <quotedText>“and”</quotedText>;</mod></p></content></level><level class="para1" eId="section-48-2-b"><num>(b)</num><content><p>omit paragraph (c) and the preceding “and”.</p></content></level></subsection><subsection eId="section-48-3"><num>(3)</num><content><p>In paragraph 9 (duty not to consider application unless certain requirements met), omit sub-paragraph (a).</p></content></subsection><subsection eId="section-48-4"><num>(4)</num><content><p><mod>After paragraph 9 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Fees</heading><paragraph eId="d25e9504" class="schProv1"><num>9A</num><subparagraph><num>(1)</num><content><p>The Secretary of State may, by regulations, provide for fees to be payable by applicants for harbour revision orders.</p></content></subparagraph><subparagraph><num>(2)</num><intro><p>Such regulations may—</p></intro><level class="para1" eId="d25e9520"><num>(a)</num><content><p>provide for the amount of a fee to be determined by a method laid down in the regulations;</p></content></level><level class="para1" eId="d25e9526"><num>(b)</num><content><p>empower or require the Secretary of State not to take steps in relation to an application if a fee is not paid on time;</p></content></level><level class="para1"><num>(c)</num><content><p>provide for the payment of a deposit on account of a fee that will or may become payable (in which case paragraphs <ref href="#d25e9520">(a)</ref> and <ref href="#d25e9526">(b)</ref> apply to the deposit as they apply to the fee);</p></content></level><level class="para1"><num>(d)</num><content><p>make incidental or supplemental provision;</p></content></level><level class="para1"><num>(e)</num><content><p>make different provision for different purposes.</p></content></level></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-48-5"><num>(5)</num><content><p><mod>In section 54 of the Harbours Act 1964 (orders and regulations), after subsection (6) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(7)</num><intro><p>As to the power to make regulations under paragraph <ref href="#d25e9504">9A</ref> of Schedule 3 (fees for applications)—</p></intro><level class="para1"><num>(a)</num><intro><p>where the power is exercised by the Secretary of State—</p></intro><level class="para2"><num>(i)</num><content><p>the regulations are to be made by statutory instrument, and</p></content></level><level class="para2"><num>(ii)</num><content><p>a statutory instrument containing such regulations is subject to annulment in pursuance of a resolution of either House of Parliament;</p></content></level></level><level class="para1"><num>(b)</num><intro><p>where the power is exercised by the Welsh Ministers (see section 17(2C))—</p></intro><level class="para2"><num>(i)</num><content><p>the regulations are to be made by statutory instrument, and</p></content></level><level class="para2"><num>(ii)</num><content><p>a statutory instrument containing such regulations is subject to annulment in pursuance of a resolution of Senedd Cymru;</p></content></level></level><level class="para1"><num>(c)</num><content><p>where the power is exercised by the Scottish Ministers (see section 17(2C)), the regulations are subject to the negative procedure (see section 28 of the Interpretation and Legislative Reform (Scotland) Act 2010).</p></content></level></subsection></quotedStructure></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-electric-vehicle-charge-points-etc"><heading>Electric vehicle charge points etc</heading><section eId="section-49"><num>49</num><heading>Installation of electric vehicle charge points</heading><subsection eId="section-49-1"><num>(1)</num><content><p><ref eId="c00061" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">Section 48</ref> of the <ref eId="c00062" href="https://www.legislation.gov.uk/ukpga/1991/22/contents">New Roads and Street Works Act 1991</ref> (streets, street works and undertakers) is amended as set out in <span>subsections (2) to (5)</span>.</p></content></subsection><subsection eId="section-49-2"><num>(2)</num><content><p><mod>After <ref eId="c00063" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">subsection (3)</ref>, insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e9650"><num>(3ZA)</num><intro><p>In this Part “street works” also includes works of any of the following kinds executed in a street in England in pursuance of a street works permit—</p></intro><level class="para1"><num>(a)</num><content><p>placing apparatus that is a public charge point, or</p></content></level><level class="para1"><num>(b)</num><content><p>inspecting, maintaining, adjusting, repairing, altering, renewing, changing the position of or removing apparatus that is a public charge point,</p></content></level><wrapUp><p>or works required for or incidental to any such works (including, in particular, breaking up or opening the street, or any sewer, drain or tunnel under it, or tunnelling or boring under the street).</p></wrapUp></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-49-3"><num>(3)</num><content><p><mod>In <ref eId="c00064" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">subsection (3A)</ref>, in the words before <ref eId="c00065" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">paragraph (a)</ref>, after “(3)” insert <quotedText>“or (3ZA)”</quotedText>.</mod></p></content></subsection><subsection eId="section-49-4"><num>(4)</num><intro><p>In <ref eId="c00066" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">subsection (4)</ref>—</p></intro><level class="para1" eId="section-49-4-a"><num>(a)</num><content><p><mod>for “in relation to street works” substitute <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>in relation to street works mentioned in subsection (3),</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-49-4-b"><num>(b)</num><content><p><mod>at the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(b)</num><content><p>in relation to street works described in subsection (3ZA), means the person who in accordance with the street works permit is permitted to carry out the works.</p></content></level></quotedStructure></mod></p></content></level></subsection><subsection eId="section-49-5"><num>(5)</num><intro><p>In <ref eId="c00067" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">subsection (5)</ref>—</p></intro><level class="para1" eId="section-49-5-a"><num>(a)</num><content><p><mod>from “are to” to “licence” substitute <quotedText startQuote="&#x201C;">(including public charge points) are to the person entitled, by virtue of—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>a statutory right,</p></content></level><level class="para1"><num>(b)</num><content><p>a street works licence, or</p></content></level><level class="para1"><num>(c)</num><content><p>where the apparatus is a public charge point installed in England in pursuance of a street works permit, the permit,</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-49-5-b"><num>(b)</num><content><p><mod>after (3) insert <quotedText>“or (3ZA)”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-49-6"><num>(6)</num><content><p><mod>In <ref eId="c00068" href="https://www.legislation.gov.uk/ukpga/1991/22/section/51">section 51</ref> of <ref eId="c00069" href="https://www.legislation.gov.uk/ukpga/1991/22/contents">that Act</ref> (prohibition of unauthorised street works), in <ref eId="c00070" href="https://www.legislation.gov.uk/ukpga/1991/22/section/51">subsection (3)</ref> for “works for” to the end substitute <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>works for road purposes,</p></content></level><level class="para1"><num>(b)</num><content><p>emergency works of any description, or</p></content></level><level class="para1"><num>(c)</num><content><p>street works as described in section 48(3ZA) (works relating to public charge points executed in a street in England in pursuance of a street works permit).</p></content></level></quotedStructure></mod></p></content></subsection><subsection eId="section-49-7"><num>(7)</num><intro><p>In <ref eId="c00071" href="https://www.legislation.gov.uk/ukpga/1991/22/section/105">section 105</ref><ref eId="c00072" href="https://www.legislation.gov.uk/ukpga/1991/22/section/105">(1)</ref> of <ref eId="c00073" href="https://www.legislation.gov.uk/ukpga/1991/22/contents">that Act</ref> (minor definitions)—</p></intro><level class="para1" eId="section-49-7-a"><num>(a)</num><content><p><mod>at the appropriate places insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="definition"><content><p>“<term refersTo="#term-public-charge-point">public charge point</term>” means a charge point within the meaning of <ref eId="c00074" href="https://www.legislation.gov.uk/ukpga/2018/18/part/2">Part 2</ref> of the <ref eId="c00075" href="https://www.legislation.gov.uk/ukpga/2018/18/contents">Automated and Electric Vehicles Act 2018</ref> that is provided for use by members of the general public;</p></content></hcontainer></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="definition"><content><p>“<term refersTo="#term-street-works-permit">street works permit</term>” means a permit granted pursuant to a permit scheme prepared under <ref eId="c00076" href="https://www.legislation.gov.uk/ukpga/2004/18/part/3">Part 3</ref> of the <ref eId="c00077" href="https://www.legislation.gov.uk/ukpga/2004/18/contents">Traffic Management Act 2004</ref>;</p></content></hcontainer></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-49-7-b"><num>(b)</num><content><p><mod>in the definition of “statutory right”, for the words from “a right exercisable” to the end substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(a)</num><content><p>a right exercisable by virtue of a street works licence, or</p></content></level><level class="para1"><num>(b)</num><content><p>a right, exercisable by virtue of a street works permit, to carry out street works described in section 48(3ZA).</p></content></level></quotedStructure></mod></p></content></level></subsection><subsection eId="section-49-8"><num>(8)</num><intro><p>In <ref eId="c00078" href="https://www.legislation.gov.uk/ukpga/1991/22/section/106">section 106</ref> of <ref eId="c00079" href="https://www.legislation.gov.uk/ukpga/1991/22/contents">that Act</ref> (index of defined expressions)—</p></intro><level class="para1" eId="section-49-8-a"><num>(a)</num><content><p><mod>at the appropriate places insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><tblock class="table" ukl:Orientation="portrait"><foreign><default:table xmlns="http://www.w3.org/1999/xhtml"><default:colgroup><default:col span="1" style="width:50%"/><default:col span="1" style="width:50%"/></default:colgroup><default:tbody><default:tr><default:td><p xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0">public charge point</p></default:td><default:td><p xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0">section 105(1)</p></default:td></default:tr></default:tbody></default:table></foreign></tblock></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><tblock class="table" ukl:Orientation="portrait"><foreign><default:table xmlns="http://www.w3.org/1999/xhtml"><default:colgroup><default:col span="1" style="width:50%"/><default:col span="1" style="width:50%"/></default:colgroup><default:tbody><default:tr><default:td><p xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0">street works permit</p></default:td><default:td><p xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0">section 105(1)</p></default:td></default:tr></default:tbody></default:table></foreign></tblock></quotedStructure><inline name="appendText">.</inline></mod></p></content></level><level class="para1" eId="section-49-8-b"><num>(b)</num><content><p><mod>in the entry for “street works”, after “48(3)” insert <quotedText>“and (3ZA)”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-49-9"><num>(9)</num><intro><p>In <ref eId="c00080" href="https://www.legislation.gov.uk/ukpga/1980/66/section/115E">section 115E</ref> of the <ref eId="c00081" href="https://www.legislation.gov.uk/ukpga/1980/66/contents">Highways Act 1980</ref> (execution of works and use of objects etc. by persons other than councils)—</p></intro><level class="para1" eId="section-49-9-a"><num>(a)</num><content><p><mod>in <ref eId="c00082" href="https://www.legislation.gov.uk/ukpga/1980/66/section/115E">subsection (1)</ref>, for “(5)” substitute <quotedText>“(6)”</quotedText>;</mod></p></content></level><level class="para1" eId="section-49-9-b"><num>(b)</num><content><p><mod>after <ref eId="c00083" href="https://www.legislation.gov.uk/ukpga/1980/66/section/115E">subsection (5)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(6)</num><content><p>A council may not under this section grant a person permission to do anything relating to a public charge point in England which is capable of being authorised by a street works permit or a street works licence.</p></content></subsection><subsection><num>(7)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-public-charge-point">public charge point</term>” means a charge point within the meaning of <ref eId="c00084" href="https://www.legislation.gov.uk/ukpga/2018/18/part/2">Part 2</ref> of the <ref eId="c00085" href="https://www.legislation.gov.uk/ukpga/2018/18/contents">Automated and Electric Vehicles Act 2018</ref> that is provided for use by members of the general public;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-street-works-permit">street works permit</term>” means a permit granted pursuant to a permit scheme prepared under <ref eId="c00086" href="https://www.legislation.gov.uk/ukpga/2004/18/part/3">Part 3</ref> of the <ref eId="c00087" href="https://www.legislation.gov.uk/ukpga/2004/18/contents">Traffic Management Act 2004</ref>.</p></content></hcontainer></subsection></quotedStructure></mod></p></content></level></subsection></section><section eId="section-50"><num>50</num><heading>Accessibility of public charging or refuelling points</heading><content><p><mod>In section 10 of the Automated and Electric Vehicles Act 2018 (public charging or refuelling points: access, standards and connection) at the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(5)</num><intro><p>Regulations may impose requirements in connection with the accessibility of public charging or refuelling points in England, Wales and Scotland, such as requirements relating to—</p></intro><level class="para1"><num>(a)</num><content><p>the design of the point,</p></content></level><level class="para1"><num>(b)</num><content><p>the location, placement or surroundings of the point, and</p></content></level><level class="para1"><num>(c)</num><content><p>the provision of assistance in using the point.</p></content></level></subsection><subsection><num>(6)</num><content><p>Regulations under subsection (5) may prescribe requirements by reference to technical standards or specifications published by a person specified in the regulations (including standards or specifications as amended from time to time).</p></content></subsection><subsection><num>(7)</num><intro><p>Regulations under subsection (5) may impose requirements on any person, including—</p></intro><level class="para1"><num>(a)</num><content><p>persons making, supplying, importing, operating or installing public charging or refuelling points;</p></content></level><level class="para1"><num>(b)</num><content><p>the owners or occupiers of land on which public charging or refuelling points are situated.</p></content></level></subsection><subsection><num>(8)</num><content><p>Regulations under subsection (5) may not impose requirements on owners or occupiers of domestic premises.</p></content></subsection></quotedStructure></mod></p></content></section></hcontainer></chapter> — Amendments to the Transport and Works Act 1992
Part 1 — Infrastructure — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" xmlns:default="http://www.w3.org/1999/xhtml" eId="part-1-chapter-3"><num>Chapter 3</num><heading>Transport infrastructure</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-amendments-to-the-highways-act-1980"><heading>Amendments to the Highways Act 1980</heading><section eId="section-31"><num>31</num><heading>Fees for certain services</heading><subsection eId="section-31-1"><num>(1)</num><content><p>The Highways Act 1980 is amended as follows.</p></content></subsection><subsection eId="section-31-2"><num>(2)</num><content><p><mod>After section 281A (stamp duty land tax) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e7028"><num>281B</num><heading>Power to provide for fees for certain services</heading><subsection eId="d25e7032"><num>(1)</num><content><p>The appropriate national authority may by regulations make provision for, or in connection with, the charging of fees to highway authorities by prescribed public authorities, in relation to the provision of relevant services.</p></content></subsection><subsection><num>(2)</num><intro><p>A “<term refersTo="#term-relevant-service">relevant service</term>” means any advice, information or other assistance (including a response to a consultation) provided, whether or not to a highway authority, in connection with—</p></intro><level class="para1"><num>(a)</num><content><p>an order made, or proposed to be made, under Part 2, 6 or 12, or</p></content></level><level class="para1"><num>(b)</num><content><p>any other prescribed matter relating to any of those Parts.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The regulations under subsection <ref href="#d25e7032">(1)</ref> may, in particular, make provision—</p></intro><level class="para1"><num>(a)</num><content><p>about when a fee (including a supplementary fee) may, and may not, be charged;</p></content></level><level class="para1"><num>(b)</num><content><p>about the amount which may be charged;</p></content></level><level class="para1"><num>(c)</num><content><p>about what may, and may not, be taken into account in calculating the amount charged;</p></content></level><level class="para1"><num>(d)</num><content><p>about which highway authority is liable to pay a fee charged;</p></content></level><level class="para1"><num>(e)</num><content><p>about when a fee charged is payable;</p></content></level><level class="para1"><num>(f)</num><content><p>about the recovery of fees charged;</p></content></level><level class="para1"><num>(g)</num><content><p>about waiver, reduction or repayment of fees;</p></content></level><level class="para1"><num>(h)</num><content><p>about the effect of paying or failing to pay fees charged (including provision permitting a prescribed public authority to withhold a relevant service that it would otherwise be required to provide under an enactment until any outstanding fees for that service are paid);</p></content></level><level class="para1"><num>(i)</num><content><p>for the supply of information for any purpose of the regulations;</p></content></level><level class="para1"><num>(j)</num><content><p>conferring a function, including a function involving the exercise of a discretion, on any person.</p></content></level></subsection><subsection><num>(4)</num><intro><p>A prescribed public authority must have regard to—</p></intro><level class="para1"><num>(a)</num><content><p>any guidance published by the Secretary of State in relation to the exercise of the authority’s functions under regulations made under this section by the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>any guidance published by the Welsh Ministers in relation to the exercise of the authority’s functions under regulations made under this section by the Welsh Ministers.</p></content></level></subsection><subsection><num>(5)</num><intro><p>Regulations under this section may make—</p></intro><level class="para1"><num>(a)</num><content><p>different provision for different purposes or areas;</p></content></level><level class="para1"><num>(b)</num><content><p>incidental, consequential, supplementary, transitional or transitory provision or savings.</p></content></level></subsection><subsection><num>(6)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-appropriate-national-authority">appropriate national authority</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>in relation to England, the Secretary of State, and</p></content></level><level class="para1"><num>(b)</num><content><p>in relation to Wales, the Welsh Ministers;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-prescribed">prescribed</term>” means prescribed by regulations made by the appropriate national authority under this section;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-public-authority">public authority</term>” means any person certain of whose functions are of a public nature.</p></content></hcontainer></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-31-3"><num>(3)</num><intro><p>In section 325 (provisions as to regulations, schemes and orders)—</p></intro><level class="para1" eId="section-31-3-a"><num>(a)</num><content><p><mod>before subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(1B)</num><content><p>The power of the Welsh Ministers to make regulations under section <ref href="#d25e7028">281B</ref> is exercisable by statutory instrument.</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-31-3-b"><num>(b)</num><content><p><mod>in subsection (2)(a), after “8A” insert <quotedText>“or regulations made by the Welsh Ministers under section <ref href="#d25e7028">281B</ref>”</quotedText>;</mod></p></content></level><level class="para1" eId="section-31-3-c"><num>(c)</num><content><p><mod>after subsection (2A) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(2B)</num><content><p>A statutory instrument containing regulations made by the Welsh Ministers under section <ref href="#d25e7028">281B</ref> is subject to annulment in pursuance of a resolution of Senedd Cymru.</p></content></subsection></quotedStructure></mod></p></content></level></subsection></section><section eId="section-32"><num>32</num><heading>Power of strategic highways company in relation to trunk roads</heading><subsection eId="section-32-1"><num>(1)</num><content><p>Section 10 of the Highways Act 1980 (trunk roads) is amended as set out in subsections <ref href="#section-32-2">(2)</ref> to <ref href="#section-32-6">(6)</ref>.</p></content></subsection><subsection eId="section-32-2"><num>(2)</num><content><p>Omit subsection (2A).</p></content></subsection><subsection eId="section-32-3"><num>(3)</num><content><p><mod>In subsection (3), for “this section” substitute <quotedText>“subsection (2)”</quotedText>.</mod></p></content></subsection><subsection eId="section-32-4"><num>(4)</num><content><p><mod>In subsection (3A), after “power” insert <quotedText>“under subsection (2)”</quotedText>.</mod></p></content></subsection><subsection eId="section-32-5"><num>(5)</num><content><p><mod>In subsection (4), for “this section” substitute <quotedText>“subsection (2)”</quotedText>.</mod></p></content></subsection><subsection eId="section-32-6"><num>(6)</num><content><p><mod>After subsection (4) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e7313"><num>(4A)</num><intro><p>A strategic highways company may by order direct—</p></intro><level class="para1"><num>(a)</num><content><p>that a highway for which the company is the highway authority is to become a trunk road,</p></content></level><level class="para1" eId="d25e7325"><num>(b)</num><intro><p>in relation to a highway in the company’s area for which the company is not the highway authority, that—</p></intro><level class="para2"><num>(i)</num><content><p>the highway is to become a trunk road, and</p></content></level><level class="para2"><num>(ii)</num><content><p>the company is to become the highway authority for it, or</p></content></level></level><level class="para1"><num>(c)</num><content><p>that a trunk road for which the company is the highway authority is to cease to be a trunk road.</p></content></level></subsection><subsection><num>(4B)</num><intro><p>In subsection <ref href="#d25e7313">(4A)</ref><ref href="#d25e7325">(b)</ref>—</p></intro><level class="para1"><num>(a)</num><content><p>the reference to the company’s area is to the area in respect of which it was appointed (see section 2(1) of the Infrastructure Act 2015), and</p></content></level><level class="para1"><num>(b)</num><content><p>the reference to a highway for which the company is not the highway authority includes a proposed highway to be constructed by the company.</p></content></level></subsection><subsection eId="d25e7372"><num>(4C)</num><content><p>A strategic highways company may make an order under subsection <ref href="#d25e7313">(4A)</ref> only if it is satisfied that the order is expedient for the purpose of extending, improving or reorganising the national system of routes for through traffic in England and Wales.</p></content></subsection><subsection><num>(4D)</num><content><p>A strategic highways company may be satisfied as mentioned in subsection <ref href="#d25e7372">(4C)</ref> only after taking into consideration the requirements of local and national planning, including the requirements of agriculture.</p></content></subsection><subsection><num>(4E)</num><intro><p>An order under subsection <ref href="#d25e7313">(4A)</ref>—</p></intro><level class="para1"><num>(a)</num><content><p>must specify the date on which it takes effect, and</p></content></level><level class="para1"><num>(b)</num><content><p>must be confirmed by the Secretary of State.</p></content></level></subsection><subsection><num>(4F)</num><content><p>Subsections (3) and (4) apply in relation to the power in subsection <ref href="#d25e7313">(4A)</ref> as they apply in relation to the power in subsection (2).</p></content></subsection><subsection><num>(4G)</num><content><p>The powers in this section are subject to section 33(4) of the Planning Act 2008 (exclusion of powers to make or confirm orders in relation to highways for which development consent required).</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-32-7"><num>(7)</num><content><p><mod>In Schedule 1 to the Highways Act 1980 (procedures for making or confirming orders and schemes), after paragraph 1 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><paragraph class="schProv1"><num>1A</num><content><p>Where an order under section 10 of this Act is submitted to the Secretary of State by a strategic highways company, that company must publish, in the manner specified in paragraph 1, the notice there referred to; and that paragraph has effect in relation to the notice as if, for the references to the draft order and the making of the order, there were substituted references to the order as submitted to the Secretary of State and the confirmation of the order respectively.</p></content></paragraph></quotedStructure></mod></p></content></subsection></section><section eId="section-33"><num>33</num><heading>Deadlines for consultation and decisions on certain orders and schemes</heading><subsection eId="section-33-1"><num>(1)</num><content><p>Schedule 1 to the <ref eId="c00053" href="https://www.legislation.gov.uk/ukpga/1980/66/contents">Highways Act 1980</ref> (procedures for making or confirming certain orders and schemes) is amended as follows.</p></content></subsection><subsection eId="section-33-2"><num>(2)</num><content><p><mod>In <ref eId="c00054" href="https://www.legislation.gov.uk/ukpga/1980/66/schedule/1/paragraph/1">paragraph 1</ref>, in sub-paragraph (b), for “6 weeks from the date of the publication of the notice” substitute <quotedText>“the minimum period specified in paragraph <ref href="#d25e7478">2A</ref>”</quotedText>.</mod></p></content></subsection><subsection eId="section-33-3"><num>(3)</num><content><p><mod>After paragraph 2 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><paragraph eId="d25e7478" class="schProv1"><num>2A</num><intro><p>The minimum period is—</p></intro><level class="para1"><num>(a)</num><content><p>30 days from the date of the publication of the notice, in the case of an order proposed by, or submitted to, the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>6 weeks from the date of the publication of the notice, in the case of an order proposed by, or submitted to, the Welsh Ministers.</p></content></level></paragraph></quotedStructure></mod></p></content></subsection><subsection eId="section-33-4"><num>(4)</num><content><p><mod>After paragraph 8 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><paragraph class="schProv1"><num>8A</num><subparagraph><num>(1)</num><content><p>This paragraph applies where the Secretary of State is exercising the functions conferred by paragraph 8.</p></content></subparagraph><subparagraph eId="d25e7513"><num>(2)</num><intro><p>The Secretary of State must—</p></intro><level class="para1"><num>(a)</num><content><p>decide to make or confirm the proposed order,</p></content></level><level class="para1"><num>(b)</num><content><p>decide not to make or confirm the proposed order, or</p></content></level><level class="para1"><num>(c)</num><content><p>decide to give notification under paragraph 8(3)(a),</p></content></level><wrapUp><p>within the period of 10 weeks beginning with the relevant day.</p></wrapUp></subparagraph><subparagraph eId="d25e7539"><num>(3)</num><intro><p>Subject to sub-paragraph <ref href="#d25e7572">(4)</ref>, the relevant day is the day on which any of the following occurs in relation to the proposed order—</p></intro><level class="para1"><num>(a)</num><content><p>the period specified in the notice published under paragraph 1 or (as the case may be) paragraph 5 expires with no qualifying objection having been received by the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>a qualifying objection is withdrawn with the result that no qualifying objections remain live;</p></content></level><level class="para1"><num>(c)</num><content><p>the Secretary of State decides under paragraph 7(2) to dispense with an inquiry;</p></content></level><level class="para1"><num>(d)</num><content><p>the Secretary of State receives the report of the person who has held a local inquiry.</p></content></level></subparagraph><subparagraph eId="d25e7572"><num>(4)</num><intro><p>In a case where—</p></intro><level class="para1"><num>(a)</num><content><p>the Secretary of State has to decide whether to confirm a related compulsory purchase order, and</p></content></level><level class="para1"><num>(b)</num><content><p>the relevant day in relation to that compulsory purchase order is later than the relevant day specified in sub-paragraph <ref href="#d25e7539">(3)</ref>,</p></content></level><wrapUp><p>the relevant day for the purposes of sub-paragraph <ref href="#d25e7513">(2)</ref> is the relevant day in relation to the compulsory purchase order.</p></wrapUp></subparagraph><subparagraph eId="d25e7598"><num>(5)</num><content><p>The relevant day in relation to a related compulsory purchase order is the day on which the procedure that must be followed before the Secretary of State can decide whether to confirm the order (not including any duty on the Secretary of State to consider certain matters before taking that decision) is completed.</p></content></subparagraph><subparagraph eId="d25e7604"><num>(6)</num><content><p>Where the Secretary of State gives notification under paragraph 8(3)(a), the Secretary of State must decide whether or not to make or confirm the proposed order within the period of 10 weeks beginning with the final day of the period specified under paragraph 8(3)(b).</p></content></subparagraph><subparagraph eId="d25e7610"><num>(7)</num><content><p>Sub-paragraphs <ref href="#d25e7572">(4)</ref> and <ref href="#d25e7598">(5)</ref> apply for postponing the first day of the period referred to in sub-paragraph <ref href="#d25e7604">(6)</ref> as they apply for postponing the relevant day for the purposes of sub-paragraph <ref href="#d25e7513">(2)</ref>.</p></content></subparagraph><subparagraph><num>(8)</num><content><p>If the Secretary of State has decided to proceed in accordance with paragraph 8(2), sub-paragraphs <ref href="#d25e7513">(2)</ref> to <ref href="#d25e7610">(7)</ref> of this paragraph apply separately in relation to each part of the proposals that is being given separate consideration.</p></content></subparagraph><subparagraph eId="d25e7640"><num>(9)</num><content><p>The Secretary of State may in any particular case, if the Secretary of State considers it appropriate, extend a period that applies under this paragraph.</p></content></subparagraph><subparagraph><num>(10)</num><intro><p>The power under sub-paragraph <ref href="#d25e7640">(9)</ref> may be exercised—</p></intro><level class="para1"><num>(a)</num><content><p>more than once in relation to the same period;</p></content></level><level class="para1"><num>(b)</num><content><p>after the expiry of the period.</p></content></level></subparagraph><subparagraph><num>(11)</num><intro><p>The Secretary of State must give written notice of any extension—</p></intro><level class="para1"><num>(a)</num><content><p>in a case where the proposed order has already been made, to the authority that made it, and</p></content></level><level class="para1"><num>(b)</num><content><p>to each person who has made a qualifying objection and not withdrawn it.</p></content></level></subparagraph><subparagraph><num>(12)</num><intro><p>In this paragraph—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-qualifying-objection">qualifying objection</term>” means an objection received as described in paragraph 7(1)(a) or (b);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-related-compulsory-purchase-order">related compulsory purchase order</term>”, in relation to a proposed order, means a compulsory purchase order proceedings on which could, by virtue of section 257(1), be taken concurrently with any proceedings under this Schedule on the proposed order.</p></content></hcontainer></subparagraph></paragraph></quotedStructure></mod></p></content></subsection><subsection eId="section-33-5"><num>(5)</num><intro><p>In <ref eId="c00055" href="https://www.legislation.gov.uk/ukpga/1980/66/schedule/1/paragraph/10">paragraph 10</ref>—</p></intro><level class="para1" eId="section-33-5-a"><num>(a)</num><content><p>the existing text becomes sub-paragraph (1);</p></content></level><level class="para1" eId="section-33-5-b"><num>(b)</num><content><p><mod>in paragraph (b) of that sub-paragraph, for “6 weeks from the date of the publication of the notice” substitute <quotedText>“the minimum period specified in sub-paragraph <ref href="#d25e7741">(2)</ref>”</quotedText>;</mod></p></content></level><level class="para1" eId="section-33-5-c"><num>(c)</num><content><p><mod>after that sub-paragraph insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><subparagraph eId="d25e7741"><num>(2)</num><intro><p>The minimum period is—</p></intro><level class="para1"><num>(a)</num><content><p>30 days from the date of the publication of the notice, in the case of a scheme proposed by, or submitted to, the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>6 weeks from the date of the publication of the notice, in the case of a scheme proposed by, or submitted to, the Welsh Ministers.</p></content></level></subparagraph></quotedStructure></mod></p></content></level></subsection><subsection eId="section-33-6"><num>(6)</num><content><p><mod>After paragraph 15 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><paragraph class="schProv1"><num>15A</num><subparagraph><num>(1)</num><content><p>This paragraph applies where the Secretary of State is exercising the functions conferred by paragraph 15.</p></content></subparagraph><subparagraph eId="d25e7776"><num>(2)</num><intro><p>The Secretary of State must—</p></intro><level class="para1"><num>(a)</num><content><p>decide to make or confirm the proposed scheme,</p></content></level><level class="para1"><num>(b)</num><content><p>decide not to make or confirm the proposed scheme, or</p></content></level><level class="para1"><num>(c)</num><content><p>decide to give notification under paragraph 15(3)(a),</p></content></level><wrapUp><p>within the period of 10 weeks beginning with the relevant day.</p></wrapUp></subparagraph><subparagraph eId="d25e7802"><num>(3)</num><intro><p>Subject to sub-paragraph <ref href="#d25e7835">(4)</ref>, the relevant day is the day on which any of the following occurs in relation to the proposed scheme—</p></intro><level class="para1"><num>(a)</num><content><p>the period specified in the notice published under paragraph 10 or (as the case may be) paragraph 12 expires with no qualifying objection having been received by the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>a qualifying objection is withdrawn with the result that no qualifying objections remain live;</p></content></level><level class="para1"><num>(c)</num><content><p>the Secretary of State decides under paragraph 14(2) to dispense with an inquiry;</p></content></level><level class="para1"><num>(d)</num><content><p>the Secretary of State receives the report of the person who has held a local inquiry.</p></content></level></subparagraph><subparagraph eId="d25e7835"><num>(4)</num><intro><p>In a case where—</p></intro><level class="para1"><num>(a)</num><content><p>the Secretary of State has to decide whether to confirm a related compulsory purchase order, and</p></content></level><level class="para1"><num>(b)</num><content><p>the relevant day in relation to that compulsory purchase order is later than the relevant day specified in sub-paragraph <ref href="#d25e7802">(3)</ref>,</p></content></level><wrapUp><p>the relevant day for the purposes of sub-paragraph <ref href="#d25e7776">(2)</ref> is the relevant day in relation to the compulsory purchase order.</p></wrapUp></subparagraph><subparagraph eId="d25e7861"><num>(5)</num><content><p>The relevant day in relation to a related compulsory purchase order is the day on which the procedure that must be followed before the Secretary of State can decide whether to confirm the order (not including any duty on the Secretary of State to consider certain matters before taking that decision) is completed.</p></content></subparagraph><subparagraph eId="d25e7867"><num>(6)</num><content><p>Where the Secretary of State gives notification under paragraph 15(3)(a), the Secretary of State must decide whether or not to make or confirm the proposed scheme within the period of 10 weeks beginning with the final day of the period specified under paragraph 15(3)(b).</p></content></subparagraph><subparagraph eId="d25e7873"><num>(7)</num><content><p>Sub-paragraphs <ref href="#d25e7835">(4)</ref> and <ref href="#d25e7861">(5)</ref> apply for postponing the first day of the period referred to in sub-paragraph <ref href="#d25e7867">(6)</ref> as they apply for postponing the relevant day for the purposes of sub-paragraph <ref href="#d25e7776">(2)</ref>.</p></content></subparagraph><subparagraph><num>(8)</num><content><p>If the Secretary of State has decided to proceed in accordance with paragraph 15(2), sub-paragraphs <ref href="#d25e7776">(2)</ref> to <ref href="#d25e7873">(7)</ref> of this paragraph apply separately in relation to each part of the proposals that is being given separate consideration.</p></content></subparagraph><subparagraph eId="d25e7903"><num>(9)</num><content><p>The Secretary of State may in any particular case, if the Secretary of State considers it appropriate, extend a period that applies under this paragraph.</p></content></subparagraph><subparagraph><num>(10)</num><intro><p>The power under sub-paragraph <ref href="#d25e7903">(9)</ref> may be exercised—</p></intro><level class="para1"><num>(a)</num><content><p>more than once in relation to the same period;</p></content></level><level class="para1"><num>(b)</num><content><p>after the expiry of the period.</p></content></level></subparagraph><subparagraph><num>(11)</num><intro><p>The Secretary of State must give written notice of any extension—</p></intro><level class="para1"><num>(a)</num><content><p>in a case where the proposed scheme has already been made, to the authority that made it, and</p></content></level><level class="para1"><num>(b)</num><content><p>to each person who has made a qualifying objection and not withdrawn it.</p></content></level></subparagraph><subparagraph><num>(12)</num><intro><p>In this paragraph—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-qualifying-objection">qualifying objection</term>” means an objection received as described in paragraph 14(1)(a) or (b);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-related-compulsory-purchase-order">related compulsory purchase order</term>”, in relation to a proposed scheme, means a compulsory purchase order proceedings on which could, by virtue of section 257(1), be taken concurrently with any proceedings under this Schedule on the proposed scheme.</p></content></hcontainer></subparagraph></paragraph></quotedStructure></mod></p></content></subsection></section><section eId="section-34"><num>34</num><heading>Procedure for certain orders and schemes</heading><subsection eId="section-34-1"><num>(1)</num><content><p>The Highways Act 1980 is amended as follows.</p></content></subsection><subsection eId="section-34-2"><num>(2)</num><intro><p>In section 325 (provision for certain regulations, orders and schemes to be made by statutory instrument)—</p></intro><level class="para1" eId="section-34-2-a"><num>(a)</num><content><p>in the heading, omit “, schemes”;</p></content></level><level class="para1" eId="section-34-2-b"><num>(b)</num><intro><p>in subsection (1)—</p></intro><level class="para2" eId="section-34-2-b-i"><num>(i)</num><content><p>omit paragraph (b);</p></content></level><level class="para2" eId="section-34-2-b-ii"><num>(ii)</num><content><p><mod>in paragraph (d), after “sections” insert <quotedText>“10,”</quotedText>.</mod></p></content></level></level></subsection><subsection eId="section-34-3"><num>(3)</num><intro><p>In section 326 (revocation and variation of schemes and orders)—</p></intro><level class="para1" eId="section-34-3-a"><num>(a)</num><intro><p>in subsection (2)—</p></intro><level class="para2" eId="section-34-3-a-i"><num>(i)</num><content><p><mod>after “An order” insert <quotedText>“or scheme”</quotedText>;</mod></p></content></level><level class="para2" eId="section-34-3-a-ii"><num>(ii)</num><content><p><mod>after “section” insert <quotedText>“10,”</quotedText>;</mod></p></content></level><level class="para2" eId="section-34-3-a-iii"><num>(iii)</num><content><p><mod>after “14B,” insert <quotedText>“16,”</quotedText>;</mod></p></content></level><level class="para2" eId="section-34-3-a-iv"><num>(iv)</num><content><p><mod>after “27,” insert <quotedText>“106(3),”</quotedText>;</mod></p></content></level><level class="para2" eId="section-34-3-a-v"><num>(v)</num><content><p><mod>after “orders” insert <quotedText>“or schemes”</quotedText>;</mod></p></content></level><level class="para2" eId="section-34-3-a-vi"><num>(vi)</num><content><p><mod>after “subsequent order” insert <quotedText>“or scheme”</quotedText>;</mod></p></content></level></level><level class="para1" eId="section-34-3-b"><num>(b)</num><content><p><mod>after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(2A)</num><content><p>Subsection (2) does not apply to an order or scheme under section 10, 16 or 106(3) made or confirmed by the Welsh Ministers (but see section 325(1A)).</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-34-3-c"><num>(c)</num><content><p><mod>in subsection (6), before “14,” insert <quotedText>“10,”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-34-4"><num>(4)</num><content><p><mod>In Schedule 1 (procedures for making or confirming certain orders and schemes), after paragraph 19 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><paragraph class="schProv1"><num>19A</num><intro><p>On making or confirming an order or scheme in accordance with this Schedule, the Secretary of State must publish on a government website—</p></intro><level class="para1"><num>(a)</num><content><p>notice of the making or confirmation of the order or scheme,</p></content></level><level class="para1"><num>(b)</num><content><p>if the order or scheme was made with modifications, a summary of those modifications, and</p></content></level><level class="para1"><num>(c)</num><intro><p>either—</p></intro><level class="para2"><num>(i)</num><content><p>a copy of the order or scheme, together with any maps or plans referred to in it, or</p></content></level><level class="para2"><num>(ii)</num><content><p>an explanation of where and how that documentation can be inspected.</p></content></level></level></paragraph></quotedStructure></mod></p></content></subsection></section><section eId="section-35"><num>35</num><heading>Compulsory acquisition powers to include taking of temporary possession</heading><content><p><mod>In section 250(8) of the Highways Act 1980 (compulsory acquisition by creation of new rights to include rights of carrying out certain activity on land), after “references to” insert <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>the right to take temporary possession or occupation of land, and</p></content></level><level class="para1"><num>(b)</num><content><p/></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-amendments-to-the-transport-and-works-act-1992"><heading>Amendments to the Transport and Works Act 1992</heading><section eId="section-36"><num>36</num><heading>Replacement of model clauses with guidance</heading><content><p><mod>In the Transport and Works Act 1992, for section 8 (model clauses) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section><num>8</num><heading>Guidance on draft orders</heading><subsection><num>(1)</num><content><p>The Secretary of State may publish guidance about the preparation of draft orders, for cases in which rules under section 6 require the submission of such drafts to the Secretary of State.</p></content></subsection><subsection><num>(2)</num><content><p>The Welsh Ministers may publish guidance about the preparation of draft orders, for cases in which rules under section 6 require the submission of such drafts to the Welsh Ministers.</p></content></subsection><subsection><num>(3)</num><content><p>The guidance may set out model provisions considered suitable for inclusion in the drafts (whether generally or in certain cases).</p></content></subsection><subsection><num>(4)</num><intro><p>In arriving at a determination under section 13 in a case to which guidance under this section applies, the Secretary of State or (as the case may be) the Welsh Ministers must have regard to—</p></intro><level class="para1"><num>(a)</num><content><p>any departure from the guidance, and</p></content></level><level class="para1"><num>(b)</num><content><p>any reasons given by the applicant for that departure.</p></content></level></subsection></section></quotedStructure></mod></p></content></section><section eId="section-37"><num>37</num><heading>Removal of special procedure for projects of national significance</heading><subsection eId="section-37-1"><num>(1)</num><content><p>In the Transport and Works Act 1992, omit section 9 (special procedure for projects considered to be of national significance).</p></content></subsection><subsection eId="section-37-2"><num>(2)</num><intro><p>In consequence of that amendment—</p></intro><level class="para1" eId="section-37-2-a"><num>(a)</num><content><p>in section 3 of the Statutory Orders (Special Procedure) Act 1945 (petitions against orders), omit subsection (4A);</p></content></level><level class="para1" eId="section-37-2-b"><num>(b)</num><content><p>in section 12 of the Transport and Works Act 1992 (special parliamentary procedure), omit subsection (2);</p></content></level><level class="para1" eId="section-37-2-c"><num>(c)</num><content><p>in the Channel Tunnel Rail Link Act 1996, omit section 42 (application of section 9 of the 1992 Act to certain proposals affecting the Channel Tunnel).</p></content></level></subsection><subsection eId="section-37-3"><num>(3)</num><content><p>The amendments made by this section do not apply in relation to an application in respect of which a notice under section 9(2) of the Transport and Works Act 1992 has been published before this section comes into force.</p></content></subsection></section><section eId="section-38"><num>38</num><heading>Duty to hold inquiry or hearing</heading><subsection eId="section-38-1"><num>(1)</num><content><p>Section 11 of the Transport and Works Act 1992 (inquiries and hearings) is amended as follows.</p></content></subsection><subsection eId="section-38-2"><num>(2)</num><content><p><mod>In subsection (3) (duty to hold inquiry or hearing on request from objector), for the words from “an objection” to “applies,” substitute <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>an objection is made by a person within subsection (4),</p></content></level><level class="para1"><num>(b)</num><content><p>the person informs the Secretary of State in writing that the person wishes the objection to be referred to an inquiry or dealt with in accordance with subsection (2), and</p></content></level><level class="para1"><num>(c)</num><content><p>the Secretary of State considers that the objection is serious enough to merit such treatment,</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-38-3"><num>(3)</num><content><p><mod>After subsection (3) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(3A)</num><content><p>In a case in which the powers in subsections (1) and (2) are exercisable by the Welsh Ministers, subsection (3) is to be read as referring to the Welsh Ministers instead of the Secretary of State.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-38-4"><num>(4)</num><content><p>The amendments made by this section do not apply in relation to an application in respect of which rule 5(1) of the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2006 (<ref eId="c00056" href="http://www.legislation.gov.uk/id/uksi/2006/1466">S.I. 2006/1466</ref>) has been complied with before this section comes into force.</p></content></subsection></section><section eId="section-39"><num>39</num><heading>Costs of inquiries</heading><subsection eId="section-39-1"><num>(1)</num><content><p>Section 11 of the Transport and Works Act 1992 (inquiries and hearings) is amended as follows.</p></content></subsection><subsection eId="section-39-2"><num>(2)</num><content><p><mod>In subsection (5) (application of section 250 of the Local Government Act 1972), before paragraph (a) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(za)</num><content><p>the powers of direction, certification and order-making conferred by section 250(4) and (5) as applied by this subsection may, unless otherwise directed by the Secretary of State or the Welsh Ministers, be exercised on their behalf by the person holding the inquiry,</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-39-3"><num>(3)</num><content><p><mod>After subsection (5) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e8378"><num>(5A)</num><content><p>The power of direction conferred by section 250(4) of the Local Government Act 1972 (costs of inquiry) as applied by subsection (5) is, in the case of an application under section 6, to be exercised so as to require the applicant to pay the costs in question, unless the person exercising the power considers that there is good reason to exercise it differently.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-39-4"><num>(4)</num><content><p><mod>In subsection (6) (application to hearings of provisions applied to inquiries), after “(costs)” insert <quotedText>“, and subsection <ref href="#d25e8378">(5A)</ref> of this section,”</quotedText>.</mod></p></content></subsection><subsection eId="section-39-5"><num>(5)</num><content><p>The amendments made by subsections <ref href="#section-39-3">(3)</ref> and <ref href="#section-39-4">(4)</ref> do not apply in relation to an application in respect of which rule 5(1) of the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2006 (<ref eId="c00057" href="http://www.legislation.gov.uk/id/uksi/2006/1466">S.I. 2006/1466</ref>) has been complied with before this section comes into force.</p></content></subsection></section><section eId="section-40"><num>40</num><heading>Deadline for decisions</heading><subsection eId="section-40-1"><num>(1)</num><content><p>The Transport and Works Act 1992 is amended as follows.</p></content></subsection><subsection eId="section-40-2"><num>(2)</num><content><p><mod>In section 13 (making or refusal of orders), after subsection (6) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e8434"><num>(7)</num><intro><p>The Secretary of State may, for cases involving applications under section 6, make rules as to the period within which—</p></intro><level class="para1"><num>(a)</num><content><p>a determination under subsection (1) must be made, or</p></content></level><level class="para1"><num>(b)</num><content><p>a step must be taken as required by subsection (4), section 13B or section 13C.</p></content></level></subsection><subsection><num>(8)</num><intro><p>Rules under subsection <ref href="#d25e8434">(7)</ref>—</p></intro><level class="para1"><num>(a)</num><content><p>may provide for periods to be determined or changed by the Secretary of State or the Welsh Ministers in individual cases;</p></content></level><level class="para1"><num>(b)</num><content><p>may provide for the postponement of a requirement under the rules where a fee payable in connection with the application is not paid on time;</p></content></level><level class="para1"><num>(c)</num><content><p>may make different provision for different cases;</p></content></level><level class="para1"><num>(d)</num><content><p>if they apply in relation to Wales, may be made only with the agreement of the Welsh Ministers;</p></content></level><level class="para1"><num>(e)</num><content><p>must be made by statutory instrument;</p></content></level><wrapUp><p>and such an instrument is subject to annulment in pursuance of a resolution of either House of Parliament.</p></wrapUp></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-40-3"><num>(3)</num><intro><p>In consequence of that amendment—</p></intro><level class="para1" eId="section-40-3-a"><num>(a)</num><content><p><mod>in section 13(6), for “to 13D” substitute <quotedText>“and 13C”</quotedText>;</mod></p></content></level><level class="para1" eId="section-40-3-b"><num>(b)</num><content><p>omit section 13D (requirement to determine EIA application or proposal within reasonable time);</p></content></level><level class="para1" eId="section-40-3-c"><num>(c)</num><content><p><mod>in section 14(3A)(a), for “to 13D” substitute <quotedText>“and 13C”</quotedText>.</mod></p></content></level></subsection></section><section eId="section-41"><num>41</num><heading>Publication of decisions and time for bringing challenge</heading><subsection eId="section-41-1"><num>(1)</num><content><p>The Transport and Works Act 1992 is amended as follows.</p></content></subsection><subsection eId="section-41-2"><num>(2)</num><intro><p>In section 14 (publicity for making or refusal of order)—</p></intro><level class="para1" eId="section-41-2-a"><num>(a)</num><content><p><mod>in subsection (1), for paragraphs (b) and (c) substitute <quotedText startQuote="&#x201C;">and</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1" eId="d25e8552"><num>(b)</num><content><p>publish the notice on a government website.</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-41-2-b"><num>(b)</num><content><p><mod>in subsection (2), for “(1)(a)” substitute <quotedText>“(1)”</quotedText>;</mod></p></content></level><level class="para1" eId="section-41-2-c"><num>(c)</num><content><p>omit subsection (2A);</p></content></level><level class="para1" eId="section-41-2-d"><num>(d)</num><content><p><mod>in subsection (3A), for “notices” substitute <quotedText>“notice”</quotedText>;</mod></p></content></level><level class="para1" eId="section-41-2-e"><num>(e)</num><content><p><mod>for subsection (3AA) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(3AA)</num><content><p>If the determination is for the making of an EIA order, the notice under subsection (1) must include the information specified in subsection (3AB).</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-41-2-f"><num>(f)</num><intro><p>in subsection (4)—</p></intro><level class="para2" eId="section-41-2-f-i"><num>(i)</num><content><p><mod>for “a notice” substitute <quotedText>“a copy of the notice under subsection (1)”</quotedText>;</mod></p></content></level><level class="para2" eId="section-41-2-f-ii"><num>(ii)</num><content><p>omit the words from “; and” to the end.</p></content></level></level></subsection><subsection eId="section-41-3"><num>(3)</num><content><p><mod>In section 22(1) (period for challenging order), for the words from “within” to “published” substitute <quotedText>“before the end of the period of 6 weeks beginning with the day after the day on which notice of the determination to make the order is first published under section 14(1)<ref href="#d25e8552">(b)</ref>”</quotedText>.</mod></p></content></subsection><subsection eId="section-41-4"><num>(4)</num><intro><p>In consequence of those amendments—</p></intro><level class="para1" eId="section-41-4-a"><num>(a)</num><content><p><mod>in section 12(3)(c) (modification of section 22(1) where special parliamentary procedure applies), for “the notice required by section 14(1)(b) is published” substitute <quotedText>“notice is first published under section 14(1)<ref href="#d25e8552">(b)</ref>”</quotedText>;</mod></p></content></level><level class="para1" eId="section-41-4-b"><num>(b)</num><content><p><mod>in section 13(5) (date of operation of order), for the words from “the notice” to “published” substitute <quotedText>“notice of the determination to make the order is first published under section 14(1)<ref href="#d25e8552">(b)</ref>”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-41-5"><num>(5)</num><content><p>The amendments made by this section do not apply in relation to a determination made before this section comes into force or any order made further to such a determination.</p></content></subsection></section><section eId="section-42"><num>42</num><heading>Fees for certain services</heading><content><p><mod>After section 23 of the Transport and Works Act 1992 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section><num>23A</num><heading>Fees for certain services in connection with orders</heading><subsection eId="d25e8686"><num>(1)</num><content><p>The appropriate national authority may by regulations make provision for, or in connection with, the charging of fees to applicants under section 6 by prescribed public authorities, in relation to the provision of relevant services.</p></content></subsection><subsection><num>(2)</num><intro><p>A “<term refersTo="#term-relevant-service">relevant service</term>” means any advice, information or other assistance (including a response to a consultation) provided, whether or not to an applicant under section 6, in connection with—</p></intro><level class="para1"><num>(a)</num><content><p>an application under section 6, or</p></content></level><level class="para1"><num>(b)</num><content><p>any other prescribed matter relating to an order, or proposed order, under section 1 or 3.</p></content></level></subsection><subsection><num>(3)</num><intro><p>Regulations made under subsection <ref href="#d25e8686">(1)</ref> may, in particular, make provision—</p></intro><level class="para1"><num>(a)</num><content><p>about when a fee (including a supplementary fee) may, and may not, be charged;</p></content></level><level class="para1"><num>(b)</num><content><p>about the amount which may be charged;</p></content></level><level class="para1"><num>(c)</num><content><p>about what may, and may not, be taken into account in calculating the amount charged;</p></content></level><level class="para1"><num>(d)</num><content><p>about when a fee charged is payable;</p></content></level><level class="para1"><num>(e)</num><content><p>about the recovery of fees charged;</p></content></level><level class="para1"><num>(f)</num><content><p>about waiver, reduction or repayment of fees;</p></content></level><level class="para1"><num>(g)</num><content><p>about the effect of paying or failing to pay fees charged (including provision permitting a prescribed public authority to withhold a relevant service that it would otherwise be required to provide under an enactment until any outstanding fees for that service are paid);</p></content></level><level class="para1"><num>(h)</num><content><p>for the supply of information for any purpose of the regulations;</p></content></level><level class="para1"><num>(i)</num><content><p>conferring a function, including a function involving the exercise of a discretion, on any person.</p></content></level></subsection><subsection><num>(4)</num><intro><p>A prescribed public authority must have regard to—</p></intro><level class="para1"><num>(a)</num><content><p>any guidance published by the Secretary of State in relation to the exercise of the authority’s functions under regulations made under this section by the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>any guidance published by the Welsh Ministers in relation to the exercise of the authority’s functions under regulations made under this section by the Welsh Ministers.</p></content></level></subsection><subsection><num>(5)</num><intro><p>Regulations under this section may make—</p></intro><level class="para1"><num>(a)</num><content><p>different provision for different purposes or areas;</p></content></level><level class="para1"><num>(b)</num><content><p>incidental, consequential, supplementary, transitional or transitory provision or savings.</p></content></level></subsection><subsection><num>(6)</num><content><p>Regulations under this section are to be made by statutory instrument.</p></content></subsection><subsection><num>(7)</num><content><p>A statutory instrument containing regulations made by the Secretary of State under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection><num>(8)</num><content><p>A statutory instrument containing regulations made by the Welsh Ministers under this section is subject to annulment in pursuance of a resolution of Senedd Cymru.</p></content></subsection><subsection><num>(9)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-appropriate-national-authority">appropriate national authority</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>in relation to England and cross-border orders, the Secretary of State, and</p></content></level><level class="para1"><num>(b)</num><content><p>in relation to Wales but not cross-border orders, the Welsh Ministers;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-cross-border-order">cross-border order</term>” means an order under section 1 or 3 that has effect both in England and in Wales;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-prescribed">prescribed</term>” means prescribed by regulations made by the appropriate national authority under this section;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-public-authority">public authority</term>” means any person certain of whose functions are of a public nature.</p></content></hcontainer></subsection></section></quotedStructure></mod></p></content></section><section eId="section-43"><num>43</num><heading>Deemed grant of listed building consent etc</heading><subsection eId="section-43-1"><num>(1)</num><content><p><mod>In the Transport and Works Act 1992, for section 17 (listed buildings and conservation areas) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e8892"><num>17</num><heading>Listed buildings: England</heading><subsection><num>(1)</num><content><p>On making an order under section 1 or 3 that authorises controlled listed building works in England, the Secretary of State may direct that listed building consent for the works is deemed to be granted, subject to such conditions (if any) as may be specified in the direction.</p></content></subsection><subsection><num>(2)</num><content><p>Section 16(2) of the Listed Buildings Act (duty of special regard to listed buildings) applies to the making of a direction under this section as it would apply to the grant of listed building consent in relation to the building concerned.</p></content></subsection><subsection><num>(3)</num><content><p>Section 72(1) of the Listed Buildings Act (duty of special attention to conservation areas) applies to the making of a direction under this section in relation to a building in a conservation area as it would apply to the grant of listed building consent in relation to that building.</p></content></subsection><subsection><num>(4)</num><content><p>The provisions of the Listed Buildings Act apply in relation to any listed building consent deemed to be granted by virtue of a direction of the Secretary of State under this section as if the consent had been granted by the Secretary of State on an application referred under section 12 of that Act.</p></content></subsection><subsection><num>(5)</num><content><p>But that does not bring the decision to make the direction within section 62(2)(a) of that Act (decisions of Secretary of State that may only be challenged by way of statutory review).</p></content></subsection><subsection><num>(6)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-conservation-area">conservation area</term>” has the same meaning as in the Listed Buildings Act (see section 91(1) of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-controlled-listed-building-works-in-england">controlled listed building works in England</term>” means works to which section 7(1) of the Listed Buildings Act (demolition or alteration in character of a listed building in England) applies;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-listed-building-consent">listed building consent</term>” means consent under section 8 of the Listed Buildings Act (listed building consent in England);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-listed-buildings-act">the Listed Buildings Act</term>” means the Planning (Listed Buildings and Conservation Areas) Act 1990.</p></content></hcontainer></subsection></section><section eId="d25e8964"><num>17A</num><heading>Listed buildings and conservation areas: Wales</heading><subsection eId="d25e8968"><num>(1)</num><content><p>On making an order under section 1 or 3 that authorises controlled listed building works in Wales, the Welsh Ministers may direct that listed building consent for the works is deemed to be granted, subject to such conditions (if any) as may be specified in the direction.</p></content></subsection><subsection eId="d25e8974"><num>(2)</num><content><p>On making an order under section 1 or 3 that authorises controlled conservation area works in Wales, the Welsh Ministers may direct that conservation area consent for the works is deemed to be granted, subject to such conditions (if any) as may be specified in the direction.</p></content></subsection><subsection><num>(3)</num><content><p>Section 96(2) of HEWA 2023 (duty of special regard to listed buildings) applies to the making of a direction under subsection <ref href="#d25e8968">(1)</ref> as it would apply to the grant of listed building consent in relation to the building concerned.</p></content></subsection><subsection><num>(4)</num><intro><p>Section 160(1) of HEWA 2023 (duty of special regard to conservation areas) applies—</p></intro><level class="para1"><num>(a)</num><content><p>to the making of a direction under subsection <ref href="#d25e8968">(1)</ref> in relation to a building in a conservation area, as it would apply to the grant of listed building consent in relation to that building, and</p></content></level><level class="para1"><num>(b)</num><content><p>to the making of a direction under subsection <ref href="#d25e8974">(2)</ref>, as it would apply to the grant of conservation area consent in relation to the building concerned.</p></content></level></subsection><subsection><num>(5)</num><content><p>The provisions of HEWA 2023 apply in relation to any consent deemed to be granted by virtue of a direction of the Welsh Ministers under this section as if the consent had been granted by the Welsh Ministers on an application referred under section 94 of that Act.</p></content></subsection><subsection><num>(6)</num><content><p>But that does not bring the decision to make the direction within section 182(2)(b) of that Act (decisions of Welsh Ministers that may only be challenged by way of statutory review).</p></content></subsection><subsection><num>(7)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-conservation-area">conservation area</term>” has the same meaning as in HEWA 2023 (see section 210 of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-conservation-area-consent">conservation area consent</term>” means consent under section 162 of HEWA 2023 (conservation area consent in Wales);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-controlled-conservation-area-works-in-wales">controlled conservation area works in Wales</term>” means works to which section 161 of HEWA 2023 (demolition of building in conservation area in Wales) applies;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-controlled-listed-building-works-in-wales">controlled listed building works in Wales</term>” means works to which section 88 of HEWA 2023 (demolition or alteration in character of a listed building in Wales) applies;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-hewa-2023">HEWA 2023</term>” means the Historic Environment (Wales) Act 2023;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-listed-building-consent">listed building consent</term>” means consent under section 89 of HEWA 2023 (listed building consent in Wales).</p></content></hcontainer></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-43-2"><num>(2)</num><intro><p>In section 22 of that Act (validity of orders)—</p></intro><level class="para1" eId="section-43-2-a"><num>(a)</num><content><p><mod>in the heading, for “under section 1 or 3” substitute <quotedText>“and directions”</quotedText>;</mod></p></content></level><level class="para1" eId="section-43-2-b"><num>(b)</num><content><p><mod>after subsection (3) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(4)</num><intro><p>This section applies to a direction under—</p></intro><level class="para1"><num>(a)</num><content><p>section 90(2A) of the Town and Country Planning Act 1990 (deemed planning permission),</p></content></level><level class="para1"><num>(b)</num><content><p>section <ref href="#d25e8892">17</ref> or <ref href="#d25e8964">17A</ref> of this Act (deemed listed building or conservation area consent), or</p></content></level><level class="para1"><num>(c)</num><content><p>section 12(2A) of the Planning (Hazardous Substances) Act 1990 (deemed hazardous substances consent),</p></content></level><wrapUp><p>as it applies to an order under section 1 or 3.</p></wrapUp></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-43-3"><num>(3)</num><content><p>In section 12 of the Planning (Listed Buildings and Conservation Areas) Act 1990 (reference of applications for listed building consent to Secretary of State), omit subsection (3A).</p></content></subsection><subsection eId="section-43-4"><num>(4)</num><content><p><mod>In section 94(4) of the Historic Environment (Wales) Act 2023 (reference to Welsh Ministers of application for listed building consent associated with Transport and Works Act application), after “application” in the second place it occurs insert <quotedText>“to the Secretary of State”</quotedText>.</mod></p></content></subsection></section><section eId="section-44"><num>44</num><heading>Deemed consent under marine licence</heading><subsection eId="section-44-1"><num>(1)</num><content><p><mod>In the Transport and Works Act 1992, after section 19 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section><num>19A</num><heading>Deemed consent under marine licences</heading><subsection eId="d25e9165"><num>(1)</num><content><p>An order of the Secretary of State under section 1 or 3 may include provision deeming a marine licence to have been granted by the Secretary of State for activities specified in the order (being activities for which the Secretary of State is the appropriate licensing authority).</p></content></subsection><subsection><num>(2)</num><intro><p>Activity specified under subsection <ref href="#d25e9165">(1)</ref> must be carried out wholly in one or more of these areas—</p></intro><level class="para1"><num>(a)</num><content><p>England;</p></content></level><level class="para1"><num>(b)</num><content><p>waters adjacent to England up to the seaward limits of the territorial sea;</p></content></level><level class="para1"><num>(c)</num><content><p>an exclusive economic zone, except any part of an exclusive economic zone in relation to which the Scottish Ministers have functions;</p></content></level><level class="para1"><num>(d)</num><content><p>a Renewable Energy Zone, except any part of a Renewable Energy Zone in relation to which the Scottish Ministers have functions;</p></content></level><level class="para1"><num>(e)</num><content><p>an area designated under section 1(7) of the Continental Shelf Act 1964, except any part of that area which is within a part of an exclusive economic zone or Renewable Energy Zone in relation to which the Scottish Ministers have functions.</p></content></level></subsection><subsection eId="d25e9210"><num>(3)</num><content><p>An order of the Welsh Ministers under section 1 or 3 may include provision deeming a marine licence to have been granted by the Welsh Ministers for activities specified in the order (being activities for which the Welsh Ministers are the appropriate licensing authority).</p></content></subsection><subsection eId="d25e9216"><num>(4)</num><intro><p>An order including provision under subsection <ref href="#d25e9165">(1)</ref> or <ref href="#d25e9210">(3)</ref> may also include provision—</p></intro><level class="para1" eId="d25e9228"><num>(a)</num><content><p>deeming the licence to have been granted subject to such conditions as may be specified in the order;</p></content></level><level class="para1" eId="d25e9234"><num>(b)</num><content><p>deeming any such conditions to have been attached to the marine licence by the Secretary of State or (as the case may be) the Welsh Ministers under Part 4 of the MCAA 2009.</p></content></level></subsection><subsection><num>(5)</num><content><p>If an order includes provision of the sort mentioned in paragraphs <ref href="#d25e9228">(a)</ref> and <ref href="#d25e9234">(b)</ref> of subsection <ref href="#d25e9216">(4)</ref>, sections 68 (notice of applications) and 69(3) and (5) (representations) of the MCAA 2009 do not apply in relation to the deemed marine licence.</p></content></subsection><subsection><num>(6)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-the-appropriate-licensing-authority">the appropriate licensing authority</term>” has the meaning given by section 113 of the MCAA 2009;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-exclusive-economic-zone">exclusive economic zone</term>” has the meaning given by section 322(1) of the MCAA 2009;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-marine-licence">marine licence</term>” means a marine licence under Part 4 of the MCAA 2009;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-mcaa-2009">the MCAA 2009</term>” means the Marine and Coastal Access Act 2009;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-renewable-energy-zone">Renewable Energy Zone</term>” has the meaning given by section 84(4) of the Energy Act 2004.</p></content></hcontainer></subsection><subsection><num>(7)</num><content><p>For the purposes of this section, waters are to be treated as adjacent, or as not adjacent, to England if they would be so treated for the purposes of section 113 of the MCAA 2009 as a result of sections 322(4) to (9) of that Act.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-44-2"><num>(2)</num><content><p>The amendments made by this section do not apply in relation to an order applied for under section 6 of the Transport and Works Act 1992 if rule 5(1) of the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2006 (<ref eId="c00058" href="http://www.legislation.gov.uk/id/uksi/2006/1466">S.I. 2006/1466</ref>) has been complied with in respect of the application before this section comes into force.</p></content></subsection></section><section eId="section-45"><num>45</num><heading>Authorisation of applications by local authorities</heading><subsection eId="section-45-1"><num>(1)</num><intro><p>In section 20 of the Transport and Works Act 1992 (power to apply for or object to orders)—</p></intro><level class="para1" eId="section-45-1-a"><num>(a)</num><content><p>in subsection (2), omit “by subsection (3) or (4)”;</p></content></level><level class="para1" eId="section-45-1-b"><num>(b)</num><content><p><mod>after subsection (4) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(5)</num><content><p>In the case of a local authority to which section 239 of the Local Government Act 1972 applies, a resolution to make an application passed, by virtue of this section, in accordance with subsection (2)(a) of that section does not need to be confirmed in accordance with subsection (2)(b) of that section.</p></content></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-45-2"><num>(2)</num><content><p>The amendments made by this section do not apply in relation to an application or objection that is the subject of a resolution under section 239(2)(a) of the Local Government Act 1972 passed before this section comes into force.</p></content></subsection></section><section eId="section-46"><num>46</num><heading>Extension to Scotland of certain amendments</heading><intro><p>The amendments made to the Transport and Works Act 1992 by the following provisions are extended to Scotland—</p></intro><level class="para1" eId="section-46-a"><num>(a)</num><content><p>Schedule 3 to the Environmental Impact Assessment (Miscellaneous Amendments Relating to Harbours, Highways and Transport) Regulations 2017 (<ref eId="c00059" href="http://www.legislation.gov.uk/id/uksi/2017/1070">S.I. 2017/1070</ref>);</p></content></level><level class="para1" eId="section-46-b"><num>(b)</num><content><p>regulation 4(3) and (4) of the Merchant Shipping and Other Transport (Environmental Protection) (Amendment) (EU Exit) Regulations 2019 (<ref eId="c00060" href="http://www.legislation.gov.uk/id/uksi/2019/311">S.I. 2019/311</ref>).</p></content></level></section><section eId="section-47"><num>47</num><heading>Power to make consequential amendments</heading><subsection eId="section-47-1"><num>(1)</num><content><p>The Secretary of State may by regulations made by statutory instrument make provision that is consequential on sections <ref href="#section-36">36</ref> to <ref href="#section-46">46</ref>.</p></content></subsection><subsection eId="section-47-2"><num>(2)</num><intro><p>Regulations under this section may amend—</p></intro><level class="para1" eId="section-47-2-a"><num>(a)</num><content><p>an Act, or</p></content></level><level class="para1" eId="section-47-2-b"><num>(b)</num><content><p>an Act or Measure of Senedd Cymru,</p></content></level><wrapUp><p>passed before the end of the session of Parliament in which this Act is passed.</p></wrapUp></subsection><subsection eId="section-47-3"><num>(3)</num><content><p>Regulations under this section may include incidental, supplemental, transitional and saving provision.</p></content></subsection><subsection eId="section-47-4"><num>(4)</num><content><p>A statutory instrument containing (whether alone or with other provision) regulations made in reliance on subsection <ref href="#section-47-2">(2)</ref> may not be made unless a draft of the statutory instrument containing them has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection eId="section-47-5"><num>(5)</num><content><p>Any other statutory instrument containing regulations under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-harbours"><heading>Harbours</heading><section eId="section-48"><num>48</num><heading>Fees for applications for harbour orders</heading><subsection eId="section-48-1"><num>(1)</num><content><p>Schedule 3 to the Harbours Act 1964 (procedure for making harbour revision orders and harbour empowerment orders) is amended as set out in subsections <ref href="#section-48-2">(2)</ref> to <ref href="#section-48-4">(4)</ref>.</p></content></subsection><subsection eId="section-48-2"><num>(2)</num><intro><p>In paragraph 7(1) (things to accompany applications)—</p></intro><level class="para1" eId="section-48-2-a"><num>(a)</num><content><p><mod>after paragraph (a) insert <quotedText>“and”</quotedText>;</mod></p></content></level><level class="para1" eId="section-48-2-b"><num>(b)</num><content><p>omit paragraph (c) and the preceding “and”.</p></content></level></subsection><subsection eId="section-48-3"><num>(3)</num><content><p>In paragraph 9 (duty not to consider application unless certain requirements met), omit sub-paragraph (a).</p></content></subsection><subsection eId="section-48-4"><num>(4)</num><content><p><mod>After paragraph 9 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Fees</heading><paragraph eId="d25e9504" class="schProv1"><num>9A</num><subparagraph><num>(1)</num><content><p>The Secretary of State may, by regulations, provide for fees to be payable by applicants for harbour revision orders.</p></content></subparagraph><subparagraph><num>(2)</num><intro><p>Such regulations may—</p></intro><level class="para1" eId="d25e9520"><num>(a)</num><content><p>provide for the amount of a fee to be determined by a method laid down in the regulations;</p></content></level><level class="para1" eId="d25e9526"><num>(b)</num><content><p>empower or require the Secretary of State not to take steps in relation to an application if a fee is not paid on time;</p></content></level><level class="para1"><num>(c)</num><content><p>provide for the payment of a deposit on account of a fee that will or may become payable (in which case paragraphs <ref href="#d25e9520">(a)</ref> and <ref href="#d25e9526">(b)</ref> apply to the deposit as they apply to the fee);</p></content></level><level class="para1"><num>(d)</num><content><p>make incidental or supplemental provision;</p></content></level><level class="para1"><num>(e)</num><content><p>make different provision for different purposes.</p></content></level></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-48-5"><num>(5)</num><content><p><mod>In section 54 of the Harbours Act 1964 (orders and regulations), after subsection (6) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(7)</num><intro><p>As to the power to make regulations under paragraph <ref href="#d25e9504">9A</ref> of Schedule 3 (fees for applications)—</p></intro><level class="para1"><num>(a)</num><intro><p>where the power is exercised by the Secretary of State—</p></intro><level class="para2"><num>(i)</num><content><p>the regulations are to be made by statutory instrument, and</p></content></level><level class="para2"><num>(ii)</num><content><p>a statutory instrument containing such regulations is subject to annulment in pursuance of a resolution of either House of Parliament;</p></content></level></level><level class="para1"><num>(b)</num><intro><p>where the power is exercised by the Welsh Ministers (see section 17(2C))—</p></intro><level class="para2"><num>(i)</num><content><p>the regulations are to be made by statutory instrument, and</p></content></level><level class="para2"><num>(ii)</num><content><p>a statutory instrument containing such regulations is subject to annulment in pursuance of a resolution of Senedd Cymru;</p></content></level></level><level class="para1"><num>(c)</num><content><p>where the power is exercised by the Scottish Ministers (see section 17(2C)), the regulations are subject to the negative procedure (see section 28 of the Interpretation and Legislative Reform (Scotland) Act 2010).</p></content></level></subsection></quotedStructure></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-electric-vehicle-charge-points-etc"><heading>Electric vehicle charge points etc</heading><section eId="section-49"><num>49</num><heading>Installation of electric vehicle charge points</heading><subsection eId="section-49-1"><num>(1)</num><content><p><ref eId="c00061" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">Section 48</ref> of the <ref eId="c00062" href="https://www.legislation.gov.uk/ukpga/1991/22/contents">New Roads and Street Works Act 1991</ref> (streets, street works and undertakers) is amended as set out in <span>subsections (2) to (5)</span>.</p></content></subsection><subsection eId="section-49-2"><num>(2)</num><content><p><mod>After <ref eId="c00063" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">subsection (3)</ref>, insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e9650"><num>(3ZA)</num><intro><p>In this Part “street works” also includes works of any of the following kinds executed in a street in England in pursuance of a street works permit—</p></intro><level class="para1"><num>(a)</num><content><p>placing apparatus that is a public charge point, or</p></content></level><level class="para1"><num>(b)</num><content><p>inspecting, maintaining, adjusting, repairing, altering, renewing, changing the position of or removing apparatus that is a public charge point,</p></content></level><wrapUp><p>or works required for or incidental to any such works (including, in particular, breaking up or opening the street, or any sewer, drain or tunnel under it, or tunnelling or boring under the street).</p></wrapUp></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-49-3"><num>(3)</num><content><p><mod>In <ref eId="c00064" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">subsection (3A)</ref>, in the words before <ref eId="c00065" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">paragraph (a)</ref>, after “(3)” insert <quotedText>“or (3ZA)”</quotedText>.</mod></p></content></subsection><subsection eId="section-49-4"><num>(4)</num><intro><p>In <ref eId="c00066" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">subsection (4)</ref>—</p></intro><level class="para1" eId="section-49-4-a"><num>(a)</num><content><p><mod>for “in relation to street works” substitute <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>in relation to street works mentioned in subsection (3),</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-49-4-b"><num>(b)</num><content><p><mod>at the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(b)</num><content><p>in relation to street works described in subsection (3ZA), means the person who in accordance with the street works permit is permitted to carry out the works.</p></content></level></quotedStructure></mod></p></content></level></subsection><subsection eId="section-49-5"><num>(5)</num><intro><p>In <ref eId="c00067" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">subsection (5)</ref>—</p></intro><level class="para1" eId="section-49-5-a"><num>(a)</num><content><p><mod>from “are to” to “licence” substitute <quotedText startQuote="&#x201C;">(including public charge points) are to the person entitled, by virtue of—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>a statutory right,</p></content></level><level class="para1"><num>(b)</num><content><p>a street works licence, or</p></content></level><level class="para1"><num>(c)</num><content><p>where the apparatus is a public charge point installed in England in pursuance of a street works permit, the permit,</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-49-5-b"><num>(b)</num><content><p><mod>after (3) insert <quotedText>“or (3ZA)”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-49-6"><num>(6)</num><content><p><mod>In <ref eId="c00068" href="https://www.legislation.gov.uk/ukpga/1991/22/section/51">section 51</ref> of <ref eId="c00069" href="https://www.legislation.gov.uk/ukpga/1991/22/contents">that Act</ref> (prohibition of unauthorised street works), in <ref eId="c00070" href="https://www.legislation.gov.uk/ukpga/1991/22/section/51">subsection (3)</ref> for “works for” to the end substitute <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>works for road purposes,</p></content></level><level class="para1"><num>(b)</num><content><p>emergency works of any description, or</p></content></level><level class="para1"><num>(c)</num><content><p>street works as described in section 48(3ZA) (works relating to public charge points executed in a street in England in pursuance of a street works permit).</p></content></level></quotedStructure></mod></p></content></subsection><subsection eId="section-49-7"><num>(7)</num><intro><p>In <ref eId="c00071" href="https://www.legislation.gov.uk/ukpga/1991/22/section/105">section 105</ref><ref eId="c00072" href="https://www.legislation.gov.uk/ukpga/1991/22/section/105">(1)</ref> of <ref eId="c00073" href="https://www.legislation.gov.uk/ukpga/1991/22/contents">that Act</ref> (minor definitions)—</p></intro><level class="para1" eId="section-49-7-a"><num>(a)</num><content><p><mod>at the appropriate places insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="definition"><content><p>“<term refersTo="#term-public-charge-point">public charge point</term>” means a charge point within the meaning of <ref eId="c00074" href="https://www.legislation.gov.uk/ukpga/2018/18/part/2">Part 2</ref> of the <ref eId="c00075" href="https://www.legislation.gov.uk/ukpga/2018/18/contents">Automated and Electric Vehicles Act 2018</ref> that is provided for use by members of the general public;</p></content></hcontainer></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="definition"><content><p>“<term refersTo="#term-street-works-permit">street works permit</term>” means a permit granted pursuant to a permit scheme prepared under <ref eId="c00076" href="https://www.legislation.gov.uk/ukpga/2004/18/part/3">Part 3</ref> of the <ref eId="c00077" href="https://www.legislation.gov.uk/ukpga/2004/18/contents">Traffic Management Act 2004</ref>;</p></content></hcontainer></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-49-7-b"><num>(b)</num><content><p><mod>in the definition of “statutory right”, for the words from “a right exercisable” to the end substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(a)</num><content><p>a right exercisable by virtue of a street works licence, or</p></content></level><level class="para1"><num>(b)</num><content><p>a right, exercisable by virtue of a street works permit, to carry out street works described in section 48(3ZA).</p></content></level></quotedStructure></mod></p></content></level></subsection><subsection eId="section-49-8"><num>(8)</num><intro><p>In <ref eId="c00078" href="https://www.legislation.gov.uk/ukpga/1991/22/section/106">section 106</ref> of <ref eId="c00079" href="https://www.legislation.gov.uk/ukpga/1991/22/contents">that Act</ref> (index of defined expressions)—</p></intro><level class="para1" eId="section-49-8-a"><num>(a)</num><content><p><mod>at the appropriate places insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><tblock class="table" ukl:Orientation="portrait"><foreign><default:table xmlns="http://www.w3.org/1999/xhtml"><default:colgroup><default:col span="1" style="width:50%"/><default:col span="1" style="width:50%"/></default:colgroup><default:tbody><default:tr><default:td><p xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0">public charge point</p></default:td><default:td><p xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0">section 105(1)</p></default:td></default:tr></default:tbody></default:table></foreign></tblock></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><tblock class="table" ukl:Orientation="portrait"><foreign><default:table xmlns="http://www.w3.org/1999/xhtml"><default:colgroup><default:col span="1" style="width:50%"/><default:col span="1" style="width:50%"/></default:colgroup><default:tbody><default:tr><default:td><p xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0">street works permit</p></default:td><default:td><p xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0">section 105(1)</p></default:td></default:tr></default:tbody></default:table></foreign></tblock></quotedStructure><inline name="appendText">.</inline></mod></p></content></level><level class="para1" eId="section-49-8-b"><num>(b)</num><content><p><mod>in the entry for “street works”, after “48(3)” insert <quotedText>“and (3ZA)”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-49-9"><num>(9)</num><intro><p>In <ref eId="c00080" href="https://www.legislation.gov.uk/ukpga/1980/66/section/115E">section 115E</ref> of the <ref eId="c00081" href="https://www.legislation.gov.uk/ukpga/1980/66/contents">Highways Act 1980</ref> (execution of works and use of objects etc. by persons other than councils)—</p></intro><level class="para1" eId="section-49-9-a"><num>(a)</num><content><p><mod>in <ref eId="c00082" href="https://www.legislation.gov.uk/ukpga/1980/66/section/115E">subsection (1)</ref>, for “(5)” substitute <quotedText>“(6)”</quotedText>;</mod></p></content></level><level class="para1" eId="section-49-9-b"><num>(b)</num><content><p><mod>after <ref eId="c00083" href="https://www.legislation.gov.uk/ukpga/1980/66/section/115E">subsection (5)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(6)</num><content><p>A council may not under this section grant a person permission to do anything relating to a public charge point in England which is capable of being authorised by a street works permit or a street works licence.</p></content></subsection><subsection><num>(7)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-public-charge-point">public charge point</term>” means a charge point within the meaning of <ref eId="c00084" href="https://www.legislation.gov.uk/ukpga/2018/18/part/2">Part 2</ref> of the <ref eId="c00085" href="https://www.legislation.gov.uk/ukpga/2018/18/contents">Automated and Electric Vehicles Act 2018</ref> that is provided for use by members of the general public;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-street-works-permit">street works permit</term>” means a permit granted pursuant to a permit scheme prepared under <ref eId="c00086" href="https://www.legislation.gov.uk/ukpga/2004/18/part/3">Part 3</ref> of the <ref eId="c00087" href="https://www.legislation.gov.uk/ukpga/2004/18/contents">Traffic Management Act 2004</ref>.</p></content></hcontainer></subsection></quotedStructure></mod></p></content></level></subsection></section><section eId="section-50"><num>50</num><heading>Accessibility of public charging or refuelling points</heading><content><p><mod>In section 10 of the Automated and Electric Vehicles Act 2018 (public charging or refuelling points: access, standards and connection) at the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(5)</num><intro><p>Regulations may impose requirements in connection with the accessibility of public charging or refuelling points in England, Wales and Scotland, such as requirements relating to—</p></intro><level class="para1"><num>(a)</num><content><p>the design of the point,</p></content></level><level class="para1"><num>(b)</num><content><p>the location, placement or surroundings of the point, and</p></content></level><level class="para1"><num>(c)</num><content><p>the provision of assistance in using the point.</p></content></level></subsection><subsection><num>(6)</num><content><p>Regulations under subsection (5) may prescribe requirements by reference to technical standards or specifications published by a person specified in the regulations (including standards or specifications as amended from time to time).</p></content></subsection><subsection><num>(7)</num><intro><p>Regulations under subsection (5) may impose requirements on any person, including—</p></intro><level class="para1"><num>(a)</num><content><p>persons making, supplying, importing, operating or installing public charging or refuelling points;</p></content></level><level class="para1"><num>(b)</num><content><p>the owners or occupiers of land on which public charging or refuelling points are situated.</p></content></level></subsection><subsection><num>(8)</num><content><p>Regulations under subsection (5) may not impose requirements on owners or occupiers of domestic premises.</p></content></subsection></quotedStructure></mod></p></content></section></hcontainer></chapter> — Harbours
Part 1 — Infrastructure — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" xmlns:default="http://www.w3.org/1999/xhtml" eId="part-1-chapter-3"><num>Chapter 3</num><heading>Transport infrastructure</heading><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-amendments-to-the-highways-act-1980"><heading>Amendments to the Highways Act 1980</heading><section eId="section-31"><num>31</num><heading>Fees for certain services</heading><subsection eId="section-31-1"><num>(1)</num><content><p>The Highways Act 1980 is amended as follows.</p></content></subsection><subsection eId="section-31-2"><num>(2)</num><content><p><mod>After section 281A (stamp duty land tax) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e7028"><num>281B</num><heading>Power to provide for fees for certain services</heading><subsection eId="d25e7032"><num>(1)</num><content><p>The appropriate national authority may by regulations make provision for, or in connection with, the charging of fees to highway authorities by prescribed public authorities, in relation to the provision of relevant services.</p></content></subsection><subsection><num>(2)</num><intro><p>A “<term refersTo="#term-relevant-service">relevant service</term>” means any advice, information or other assistance (including a response to a consultation) provided, whether or not to a highway authority, in connection with—</p></intro><level class="para1"><num>(a)</num><content><p>an order made, or proposed to be made, under Part 2, 6 or 12, or</p></content></level><level class="para1"><num>(b)</num><content><p>any other prescribed matter relating to any of those Parts.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The regulations under subsection <ref href="#d25e7032">(1)</ref> may, in particular, make provision—</p></intro><level class="para1"><num>(a)</num><content><p>about when a fee (including a supplementary fee) may, and may not, be charged;</p></content></level><level class="para1"><num>(b)</num><content><p>about the amount which may be charged;</p></content></level><level class="para1"><num>(c)</num><content><p>about what may, and may not, be taken into account in calculating the amount charged;</p></content></level><level class="para1"><num>(d)</num><content><p>about which highway authority is liable to pay a fee charged;</p></content></level><level class="para1"><num>(e)</num><content><p>about when a fee charged is payable;</p></content></level><level class="para1"><num>(f)</num><content><p>about the recovery of fees charged;</p></content></level><level class="para1"><num>(g)</num><content><p>about waiver, reduction or repayment of fees;</p></content></level><level class="para1"><num>(h)</num><content><p>about the effect of paying or failing to pay fees charged (including provision permitting a prescribed public authority to withhold a relevant service that it would otherwise be required to provide under an enactment until any outstanding fees for that service are paid);</p></content></level><level class="para1"><num>(i)</num><content><p>for the supply of information for any purpose of the regulations;</p></content></level><level class="para1"><num>(j)</num><content><p>conferring a function, including a function involving the exercise of a discretion, on any person.</p></content></level></subsection><subsection><num>(4)</num><intro><p>A prescribed public authority must have regard to—</p></intro><level class="para1"><num>(a)</num><content><p>any guidance published by the Secretary of State in relation to the exercise of the authority’s functions under regulations made under this section by the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>any guidance published by the Welsh Ministers in relation to the exercise of the authority’s functions under regulations made under this section by the Welsh Ministers.</p></content></level></subsection><subsection><num>(5)</num><intro><p>Regulations under this section may make—</p></intro><level class="para1"><num>(a)</num><content><p>different provision for different purposes or areas;</p></content></level><level class="para1"><num>(b)</num><content><p>incidental, consequential, supplementary, transitional or transitory provision or savings.</p></content></level></subsection><subsection><num>(6)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-appropriate-national-authority">appropriate national authority</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>in relation to England, the Secretary of State, and</p></content></level><level class="para1"><num>(b)</num><content><p>in relation to Wales, the Welsh Ministers;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-prescribed">prescribed</term>” means prescribed by regulations made by the appropriate national authority under this section;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-public-authority">public authority</term>” means any person certain of whose functions are of a public nature.</p></content></hcontainer></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-31-3"><num>(3)</num><intro><p>In section 325 (provisions as to regulations, schemes and orders)—</p></intro><level class="para1" eId="section-31-3-a"><num>(a)</num><content><p><mod>before subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(1B)</num><content><p>The power of the Welsh Ministers to make regulations under section <ref href="#d25e7028">281B</ref> is exercisable by statutory instrument.</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-31-3-b"><num>(b)</num><content><p><mod>in subsection (2)(a), after “8A” insert <quotedText>“or regulations made by the Welsh Ministers under section <ref href="#d25e7028">281B</ref>”</quotedText>;</mod></p></content></level><level class="para1" eId="section-31-3-c"><num>(c)</num><content><p><mod>after subsection (2A) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(2B)</num><content><p>A statutory instrument containing regulations made by the Welsh Ministers under section <ref href="#d25e7028">281B</ref> is subject to annulment in pursuance of a resolution of Senedd Cymru.</p></content></subsection></quotedStructure></mod></p></content></level></subsection></section><section eId="section-32"><num>32</num><heading>Power of strategic highways company in relation to trunk roads</heading><subsection eId="section-32-1"><num>(1)</num><content><p>Section 10 of the Highways Act 1980 (trunk roads) is amended as set out in subsections <ref href="#section-32-2">(2)</ref> to <ref href="#section-32-6">(6)</ref>.</p></content></subsection><subsection eId="section-32-2"><num>(2)</num><content><p>Omit subsection (2A).</p></content></subsection><subsection eId="section-32-3"><num>(3)</num><content><p><mod>In subsection (3), for “this section” substitute <quotedText>“subsection (2)”</quotedText>.</mod></p></content></subsection><subsection eId="section-32-4"><num>(4)</num><content><p><mod>In subsection (3A), after “power” insert <quotedText>“under subsection (2)”</quotedText>.</mod></p></content></subsection><subsection eId="section-32-5"><num>(5)</num><content><p><mod>In subsection (4), for “this section” substitute <quotedText>“subsection (2)”</quotedText>.</mod></p></content></subsection><subsection eId="section-32-6"><num>(6)</num><content><p><mod>After subsection (4) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e7313"><num>(4A)</num><intro><p>A strategic highways company may by order direct—</p></intro><level class="para1"><num>(a)</num><content><p>that a highway for which the company is the highway authority is to become a trunk road,</p></content></level><level class="para1" eId="d25e7325"><num>(b)</num><intro><p>in relation to a highway in the company’s area for which the company is not the highway authority, that—</p></intro><level class="para2"><num>(i)</num><content><p>the highway is to become a trunk road, and</p></content></level><level class="para2"><num>(ii)</num><content><p>the company is to become the highway authority for it, or</p></content></level></level><level class="para1"><num>(c)</num><content><p>that a trunk road for which the company is the highway authority is to cease to be a trunk road.</p></content></level></subsection><subsection><num>(4B)</num><intro><p>In subsection <ref href="#d25e7313">(4A)</ref><ref href="#d25e7325">(b)</ref>—</p></intro><level class="para1"><num>(a)</num><content><p>the reference to the company’s area is to the area in respect of which it was appointed (see section 2(1) of the Infrastructure Act 2015), and</p></content></level><level class="para1"><num>(b)</num><content><p>the reference to a highway for which the company is not the highway authority includes a proposed highway to be constructed by the company.</p></content></level></subsection><subsection eId="d25e7372"><num>(4C)</num><content><p>A strategic highways company may make an order under subsection <ref href="#d25e7313">(4A)</ref> only if it is satisfied that the order is expedient for the purpose of extending, improving or reorganising the national system of routes for through traffic in England and Wales.</p></content></subsection><subsection><num>(4D)</num><content><p>A strategic highways company may be satisfied as mentioned in subsection <ref href="#d25e7372">(4C)</ref> only after taking into consideration the requirements of local and national planning, including the requirements of agriculture.</p></content></subsection><subsection><num>(4E)</num><intro><p>An order under subsection <ref href="#d25e7313">(4A)</ref>—</p></intro><level class="para1"><num>(a)</num><content><p>must specify the date on which it takes effect, and</p></content></level><level class="para1"><num>(b)</num><content><p>must be confirmed by the Secretary of State.</p></content></level></subsection><subsection><num>(4F)</num><content><p>Subsections (3) and (4) apply in relation to the power in subsection <ref href="#d25e7313">(4A)</ref> as they apply in relation to the power in subsection (2).</p></content></subsection><subsection><num>(4G)</num><content><p>The powers in this section are subject to section 33(4) of the Planning Act 2008 (exclusion of powers to make or confirm orders in relation to highways for which development consent required).</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-32-7"><num>(7)</num><content><p><mod>In Schedule 1 to the Highways Act 1980 (procedures for making or confirming orders and schemes), after paragraph 1 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><paragraph class="schProv1"><num>1A</num><content><p>Where an order under section 10 of this Act is submitted to the Secretary of State by a strategic highways company, that company must publish, in the manner specified in paragraph 1, the notice there referred to; and that paragraph has effect in relation to the notice as if, for the references to the draft order and the making of the order, there were substituted references to the order as submitted to the Secretary of State and the confirmation of the order respectively.</p></content></paragraph></quotedStructure></mod></p></content></subsection></section><section eId="section-33"><num>33</num><heading>Deadlines for consultation and decisions on certain orders and schemes</heading><subsection eId="section-33-1"><num>(1)</num><content><p>Schedule 1 to the <ref eId="c00053" href="https://www.legislation.gov.uk/ukpga/1980/66/contents">Highways Act 1980</ref> (procedures for making or confirming certain orders and schemes) is amended as follows.</p></content></subsection><subsection eId="section-33-2"><num>(2)</num><content><p><mod>In <ref eId="c00054" href="https://www.legislation.gov.uk/ukpga/1980/66/schedule/1/paragraph/1">paragraph 1</ref>, in sub-paragraph (b), for “6 weeks from the date of the publication of the notice” substitute <quotedText>“the minimum period specified in paragraph <ref href="#d25e7478">2A</ref>”</quotedText>.</mod></p></content></subsection><subsection eId="section-33-3"><num>(3)</num><content><p><mod>After paragraph 2 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><paragraph eId="d25e7478" class="schProv1"><num>2A</num><intro><p>The minimum period is—</p></intro><level class="para1"><num>(a)</num><content><p>30 days from the date of the publication of the notice, in the case of an order proposed by, or submitted to, the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>6 weeks from the date of the publication of the notice, in the case of an order proposed by, or submitted to, the Welsh Ministers.</p></content></level></paragraph></quotedStructure></mod></p></content></subsection><subsection eId="section-33-4"><num>(4)</num><content><p><mod>After paragraph 8 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><paragraph class="schProv1"><num>8A</num><subparagraph><num>(1)</num><content><p>This paragraph applies where the Secretary of State is exercising the functions conferred by paragraph 8.</p></content></subparagraph><subparagraph eId="d25e7513"><num>(2)</num><intro><p>The Secretary of State must—</p></intro><level class="para1"><num>(a)</num><content><p>decide to make or confirm the proposed order,</p></content></level><level class="para1"><num>(b)</num><content><p>decide not to make or confirm the proposed order, or</p></content></level><level class="para1"><num>(c)</num><content><p>decide to give notification under paragraph 8(3)(a),</p></content></level><wrapUp><p>within the period of 10 weeks beginning with the relevant day.</p></wrapUp></subparagraph><subparagraph eId="d25e7539"><num>(3)</num><intro><p>Subject to sub-paragraph <ref href="#d25e7572">(4)</ref>, the relevant day is the day on which any of the following occurs in relation to the proposed order—</p></intro><level class="para1"><num>(a)</num><content><p>the period specified in the notice published under paragraph 1 or (as the case may be) paragraph 5 expires with no qualifying objection having been received by the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>a qualifying objection is withdrawn with the result that no qualifying objections remain live;</p></content></level><level class="para1"><num>(c)</num><content><p>the Secretary of State decides under paragraph 7(2) to dispense with an inquiry;</p></content></level><level class="para1"><num>(d)</num><content><p>the Secretary of State receives the report of the person who has held a local inquiry.</p></content></level></subparagraph><subparagraph eId="d25e7572"><num>(4)</num><intro><p>In a case where—</p></intro><level class="para1"><num>(a)</num><content><p>the Secretary of State has to decide whether to confirm a related compulsory purchase order, and</p></content></level><level class="para1"><num>(b)</num><content><p>the relevant day in relation to that compulsory purchase order is later than the relevant day specified in sub-paragraph <ref href="#d25e7539">(3)</ref>,</p></content></level><wrapUp><p>the relevant day for the purposes of sub-paragraph <ref href="#d25e7513">(2)</ref> is the relevant day in relation to the compulsory purchase order.</p></wrapUp></subparagraph><subparagraph eId="d25e7598"><num>(5)</num><content><p>The relevant day in relation to a related compulsory purchase order is the day on which the procedure that must be followed before the Secretary of State can decide whether to confirm the order (not including any duty on the Secretary of State to consider certain matters before taking that decision) is completed.</p></content></subparagraph><subparagraph eId="d25e7604"><num>(6)</num><content><p>Where the Secretary of State gives notification under paragraph 8(3)(a), the Secretary of State must decide whether or not to make or confirm the proposed order within the period of 10 weeks beginning with the final day of the period specified under paragraph 8(3)(b).</p></content></subparagraph><subparagraph eId="d25e7610"><num>(7)</num><content><p>Sub-paragraphs <ref href="#d25e7572">(4)</ref> and <ref href="#d25e7598">(5)</ref> apply for postponing the first day of the period referred to in sub-paragraph <ref href="#d25e7604">(6)</ref> as they apply for postponing the relevant day for the purposes of sub-paragraph <ref href="#d25e7513">(2)</ref>.</p></content></subparagraph><subparagraph><num>(8)</num><content><p>If the Secretary of State has decided to proceed in accordance with paragraph 8(2), sub-paragraphs <ref href="#d25e7513">(2)</ref> to <ref href="#d25e7610">(7)</ref> of this paragraph apply separately in relation to each part of the proposals that is being given separate consideration.</p></content></subparagraph><subparagraph eId="d25e7640"><num>(9)</num><content><p>The Secretary of State may in any particular case, if the Secretary of State considers it appropriate, extend a period that applies under this paragraph.</p></content></subparagraph><subparagraph><num>(10)</num><intro><p>The power under sub-paragraph <ref href="#d25e7640">(9)</ref> may be exercised—</p></intro><level class="para1"><num>(a)</num><content><p>more than once in relation to the same period;</p></content></level><level class="para1"><num>(b)</num><content><p>after the expiry of the period.</p></content></level></subparagraph><subparagraph><num>(11)</num><intro><p>The Secretary of State must give written notice of any extension—</p></intro><level class="para1"><num>(a)</num><content><p>in a case where the proposed order has already been made, to the authority that made it, and</p></content></level><level class="para1"><num>(b)</num><content><p>to each person who has made a qualifying objection and not withdrawn it.</p></content></level></subparagraph><subparagraph><num>(12)</num><intro><p>In this paragraph—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-qualifying-objection">qualifying objection</term>” means an objection received as described in paragraph 7(1)(a) or (b);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-related-compulsory-purchase-order">related compulsory purchase order</term>”, in relation to a proposed order, means a compulsory purchase order proceedings on which could, by virtue of section 257(1), be taken concurrently with any proceedings under this Schedule on the proposed order.</p></content></hcontainer></subparagraph></paragraph></quotedStructure></mod></p></content></subsection><subsection eId="section-33-5"><num>(5)</num><intro><p>In <ref eId="c00055" href="https://www.legislation.gov.uk/ukpga/1980/66/schedule/1/paragraph/10">paragraph 10</ref>—</p></intro><level class="para1" eId="section-33-5-a"><num>(a)</num><content><p>the existing text becomes sub-paragraph (1);</p></content></level><level class="para1" eId="section-33-5-b"><num>(b)</num><content><p><mod>in paragraph (b) of that sub-paragraph, for “6 weeks from the date of the publication of the notice” substitute <quotedText>“the minimum period specified in sub-paragraph <ref href="#d25e7741">(2)</ref>”</quotedText>;</mod></p></content></level><level class="para1" eId="section-33-5-c"><num>(c)</num><content><p><mod>after that sub-paragraph insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><subparagraph eId="d25e7741"><num>(2)</num><intro><p>The minimum period is—</p></intro><level class="para1"><num>(a)</num><content><p>30 days from the date of the publication of the notice, in the case of a scheme proposed by, or submitted to, the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>6 weeks from the date of the publication of the notice, in the case of a scheme proposed by, or submitted to, the Welsh Ministers.</p></content></level></subparagraph></quotedStructure></mod></p></content></level></subsection><subsection eId="section-33-6"><num>(6)</num><content><p><mod>After paragraph 15 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><paragraph class="schProv1"><num>15A</num><subparagraph><num>(1)</num><content><p>This paragraph applies where the Secretary of State is exercising the functions conferred by paragraph 15.</p></content></subparagraph><subparagraph eId="d25e7776"><num>(2)</num><intro><p>The Secretary of State must—</p></intro><level class="para1"><num>(a)</num><content><p>decide to make or confirm the proposed scheme,</p></content></level><level class="para1"><num>(b)</num><content><p>decide not to make or confirm the proposed scheme, or</p></content></level><level class="para1"><num>(c)</num><content><p>decide to give notification under paragraph 15(3)(a),</p></content></level><wrapUp><p>within the period of 10 weeks beginning with the relevant day.</p></wrapUp></subparagraph><subparagraph eId="d25e7802"><num>(3)</num><intro><p>Subject to sub-paragraph <ref href="#d25e7835">(4)</ref>, the relevant day is the day on which any of the following occurs in relation to the proposed scheme—</p></intro><level class="para1"><num>(a)</num><content><p>the period specified in the notice published under paragraph 10 or (as the case may be) paragraph 12 expires with no qualifying objection having been received by the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>a qualifying objection is withdrawn with the result that no qualifying objections remain live;</p></content></level><level class="para1"><num>(c)</num><content><p>the Secretary of State decides under paragraph 14(2) to dispense with an inquiry;</p></content></level><level class="para1"><num>(d)</num><content><p>the Secretary of State receives the report of the person who has held a local inquiry.</p></content></level></subparagraph><subparagraph eId="d25e7835"><num>(4)</num><intro><p>In a case where—</p></intro><level class="para1"><num>(a)</num><content><p>the Secretary of State has to decide whether to confirm a related compulsory purchase order, and</p></content></level><level class="para1"><num>(b)</num><content><p>the relevant day in relation to that compulsory purchase order is later than the relevant day specified in sub-paragraph <ref href="#d25e7802">(3)</ref>,</p></content></level><wrapUp><p>the relevant day for the purposes of sub-paragraph <ref href="#d25e7776">(2)</ref> is the relevant day in relation to the compulsory purchase order.</p></wrapUp></subparagraph><subparagraph eId="d25e7861"><num>(5)</num><content><p>The relevant day in relation to a related compulsory purchase order is the day on which the procedure that must be followed before the Secretary of State can decide whether to confirm the order (not including any duty on the Secretary of State to consider certain matters before taking that decision) is completed.</p></content></subparagraph><subparagraph eId="d25e7867"><num>(6)</num><content><p>Where the Secretary of State gives notification under paragraph 15(3)(a), the Secretary of State must decide whether or not to make or confirm the proposed scheme within the period of 10 weeks beginning with the final day of the period specified under paragraph 15(3)(b).</p></content></subparagraph><subparagraph eId="d25e7873"><num>(7)</num><content><p>Sub-paragraphs <ref href="#d25e7835">(4)</ref> and <ref href="#d25e7861">(5)</ref> apply for postponing the first day of the period referred to in sub-paragraph <ref href="#d25e7867">(6)</ref> as they apply for postponing the relevant day for the purposes of sub-paragraph <ref href="#d25e7776">(2)</ref>.</p></content></subparagraph><subparagraph><num>(8)</num><content><p>If the Secretary of State has decided to proceed in accordance with paragraph 15(2), sub-paragraphs <ref href="#d25e7776">(2)</ref> to <ref href="#d25e7873">(7)</ref> of this paragraph apply separately in relation to each part of the proposals that is being given separate consideration.</p></content></subparagraph><subparagraph eId="d25e7903"><num>(9)</num><content><p>The Secretary of State may in any particular case, if the Secretary of State considers it appropriate, extend a period that applies under this paragraph.</p></content></subparagraph><subparagraph><num>(10)</num><intro><p>The power under sub-paragraph <ref href="#d25e7903">(9)</ref> may be exercised—</p></intro><level class="para1"><num>(a)</num><content><p>more than once in relation to the same period;</p></content></level><level class="para1"><num>(b)</num><content><p>after the expiry of the period.</p></content></level></subparagraph><subparagraph><num>(11)</num><intro><p>The Secretary of State must give written notice of any extension—</p></intro><level class="para1"><num>(a)</num><content><p>in a case where the proposed scheme has already been made, to the authority that made it, and</p></content></level><level class="para1"><num>(b)</num><content><p>to each person who has made a qualifying objection and not withdrawn it.</p></content></level></subparagraph><subparagraph><num>(12)</num><intro><p>In this paragraph—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-qualifying-objection">qualifying objection</term>” means an objection received as described in paragraph 14(1)(a) or (b);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-related-compulsory-purchase-order">related compulsory purchase order</term>”, in relation to a proposed scheme, means a compulsory purchase order proceedings on which could, by virtue of section 257(1), be taken concurrently with any proceedings under this Schedule on the proposed scheme.</p></content></hcontainer></subparagraph></paragraph></quotedStructure></mod></p></content></subsection></section><section eId="section-34"><num>34</num><heading>Procedure for certain orders and schemes</heading><subsection eId="section-34-1"><num>(1)</num><content><p>The Highways Act 1980 is amended as follows.</p></content></subsection><subsection eId="section-34-2"><num>(2)</num><intro><p>In section 325 (provision for certain regulations, orders and schemes to be made by statutory instrument)—</p></intro><level class="para1" eId="section-34-2-a"><num>(a)</num><content><p>in the heading, omit “, schemes”;</p></content></level><level class="para1" eId="section-34-2-b"><num>(b)</num><intro><p>in subsection (1)—</p></intro><level class="para2" eId="section-34-2-b-i"><num>(i)</num><content><p>omit paragraph (b);</p></content></level><level class="para2" eId="section-34-2-b-ii"><num>(ii)</num><content><p><mod>in paragraph (d), after “sections” insert <quotedText>“10,”</quotedText>.</mod></p></content></level></level></subsection><subsection eId="section-34-3"><num>(3)</num><intro><p>In section 326 (revocation and variation of schemes and orders)—</p></intro><level class="para1" eId="section-34-3-a"><num>(a)</num><intro><p>in subsection (2)—</p></intro><level class="para2" eId="section-34-3-a-i"><num>(i)</num><content><p><mod>after “An order” insert <quotedText>“or scheme”</quotedText>;</mod></p></content></level><level class="para2" eId="section-34-3-a-ii"><num>(ii)</num><content><p><mod>after “section” insert <quotedText>“10,”</quotedText>;</mod></p></content></level><level class="para2" eId="section-34-3-a-iii"><num>(iii)</num><content><p><mod>after “14B,” insert <quotedText>“16,”</quotedText>;</mod></p></content></level><level class="para2" eId="section-34-3-a-iv"><num>(iv)</num><content><p><mod>after “27,” insert <quotedText>“106(3),”</quotedText>;</mod></p></content></level><level class="para2" eId="section-34-3-a-v"><num>(v)</num><content><p><mod>after “orders” insert <quotedText>“or schemes”</quotedText>;</mod></p></content></level><level class="para2" eId="section-34-3-a-vi"><num>(vi)</num><content><p><mod>after “subsequent order” insert <quotedText>“or scheme”</quotedText>;</mod></p></content></level></level><level class="para1" eId="section-34-3-b"><num>(b)</num><content><p><mod>after subsection (2) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(2A)</num><content><p>Subsection (2) does not apply to an order or scheme under section 10, 16 or 106(3) made or confirmed by the Welsh Ministers (but see section 325(1A)).</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-34-3-c"><num>(c)</num><content><p><mod>in subsection (6), before “14,” insert <quotedText>“10,”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-34-4"><num>(4)</num><content><p><mod>In Schedule 1 (procedures for making or confirming certain orders and schemes), after paragraph 19 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><paragraph class="schProv1"><num>19A</num><intro><p>On making or confirming an order or scheme in accordance with this Schedule, the Secretary of State must publish on a government website—</p></intro><level class="para1"><num>(a)</num><content><p>notice of the making or confirmation of the order or scheme,</p></content></level><level class="para1"><num>(b)</num><content><p>if the order or scheme was made with modifications, a summary of those modifications, and</p></content></level><level class="para1"><num>(c)</num><intro><p>either—</p></intro><level class="para2"><num>(i)</num><content><p>a copy of the order or scheme, together with any maps or plans referred to in it, or</p></content></level><level class="para2"><num>(ii)</num><content><p>an explanation of where and how that documentation can be inspected.</p></content></level></level></paragraph></quotedStructure></mod></p></content></subsection></section><section eId="section-35"><num>35</num><heading>Compulsory acquisition powers to include taking of temporary possession</heading><content><p><mod>In section 250(8) of the Highways Act 1980 (compulsory acquisition by creation of new rights to include rights of carrying out certain activity on land), after “references to” insert <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>the right to take temporary possession or occupation of land, and</p></content></level><level class="para1"><num>(b)</num><content><p/></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-amendments-to-the-transport-and-works-act-1992"><heading>Amendments to the Transport and Works Act 1992</heading><section eId="section-36"><num>36</num><heading>Replacement of model clauses with guidance</heading><content><p><mod>In the Transport and Works Act 1992, for section 8 (model clauses) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section><num>8</num><heading>Guidance on draft orders</heading><subsection><num>(1)</num><content><p>The Secretary of State may publish guidance about the preparation of draft orders, for cases in which rules under section 6 require the submission of such drafts to the Secretary of State.</p></content></subsection><subsection><num>(2)</num><content><p>The Welsh Ministers may publish guidance about the preparation of draft orders, for cases in which rules under section 6 require the submission of such drafts to the Welsh Ministers.</p></content></subsection><subsection><num>(3)</num><content><p>The guidance may set out model provisions considered suitable for inclusion in the drafts (whether generally or in certain cases).</p></content></subsection><subsection><num>(4)</num><intro><p>In arriving at a determination under section 13 in a case to which guidance under this section applies, the Secretary of State or (as the case may be) the Welsh Ministers must have regard to—</p></intro><level class="para1"><num>(a)</num><content><p>any departure from the guidance, and</p></content></level><level class="para1"><num>(b)</num><content><p>any reasons given by the applicant for that departure.</p></content></level></subsection></section></quotedStructure></mod></p></content></section><section eId="section-37"><num>37</num><heading>Removal of special procedure for projects of national significance</heading><subsection eId="section-37-1"><num>(1)</num><content><p>In the Transport and Works Act 1992, omit section 9 (special procedure for projects considered to be of national significance).</p></content></subsection><subsection eId="section-37-2"><num>(2)</num><intro><p>In consequence of that amendment—</p></intro><level class="para1" eId="section-37-2-a"><num>(a)</num><content><p>in section 3 of the Statutory Orders (Special Procedure) Act 1945 (petitions against orders), omit subsection (4A);</p></content></level><level class="para1" eId="section-37-2-b"><num>(b)</num><content><p>in section 12 of the Transport and Works Act 1992 (special parliamentary procedure), omit subsection (2);</p></content></level><level class="para1" eId="section-37-2-c"><num>(c)</num><content><p>in the Channel Tunnel Rail Link Act 1996, omit section 42 (application of section 9 of the 1992 Act to certain proposals affecting the Channel Tunnel).</p></content></level></subsection><subsection eId="section-37-3"><num>(3)</num><content><p>The amendments made by this section do not apply in relation to an application in respect of which a notice under section 9(2) of the Transport and Works Act 1992 has been published before this section comes into force.</p></content></subsection></section><section eId="section-38"><num>38</num><heading>Duty to hold inquiry or hearing</heading><subsection eId="section-38-1"><num>(1)</num><content><p>Section 11 of the Transport and Works Act 1992 (inquiries and hearings) is amended as follows.</p></content></subsection><subsection eId="section-38-2"><num>(2)</num><content><p><mod>In subsection (3) (duty to hold inquiry or hearing on request from objector), for the words from “an objection” to “applies,” substitute <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>an objection is made by a person within subsection (4),</p></content></level><level class="para1"><num>(b)</num><content><p>the person informs the Secretary of State in writing that the person wishes the objection to be referred to an inquiry or dealt with in accordance with subsection (2), and</p></content></level><level class="para1"><num>(c)</num><content><p>the Secretary of State considers that the objection is serious enough to merit such treatment,</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-38-3"><num>(3)</num><content><p><mod>After subsection (3) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(3A)</num><content><p>In a case in which the powers in subsections (1) and (2) are exercisable by the Welsh Ministers, subsection (3) is to be read as referring to the Welsh Ministers instead of the Secretary of State.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-38-4"><num>(4)</num><content><p>The amendments made by this section do not apply in relation to an application in respect of which rule 5(1) of the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2006 (<ref eId="c00056" href="http://www.legislation.gov.uk/id/uksi/2006/1466">S.I. 2006/1466</ref>) has been complied with before this section comes into force.</p></content></subsection></section><section eId="section-39"><num>39</num><heading>Costs of inquiries</heading><subsection eId="section-39-1"><num>(1)</num><content><p>Section 11 of the Transport and Works Act 1992 (inquiries and hearings) is amended as follows.</p></content></subsection><subsection eId="section-39-2"><num>(2)</num><content><p><mod>In subsection (5) (application of section 250 of the Local Government Act 1972), before paragraph (a) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(za)</num><content><p>the powers of direction, certification and order-making conferred by section 250(4) and (5) as applied by this subsection may, unless otherwise directed by the Secretary of State or the Welsh Ministers, be exercised on their behalf by the person holding the inquiry,</p></content></level></quotedStructure><inline name="appendText">.</inline></mod></p></content></subsection><subsection eId="section-39-3"><num>(3)</num><content><p><mod>After subsection (5) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e8378"><num>(5A)</num><content><p>The power of direction conferred by section 250(4) of the Local Government Act 1972 (costs of inquiry) as applied by subsection (5) is, in the case of an application under section 6, to be exercised so as to require the applicant to pay the costs in question, unless the person exercising the power considers that there is good reason to exercise it differently.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-39-4"><num>(4)</num><content><p><mod>In subsection (6) (application to hearings of provisions applied to inquiries), after “(costs)” insert <quotedText>“, and subsection <ref href="#d25e8378">(5A)</ref> of this section,”</quotedText>.</mod></p></content></subsection><subsection eId="section-39-5"><num>(5)</num><content><p>The amendments made by subsections <ref href="#section-39-3">(3)</ref> and <ref href="#section-39-4">(4)</ref> do not apply in relation to an application in respect of which rule 5(1) of the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2006 (<ref eId="c00057" href="http://www.legislation.gov.uk/id/uksi/2006/1466">S.I. 2006/1466</ref>) has been complied with before this section comes into force.</p></content></subsection></section><section eId="section-40"><num>40</num><heading>Deadline for decisions</heading><subsection eId="section-40-1"><num>(1)</num><content><p>The Transport and Works Act 1992 is amended as follows.</p></content></subsection><subsection eId="section-40-2"><num>(2)</num><content><p><mod>In section 13 (making or refusal of orders), after subsection (6) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e8434"><num>(7)</num><intro><p>The Secretary of State may, for cases involving applications under section 6, make rules as to the period within which—</p></intro><level class="para1"><num>(a)</num><content><p>a determination under subsection (1) must be made, or</p></content></level><level class="para1"><num>(b)</num><content><p>a step must be taken as required by subsection (4), section 13B or section 13C.</p></content></level></subsection><subsection><num>(8)</num><intro><p>Rules under subsection <ref href="#d25e8434">(7)</ref>—</p></intro><level class="para1"><num>(a)</num><content><p>may provide for periods to be determined or changed by the Secretary of State or the Welsh Ministers in individual cases;</p></content></level><level class="para1"><num>(b)</num><content><p>may provide for the postponement of a requirement under the rules where a fee payable in connection with the application is not paid on time;</p></content></level><level class="para1"><num>(c)</num><content><p>may make different provision for different cases;</p></content></level><level class="para1"><num>(d)</num><content><p>if they apply in relation to Wales, may be made only with the agreement of the Welsh Ministers;</p></content></level><level class="para1"><num>(e)</num><content><p>must be made by statutory instrument;</p></content></level><wrapUp><p>and such an instrument is subject to annulment in pursuance of a resolution of either House of Parliament.</p></wrapUp></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-40-3"><num>(3)</num><intro><p>In consequence of that amendment—</p></intro><level class="para1" eId="section-40-3-a"><num>(a)</num><content><p><mod>in section 13(6), for “to 13D” substitute <quotedText>“and 13C”</quotedText>;</mod></p></content></level><level class="para1" eId="section-40-3-b"><num>(b)</num><content><p>omit section 13D (requirement to determine EIA application or proposal within reasonable time);</p></content></level><level class="para1" eId="section-40-3-c"><num>(c)</num><content><p><mod>in section 14(3A)(a), for “to 13D” substitute <quotedText>“and 13C”</quotedText>.</mod></p></content></level></subsection></section><section eId="section-41"><num>41</num><heading>Publication of decisions and time for bringing challenge</heading><subsection eId="section-41-1"><num>(1)</num><content><p>The Transport and Works Act 1992 is amended as follows.</p></content></subsection><subsection eId="section-41-2"><num>(2)</num><intro><p>In section 14 (publicity for making or refusal of order)—</p></intro><level class="para1" eId="section-41-2-a"><num>(a)</num><content><p><mod>in subsection (1), for paragraphs (b) and (c) substitute <quotedText startQuote="&#x201C;">and</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1" eId="d25e8552"><num>(b)</num><content><p>publish the notice on a government website.</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-41-2-b"><num>(b)</num><content><p><mod>in subsection (2), for “(1)(a)” substitute <quotedText>“(1)”</quotedText>;</mod></p></content></level><level class="para1" eId="section-41-2-c"><num>(c)</num><content><p>omit subsection (2A);</p></content></level><level class="para1" eId="section-41-2-d"><num>(d)</num><content><p><mod>in subsection (3A), for “notices” substitute <quotedText>“notice”</quotedText>;</mod></p></content></level><level class="para1" eId="section-41-2-e"><num>(e)</num><content><p><mod>for subsection (3AA) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(3AA)</num><content><p>If the determination is for the making of an EIA order, the notice under subsection (1) must include the information specified in subsection (3AB).</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-41-2-f"><num>(f)</num><intro><p>in subsection (4)—</p></intro><level class="para2" eId="section-41-2-f-i"><num>(i)</num><content><p><mod>for “a notice” substitute <quotedText>“a copy of the notice under subsection (1)”</quotedText>;</mod></p></content></level><level class="para2" eId="section-41-2-f-ii"><num>(ii)</num><content><p>omit the words from “; and” to the end.</p></content></level></level></subsection><subsection eId="section-41-3"><num>(3)</num><content><p><mod>In section 22(1) (period for challenging order), for the words from “within” to “published” substitute <quotedText>“before the end of the period of 6 weeks beginning with the day after the day on which notice of the determination to make the order is first published under section 14(1)<ref href="#d25e8552">(b)</ref>”</quotedText>.</mod></p></content></subsection><subsection eId="section-41-4"><num>(4)</num><intro><p>In consequence of those amendments—</p></intro><level class="para1" eId="section-41-4-a"><num>(a)</num><content><p><mod>in section 12(3)(c) (modification of section 22(1) where special parliamentary procedure applies), for “the notice required by section 14(1)(b) is published” substitute <quotedText>“notice is first published under section 14(1)<ref href="#d25e8552">(b)</ref>”</quotedText>;</mod></p></content></level><level class="para1" eId="section-41-4-b"><num>(b)</num><content><p><mod>in section 13(5) (date of operation of order), for the words from “the notice” to “published” substitute <quotedText>“notice of the determination to make the order is first published under section 14(1)<ref href="#d25e8552">(b)</ref>”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-41-5"><num>(5)</num><content><p>The amendments made by this section do not apply in relation to a determination made before this section comes into force or any order made further to such a determination.</p></content></subsection></section><section eId="section-42"><num>42</num><heading>Fees for certain services</heading><content><p><mod>After section 23 of the Transport and Works Act 1992 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section><num>23A</num><heading>Fees for certain services in connection with orders</heading><subsection eId="d25e8686"><num>(1)</num><content><p>The appropriate national authority may by regulations make provision for, or in connection with, the charging of fees to applicants under section 6 by prescribed public authorities, in relation to the provision of relevant services.</p></content></subsection><subsection><num>(2)</num><intro><p>A “<term refersTo="#term-relevant-service">relevant service</term>” means any advice, information or other assistance (including a response to a consultation) provided, whether or not to an applicant under section 6, in connection with—</p></intro><level class="para1"><num>(a)</num><content><p>an application under section 6, or</p></content></level><level class="para1"><num>(b)</num><content><p>any other prescribed matter relating to an order, or proposed order, under section 1 or 3.</p></content></level></subsection><subsection><num>(3)</num><intro><p>Regulations made under subsection <ref href="#d25e8686">(1)</ref> may, in particular, make provision—</p></intro><level class="para1"><num>(a)</num><content><p>about when a fee (including a supplementary fee) may, and may not, be charged;</p></content></level><level class="para1"><num>(b)</num><content><p>about the amount which may be charged;</p></content></level><level class="para1"><num>(c)</num><content><p>about what may, and may not, be taken into account in calculating the amount charged;</p></content></level><level class="para1"><num>(d)</num><content><p>about when a fee charged is payable;</p></content></level><level class="para1"><num>(e)</num><content><p>about the recovery of fees charged;</p></content></level><level class="para1"><num>(f)</num><content><p>about waiver, reduction or repayment of fees;</p></content></level><level class="para1"><num>(g)</num><content><p>about the effect of paying or failing to pay fees charged (including provision permitting a prescribed public authority to withhold a relevant service that it would otherwise be required to provide under an enactment until any outstanding fees for that service are paid);</p></content></level><level class="para1"><num>(h)</num><content><p>for the supply of information for any purpose of the regulations;</p></content></level><level class="para1"><num>(i)</num><content><p>conferring a function, including a function involving the exercise of a discretion, on any person.</p></content></level></subsection><subsection><num>(4)</num><intro><p>A prescribed public authority must have regard to—</p></intro><level class="para1"><num>(a)</num><content><p>any guidance published by the Secretary of State in relation to the exercise of the authority’s functions under regulations made under this section by the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>any guidance published by the Welsh Ministers in relation to the exercise of the authority’s functions under regulations made under this section by the Welsh Ministers.</p></content></level></subsection><subsection><num>(5)</num><intro><p>Regulations under this section may make—</p></intro><level class="para1"><num>(a)</num><content><p>different provision for different purposes or areas;</p></content></level><level class="para1"><num>(b)</num><content><p>incidental, consequential, supplementary, transitional or transitory provision or savings.</p></content></level></subsection><subsection><num>(6)</num><content><p>Regulations under this section are to be made by statutory instrument.</p></content></subsection><subsection><num>(7)</num><content><p>A statutory instrument containing regulations made by the Secretary of State under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection><subsection><num>(8)</num><content><p>A statutory instrument containing regulations made by the Welsh Ministers under this section is subject to annulment in pursuance of a resolution of Senedd Cymru.</p></content></subsection><subsection><num>(9)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><intro><p>“<term refersTo="#term-appropriate-national-authority">appropriate national authority</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>in relation to England and cross-border orders, the Secretary of State, and</p></content></level><level class="para1"><num>(b)</num><content><p>in relation to Wales but not cross-border orders, the Welsh Ministers;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-cross-border-order">cross-border order</term>” means an order under section 1 or 3 that has effect both in England and in Wales;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-prescribed">prescribed</term>” means prescribed by regulations made by the appropriate national authority under this section;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-public-authority">public authority</term>” means any person certain of whose functions are of a public nature.</p></content></hcontainer></subsection></section></quotedStructure></mod></p></content></section><section eId="section-43"><num>43</num><heading>Deemed grant of listed building consent etc</heading><subsection eId="section-43-1"><num>(1)</num><content><p><mod>In the Transport and Works Act 1992, for section 17 (listed buildings and conservation areas) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e8892"><num>17</num><heading>Listed buildings: England</heading><subsection><num>(1)</num><content><p>On making an order under section 1 or 3 that authorises controlled listed building works in England, the Secretary of State may direct that listed building consent for the works is deemed to be granted, subject to such conditions (if any) as may be specified in the direction.</p></content></subsection><subsection><num>(2)</num><content><p>Section 16(2) of the Listed Buildings Act (duty of special regard to listed buildings) applies to the making of a direction under this section as it would apply to the grant of listed building consent in relation to the building concerned.</p></content></subsection><subsection><num>(3)</num><content><p>Section 72(1) of the Listed Buildings Act (duty of special attention to conservation areas) applies to the making of a direction under this section in relation to a building in a conservation area as it would apply to the grant of listed building consent in relation to that building.</p></content></subsection><subsection><num>(4)</num><content><p>The provisions of the Listed Buildings Act apply in relation to any listed building consent deemed to be granted by virtue of a direction of the Secretary of State under this section as if the consent had been granted by the Secretary of State on an application referred under section 12 of that Act.</p></content></subsection><subsection><num>(5)</num><content><p>But that does not bring the decision to make the direction within section 62(2)(a) of that Act (decisions of Secretary of State that may only be challenged by way of statutory review).</p></content></subsection><subsection><num>(6)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-conservation-area">conservation area</term>” has the same meaning as in the Listed Buildings Act (see section 91(1) of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-controlled-listed-building-works-in-england">controlled listed building works in England</term>” means works to which section 7(1) of the Listed Buildings Act (demolition or alteration in character of a listed building in England) applies;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-listed-building-consent">listed building consent</term>” means consent under section 8 of the Listed Buildings Act (listed building consent in England);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-listed-buildings-act">the Listed Buildings Act</term>” means the Planning (Listed Buildings and Conservation Areas) Act 1990.</p></content></hcontainer></subsection></section><section eId="d25e8964"><num>17A</num><heading>Listed buildings and conservation areas: Wales</heading><subsection eId="d25e8968"><num>(1)</num><content><p>On making an order under section 1 or 3 that authorises controlled listed building works in Wales, the Welsh Ministers may direct that listed building consent for the works is deemed to be granted, subject to such conditions (if any) as may be specified in the direction.</p></content></subsection><subsection eId="d25e8974"><num>(2)</num><content><p>On making an order under section 1 or 3 that authorises controlled conservation area works in Wales, the Welsh Ministers may direct that conservation area consent for the works is deemed to be granted, subject to such conditions (if any) as may be specified in the direction.</p></content></subsection><subsection><num>(3)</num><content><p>Section 96(2) of HEWA 2023 (duty of special regard to listed buildings) applies to the making of a direction under subsection <ref href="#d25e8968">(1)</ref> as it would apply to the grant of listed building consent in relation to the building concerned.</p></content></subsection><subsection><num>(4)</num><intro><p>Section 160(1) of HEWA 2023 (duty of special regard to conservation areas) applies—</p></intro><level class="para1"><num>(a)</num><content><p>to the making of a direction under subsection <ref href="#d25e8968">(1)</ref> in relation to a building in a conservation area, as it would apply to the grant of listed building consent in relation to that building, and</p></content></level><level class="para1"><num>(b)</num><content><p>to the making of a direction under subsection <ref href="#d25e8974">(2)</ref>, as it would apply to the grant of conservation area consent in relation to the building concerned.</p></content></level></subsection><subsection><num>(5)</num><content><p>The provisions of HEWA 2023 apply in relation to any consent deemed to be granted by virtue of a direction of the Welsh Ministers under this section as if the consent had been granted by the Welsh Ministers on an application referred under section 94 of that Act.</p></content></subsection><subsection><num>(6)</num><content><p>But that does not bring the decision to make the direction within section 182(2)(b) of that Act (decisions of Welsh Ministers that may only be challenged by way of statutory review).</p></content></subsection><subsection><num>(7)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-conservation-area">conservation area</term>” has the same meaning as in HEWA 2023 (see section 210 of that Act);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-conservation-area-consent">conservation area consent</term>” means consent under section 162 of HEWA 2023 (conservation area consent in Wales);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-controlled-conservation-area-works-in-wales">controlled conservation area works in Wales</term>” means works to which section 161 of HEWA 2023 (demolition of building in conservation area in Wales) applies;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-controlled-listed-building-works-in-wales">controlled listed building works in Wales</term>” means works to which section 88 of HEWA 2023 (demolition or alteration in character of a listed building in Wales) applies;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-hewa-2023">HEWA 2023</term>” means the Historic Environment (Wales) Act 2023;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-listed-building-consent">listed building consent</term>” means consent under section 89 of HEWA 2023 (listed building consent in Wales).</p></content></hcontainer></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-43-2"><num>(2)</num><intro><p>In section 22 of that Act (validity of orders)—</p></intro><level class="para1" eId="section-43-2-a"><num>(a)</num><content><p><mod>in the heading, for “under section 1 or 3” substitute <quotedText>“and directions”</quotedText>;</mod></p></content></level><level class="para1" eId="section-43-2-b"><num>(b)</num><content><p><mod>after subsection (3) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(4)</num><intro><p>This section applies to a direction under—</p></intro><level class="para1"><num>(a)</num><content><p>section 90(2A) of the Town and Country Planning Act 1990 (deemed planning permission),</p></content></level><level class="para1"><num>(b)</num><content><p>section <ref href="#d25e8892">17</ref> or <ref href="#d25e8964">17A</ref> of this Act (deemed listed building or conservation area consent), or</p></content></level><level class="para1"><num>(c)</num><content><p>section 12(2A) of the Planning (Hazardous Substances) Act 1990 (deemed hazardous substances consent),</p></content></level><wrapUp><p>as it applies to an order under section 1 or 3.</p></wrapUp></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-43-3"><num>(3)</num><content><p>In section 12 of the Planning (Listed Buildings and Conservation Areas) Act 1990 (reference of applications for listed building consent to Secretary of State), omit subsection (3A).</p></content></subsection><subsection eId="section-43-4"><num>(4)</num><content><p><mod>In section 94(4) of the Historic Environment (Wales) Act 2023 (reference to Welsh Ministers of application for listed building consent associated with Transport and Works Act application), after “application” in the second place it occurs insert <quotedText>“to the Secretary of State”</quotedText>.</mod></p></content></subsection></section><section eId="section-44"><num>44</num><heading>Deemed consent under marine licence</heading><subsection eId="section-44-1"><num>(1)</num><content><p><mod>In the Transport and Works Act 1992, after section 19 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section><num>19A</num><heading>Deemed consent under marine licences</heading><subsection eId="d25e9165"><num>(1)</num><content><p>An order of the Secretary of State under section 1 or 3 may include provision deeming a marine licence to have been granted by the Secretary of State for activities specified in the order (being activities for which the Secretary of State is the appropriate licensing authority).</p></content></subsection><subsection><num>(2)</num><intro><p>Activity specified under subsection <ref href="#d25e9165">(1)</ref> must be carried out wholly in one or more of these areas—</p></intro><level class="para1"><num>(a)</num><content><p>England;</p></content></level><level class="para1"><num>(b)</num><content><p>waters adjacent to England up to the seaward limits of the territorial sea;</p></content></level><level class="para1"><num>(c)</num><content><p>an exclusive economic zone, except any part of an exclusive economic zone in relation to which the Scottish Ministers have functions;</p></content></level><level class="para1"><num>(d)</num><content><p>a Renewable Energy Zone, except any part of a Renewable Energy Zone in relation to which the Scottish Ministers have functions;</p></content></level><level class="para1"><num>(e)</num><content><p>an area designated under section 1(7) of the Continental Shelf Act 1964, except any part of that area which is within a part of an exclusive economic zone or Renewable Energy Zone in relation to which the Scottish Ministers have functions.</p></content></level></subsection><subsection eId="d25e9210"><num>(3)</num><content><p>An order of the Welsh Ministers under section 1 or 3 may include provision deeming a marine licence to have been granted by the Welsh Ministers for activities specified in the order (being activities for which the Welsh Ministers are the appropriate licensing authority).</p></content></subsection><subsection eId="d25e9216"><num>(4)</num><intro><p>An order including provision under subsection <ref href="#d25e9165">(1)</ref> or <ref href="#d25e9210">(3)</ref> may also include provision—</p></intro><level class="para1" eId="d25e9228"><num>(a)</num><content><p>deeming the licence to have been granted subject to such conditions as may be specified in the order;</p></content></level><level class="para1" eId="d25e9234"><num>(b)</num><content><p>deeming any such conditions to have been attached to the marine licence by the Secretary of State or (as the case may be) the Welsh Ministers under Part 4 of the MCAA 2009.</p></content></level></subsection><subsection><num>(5)</num><content><p>If an order includes provision of the sort mentioned in paragraphs <ref href="#d25e9228">(a)</ref> and <ref href="#d25e9234">(b)</ref> of subsection <ref href="#d25e9216">(4)</ref>, sections 68 (notice of applications) and 69(3) and (5) (representations) of the MCAA 2009 do not apply in relation to the deemed marine licence.</p></content></subsection><subsection><num>(6)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-the-appropriate-licensing-authority">the appropriate licensing authority</term>” has the meaning given by section 113 of the MCAA 2009;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-exclusive-economic-zone">exclusive economic zone</term>” has the meaning given by section 322(1) of the MCAA 2009;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-marine-licence">marine licence</term>” means a marine licence under Part 4 of the MCAA 2009;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-the-mcaa-2009">the MCAA 2009</term>” means the Marine and Coastal Access Act 2009;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-renewable-energy-zone">Renewable Energy Zone</term>” has the meaning given by section 84(4) of the Energy Act 2004.</p></content></hcontainer></subsection><subsection><num>(7)</num><content><p>For the purposes of this section, waters are to be treated as adjacent, or as not adjacent, to England if they would be so treated for the purposes of section 113 of the MCAA 2009 as a result of sections 322(4) to (9) of that Act.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-44-2"><num>(2)</num><content><p>The amendments made by this section do not apply in relation to an order applied for under section 6 of the Transport and Works Act 1992 if rule 5(1) of the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2006 (<ref eId="c00058" href="http://www.legislation.gov.uk/id/uksi/2006/1466">S.I. 2006/1466</ref>) has been complied with in respect of the application before this section comes into force.</p></content></subsection></section><section eId="section-45"><num>45</num><heading>Authorisation of applications by local authorities</heading><subsection eId="section-45-1"><num>(1)</num><intro><p>In section 20 of the Transport and Works Act 1992 (power to apply for or object to orders)—</p></intro><level class="para1" eId="section-45-1-a"><num>(a)</num><content><p>in subsection (2), omit “by subsection (3) or (4)”;</p></content></level><level class="para1" eId="section-45-1-b"><num>(b)</num><content><p><mod>after subsection (4) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(5)</num><content><p>In the case of a local authority to which section 239 of the Local Government Act 1972 applies, a resolution to make an application passed, by virtue of this section, in accordance with subsection (2)(a) of that section does not need to be confirmed in accordance with subsection (2)(b) of that section.</p></content></subsection></quotedStructure></mod></p></content></level></subsection><subsection eId="section-45-2"><num>(2)</num><content><p>The amendments made by this section do not apply in relation to an application or objection that is the subject of a resolution under section 239(2)(a) of the Local Government Act 1972 passed before this section comes into force.</p></content></subsection></section><section eId="section-46"><num>46</num><heading>Extension to Scotland of certain amendments</heading><intro><p>The amendments made to the Transport and Works Act 1992 by the following provisions are extended to Scotland—</p></intro><level class="para1" eId="section-46-a"><num>(a)</num><content><p>Schedule 3 to the Environmental Impact Assessment (Miscellaneous Amendments Relating to Harbours, Highways and Transport) Regulations 2017 (<ref eId="c00059" href="http://www.legislation.gov.uk/id/uksi/2017/1070">S.I. 2017/1070</ref>);</p></content></level><level class="para1" eId="section-46-b"><num>(b)</num><content><p>regulation 4(3) and (4) of the Merchant Shipping and Other Transport (Environmental Protection) (Amendment) (EU Exit) Regulations 2019 (<ref eId="c00060" href="http://www.legislation.gov.uk/id/uksi/2019/311">S.I. 2019/311</ref>).</p></content></level></section><section eId="section-47"><num>47</num><heading>Power to make consequential amendments</heading><subsection eId="section-47-1"><num>(1)</num><content><p>The Secretary of State may by regulations made by statutory instrument make provision that is consequential on sections <ref href="#section-36">36</ref> to <ref href="#section-46">46</ref>.</p></content></subsection><subsection eId="section-47-2"><num>(2)</num><intro><p>Regulations under this section may amend—</p></intro><level class="para1" eId="section-47-2-a"><num>(a)</num><content><p>an Act, or</p></content></level><level class="para1" eId="section-47-2-b"><num>(b)</num><content><p>an Act or Measure of Senedd Cymru,</p></content></level><wrapUp><p>passed before the end of the session of Parliament in which this Act is passed.</p></wrapUp></subsection><subsection eId="section-47-3"><num>(3)</num><content><p>Regulations under this section may include incidental, supplemental, transitional and saving provision.</p></content></subsection><subsection eId="section-47-4"><num>(4)</num><content><p>A statutory instrument containing (whether alone or with other provision) regulations made in reliance on subsection <ref href="#section-47-2">(2)</ref> may not be made unless a draft of the statutory instrument containing them has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection eId="section-47-5"><num>(5)</num><content><p>Any other statutory instrument containing regulations under this section is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-harbours"><heading>Harbours</heading><section eId="section-48"><num>48</num><heading>Fees for applications for harbour orders</heading><subsection eId="section-48-1"><num>(1)</num><content><p>Schedule 3 to the Harbours Act 1964 (procedure for making harbour revision orders and harbour empowerment orders) is amended as set out in subsections <ref href="#section-48-2">(2)</ref> to <ref href="#section-48-4">(4)</ref>.</p></content></subsection><subsection eId="section-48-2"><num>(2)</num><intro><p>In paragraph 7(1) (things to accompany applications)—</p></intro><level class="para1" eId="section-48-2-a"><num>(a)</num><content><p><mod>after paragraph (a) insert <quotedText>“and”</quotedText>;</mod></p></content></level><level class="para1" eId="section-48-2-b"><num>(b)</num><content><p>omit paragraph (c) and the preceding “and”.</p></content></level></subsection><subsection eId="section-48-3"><num>(3)</num><content><p>In paragraph 9 (duty not to consider application unless certain requirements met), omit sub-paragraph (a).</p></content></subsection><subsection eId="section-48-4"><num>(4)</num><content><p><mod>After paragraph 9 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="schedule" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="schedule" ukl:Format="double"><hcontainer name="crossheading" class="schGroup7"><heading>Fees</heading><paragraph eId="d25e9504" class="schProv1"><num>9A</num><subparagraph><num>(1)</num><content><p>The Secretary of State may, by regulations, provide for fees to be payable by applicants for harbour revision orders.</p></content></subparagraph><subparagraph><num>(2)</num><intro><p>Such regulations may—</p></intro><level class="para1" eId="d25e9520"><num>(a)</num><content><p>provide for the amount of a fee to be determined by a method laid down in the regulations;</p></content></level><level class="para1" eId="d25e9526"><num>(b)</num><content><p>empower or require the Secretary of State not to take steps in relation to an application if a fee is not paid on time;</p></content></level><level class="para1"><num>(c)</num><content><p>provide for the payment of a deposit on account of a fee that will or may become payable (in which case paragraphs <ref href="#d25e9520">(a)</ref> and <ref href="#d25e9526">(b)</ref> apply to the deposit as they apply to the fee);</p></content></level><level class="para1"><num>(d)</num><content><p>make incidental or supplemental provision;</p></content></level><level class="para1"><num>(e)</num><content><p>make different provision for different purposes.</p></content></level></subparagraph></paragraph></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-48-5"><num>(5)</num><content><p><mod>In section 54 of the Harbours Act 1964 (orders and regulations), after subsection (6) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(7)</num><intro><p>As to the power to make regulations under paragraph <ref href="#d25e9504">9A</ref> of Schedule 3 (fees for applications)—</p></intro><level class="para1"><num>(a)</num><intro><p>where the power is exercised by the Secretary of State—</p></intro><level class="para2"><num>(i)</num><content><p>the regulations are to be made by statutory instrument, and</p></content></level><level class="para2"><num>(ii)</num><content><p>a statutory instrument containing such regulations is subject to annulment in pursuance of a resolution of either House of Parliament;</p></content></level></level><level class="para1"><num>(b)</num><intro><p>where the power is exercised by the Welsh Ministers (see section 17(2C))—</p></intro><level class="para2"><num>(i)</num><content><p>the regulations are to be made by statutory instrument, and</p></content></level><level class="para2"><num>(ii)</num><content><p>a statutory instrument containing such regulations is subject to annulment in pursuance of a resolution of Senedd Cymru;</p></content></level></level><level class="para1"><num>(c)</num><content><p>where the power is exercised by the Scottish Ministers (see section 17(2C)), the regulations are subject to the negative procedure (see section 28 of the Interpretation and Legislative Reform (Scotland) Act 2010).</p></content></level></subsection></quotedStructure></mod></p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock" eId="part-1-chapter-3-crossheading-electric-vehicle-charge-points-etc"><heading>Electric vehicle charge points etc</heading><section eId="section-49"><num>49</num><heading>Installation of electric vehicle charge points</heading><subsection eId="section-49-1"><num>(1)</num><content><p><ref eId="c00061" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">Section 48</ref> of the <ref eId="c00062" href="https://www.legislation.gov.uk/ukpga/1991/22/contents">New Roads and Street Works Act 1991</ref> (streets, street works and undertakers) is amended as set out in <span>subsections (2) to (5)</span>.</p></content></subsection><subsection eId="section-49-2"><num>(2)</num><content><p><mod>After <ref eId="c00063" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">subsection (3)</ref>, insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e9650"><num>(3ZA)</num><intro><p>In this Part “street works” also includes works of any of the following kinds executed in a street in England in pursuance of a street works permit—</p></intro><level class="para1"><num>(a)</num><content><p>placing apparatus that is a public charge point, or</p></content></level><level class="para1"><num>(b)</num><content><p>inspecting, maintaining, adjusting, repairing, altering, renewing, changing the position of or removing apparatus that is a public charge point,</p></content></level><wrapUp><p>or works required for or incidental to any such works (including, in particular, breaking up or opening the street, or any sewer, drain or tunnel under it, or tunnelling or boring under the street).</p></wrapUp></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-49-3"><num>(3)</num><content><p><mod>In <ref eId="c00064" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">subsection (3A)</ref>, in the words before <ref eId="c00065" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">paragraph (a)</ref>, after “(3)” insert <quotedText>“or (3ZA)”</quotedText>.</mod></p></content></subsection><subsection eId="section-49-4"><num>(4)</num><intro><p>In <ref eId="c00066" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">subsection (4)</ref>—</p></intro><level class="para1" eId="section-49-4-a"><num>(a)</num><content><p><mod>for “in relation to street works” substitute <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>in relation to street works mentioned in subsection (3),</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-49-4-b"><num>(b)</num><content><p><mod>at the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(b)</num><content><p>in relation to street works described in subsection (3ZA), means the person who in accordance with the street works permit is permitted to carry out the works.</p></content></level></quotedStructure></mod></p></content></level></subsection><subsection eId="section-49-5"><num>(5)</num><intro><p>In <ref eId="c00067" href="https://www.legislation.gov.uk/ukpga/1991/22/section/48">subsection (5)</ref>—</p></intro><level class="para1" eId="section-49-5-a"><num>(a)</num><content><p><mod>from “are to” to “licence” substitute <quotedText startQuote="&#x201C;">(including public charge points) are to the person entitled, by virtue of—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>a statutory right,</p></content></level><level class="para1"><num>(b)</num><content><p>a street works licence, or</p></content></level><level class="para1"><num>(c)</num><content><p>where the apparatus is a public charge point installed in England in pursuance of a street works permit, the permit,</p></content></level></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-49-5-b"><num>(b)</num><content><p><mod>after (3) insert <quotedText>“or (3ZA)”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-49-6"><num>(6)</num><content><p><mod>In <ref eId="c00068" href="https://www.legislation.gov.uk/ukpga/1991/22/section/51">section 51</ref> of <ref eId="c00069" href="https://www.legislation.gov.uk/ukpga/1991/22/contents">that Act</ref> (prohibition of unauthorised street works), in <ref eId="c00070" href="https://www.legislation.gov.uk/ukpga/1991/22/section/51">subsection (3)</ref> for “works for” to the end substitute <quotedText startQuote="&#x201C;">—</quotedText><quotedStructure endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="default"><level class="para1"><num>(a)</num><content><p>works for road purposes,</p></content></level><level class="para1"><num>(b)</num><content><p>emergency works of any description, or</p></content></level><level class="para1"><num>(c)</num><content><p>street works as described in section 48(3ZA) (works relating to public charge points executed in a street in England in pursuance of a street works permit).</p></content></level></quotedStructure></mod></p></content></subsection><subsection eId="section-49-7"><num>(7)</num><intro><p>In <ref eId="c00071" href="https://www.legislation.gov.uk/ukpga/1991/22/section/105">section 105</ref><ref eId="c00072" href="https://www.legislation.gov.uk/ukpga/1991/22/section/105">(1)</ref> of <ref eId="c00073" href="https://www.legislation.gov.uk/ukpga/1991/22/contents">that Act</ref> (minor definitions)—</p></intro><level class="para1" eId="section-49-7-a"><num>(a)</num><content><p><mod>at the appropriate places insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="definition"><content><p>“<term refersTo="#term-public-charge-point">public charge point</term>” means a charge point within the meaning of <ref eId="c00074" href="https://www.legislation.gov.uk/ukpga/2018/18/part/2">Part 2</ref> of the <ref eId="c00075" href="https://www.legislation.gov.uk/ukpga/2018/18/contents">Automated and Electric Vehicles Act 2018</ref> that is provided for use by members of the general public;</p></content></hcontainer></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="definition"><content><p>“<term refersTo="#term-street-works-permit">street works permit</term>” means a permit granted pursuant to a permit scheme prepared under <ref eId="c00076" href="https://www.legislation.gov.uk/ukpga/2004/18/part/3">Part 3</ref> of the <ref eId="c00077" href="https://www.legislation.gov.uk/ukpga/2004/18/contents">Traffic Management Act 2004</ref>;</p></content></hcontainer></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-49-7-b"><num>(b)</num><content><p><mod>in the definition of “statutory right”, for the words from “a right exercisable” to the end substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><level class="para1"><num>(a)</num><content><p>a right exercisable by virtue of a street works licence, or</p></content></level><level class="para1"><num>(b)</num><content><p>a right, exercisable by virtue of a street works permit, to carry out street works described in section 48(3ZA).</p></content></level></quotedStructure></mod></p></content></level></subsection><subsection eId="section-49-8"><num>(8)</num><intro><p>In <ref eId="c00078" href="https://www.legislation.gov.uk/ukpga/1991/22/section/106">section 106</ref> of <ref eId="c00079" href="https://www.legislation.gov.uk/ukpga/1991/22/contents">that Act</ref> (index of defined expressions)—</p></intro><level class="para1" eId="section-49-8-a"><num>(a)</num><content><p><mod>at the appropriate places insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><tblock class="table" ukl:Orientation="portrait"><foreign><default:table xmlns="http://www.w3.org/1999/xhtml"><default:colgroup><default:col span="1" style="width:50%"/><default:col span="1" style="width:50%"/></default:colgroup><default:tbody><default:tr><default:td><p xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0">public charge point</p></default:td><default:td><p xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0">section 105(1)</p></default:td></default:tr></default:tbody></default:table></foreign></tblock></quotedStructure><inline name="appendText">;</inline></mod></p><p><mod><quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><tblock class="table" ukl:Orientation="portrait"><foreign><default:table xmlns="http://www.w3.org/1999/xhtml"><default:colgroup><default:col span="1" style="width:50%"/><default:col span="1" style="width:50%"/></default:colgroup><default:tbody><default:tr><default:td><p xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0">street works permit</p></default:td><default:td><p xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0">section 105(1)</p></default:td></default:tr></default:tbody></default:table></foreign></tblock></quotedStructure><inline name="appendText">.</inline></mod></p></content></level><level class="para1" eId="section-49-8-b"><num>(b)</num><content><p><mod>in the entry for “street works”, after “48(3)” insert <quotedText>“and (3ZA)”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-49-9"><num>(9)</num><intro><p>In <ref eId="c00080" href="https://www.legislation.gov.uk/ukpga/1980/66/section/115E">section 115E</ref> of the <ref eId="c00081" href="https://www.legislation.gov.uk/ukpga/1980/66/contents">Highways Act 1980</ref> (execution of works and use of objects etc. by persons other than councils)—</p></intro><level class="para1" eId="section-49-9-a"><num>(a)</num><content><p><mod>in <ref eId="c00082" href="https://www.legislation.gov.uk/ukpga/1980/66/section/115E">subsection (1)</ref>, for “(5)” substitute <quotedText>“(6)”</quotedText>;</mod></p></content></level><level class="para1" eId="section-49-9-b"><num>(b)</num><content><p><mod>after <ref eId="c00083" href="https://www.legislation.gov.uk/ukpga/1980/66/section/115E">subsection (5)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(6)</num><content><p>A council may not under this section grant a person permission to do anything relating to a public charge point in England which is capable of being authorised by a street works permit or a street works licence.</p></content></subsection><subsection><num>(7)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-public-charge-point">public charge point</term>” means a charge point within the meaning of <ref eId="c00084" href="https://www.legislation.gov.uk/ukpga/2018/18/part/2">Part 2</ref> of the <ref eId="c00085" href="https://www.legislation.gov.uk/ukpga/2018/18/contents">Automated and Electric Vehicles Act 2018</ref> that is provided for use by members of the general public;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-street-works-permit">street works permit</term>” means a permit granted pursuant to a permit scheme prepared under <ref eId="c00086" href="https://www.legislation.gov.uk/ukpga/2004/18/part/3">Part 3</ref> of the <ref eId="c00087" href="https://www.legislation.gov.uk/ukpga/2004/18/contents">Traffic Management Act 2004</ref>.</p></content></hcontainer></subsection></quotedStructure></mod></p></content></level></subsection></section><section eId="section-50"><num>50</num><heading>Accessibility of public charging or refuelling points</heading><content><p><mod>In section 10 of the Automated and Electric Vehicles Act 2018 (public charging or refuelling points: access, standards and connection) at the end insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(5)</num><intro><p>Regulations may impose requirements in connection with the accessibility of public charging or refuelling points in England, Wales and Scotland, such as requirements relating to—</p></intro><level class="para1"><num>(a)</num><content><p>the design of the point,</p></content></level><level class="para1"><num>(b)</num><content><p>the location, placement or surroundings of the point, and</p></content></level><level class="para1"><num>(c)</num><content><p>the provision of assistance in using the point.</p></content></level></subsection><subsection><num>(6)</num><content><p>Regulations under subsection (5) may prescribe requirements by reference to technical standards or specifications published by a person specified in the regulations (including standards or specifications as amended from time to time).</p></content></subsection><subsection><num>(7)</num><intro><p>Regulations under subsection (5) may impose requirements on any person, including—</p></intro><level class="para1"><num>(a)</num><content><p>persons making, supplying, importing, operating or installing public charging or refuelling points;</p></content></level><level class="para1"><num>(b)</num><content><p>the owners or occupiers of land on which public charging or refuelling points are situated.</p></content></level></subsection><subsection><num>(8)</num><content><p>Regulations under subsection (5) may not impose requirements on owners or occupiers of domestic premises.</p></content></subsection></quotedStructure></mod></p></content></section></hcontainer></chapter> — Electric vehicle charge points etc
Part 2 — Planning — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" eId="part-2-chapter-1"><num>Chapter 1</num><heading>Planning decisions</heading><section eId="section-51"><num>51</num><heading>Fees for planning applications etc</heading><subsection eId="section-51-1"><num>(1)</num><content><p><ref eId="c00088" href="https://www.legislation.gov.uk/ukpga/1990/8/section/303">Section 303</ref> of the <ref eId="c00089" href="https://www.legislation.gov.uk/ukpga/1990/8/contents">Town and Country Planning Act 1990</ref> (fees for planning applications etc) is amended as set out in <span><ref href="#section-51-2">subsections (2)</ref> to <ref href="#section-51-5">(5)</ref></span>.</p></content></subsection><subsection eId="section-51-2"><num>(2)</num><content><p><mod>After <ref eId="c00090" href="https://www.legislation.gov.uk/ukpga/1990/8/section/303">subsection (5)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e10119"><num>(5A)</num><content><p>Regulations made by the Secretary of State under subsection (1) or (2) may authorise or require a local planning authority in England to set the level of a fee or charge.</p></content></subsection><subsection eId="d25e10125"><num>(5B)</num><content><p>Regulations under subsection (1ZA) may authorise or require the Mayor of London or a specified person to set the level of a fee or charge.</p></content></subsection><subsection><num>(5C)</num><intro><p>Provision made in reliance on subsection <ref href="#d25e10119">(5A)</ref> or <ref href="#d25e10125">(5B)</ref> must include provision about—</p></intro><level class="para1"><num>(a)</num><content><p>consultation to be carried out in relation to the setting of the level of a fee or charge;</p></content></level><level class="para1"><num>(b)</num><content><p>the criteria to be applied when setting the level of a fee or charge;</p></content></level><level class="para1"><num>(c)</num><content><p>publication of information or reports;</p></content></level><level class="para1"><num>(d)</num><content><p>obligations to notify the Secretary of State;</p></content></level><level class="para1"><num>(e)</num><content><p>reviews of the level of a fee or charge.</p></content></level></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-51-3"><num>(3)</num><content><p><mod>After <ref eId="c00091" href="https://www.legislation.gov.uk/ukpga/1990/8/section/303">subsection (8A)</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(8B)</num><intro><p>Where—</p></intro><level class="para1"><num>(a)</num><content><p>a local planning authority in England, the Mayor of London or a specified person calculates the amount of a fee or charge in pursuance of regulations under subsection (1) or (1ZA), or</p></content></level><level class="para1"><num>(b)</num><content><p>a local planning authority in England, the Mayor of London or a specified person sets the level of a fee or charge in pursuance of regulations under subsection (1), (1ZA) or (2),</p></content></level><wrapUp><p>the fee or charge must be calculated or set with a view to ensuring that, so far as possible, it does not exceed the cost of carrying out the function in respect of which it is imposed.</p></wrapUp></subsection><subsection><num>(8C)</num><content><p>A local planning authority in England, the Mayor of London or a specified person must secure that their income from fees or charges paid in pursuance of regulations made under subsection (1), (1ZA) or (2) is applied towards the carrying out of functions that the authority, Mayor or person has that fall within <ref href="#d25e10212">subsection (8D)</ref>.</p></content></subsection><subsection eId="d25e10212"><num>(8D)</num><intro><p>The functions that fall within this subsection are—</p></intro><level class="para1"><num>(a)</num><intro><p>functions under—</p></intro><level class="para2"><num>(i)</num><content><p>Part 3,</p></content></level><level class="para2"><num>(ii)</num><content><p>in Part 7, section 191 or 192, or</p></content></level><level class="para2"><num>(iii)</num><content><p>Part 8;</p></content></level></level><level class="para1"><num>(b)</num><content><p>in the case of the Mayor of London, functions under section 2A and related functions under sections 2B to 2F;</p></content></level><level class="para1"><num>(c)</num><content><p>functions under Part 1 of the Planning (Listed Buildings and Conservation Areas) Act 1990;</p></content></level><level class="para1"><num>(d)</num><content><p>functions under section 17 of the Land Compensation Act 1961;</p></content></level><level class="para1"><num>(e)</num><content><p>functions specified for the purposes of this paragraph in regulations made by the Secretary of State,</p></content></level><wrapUp><p>other than functions in connection with applications made in legal proceedings.</p></wrapUp></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-51-4"><num>(4)</num><content><p><mod>In <ref eId="c00092" href="https://www.legislation.gov.uk/ukpga/1990/8/section/303">subsection (10)</ref>, after “planning authority” insert <quotedText>“in Wales”</quotedText>.</mod></p></content></subsection><subsection eId="section-51-5"><num>(5)</num><content><p>Omit <ref eId="c00093" href="https://www.legislation.gov.uk/ukpga/1990/8/section/303">subsection (10A)</ref>.</p></content></subsection><subsection eId="section-51-6"><num>(6)</num><content><p><mod>After <ref eId="c00094" href="https://www.legislation.gov.uk/ukpga/1990/8/section/303">section 303</ref> of the <ref eId="c00095" href="https://www.legislation.gov.uk/ukpga/1990/8/contents">Town and Country Planning Act 1990</ref> insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e10305"><num>303ZZA</num><heading>Directions in relation to fees set by English local planning authorities etc</heading><subsection><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1"><num>(a)</num><content><p>by virtue of section 303<ref href="#d25e10119">(5A)</ref> or <ref href="#d25e10125">(5B)</ref>, a local planning authority in England, the Mayor of London or a specified person (a “charging authority”) has set or is proposing to set its own fee or charge in respect of a matter, and</p></content></level><level class="para1"><num>(b)</num><content><p>the Secretary of State considers that the fee or charge is set or proposed to be set at a level that is not appropriate.</p></content></level></subsection><subsection eId="d25e10333"><num>(2)</num><content><p>The Secretary of State may direct the charging authority to review the level of the fee or charge.</p></content></subsection><subsection eId="d25e10339"><num>(3)</num><intro><p>A charging authority to which a direction is given under <ref href="#d25e10333">subsection (2)</ref> must—</p></intro><level class="para1"><num>(a)</num><content><p>review the fee or charge, and</p></content></level><level class="para1"><num>(b)</num><content><p>notify the Secretary of State of its decision as a result of the review, giving reasons.</p></content></level></subsection><subsection><num>(4)</num><intro><p>Subsection <ref href="#d25e10384">(5)</ref> applies where—</p></intro><level class="para1"><num>(a)</num><content><p>a charging authority fails to comply with <ref href="#d25e10339">subsection (3)</ref>, or</p></content></level><level class="para1"><num>(b)</num><content><p>a charging authority complies with that subsection but the Secretary of State considers that the fee or charge remains set at a level that is not appropriate.</p></content></level></subsection><subsection eId="d25e10384"><num>(5)</num><content><p>The Secretary of State may direct that the fee or charge is to be of such amount as may be specified in, or determined in accordance with, the direction.</p></content></subsection><subsection><num>(6)</num><intro><p>The Secretary of State may by regulations make provision—</p></intro><level class="para1"><num>(a)</num><content><p>about the time by which any requirement imposed by or under this section must be complied with;</p></content></level><level class="para1"><num>(b)</num><content><p>about the fee or charge that is to apply while a charging authority reviews a fee or charge following a direction under <ref href="#d25e10333">subsection (2)</ref>;</p></content></level><level class="para1"><num>(c)</num><content><p>about repayment of the whole or part of any fee or charge where the level of the fee or charge is reduced as a result of a direction under <ref href="#d25e10333">subsection (2)</ref> or <ref href="#d25e10384">(5)</ref>.</p></content></level></subsection><subsection><num>(7)</num><content><p>In this section “<term refersTo="#term-specified-person">specified person</term>” has the same meaning as in section 303.</p></content></subsection></section></quotedStructure></mod></p></content></subsection></section><section eId="section-52"><num>52</num><heading>Surcharge on planning fees</heading><content><p><mod>In the <ref eId="c00096" href="https://www.legislation.gov.uk/ukpga/1990/8/contents">Town and Country Planning Act 1990</ref>, after <ref href="#d25e10305">section 303ZZA</ref> (inserted by <ref href="#section-51">section 51</ref>) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section><num>303ZZB</num><heading>Surcharge on planning fees</heading><subsection eId="d25e10459"><num>(1)</num><intro><p>The Secretary of State may by regulations make provision for a surcharge to be imposed on a fee or charge paid—</p></intro><level class="para1"><num>(a)</num><content><p>to a local planning authority in England under section 303(1) or (2),</p></content></level><level class="para1"><num>(b)</num><content><p>to the Mayor of London or a specified person under section 303(1ZA), or</p></content></level><level class="para1"><num>(c)</num><content><p>to the Secretary of State under section 303(1A), (2), (3) or (4A).</p></content></level></subsection><subsection><num>(2)</num><intro><p>Where regulations under subsection (1) provide for a surcharge to be imposed on a fee or charge paid to a person other than the Secretary of State, that person must pay to the Secretary of State the amount they receive from any surcharges—</p></intro><level class="para1"><num>(a)</num><content><p>subject to such deductions, and</p></content></level><level class="para1"><num>(b)</num><content><p>at the times and in the manner,</p></content></level><wrapUp><p>as set out in regulations under <ref href="#d25e10459">subsection (1)</ref>.</p></wrapUp></subsection><subsection><num>(3)</num><intro><p>Regulations under <ref href="#d25e10459">subsection (1)</ref> may—</p></intro><level class="para1"><num>(a)</num><content><p>specify the level of the surcharge as a percentage of the level of a fee or charge;</p></content></level><level class="para1"><num>(b)</num><content><p>make different provision for different purposes, including setting different levels of surcharge for different fees, charges, cases or circumstances.</p></content></level></subsection><subsection><num>(4)</num><intro><p>Regulations under <ref href="#d25e10459">subsection (1)</ref> may provide that where the level of the fee or charge has been set by—</p></intro><level class="para1"><num>(a)</num><content><p>a local planning authority under section 303<ref href="#d25e10119">(5A)</ref>, or</p></content></level><level class="para1"><num>(b)</num><content><p>the Mayor of London or a specified person under section 303<ref href="#d25e10125">(5B)</ref>,</p></content></level><wrapUp><p>the surcharge may be set as a percentage of the fee or charge that would be payable had the level of the fee or charge not been so set.</p></wrapUp></subsection><subsection><num>(5)</num><content><p>The Secretary of State must list in regulations the persons whose relevant costs the surcharge is intended to cover (“listed persons”).</p></content></subsection><subsection><num>(6)</num><content><p>In setting the level of the surcharge, the Secretary of State must have regard to the relevant costs of the listed persons, and must secure that, taking one financial year with another, the income from the surcharge does not exceed the relevant costs of the listed persons.</p></content></subsection><subsection><num>(7)</num><intro><p>In subsections (5) and (6), “<term refersTo="#term-relevant-costs">relevant costs</term>” means the costs of providing advice, information or assistance (including the provision of a response to a consultation) in connection with—</p></intro><level class="para1"><num>(a)</num><content><p>applications,</p></content></level><level class="para1"><num>(b)</num><content><p>proposed applications, or</p></content></level><level class="para1"><num>(c)</num><content><p>proposals for a permission, approval or consent,</p></content></level><wrapUp><p>that are made under or for the purposes of the planning Acts and that relate to land in England.</p></wrapUp></subsection><subsection><num>(8)</num><content><p>Regulations under <ref href="#d25e10459">subsection (1)</ref> may set the surcharge at a level that exceeds the costs of listed persons of providing advice, information or assistance in connection with the application, proposed application or proposal in respect of which the surcharge is imposed.</p></content></subsection><subsection><num>(9)</num><content><p>Paragraphs (a) to (f) of section 303(5) apply to regulations under this section as they apply to regulations under <ref href="#d25e10459">subsection (1)</ref>, save that references to a fee or charge are to be read as references to the surcharge.</p></content></subsection><subsection><num>(10)</num><content><p>A statutory instrument containing regulations under this section may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection></section></quotedStructure></mod></p></content></section><section eId="section-53"><num>53</num><heading>Training for local planning authorities in England</heading><content><p><mod>In the <ref eId="c00097" href="https://www.legislation.gov.uk/ukpga/1990/8/contents">Town and Country Planning Act 1990</ref>, after section 319 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="crossheading" ukl:Name="Pblock"><heading>England: training in the exercise of certain planning functions</heading><section eId="d25e10641"><num>319ZZA</num><heading>Training: local planning authorities in England</heading><subsection eId="d25e10645"><num>(1)</num><content><p>The Secretary of State may by regulations make provision for and in connection with the training of members of local planning authorities in their exercise of such relevant planning functions as are prescribed.</p></content></subsection><subsection><num>(2)</num><content><p>Such regulations must provide for satisfactory completion of the training to be evidenced by a certificate valid for a prescribed period (a “certificate of completion”).</p></content></subsection><subsection eId="d25e10657"><num>(3)</num><intro><p>A member of a local planning authority who does not hold a valid certificate of completion is prohibited from—</p></intro><level class="para1"><num>(a)</num><content><p>exercising the prescribed relevant planning functions on behalf of a local planning authority, or</p></content></level><level class="para1"><num>(b)</num><content><p>being involved in exercising the prescribed relevant planning functions on behalf of a local planning authority as a member of a committee or any other body.</p></content></level></subsection><subsection><num>(4)</num><intro><p>Regulations under subsection <ref href="#d25e10645">(1)</ref> may, in particular—</p></intro><level class="para1"><num>(a)</num><intro><p>provide for accreditation by the Secretary of State of—</p></intro><level class="para2"><num>(i)</num><content><p>courses of training, and</p></content></level><level class="para2"><num>(ii)</num><content><p>persons providing such courses;</p></content></level></level><level class="para1"><num>(b)</num><content><p>impose requirements as to record-keeping, including by imposing such requirements on a training provider.</p></content></level></subsection><subsection><num>(5)</num><content><p>Regulations under <ref href="#d25e10645">subsection (1)</ref> must require a local planning authority to publish on their website which of their members hold valid certificates of completion.</p></content></subsection><subsection><num>(6)</num><content><p>The validity of anything done in the exercise of a prescribed relevant planning function is not affected by any breach of <ref href="#d25e10657">subsection (3)</ref>.</p></content></subsection><subsection><num>(7)</num><intro><p>In this section—</p></intro><level class="para1"><num>(a)</num><content><p>references to a local planning authority are to a local planning authority in England;</p></content></level><level class="para1"><num>(b)</num><content><p>references to a member of a local planning authority include a person who (though not a member of a local planning authority) is an appointed member of a committee or sub-committee of a local planning authority.</p></content></level></subsection><subsection><num>(8)</num><content><p>This section applies in relation to a relevant planning function conferred on a mineral planning authority as if references to a local planning authority were to a mineral planning authority in England.</p></content></subsection><subsection eId="d25e10750"><num>(9)</num><intro><p>In this section, “<term refersTo="#term-relevant-planning-function">relevant planning function</term>” means—</p></intro><level class="para1" eId="d25e10759"><num>(a)</num><intro><p>a function under—</p></intro><level class="para2"><num>(i)</num><content><p>Part 3;</p></content></level><level class="para2"><num>(ii)</num><content><p>in Part 7, sections 191(4) and 192(2);</p></content></level><level class="para2"><num>(iii)</num><content><p>Part 8;</p></content></level><level class="para2"><num>(iv)</num><content><p>in Part 10, section 257;</p></content></level></level><level class="para1"><num>(b)</num><content><p>a function under section 17 of the Land Compensation Act 1961;</p></content></level><level class="para1" eId="d25e10795"><num>(c)</num><content><p>a function under <ref eId="c00098" href="https://www.legislation.gov.uk/ukpga/1990/9/part/1">Part 1</ref> of the <ref eId="c00099" href="https://www.legislation.gov.uk/ukpga/1990/9/contents">Planning (Listed Buildings and Conservation Areas) Act 1990</ref>;</p></content></level><level class="para1"><num>(d)</num><content><p>a function of imposing or amending any condition, limitation or other restriction on a permission, approval or consent required by or under an enactment specified in paragraph <ref href="#d25e10759">(a)</ref> or <ref href="#d25e10795">(c)</ref>;</p></content></level><level class="para1"><num>(e)</num><intro><p>an enforcement function exercisable in relation to—</p></intro><level class="para2"><num>(i)</num><content><p>development carried out without a permission, approval or consent required by or under an enactment specified in paragraph <ref href="#d25e10759">(a)</ref> or <ref href="#d25e10795">(c)</ref>, or</p></content></level><level class="para2"><num>(ii)</num><content><p>a failure to comply with any condition, limitation or other restriction of any such permission, approval or consent.</p></content></level></level></subsection><subsection eId="d25e10843"><num>(10)</num><content><p>In <ref href="#d25e10750">subsection (9)</ref> any reference to a function under an enactment includes a function under an instrument made under the enactment.</p></content></subsection></section><section><num>319ZZB</num><heading>Training: certain mayoral planning functions</heading><subsection eId="d25e10859"><num>(1)</num><content><p>The Secretary of State may by regulations make provision for and in connection with the training of persons who may exercise relevant mayoral planning functions in their exercise of such relevant mayoral planning functions as are prescribed.</p></content></subsection><subsection><num>(2)</num><content><p>Such regulations must provide for satisfactory completion of the training to be evidenced by a certificate valid for a prescribed period (a “certificate of completion”).</p></content></subsection><subsection eId="d25e10871"><num>(3)</num><content><p>A mayor is prohibited from exercising the prescribed relevant mayoral planning functions without a valid certificate of completion.</p></content></subsection><subsection eId="d25e10877"><num>(4)</num><content><p>A person who is authorised (by or under any enactment or by arrangements made by a mayor) to exercise a prescribed relevant mayoral planning function on behalf of a mayor is prohibited from exercising such a function, or being involved in the exercise of such a function as a member of a committee or any other body, without a valid certificate of completion.</p></content></subsection><subsection><num>(5)</num><intro><p>Regulations under subsection <ref href="#d25e10859">(1)</ref> may, in particular—</p></intro><level class="para1"><num>(a)</num><intro><p>provide for accreditation by the Secretary of State of—</p></intro><level class="para2"><num>(i)</num><content><p>courses of training, and</p></content></level><level class="para2"><num>(ii)</num><content><p>persons providing such courses;</p></content></level></level><level class="para1"><num>(b)</num><content><p>impose requirements as to record-keeping, including by imposing such requirements on a training provider.</p></content></level></subsection><subsection><num>(6)</num><content><p>The validity of anything done in the exercise of a prescribed relevant mayoral planning function is not affected by any breach of subsection <ref href="#d25e10871">(3)</ref> or <ref href="#d25e10877">(4)</ref>.</p></content></subsection><subsection><num>(7)</num><intro><p>In subsections <ref href="#d25e10871">(3)</ref> and <ref href="#d25e10877">(4)</ref>, references to a mayor are to—</p></intro><level class="para1"><num>(a)</num><content><p>the Mayor of London,</p></content></level><level class="para1"><num>(b)</num><content><p>a mayor for the area of a combined authority, and</p></content></level><level class="para1"><num>(c)</num><content><p>a mayor for the area of a combined county authority.</p></content></level></subsection><subsection eId="d25e10958"><num>(8)</num><intro><p>In this section “<term refersTo="#term-relevant-mayoral-planning-function">relevant mayoral planning function</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>any of the functions of the Mayor of London specified in subsection <ref href="#d25e10985">(9)</ref>, and</p></content></level><level class="para1"><num>(b)</num><content><p>any functions of a mayor for the area of a combined authority or a mayor for the area of a combined county authority which correspond to the functions of the Mayor of London specified in subsection <ref href="#d25e10985">(9)</ref>.</p></content></level></subsection><subsection eId="d25e10985"><num>(9)</num><intro><p>The functions of the Mayor of London referred to in subsection <ref href="#d25e10958">(8)</ref> are as follows—</p></intro><level class="para1"><num>(a)</num><intro><p>the function of—</p></intro><level class="para2"><num>(i)</num><content><p>giving a direction under section 2A(1) or (1B);</p></content></level><level class="para2"><num>(ii)</num><content><p>giving a direction under section 74(1B)(a);</p></content></level></level><level class="para1"><num>(b)</num><content><p>the function of determining an application by virtue of section 2A or 2B, and related functions under sections 2C and 2F;</p></content></level><level class="para1"><num>(c)</num><content><p>a function under section 2E;</p></content></level><level class="para1"><num>(d)</num><content><p>the function of making a Mayoral development order under section 61DA;</p></content></level><level class="para1"><num>(e)</num><content><p>a function exercisable in connection with a Mayoral development order.</p></content></level></subsection><subsection><num>(10)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-combined-authority">combined authority</term>” means a combined authority established under section 103(1) of the Local Democracy, Economic Development and Construction Act 2009;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-combined-county-authority">combined county authority</term>” means a combined county authority established under section 9(1) of the Levelling-up and Regeneration Act 2023.</p></content></hcontainer></subsection></section></hcontainer></quotedStructure></mod></p></content></section><section eId="section-54"><num>54</num><heading>Delegation of planning decisions in England</heading><subsection eId="section-54-1"><num>(1)</num><content><p><mod>In the Town and Country Planning Act 1990, after <ref eId="c00100" href="https://www.legislation.gov.uk/ukpga/1990/8/section/319ZZB">section 319ZZB</ref> (inserted by section 53) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><hcontainer name="crossheading" ukl:Name="Pblock"><heading>England: discharge of functions of local planning authority</heading><section eId="d25e11083"><num>319ZZC</num><heading>Requirement for functions to be discharged by committee, sub-committee or officer</heading><subsection><num>(1)</num><intro><p>The Secretary of State may by regulations require a relevant local planning authority to make arrangements under section 101 of the 1972 Act for such relevant planning functions as are prescribed—</p></intro><level class="para1"><num>(a)</num><content><p>to be discharged by a committee, sub-committee or officer of the authority;</p></content></level><level class="para1"><num>(b)</num><content><p>to be discharged by a committee, sub-committee or officer of the authority in prescribed circumstances.</p></content></level></subsection><subsection><num>(2)</num><intro><p>The regulations may —</p></intro><level class="para1"><num>(a)</num><content><p>prescribe the terms of the arrangements (which may include exceptions) and any permitted variations in those terms;</p></content></level><level class="para1"><num>(b)</num><content><p>provide for the arrangements to confer a discretion on any person in connection with the delegation of a function.</p></content></level></subsection><subsection><num>(3)</num><content><p>Where arrangements required by the regulations are in force in relation to a relevant planning function, the function may only be exercised in accordance with the arrangements (and section 101(4) of the 1972 Act does not apply).</p></content></subsection></section><section eId="d25e11132"><num>319ZZD</num><heading>Size and composition of committee discharging functions</heading><subsection><num>(1)</num><content><p>The Secretary of State may by regulations prescribe requirements relating to the size and composition of a committee or sub-committee by which such relevant planning functions as are prescribed are to be discharged.</p></content></subsection><subsection><num>(2)</num><content><p>A relevant local planning authority may not arrange for a relevant planning function to be discharged by a committee or sub-committee of the authority which fails to satisfy a requirement imposed by regulations under this section in relation to the discharge of that function.</p></content></subsection><subsection><num>(3)</num><content><p>If a committee or sub-committee discharging a relevant planning function fails to satisfy such a requirement, paragraph 43 of Schedule 12 to the 1972 Act (validity of proceedings) does not apply in relation to the failure.</p></content></subsection></section><section eId="d25e11157"><num>319ZZE</num><heading>Sections 319ZZC and 319ZZD: supplementary</heading><subsection><num>(1)</num><content><p>Sections 101 and 102 of the 1972 Act have effect subject to sections 319ZZC and 319ZZD and any regulations made under them.</p></content></subsection><subsection><num>(2)</num><intro><p>Where arrangements are in force under section 101(5) of the 1972 Act for two or more relevant local planning authorities to discharge any of their relevant planning functions jointly, sections 319ZZC and 319ZZD apply in relation to those functions as if—</p></intro><level class="para1"><num>(a)</num><content><p>references to a committee or sub-committee of a relevant local planning authority were references to a joint committee or sub-committee of those authorities;</p></content></level><level class="para1"><num>(b)</num><content><p>references to an officer of a relevant local planning authority were references to an officer of any of those authorities.</p></content></level></subsection><subsection><num>(3)</num><intro><p>Regulations under sections 319ZZC and 319ZZD may—</p></intro><level class="para1"><num>(a)</num><content><p>make different provision for different relevant local planning authorities;</p></content></level><level class="para1"><num>(b)</num><content><p>make different provision for cases where two or more such authorities have made arrangements under section 101(1)(b) or (5) of the 1972 Act for the discharge of any of their relevant planning functions.</p></content></level></subsection><subsection eId="d25e11203"><num>(4)</num><content><p>In operating arrangements required by regulations under section 319ZZC, relevant local planning authorities must have regard to any relevant guidance issued by the Secretary of State.</p></content></subsection><subsection eId="d25e11209"><num>(5)</num><content><p>In making arrangements for the discharge of a function prescribed in regulations under section 319ZZD, relevant local planning authorities must have regard to any relevant guidance issued by the Secretary of State.</p></content></subsection><subsection><num>(6)</num><intro><p>The Secretary of State must consult such persons as the Secretary of State considers appropriate before—</p></intro><level class="para1"><num>(a)</num><content><p>making regulations under section 319ZZC or 319ZZD, or</p></content></level><level class="para1"><num>(b)</num><content><p>issuing guidance under subsection (4) or (5).</p></content></level></subsection><subsection><num>(7)</num><content><p>Sections 319ZZC and 319ZZD and this section apply in relation to a relevant planning function conferred on a relevant mineral planning authority as if references to a relevant local planning authority were to a relevant mineral planning authority.</p></content></subsection></section><section><num>319ZZF</num><heading>Interpretation of sections 319ZZC to 319ZZE</heading><subsection><num>(1)</num><intro><p>In sections 319ZZC to section 319ZZE, “<term refersTo="#term-relevant-local-planning-authority">relevant local planning authority</term>” means a local planning authority in England which is an authority to which sections 101 and 102 of the 1972 Act apply, except that it does not include—</p></intro><level class="para1"><num>(a)</num><content><p>a National Park authority, or</p></content></level><level class="para1"><num>(b)</num><content><p>the Broads Authority.</p></content></level></subsection><subsection><num>(2)</num><content><p>In section 319ZZE, “<term refersTo="#term-relevant-mineral-planning-authority">relevant mineral planning authority</term>” means a mineral planning authority in England which is an authority to which sections 101 and 102 of the 1972 Act apply, except that it does not include a National Park authority.</p></content></subsection><subsection><num>(3)</num><content><p>In sections 319ZZC to 319ZZE, “<term refersTo="#term-relevant-planning-function">relevant planning function</term>” has the same meaning as in section 319ZZA (see subsections (9) and (10) of that section).</p></content></subsection><subsection><num>(4)</num><content><p>In sections 319ZZC to 319ZZE and this section, “<term refersTo="#term-the-1972-act">the 1972 Act</term>” means the <ref eId="c00101" href="https://www.legislation.gov.uk/ukpga/1972/70/contents">Local Government Act 1972</ref>.</p></content></subsection></section></hcontainer></quotedStructure></mod></p></content></subsection><subsection eId="section-54-2"><num>(2)</num><content><p><mod>In <ref eId="c00102" href="https://www.legislation.gov.uk/ukpga/1990/8/section/316">section 316</ref> of the <ref eId="c00103" href="https://www.legislation.gov.uk/ukpga/1990/8/contents">Town and Country Planning Act 1990</ref> (land of interested planning authorities and development by them), in <ref eId="c00104" href="https://www.legislation.gov.uk/ukpga/1990/8/section/316">subsection (3)</ref>, in the words after paragraph (b), after “under” insert <quotedText>“sections 319ZZC to 319ZZE or”</quotedText>.</mod></p></content></subsection><subsection eId="section-54-3"><num>(3)</num><content><p><mod>In section 333 of the Town and Country Planning Act 1990 (regulations and orders), after subsection (3ZAA), insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(3ZAB)</num><content><p>The first regulations under section 319ZZC or 319ZZD may not be made unless a draft of the instrument containing the regulations has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection></quotedStructure></mod></p></content></subsection></section><section eId="section-55"><num>55</num><heading>Directions giving deemed planning permission: special regard to heritage assets</heading><subsection eId="section-55-1"><num>(1)</num><content><p><mod>In section 90 of the Town and Country Planning Act 1990 (directions deeming planning permission to be granted for certain development with government authorisation), after subsection (2A) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e11344"><num>(2B)</num><content><p>Section 66(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 (special regard to listed buildings) applies to a government department or the Secretary of State in considering whether to make a direction under this section as it applies to the Secretary of State in considering whether to grant planning permission.</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-55-2"><num>(2)</num><intro><p>In section 90(2B) of that Act (inserted by subsection (1))—</p></intro><level class="para1" eId="section-55-2-a"><num>(a)</num><content><p><mod>for “applies”, in the first place it appears, substitute <quotedText>“and section 58B of this Act (special regard to other heritage assets) apply”</quotedText>;</mod></p></content></level><level class="para1" eId="section-55-2-b"><num>(b)</num><content><p><mod>for “it applies” substitute <quotedText>“they apply”</quotedText>.</mod></p></content></level></subsection></section><section eId="section-56"><num>56</num><heading>Planning permission etc: extension of time in event of legal challenge</heading><subsection eId="section-56-1"><num>(1)</num><content><p>The Town and Country Planning Act 1990 is amended as set out in subsections <ref href="#section-56-2">(2)</ref> and <ref href="#section-56-3">(3)</ref>.</p></content></subsection><subsection eId="section-56-2"><num>(2)</num><content><p><mod>In section 91 (general condition limiting duration of planning permission), for subsections (3A) and (3B) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(3A)</num><intro><p>In subsections <ref href="#d25e11428">(3B)</ref> to <ref href="#d25e11440">(3BB)</ref>—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-implementation-period">implementation period</term>” means the period before the end of which a development to which a planning permission relates must be begun (see subsections (1) and (3));</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-relevant-proceedings">relevant proceedings</term>” means proceedings to challenge the validity, in respect of the development of land in England, of a grant of planning permission or of a deemed grant of planning permission.</p></content></hcontainer></subsection><subsection eId="d25e11428"><num>(3B)</num><content><p>If a person is given permission by a court to bring relevant proceedings, the implementation period is extended by one year.</p></content></subsection><subsection eId="d25e11434"><num>(3BA)</num><content><p>If a party to relevant proceedings is given permission to appeal to the Court of Appeal against a decision determining the challenge, the implementation period is extended by one year.</p></content></subsection><subsection eId="d25e11440"><num>(3BB)</num><content><p>If a party to relevant proceedings is given permission to appeal to the Supreme Court against a decision determining the challenge, the implementation period is extended by two years.</p></content></subsection><subsection><num>(3BC)</num><content><p>Any extension of a period under subsection <ref href="#d25e11428">(3B)</ref>, <ref href="#d25e11434">(3BA)</ref> or <ref href="#d25e11440">(3BB)</ref> is to run concurrently with any other extension of the period under the same subsection (so far as they overlap).</p></content></subsection><subsection><num>(3BD)</num><content><p>Any extension of a period under subsection <ref href="#d25e11434">(3BA)</ref> is to run consecutively to the previous extension of the period under subsection <ref href="#d25e11428">(3B)</ref> (if they would otherwise overlap).</p></content></subsection><subsection><num>(3BE)</num><content><p>Any extension of a period under subsection <ref href="#d25e11440">(3BB)</ref> is to run consecutively to the previous extension of the period under subsection <ref href="#d25e11428">(3B)</ref> and any previous extension of the period under subsection <ref href="#d25e11434">(3BA)</ref> (if they would otherwise overlap).</p></content></subsection><subsection><num>(3BF)</num><content><p>The references in subsections (3BA) and <ref href="#d25e11440">(3BB)</ref> to determining a challenge are to determining it after a full hearing (and accordingly do not include a refusal of permission or leave).</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-56-3"><num>(3)</num><content><p><mod>After section 92 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section><num>92A</num><heading>Extension of outline planning permission etc in event of legal challenge</heading><subsection><num>(1)</num><intro><p>This section applies where a person is given permission by a court to bring proceedings challenging the validity, in respect of the development of land in England, of—</p></intro><level class="para1"><num>(a)</num><content><p>a grant (or deemed grant) of outline planning permission, or</p></content></level><level class="para1"><num>(b)</num><content><p>the approval of reserved matters under such a permission.</p></content></level></subsection><subsection eId="d25e11529"><num>(2)</num><content><p>Any reserved matters application period or implementation period that is running when the court gives permission to bring the proceedings is extended by one year.</p></content></subsection><subsection eId="d25e11535"><num>(3)</num><content><p>If a party to the proceedings is given permission to appeal to the Court of Appeal against a decision determining the challenge, any reserved matters application period or implementation period that is running at that time is extended by one year.</p></content></subsection><subsection eId="d25e11541"><num>(4)</num><content><p>If a party to the proceedings is given permission to appeal to the Supreme Court against a decision determining the challenge, any reserved matters application period or implementation period that is running at that time is extended by two years.</p></content></subsection><subsection><num>(5)</num><content><p>Any extension of a period under subsection <ref href="#d25e11529">(2)</ref>, <ref href="#d25e11535">(3)</ref> or <ref href="#d25e11541">(4)</ref> is to run concurrently with any other extension of the period under the same subsection (so far as they overlap).</p></content></subsection><subsection><num>(6)</num><content><p>Any extension of a period under subsection <ref href="#d25e11535">(3)</ref> is to run consecutively to the previous extension of the period under subsection <ref href="#d25e11529">(2)</ref> (if they would otherwise overlap).</p></content></subsection><subsection><num>(7)</num><content><p>Any extension of a period under subsection <ref href="#d25e11541">(4)</ref> is to run consecutively to the previous extension of the period under subsection <ref href="#d25e11529">(2)</ref> and any previous extension of the period under subsection <ref href="#d25e11535">(3)</ref> (if they would otherwise overlap).</p></content></subsection><subsection><num>(8)</num><content><p>For the purposes of subsections <ref href="#d25e11529">(2)</ref> to <ref href="#d25e11541">(4)</ref>, an implementation period that is determined by reference to an approval of a reserved matter starts to run when the reserved matters application is made (and the reserved matters application period ceases to run at that point).</p></content></subsection><subsection><num>(9)</num><content><p>Subsection <ref href="#d25e11610">(10)</ref> applies if a reserved matters application is made without taking advantage of an extension under this section.</p></content></subsection><subsection eId="d25e11610"><num>(10)</num><content><p>Any implementation period determined by reference to the approval sought by the reserved matters application is extended by the number of days by which the reserved matters application period is extended under this section.</p></content></subsection><subsection><num>(11)</num><content><p>Subsection <ref href="#d25e11626">(12)</ref> applies if a reserved matters application period is extended (or further extended) under this section and the reserved matters application is made taking advantage of the extension but before the end of the period as extended.</p></content></subsection><subsection eId="d25e11626"><num>(12)</num><content><p>Any implementation period determined by reference to the approval sought by the reserved matters application is extended by the number of whole days remaining in the reserved matters application period (as extended) when the reserved matters application is made.</p></content></subsection><subsection><num>(13)</num><intro><p>In this section—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-implementation-period">implementation period</term>”, in relation to a grant of outline planning permission, means the period before the end of which development to which the permission relates must be begun (see section 92(2)(b), (4) and (5));</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-outline-planning-permission">outline planning permission</term>” has the same meaning as in section 92;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-reserved-matters-application">reserved matters application</term>” means an application for the approval of a reserved matter in pursuance of section 92;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-reserved-matters-application-period">reserved matters application period</term>”, in relation to a grant of outline planning permission, means the period before the end of which a reserved matters application relating to the permission is required to be made (see section 92(2)(a), (4) and (5)).</p></content></hcontainer></subsection><subsection><num>(14)</num><content><p>In this section, references to determining a challenge are to determining it after a full hearing (and accordingly do not include a refusal of permission or leave).</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-56-4"><num>(4)</num><content><p><mod>In the Planning (Listed Buildings and Conservation Areas) Act 1990, in section 18 (limit of duration of listed buildings consent), for subsections (2A) and (2B) substitute—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection><num>(2A)</num><intro><p>In subsections (2A) to (2BB)—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-implementation-period">implementation period</term>” means the period before the end of which works to which a listed building consent relates are required to be begun in pursuance of subsection (1) or (2);</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-relevant-proceedings">relevant proceedings</term>” means proceedings to challenge the validity of a grant of listed building consent or of a deemed grant of listed building consent.</p></content></hcontainer></subsection><subsection eId="d25e11701"><num>(2B)</num><content><p>If a person is given permission by a court to bring relevant proceedings, the implementation period is extended by one year.</p></content></subsection><subsection eId="d25e11707"><num>(2BA)</num><content><p>If a party to relevant proceedings is given permission to appeal to the Court of Appeal against a decision determining the challenge, the implementation period is extended by one year.</p></content></subsection><subsection eId="d25e11713"><num>(2BB)</num><content><p>If a party to relevant proceedings is given permission to appeal to the Supreme Court against a decision determining the challenge, the implementation period is extended by two years.</p></content></subsection><subsection><num>(2BC)</num><content><p>Any extension of a period under subsection <ref href="#d25e11701">(2B)</ref>, <ref href="#d25e11707">(2BA)</ref> or <ref href="#d25e11713">(2BB)</ref> is to run concurrently with any other extension of the period under the same subsection (so far as they overlap).</p></content></subsection><subsection><num>(2BD)</num><content><p>Any extension of a period under subsection <ref href="#d25e11707">(2BA)</ref> is to run consecutively to the previous extension of the period under subsection <ref href="#d25e11701">(2B)</ref> (if they would otherwise overlap).</p></content></subsection><subsection><num>(2BE)</num><content><p>Any extension of a period under subsection <ref href="#d25e11713">(2BB)</ref> is to run consecutively to the previous extension of the period under subsection <ref href="#d25e11701">(2B)</ref> and any previous extension of the period under subsection <ref href="#d25e11707">(2BA)</ref> (if they would otherwise overlap).</p></content></subsection><subsection><num>(2BF)</num><content><p>The references in subsections <ref href="#d25e11707">(2BA)</ref> and <ref href="#d25e11713">(2BB)</ref> to determining a challenge are to determining it after a full hearing (and accordingly do not include a refusal of permission or leave).</p></content></subsection></quotedStructure></mod></p></content></subsection><subsection eId="section-56-5"><num>(5)</num><content><p>The amendments made by subsections <ref href="#section-56-2">(2)</ref> and <ref href="#section-56-4">(4)</ref> do not operate to extend any implementation period that has already expired.</p></content></subsection><subsection eId="section-56-6"><num>(6)</num><intro><p>In relation to proceedings begun before the day on which subsection <ref href="#section-56-2">(2)</ref> comes into force (“<term refersTo="#term-the-commencement-date" eId="term-the-commencement-date">the commencement date</term>”)—</p></intro><level class="para1" eId="section-56-6-a"><num>(a)</num><content><p>any extension of time under section 91(3B) of the Town and Country Planning Act 1990 that had already arisen before the commencement date as a result of those proceedings is unaffected;</p></content></level><level class="para1" eId="section-56-6-b"><num>(b)</num><content><p>subsections <ref href="#d25e11428">(3B)</ref> to <ref href="#d25e11440">(3BB)</ref> of section 91 of that Act (as inserted by subsection <ref href="#section-56-2">(2)</ref>) apply so far as any event in the proceedings giving rise to an extension of time under those subsections occurs on or after the commencement date, but not otherwise.</p></content></level></subsection><subsection eId="section-56-7"><num>(7)</num><content><p>In relation to proceedings begun before the day on which subsection <ref href="#section-56-3">(3)</ref> comes into force, section 92A of the Town and Country Planning Act 1990 (inserted by subsection <ref href="#section-56-3">(3)</ref>) applies so far as any event in the proceedings giving rise to an extension of time under that section occurs on or after that day, but not otherwise.</p></content></subsection><subsection eId="section-56-8"><num>(8)</num><intro><p>In relation to proceedings begun before the day on which subsection <ref href="#section-56-4">(4)</ref> comes into force (“<term refersTo="#term-the-commencement-date" eId="term-the-commencement-date">the commencement date</term>”)—</p></intro><level class="para1" eId="section-56-8-a"><num>(a)</num><content><p>any extension of time under section 18(2B) of the Planning (Listed Buildings and Conservation Areas) Act 1990 that had already arisen before the commencement date as a result of those proceedings is unaffected;</p></content></level><level class="para1" eId="section-56-8-b"><num>(b)</num><content><p>subsections <ref href="#d25e11701">(2B)</ref> to <ref href="#d25e11713">(2BB)</ref> of section 18 of that Act (as inserted by subsection <ref href="#section-56-4">(4)</ref>) apply so far as any event in the proceedings giving rise to an extension of time under those subsections occurs on or after the commencement date, but not otherwise.</p></content></level></subsection></section><section eId="section-57"><num>57</num><heading>Provision of advice by Natural England to public authorities</heading><subsection eId="section-57-1"><num>(1)</num><content><p>The Natural Environment and Rural Communities Act 2006 is amended as set out in <ref href="#section-57-2">subsections (2)</ref> and <ref href="#section-57-3">(3)</ref>.</p></content></subsection><subsection eId="section-57-2"><num>(2)</num><intro><p>In section 4 (advice)—</p></intro><level class="para1" eId="section-57-2-a"><num>(a)</num><content><p><mod>after subsection (1) insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><subsection eId="d25e11897"><num>(1A)</num><content><p>Natural England is not required by subsection (1) to give advice in response to a request to which <ref href="#d25e11906">subsection (1B)</ref> applies that is made by a public authority other than a Minister of the Crown.</p></content></subsection><subsection eId="d25e11906"><num>(1B)</num><intro><p>This subsection applies to a request for advice relating to—</p></intro><level class="para1"><num>(a)</num><content><p>a specific development that requires, but has not been granted, planning permission under section 57 of the Town and Country Planning Act 1990 (“<term refersTo="#term-the-1990-act">the 1990 Act</term>”),</p></content></level><level class="para1"><num>(b)</num><content><p>an application for any consent, agreement or approval required by a condition imposed on a grant of planning permission required under that section,</p></content></level><level class="para1"><num>(c)</num><content><p>permission in principle for a specific development under section 58A of the 1990 Act, and</p></content></level><level class="para1"><num>(d)</num><content><p>the approval of a reserved matter within the meaning of section 92 of the 1990 Act.</p></content></level></subsection><subsection eId="d25e11939"><num>(1C)</num><content><p>Natural England may give advice in response to a request to which it is not required to respond as a result of <ref href="#d25e11897">subsection (1A)</ref>.</p></content></subsection></quotedStructure><inline name="appendText">;</inline></mod></p></content></level><level class="para1" eId="section-57-2-b"><num>(b)</num><content><p><mod>in subsection (2), after “(1)” insert <quotedText>“or <ref href="#d25e11939">(1C)</ref>”</quotedText>.</mod></p></content></level></subsection><subsection eId="section-57-3"><num>(3)</num><content><p><mod>After section 4 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><section eId="d25e11972"><num>4A</num><heading>Supplementary provision</heading><subsection><num>(1)</num><content><p>Natural England must prepare and publish a statement setting out how it intends to deal with requests for advice which it is not required to give as a result of section 4<ref href="#d25e11897">(1A)</ref>.</p></content></subsection><subsection><num>(2)</num><intro><p>Natural England must review the statement before the end of—</p></intro><level class="para1"><num>(a)</num><content><p>the period of five years beginning with the day on which it is first published, and</p></content></level><level class="para1"><num>(b)</num><content><p>each successive period of five years.</p></content></level></subsection><subsection><num>(3)</num><content><p>Natural England may review the statement more than once during any of those periods.</p></content></subsection><subsection><num>(4)</num><content><p>Natural England may revise the statement following a review.</p></content></subsection><subsection><num>(5)</num><content><p>Natural England must publish any revised statement.</p></content></subsection><subsection eId="d25e12021"><num>(6)</num><intro><p>Before publishing a statement (including a revised statement) under this section, Natural England must—</p></intro><level class="para1"><num>(a)</num><content><p>consult the Secretary of State, and</p></content></level><level class="para1" eId="d25e12033"><num>(b)</num><content><p>make any changes to the statement that the Secretary of State may require in response.</p></content></level></subsection><subsection><num>(7)</num><content><p>But the duty in <ref href="#d25e12021">subsection (6)</ref> does not apply in relation to the publication of a revised statement which, in the opinion of Natural England, contains no substantial revisions.</p></content></subsection><subsection><num>(8)</num><content><p>The Secretary of State may require a change as mentioned in <ref href="#d25e12021">subsection (6)</ref><ref href="#d25e12033">(b)</ref> only if the Secretary of State considers that the change would promote Natural England’s general purpose.</p></content></subsection></section></quotedStructure></mod></p></content></subsection><subsection eId="section-57-4"><num>(4)</num><content><p>The duties imposed by <ref href="#d25e11972">section 4A</ref><ref href="#d25e12021">(6)</ref> of the Natural Environment and Rural Communities Act 2006, as inserted by <ref href="#section-57-3">subsection (3)</ref>, may be satisfied by consultation carried out, and changes made, before this section comes into force.</p></content></subsection></section></chapter>
Part 2 — Planning — <chapter xmlns="http://docs.oasis-open.org/legaldocml/ns/akn/3.0" xmlns:uk="https://www.legislation.gov.uk/namespaces/UK-AKN" xmlns:ukl="http://www.legislation.gov.uk/namespaces/legislation" eId="part-2-chapter-2"><num>Chapter 2</num><heading>Spatial development strategies</heading><section eId="section-58"><num>58</num><heading>Spatial development strategies</heading><subsection eId="section-58-1"><num>(1)</num><content><p><mod>Before section 13 of the Planning and Compulsory Purchase Act 2004 insert—<quotedStructure startQuote="&#x201C;" endQuote="&#x201D;" uk:context="body" uk:docName="ukpga" ukl:TargetClass="primary" ukl:TargetSubClass="unknown" ukl:Context="main" ukl:Format="double"><part><num>Part 1A</num><heading>Strategic plan-making</heading><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Strategic planning authorities and strategic planning boards</heading><section eId="d25e12106"><num>12A</num><heading>Spatial development strategy to be produced by strategic planning authorities</heading><subsection><num>(1)</num><content><p>This Part requires strategic planning authorities to prepare a document, conforming to section <ref href="#d25e12513">12D</ref>, known as a “spatial development strategy”.</p></content></subsection><subsection eId="d25e12119"><num>(2)</num><intro><p>In this Part “<term refersTo="#term-strategic-planning-authority">strategic planning authority</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a strategic planning board (see section <ref href="#d25e12263">12B</ref>);</p></content></level><level class="para1" eId="d25e12137"><num>(b)</num><content><p>a combined authority;</p></content></level><level class="para1"><num>(c)</num><content><p>a combined county authority;</p></content></level><level class="para1"><num>(d)</num><content><p>an upper-tier county council for an area no part of which forms part of the area of a combined authority or a combined county authority;</p></content></level><level class="para1" eId="d25e12155"><num>(e)</num><intro><p>a unitary authority for an area—</p></intro><level class="para2"><num>(i)</num><content><p>that is in England, and</p></content></level><level class="para2"><num>(ii)</num><content><p>no part of which forms part of the area of a combined authority or a combined county authority.</p></content></level></level></subsection><subsection><num>(3)</num><content><p>But a principal authority that is a constituent authority of a strategic planning board is not a strategic planning authority for the purposes of this Part.</p></content></subsection><subsection eId="d25e12179"><num>(4)</num><intro><p>In this Part “<term refersTo="#term-strategy-area">strategy area</term>”, in relation to a spatial development strategy, means—</p></intro><level class="para1"><num>(a)</num><content><p>in the case of a strategic planning board, the area consisting of the areas of the constituent authorities of the board;</p></content></level><level class="para1"><num>(b)</num><content><p>in the case of a combined authority, the area of the combined authority;</p></content></level><level class="para1"><num>(c)</num><content><p>in the case of a combined county authority, the area of the combined county authority;</p></content></level><level class="para1"><num>(d)</num><content><p>in the case of an upper-tier county council, the area of the upper-tier county council;</p></content></level><level class="para1"><num>(e)</num><content><p>in the case of a unitary authority, the area of the unitary authority.</p></content></level></subsection><subsection><num>(5)</num><intro><p>Any function of a strategic planning authority exercisable by or under this Part by a principal authority is not a function to which either of the following provisions of the Local Government Act 1972 applies—</p></intro><level class="para1"><num>(a)</num><content><p>section 101(1)(b);</p></content></level><level class="para1"><num>(b)</num><content><p>section 101(5).</p></content></level></subsection><subsection><num>(6)</num><content><p>For provision about the spatial development strategy for London, see (in particular) sections 334 to 343 of the Greater London Authority Act 1999.</p></content></subsection><subsection eId="d25e12242"><num>(7)</num><content><p>In this Part “<term refersTo="#term-principal-authority">principal authority</term>” means a body specified in any of paragraphs <ref href="#d25e12137">(b)</ref> to <ref href="#d25e12155">(e)</ref> of subsection <ref href="#d25e12119">(2)</ref>.</p></content></subsection></section><section eId="d25e12263"><num>12B</num><heading>Strategic planning boards</heading><subsection eId="d25e12267"><num>(1)</num><content><p>This section applies where the Secretary of State considers that it is desirable for a spatial development strategy to relate to an area consisting of the areas of two or more principal authorities.</p></content></subsection><subsection eId="d25e12273"><num>(2)</num><content><p>Subject to subsection <ref href="#d25e12288">(4)</ref>, the Secretary of State may by regulations establish a joint committee of the authorities to exercise functions under this Part in relation to an area consisting of the areas of those authorities (the “constituent authorities”).</p></content></subsection><subsection><num>(3)</num><content><p>Such a committee is to be known as a “strategic planning board”.</p></content></subsection><subsection eId="d25e12288"><num>(4)</num><intro><p>The Secretary of State may make regulations under subsection <ref href="#d25e12273">(2)</ref> establishing a strategic planning board only after consulting the following on a draft of the proposed regulations—</p></intro><level class="para1"><num>(a)</num><content><p>the principal authorities that are to be the constituent authorities of the board,</p></content></level><level class="para1"><num>(b)</num><content><p>any local planning authority for an area that is wholly or partly within, or adjoins, the area of any of those authorities, and</p></content></level><level class="para1" eId="d25e12309"><num>(c)</num><content><p>the person responsible for preparing a spatial development strategy for an area that adjoins the area of any of those authorities.</p></content></level></subsection><subsection><num>(5)</num><content><p>Where the Secretary of State is considering whether to, or has decided to, establish a strategic planning board, the Secretary of State may direct the principal authorities that are to be the constituent authorities of the board not to take any step, or any further step, or not to take a step specified in the direction, in connection with the preparation of their own spatial development strategies.</p></content></subsection></section><section eId="d25e12324"><num>12C</num><heading>Regulations about strategic planning boards</heading><subsection><num>(1)</num><intro><p>Strategic planning board regulations that establish a strategic planning board must specify—</p></intro><level class="para1"><num>(a)</num><content><p>the constituent authorities of the board, and</p></content></level><level class="para1"><num>(b)</num><content><p>the area in relation to which the board exercises functions under this Part.</p></content></level></subsection><subsection eId="d25e12346"><num>(2)</num><intro><p>Strategic planning board regulations may make provision about—</p></intro><level class="para1"><num>(a)</num><content><p>the composition of a strategic planning board (including about the appointment of members to the board or any sub-committee of the board);</p></content></level><level class="para1"><num>(b)</num><content><p>the proceedings of a strategic planning board and of any sub-committee of the board (including provision about voting rights);</p></content></level><level class="para1" eId="d25e12364"><num>(c)</num><content><p>such other matters as the Secretary of State considers are necessary or expedient to facilitate the exercise by a strategic planning board of its functions under this Part.</p></content></level></subsection><subsection eId="d25e12370"><num>(3)</num><intro><p>Provision of the kind mentioned in subsection <ref href="#d25e12346">(2)</ref><ref href="#d25e12364">(c)</ref> may include provision—</p></intro><level class="para1"><num>(a)</num><content><p>corresponding to provisions relating to joint committees in Part 6 of the Local Government Act 1972;</p></content></level><level class="para1" eId="d25e12387"><num>(b)</num><content><p>applying (with or without modifications) such enactments relating to local authorities as the Secretary of State considers appropriate;</p></content></level><level class="para1"><num>(c)</num><content><p>requiring the making by a constituent authority of payments towards the costs of the strategic planning board;</p></content></level><level class="para1"><num>(d)</num><content><p>modifying the application of this Part in relation to a strategic planning board.</p></content></level></subsection><subsection><num>(4)</num><intro><p>For the purposes of subsection <ref href="#d25e12370">(3)</ref><ref href="#d25e12387">(b)</ref> a local authority is any of the following—</p></intro><level class="para1"><num>(a)</num><content><p>a county council;</p></content></level><level class="para1"><num>(b)</num><content><p>a district council;</p></content></level><level class="para1"><num>(c)</num><content><p>a London borough council.</p></content></level></subsection><subsection><num>(5)</num><content><p>If strategic planning board regulations establishing a strategic planning board are annulled in pursuance of a resolution of either House of Parliament, the strategic planning board is dissolved with effect from the date of the resolution.</p></content></subsection><subsection eId="d25e12440"><num>(6)</num><intro><p>The Secretary of State’s power to make strategic planning board regulations that amend or revoke other strategic planning board regulations—</p></intro><level class="para1"><num>(a)</num><content><p>is exercisable whether or not the constituent authorities of the strategic planning board in question request an amendment or revocation;</p></content></level><level class="para1" eId="d25e12452"><num>(b)</num><intro><p>is exercisable only after the Secretary of State has consulted the following on a draft of the proposed regulations—</p></intro><level class="para2"><num>(i)</num><content><p>the strategic planning board in question,</p></content></level><level class="para2"><num>(ii)</num><content><p>the constituent authorities of that board,</p></content></level><level class="para2"><num>(iii)</num><content><p>any local planning authority for an area that is wholly or partly within, or adjoins, the area of any of those authorities, and</p></content></level><level class="para2" eId="d25e12476"><num>(iv)</num><content><p>the person responsible for preparing a spatial development strategy for an area that adjoins the area of any of those authorities.</p></content></level></level></subsection><subsection><num>(7)</num><content><p>The condition in section <ref href="#d25e12263">12B</ref><ref href="#d25e12267">(1)</ref> does not apply in relation to strategic planning board regulations that amend or revoke other strategic planning board regulations.</p></content></subsection><subsection><num>(8)</num><content><p>In this section “<term refersTo="#term-strategic-planning-board-regulations">strategic planning board regulations</term>” means regulations under section <ref href="#d25e12263">12B</ref><ref href="#d25e12273">(2)</ref>.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Contents of spatial development strategy</heading><section eId="d25e12513"><num>12D</num><heading>Contents of spatial development strategy</heading><subsection eId="d25e12517"><num>(1)</num><content><p>A spatial development strategy must include a statement of the strategic planning authority’s policies (however expressed), in relation to the development and use of land in the strategy area, which are of strategic importance to that area.</p></content></subsection><subsection><num>(2)</num><content><p>A spatial development strategy must include a reasoned justification for the policies referred to in subsection <ref href="#d25e12517">(1)</ref>.</p></content></subsection><subsection><num>(3)</num><content><p>A spatial development strategy must specify the period for which it is to have effect.</p></content></subsection><subsection eId="d25e12538"><num>(4)</num><intro><p>A spatial development strategy may specify or describe infrastructure the provision of which the strategic planning authority considers to be of strategic importance to the strategy area for the purposes of—</p></intro><level class="para1"><num>(a)</num><content><p>supporting or facilitating development in that area,</p></content></level><level class="para1"><num>(b)</num><content><p>mitigating, or adapting to, climate change, or</p></content></level><level class="para1"><num>(c)</num><content><p>promoting or improving the economic, social or environmental well-being of that area.</p></content></level></subsection><subsection eId="d25e12562"><num>(5)</num><intro><p>A spatial development strategy may specify or describe—</p></intro><level class="para1"><num>(a)</num><content><p>an amount or distribution of housing (of any kind), the provision of which the strategic planning authority considers to be of strategic importance to the strategy area;</p></content></level><level class="para1"><num>(b)</num><content><p>an amount or distribution of affordable housing or any other kind of housing, the provision of which the strategic planning authority considers to be of strategic importance to the strategy area.</p></content></level></subsection><subsection><num>(6)</num><content><p>For the purposes of subsections <ref href="#d25e12517">(1)</ref>, <ref href="#d25e12538">(4)</ref> and <ref href="#d25e12562">(5)</ref>, a matter may be of strategic importance to a strategy area even if it affects only part of that area.</p></content></subsection><subsection><num>(7)</num><content><p>The Secretary of State may prescribe further matters a spatial development strategy may, or must, deal with.</p></content></subsection><subsection><num>(8)</num><content><p>A spatial development strategy must contain such diagrams, illustrations or other descriptive or explanatory matter relating to its contents as may be prescribed.</p></content></subsection><subsection><num>(9)</num><content><p>A spatial development strategy may make different provision for different cases or for different parts of the strategy area.</p></content></subsection><subsection><num>(10)</num><content><p>A spatial development strategy must be designed to secure that the use and development of land in the strategy area contribute to the mitigation of, and adaptation to, climate change.</p></content></subsection><subsection><num>(11)</num><intro><p>A spatial development strategy must take account of any local nature recovery strategy, under section 104 of the Environment Act 2021, that relates to any part of the strategy area, including in particular—</p></intro><level class="para1"><num>(a)</num><intro><p>the areas identified in the strategy as areas which—</p></intro><level class="para2"><num>(i)</num><content><p>are, or could become, of particular importance for biodiversity, or</p></content></level><level class="para2"><num>(ii)</num><content><p>are areas where the recovery or enhancement of biodiversity could make a particular contribution to other environmental benefits,</p></content></level></level><level class="para1"><num>(b)</num><content><p>the priorities set out in the strategy for recovering or enhancing biodiversity, and</p></content></level><level class="para1"><num>(c)</num><content><p>the proposals set out in the strategy as to potential measures relating to those priorities.</p></content></level></subsection><subsection><num>(12)</num><intro><p>A spatial development strategy must not—</p></intro><level class="para1"><num>(a)</num><content><p>include anything that is not permitted or required by or under the preceding provisions of this section,</p></content></level><level class="para1"><num>(b)</num><content><p>specify particular sites where development should take place, or</p></content></level><level class="para1"><num>(c)</num><content><p>be inconsistent with or (in substance) repeat any national development management policy.</p></content></level></subsection><subsection><num>(13)</num><intro><p>The Secretary of State may prescribe—</p></intro><level class="para1"><num>(a)</num><content><p>the form of a spatial development strategy;</p></content></level><level class="para1"><num>(b)</num><content><p>documents that must accompany a spatial development strategy.</p></content></level></subsection><subsection><num>(14)</num><intro><p>In subsection <ref href="#d25e12562">(5)</ref> “<term refersTo="#term-affordable-housing">affordable housing</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>social housing within the meaning of Part 2 of the Housing and Regeneration Act 2008, and</p></content></level><level class="para1"><num>(b)</num><content><p>any other description of housing that may be prescribed.</p></content></level></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Spatial development strategy timetable</heading><section eId="d25e12728"><num>12E</num><heading>Timetable for preparing spatial development strategy</heading><subsection><num>(1)</num><content><p>A strategic planning authority must prepare and maintain a document relating to its spatial development strategy, known as a “spatial development strategy timetable”.</p></content></subsection><subsection><num>(2)</num><intro><p>A spatial development strategy timetable must specify—</p></intro><level class="para1"><num>(a)</num><content><p>the strategy area, and</p></content></level><level class="para1"><num>(b)</num><content><p>a timetable for the preparation of the strategy that is consistent with this Part and any regulations made under it.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The Secretary of State may prescribe—</p></intro><level class="para1"><num>(a)</num><content><p>the form and content of a spatial development strategy timetable;</p></content></level><level class="para1"><num>(b)</num><content><p>further matters the timetable must deal with.</p></content></level></subsection></section><section><num>12F</num><heading>Spatial development strategy timetable: further provision</heading><subsection eId="d25e12781"><num>(1)</num><content><p>A strategic planning authority must submit its draft spatial development strategy timetable to the Secretary of State within such period as may be prescribed.</p></content></subsection><subsection eId="d25e12787"><num>(2)</num><content><p>The Secretary of State may direct the strategic planning authority to make specified amendments to the draft timetable.</p></content></subsection><subsection><num>(3)</num><content><p>If the Secretary of State has not given such a direction to the strategic planning authority within the period of four weeks beginning with the date when the timetable was sent to the Secretary of State, the strategic planning authority may bring the timetable into effect.</p></content></subsection><subsection eId="d25e12799"><num>(4)</num><intro><p>A strategic planning authority to which a direction under subsection <ref href="#d25e12787">(2)</ref> is given—</p></intro><level class="para1" eId="d25e12808"><num>(a)</num><content><p>must submit a revised draft spatial development strategy timetable to the Secretary of State within the period specified in the direction, and</p></content></level><level class="para1"><num>(b)</num><content><p>may bring the timetable into effect only when the Secretary of State approves the timetable as revised in accordance with that direction or any further direction under subsection <ref href="#d25e12787">(2)</ref>.</p></content></level></subsection><subsection eId="d25e12823"><num>(5)</num><intro><p>If a strategic planning authority—</p></intro><level class="para1"><num>(a)</num><content><p>does not comply with subsection <ref href="#d25e12781">(1)</ref>, or</p></content></level><level class="para1"><num>(b)</num><content><p>does not comply with subsection <ref href="#d25e12799">(4)</ref><ref href="#d25e12808">(a)</ref>,</p></content></level><wrapUp><p>the Secretary of State may prepare a spatial development strategy timetable and direct the strategic planning authority to bring it into effect.</p></wrapUp></subsection><subsection><num>(6)</num><content><p>A direction under subsection <ref href="#d25e12787">(2)</ref> or <ref href="#d25e12823">(5)</ref> must contain the Secretary of State’s reasons for giving it.</p></content></subsection><subsection><num>(7)</num><content><p>To bring a spatial development strategy timetable into effect, a strategic planning authority must publish it, together with a statement that the timetable has effect.</p></content></subsection><subsection><num>(8)</num><content><p>A strategic planning authority must comply with a spatial development strategy timetable that has effect.</p></content></subsection><subsection eId="d25e12875"><num>(9)</num><content><p>The Secretary of State may by regulations make provision as to when, or the circumstances in which, a strategic planning authority must revise a spatial development strategy timetable that has effect.</p></content></subsection><subsection><num>(10)</num><intro><p>Regulations under subsection <ref href="#d25e12875">(9)</ref>—</p></intro><level class="para1"><num>(a)</num><content><p>may provide that revisions of a spatial development strategy timetable must be approved by the Secretary of State;</p></content></level><level class="para1"><num>(b)</num><content><p>may confer a power to direct that a timetable is to be revised or that revisions require the approval of the Secretary of State.</p></content></level></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Preparation and adoption of spatial development strategy</heading><section eId="d25e12908"><num>12G</num><heading>Preparation of draft spatial development strategy</heading><subsection><num>(1)</num><content><p>A strategic planning authority must prepare a draft of its spatial development strategy.</p></content></subsection><subsection eId="d25e12918"><num>(2)</num><intro><p>In doing so, a strategic planning authority must have regard to—</p></intro><level class="para1" eId="d25e12924"><num>(a)</num><content><p>any strategy, plan or policy published by the strategic planning authority that the strategic planning authority considers to be relevant,</p></content></level><level class="para1"><num>(b)</num><intro><p>the effect which the proposed spatial development strategy would have on each of the following—</p></intro><level class="para2"><num>(i)</num><content><p>the health of persons in the strategy area;</p></content></level><level class="para2"><num>(ii)</num><content><p>health inequalities between persons living in the strategy area;</p></content></level><level class="para2"><num>(iii)</num><content><p>the achievement of sustainable development;</p></content></level></level><level class="para1"><num>(c)</num><content><p>the need to ensure that the strategy is consistent with current national policies;</p></content></level><level class="para1"><num>(d)</num><content><p>any other prescribed matters.</p></content></level></subsection><subsection><num>(3)</num><content><p>In subsection <ref href="#d25e12918">(2)</ref><ref href="#d25e12924">(a)</ref>, the reference to any strategy, plan or policy published by a strategic planning authority includes a reference to any strategy, plan or policy published by a constituent authority of a strategic planning board.</p></content></subsection></section><section eId="d25e12980"><num>12H</num><heading>Consultation and representations</heading><subsection eId="d25e12984"><num>(1)</num><intro><p>A strategic planning authority that has prepared a draft spatial development strategy must—</p></intro><level class="para1" eId="d25e12990"><num>(a)</num><content><p>publish the draft strategy on the authority’s website,</p></content></level><level class="para1" eId="d25e12996"><num>(b)</num><content><p>notify the persons specified in subsection <ref href="#d25e13011">(2)</ref> that the draft strategy has been published on the authority’s website, and</p></content></level><level class="para1" eId="d25e13005"><num>(c)</num><content><p>make copies of the draft strategy available for inspection at the authority’s principal office and at any other place that the authority considers appropriate.</p></content></level></subsection><subsection eId="d25e13011"><num>(2)</num><intro><p>The persons referred to in subsection <ref href="#d25e12984">(1)</ref><ref href="#d25e12996">(b)</ref> are—</p></intro><level class="para1"><num>(a)</num><content><p>the Secretary of State,</p></content></level><level class="para1"><num>(b)</num><content><p>any county council for an area that is within, or any part of which is within, the strategy area,</p></content></level><level class="para1"><num>(c)</num><content><p>any district council for an area that is within the strategy area,</p></content></level><level class="para1"><num>(d)</num><content><p>any county council or district council for an area that adjoins the strategy area and is affected by the strategy,</p></content></level><level class="para1"><num>(e)</num><content><p>any local planning authority for an area that is wholly or partly within, or adjoins, the strategy area and is affected by the strategy,</p></content></level><level class="para1" eId="d25e13052"><num>(f)</num><content><p>the person responsible for preparing a spatial development strategy for an area that adjoins the strategy area and is affected by the strategy,</p></content></level><level class="para1"><num>(g)</num><content><p>such other persons as may be prescribed, and</p></content></level><level class="para1" eId="d25e13064"><num>(h)</num><content><p>such other persons as the strategic planning authority considers appropriate.</p></content></level></subsection><subsection><num>(3)</num><intro><p>In exercising its discretion under subsection <ref href="#d25e13011">(2)</ref><ref href="#d25e13064">(h)</ref> the strategic planning authority must consider notifying (at least) the following about the publication of the draft spatial development strategy—</p></intro><level class="para1"><num>(a)</num><content><p>voluntary bodies some or all of whose activities benefit the whole or part of the strategy area,</p></content></level><level class="para1"><num>(b)</num><content><p>bodies which represent the interests of different racial, ethnic or national groups in the strategy area,</p></content></level><level class="para1"><num>(c)</num><content><p>bodies which represent the interests of different religious groups in the strategy area, and</p></content></level><level class="para1"><num>(d)</num><content><p>bodies which represent the interests of different persons carrying on business in the strategy area.</p></content></level></subsection><subsection eId="d25e13105"><num>(4)</num><intro><p>Where a strategic planning authority—</p></intro><level class="para1"><num>(a)</num><content><p>publishes a draft spatial development strategy as required by subsection <ref href="#d25e12984">(1)</ref><ref href="#d25e12990">(a)</ref>, or</p></content></level><level class="para1"><num>(b)</num><content><p>makes such a strategy available for inspection as required by subsection <ref href="#d25e12984">(1)</ref><ref href="#d25e13005">(c)</ref>,</p></content></level><wrapUp><p>the authority must also publish or make available a statement inviting representations to be made to the authority about the strategy.</p></wrapUp></subsection><subsection eId="d25e13135"><num>(5)</num><content><p>A notification of a person under subsection <ref href="#d25e12984">(1)</ref><ref href="#d25e12996">(b)</ref> about a draft spatial development strategy must include an invitation to the person to make representations to the strategic planning authority about the strategy.</p></content></subsection><subsection><num>(6)</num><content><p>An invitation to a person under subsection <ref href="#d25e13105">(4)</ref> or <ref href="#d25e13135">(5)</ref> must explain the effect of regulations under subsection <ref href="#d25e13161">(7)</ref>.</p></content></subsection><subsection eId="d25e13161"><num>(7)</num><intro><p>Representations must be made—</p></intro><level class="para1"><num>(a)</num><content><p>in the prescribed form and manner;</p></content></level><level class="para1"><num>(b)</num><content><p>within the prescribed period.</p></content></level></subsection><subsection><num>(8)</num><intro><p>In subsection <ref href="#d25e12984">(1)</ref>—</p></intro><level class="para1"><num>(a)</num><content><p>references to a strategic planning authority’s website include references to the website of a constituent authority of a strategic planning board;</p></content></level><level class="para1"><num>(b)</num><content><p>the reference to a strategic planning authority’s principal office includes a reference to the principal office of a constituent authority of a strategic planning board.</p></content></level></subsection></section><section eId="d25e13203"><num>12I</num><heading>Public examination</heading><subsection eId="d25e13207"><num>(1)</num><content><p>A strategic planning authority that has prepared a draft spatial development strategy must, unless the Secretary of State otherwise directs, make arrangements for an examination of the draft strategy to be held in public.</p></content></subsection><subsection eId="d25e13213"><num>(2)</num><content><p>Such an examination is to be conducted by a person appointed by the Secretary of State (the “examiner”).</p></content></subsection><subsection><num>(3)</num><content><p>The matters examined at an examination are to be such matters affecting the consideration of the spatial development strategy as the examiner considers appropriate.</p></content></subsection><subsection><num>(4)</num><intro><p>The following may take part in an examination—</p></intro><level class="para1"><num>(a)</num><content><p>the strategic planning authority that prepared the strategy, and</p></content></level><level class="para1"><num>(b)</num><content><p>any person invited to do so by the examiner.</p></content></level></subsection><subsection><num>(5)</num><content><p>No person is to have a right to be heard at an examination.</p></content></subsection><subsection><num>(6)</num><content><p>On conclusion of the examination, the examiner must make a report to the strategic planning authority that prepared the strategy.</p></content></subsection><subsection><num>(7)</num><content><p>The report may recommend that specified modifications are made to the draft strategy before it is adopted.</p></content></subsection><subsection eId="d25e13261"><num>(8)</num><content><p>The report may recommend that the draft strategy is withdrawn.</p></content></subsection><subsection eId="d25e13267"><num>(9)</num><content><p>The strategic planning authority must publish the report.</p></content></subsection></section><section eId="d25e13276"><num>12J</num><heading>Withdrawal before adoption</heading><subsection><num>(1)</num><content><p>A strategic planning authority may withdraw its draft spatial development strategy at any time before arrangements are made for its examination.</p></content></subsection><subsection><num>(2)</num><content><p>Subsection <ref href="#d25e13295">(3)</ref> applies at any time after arrangements have been made for examination of a draft spatial development strategy (but before it is adopted).</p></content></subsection><subsection eId="d25e13295"><num>(3)</num><intro><p>The strategic planning authority that prepared the draft strategy may withdraw it only if—</p></intro><level class="para1"><num>(a)</num><content><p>the Secretary of State so directs, or</p></content></level><level class="para1"><num>(b)</num><content><p>the examiner recommends that it is withdrawn, and the Secretary of State has not directed that it is not to be withdrawn.</p></content></level></subsection><subsection><num>(4)</num><intro><p>The steps taken by a strategic planning authority to withdraw a draft strategy must include—</p></intro><level class="para1"><num>(a)</num><content><p>deleting the strategy from the website on which it was published;</p></content></level><level class="para1"><num>(b)</num><content><p>removing copies of the strategy that were made available for inspection;</p></content></level><level class="para1"><num>(c)</num><intro><p>notifying the following that the strategy has been withdrawn—</p></intro><level class="para2"><num>(i)</num><content><p>each person to whom a notification under section <ref href="#d25e12980">12H</ref><ref href="#d25e12984">(1)</ref><ref href="#d25e12996">(b)</ref> was required to be given;</p></content></level><level class="para2"><num>(ii)</num><content><p>any person, not within sub-paragraph (i), who made representations in accordance with regulations under section <ref href="#d25e12980">12H</ref><ref href="#d25e13161">(7)</ref>.</p></content></level></level></subsection></section><section eId="d25e13364"><num>12K</num><heading>Submission to Secretary of State before adoption</heading><subsection><num>(1)</num><intro><p>This section applies where—</p></intro><level class="para1"><num>(a)</num><content><p>a draft spatial development strategy has been published under section <ref href="#d25e12980">12H</ref>,</p></content></level><level class="para1"><num>(b)</num><content><p>the prescribed period for the making of representations (see section <ref href="#d25e12980">12H</ref><ref href="#d25e13161">(7)</ref>) has elapsed,</p></content></level><level class="para1"><num>(c)</num><intro><p>either—</p></intro><level class="para2"><num>(i)</num><content><p>the strategic planning authority that prepared the draft strategy has published the examiner’s report on it (see section <ref href="#d25e13203">12I</ref><ref href="#d25e13267">(9)</ref>), or</p></content></level><level class="para2"><num>(ii)</num><content><p>no examination of the draft strategy is needed because of a direction under section <ref href="#d25e13203">12I</ref><ref href="#d25e13207">(1)</ref>, and</p></content></level></level><level class="para1"><num>(d)</num><content><p>the draft strategy has not been withdrawn (see section <ref href="#d25e13276">12J</ref>).</p></content></level></subsection><subsection><num>(2)</num><intro><p>The strategic planning authority must—</p></intro><level class="para1"><num>(a)</num><content><p>consider any representations received in accordance with regulations under section <ref href="#d25e12980">12H</ref><ref href="#d25e13161">(7)</ref> and decide whether to make any modifications as a result,</p></content></level><level class="para1"><num>(b)</num><content><p>if an examination was held, consider the examiner’s report and decide whether to make any modifications that the examiner recommends, and</p></content></level><level class="para1"><num>(c)</num><intro><p>consider whether to make any other modifications to take account of—</p></intro><level class="para2"><num>(i)</num><content><p>any national development management policies so far as material, or</p></content></level><level class="para2"><num>(ii)</num><content><p>any other material considerations.</p></content></level></level></subsection><subsection><num>(3)</num><content><p>After such consideration and (if considered appropriate) modification, the strategic planning authority must submit the draft spatial development strategy to the Secretary of State, stating that the authority intends to adopt it.</p></content></subsection><subsection><num>(4)</num><intro><p>The strategic planning authority must inform the Secretary of State of—</p></intro><level class="para1"><num>(a)</num><content><p>any modifications made to the published draft strategy, and the reasons for making them;</p></content></level><level class="para1"><num>(b)</num><content><p>any modifications to the published draft strategy that the examiner recommended but which the authority has not made, and the reasons for not making them.</p></content></level></subsection><subsection eId="d25e13496"><num>(5)</num><intro><p>If the Secretary of State considers that a submitted spatial development strategy is—</p></intro><level class="para1"><num>(a)</num><content><p>inconsistent with current national policies, or</p></content></level><level class="para1"><num>(b)</num><content><p>detrimental to the interests of an area outside the strategy area,</p></content></level><wrapUp><p>the Secretary of State may, within the relevant period, direct the strategic planning authority to make specified modifications of the strategy in order to deal with the inconsistency or detriment.</p></wrapUp></subsection><subsection eId="d25e13516"><num>(6)</num><intro><p>In this section “<term refersTo="#term-the-relevant-period">the relevant period</term>”, in relation to a spatial development strategy, means—</p></intro><level class="para1" eId="d25e13525"><num>(a)</num><content><p>the period of six weeks beginning with the date when the strategy was submitted to the Secretary of State, or</p></content></level><level class="para1"><num>(b)</num><content><p>such longer period as is specified by the Secretary of State in a direction given within the period specified in paragraph <ref href="#d25e13525">(a)</ref> to the authority that submitted the strategy.</p></content></level></subsection></section><section eId="d25e13543"><num>12L</num><heading>Adoption of spatial development strategy</heading><subsection eId="d25e13547"><num>(1)</num><content><p>A spatial development strategy must not be adopted by a strategic planning authority unless it is in the form submitted to the Secretary of State under section <ref href="#d25e13364">12K</ref>, subject to any modifications directed to be made under subsection <ref href="#d25e13496">(5)</ref> of that section.</p></content></subsection><subsection eId="d25e13559"><num>(2)</num><intro><p>A spatial development strategy must not be adopted by a strategic planning authority unless—</p></intro><level class="para1"><num>(a)</num><content><p>the relevant period (as defined in section <ref href="#d25e13364">12K</ref><ref href="#d25e13516">(6)</ref>) has elapsed,</p></content></level><level class="para1"><num>(b)</num><content><p>the authority has complied with any requirement of regulations under this Part for steps to be taken, or a period to elapse, before a strategy may be adopted, and</p></content></level><level class="para1"><num>(c)</num><content><p>if a direction was given to the authority under section <ref href="#d25e13364">12K</ref><ref href="#d25e13496">(5)</ref>, the Secretary of State confirms that the Secretary of State is content with the modified strategy.</p></content></level></subsection><subsection eId="d25e13593"><num>(3)</num><content><p>A strategic planning authority must hold a vote on a resolution to adopt its spatial development strategy as soon as reasonably practicable after the conditions in subsection <ref href="#d25e13559">(2)</ref> are satisfied.</p></content></subsection><subsection><num>(4)</num><intro><p>Subsection <ref href="#d25e13623">(5)</ref> applies in relation to the adoption of a spatial development strategy by—</p></intro><level class="para1"><num>(a)</num><content><p>a mayoral combined authority, or</p></content></level><level class="para1"><num>(b)</num><content><p>a mayoral combined county authority.</p></content></level></subsection><subsection eId="d25e13623"><num>(5)</num><content><p>In the event of a tied vote on whether to pass a resolution to adopt the strategy, the mayor of the authority has a casting vote (in addition to any other vote the mayor may have).</p></content></subsection><subsection><num>(6)</num><content><p>A strategic planning authority that has adopted a spatial development strategy must publish the strategy together with a statement that it has been adopted.</p></content></subsection><subsection><num>(7)</num><content><p>A spatial development strategy becomes operative when it is published.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Review, alteration and replacement of spatial development strategy</heading><section eId="d25e13647"><num>12M</num><heading>Review and monitoring</heading><subsection><num>(1)</num><content><p>This section applies in relation to an operative spatial development strategy.</p></content></subsection><subsection eId="d25e13657"><num>(2)</num><content><p>A strategic planning authority must keep under review the matters which may be expected to affect the development of the strategy area or the planning of its development or which are otherwise relevant to the content of the strategy.</p></content></subsection><subsection eId="d25e13663"><num>(3)</num><intro><p>In exercising functions under subsection <ref href="#d25e13657">(2)</ref>, a strategic planning authority must—</p></intro><level class="para1"><num>(a)</num><content><p>if the authority identifies matters to be kept under review that relate to the area of a local planning authority that is outside the strategy area, consult that local planning authority about those matters;</p></content></level><level class="para1" eId="d25e13678"><num>(b)</num><content><p>if the authority identifies matters to be kept under review that relate to the area of a person responsible for preparing a spatial development strategy that is outside the strategy area, consult that person about those matters.</p></content></level></subsection><subsection><num>(4)</num><content><p>A strategic planning authority must carry out a review of its spatial development strategy from time to time.</p></content></subsection><subsection><num>(5)</num><content><p>The Secretary of State may direct a strategic planning authority to review all or specified parts of its spatial development strategy.</p></content></subsection><subsection><num>(6)</num><intro><p>A strategic planning authority must—</p></intro><level class="para1"><num>(a)</num><content><p>monitor the implementation of its spatial development strategy, and</p></content></level><level class="para1"><num>(b)</num><content><p>monitor, and collect information about, matters relevant to the preparation, review, alteration, replacement or implementation of the strategy.</p></content></level></subsection><subsection><num>(7)</num><intro><p>The Secretary of State may make regulations imposing either or both of the following duties on each strategic planning authority that has an operative spatial development strategy—</p></intro><level class="para1"><num>(a)</num><content><p>a duty to make prescribed information relating to the implementation of the authority’s strategy available to the public in such form and manner as may be prescribed;</p></content></level><level class="para1"><num>(b)</num><content><p>a duty to provide prescribed information relating to the implementation of the authority’s strategy to the Secretary of State in such form and manner as may be prescribed.</p></content></level></subsection></section><section><num>12N</num><heading>Alterations</heading><subsection><num>(1)</num><content><p>This section applies in relation to an operative spatial development strategy.</p></content></subsection><subsection><num>(2)</num><content><p>A strategic planning authority may at any time prepare alterations of its strategy.</p></content></subsection><subsection><num>(3)</num><content><p>The Secretary of State may direct a strategic planning authority to alter its spatial development strategy as specified in the direction.</p></content></subsection><subsection><num>(4)</num><content><p>The Secretary of State may by regulations make provision as to when, or the circumstances in which, a strategic planning authority must alter its spatial development strategy.</p></content></subsection><subsection><num>(5)</num><content><p>A spatial development strategy as altered must still conform to section <ref href="#d25e12513">12D</ref>.</p></content></subsection><subsection><num>(6)</num><content><p>Sections <ref href="#d25e12908">12G</ref> to <ref href="#d25e13543">12L</ref> apply in relation to the preparation and adoption of an alteration of a spatial development strategy as they apply in relation to the preparation and adoption of a spatial development strategy.</p></content></subsection></section><section eId="d25e13787"><num>12O</num><heading>Replacement</heading><subsection><num>(1)</num><content><p>This section applies in relation to an operative spatial development strategy.</p></content></subsection><subsection><num>(2)</num><content><p>A strategic planning authority may at any time prepare a new spatial development strategy as a replacement.</p></content></subsection><subsection><num>(3)</num><content><p>The Secretary of State may direct a strategic planning authority to replace its spatial development strategy.</p></content></subsection><subsection><num>(4)</num><content><p>The Secretary of State may by regulations make provision as to when, or the circumstances in which, a strategic planning authority must replace its spatial development strategy.</p></content></subsection><subsection><num>(5)</num><content><p>A strategic planning authority’s operative spatial development strategy is revoked upon a new spatial development strategy being adopted by the authority in accordance with this Part.</p></content></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Secretary of State’s intervention powers in relation to spatial development strategy</heading><section eId="d25e13827"><num>12P</num><heading>Powers where strategic planning authority is failing etc</heading><subsection><num>(1)</num><intro><p>This section applies if the Secretary of State considers that—</p></intro><level class="para1"><num>(a)</num><content><p>a strategic planning authority is failing to do anything it is necessary or expedient for it to do in connection with the preparation, adoption, alteration, replacement or review of a spatial development strategy,</p></content></level><level class="para1"><num>(b)</num><intro><p>a spatial development strategy is, is going to be or may be—</p></intro><level class="para2"><num>(i)</num><content><p>inconsistent with current national policies, or</p></content></level><level class="para2"><num>(ii)</num><content><p>detrimental to the interests of an area outside the strategy area, or</p></content></level></level><level class="para1"><num>(c)</num><intro><p>a proposed alteration of a spatial development strategy will, or may, result in the strategy becoming—</p></intro><level class="para2"><num>(i)</num><content><p>inconsistent with current national policies, or</p></content></level><level class="para2"><num>(ii)</num><content><p>detrimental to the interests of an area outside the strategy area.</p></content></level></level></subsection><subsection eId="d25e13879"><num>(2)</num><intro><p>The Secretary of State may—</p></intro><level class="para1" eId="d25e13885"><num>(a)</num><content><p>if the strategy is not operative, take over preparation of the strategy from the strategic planning authority;</p></content></level><level class="para1" eId="d25e13891"><num>(b)</num><content><p>if the strategy is operative, alter the strategy;</p></content></level><level class="para1" eId="d25e13897"><num>(c)</num><content><p>give a direction to the strategic planning authority in relation to the preparation, adoption, withdrawal, alteration, replacement, review or revocation of the strategy.</p></content></level></subsection><subsection><num>(3)</num><intro><p>The power of direction under subsection <ref href="#d25e13879">(2)</ref><ref href="#d25e13897">(c)</ref> includes power to direct a strategic planning authority—</p></intro><level class="para1"><num>(a)</num><content><p>to modify or withdraw its draft spatial development strategy;</p></content></level><level class="para1"><num>(b)</num><content><p>to alter or revoke its (operative) spatial development strategy.</p></content></level></subsection><subsection><num>(4)</num><content><p>Subsections <ref href="#d25e13943">(5)</ref> to <ref href="#d25e14112">(12)</ref> apply if preparation of a spatial development strategy is taken over under subsection <ref href="#d25e13879">(2)</ref><ref href="#d25e13885">(a)</ref>.</p></content></subsection><subsection eId="d25e13943"><num>(5)</num><intro><p>The Secretary of State must publish a document setting out—</p></intro><level class="para1"><num>(a)</num><content><p>the timetable for preparing the strategy, and</p></content></level><level class="para1"><num>(b)</num><content><p>details of any departures from any existing spatial development strategy timetable.</p></content></level></subsection><subsection eId="d25e13961"><num>(6)</num><intro><p>The Secretary of State must (or, if an examination of the draft strategy has already been held, may)—</p></intro><level class="para1" eId="d25e13967"><num>(a)</num><content><p>make arrangements for an examination of the draft strategy to be held in public, or</p></content></level><level class="para1"><num>(b)</num><content><p>direct the strategic planning authority to make arrangements for an examination of the draft strategy under section <ref href="#d25e13203">12I</ref>.</p></content></level></subsection><subsection><num>(7)</num><content><p>Subsections <ref href="#d25e13213">(2)</ref> to <ref href="#d25e13261">(8)</ref> of section <ref href="#d25e13203">12I</ref> apply in relation to an examination held under subsection <ref href="#d25e13961">(6)</ref><ref href="#d25e13967">(a)</ref>, reading references to the strategic planning authority as references to the Secretary of State.</p></content></subsection><subsection><num>(8)</num><intro><p>The Secretary of State must either—</p></intro><level class="para1"><num>(a)</num><content><p>publish the examiner’s report, or</p></content></level><level class="para1"><num>(b)</num><content><p>direct the strategic planning authority to publish it.</p></content></level></subsection><subsection eId="d25e14020"><num>(9)</num><intro><p>The Secretary of State may then—</p></intro><level class="para1" eId="d25e14026"><num>(a)</num><content><p>approve the strategy,</p></content></level><level class="para1" eId="d25e14032"><num>(b)</num><content><p>modify the strategy and approve it with the modifications,</p></content></level><level class="para1" eId="d25e14038"><num>(c)</num><intro><p>direct the strategic planning authority to consider adopting—</p></intro><level class="para2"><num>(i)</num><content><p>the strategy, or</p></content></level><level class="para2"><num>(ii)</num><content><p>the strategy as modified by the Secretary of State, or</p></content></level></level><level class="para1"><num>(d)</num><content><p>reject the strategy.</p></content></level></subsection><subsection><num>(10)</num><content><p>If the Secretary of State gives a direction under subsection <ref href="#d25e14020">(9)</ref><ref href="#d25e14038">(c)</ref>, section <ref href="#d25e13543">12L</ref> applies with the omission of subsections <ref href="#d25e13547">(1)</ref> and <ref href="#d25e13559">(2)</ref> of that section (and as if the reference in subsection <ref href="#d25e13593">(3)</ref> of that section to the conditions in subsection (2) being satisfied were a reference to the direction being received).</p></content></subsection><subsection><num>(11)</num><intro><p>If the Secretary of State approves a spatial development strategy under subsection <ref href="#d25e14020">(9)</ref><ref href="#d25e14026">(a)</ref> or <ref href="#d25e14032">(b)</ref>, the Secretary of State must either—</p></intro><level class="para1"><num>(a)</num><content><p>publish the strategy, or</p></content></level><level class="para1"><num>(b)</num><content><p>direct the strategic planning authority to publish it.</p></content></level></subsection><subsection eId="d25e14112"><num>(12)</num><content><p>The spatial development strategy becomes operative when it is published.</p></content></subsection><subsection><num>(13)</num><content><p>Subsections <ref href="#d25e13943">(5)</ref> to <ref href="#d25e14112">(12)</ref> (and the provisions applied by them) apply in relation to an alteration of a strategy under subsection <ref href="#d25e13879">(2)</ref><ref href="#d25e13891">(b)</ref> as they apply to a strategy prepared under subsection <ref href="#d25e13879">(2)</ref><ref href="#d25e13885">(a)</ref>.</p></content></subsection><subsection><num>(14)</num><intro><p>The Secretary of State must give reasons for—</p></intro><level class="para1"><num>(a)</num><content><p>whatever the Secretary of State does under subsection <ref href="#d25e13879">(2)</ref>;</p></content></level><level class="para1"><num>(b)</num><content><p>the decision made under subsection <ref href="#d25e14020">(9)</ref>.</p></content></level></subsection><subsection eId="d25e14164"><num>(15)</num><intro><p>In the exercise of any function under this section the Secretary of State—</p></intro><level class="para1"><num>(a)</num><content><p>may take account of any matter that the Secretary of State considers to be relevant (regardless of whether the matter was taken account of by the strategic planning authority), and</p></content></level><level class="para1" eId="d25e14176"><num>(b)</num><intro><p>must have regard to—</p></intro><level class="para2"><num>(i)</num><content><p>the spatial development strategy timetable, and</p></content></level><level class="para2" eId="d25e14188"><num>(ii)</num><content><p>the local plan timetable prepared by a local planning authority for an area that is wholly or partly within the strategy area.</p></content></level></level></subsection><subsection><num>(16)</num><content><p>In subsection <ref href="#d25e14164">(15)</ref><ref href="#d25e14176">(b)</ref><ref href="#d25e14188">(ii)</ref> “<term refersTo="#term-local-plan-timetable">local plan timetable</term>” is to be construed in accordance with section 15B.</p></content></subsection></section><section eId="d25e14213"><num>12Q</num><heading>Power to approve strategy where adoption resolution not passed</heading><subsection><num>(1)</num><content><p>This section applies in the event of a vote by a strategic planning authority against passing a resolution to adopt a spatial development strategy.</p></content></subsection><subsection eId="d25e14223"><num>(2)</num><intro><p>The Secretary of State may, if the Secretary of State considers it appropriate—</p></intro><level class="para1" eId="d25e14229"><num>(a)</num><content><p>approve the strategy, or</p></content></level><level class="para1" eId="d25e14235"><num>(b)</num><content><p>modify the strategy and approve it with the modifications.</p></content></level></subsection><subsection eId="d25e14241"><num>(3)</num><intro><p>The powers in subsection <ref href="#d25e14223">(2)</ref> are exercisable—</p></intro><level class="para1"><num>(a)</num><content><p>on the Secretary of State’s own initiative, or</p></content></level><level class="para1" eId="d25e14256"><num>(b)</num><content><p>in the case of a strategy prepared by a mayoral combined authority or a mayoral combined county authority, if the mayor of the authority requests the Secretary of State to exercise those powers.</p></content></level></subsection><subsection><num>(4)</num><content><p>The function of making a request as mentioned in subsection <ref href="#d25e14241">(3)</ref><ref href="#d25e14256">(b)</ref> is exercisable only by the mayor (and may not be the subject of arrangements under section 107D(3) of the Local Democracy, Economic Development and Construction Act 2009 or section 30(3) of the Levelling-up and Regeneration Act 2023).</p></content></subsection><subsection><num>(5)</num><intro><p>The Secretary of State must give reasons to the strategic planning authority or (as the case may be) the mayor of the strategic planning authority—</p></intro><level class="para1"><num>(a)</num><content><p>for anything the Secretary of State does under subsection <ref href="#d25e14223">(2)</ref>, or</p></content></level><level class="para1"><num>(b)</num><content><p>if the Secretary of State declines to approve the strategy, for that decision.</p></content></level></subsection><subsection><num>(6)</num><intro><p>If the Secretary of State approves a spatial development strategy under subsection <ref href="#d25e14223">(2)</ref> the Secretary of State must either—</p></intro><level class="para1"><num>(a)</num><content><p>publish the strategy, or</p></content></level><level class="para1"><num>(b)</num><content><p>direct the strategic planning authority to publish it.</p></content></level></subsection><subsection><num>(7)</num><content><p>The spatial development strategy becomes operative when it is published.</p></content></subsection><subsection><num>(8)</num><content><p>In making a decision under this section the Secretary of State may take account of any matter that the Secretary of State considers to be relevant (regardless of whether the matter was taken account of by the strategic planning authority).</p></content></subsection></section><section><num>12R</num><heading>Liability for Secretary of State’s costs of intervention</heading><subsection eId="d25e14334"><num>(1)</num><content><p>The Secretary of State may require a strategic planning authority to reimburse the Secretary of State for any expenditure incurred by the Secretary of State in, or in connection with, exercising a function under section <ref href="#d25e13827">12P</ref> or <ref href="#d25e14213">12Q</ref> in relation to the authority’s spatial development strategy.</p></content></subsection><subsection><num>(2)</num><content><p>Where the strategic planning authority is a strategic planning board, subsection <ref href="#d25e14334">(1)</ref> is to be read as giving power for the Secretary of State to require reimbursement of such expenditure from the constituent authorities of the board in such proportions as the Secretary of State considers just and reasonable.</p></content></subsection></section><section><num>12S</num><heading>Temporary direction pending possible use of intervention powers</heading><subsection><num>(1)</num><intro><p>If the Secretary of State is considering whether to take action under section <ref href="#d25e13827">12P</ref> in relation to a spatial development strategy, the Secretary of State may direct the strategic planning authority responsible for the strategy not to take any step, or not to take a step specified in the direction, in connection with the strategy—</p></intro><level class="para1"><num>(a)</num><content><p>until a time or event (if any) specified in the direction, or</p></content></level><level class="para1"><num>(b)</num><content><p>until the direction is revoked.</p></content></level></subsection><subsection><num>(2)</num><content><p>A spatial development strategy to which such a direction relates is not operative while the direction is in force.</p></content></subsection><subsection><num>(3)</num><intro><p>A direction given under this section in relation to a strategy ceases to have effect if the Secretary of State—</p></intro><level class="para1"><num>(a)</num><content><p>gives a direction under section <ref href="#d25e13827">12P</ref><ref href="#d25e13879">(2)</ref><ref href="#d25e13897">(c)</ref> or <ref href="#d25e14020">(9)</ref><ref href="#d25e14038">(c)</ref> in relation to the strategy, or</p></content></level><level class="para1"><num>(b)</num><content><p>approves the strategy under section <ref href="#d25e13827">12P</ref><ref href="#d25e14020">(9)</ref><ref href="#d25e14026">(a)</ref> or <ref href="#d25e14032">(b)</ref>.</p></content></level></subsection></section></hcontainer><hcontainer name="crossheading" ukl:Name="Pblock"><heading>Supplementary</heading><section><num>12T</num><heading>Supplementary etc provision in connection with regulations about strategic planning boards</heading><subsection eId="d25e14439"><num>(1)</num><content><p>The Secretary of State may by regulations make supplementary, incidental, transitional, transitory or saving provision for the purposes of strategic planning board regulations.</p></content></subsection><subsection><num>(2)</num><content><p>Where, immediately before strategic planning board regulations establishing a strategic planning board come into force, a spatial development strategy is operative in relation to the area of a principal authority that is to be a constituent authority of the board, regulations under subsection <ref href="#d25e14439">(1)</ref> may include provision for that strategy to be treated, for the purposes of this Part or another enactment, as the operative spatial development strategy of the strategic planning board.</p></content></subsection><subsection><num>(3)</num><content><p>Where a strategic planning board has an operative spatial development strategy immediately before strategic planning board regulations that revoke the regulations that established that board come into force, regulations under subsection <ref href="#d25e14439">(1)</ref> may include provision for that strategy to be treated, for the purposes of this Part or another enactment, as the operative spatial development strategy of a prescribed principal authority or authorities.</p></content></subsection><subsection><num>(4)</num><content><p>In this section “<term refersTo="#term-strategic-planning-board-regulations">strategic planning board regulations</term>” means regulations under section <ref href="#d25e12263">12B</ref><ref href="#d25e12273">(2)</ref>.</p></content></subsection></section><section><num>12U</num><heading>Regulations</heading><subsection><num>(1)</num><content><p>The Secretary of State may by regulations make provision in connection with the exercise by any person of a function conferred by or under this Part.</p></content></subsection><subsection><num>(2)</num><intro><p>The regulations may (among other things) make provision as to—</p></intro><level class="para1"><num>(a)</num><content><p>the procedure to be followed in connection with the preparation, adoption, publication, review, withdrawal, alteration or replacement of a spatial development strategy or in connection with a review under section <ref href="#d25e13647">12M</ref><ref href="#d25e13657">(2)</ref>;</p></content></level><level class="para1"><num>(b)</num><content><p>the remuneration and allowances payable to a person appointed to conduct a public examination (under section <ref href="#d25e13203">12I</ref> or as mentioned in section <ref href="#d25e13827">12P</ref><ref href="#d25e13961">(6)</ref><ref href="#d25e13967">(a)</ref>);</p></content></level><level class="para1"><num>(c)</num><content><p>the supply of information or documents to the Secretary of State by a strategic planning authority for the purposes of any decision that the Secretary of State may make under this Part;</p></content></level><level class="para1"><num>(d)</num><content><p>the determination of the time by or at which anything must be done for the purposes of this Part;</p></content></level><level class="para1"><num>(e)</num><content><p>the manner of publication of any document required to be published under this Part;</p></content></level><level class="para1"><num>(f)</num><content><p>the making of reasonable charges for the provision of copies of documents required by or under this Part.</p></content></level></subsection><subsection><num>(3)</num><content><p>Regulations under this Part may make different provision for different areas.</p></content></subsection></section><section><num>12V</num><heading>Directions</heading><subsection><num>(1)</num><intro><p>A direction given to a strategic planning authority under this Part may—</p></intro><level class="para1"><num>(a)</num><content><p>require the authority to do specified things by specified dates;</p></content></level><level class="para1"><num>(b)</num><content><p>require the authority to keep the Secretary of State informed at specified intervals of the progress being made towards doing what the authority is directed to do.</p></content></level></subsection><subsection><num>(2)</num><content><p>A direction under this Part must be given in writing.</p></content></subsection><subsection><num>(3)</num><content><p>A direction under this Part may be varied or revoked by notice in writing to the strategic planning authority to which it was given.</p></content></subsection><subsection><num>(4)</num><content><p>A direction under this Part must be published.</p></content></subsection></section><section eId="d25e14599"><num>12W</num><heading>Meaning of “spatial development strategy” etc</heading><subsection eId="d25e14603"><num>(1)</num><intro><p>In this Part “<term refersTo="#term-spatial-development-strategy">spatial development strategy</term>” means, as the context requires—</p></intro><level class="para1"><num>(a)</num><content><p>a strategy adopted by a strategic planning authority under section <ref href="#d25e13543">12L</ref>,</p></content></level><level class="para1" eId="d25e14621"><num>(b)</num><content><p>a strategy approved by the Secretary of State under section <ref href="#d25e13827">12P</ref><ref href="#d25e14020">(9)</ref><ref href="#d25e14026">(a)</ref> or <ref href="#d25e14032">(b)</ref> or <ref href="#d25e14213">12Q</ref><ref href="#d25e14223">(2)</ref><ref href="#d25e14229">(a)</ref> or <ref href="#d25e14235">(b)</ref>, or</p></content></level><level class="para1"><num>(c)</num><content><p>a strategy in preparation by a strategic planning authority in accordance with this Part.</p></content></level></subsection><subsection><num>(2)</num><intro><p>In sections <ref href="#d25e12263">12B</ref><ref href="#d25e12288">(4)</ref><ref href="#d25e12309">(c)</ref>, <ref href="#d25e12324">12C</ref><ref href="#d25e12440">(6)</ref><ref href="#d25e12452">(b)</ref><ref href="#d25e12476">(iv)</ref>, <ref href="#d25e12980">12H</ref><ref href="#d25e13011">(2)</ref><ref href="#d25e13052">(f)</ref> and <ref href="#d25e13647">12M</ref><ref href="#d25e13663">(3)</ref><ref href="#d25e13678">(b)</ref>—</p></intro><level class="para1"><num>(a)</num><intro><p>“<term refersTo="#term-spatial-development-strategy">spatial development strategy</term>” includes—</p></intro><level class="para2"><num>(i)</num><content><p>the spatial development strategy for London,</p></content></level><level class="para2"><num>(ii)</num><content><p>a spatial development strategy adopted by a combined authority in accordance with regulations under section 105A of the Local Democracy, Economic Development and Construction Act 2009, and</p></content></level><level class="para2"><num>(iii)</num><content><p>a spatial development strategy adopted by a combined county authority in accordance with regulations under section 19 of the Levelling-up and Regeneration Act 2023; and</p></content></level></level><level class="para1"><num>(b)</num><content><p>“person responsible for preparing a spatial development strategy” is to be read accordingly.</p></content></level></subsection><subsection><num>(3)</num><content><p>For the purposes of sections <ref href="#d25e13647">12M</ref> to <ref href="#d25e13787">12O</ref>, a spatial development strategy approved by the Secretary of State under a power specified in subsection <ref href="#d25e14603">(1)</ref><ref href="#d25e14621">(b)</ref> is to be regarded as the spatial development strategy of the strategic planning authority in relation to which the power is exercised.</p></content></subsection></section><section><num>12X</num><heading>Interpretation</heading><subsection><num>(1)</num><intro><p>In this Part—</p></intro><hcontainer name="definition"><content><p>“<term refersTo="#term-combined-authority">combined authority</term>” means a combined authority established under section 103(1) of the Local Democracy, Economic Development and Construction Act 2009;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-combined-county-authority">combined county authority</term>” means a combined county authority established under section 9(1) of the Levelling-up and Regeneration Act 2023;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-constituent-authority">constituent authority</term>”, in relation to a strategic planning board, is to be construed in accordance with section <ref href="#d25e12263">12B</ref>;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-examination">examination</term>” means an examination in public of a draft spatial development strategy as set out in section <ref href="#d25e13203">12I</ref>, and “<term refersTo="#term-examiner">examiner</term>” is to be construed accordingly;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-mayoral-combined-authority">mayoral combined authority</term>” has the meaning given by section 107A(8) of the Local Democracy, Economic Development and Construction Act 2009;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-mayoral-combined-county-authority">mayoral combined county authority</term>” has the meaning given by section 27(8) of the Levelling-up and Regeneration Act 2023;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-national-development-management-policy">national development management policy</term>” must be construed in accordance with section 38ZA;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-principal-authority">principal authority</term>” has the meaning given by section <ref href="#d25e12106">12A</ref><ref href="#d25e12242">(7)</ref>;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-spatial-development-strategy-for-london">spatial development strategy for London</term>” means the strategy adopted by the Mayor of London under Part 8 of the Greater London Authority Act 1999;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-spatial-development-strategy-timetable">spatial development strategy timetable</term>” has the meaning given by section <ref href="#d25e12728">12E</ref>;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-strategic-planning-authority">strategic planning authority</term>” has the meaning given by section <ref href="#d25e12106">12A</ref>;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-strategic-planning-board">strategic planning board</term>” has the meaning given by section <ref href="#d25e12263">12B</ref>;</p></content></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-strategy-area">strategy area</term>” has the meaning given by section <ref href="#d25e12106">12A</ref><ref href="#d25e12179">(4)</ref>;</p></content></hcontainer><hcontainer name="definition"><intro><p>“<term refersTo="#term-unitary-authority">unitary authority</term>” means—</p></intro><level class="para1"><num>(a)</num><content><p>a county council for an area that does not include the areas of district councils, or</p></content></level><level class="para1"><num>(b)</num><content><p>a district council for an area that does not form part of the area of a county council;</p></content></level></hcontainer><hcontainer name="definition"><content><p>“<term refersTo="#term-upper-tier-county-council">upper-tier county council</term>” means a county council for an area that includes the areas of district councils.</p></content></hcontainer></subsection><subsection><num>(2)</num><intro><p>In this Part—</p></intro><level class="para1"><num>(a)</num><content><p>“<term refersTo="#term-local-planning-authority">local planning authority</term>” has the same meaning as in Part 2 (see section 15LF);</p></content></level><level class="para1"><num>(b)</num><content><p>references to a local planning authority’s area are to the area for which they are the local planning authority in accordance with that Part.</p></content></level></subsection></section></hcontainer></part></quotedStructure></mod></p></content></subsection><subsection eId="section-58-2"><num>(2)</num><intro><p>In section 334 of the Greater London Authority Act 1999—</p></intro><level class="para1" eId="section-58-2-a"><num>(a)</num><content><p>in subsection (2A) (as inserted by section 95(2) of the Levelling-up and Regeneration Act 2023) omit paragraph (b) (and the “and” at the end of paragraph (a));</p></content></level><level class="para1" eId="section-58-2-b"><num>(b)</num><content><p>in subsection (2D) (also inserted by section 95(2) of that Act) omit paragraph (b) (and the “but” at the end of paragraph (a)).</p></content></level></subsection><subsection eId="section-58-3"><num>(3)</num><content><p><ref href="#schedule-2">Schedule 2</ref> makes minor and consequential amendments in connection with subsection <ref href="#section-58-1">(1)</ref>.</p></content></subsection><subsection eId="section-58-4"><num>(4)</num><content><p>The Secretary of State may by regulations by statutory instrument make provision that is consequential on subsection <ref href="#section-58-1">(1)</ref>.</p></content></subsection><subsection eId="section-58-5"><num>(5)</num><content><p>Regulations under subsection <ref href="#section-58-4">(4)</ref> may amend an Act passed before the end of the session of Parliament in which this Act is passed.</p></content></subsection><subsection eId="section-58-6"><num>(6)</num><content><p>Regulations under subsection <ref href="#section-58-4">(4)</ref> may include incidental, supplemental, transitional and saving provision.</p></content></subsection><subsection eId="section-58-7"><num>(7)</num><content><p>A statutory instrument containing (whether alone or with other provision) regulations made in reliance on subsection <ref href="#section-58-5">(5)</ref> may not be made unless a draft of the statutory instrument containing them has been laid before, and approved by a resolution of, each House of Parliament.</p></content></subsection><subsection eId="section-58-8"><num>(8)</num><content><p>Any other statutory instrument containing regulations under subsection <ref href="#section-58-4">(4)</ref> is subject to annulment in pursuance of a resolution of either House of Parliament.</p></content></subsection></section></chapter>
Part 3 — Development and nature recovery — Overview
Part 3 — Development and nature recovery — Environmental delivery plans: content
Part 3 — Development and nature recovery — Environmental delivery plans: procedure
Part 3 — Development and nature recovery — Environmental delivery plans: reporting, amendment, revocation and challenge
Part 3 — Development and nature recovery — The nature restoration levy
Part 3 — Development and nature recovery — Powers and duties: Natural England etc
Part 3 — Development and nature recovery — Power to designate another person to prepare EDPs etc
Part 3 — Development and nature recovery — Supplementary
Part 4 — Development corporations
Part 5 — Compulsory purchase
Part 6 — Miscellaneous and general provision